KR100665986B1 KR1020050123582A KR20050123582A KR100665986B1 KR 100665986 B1 KR100665986 B1 KR 100665986B1 KR 1020050123582 A KR1020050123582 A KR 1020050123582A KR 20050123582 A KR20050123582 A KR 20050123582A KR 100665986 B1 KR100665986 B1 KR 100665986B1
Authority
KR
South Korea
Prior art keywords
drainage
pipe
construction method
maintaining
hydraulic pressure
Prior art date
Application number
KR1020050123582A
Other languages
Korean (ko)
Inventor
박옥교
김형태
최재성
Original Assignee
박옥교
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 박옥교 filed Critical 박옥교
Priority to KR1020050123582A priority Critical patent/KR100665986B1/en
Application granted granted Critical
Publication of KR100665986B1 publication Critical patent/KR100665986B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/10Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Abstract

A construction method of a drainageway is provided to keep uplift pressure regularly and to prevent the excessive discharge of underground water by ascending or descending a drainageway to the appointed height to have the differential head of water and distributing pressure evenly. A construction method of a drainageway for keeping optimum water pressure comprises the steps of leveling up an excavation plane(1) and installing drain boards(10) on the leveled excavation plane to function as a drainageway and placing lean concrete(20) and bottom concrete(40), decompressing to ascend and descend the drainageway to the appointed height from the excavation plane to be located higher than the lean concrete and the bottom concrete, and forming a lean concrete layer by placing mortar to the appointed height on the excavation plane.

Description

적정수압 유지를 위한 배수로 시공방법 {The construction method of basement drainage}The construction method of basement drainage

도 1은 종래의 배수로 시공 단면을 나타내는 도면이다.1 is a view showing a cross section of a conventional drainage construction.

도 2는 종래의 배수로 시공 단면을 확대하여 나타내는 도면이다.2 is an enlarged view showing a cross section of a conventional drainage construction.

도 3은 본 발명의 다양한 배수로 시공 방법을 나타내는 도면이다.3 is a view showing a variety of drainage construction method of the present invention.

도 4는 다양한 위치와 경로를 갖는 본 발명의 배수로 시공 방법을 나타내는 도면이다.4 is a view showing a drainage construction method of the present invention having various positions and paths.

도 5는 다양한 위치와 경로를 갖는 본 발명의 다른 배수로 시공 방법을 나타내는 도면이다.5 is a view showing another drainage construction method of the present invention having various positions and paths.

도 6은 다양한 위치와 경로를 갖는 본 발명의 또 다른 배수로 시공 방법을 나타내는 도면이다.6 is a view showing another drainage construction method of the present invention having a variety of positions and paths.

도 7은 사이펀 효과를 방지하기 위한 본 발명 배수로의 다양한 형태를 나타내는 도면이다.7 is a view showing various forms of the present invention drainage for preventing the siphon effect.

< 도면의 주요 부분의 부호의 설명 ><Description of Signs of Major Parts of Drawings>

1: 굴토마감면 10 : 배수재1: gulto finish noodle 10: drainage

12 : 커넥터 20 : 버림콘크리트12: connector 20: discarded concrete

30 : 집수정 40 : 바닥구체콘크리트30: sump 40: floor concrete

42 : 벽체 50 : 관42: wall 50: tube

52 : 상방배출관 54 : 하방배출관52: upward discharge pipe 54: downward discharge pipe

56 : 상단수용공간 60 : 무공관56: upper accommodation space 60: non-public hall

62 : 상방배출관 64 : 하방배출관62: upward discharge pipe 64: downward discharge pipe

66 : 상단수용공간 68 : 홀66: upper accommodation space 68: hall

본 발명은 건축물 하부 및 주위의 지하수를 배수하기 위한 배수로 시공방법에 관한 것으로서, 보다 상세하게는 건축물의 하부 혹은 측면에서 침투하는 지하수를 집수정 등을 통해 적절히 배출시키되, 과도한 지하수 배출로 인한 문제를 방지하기 위해 건축물의 자중과 건축물 바닥면에서의 지하수의 작용압력에 의한 힘이 균형을 이룰 수 있는 배수로를 시공하기 위한 방법에 관한 것이다.The present invention relates to a drainage construction method for draining the groundwater around the lower part of the building and, more particularly, the groundwater penetrating from the lower part or side of the building is appropriately discharged through a collecting well, etc. The present invention relates to a method for constructing a drainage path where a balance between self-weight of a building and an action pressure of groundwater on the floor of a building can be balanced.

