KR100685174B1 - Clip for channel - Google Patents

Clip for channel Download PDF

Info

Publication number
KR100685174B1
KR100685174B1 KR1020050114052A KR20050114052A KR100685174B1 KR 100685174 B1 KR100685174 B1 KR 100685174B1 KR 1020050114052 A KR1020050114052 A KR 1020050114052A KR 20050114052 A KR20050114052 A KR 20050114052A KR 100685174 B1 KR100685174 B1 KR 100685174B1
Authority
KR
South Korea
Prior art keywords
grip member
clip
grooved steel
vertical
bolt
Prior art date
Application number
KR1020050114052A
Other languages
Korean (ko)
Inventor
표근섭
Original Assignee
표근섭
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 표근섭 filed Critical 표근섭
Priority to KR1020050114052A priority Critical patent/KR100685174B1/en
Application granted granted Critical
Publication of KR100685174B1 publication Critical patent/KR100685174B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18Means for suspending the supporting construction
    • E04B9/20Means for suspending the supporting construction adjustable
    • E04B9/205Means for suspending the supporting construction adjustable by means of a resilient clip
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18Means for suspending the supporting construction
    • E04B2009/186Means for suspending the supporting construction with arrangements for damping vibration

Abstract

A clip for a channel bar is provided to conveniently perform crossing connection between the channel bar and a pipe with a simplified structure. A clip for a channel bar comprises a first grip member(100), a second grip member(200), and a bolt(300) and a nut(400). The first grip member includes a body part(110), a flange part(120) bent at an upper end of the body part, a fixing hole(130) formed on the upper end of the body part, which is a lower part of the flange part, and a shoulder part(140) disposed at a lower end of the body part. The second grip member includes a first vertical part(210), a shoulder part(220) formed at a lower end of the first vertical part, a first horizontal part(230) bent and extended from an upper end of the first vertical part, a second vertical part(240) bent from the first horizontal part, a fixing hole(250) formed at the second vertical part, and a second horizontal part(260) bent from the second vertical part in the opposite direction to the first horizontal part. The bolt and nut are fit in the fixing holes of the first and the second grip members.

Description

홈형강용 클립{Clip for channel}Groove Clips {Clip for channel}

도 1은 본 발명의 제 1 실시예에 따른 홈형강용 클립을 도시한 사시도1 is a perspective view showing a grooved steel clip according to a first embodiment of the present invention

도 2는 도 1의 클립에 의해 홈형강과 사각 파이프가 교차되게 연결되는 예를 도시한 사시도2 is a perspective view showing an example in which the grooved steel and the square pipe are connected to each other by the clip of FIG.

도 3은 본 발명의 제 2 실시예에 따른 홈형강용 클립을 도시한 사시도Figure 3 is a perspective view showing a grooved steel clip according to a second embodiment of the present invention

도 4는 도 3의 클립에 의해 홈형강과 사각 파이프가 교차되게 연결되는 예를 도시한 사시도4 is a perspective view showing an example in which the grooved steel and the square pipe are connected to each other by the clip of FIG.

본 발명은 홈형강과 사각 파이프 또는 홈형강과 원형 파이프를 교차되게 결합시키는 홈형강용 클립에 관한 것으로서, 보다 상세하게는 제 1 그립부재와 제 2 그립부재의 상단이 볼트와 너트에 의해 결합되고, 제 1 그립부재의 하단 및 제 2 그립부재의 하단에 어깨부가 형성되어, 상기 제 1 및 제 2 그립부재의 어깨부가 홈형강에 끼워져 걸리며, 제 2 그립부재가 굴절되거나 만곡되어 제 1 그립부재와 제 2 그립부재 사이에 사각 파이프 또는 원형 파이프를 홈형강과 교차되게 고정할 수 있는 홈형강용 클립에 관한 것이다.The present invention relates to a grooved steel clip for coupling the grooved steel and the square pipe or the grooved steel and the circular pipe, and more specifically, the upper end of the first grip member and the second grip member are coupled by bolts and nuts. A shoulder portion is formed at a lower end of the first grip member and a lower end of the second grip member, and the shoulder portions of the first and second grip members are fitted into the grooved steel, and the second grip member is bent or curved to allow the first grip member. And a grooved steel clip capable of fixing a square pipe or a circular pipe to intersect the grooved steel between the second grip member and the second grip member.

