KR100669863B1 - Civil Engineering Bridge Bridge Concrete Slab - Google Patents

Civil Engineering Bridge Bridge Concrete Slab Download PDF

Info

Publication number
KR100669863B1
KR100669863B1 KR1020040085596A KR20040085596A KR100669863B1 KR 100669863 B1 KR100669863 B1 KR 100669863B1 KR 1020040085596 A KR1020040085596 A KR 1020040085596A KR 20040085596 A KR20040085596 A KR 20040085596A KR 100669863 B1 KR100669863 B1 KR 100669863B1
Authority
KR
South Korea
Prior art keywords
concrete slab
bridge
unit member
reinforcing bars
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
KR1020040085596A
Other languages
Korean (ko)
Other versions
KR20060036583A (en
Inventor
김성곤
Original Assignee
박종면
강화영
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 박종면, 강화영 filed Critical 박종면
Priority to KR1020040085596A priority Critical patent/KR100669863B1/en
Publication of KR20060036583A publication Critical patent/KR20060036583A/en
Application granted granted Critical
Publication of KR100669863B1 publication Critical patent/KR100669863B1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00—Structural or constructional details of bridges
    • E01D19/12—Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125—Grating or flooring for bridges
    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00—Material constitution of bridges
    • E01D2101/20—Concrete, stone or stone-like material
    • E01D2101/24—Concrete
    • E01D2101/26—Concrete reinforced
    • E01D2101/268—Composite concrete-metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Road Paving Structures (AREA)

Abstract

본 발명은 토목구조용 교량 콘크리트 슬래브에 관한 것으로서, 더욱 상세하게는 교량 콘크리트 슬래브 시공이 보다 간편하여 공기단축과 함께 철근사용량을 줄여 시공비 절감에 기여할 수 있는 토목구조용 교량 콘크리트 슬래브에 관한 것이다.The present invention relates to a bridge concrete slab for civil engineering, and more particularly, to a bridge concrete slab for civil engineering which can contribute to the construction cost reduction by reducing the amount of reinforcing steel used together with the shortening of the concrete concrete slab.

이를 위해서 본 발명은 길이방향으로 연속 반복되는 판재 형태의 단위부재(10)의 요철부(11)(13)에 의해 내측에 일정한 크기로 되는 다수의 공간(14)을 구획시키도록 구성된 것에 있어서, 상기 단위부재(10)의 요철부(11,13)에 소정의 크기로 되는 구멍(15)이 천설되어 양쪽으로 구획되는 공간(14,14')이 상기 구멍(15)을 서로 공유하도록 되고, 상기 구멍(15)으로 끼워지는 철근(F)은 양쪽이 서로 맞닿는 단위부재(10)(10')의 양쪽 측면부를 감싸는 "U" 형으로 되고, 그 내측에는 외부와 연통되는 개방부(52)가 구비된 철근수용홈(51a,53a)이 구비된 고정구(50)로 고정되는 것을 특징으로 함,To this end, the present invention is configured to partition a plurality of spaces 14 having a constant size inside by the uneven parts 11 and 13 of the unit member 10 in the form of a plate which is continuously repeated in the longitudinal direction, Holes 15 having a predetermined size are formed in the uneven parts 11 and 13 of the unit member 10 so that the spaces 14 and 14 'partitioned to both sides share the holes 15. The reinforcing bar F fitted into the hole 15 has a “U” shape that surrounds both side portions of the unit members 10 and 10 ′ which are in contact with each other, and an opening 52 communicating with the outside therein. It is characterized in that it is fixed with a fixture 50 is provided with a reinforcing groove (51a, 53a) is provided,

슬래브, 교량, 경량판넬Slab, Bridge, Lightweight Panel

Description

토목구조용 교량 콘크리트 슬래브{SLAB}Civil Engineering Bridge Concrete Slab

도1은 종래 토목구조용 교량 콘크리트 슬래브의 예시도,1 is an exemplary view of a conventional bridge concrete slab for civil engineering,

도2는 본 발명에 따른 토목구조용 교량 콘크리트 슬래브의 예시도,2 is an exemplary view of a concrete bridge slab for civil engineering according to the present invention;

도3a는 본 발명에 따른 토목구조용 교량 콘크리트 슬래브를 구성하는 단위부재의 예시도,Figure 3a is an illustration of a unit member constituting the bridge concrete slab for civil construction according to the present invention,

도3b는 도 3a의 단위부재들이 조립되어 모듈화된 콘크리트 슬래브 블럭의 예시도,3B is an exemplary view of a modular slab block in which the unit members of FIG. 3A are assembled and modularized;

도4는 본 발명의 단위부재를 성형하는 단위부재성형기의 예시도,Figure 4 is an illustration of a unit member molding machine for molding the unit member of the present invention;

도5는 본 발명에 따른 콘크리트 슬래브 블럭에 철근이 조립된 예시도,5 is an exemplary view in which reinforcing bars are assembled in a concrete slab block according to the present invention;

도6은 도5의 일요부를 발체한 요부 상세도,6 is a detailed view of the main portion of the main body of FIG. 5;

도7a, 도7b는 본 발명의 또 다른 실시예도,Figure 7a, 7b is another embodiment of the present invention,

도8a, 도8b, 도8c는 본 발명에 따른 콘크리트 슬래브의 여러가지 형태를 나타낸 예시도,8a, 8b, 8c is an exemplary view showing various forms of the concrete slab according to the present invention,

도9a, 도9b는 본 발명에 따른 토목구조용 교량 콘크리트 슬래브의 시공단면도,Figure 9a, Figure 9b is a construction cross-sectional view of the bridge concrete slab for civil construction according to the present invention,

