KR100693807B1 - Trench drainage construction method to maintain proper water pressure - Google Patents

Trench drainage construction method to maintain proper water pressure Download PDF

Info

Publication number
KR100693807B1
KR100693807B1 KR1020060045501A KR20060045501A KR100693807B1 KR 100693807 B1 KR100693807 B1 KR 100693807B1 KR 1020060045501 A KR1020060045501 A KR 1020060045501A KR 20060045501 A KR20060045501 A KR 20060045501A KR 100693807 B1 KR100693807 B1 KR 100693807B1
Authority
KR
South Korea
Prior art keywords
drainage
pipe
groundwater
construction method
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
KR1020060045501A
Other languages
Korean (ko)
Inventor
박옥교
김형태
최재성
Original Assignee
박옥교
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 박옥교 filed Critical 박옥교
Priority to KR1020060045501A priority Critical patent/KR100693807B1/en
Application granted granted Critical
Publication of KR100693807B1 publication Critical patent/KR100693807B1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • E02D31/025—Draining membranes, sheets or fabric specially adapted therefor, e.g. with dimples
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02B—HYDRAULIC ENGINEERING
    • E02B11/00—Drainage of soil, e.g. for agricultural purposes
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02B—HYDRAULIC ENGINEERING
    • E02B13/00—Irrigation ditches, i.e. gravity flow, open channel water distribution systems
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/10—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
    • E02D31/12—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure against upward hydraulic pressure

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Agronomy & Crop Science (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

본 발명은 건축물 하부 및 주위의 지하수를 배수하기 위한 배수로 시공방법에 관한 것으로서, 보다 상세하게는 건축물의 하부 혹은 측면에서 침투하는 지하수를 집수정 등을 통해 적절히 배출시키되, 과도한 지하수 배출로 인한 문제를 방지하기 위해 건축물의 자중과 건축물 바닥면에서의 지하수의 작용압력에 의한 힘이 균형을 이룰 수 있는 배수로를 시공하기 위한 방법에 관한 것이다. 본 발명의 구성은, 지하 건축 구조물의 바닥 하부에서 발생되는 지하수의 수두차에 의한 높은 상향수압을 방지하고 적정한 수압을 유지시키기 위한 배수로 시공방법에 있어서, 굴토 후의 상면 자체 또는 잔토층, 자갈층, 버럭층 등을 이용하여 굴토마감면이 수평을 이루도록 정지하는 수평정지 작업공정, 상기 굴토마감면의 소정 위치부터 집수정이 설치되는 위치까지 소정 너비와 깊이로 파내는 배출경로 형성공정, 상기 굴토마감면의 일측에 집수정을 설치하는 집수정 설치공정, 상기 배출경로 내에 상기 집수정과 연결되는 배출관을 배치하고 되메움 하는 배출관 설치공정, 상기 수평정지 작업공정을 거친 상기 굴토마감면에 배수로 기능을 위한 배수재를 설치하는 배수재 설치공정, 상기 굴토마감면 위에 몰탈을 소정 높이로 타설하여 버림콘크리트층을 형성하는 버림콘크리트 타설공정 및 상기 배수재 및 상기 배출관과 연결되어 지하수를 배출하기 위한 배수로가 상기 굴토마감면으로부터 소정 높이만큼 상승 및 하강하도록 감압구조체를 연결하는 감압 작업공정을 포함하여 구성되는 것을 특징으로 한다.The present invention relates to a drainage construction method for draining the groundwater around the lower part of the building and, more particularly, the groundwater penetrating from the lower part or side of the building is appropriately discharged through a collecting well, etc. The present invention relates to a method for constructing a drainage path where a balance between self-weight of a building and an action pressure of groundwater on the floor of a building can be balanced. The construction of the present invention, in the drainage construction method to prevent the high water pressure caused by the water head difference of the groundwater generated in the bottom of the underground building structure and to maintain the proper water pressure, the top surface itself after the excavation or the earth soil layer, gravel layer, the bag Horizontal stop working process to stop the gulting finish surface horizontally by using a layer or the like, a discharge path forming step of digging with a predetermined width and depth from the predetermined position of the gulting finish surface to the installation site of the gulting finish surface, the A drainage installation process for installing a sump well on one side, a drainage pipe installation process for placing and backfilling a discharge pipe connected to the sump well in the discharge path, and drainage for drainage function on the gulto finish surface after the horizontal stop work process Drainage installation process for installing the cast concrete, the mortar to the predetermined height on the gulto finish surface And a decompression work process for connecting the decompression structure so as to raise and lower the drain concrete path connected with the drainage material and the discharge pipe for discharging groundwater connected to the drain pipe and the discharge surface by a predetermined height. It is done.

본 발명은 지하수의 상향수압을 방지하기 위한 배수로를 시공함에 있어, 배수로의 일정 위치에 일정 수두차를 갖도록 배수로를 상향 및 하향으로 올라갔다 내려가도록 구성함으로써, 일정 구간마다 고르게 압력이 분포되도록 하여 건물 바닥면에 미치는 상향수압을 일정하게 유지, 조절하는 동시에, 과도한 지하수 배출을 방지하는 효과를 갖는다.The present invention in the construction of the drainage to prevent the up-water pressure of the groundwater, by configuring the drainage up and down to go up and down to have a certain head difference at a certain position of the drainage, so that the pressure is distributed evenly in a certain section While maintaining and regulating the constant upstream pressure on the bottom surface, it has the effect of preventing excessive groundwater discharge.

Description

적정수압 유지를 위한 트렌치형 배수로 시공방법 {The construction method of basement drainage}Construction method of trench drainage to maintain proper water pressure {The construction method of basement drainage}

도 1은 종래의 배수로 시공 단면을 나타내는 도면이다.1 is a view showing a cross section of a conventional drainage construction.

도 2는 종래의 배수로 시공 단면을 확대하여 나타내는 도면이다.2 is an enlarged view showing a cross section of a conventional drainage construction.

도 3은 본 발명의 배수로 시공 방법을 나타내기 위한 도면이다.3 is a view for showing a drainage construction method of the present invention.

도 4는 본 발명의 배수로 시공 방법에 따른 배수구조를 나타내는 도면이다.4 is a view showing a drainage structure according to the drainage construction method of the present invention.

도 5는 본 발명의 배수로 시공 방법에 따른 다른 배수구조를 나타내는 도면이다.5 is a view showing another drainage structure according to the drainage construction method of the present invention.

도 6은 본 발명의 배수로 시공 방법에 따른 또 다른 배수구조를 나타내는 도면이다.6 is a view showing another drainage structure according to the drainage construction method of the present invention.

도 7은 사이펀 효과를 방지하기 위한 본 발명의 배수로 시공 방법에 따른 배수구조의 다양한 형태를 나타내는 도면이다.7 is a view showing various forms of the drainage structure according to the drainage construction method of the present invention for preventing the siphon effect.