일반적으로 건축물 주변 및 하부에 많은 양의 지하수가 존재하게 되면 건축물은 지하수로 인해 일종의 부력을 전달받아 건축물이 떠오르는 힘을 받으며 파괴되어 안전을 위협하게 된다. 반대로, 건축물 주변 및 하부에 존재하는 지하수를 강제 배수에 의해 많은 양을 급격하게 제거해 버리면 지하수가 존재하던 공간이 갑자기 비게 되면서 지반이 침하하게 되고, 이로 인해 건축물이 내려앉게 되어 그 안전 을 위협하게 된다.In general, when a large amount of groundwater exists around and underneath the building, the building receives a buoyancy force due to the groundwater, which causes the building to rise and is destroyed, threatening safety. On the contrary, if a large amount of groundwater existing around and underneath the building is removed by forced drainage, the ground where the groundwater existed suddenly becomes empty and the ground sinks, which causes the building to fall down and threaten its safety. .

건물의 기초 바닥에 작용하는 상향수압 처리를 위해서 사하중과 영구(부력)앙카를 통한 공법이 많이 사용되나, 이는 건물의 내구성 및 안전성과 관련하여 부력앙카의 인장력에 대한 지속적인 신뢰성이 보장되지 않는다는 한계가 있다. 이를 개선한 방법이 기초바닥 아래에 인위적인 집수정과 배수층을 형성하여 부지 내로 유입되는 지하수가 배수로를 따라 집수정으로 모이면 정기적으로 이를 펌핑하여 배출시킴으로써 기초바닥 콘크리트에 양압이 작용하지 않도록 하는 기초바닥 영구 배수시스템 방법이다. 이는 종래의 방법에 비해 높은 지하수위와 비례하여 작용하는 상향수압 문제를 보다 안정적이고, 영구적으로 해결하게 하는 장점이 있다.Many methods are used through dead weight and permanent (buoyancy) anchors for the up-water pressure treatment on the foundation floor of the building, but this is limited in that the continuous reliability of the buoyancy anchor's tensile force is not guaranteed with respect to the durability and safety of the building. have. An improved method is to form an artificial catchment and drainage layer under the foundation floor so that the groundwater flowing into the site is collected in the catchment along the drainage path and pumped and discharged regularly so that the foundation floor concrete does not act as a positive pressure. Permanent drainage system method. This has the advantage of more stable and permanently solve the problem of up-water pressure in proportion to the high groundwater level compared to the conventional method.

이러한 종래의 일반적인 배수 시스템이 도 1 및 도 2에 도시되어 있다. 도 1 및 도 2를 참조하면, 굴토마감면(101) 위에 소정 높이를 갖는 배수재(또는 거푸집)(110)을 가로 및/또는 세로로 서로 소정의 간격을 이루면서 수평되게 연결하여 배치하되 상기 암반층의 굴토마감면(101)과 상기 배수재(110) 사이에 부직포(미도시)를 위치시키면서 일측으로 모여진 배수재(110)의 출구가 상기 집수정(130)과 연결되도록 설치하고 그 위에 몰탈을 소정 높이로 타설하여 버림콘크리트(120)를 형성하는 방식이다.This conventional general drainage system is shown in FIGS. 1 and 2. Referring to FIGS. 1 and 2, the drainage material (or formwork) 110 having a predetermined height is horizontally and / or vertically connected to each other at a predetermined interval and disposed horizontally on the gulto finish surface 101, but the rock layer While placing the nonwoven fabric (not shown) between the gulto finish surface 101 and the drainage 110 is installed so that the outlet of the drainage 110 gathered to one side is connected to the sump 130 and the mortar on a predetermined height It is a method of forming cast concrete 120 by pouring.