대한민국 실용신안등록 제390611호(2005년 7월 13일)에 "천정마감재 설치구조"가 소개되어 있다.Korean Utility Model Registration No. 390611 (July 13, 2005) introduces the ceiling finishing material installation structure.

상기 천정마감재 설치구조는 천정에 다수 고정된 행거볼트에 행거클립이 고정되고, 상기 행거클립의 내부에 직교방향으로 수개의 캐링이 연결되며, 상기 캐링에 엠바아가 직교방향으로 연결된 다수개의 고정클립으로서 지지한 천정구조에 있어서, 상기 엠바아의 하부에 설치 시공되는 천정마감재를 좌우 대칭형으로 구성하되, 중앙은 임의 형상의 장식부를 마련하고, 각 천정마감재의 양단에는 고정피스로서 엠바아에 고정될 수 있는 구조로 형성하며, 각 천정마감재의 양단측 고정피스가 박히는 내측에는 각각 요철이 형성된 조립부재를 하향으로 돌출성형하고, 상기 요철이 형성된 각 조립부재의 외단부에는 조립부재의 요철에 부합되는 별도의 요철이 형성된 마감부재를 결합하므로서 수리 보수 및 교체가 필요한 경우 필요한 위치의 천정마감재만을 개별적으로 분리할 수 있게 구성한 것이다.The ceiling finishing material installation structure is a hanger clip is fixed to a plurality of hanger bolts fixed to the ceiling, a plurality of carings are connected in the orthogonal direction to the inside of the hanger clip, as a plurality of fixed clips connected to the embar in the orthogonal direction In the supported ceiling structure, the ceiling finishing material installed on the lower part of the embar is configured to be symmetrical, the center is provided with a decorative portion of any shape, and both ends of each ceiling finishing material can be fixed to the embar as a fixing piece It is formed in a structure that is formed, each of the two end fixing pieces of the ceiling finishing material is formed in the projection projecting downward downwardly the assembling member is formed, respectively, and the outer end of each of the assembling member formed with the concave and convex to the concave and convexity of the assembly member If you need to repair and replace the concave and convex finish member, only the ceiling finish material in the required position Are configured to be separated separately.

상기와 같은 천정마감재 설치구조에 사용되는 종래의 고정클립은 하단 어깨부가 엠바아의 홈에 걸려 엠바아가 고정클립에 매달리게 되지만, 상기 고정클립과 캐링(사각 파이프 또는 "ㄷ" 형강)에 용접되거나 별도의 고정핀에 의해 고정되기 때문에, 고정클립과 캐링이 용접된 상태에서 지진이 발생할 경우, 고정클립과 캐링의 용접부위가 파손되어, 천정 슬라브에 매달린 구조물이 낙하될 수 있는 위험이 있으며, 고정클립과 캐링을 고정핀으로 고정할 경우, 무거운 천정 구조물을 설치할 수 없는 단점이 있다.Conventional fixed clip used in the ceiling finishing material installation structure as described above, but the lower shoulder is caught in the groove of the embar, the embar is suspended on the fixed clip, welded to the fixed clip and the caring (square pipe or "c" section steel) or separately Since it is fixed by the fixing pin of the fixed clip, if the earthquake occurs while the fixing clip and the carry ring are welded, the welding part of the fixing clip and the carry ring is damaged, and there is a danger that the structure suspended from the ceiling slab may fall. When fixing the caring with a fixing pin, there is a disadvantage that can not install a heavy ceiling structure.