< 도면의 주요부분에 대한 부호설명><Explanation of Signs of Major Parts of Drawings>

10, 단위부재 11,13: 요철부10, unit member 11, 13: uneven portion

14: 공간 15: 구멍14: space 15: hole

16: 블랭킹부 17: 보강부16: blanking part 17: reinforcing part

30: 단위부재성형기 31,33: 압착롤울러30: unit member molding machine 31, 33: pressing roller

31a,33a: 홈 31b,33b: 돌기31a, 33a: groove 31b, 33b: protrusion

40: 받침대 50: 고정구40: base 50: fixture

51a,53a: 철근수용홈 52: 개방부51a, 53a: reinforcing bar 52: opening

70: 노면가열시스템 제어기 71:전기공급부70: road heating system controller 71: electricity supply

A: 판재원판 C: 콘크리트A: Plate disc C: Concrete

F: 철근 100: 콘크리트 슬래브F: Reinforced 100: Concrete slab

본 발명은 토목구조용 교량 콘크리트 슬래브에 관한 것으로서, 더욱 상세하게는 교량 콘크리트 슬래브 시공이 보다 간편하여 공기단축과 함께 철근사용량을 줄여 시공비 절감에 기여할 수 있는 토목구조용 교량 콘크리트 슬래브에 관한 것이다.The present invention relates to a bridge concrete slab for civil engineering, and more particularly, to a bridge concrete slab for civil engineering which can contribute to the construction cost reduction by reducing the amount of reinforcing steel used together with the shortening of the concrete concrete slab.

일반적으로 토목구조물의 하나인 교량은 통로를 형성하는 상부구조물과, 상부구조물을 지지하는 하부구조물로 구성되고 있다.In general, a bridge, which is one of civil engineering structures, is composed of an upper structure forming a passageway and a lower structure supporting the upper structure.

종래에는 도 1에 나타낸 바와 같이 교량에 있어 상부구조물은 압축재인 콘크리트와 인장재인 강재 도는 FRP를 재료로 시공되며, 상부구조물은 현장에서 주철근과 보조철근(배력철근)이 가로(종)방향과 세로(횡)방향으로 서로 교차되게 배근한 후 그 위에 콘크리트를 타설하거나 공장에서 프리캐스트 상판(Precast Deck Pannel) 형태로 제작하여 현장에서 결합한 후 콘크리트를 타설하는 방식으로 시공된다. 하지만 현장타설형 상부구조물은 철근콘크리트의 특성상 무게가 무겁고 공사기간도 길어 막대한 비용이 소요되는 단점이 있다.Conventionally, as shown in FIG. 1, the upper structure of the bridge is constructed of concrete, which is a compressive material, and steel, which is a tensile material, or FRP, and the upper structure has a longitudinal (long) direction and a vertical reinforcing bar and auxiliary reinforcing bars in the site It is installed by placing the concrete on it after crossing each other in the (lateral) direction or by manufacturing it in the form of Precast Deck Pannel at the factory and combining it in the field and then placing the concrete. However, the cast-in-place superstructure has the disadvantage of costly due to the heavy weight and long construction period due to the characteristics of the reinforced concrete.

그리고 프리캐스트를 이용한 상부구조물은 현장타설형 상부구조물에 비해 공기가 크게 단축되는 이점이 있는 반면에 그 크기가 크고 무거워 운반 및 설치에 많은 비용이 소요되는 문제점이 있다.And while the upper structure using the precast has the advantage that the air is significantly shortened compared to the cast-in-place superstructure, the size is large and heavy, there is a problem that costs a lot of transportation and installation.

한편, 교량의 경우 동절기시 눈, 비로 인해 쉽게 결빙되는 단점이 있어 이를 해소하고자 염화칼슘 등을 뿌리거나 제설 작업을 지속적으로 시행하는데 따른 경제적, 시간적인 비용이 많이 소요되는 문제점이 있다.On the other hand, in the case of bridges there is a disadvantage that easily freezes due to snow and rain during the winter season, there is a problem in that it takes a lot of economic and time costs to spray calcium chloride or continuously carry out snow removal work to solve this problem.

상기한 종래의 문제점을 해결하기 위한 것으로, 본 발명은 교량 콘크리트 슬래브를 공장에서 일정 단위형태로 사전 제작하여 모듈화한 콘크리트 슬래브 블럭을 구성하고, 상기 블럭은 현장으로 운반하여 이를 조립하는 조립식으로 구성하여 교량 콘크리트 슬래브를 보다 신속하게 시공할 수 있는 교량 콘크리트 슬래브를 제공함에 그 목적이 있는 것이다.In order to solve the above problems, the present invention comprises a concrete slab block pre-fabricated by manufacturing a bridge concrete slab in a predetermined unit form in the factory, and the block is configured to be assembled to transport it to the site to assemble it It is an object of the present invention to provide a bridge concrete slab capable of constructing a bridge concrete slab more quickly.

또한, 본 발명은 기존처럼 콘크리트 슬래브의 골격이 강재 철근이 아닌 표면적이 넓은 얇은 금속판재로 대신하더라도 기존과 동일한 강성과 내구성을 유지할 수 있고, 콘크리트 단면(두께)을 줄일 수 있어 경량화에 기여할 수 있는 콘크리트 슬래브를 제공함을 또 다른 목적으로 하고 있다.In addition, the present invention can maintain the same stiffness and durability as conventional, even if the skeleton of the concrete slab instead of steel reinforcement instead of a steel reinforcement, and can reduce the concrete cross-section (thickness) to contribute to weight reduction Another object is to provide a concrete slab.