< 도면의 주요 부분에 대한 부호의 설명 ><Description of Symbols for Main Parts of Drawings>

1: 굴토마감면 10 : 배수재1: gulto finish noodle 10: drainage

20 : 버림콘크리트 30 : 집수정20: discarded concrete 30: sump

40 : 바닥구체콘크리트 42 : 벽체40: floor concrete concrete 42: wall

50 : 관 52 : 상방연장로50: tube 52: upward extension road

54 : 하방연장로 56 : 상단수용공간54: Downward extension road 56: Upper accommodation space

58 : 홀58: hall

본 발명은 건축물 하부 및 주위의 지하수를 배수하기 위한 배수로 시공방법에 관한 것으로서, 보다 상세하게는 건축물의 하부 혹은 측면에서 침투하는 지하수를 집수정 등을 통해 적절히 배출시키되, 과도한 지하수 배출로 인한 문제를 방지하기 위해 건축물의 자중과 건축물 바닥면에서의 지하수의 작용압력에 의한 힘이 균형을 이룰 수 있는 배수로를 시공하기 위한 방법에 관한 것이다.The present invention relates to a drainage construction method for draining the groundwater around the lower part of the building and, more particularly, the groundwater penetrating from the lower part or side of the building is appropriately discharged through a collecting well, etc. The present invention relates to a method for constructing a drainage path where a balance between self-weight of a building and an action pressure of groundwater on the floor of a building can be balanced.

일반적으로 건축물 주변 및 하부에 많은 양의 지하수가 존재하게 되면 건축물은 지하수로 인해 일종의 부력을 전달받아 건축물이 떠오르는 힘을 받으며 파괴되어 안전을 위협하게 된다. 반대로, 건축물 주변 및 하부에 존재하는 지하수를 강제 배수에 의해 많은 양을 급격하게 제거해 버리면 지하수가 존재하던 공간이 갑자기 비게 되면서 지반이 침하하게 되고, 이로 인해 건축물이 내려앉게 되어 그 안전을 위협하게 된다.In general, when a large amount of groundwater exists around and underneath the building, the building receives a buoyancy force due to the groundwater, which causes the building to rise and is destroyed, threatening safety. On the contrary, if the groundwater existing around and underneath the building is rapidly removed by forced drainage, the ground where the groundwater existed suddenly becomes empty and the ground sinks, which causes the building to fall and threaten its safety. .

건물의 기초 바닥에 작용하는 상향수압 처리를 위해서 사하중과 영구(부력)앙카를 통한 공법이 많이 사용되나, 이는 건물의 내구성 및 안전성과 관련하여 부 력앙카의 인장력에 대한 지속적인 신뢰성이 보장되지 않는다는 한계가 있다. 이를 개선한 방법이 기초바닥 아래에 인위적인 집수정과 배수층을 형성하여 부지 내로 유입되는 지하수가 배수로를 따라 집수정으로 모이면 정기적으로 이를 펌핑하여 배출시킴으로써 기초바닥 콘크리트에 양압이 작용하지 않도록 하는 기초바닥 영구 배수시스템 방법이다. 이는 종래의 방법에 비해 높은 지하수위와 비례하여 작용하는 상향수압 문제를 보다 안정적이고, 영구적으로 해결하게 하는 장점이 있다.Many methods are used through dead weight and permanent (buoyancy) anchors for the up-water pressure treatment acting on the foundation floor of the building, but this is the limitation that the continuous reliability of the buoyancy anchor's tensile force is not guaranteed in relation to the durability and safety of the building. There is. An improved method is to form an artificial catchment and drainage layer under the foundation floor so that the groundwater flowing into the site is collected in the catchment along the drainage path and pumped and discharged regularly so that the foundation floor concrete does not act as a positive pressure. Permanent drainage system method. This has the advantage of more stable and permanently solve the problem of up-water pressure in proportion to the high groundwater level compared to the conventional method.

이러한 종래의 일반적인 배수 시스템이 도 1 및 도 2에 도시되어 있다. 도 1 및 도 2를 참조하면, 굴토마감면(101) 위에 소정 높이를 갖는 배수재(또는 거푸집)(110)을 가로 및/또는 세로로 서로 소정의 간격을 이루면서 수평되게 연결하여 배치하되 상기 암반층의 굴토마감면(101)과 상기 배수재(110) 사이에 부직포(미도시)를 위치시키면서 일측으로 모여진 배수재(110)의 출구가 상기 집수정(130)과 연결되도록 설치하고 그 위에 몰탈을 소정 높이로 타설하여 버림콘크리트(120)를 형성하는 방식이다.This conventional general drainage system is shown in FIGS. 1 and 2. Referring to FIGS. 1 and 2, the drainage material (or formwork) 110 having a predetermined height is horizontally and / or vertically connected to each other at a predetermined interval and disposed horizontally on the gulto finish surface 101, but the rock layer While placing the nonwoven fabric (not shown) between the gulto finish surface 101 and the drainage 110 is installed so that the outlet of the drainage 110 gathered to one side is connected to the sump 130 and the mortar on a predetermined height It is a method of forming cast concrete 120 by pouring.

이러한 종래의 방식은 집수정(130)을 통해 강제배수시키거나, 또는 별도의 배출관(미도시)과 직접 연결되며 외부의 주배수로(미도시)와 연통되어, 상향 수압에 의해 자연배수시킬 수 있게 된다. 그런데 이러한 배수 방법은 과도한 배출로 인한 지반 침하를 방지할 수 없다는 문제점이 있다.This conventional method is forced to drain through the sump 130, or directly connected to a separate discharge pipe (not shown) and in communication with the external main drain (not shown), so that it can be naturally drained by the upward pressure do. However, this drainage method has a problem that can not prevent ground subsidence due to excessive discharge.

따라서 건축물의 상향 수압 방지를 위한 지하수 배출을 원활히 하는 동시에 과도한 배출을 방지하여, 설계안정수위, 즉 건축물의 자중과 건축물 하부에서의 지하수의 작용압력에 의한 힘이 균형을 이루는 이론적인 지하수 안정 수위로 유지될 수 있도록 하기 위해, 건축물 하부 저면으로 침투되는 지하수를 설계안정수위가 될 때까지 중간중간 다양한 방법을 통하여 집수하고, 설계안정수위를 넘는 경우에만 배출할 수 있도록 하는 배수시스템을 구비할 필요가 있게 되었다.Therefore, the groundwater discharge is prevented to prevent the upward pressure of the building, and at the same time, the excessive discharge is prevented, and the design ground water level, that is, the theoretical groundwater level is a balance between the force due to the pressure of the groundwater under the building. In order to be maintained, it is necessary to have a drainage system that collects groundwater that penetrates the bottom of the building through various intermediate methods until it reaches the design stability level, and discharges it only when it exceeds the design stability level. It became.