따라서, 본 발명의 목적은 제 1 그립부재와 제 2 그립부재의 상단이 볼트와 너트에 의해 결합되고, 제 1 그립부재의 하단 및 제 2 그립부재의 하단에 어깨부가 형성되어, 상기 제 1 및 제 2 그립부재의 어깨부가 홈형강에 끼워져 걸리며, 제 2 그립부재가 굴절되거나 만곡되어 제 1 그립부재와 제 2 그립부재 사이에 사각 파이프 또는 원형 파이프를 홈형강과 교차되게 고정할 수 있어, 홈형강과 사각 파이프(또는 원형 파이프)가 교차되도록 용이하게 연결할 수 있으며, 사각파이프와 홈형강을 견고하게 연결할 수 있어 무거운 천정 구조물을 설치할 수 있고, 지진에 의한 사각 파이프가 진동을 흡수할 수 있는 홈형강용 클립을 제공하는 것이다.Accordingly, an object of the present invention is the upper end of the first grip member and the second grip member is coupled by a bolt and a nut, the lower end of the first grip member and the lower end of the second grip member is formed, the first and The shoulder portion of the second grip member is fitted into the grooved steel, and the second grip member is bent or curved to fix the square pipe or the circular pipe between the first grip member and the second grip member so as to intersect the grooved steel. It can be easily connected so that the section steel and square pipe (or round pipe) intersect, and can firmly connect the square pipe and the grooved steel to install heavy ceiling structure, and the groove where the square pipe can absorb vibration by earthquake To provide a steel clip.

상기와 같은 목적을 달성하기 위한 본 발명의 바람직한 실시예를 도면을 참조하여 상세하게 설명하기로 한다.Preferred embodiments of the present invention for achieving the above object will be described in detail with reference to the drawings.

본 발명에서 홈형강은 C 형강, M 형강 등을 의미하며, 특히 M 형강의 경우 개구부로 본 발명의 클립을 끼워 걸수 있는 것을 의미한다.In the present invention, the grooved steel means C-shaped steel, M-shaped steel, and the like, in particular, M-shaped steel means that the clip of the present invention can be hooked into the opening.

도 1 및 도 2를 참조하면, 본 발명의 제 1 실시예에 따른 홈형강용 클립(1)은 제 1 그립부재(100)와 제 2 그립부재(200)의 상단이 볼트(300)와 너트(400)에 의해 결합된다.1 and 2, the grooved steel clip 1 according to the first embodiment of the present invention, the upper end of the first grip member 100 and the second grip member 200 is bolt 300 and nut Are combined by 400.

상기 제 1 그립부재(100)는 바디부(110)의 상단에서 플랜지부(120)가 절곡되고, 상기 플랜지부(120)의 하부인 바디부의 상단에 체결구멍(130)이 형성되고, 상기 바디부(110)의 하단에 어깨부(140)가 형성된다.In the first grip member 100, the flange part 120 is bent at the upper end of the body part 110, and a fastening hole 130 is formed at the upper end of the body part which is lower than the flange part 120, and the body The shoulder 140 is formed at the lower end of the unit 110.

상기 제 2 그립부재(200)는 제 1 수직부(210)의 하단에 어깨부(220)가 형성되고, 상기 제 1 수직부(210)의 상단에서 제 1 수평부(230)가 굴절되어 연장되고, 상기 제 1 수평부(230)에서 제 2 수직부(240)가 굴절되고, 상기 제 2 수직부(240)에 체결구멍(250)이 형성되고, 상기 제 2 수직부(240)에서 제 2 수평부(260)가 제 1 수평부(230)와 반대방향으로 굴절된다.The second grip member 200 has a shoulder portion 220 formed at a lower end of the first vertical portion 210, and the first horizontal portion 230 is bent and extended from an upper end of the first vertical portion 210. The second vertical portion 240 is refracted in the first horizontal portion 230, the fastening hole 250 is formed in the second vertical portion 240, and the second vertical portion 240 is formed in the second vertical portion 240. The second horizontal portion 260 is refracted in the direction opposite to the first horizontal portion 230.