또한, 본 발명은 콘크리크 슬래브는 동절기시 결빙을 방지하는 노면가열시스 템으로 전용되어질 수 있게함을 또 다른 목적으로 하고 있다.In addition, the present invention has another object that the concrete slab can be converted to a road surface heating system to prevent freezing during winter.

상기한 목적 달성을 위한 본 발명의 특징은, 길이방향으로 연속 반복되는 판재 형태의 단위부재(10)에 형성한 요철부(11)(13)에 의해 내측에 일정한 크기로 되는 다수의 공간(14)을 구획시키도록 구성한 것에 있어서, 상기 단위부재(10)의 요철부(11,13)에 소정의 크기로 되는 구멍(15)이 천설되어 양쪽으로 구획되는 공간(14,14')이 상기 구멍(15)을 서로 공유하도록 구성되는 것을 특징으로 한다.A feature of the present invention for achieving the above object is a plurality of spaces 14 having a constant size inside by the uneven portions 11 and 13 formed in the unit member 10 in the form of a plate which is continuously repeated in the longitudinal direction. ), The spaces 15 and 14 'are formed in the concave and convex portions 11 and 13 of the unit member 10 and partitioned to both sides. It is characterized in that it is configured to share (15) with each other.

또한, 단위부재(10)는 폭방향으로 보강부(17)가 병설되고, 상기 구멍(15)에 철근(F)이 끼워지고, 상기 철근(F)을 고정하는 고정구(50)는 양쪽이 서로 맞닿는 단위부재(10)(10')의 양쪽 측면부를 감싸는 "U" 형으로 형성되고 그 내측에는 외부와 연통되는 개방부(52)가 구비된 철근수용홈(51a,53a)이 설치되어 구멍(15)으로 관통되게 기워지는 철근(F)이 철근수용홈(51a,53a)에 안착되는 것을 특징으로 하고 있다.In addition, the unit member 10 is provided with a reinforcing portion 17 in the width direction, the reinforcing bar (F) is fitted into the hole 15, the fastener 50 for fixing the reinforcing bar (F) both sides mutually Reinforcing bars 51a and 53a having an opening portion 52 formed in a “U” shape surrounding both side portions of the unit members 10 and 10 ′ which are in contact with each other and communicating with the outside are provided. 15) is characterized in that the reinforcing bar (F) to be penetrated into the reinforcement receiving groove (51a, 53a) is seated.

본 발명의 토목구조용 교량 콘크리트 슬래브 블럭 또는 단위부재에는 노면의 온도나 눈, 우수의 량에 따라 온, 오프 작동시키는 제어기(70)가 구비된 노면가열시스템이 연결되는 전기공급부를 설치하여 상기 전기공급부에 외부 전원이 연결되어질 수 있도록 구성되는 것을 특징으로 하고 있다.The electrical supply unit is installed in the bridge concrete slab block or unit member for civil engineering of the present invention is connected to the road surface heating system having a controller 70 to operate on, off according to the temperature of the road surface, snow, rain water It is characterized in that it is configured to be connected to an external power source.

이하, 본 발명의 바람직한 실시예를 첨부한 도면을 참조하여 더욱 상세히 설명한다.Hereinafter, with reference to the accompanying drawings, preferred embodiments of the present invention will be described in more detail.

도 2은 본 발명의 토목구조용 교량 콘크리트 슬래브가 시공된 상태를 나타낸 예시도이고, 도 3a와 3b는 본 발명에 따른 교량 컨크리트 슬래브 블럭을 구성하는 단위부재와 상기 단위부재가 조립된 블럭의 예시도를 나타낸고 있다.Figure 2 is an exemplary view showing a state in which the construction of the bridge concrete slab for civil engineering of the present invention, Figures 3a and 3b is an example of a unit member constituting the bridge concrete slab block and the block in which the unit member is assembled The figure is shown.

첨부 도면에서와 같이 토목건축물의 교량 및 콘크리트 슬래브는 소정의 폭을 이루며 길이방향으로 연속되는 띠모양의 금속박판의 양쪽면에 서로 대응되는 사다리꼴 모양의 요철부(11)(13)가 연속 반복되는 하나의 단위부재(10)로 구성되고, 상기 단위부재(10)(10')를 폭방향으로 차례로 조립하여 소망하는 형태와 모양으로 모듈화된 콘크리트 슬래브 블럭(100)을 제공한다.As shown in the accompanying drawings, the bridge and the concrete slab of the civil engineering structure having a predetermined width and the trapezoidal irregularities (11, 13) corresponding to each other on both sides of the strip-shaped metal plate continuous in the longitudinal direction is repeated Consisting of one unit member 10, the unit members 10, 10 'are sequentially assembled in the width direction to provide a modular concrete slab block 100 in a desired shape and shape.

이를 위해서 본 발명은 단위부재(10)의 양쪽 요철부(11)(13)가 인접되는 또 다른 단위부재(10')와 상호간에 지그재그로 맞닿게 용접 또는 별도의 고정구로 차례로 고정되게 조립하여 각각 조립되어지는 단위부재(10,10')의 요철부(11,13)에 의해 조립되는 내측면에 일정한 형태와 모양으로 독립된 공간(14)으로 다수 구획되어지도록 일정 단위의 폭과 크기(1m×1m, 1m×2m)로 규격화된 콘크리트 슬래브 블럭을 제공한다.To this end, in the present invention, both of the uneven parts 11 and 13 of the unit member 10 are assembled to be fixed by welding or a separate fixture in turn to be in contact with another unit member 10 'adjacent to each other in a zigzag. The width and size of a predetermined unit (1m ×) are divided into a plurality of independent spaces 14 in a predetermined form and shape on the inner surface assembled by the uneven parts 11 and 13 of the unit members 10 and 10 'to be assembled. 1m, 1m × 2m) provide concrete slab blocks.