본 발명은 상기와 같은 문제점을 해결하기 위해 안출된 것으로서, 건축물 저면의 지하수위가 설계안정수위를 넘지 않도록 하여 지하수에 의해 작용된 부력이 건축물의 안전을 위협하는 것을 피할 수 있는 동시에, 지하수가 과도하게 강제 배수되는 것을 방지하기 위한 트렌치형 배수로 구조를 시공하기 위한 방법을 제공하는 것을 목적으로 한다.The present invention has been made to solve the above problems, the groundwater level of the bottom of the building does not exceed the design stable water level to avoid buoyancy acted by the groundwater threatens the safety of the building, and the groundwater is excessive It is an object of the present invention to provide a method for constructing a trench drainage structure for preventing forced drainage.

상기와 같은 목적을 달성하기 위한 본 발명의 구성은, 지하 건축 구조물의 바닥 하부에서 발생되는 지하수의 수두차에 의한 높은 상향수압을 방지하고 적정한 수압을 유지시키기 위한 배수로 시공방법에 있어서, 굴토 후의 상면 자체 또는 잔토층, 자갈층, 버럭층 등을 이용하여 굴토마감면이 수평을 이루도록 정지하는 수평정지 작업공정; 상기 굴토마감면의 소정 위치부터 집수정이 설치되는 위치까지 소정 너비와 깊이로 파내는 배출경로 형성공정; 상기 굴토마감면의 일측에 집수정을 설치하는 집수정 설치공정; 상기 배출경로 내에 상기 집수정과 연결되는 무공형 배출관을 배치하고 되메움 하는 배출관 설치공정; 상기 수평정지 작업공정을 거친 상 기 굴토마감면에 배수로 기능을 위한 배수재를 설치하는 배수재 설치공정; 상기 굴토마감면 위에 몰탈을 소정 높이로 타설하여 버림콘크리트층을 형성하는 버림콘크리트 타설공정; 및 상기 배수재 및 상기 배출관과 연결되어 지하수를 배출하기 위한 배수로가 상기 굴토마감면으로부터 소정 높이만큼 상승 및 하강하도록 감압구조체를 연결하는 감압 작업공정을 포함하여 구성되는 것을 특징으로 한다.The construction of the present invention for achieving the above object is, in the drainage construction method for preventing the high up-water pressure caused by the water head difference of the groundwater generated in the bottom of the underground building structure and to maintain a proper water pressure, the upper surface after the excavation Horizontal stop working process to stop the oyster finish surface to be horizontal by using itself or the remaining soil layer, gravel layer, the barrier layer; A discharge path forming step of digging at a predetermined width and depth from a predetermined position of the gulting finish surface to a position at which a collecting well is installed; A collecting well installation step of installing a collecting well on one side of the gulto finish surface; A discharge pipe installation step of disposing and filling the non-porous discharge pipe connected to the sump well in the discharge path; A drainage installation process of installing drainage material for drainage function on the oyster toe finish surface which has undergone the horizontal stop working process; A cast concrete placing process of forming a cast concrete layer by pouring mortar to a predetermined height on the gulting finish surface; And a decompression work process connected to the drainage material and the discharge pipe to connect the decompression structure so that the drainage path for discharging the groundwater is raised and lowered by a predetermined height from the gulto finish surface.

상기 감압 작업공정은 상기 배수재에 별도의 관을 연결하는 시공방법을 포함하고, 상기 감압구조체는 상기 관에 의해 배수로가 상기 배수재의 위치로부터 소정 높이만큼 상승한 후 하강되는 형상인 것임을 일 특징으로 한다.The depressurizing work process includes a construction method for connecting a separate pipe to the drain material, and the depressurizing structure is characterized in that the drainage path is lowered after the pipe is raised by a predetermined height from the position of the drain material by the pipe.

상기 관은 지름이 다른 동심의 구분면이 형성되고 상단부분만 연통되는 이중관 형태이며, 상기 구분면에 의해 분리된 하부 공간에는 상기 배수재와 연결되기 위한 유입구와, 상기 배출관과 연결되기 위한 배출구가 형성되는 것을 일 특징으로 한다.The pipe has a concentric separation surface having a different diameter and is formed in a double pipe shape in which only the upper part is in communication. In the lower space separated by the separation surface, an inlet for connecting with the drainage and an outlet for connecting with the discharge pipe are formed. It is characterized by being.

상기 관은 상방연장로와 하방연장로를 구비하며, 상기 상방연장로와 하방연장로는 상단부분이 상호 연통되고, 상기 상방연장로의 하부 공간에는 상기 배수재와 연결되기 위한 유입구와, 상기 하방연장로의 하부 공간에는 상기 배출관과 연결되기 위한 배출구가 형성되는 것을 일 특징으로 한다.The pipe has an upward extension path and a downward extension path, wherein the upper extension path and the downward extension path communicate with each other at an upper end thereof, and the lower space of the upper extension path has an inlet for connecting with the drainage material, and the downward extension path. The lower space of the furnace is characterized in that the outlet for connecting to the discharge pipe is formed.

상기 배수재는 배수판, 드레인 보드, 드레인 매트, 유공관, 무공관, PE관, PVC관, 토목섬유, 비닐, 다발관, 거푸집 중 어느 하나인 것을 일 특징으로 한다.The drainage material is characterized in that any one of the drain plate, drain board, drain mat, perforated pipe, non-perforated pipe, PE pipe, PVC pipe, geotextile, vinyl, bundle pipe, formwork.

상기 배출관은 무공관인 것을 일 특징으로 한다.The discharge pipe is characterized in that the air pipe.

상기 관의 하강하는 부분의 전부 또는 일부 단면적은 상기 관의 상승하는 부 분의 단면적보다 넓은 형태인 것임을 일 특징으로 한다.All or part of the cross section of the descending portion of the tube is characterized in that the shape is wider than the cross-sectional area of the rising portion of the tube.

상기 관의 상승하는 부분 상단부에는 상승하는 부분의 상기 관 단면적보다 큰 상단수용공간이 구비되는 것을 일 특징으로 한다.The upper portion of the rising portion of the tube is characterized in that the upper receiving space larger than the cross-sectional area of the rising portion is provided.

상기 관의 상단부측에는 홀이 형성되는 것을 일 특징으로 한다.The upper end side of the tube is characterized in that the hole is formed.

이하 첨부된 도면에 도시된 본 발명 구성의 실시례를 참조하여, 본 발명의 구성을 상세히 살펴보도록 한다.Hereinafter, the configuration of the present invention will be described in detail with reference to embodiments of the present invention shown in the accompanying drawings.

도 3은 본 발명의 배수로 시공 방법을 나타내기 위한 도면이다. 도 3을 참조하면, 굴토마감면(1) 위의 배수재(10)로부터 상방으로 일정 높이를 갖도록 하면서, 버림콘크리트(20)와 바닥구체콘크리트(40)보다 높은 위치까지 배수로가 상승하였다가 하강하도록 한다. 이로써, 배수재(10)를 흐르던 지하수의 상향수압이 상승한 위치까지의 수두차에 못미치면 배수가 안되다가, 이를 넘어서면 배수가 되도록 한다. 이로 인해 조그만 상향수압에도 많은 양의 지하수가 배출되는 것을 방지할 수 있게 된다.3 is a view for showing a drainage construction method of the present invention. Referring to Figure 3, while having a certain height upward from the drainage material 10 on the gulting finish surface (1), the drainage path to the position higher than the discarded concrete 20 and the bottom concrete concrete 40 to rise and descend do. As a result, if the water head difference to the position where the upward water pressure of the groundwater flowing through the drain 10 rises below the water level, the water is not drained. This prevents a large amount of groundwater from being discharged even at the slight upward pressure.