상기 제 2 수직부(240)의 높이(h)는 볼트(300)의 헤드(310)의 직경(d)과 같도록 설계되어 있다. 이것에 의해, 너트(400)를 상기 볼트(300)에 체결할 때, 상기 볼트(300)의 헤드(310)의 모서리가 제 2 수직부(260)의 하부면과 제 1 수직부(230)의 상부면에 걸려 볼트(300)가 너트(310)와 함께 회전되지 않게 된다. 따라서, 너트(400)를 볼트에 체결할 때, 작업자는 한 손으로 볼트(300)의 헤드(310)를 잡을 필요가 없게 된다.The height h of the second vertical portion 240 is designed to be equal to the diameter d of the head 310 of the bolt 300. As a result, when the nut 400 is fastened to the bolt 300, the edge of the head 310 of the bolt 300 is lowered from the lower surface of the second vertical portion 260 and the first vertical portion 230. The upper surface of the bolt 300 is not rotated together with the nut 310. Thus, when fastening the nut 400 to the bolt, the worker does not need to hold the head 310 of the bolt 300 with one hand.

상기와 같이 구성된 본 발명의 제 1 실시예에 따른 홈형강용 클립(1)은, 도 2에 도시된 바와같이, 제 1 그립부재(100)와 제 2 그립부재(200)의 어깨부(140, 220)를 홈형강(500)의 홈(510)에 끼워걸고, 상기 홈형강(500)과 교차되는 사각 파이프(600)가 제 1 그립부재(100)와 제 2 그립부재(200) 사이에 배치한다. 이때, 제 2 그립부재(200)의 제 1 수직부(210)와 제 1 수평부(230)가 사각 파이프(600)의 감싸게 되고, 제 1 그립부재(100)의 플랜지부(120)가 제 2 그립부재(200)의 제 2 수평부(260)에 포개어진다. 이후, 볼트(300)를 제 1 그립부재(100)와 제 2 그립부재(200)의 체결구멍(130, 250)에 끼우고, 너트(400)를 볼트(300)에 체결하여 홈형강(500)과 사각 파이프(600)가 서로 교차되도록 연결한다.The grooved steel clip 1 according to the first embodiment of the present invention configured as described above, as shown in FIG. 2, the shoulder portion 140 of the first grip member 100 and the second grip member 200. , 220 is inserted into the groove 510 of the grooved steel 500, and the square pipe 600 intersecting the grooved steel 500 is between the first grip member 100 and the second grip member 200. To place. In this case, the first vertical portion 210 and the first horizontal portion 230 of the second grip member 200 are wrapped around the square pipe 600, and the flange portion 120 of the first grip member 100 may be formed. 2 is overlapped with the second horizontal portion 260 of the grip member (200). Thereafter, the bolt 300 is inserted into the fastening holes 130 and 250 of the first grip member 100 and the second grip member 200, and the nut 400 is fastened to the bolt 300 to form the grooved steel 500. ) And the square pipe 600 are connected to cross each other.

상기와 같이 홈형강(500)과 사각 파이프(600)를 본 발명의 제 1 실시예에 따른 홈형강용 클립(1)으로 연결하였을 경우, 사각 파이프(600)의 단부가 본 발명의 제 1 실시예에 따른 홈형강용 클립(1)을 중심으로 화살표(610) 방향으로 유동이 가능하여, 지진 등이 발생하였을 경우, 사각 파이프(600)가 흔들려도 본 발명의 제 1 실시예에 따른 홈형강용 클립(1)에 의해 홈형강(500)과 사각 파이프(600)와 분리되지 않아 내진설계에 반영할 수 있다.As described above, when the grooved steel 500 and the square pipe 600 are connected with the grooved steel clip 1 according to the first embodiment of the present invention, the end of the square pipe 600 is the first embodiment of the present invention. It is possible to flow in the direction of the arrow 610 around the grooved steel clip (1) according to the example, when an earthquake or the like, even if the square pipe 600 shakes the grooved steel according to the first embodiment of the present invention It is not separated from the grooved steel 500 and the square pipe 600 by the use clip (1) can be reflected in the seismic design.