이처럼 모듈화된 콘크리트 슬래브 블럭(100)은 교량을 시공하고자 하는 거푸집 상면에 길이방향으로 연속되게 연결하거나 상,하,좌,우 방향으로 차례로 연결 되도록 조립하여 콘크리트가 타설되어질 수 있는 골조를 형성한다.The modular concrete slab block 100 is formed in such a way that the concrete can be poured by assembling such that the bridge is continuously connected in the longitudinal direction to the formwork to be constructed in the longitudinal direction or connected in the up, down, left, right direction in turn.

도 3a에 나타낸 바와 같이 콘크리트 슬래브(100)를 구성하는 각각의 단위부재(10)는 한쪽 요철부(11) 또는 양쪽 요철부(11,13)에 소정의 크기로 되는 구멍(15)이 천설되어 마주하는 양쪽 요철부(11,11')(13,13')에 의해 각각 구획되는 공간(14,14')들과 연통되는 상기 구멍(15)을 서로 공유하도록 되어 있다.As shown in FIG. 3A, each unit member 10 constituting the concrete slab 100 is provided with holes 15 having a predetermined size in one uneven portion 11 or both uneven portions 11 and 13. The holes 15 communicating with the spaces 14 and 14 'which are respectively partitioned by opposing concave-convex portions 11 and 11' and 13 and 13 'are shared.

이와 같이 요철부(11,13)에 관통되는 구멍(15)을 뚫게되면 교량 시공을 위해 콘크리트를 타설하는 경우 콘크리트들이 각각의 공간(14,14')은 물론 상기 구멍(15)에까지 모두 채워지게 되고, 이때 양쪽으로 구획된 각각의 공간(14,14')에 채워지는 콘크리트의 양생후에는 마치 고리를 연결한 것과 같은 형태를 이루며 일체감을 형성하게 되므로 콘크리트 슬래브의 전체 강도가 균일하게 됨은 물론 내구성이 향상되어 표면적이 큰 금속판재를 슬래브용 골조로 이용하는데 따른 단점을 보완할 수 있는 것이다.As such, when the holes 15 penetrated through the uneven parts 11 and 13 are placed, the concrete is filled in the respective spaces 14 and 14 'as well as the holes 15 when the concrete is poured for the construction of the bridge. In this case, after curing of the concrete filled in each space (14,14 ') partitioned on both sides to form a sense of unity, as if connected to the ring, the overall strength of the concrete slab becomes uniform as well as durable This improvement can be used to compensate for the shortcomings of using a large surface area metal plate as a slab frame.

도 6에 나타낸 바와 같이 상기 구멍(15)은 그 내측으로 철근(F)이 관통되게 끼워넣을 수 있는 충분한 크기로 형성하는 것이 바람직하고, 상기 철근(F)은 모듈화된 콘크리트 슬래브 블럭(100)의 이동 및 운반시 뒤틀림 방지 및 인장재의 역활을 충분히 수행할 수 있게 한다.As shown in FIG. 6, the hole 15 is preferably formed in a size sufficient to allow the reinforcing bars F to penetrate therein, and the reinforcing bars F are formed of the modular concrete slab block 100. To prevent warping and to serve as a tension member during movement and transport.

상기한 구멍 대신에 도 3a에 나타낸 바와 같이 단위부재(10)의 폭방향을 따라 한쪽면으로 소정의 폭만큼 부분적으로 블랭킹되는 보강부(17)가 형성된다. 상기 보강부(17)는 인접되는 또 다른 단위부재(10)서 서로 지그재그로 맞대었을 경우 상호 간섭을 받지 않는 위치에 설치하여 단위부재(10)와 직교되는 폭방향으로 작용하는 직교하중을 지탱할 수 있는 강성 및 내구성 강화에 기여할 수 있게 한다.Instead of the hole described above, as shown in FIG. 3A, a reinforcement part 17 is formed to be partially blanked by a predetermined width on one side along the width direction of the unit member 10. The reinforcement part 17 can support an orthogonal load acting in a width direction perpendicular to the unit member 10 by installing it at a position not mutually interfering with each other when the other unit members 10 are zig-zag adjacent to each other. To contribute to enhanced rigidity and durability.

본 발명은 단위부재(10)의 요철부(11,13)에 구멍(15)이 천공되는 것외에 도 7a와 7b에 나타낸 바와 같이 단위부재(10)의 한쪽면이 프레스에 의해 소망하는 형태로 압압되는 블랭킹부(blanking)(16)(16')를 성형할 수 있고, 그 용도와 목적에 따라서는 상기 구멍(15)과 블랭킹부(16)를 함께 성형도 가능하다.According to the present invention, as shown in FIGS. 7A and 7B, in addition to the hole 15 being drilled in the uneven portions 11 and 13 of the unit member 10, one side of the unit member 10 may be pressed by a press. Blanks 16 and 16 'to be pressed can be formed, and the hole 15 and the blanking 16 can be formed together depending on the purpose and purpose thereof.

그리고 콘크리트 슬래브 블럭(100)을 구성하기 위한 각각의 단위부재(10) 성형을 위해서는 별도의 단위부재성형기(30)가 제공된다.In addition, a separate unit member molding machine 30 is provided for forming each unit member 10 for forming the concrete slab block 100.