배수재(10)로 유입된 지하수는 배수 경로가 상방으로 올라가도록 하는 관(50)을 따라 일정 높이만큼 상승 후 하강하게 되며, 하강한 후에는 굴토마감면(1)보다 낮은 위치에 묻혀있는 배출관(60)을 따라 집수정(30)으로 배출된다.The groundwater introduced into the drainage material 10 rises and descends by a predetermined height along the pipe 50 allowing the drainage path to rise upwards, and after falling, the discharged pipe buried at a position lower than the gulto finish surface 1 ( 60 is discharged to the sump (30).

배수재(10)는 굴토마감면(1) 상에 배치되고, 배출관(60)은 굴토마감면(1) 보다 하측에 배치된다. 이를 위해서 관(50)부터 집수정(30) 사이의 위치에는 굴토마감면(1)을 배출관(60)이 들어갈 수 있는 너비와 깊이로 파내어 트렌치를 형성한 후 , 배출관(60)을 트렌치 내에 배치한 후 그 상측을 흙이나 버림콘크리트(20) 등으로 덮어 되메운다. 배수재(10)와 관(50), 관(50)과 배출관(60)의 사이에는 별도의 커넥터(미도시)나 소켓(미도시)을 사용하여 연결한다.The drainage material 10 is disposed on the gulting finish surface 1, and the discharge pipe 60 is disposed below the gulting finish surface 1. To this end, at the position between the pipe 50 and the sump 30, the gulto finish surface 1 is dug into a width and depth where the discharge pipe 60 can enter, and then a trench is formed, and then the discharge pipe 60 is disposed in the trench. After that, the upper side is covered with soil or discarded concrete 20, and backfilled. Between the drain 10 and the pipe 50, between the pipe 50 and the discharge pipe 60 is connected using a separate connector (not shown) or a socket (not shown).

배수재(10)의 배치, 트렌치 형성, 배출관(60) 배치, 집수정(30) 설치 공정의 순서는 현장 상황과 여건에 따라 바꿀 수도 있다. 배수재(10)와 배출관(60)이 배치된 이후에는 감압구조체인 관(50)을 연결한 후에 버림콘크리트(20)를 타설하거나, 또는 배수재(10), 배출관(60)과 연결되는 소켓이나 커넥터를 상방으로 인출시킨 상태에서 버림콘크리트(20)를 먼저 타설하고, 그 후에 관(50)을 소켓, 커넥터와 연결하는 것도 가능하다.The order of the arrangement of the drain 10, the formation of the trench, the arrangement of the discharge pipe 60, the installation of the sump 30 may be changed according to the site situation and conditions. After the drainage material 10 and the discharge pipe 60 are disposed, after the pipe 50 which is a decompression structure is connected, the discarded concrete 20 is poured, or the drainage material 10 and the socket or connector connected to the discharge pipe 60. It is also possible to pour the discarded concrete 20 first in the state withdrawn upwards, and then connect the pipe 50 with a socket and a connector.

감압구조체인 관(50)은 소켓, 커넥터를 이용하여 유역별로 다수 개 설치할 수도 있으며, 용이하게 이동 설치가 가능하도록 별도의 연장 배수로를 소켓, 커넥터에 연결시킨 후에 접합하는 것도 가능하다. 아울러 감압구조체는 지하실 구조상 벽체나 기둥 내에 설치하거나, 그 근방에 설치하는 것이 바람직하다.Pipe 50, which is a decompression structure, may be installed in a plurality of basins by using a socket and a connector, and may be joined after connecting a separate extension drain to the socket and the connector so as to be easily installed. In addition, the pressure reduction structure is preferably installed in or near the wall or pillar due to the basement structure.

배수재(10)는 굴토마감면(1)과 버림콘크리트층(20) 사이에 비닐, 부직포(미도시) 등을 개재하며 형성되는 미세한 틈에 해당되는 공간일 수도 있고, 또는 관, 거푸집, 판넬 등을 이용하여 버림콘크리트 타설시 버림콘크리트층(20) 내에 형성되도록 할 수도 있으며, 유공관, 무공관, 다발관, 드레인 매트, 드레인 보드, 배수판, PE관, PVC관, 토목섬유 등의 배수재가 배치되어 그 내부의 공간이 확보되면서 형성되도록 할 수도 있다. The drainage material 10 may be a space corresponding to a minute gap formed between the gulting finish surface 1 and the discarded concrete layer 20 through a vinyl, a nonwoven fabric (not shown), or a tube, formwork, panel, or the like. When cast concrete is cast using the cast concrete layer 20 may be formed, and drainage pipes, non-perforated pipes, bundle pipes, drain mats, drain boards, drain plates, PE pipes, PVC pipes, geotextiles, etc. It may also be formed while ensuring the space therein.

감압구조체로 사용되는 배수재, 커넥터, 관 등의 구성은 상승 및 하강을 하 는 구조로서 무공형이어야 한다. 즉, 내부의 지하수가 외부로 배출되지 않도록 밀폐된 구조이어야 한다. 만약 외부와 연통되는 구멍이나 홀이 있는 경우에는, 지하수가 반대방향으로 흐를 수 있기 때문이다. 따라서 감압위치 주변에서의 배수재, 커넥터, 관은 모두 무공관으로 구성하여야 하며, 무공형이 아닌 경우에는 외부와 연통되지 않도록 콘크리트 속에 밀폐시키거나, 벽체 내에 매설하여 외부로 지하수가 배출되거나 외부로부터 유입될 수 없도록 하여야 한다.Drainage, connectors, pipes, etc., used as pressure-reducing structures, are to be raised and lowered and to be non-porous. That is, the internal groundwater should be sealed so that it does not discharge to the outside. If there is a hole or a hole communicating with the outside, groundwater may flow in the opposite direction. Therefore, drains, connectors, and pipes around the decompression position should all be made of non-perforated pipes. If they are not non-formed, they should be sealed in concrete to prevent communication with the outside, or be buried in a wall to discharge groundwater to the outside or inflow from the outside. It should not be possible.

감압 작업공정에 있어서, 배수재(10) 자체가 상방 및 하방으로 일정 높이를 갖도록 형성할 수도 있으며, 배수재(10)에 별도의 (뒤집어진) U자형 관(50)을 연결하여 집수정(30)측으로 연결할 수도 있으며, 또는 안쪽관은 상승, 바깥쪽 관은 하강하도록 구성된 이중 원통형의 관을 사용할 수도 있다.In the depressurization work process, the drainage material 10 itself may be formed to have a predetermined height upward and downward, and the sump well 30 may be connected to a separate (inverted) U-shaped pipe 50 to the drainage material 10. It may be connected to the side, or a double cylindrical tube configured to raise the inner tube and lower the outer tube may be used.