도 3 및 도 4를 참조하면, 본 발명의 제 2 실시예에 따른 홈형강용 클립은 제 2 그립부재(200)의 제 1 수직부(210)와 제 1 수평부(230) 사이에 만곡부(270)가 형성되는 것을 제외하고, 제 1 실시예에 따른 홈형강용 클립과 동일하다.3 and 4, the grooved steel clip according to the second embodiment of the present invention may have a curved portion between the first vertical portion 210 and the first horizontal portion 230 of the second grip member 200. 270 is the same as the grooved steel clip according to the first embodiment, except that it is formed.

상기 만곡부(270)는, 도 4에 도시된 바와같이, 제 2 그립부재(200)가 원형 파이프(800)의 곡률에 맞게 만곡된다.As shown in FIG. 4, the curved portion 270 has the second grip member 200 curved to match the curvature of the circular pipe 800.

위에서 설명한 바와같이, 본 발명에 따른 홈형강용 클립은 홈형강과 교차된 상태에서 파이프의 단부가 유동 가능하도록 홈형강과 파이프를 연결하므로서, 지진 등이 발생하였을 경우, 파이프가 흔들려도 홈형강과 파이프의 연결이 분리되지 않아 내진설계에 반영할 수 있으며, 구조가 단순하여 홈형강과 파이프의 교차연결작업이 편리한 효과가 있다.As described above, the grooved steel clip according to the present invention connects the grooved steel and the pipe to allow the end of the pipe to flow in the state where the grooved steel intersects, so that when an earthquake or the like occurs, the grooved steel and The connection of the pipe is not separated and can be reflected in the seismic design, and the simple structure makes it easy to cross connect the grooved steel and the pipe.

Claims (3)

바디부(110)와, 상기 바디부(110)의 상단에서 절곡되는 플랜지부(120)와, 상기 플랜지부의 하부인 바디부(110)의 상단에 형성되는 체결구멍(130)과, 상기 바디부(110)의 하단에 형성되는 어깨부(140)로 구성되는 제 1 그립부재(100)와;Body portion 110, the flange portion 120 that is bent at the upper end of the body portion 110, the fastening hole 130 formed in the upper end of the body portion 110 that is lower than the flange portion, and the body A first grip member 100 composed of a shoulder portion 140 formed at a lower end of the portion 110; 제 1 수직부와(210)와, 제 1 수직부(210)의 하단에 형성되는 어깨부(220)와, 상기 제 1 수직부(210)의 상단에서 굴절되어 연장되는 제 1 수평부(230)와, 상기 제 1 수평부(230)에서 굴절되는 제 2 수직부(240)와, 상기 제 2 수직부(240)에 형성되는 체결구멍(250)과, 상기 제 2 수직부(240)에서 제 2 수평부(260)가 제 1 수평부(230)와 반대방향으로 굴절되는 제 2 그립부재(200)와;The first vertical portion 210, the shoulder 220 formed at the lower end of the first vertical portion 210, and the first horizontal portion 230 refracted and extended from the upper end of the first vertical portion 210. ), A second vertical portion 240 refracted by the first horizontal portion 230, a fastening hole 250 formed in the second vertical portion 240, and the second vertical portion 240. A second grip member 200 in which the second horizontal portion 260 is refracted in a direction opposite to the first horizontal portion 230; 상기 제 1 그립부재(100)의 체결구멍(130)과 제 2 그립부재(200)의 체결구멍(250)에 끼워져 체결되는 볼트(300)와 너트(400)로 구성되는 것을 특징으로 하는 홈형강용 클립.Grooved steel, characterized in that consisting of the bolt 300 and the nut 400 is fitted into the fastening hole 130 of the first grip member 100 and the fastening hole 250 of the second grip member 200. Dragon clip. 제 1 항에 있어서,The method of claim 1, 상기 제 2 수직부(240)의 높이(h)는 볼트(300)의 헤드(310)의 직경(d)과 같은 것을 특징으로 하는 홈형강용 클립.The height (h) of the second vertical portion 240 is the grooved steel clip, characterized in that the same as the diameter (d) of the head (310) of the bolt (300). 제 1 항에 있어서,The method of claim 1, 상기 제 2 그립부재(200)의 제 1 수직부(210)와 제 1 수평부(230) 사이에 형성되는 만곡부(270)를 더 포함하는 것을 특징으로 하는 홈형강용 클립.The grooved steel clip further comprises a curved portion 270 formed between the first vertical portion 210 and the first horizontal portion 230 of the second grip member 200.
KR1020050114052A 2005-11-28 2005-11-28 Clip for channel KR100685174B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050114052A KR100685174B1 (en) 2005-11-28 2005-11-28 Clip for channel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050114052A KR100685174B1 (en) 2005-11-28 2005-11-28 Clip for channel