도 4에 나타낸 바와 같이 단위부재성형기(30)는 한 쌍의 압착로울러(31,33)로 구성되고, 각각의 압착로울러(31.33)는 그 외원주면에 서로 대응되는 모양의 폭과 피치 및 굴곡을 갖는 홈(31a)(33a)과 돌기(31b)(33b)가 형성되어 이들 홈과 돌기가 서로 맞물린 상태로 회전하도록 구성되어 각각의 단위부재(10)를 압착로울러(31,33) 사이로 통과시키는 간단한 작업으로 단위부재(10)의 양쪽면에는 사다리꼴 모양의 요철부(11.13)를 균일하게 성형할 수 있도록 하였다.As shown in FIG. 4, the unit member molding machine 30 includes a pair of compression rollers 31 and 33, and each of the compression rollers 31.33 has a width, a pitch, and a curved shape corresponding to each other on its outer circumferential surface. Grooves 31a and 33a and protrusions 31b and 33b are formed to rotate in a state where these grooves and protrusions are engaged with each other to pass each unit member 10 between the pressing rollers 31 and 33. By simple operation, both sides of the unit member 10 were capable of uniformly forming a trapezoidal uneven portion (11.13).

단위부재성형기(30)는 띠 모양으로 절단된 길이가 단위부재를 가공하도록 구성하였으나, 필요에 따라서는 폭이 넓은 판재 원판를 이용할 수 있다. 이경우 단위부재성형기(30)의 전방에 판재(A)를 단위부재(10)의 폭으로 절단하도록 절단롤러(35)를 나란히 배치하여 상기 절단롤러(35)가 판재(A)를 단위부재의 폭으로 절단할 수 있게하고, 상기 절단롤러(35)에 의해 일정한 폭으로 절단된 각각의 단위부재(10)는 그 배면부에 위치한 한쌍의 압착로울러(31,33)로 압착 성형할 수 있게 된다.The unit member molding machine 30 is configured to process a unit member having a length cut into a strip, but a wide plate disc may be used as necessary. In this case, the cutting roller 35 is arranged side by side to cut the plate A to the width of the unit member 10 in front of the unit member molding machine 30 so that the cutting roller 35 causes the plate A to be the width of the unit member. Each unit member 10 cut to a predetermined width by the cutting roller 35 can be press-molded with a pair of pressing rollers 31 and 33 located at the rear portion thereof.

또한, 본 발명은 콘크리트 슬래브 블럭(100)의 하부측에는 블럭 형태로 된 받침대(40) 및 각각의 단위부재(10) 또는 모듈화된 콘크리트 슬래브 블럭(100)를 고정되게 조립하는 고정구(50)를 구비하고 있다.In addition, the present invention is provided on the lower side of the concrete slab block 100 has a base 40 in the form of blocks and fixtures 50 for assembling each unit member 10 or modular concrete slab block 100 to be fixed. Doing.

상기 받침대(40)는 거푸집의 상면과 콘크리트 슬래브 블럭(100) 사이에 일정한 간격을 유지하게 하는 스페이서의 기능을 갖도록 자립되게 세워질 수 있는 구조 로 되어 있다.The pedestal 40 has a structure that can be erected to stand free to have the function of a spacer to maintain a constant gap between the upper surface of the formwork and the concrete slab block 100.

상기 받침대(40)와 콘크리트 슬래브 블럭(100)은 콘크리트 타설 후에는 일체로 구성되는 것이므로 이들이 양생되지전까지만 상호 유동됨이 없게 고정하는 역활을 가질 수 있도록 와이어를 이용하여 고정킨다.Since the pedestal 40 and the concrete slab block 100 are integrally formed after the concrete is placed, they are fixed by using wires to have a role of fixing them so that they do not flow to each other until curing.

도 6에서와 같이 고정구(50)는 양쪽이 서로 맞닿는 단위부재(10)(10')의 양쪽 측면부를 감싸듯이 덮을 수 있도록 양쪽으로 절곡되는 "U" 형으로 되어 서로 맞대어지는 양쪽 단위부재(10,10')를 고정시키도록 되고, 상기 고정구(50)의 양쪽 끝단부(51,53)에는 외부와 연통되는 개방부(52)를 갖는 철근수용홈(51a,53a)이 설치되어 콘크리트 슬래브(100)의 구멍(15)으로 끼워지는 철근(F)의 외주면이 상기 철근수용홈(51a,53a)에 안착된 상태로 고정되어질 수 있게 하였다.As shown in FIG. 6, the fastener 50 has a “U” shape that is bent to both sides so as to cover both side portions of the unit members 10 and 10 ′ which are in contact with each other, so that both unit members 10 are opposed to each other. 10 '), and both end portions 51 and 53 of the fixture 50 are provided with reinforcing bar grooves 51a and 53a having openings 52 communicating with the outside. The outer circumferential surface of the reinforcing bars F fitted into the holes 15 of 100 may be fixed while being seated in the reinforcing bars 51a and 53a.

상기 철근수용홈(51a,53a)과 연통되는 개방부(52)는 철근 또는 그 내측에 형성된 철근수용홈(51a,53a)의 직경보다 좁게 형성하여 고정구(50)의 철근수용홈(51a,53a)에 수용되는 철근(F)이 자의적으로 이탈되는 것을 방지하도록 되어 있다. 상기 고정구(50)는 콘크리트 슬래브 블럭(100,100)들을 차례로 연결 조립하는 경우 이들을 고정되게 연결하는 조립부재로 아주 유용하게 이용되어질 수 있다.The opening portion 52 communicating with the reinforcing bars 51a and 53a is formed to be narrower than the diameter of the reinforcing bars 51a and 53a formed in the reinforcing bars or the inner side thereof, so that the reinforcing bars 51a and 53a of the fixture 50 are formed. Reinforcement F accommodated in) is prevented from being arbitrarily separated. The fastener 50 may be very useful as an assembly member for connecting the concrete slab blocks 100 and 100 in order to assemble them.