도 4는 본 발명의 배수로 시공 방법에 따른 배수구조를 나타내는 도면이다. 도 4를 참조하면, 굴토마감면(1)에 배치된 배수재(10)를 버림콘크리트(20)와 바닥구체콘크리트(40)를 지나 상측으로 소정 높이만큼 상승시켰다가, 다시 하강시켜 굴토마감면(1)의 아래에서 집수정측으로 연장하는 방식이다. 이 때 감압을 위해 배수재(10)를 건물 벽체(42) 내에서 위로 상승시켰다가 하강시키거나, 또는 감압을 위한 관(50)이 건물 벽체(42) 내에 위치하도록 하는 것도 가능하다. 아울러, 건물 벽체(42) 내에 관(50)의 일부분이 위치되고, 나머지 부분은 벽체(42) 외측으로 노출되도록 구성할 수도 있다.4 is a view showing a drainage structure according to the drainage construction method of the present invention. Referring to FIG. 4, the drainage material 10 disposed on the gulting finish surface 1 is raised by a predetermined height upward through the discarded concrete 20 and the bottom concrete concrete 40, and then lowered again to give the gulting finish surface ( It extends from the bottom of 1) to the collecting well side. At this time, it is possible to raise and lower the drain 10 in the building wall 42 for the decompression, or to allow the pipe 50 for the decompression to be located in the building wall 42. In addition, a portion of the tube 50 is located in the building wall 42, and the remaining portion may be configured to be exposed to the outside of the wall 42.

도 5는 본 발명의 배수로 시공 방법에 따른 다른 배수구조를 나타내는 도면이다. 도 5를 참조하면, 감압을 위한 구성, 예컨대 관(50)이 집수정(30) 근방에 위치되고, 배출관(60)을 통해 집수정(30)으로 배출이 가능하도록 하는 것도 가능하다. 이러한 감압 구조는 수리학적 계산에 따라 필요한 위치에 적절하게 선택 설치될 수 있다.5 is a view showing another drainage structure according to the drainage construction method of the present invention. Referring to FIG. 5, a configuration for decompression, for example, the pipe 50 may be located near the water collecting well 30 and may be discharged to the water collecting well 30 through the discharge pipe 60. Such a decompression structure may be appropriately installed in the required position according to hydraulic calculations.

도 6은 본 발명의 배수로 시공 방법에 따른 또 다른 배수구조를 나타내는 도면이다. 도 6을 참조하면, 배수재(10)와는 별도로 집수정까지의 배수로를 형성할 수도 있으며, 관(50)은 버림콘크리트(20)와 바닥구체콘크리트(40) 상측으로 일정 높이만큼 상승한 후 다시 하강하여, 하강 후에는 굴토마감면(1) 내에서 집수정까지 연장된다. 이 때 배수재(10)가 관(50)으로만 연결되도록 할 수도 있으나, 배수재(10)의 일 측면만 관(50)쪽으로 개방되고, 배수재(10)는 계속 연장되어 집수정쪽으로 연결되도록 할 수도 있다.6 is a view showing another drainage structure according to the drainage construction method of the present invention. Referring to FIG. 6, a drainage path to the sump may be formed separately from the drainage material 10, and the pipe 50 may be lowered again by a predetermined height above the discarded concrete 20 and the bottom concrete concrete 40. After descending, it extends to the sump well in the gulto finish surface (1). At this time, the drainage material 10 may be connected only to the pipe 50, but only one side of the drainage material 10 is opened toward the pipe 50, and the drainage material 10 may be continuously extended to be connected to the water collecting well. have.

이 경우 상향수압이 적당한 수준에서는 배수재(10)로만 지하수가 배출되다가, 상향수압이 높아지기 시작하면 일정 수준부터는 배수재(10)와 함께 관(50)을 통해 배출관(60)으로 지하수가 흐르게 된다.In this case, the groundwater is discharged only to the drainage material 10 at an appropriate level of the upstream pressure, and when the upward pressure rises, the groundwater flows to the discharge pipe 60 through the pipe 50 together with the drainage 10 from a predetermined level.

도 7은 사이펀 효과를 방지하기 위한 본 발명의 배수로 시공 방법에 따른 배수구조의 다양한 형태를 나타내는 도면이다. 도 7을 참조하면, 사이펀 효과를 방지하기 위한 다양한 형상의 관(50)이 개시되어 있다.7 is a view showing various forms of the drainage structure according to the drainage construction method of the present invention for preventing the siphon effect. Referring to FIG. 7, various shapes of tubes 50 are disclosed to prevent the siphon effect.

본 발명은 지하수의 과도한 상향수압을 방지하기 위해 지하수를 배출시키는 목적뿐만 아니라, 과도한 지하수 배출로 인해 지반 침하 현상이 발생되는 것을 방지하는 목적도 갖는다. 무공형의 관(50)은 내부 단면적을 가득 채워 흐르는 지하수에 의해 사이펀 현상이 발생하기도 한다. The present invention not only discharges groundwater to prevent excessive upward water pressure of groundwater, but also has an object of preventing ground subsidence due to excessive groundwater discharge. The non-porous tube 50 is a siphon phenomenon occurs by the groundwater flowing through the entire cross-sectional area.

즉, 초기에 흐르는 지하수가 하강하면서, 내부적으로 저압, 진공상태가 형성되어, 하측에 있던 지하수가 끌려 올라와 배출되는 현상이 발생하게 된다. 이 경우, 전술한 수압유지 수단에도 불구하고, 낮은 위치의 지하수들도 배출되어 버리게 된다.That is, while the groundwater flowing initially falls, a low pressure and a vacuum state are formed internally, and the groundwater which was in the lower side is attracted and discharged. In this case, in spite of the above-mentioned hydraulic pressure holding means, groundwater at a lower position is also discharged.

이러한 사이펀 현상을 방지하기 위해 다양한 형상의 무공관을 사용한다. (a)를 참조하면, 상방연장로(52)의 단면적보다 하방연장로(54)의 단면적을 크게 한다. 이 경우 하방으로 흐르는 지하수가 단면을 모두 채워 밀폐시키지 아니하며, 빈 공간이 발생하므로, 상방연장로(52)의 지하수가 딸려 올라오는 것을 방지할 수 있게 된다.In order to prevent such a siphon phenomenon, various shapes of hollow tubes are used. Referring to (a), the cross-sectional area of the downward extension path 54 is made larger than the cross-sectional area of the upward extension path 52. In this case, the groundwater flowing downwards does not fill all the cross-sections, and since the empty space is generated, the groundwater of the upper extension road 52 can be prevented from coming up.