Publications (1)

Publication Number Publication Date
KR100685174B1 true KR100685174B1 (en) 2007-02-26

Family

ID=38104220

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050114052A KR100685174B1 (en) 2005-11-28 2005-11-28 Clip for channel

Country Status (1)

Country Link
KR (1) KR100685174B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101389958B1 (en) * 2012-07-26 2014-04-30 국일내외건축 주식회사 Celling louver
CN104763089A (en) * 2015-03-20 2015-07-08 嘉兴格勒集成吊顶科技有限公司 Keel connecting piece
CN112854584A (en) * 2021-01-11 2021-05-28 郭燕 Wall body fossil fragments steel construction connection structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101389958B1 (en) * 2012-07-26 2014-04-30 국일내외건축 주식회사 Celling louver
CN104763089A (en) * 2015-03-20 2015-07-08 嘉兴格勒集成吊顶科技有限公司 Keel connecting piece
CN112854584A (en) * 2021-01-11 2021-05-28 郭燕 Wall body fossil fragments steel construction connection structure
CN112854584B (en) * 2021-01-11 2022-05-17 广东新艺达国际装配式建筑装饰工程有限公司 Wall body fossil fragments steel construction connection structure

Similar Documents

Publication Publication Date Title
CA2606845A1 (en) Paired main tee clip
WO2004042266A1 (en) Para-seismic support for pipes
JP5957228B2 (en) Ceiling foundation structure
JP6170697B2 (en) Ceiling foundation structure
KR100685174B1 (en) Clip for channel
JP2018062853A (en) Ceiling substrate structure
JP2013224574A5 (en)
JP5601620B2 (en) Pre-assembled suspended ceiling grate
JP5997914B2 (en) Ceiling foundation structure
JP4787607B2 (en) Suspended ceiling hanging bracket
KR20170032555A (en) Cable tray
JP2004301187A (en) Suspension device for ceiling-suspended object
KR200417314Y1 (en) Apparatus for supporting falling objects
KR200400496Y1 (en) A fence connector A easy control appartuss for angle
KR101929313B1 (en) Pipe supporting member
KR20110008103U (en) Assembly type cable tray for branch point
KR101845008B1 (en) Guard fence using band and connector, and method for constructing this same
KR20200000017A (en) a seismic fixing bracket
KR200418548Y1 (en) Brace for trees
KR102173311B1 (en) The apparatus and constructing method of ceiling finishing using damping bracket
JP5957271B2 (en) Ceiling foundation structure
KR102336056B1 (en) Fixture for Fastening Ceiling Finishing Bar
JP4112831B2 (en) Handrail beam fixing structure for fence
KR102228836B1 (en) A method of manufacturing a pipe hanger that is connected integrally and is easy to construct, and a hanger for pipes manufactured thereby
CN215445358U (en) Be suitable for novel pipeline installing support of using on circular structure post

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130311

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20140305

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20150209

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20151209

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20170119

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20180309

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20190214

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20200212

Year of fee payment: 14