또한, 본 발명에서는 상기 콘크리트 슬래브 블럭(100)들이 금속으로 이루어진 점을 감안하여 상기 콘크리트 슬래브 블럭(100)의 최종 마감부 또는 각 단위부재(10)에 노면가열시스템의 제어기(70)가 접속되는 전기공급부(71)를 고정되게 설치하여 전기공급부(71)에 노면가열시스템의 제어기(70)가 접속되는 전기공급부(71)를 고정되게 설치하여 상기 전기공급부(71)에 외부 전원이 공급되어질 수 있도록 연결하면 동절기시 눈, 우수의 량에 따라 온, 오프 되는 전기를 도통시킬 경우 노면이 결빙되는 것을 방지하는 가열시스템으로 이용할 수 있다.In addition, in the present invention, in consideration of the point that the concrete slab blocks 100 are made of metal, the controller 70 of the road surface heating system is connected to the final finishing portion or each unit member 10 of the concrete slab block 100. The electric supply unit 71 may be fixedly installed so that the electric supply unit 71 to which the controller 70 of the road surface heating system is connected to the electric supply unit 71 may be fixed so that external power may be supplied to the electric supply unit 71. If it is connected, it can be used as a heating system to prevent the road surface from freezing when electricity is turned on or off depending on the amount of snow and rain in winter.

노면가열시스템의 제어기(70)는 단위부재에 인가되는 전원을 선택적으로 공급하는 스위치와, 노면의 온도나 눈, 우수의 량에 따라 "ON", "OFF" 작동시키는 센서와 제어수단을 함께 구비된다.The controller 70 of the road heating system is provided with a switch for selectively supplying power applied to the unit member, a sensor and a control means for operating " ON " and " OFF " according to the temperature, snow, and rain of the road surface. do.

이와 같이 본 발명은, 교량 축조시 교량의 상부구조물에 공장에서 제작하여 운반된 모듕화된 콘크리트 슬래브 블럭(100)를 상,하,좌,우 방향으로 배치하고, 이들은 고정구(50)를 이용하여 고정되도록 시공한다. 이때 거푸집에 시공되는 콘크리트 슬래브 블럭(100)의 구멍(15)에는 등간격 또는 일정거리 간격으로 철근(F)을 끼워넣어 고정구(50)를 이용하여 함께 고정시킨다.As described above, the present invention arranges the modeled concrete slab block 100 manufactured and transported to the upper structure of the bridge at the time of construction of the bridge in the up, down, left, and right directions, and these are fixed using the fastener 50. Construct to be fixed. At this time, the holes 15 of the concrete slab block 100, which is constructed in the formwork is inserted into the reinforcing bars (F) at regular intervals or at regular intervals to be fixed together using a fixture (50).

이처럼 콘크리트 슬래브 블럭(100)의 구멍(15) 일부에 철근(F)이 관통되게 끼워넣게 되면 기존 보다 적은 량의 철근(F)만으로도 콘크리트 슬래브 블럭(100)의 강도를 보강하는 인장재의 역활을 충분히 수행할 수 있어 기존 보다 적은 량이 소요되게 되게 된다.When the reinforcing bar (F) is inserted through a portion of the hole 15 of the concrete slab block 100 as described above, the reinforcing material that reinforces the strength of the concrete slab block 100 is sufficient even with a smaller amount of reinforcing bar F than the existing one. It can be carried out so that a smaller amount than before.

한편, 교량 슬래브가 상대적으로 큰 경우에는 단일 블럭 즉, 보다 폭이 넓은 단위부재를 사용하는 경우 직교되는 하중에 의해 굴신되는 단점이 있게된다, 이때는 폭이 작은 단위부재를 상,하 2단으로 적층되는 방식 즉, 도 9b에 도시한 바와 같이 콘크리트 슬래브 블럭이 상,하부로 적층되게 쌓아 올리는 방법으로 콘크리트 슬래브를 시공할 수 있는 것이다.On the other hand, when the bridge slab is relatively large, there is a disadvantage in that a single block, that is, when a wider unit member is used, is flexed by an orthogonal load. That is, the concrete slab can be constructed by stacking the concrete slab blocks stacked up and down as shown in Figure 9b.

그리고 시공된 콘크리트 슬래브 블럭(100)의 최종 마감부에는 별도의 노면가 열시스템의 제어기(70)가 연결되는 전기공급부(71)를 설치하여 상기 전기공급부(71)를 통해 전기를 공급할 수 있게한다. 그리하면 노면에 별도의 열선이나 전기설비를 시공하지 아니하더라도 금속판재로 이루어진 각각의 단위부재(10)가 노면을 가열에 필요한 열선 기능과 역활을 수행하게 되어 동절기시 노면이 결빙되는 것을 방지하는 가열시스템으로 이용되어질 수 있다.In addition, the final finishing portion of the constructed concrete slab block 100 is provided with an electric supply unit 71 to which the controller 70 of the separate road surface heating system is connected so that electricity can be supplied through the electric supply unit 71. Then, even if a separate heating wire or electric equipment is not installed on the road surface, each unit member 10 made of a metal plate performs the heating wire function necessary for heating the road surface, thereby preventing the road surface from freezing during the winter season. Can be used as a system.

이상에서 설명한 바와 같이 본 발명에 의하면, 토목건축물의 교량 콘크리트 슬래브를 일정단위 크기로 모듈화 된 블럭을 공장에서 사전 제작하여 작업 현장으로 운반한 후 현장에서 조립하는 조립식으로 구성하므로서 콘크리트 슬래브 시공이 보다 간편하게 이루어질 수 있게되어 공사기간을 단축시키는 크게 기여할 수 있는 이점이 있다.As described above, according to the present invention, the construction of concrete slab is more convenient by constructing the prefabricated blocks of the concrete slab of civil engineering to a certain unit size in the factory and transporting them to the work site and then assembling them on the site. It can be made there is an advantage that can greatly contribute to shorten the construction period.