(b)를 참조하면, 상방연장로(52)과 하방연장로(54)의 사이, 상단부에 상단수용공간(56)을 형성한다. 상단수용공간(56)은 일정 부피의 밀폐 공간으로서 단면적이 넓은 하방연장로(54)와 함께 넓은 단면적을 갖게 된다. 따라서 상방연장로(52)를 따라 상승한 지하수는 상단수용공간(56)에 이르면서, 하방연장로(52)로 사이펀 현상 없이 흘러내리게 된다.Referring to (b), the upper accommodating space 56 is formed at the upper end between the upper extension path 52 and the lower extension path 54. The upper accommodating space 56 is a sealed volume of a predetermined volume and has a large cross-sectional area with the downward extension path 54 having a large cross-sectional area. Therefore, the groundwater rising along the upward extension path 52 flows down to the upper receiving space 56 without being siphoned into the downward extension path 52.

(c)를 참조하면, 별도로 상측에 홀(58)을 형성할 수 있다. 홀(58)은 무공관(50) 내부로 공기를 공급해 주므로, 무공관(50) 내에서 저압, 진공 상태가 발생되 지 않도록 하는 역할을 한다.Referring to (c), it is possible to form a hole 58 on the upper side separately. Since the hole 58 supplies air into the non-empty tube 50, the hole 58 serves to prevent the low pressure and vacuum from occurring in the non-empty tube 50.

(d)를 참조하면, 홀(58)과 함께 하방연장로(64)의 단면적을 크게 하여, 홀(58)의 기능과 동시에 작용되도록 할 수도 있게 된다.Referring to (d), it is possible to increase the cross-sectional area of the downward extension path 64 together with the hole 58 so as to act simultaneously with the function of the hole 58.

아울러 홀(58)은 상방연장로와 하방연장로의 내부를 세척하는데 효과적으로 사용될 수도 있다. 홀(58)을 통해 배출관 내부로 물을 뿜어 배출관에 침전, 누적되고 있는 부유물, 침전물을 집수정쪽으로 강제적으로 배수시키는데 사용될 수도 있다. 아울러 홀(58)은 선택에 따라 밸브(미도시)를 통해 개방시키거나, 폐쇄시킬 수 있도록 하는 것이 바람직하다. In addition, the hole 58 may be effectively used to clean the interior of the upper and lower extension furnace. It may be used to forcibly drain the water into the discharge pipe through the hole 58 to forcibly drain the sediment, accumulated and sediment in the discharge pipe toward the sump. In addition, the hole 58 may be opened or closed through a valve (not shown) according to a selection.

이하 본 발명에 따른 배수 구조체의 배수 동작과 각각의 구성에서의 효과를 설명하도록 한다.Hereinafter, the drainage operation of the drainage structure according to the present invention and the effect in each configuration will be described.

건축물 지하에 고인 지하수는 건축물의 자중과 지하수의 증가로 인한 상향수압으로 인해 배수재로 유입되어 소정의 주요 배수재로 모인다. 배수재로 흐르는 지하수는 상향 수압에 의해 일정한 방향으로 밀려나가게 되는데, 상방으로 일정 높이를 갖는 감압관에 이르면서 진행이 일단 멈추게 된다. 우천, 하천 수량 증가 등의 이유로 지하수의 상향수압이 계속 증가하게 되면, 감압관의 상방연장로를 통해 수위가 높아지고, 이를 넘어서는 압력이 발생되는 경우에는 감압관에서 넘치는 지하수는 하방연장로를 통해 배출관으로 유입된다.The groundwater accumulated in the basement of the building flows into the drainage due to the self-weight of the building and the upward water pressure due to the increase of the groundwater. Groundwater flowing through the drainage is pushed out in a constant direction by the upward hydraulic pressure, the process is stopped once reaching the pressure reducing pipe having a certain height upward. If the upstream water pressure of the groundwater continues to increase due to rainy weather or an increase in the number of rivers, the water level rises through the upward extension passage of the decompression tube, and if the pressure exceeds that, the groundwater overflowing from the decompression tube is discharged through the downward passage Flows into.

이 때 감압관을 넘어선 지하수는 압력이 상대적으로 감소하게 되고, 역방향으로 다시 역류하지 못하며, 집수정 또는 외부의 배수처를 향해 흐르게 된다. 위치 마다 투수계수가 다른 지하수의 배수에 있어서, 먼 거리에 있는 지하수를 감압 없이 그냥 집수하는 경우, 집수 위치로부터 먼 위치에 있는 배수재의 집수정측 단부에는 상당히 큰 누적 압력이 걸릴 수밖에 없는데, 이를 감압관을 통해 중간중간 제어하여 이러한 문제점을 해결하게 된다. At this time, the groundwater beyond the decompression tube is relatively reduced in pressure, does not flow back in the reverse direction, flows toward the sump or the external drainage. In the drainage of groundwater with different permeability coefficients for each position, if the groundwater at a distance is collected without decompression, a very large cumulative pressure may be applied to the water collecting well end of the drainage at a position far from the catchment position. Intermediate control through the pipe solves this problem.

본 발명과 같은 시스템, 구조체에서는 사전에 각 유역별로 경로에 따라 감압을 시켜 집수정측으로 보내게 되므로, 이러한 문제가 발생하지 않게 된다. 아울러 유역별로 유입되는 수압이 조절되어 있기 때문에, 고압의 지하수 유입을 대비하여 두꺼운 관 내지는 다양한 분산 경로를 갖는 다수의 주배수관이 필요 없으며, 여러 영역의 배수재를 직접 집수정에 연결할 필요도 없게 되어, 최소의 관으로도 유입되는 지하수의 수압을 수용할 수 있게 된다. In the system and the structure of the present invention, since the pressure is reduced in accordance with the path for each watershed in advance, it is sent to the water collecting well side, such a problem does not occur. In addition, because the water pressure flows by basin is controlled, there is no need for a thick pipe or a plurality of main drainage pipes having various distribution paths in preparation for the inflow of high pressure groundwater, and it is not necessary to directly connect drainage materials in various areas to the sump. It will be able to accommodate the hydraulic pressure of the groundwater flowing into the minimum pipe.

상기와 같은 시공방법에 의해 시공된 배수로는, 중간에 배수재 또는 관에 가해지는 압력을 적절히 감압시킬 수 있게 된다. 수리학적 계산에 의해 관의 높이를 조절함에 따라, 적정수압이 넘는 경우에만 지하수를 배출할 수 있도록 하며, 관을 통과한 지하수는 굴토마감면 하측 내부의 배출관을 따라 집수정측으로 흐르도록 한다. 이로 인해 배수재 및 관에 과도하게 미치는 압력을 감소시킴은 물론, 약간의 상향수압에서도 많은 양의 지하수가 배출되는 것을 방지하고, 지하수가 역류하는 것도 방지하게 된다.The drainage channel constructed by the above-mentioned construction method can appropriately reduce the pressure applied to the drainage material or the pipe in the middle. As the height of the pipe is adjusted by hydraulic calculation, the groundwater can be discharged only when the proper water pressure is exceeded, and the groundwater passing through the pipe flows along the discharge pipe in the lower side of the gulto finish surface to the sump well side. This reduces excessive pressure on drains and pipes, as well as preventing the discharge of large amounts of groundwater at a slight upward pressure, and also prevents backflow of groundwater.