또한, 본 발명은 폭이 작고 좁은 경량판재를 이용하므로써 가볍고, 제작 및 생산비가 적어 가격도 저렴할 뿐만 아니라, 타설되는 콘크리트와 결합성을 높일 수 있도록 서로 구획되어지는 각각의 공간들을 서로 공유하는 구멍이 천설하여 상기 상기 구멍에 의해 콘크리트가 사슬처럼 연결되는 방식으로 타설되므로 보다 견고하게 시공되어질 수 있게 된다.In addition, the present invention is light by using a narrow and narrow lightweight plate, and the production and production costs are low, as well as low in price, and the holes sharing each other spaces that are partitioned with each other so as to increase the bonding with the concrete to be poured Since it is laid in a way that concrete is connected like a chain by the hole, it can be constructed more firmly.

또한, 본 발명은 교량의 설치시공 작업을 간편히 시행할 수 있게함으로써 공사기간의 단축과 함께 기존에 철근만을 이용하던 것을 경량판재로 대신하므로써 철근 사용량을 크게 줄게 되고, 교량의 경량화에 기여할 수 있게되는 이점이 있다.In addition, the present invention can be easily carried out by the installation and construction work of the bridge by reducing the construction period and by using a light plate instead of the existing reinforcing bar to reduce the amount of reinforcing bar significantly, and contribute to the weight reduction of the bridge There is an advantage.

또한, 본 발명은 콘크리트 슬래브 블럭(100)은 노면이 결빙되는 것을 방지하 는 가열시스템으로 전용이 가능하게 되어 이를 따로 시공하는데 따른 번거러움을 덜 수 있으며, 동결방지를 위한 열화칼슘 등을 포설하지 않아도 되므로 경제적, 시간적인 비용 절감 및 도로의 수명이 연장되는 등의 효과를 갖는 매우 유용한 발명인 것이다.In addition, the present invention is the concrete slab block 100 can be dedicated to the heating system to prevent the road surface freezing can be reduced to the hassle of separate construction, without having to install a deteriorated calcium, etc. to prevent freezing Therefore, it is a very useful invention having the effect of reducing the economical and time cost and extending the life of the road.

Claims (5)

삭제delete 삭제delete 삭제delete 길이방향을 따라 서로 상반되게 연속 반복적으로 절곡되어 서로 마주하게 조립되는 단위부재(10)의 요철부(11)(13)에 의해 양쪽으로 구획되는 다수의 공간(14,14')이 형성되고, 상기 요철부(11)(13)에는 인접되는 공간(14,14')을 서로 공유하도록 구멍(15)이 천공되는 것에 있어서,A plurality of spaces 14 and 14 'are formed on both sides by the concave and convex portions 11 and 13 of the unit member 10 which are bent repeatedly and repeatedly opposite to each other along the longitudinal direction, and are assembled to face each other. In the concave and convex portions 11 and 13, holes 15 are drilled to share adjacent spaces 14 and 14 'with each other. 상기 구멍(15)으로 철근(F)이 관통되게 끼워지고, 상기 철근(F)은 단위부재(10)(10')의 양쪽 측면부를 감싸도록 "U" 형으로 절곡되는 고정구(50)에 의해 고정되며 상기 고정구(50)는 양쪽 끝단부(51,53)에 개방부(52)를 갖는 철근수용홈(51a,53a)이 설치되어 상기 철근수용홈(51a,53a)에 철근(F)이 위치하도록 고정되는 것을 특징으로 하는 토목건축용 교량 콘크리트 슬래브.Reinforcing bars (F) are inserted through the holes (15), and the reinforcing bars (F) are bent by a fixture (50) bent in a "U" shape to surround both side portions of the unit members (10, 10 '). The fastener 50 is provided with reinforcing bars 51a and 53a having openings 52 at both ends 51 and 53, so that reinforcing bars F are provided in the reinforcing bars 51a and 53a. Bridge concrete slab for civil construction, characterized in that fixed to position. 길이방향을 따라 서로 상반되게 연속 반복적으로 절곡되어 서로 마주하는 한 쌍의 요철부(11)(13)에 의해 양쪽으로 구획되는 다수의 공간(14,14')이 형성되고, 상기 요철부(11)(13)에는 인접되는 공간(14,14')을 서로 공유하도록 구멍(15)이 천공되는 것에 있어서,A plurality of spaces 14 and 14 'partitioned on both sides are formed by a pair of uneven portions 11 and 13 facing each other by successively repeatedly bending opposite to each other along the longitudinal direction, and the uneven portions 11 In the hole 13, holes 15 are drilled to share adjacent spaces 14 and 14 'with each other. 상기 단위부재(10)에 노면가열시스템 제어기(70)의 외부 전원을 공급하는 전기공급부(71)를 연결하여 상기 단위부재(10)를 노면가열을 위한 열선 대용으로 이용하는 것을 특징으로 하는 토목건축용 교량 콘크리트 슬래브.Bridge for civil construction, characterized in that the unit member 10 is used as a substitute for heating wire for road heating by connecting the electric supply unit 71 for supplying external power of the road surface heating system controller 70 to the unit member 10. Concrete slab.
KR1020040085596A 2004-10-26 2004-10-26 Civil Engineering Bridge Bridge Concrete Slab Expired - Fee Related KR100669863B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040085596A KR100669863B1 (en) 2004-10-26 2004-10-26 Civil Engineering Bridge Bridge Concrete Slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040085596A KR100669863B1 (en) 2004-10-26 2004-10-26 Civil Engineering Bridge Bridge Concrete Slab