본 발명은 지하수의 상향수압을 방지하기 위한 배수로를 시공함에 있어, 배 수로의 일정 위치에 일정 수두차를 갖도록 배수로를 상향 및 하향으로 올라갔다 내려가도록 구성함으로써, 일정 구간마다 고르게 압력이 분포되도록 하여 건물 바닥면에 미치는 상향수압을 일정하게 유지, 조절하는 동시에, 과도한 지하수 배출을 방지하는 효과를 갖는다.In the present invention in the construction of the drainage for preventing the up-water pressure of the groundwater, by configuring the drainage up and down to go up and down to have a certain head difference at a certain position of the drainage, so that the pressure is distributed evenly for each section It maintains and regulates the constant water pressure on the floor of the building at the same time, and has the effect of preventing excessive groundwater discharge.

또한 본 발명은 감압을 위한 관에 의해 일정 수압에 이르기 전에는 과도한 지하수 배출을 억제하여 지반이 침하되는 것을 방지하며, 배출된 지하수의 역류를 방지하는 효과를 갖는다.In addition, the present invention by inhibiting the excessive groundwater discharge to reach a certain water pressure by the pressure reducing pipe to prevent ground subsidence, and has the effect of preventing the backflow of the discharged groundwater.

본 발명은 관의 단면적을 서로 다르게 하거나, 또는 별도의 홀을 관에 형성하도록 하여, 관 내에 저압 또는 진공 상태가 되는 것을 방지하여 사이펀 효과로 인한 지하수의 과도한 배출을 방지하는 효과를 갖는다.The present invention has an effect of preventing the excessive discharge of groundwater due to the siphon effect by preventing the cross-sectional area of the pipe to be different from each other, or to form a separate hole in the pipe, to prevent the low pressure or vacuum in the pipe.

Claims (9)

지하 건축 구조물의 바닥 하부에서 발생되는 지하수의 수두차에 의한 높은 상향수압을 방지하고 적정한 수압을 유지시키기 위한 배수로 시공방법에 있어서,In the drainage construction method to prevent the high up water pressure caused by the water head difference of the ground water generated in the bottom of the underground building structure and to maintain the proper water pressure, 굴토 후의 상면 자체 또는 잔토층, 자갈층, 버럭층 등을 이용하여 굴토마감면이 수평을 이루도록 정지하는 수평정지 작업공정;A horizontal stop working step of stopping the gulto finish surface horizontally by using the upper surface itself after the gulting or the remaining soil layer, the gravel layer, the buffing layer, etc .; 상기 굴토마감면의 소정 위치부터 집수정이 설치되는 위치까지 소정 너비와 깊이로 파내는 배출경로 형성공정;A discharge path forming step of digging at a predetermined width and depth from a predetermined position of the gulting finish surface to a position at which a collecting well is installed; 상기 굴토마감면의 일측에 집수정을 설치하는 집수정 설치공정;A collecting well installation step of installing a collecting well on one side of the gulto finish surface; 상기 배출경로 내에 상기 집수정과 연결되는 무공형 배출관을 배치하고 되메움 하는 배출관 설치공정;A discharge pipe installation step of disposing and filling the non-porous discharge pipe connected to the sump well in the discharge path; 상기 수평정지 작업공정을 거친 상기 굴토마감면에 배수로 기능을 위한 배수재를 설치하는 배수재 설치공정;A drainage installing step of installing drainage for drainage function on the gulto finish surface after the horizontal stop working process; 상기 굴토마감면 위에 몰탈을 소정 높이로 타설하여 버림콘크리트층을 형성하는 버림콘크리트 타설공정; 및A cast concrete placing process of forming a cast concrete layer by pouring mortar to a predetermined height on the gulting finish surface; And 상기 배수재 및 상기 배출관과 연결되어 지하수를 배출하기 위한 배수로가 상기 굴토마감면으로부터 소정 높이만큼 상승 및 하강하도록 감압구조체를 연결하는 감압 작업공정을 포함하여 구성되는 것을 특징으로 하는 적정수압 유지를 위한 트렌치형 배수로 시공방법.A trench for maintaining a suitable hydraulic pressure, comprising a depressurizing work process for connecting a depressurizing structure such that a drainage passage connected with the drainage material and the discharge pipe for discharging groundwater is raised and lowered by a predetermined height from the gulting finish surface. Type drainage construction method. 제 1 항에 있어서, 상기 감압 작업공정은:The process of claim 1 wherein the depressurization process is: 상기 배수재에 별도의 관을 연결하는 시공방법을 포함하고,Including a construction method for connecting a separate pipe to the drain, 상기 감압구조체는 상기 관에 의해 배수로가 상기 배수재의 위치로부터 소정 높이만큼 상승한 후 하강되는 형상인 것임을 특징으로 하는 적정수압 유지를 위한 트렌치형 배수로 시공방법.The decompression structure is a trench-type drainage construction method for maintaining a suitable hydraulic pressure, characterized in that the drainage is raised by a predetermined height from the position of the drainage by the pipe is lowered. 제 2 항에 있어서, 상기 관은:The tube of claim 2 wherein the tube is: 지름이 다른 동심의 구분면이 형성되고 상단부분만 연통되는 이중관 형태이며,The concentric dividing surface with different diameters is formed, and only the upper part is in communication with the double tube shape. 상기 구분면에 의해 분리된 하부 공간에는 상기 배수재와 연결되기 위한 유입구와, 상기 배출관과 연결되기 위한 배출구가 형성되는 것을 특징으로 하는 적정수압 유지를 위한 트렌치형 배수로 시공방법.A trench drainage construction method for maintaining proper hydraulic pressure, characterized in that the lower space separated by the partition surface is formed with an inlet for connecting to the drain and the outlet for connecting to the discharge pipe. 제 2 항에 있어서, 상기 관은:The tube of claim 2 wherein the tube is: 상방연장로와 하방연장로를 구비하며,Equipped with upward extension path and downward extension path, 상기 상방연장로와 하방연장로는 상단부분이 상호 연통되고,The upper extension part and the lower extension part is in communication with the upper part, 상기 상방연장로의 하부 공간에는 상기 배수재와 연결되기 위한 유입구와, 상기 하방연장로의 하부 공간에는 상기 배출관과 연결되기 위한 배출구가 형성되는 것을 특징으로 하는 적정수압 유지를 위한 트렌치형 배수로 시공방법.The lower space of the upper extension road inlet for connecting with the drainage, and the lower space of the lower extension road is formed in the trench type drainage for maintaining a proper hydraulic pressure, characterized in that the outlet for connecting to the discharge pipe is formed. 제 1 항에 있어서, 상기 배수재는:The method of claim 1, wherein the drainage material is: 배수판, 드레인 보드, 드레인 매트, 유공관, 무공관, PE관, PVC관, 토목섬유, 비닐, 다발관, 거푸집 중 어느 하나인 것을 특징으로 하는 적정수압 유지를 위한 트렌치형 배수로 시공방법.Drain board, drain board, drain mat, perforated pipe, non-perforated pipe, PE pipe, PVC pipe, geotextile, vinyl, bundle pipe, formwork any one of the trench type drainage construction method for maintaining the proper pressure. 제 1 항에 있어서, 상기 배출관은 무공관인 것을 특징으로 하는 적정수압 유지를 위한 트렌치형 배수로 시공방법.The method of claim 1, wherein the discharge pipe is a non-pipe, trench type drainage construction method for maintaining a suitable pressure. 제 3 항 또는 제 4 항에 있어서,The method according to claim 3 or 4, 상기 관의 하강하는 부분의 전부 또는 일부 단면적은 상기 관의 상승하는 부분의 단면적보다 넓은 형태인 것임을 특징으로 하는 적정수압 유지를 위한 트렌치형 배수로 시공방법.All or a partial cross-sectional area of the descending portion of the tube is wider than the cross-sectional area of the rising portion of the tube trench type drainage construction method for maintaining the proper pressure. 제 3 항 또는 제 4 항에 있어서,The method according to claim 3 or 4, 상기 관의 상승하는 부분 상단부에는 상승하는 부분의 상기 관 단면적보다 큰 상단수용공간이 구비되는 것을 특징으로 하는 적정수압 유지를 위한 트렌치형 배수로 시공방법.Trench-type drainage construction method for maintaining the proper pressure, characterized in that the upper end of the rising portion of the tube is provided with an upper receiving space larger than the pipe cross-sectional area of the rising portion. 제 3 항 또는 제 4 항에 있어서,The method according to claim 3 or 4, 상기 관의 상단부측에는 홀이 형성되는 것을 특징으로 하는 적정수압 유지를 위한 트렌치형 배수로 시공방법.Trench-type drainage construction method for maintaining the proper pressure, characterized in that the hole is formed on the upper end side of the pipe.
KR1020060045501A 2006-05-22 2006-05-22 Trench drainage construction method to maintain proper water pressure Expired - Fee Related KR100693807B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060045501A KR100693807B1 (en) 2006-05-22 2006-05-22 Trench drainage construction method to maintain proper water pressure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060045501A KR100693807B1 (en) 2006-05-22 2006-05-22 Trench drainage construction method to maintain proper water pressure

Publications (1)

Publication Number Publication Date
KR100693807B1 true KR100693807B1 (en) 2007-03-14

Family

ID=38103347

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060045501A Expired - Fee Related KR100693807B1 (en) 2006-05-22 2006-05-22 Trench drainage construction method to maintain proper water pressure

Country Status (1)

Country Link
KR (1) KR100693807B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113482713A (en) * 2021-08-02 2021-10-08 中建七局第一建筑有限公司 Drainage lowering construction process for inclined shaft of extra-long water-rich karst tunnel

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100317530B1 (en) 1999-06-15 2001-12-22 정성남 An underground pressure release well system
KR100665986B1 (en) 2005-12-15 2007-01-10 박옥교 Drainage construction method to maintain proper water pressure

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100317530B1 (en) 1999-06-15 2001-12-22 정성남 An underground pressure release well system
KR100665986B1 (en) 2005-12-15 2007-01-10 박옥교 Drainage construction method to maintain proper water pressure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113482713A (en) * 2021-08-02 2021-10-08 中建七局第一建筑有限公司 Drainage lowering construction process for inclined shaft of extra-long water-rich karst tunnel
CN113482713B (en) * 2021-08-02 2024-01-30 中建七局第一建筑有限公司 Drainage construction process for inclined shaft of super-long water-rich karst tunnel

Similar Documents

Publication Publication Date Title
CN109137940B (en) A kind of three-dimensional drainage system suitable for loose landfill side slope
CN111705825B (en) Drainage and landing permanent-temporary integrated construction method for underground deep foundation pit
KR100665984B1 (en) Trench Type Natural Drainage Construction Method for Reducing Upward Pressure of Buildings
KR100753556B1 (en) Construction method of pressure reduction drainage system and system
KR100665986B1 (en) Drainage construction method to maintain proper water pressure
CN217325443U (en) High groundwater water level excavation supporting cuts drainage system
KR200411498Y1 (en) Vertical drainage system with adjustable water pressure for each basin
KR100666102B1 (en) Vertical drainage system with adjustable up water pressure
KR200412083Y1 (en) Vertical Drainage System for Upstream Water Pressure Control
KR20060005466A (en) Basement floor drainage method
KR200445948Y1 (en) Drainage system with adjustable groundwater pressure
KR100945595B1 (en) Groundwater drainage
KR200446848Y1 (en) Drainage structure with upward hydraulic pressure control
KR200411497Y1 (en) Hydraulic pressure control drainage structure
KR200413300Y1 (en) Vertical drainage system with adjustable up water pressure
KR100728583B1 (en) Permanent Drainage System
KR100965002B1 (en) Groundwater drainage
KR100656410B1 (en) Vertical drainage system with adjustable water pressure for each basin
KR100730586B1 (en) Vertical Drainage System for Upstream Water Pressure Control
JP3777085B2 (en) Construction method of underground storage structure and underground storage structure
KR100665985B1 (en) Natural Drainage Construction Method for Reducing Upward Pressure of Buildings
KR100556820B1 (en) Positive pressure attenuation chamber and its construction method
KR100748607B1 (en) Groundwater Drainage Construction Method and System for Reducing Upstream Pressure of Building
KR20020033686A (en) Drainage System using Hexa-Tube Connector
KR101100364B1 (en) Positive pressure regulating device and permanent drainage method using the same

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

St.27 status event code: A-0-1-A10-A12-nap-PA0109

PA0201 Request for examination

St.27 status event code: A-1-2-D10-D11-exm-PA0201

D13-X000 Search requested

St.27 status event code: A-1-2-D10-D13-srh-X000

D14-X000 Search report completed

St.27 status event code: A-1-2-D10-D14-srh-X000

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

St.27 status event code: A-1-2-D10-D22-exm-PE0701

GRNT Written decision to grant
PR0701 Registration of establishment

St.27 status event code: A-2-4-F10-F11-exm-PR0701

PR1002 Payment of registration fee

St.27 status event code: A-2-2-U10-U11-oth-PR1002

Fee payment year number: 1

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

PG1601 Publication of registration

St.27 status event code: A-4-4-Q10-Q13-nap-PG1601

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R11-asn-PN2301

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R14-asn-PN2301

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 4

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 5

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

FPAY Annual fee payment

Payment date: 20120306

Year of fee payment: 6

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 6

LAPS Lapse due to unpaid annual fee
PC1903 Unpaid annual fee

St.27 status event code: A-4-4-U10-U13-oth-PC1903

Not in force date: 20130307

Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

PC1903 Unpaid annual fee

St.27 status event code: N-4-6-H10-H13-oth-PC1903

Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

Not in force date: 20130307

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000