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2004-0030161U Division KR200372745Y1 (en) 2004-10-26 2004-10-26 Slab

Publications (2)

Publication Number Publication Date
KR20060036583A KR20060036583A (en) 2006-05-02
KR100669863B1 true KR100669863B1 (en) 2007-01-17

Family

ID=37144702

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040085596A Expired - Fee Related KR100669863B1 (en) 2004-10-26 2004-10-26 Civil Engineering Bridge Bridge Concrete Slab

Country Status (1)

Country Link
KR (1) KR100669863B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102178005B1 (en) * 2020-07-24 2020-11-12 김성 Concrete paving slab structure using honeycomb composite material

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116732859A (en) * 2021-02-05 2023-09-12 成都蜂装钢构集团有限公司 Assembled elevated road and bridge mounting structure

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200347024Y1 (en) * 2004-01-15 2004-04-03 조기현 Complex Slab Structure using 2 Dimensionally arrayed Corrugated Type Deck Plate

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200347024Y1 (en) * 2004-01-15 2004-04-03 조기현 Complex Slab Structure using 2 Dimensionally arrayed Corrugated Type Deck Plate

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102178005B1 (en) * 2020-07-24 2020-11-12 김성 Concrete paving slab structure using honeycomb composite material

Also Published As

Publication number Publication date
KR20060036583A (en) 2006-05-02

Similar Documents

Publication Publication Date Title
KR101152270B1 (en) Precast concrete slab system for building which have long span and require high design load and construction method using this system
KR101765334B1 (en) Construction methods of precast concrete slab having its connection part being concealed by coupled ribs and, precast concrete slab used therefor
KR20170141895A (en) Arch structure with reinforced arch rib segment and arch structure construction method therefor
KR101850948B1 (en) Eco-mold module and construction method of wooden building using the same
KR101586385B1 (en) Coupled PC Composite Girder and Construction Method thereof
KR101043531B1 (en) Support beam structure that can reduce the span length and ceiling height
KR20080004835U (en) A Precast Concrete Culvert
CA2023198C (en) Composite girder construction and method of making same
JP2005180005A (en) Precast prestressed concrete web for concrete box girder bridge, and the concrete box girder bridge using the same
KR101937366B1 (en) A Precast structure for underground tunnel
KR20080093261A (en) Steel composite bridge construction method
JP5769291B2 (en) Precast synthetic slab erection method
KR101476411B1 (en) Precast concrete frame for buildings using precast concrete beam continued by post tensioning
KR20130040652A (en) Precast concrete frame and its construction method for buildings using precast concrete slab continued by post tensioning
KR100634344B1 (en) Composite bottom plate and its connection structure
KR200372745Y1 (en) Slab
KR20060036583A (en) Civil Engineering Bridge Bridge Concrete Slab
RU2516174C2 (en) Prestressed board
KR102113729B1 (en) Composite built-up beam
KR100728106B1 (en) Cantilevered part installation structure and construction method of bridge deck
KR101241400B1 (en) Arch structure
KR20060028828A (en) Slab Integral Precast Concrete Girder
KR20170040022A (en) Hybrid beam with wide PSC lower flange and enlarged section upper flange and structure frame using the same
KR200398769Y1 (en) prefabricated arched tunnel with cross section of T-type
KR101576215B1 (en) Prefabricated precast concrete girder for building construction

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

St.27 status event code: A-0-1-A10-A12-nap-PA0109

PA0201 Request for examination

St.27 status event code: A-1-2-D10-D11-exm-PA0201

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

R15-X000 Change to inventor requested

St.27 status event code: A-3-3-R10-R15-oth-X000

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

R15-X000 Change to inventor requested

St.27 status event code: A-3-3-R10-R15-oth-X000

R16-X000 Change to inventor recorded

St.27 status event code: A-3-3-R10-R16-oth-X000

PE0801 Dismissal of amendment

St.27 status event code: A-2-2-P10-P12-nap-PE0801

PG1501 Laying open of application

St.27 status event code: A-1-1-Q10-Q12-nap-PG1501

E902 Notification of reason for refusal
PE0902 Notice of grounds for rejection

St.27 status event code: A-1-2-D10-D21-exm-PE0902

T11-X000 Administrative time limit extension requested

St.27 status event code: U-3-3-T10-T11-oth-X000

T11-X000 Administrative time limit extension requested

St.27 status event code: U-3-3-T10-T11-oth-X000

E13-X000 Pre-grant limitation requested

St.27 status event code: A-2-3-E10-E13-lim-X000

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

R15-X000 Change to inventor requested

St.27 status event code: A-3-3-R10-R15-oth-X000

R16-X000 Change to inventor recorded

St.27 status event code: A-3-3-R10-R16-oth-X000

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

St.27 status event code: A-1-2-D10-D22-exm-PE0701

GRNT Written decision to grant
PR0701 Registration of establishment

St.27 status event code: A-2-4-F10-F11-exm-PR0701

PR1002 Payment of registration fee

St.27 status event code: A-2-2-U10-U11-oth-PR1002

Fee payment year number: 1

PG1601 Publication of registration

St.27 status event code: A-4-4-Q10-Q13-nap-PG1601

LAPS Lapse due to unpaid annual fee
PC1903 Unpaid annual fee

St.27 status event code: A-4-4-U10-U13-oth-PC1903

Not in force date: 20100111

Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

PC1903 Unpaid annual fee

St.27 status event code: N-4-6-H10-H13-oth-PC1903

Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

Not in force date: 20100111

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000