이러한 종래의 방식은 집수정(130)을 통해 강제배수시키거나, 또는 별도의 배출관(미도시)과 직접 연결되며 외부의 주배수로(미도시)와 연통되어, 상향 수압에 의해 자연배수시킬 수 있게 된다. 그런데 이러한 배수 방법은 과도한 배출로 인한 지반 침하를 방지할 수 없다는 문제점이 있다.This conventional method is forced to drain through the sump 130, or directly connected to a separate discharge pipe (not shown) and in communication with the external main drain (not shown), so that it can be naturally drained by the upward pressure do. However, this drainage method has a problem that can not prevent ground subsidence due to excessive discharge.

따라서 건축물의 상향 수압 방지를 위한 지하수 배출을 원활히 하는 동시에 과도한 배출을 방지하여, 설계안정수위, 즉 건축물의 자중과 건축물 하부에서의 지하수의 작용압력에 의한 힘이 균형을 이루는 이론적인 지하수 안정 수위로 유지될 수 있도록 하기 위해, 건축물 하부 저면으로 침투되는 지하수를 설계안정수위가 될 때까지 중간중간 다양한 방법을 통하여 집수하고, 설계안정수위를 넘는 경우에만 배출할 수 있도록 하는 배수시스템을 구비할 필요가 있게 되었다.Therefore, the groundwater discharge is prevented to prevent the upward pressure of the building, and at the same time, the excessive discharge is prevented, and the design ground water level, that is, the theoretical groundwater level is a balance between the force due to the pressure of the groundwater under the building. In order to be maintained, it is necessary to have a drainage system that collects groundwater that penetrates the bottom of the building through various intermediate methods until it reaches the design stability level, and discharges it only when it exceeds the design stability level. It became.

본 발명은 상기와 같은 문제점을 해결하기 위해 안출된 것으로서, 건축물 저면의 지하수위가 설계안정수위를 넘지 않도록 하여 지하수에 의해 작용된 부력이 건축물의 안전을 위협하는 것을 피할 수 있는 동시에, 지하수가 과도하게 강제 배수되는 것을 방지하기 위한 배수로 구조를 시공하기 위한 방법을 제공하는 것을 목적으로 한다.The present invention has been made to solve the above problems, the groundwater level of the bottom of the building does not exceed the design stable water level to avoid buoyancy acted by the groundwater threatens the safety of the building, and the groundwater is excessive It is an object of the present invention to provide a method for constructing a drainage structure for preventing forced drainage.

상기와 같은 목적을 달성하기 위한 본 발명의 구성은, 지하 건축 구조물의 바닥 하부에서 발생되는 지하수의 수두차에 의한 높은 상향수압을 방지하고 적정한 수압을 유지시키기 위한 배수로 시공방법에 있어서, 굴토 후의 상면 자체 또는 잔토층, 자갈층, 버럭층 등을 이용하여 굴토마감면이 수평을 이루도록 정지하는 수평정지 작업공정; 상기 수평정지 작업공정을 거친 상기 굴토마감면에 배수로 기능을 위한 배수재를 설치하는 배수재 설치공정; 상기 배수로가 상기 굴토마감면으로부터 소정 높이만큼 상승 및 하강하도록 하는 감압 작업공정; 및 상기 굴토마감면 위에 몰탈을 소정 높이로 타설하여 버림콘크리트층을 형성하는 버림콘크리트 타설공정;을 포함하여 구성되는 것을 특징으로 한다.The construction of the present invention for achieving the above object is, in the drainage construction method for preventing the high up-water pressure caused by the water head difference of the groundwater generated in the bottom of the underground building structure and to maintain a proper water pressure, the upper surface after the excavation Horizontal stop working process to stop the oyster finish surface to be horizontal by using itself or the remaining soil layer, gravel layer, the barrier layer; A drainage installing step of installing drainage for drainage function on the gulto finish surface after the horizontal stop working process; A decompression work step of allowing the drainage path to ascend and descend by a predetermined height from the gulting finish surface; And a discarding concrete placing step of forming a discarding concrete layer by pouring mortar on the gulting finish surface to a predetermined height.

상기 감압 작업공정은: 상기 배수재가 소정 높이만큼 상승한 후 하강되도록 하는 시공방법을 포함하는 것을 일 특징으로 한다.The depressurizing work process is characterized in that it comprises a construction method for causing the drainage material to rise and then descend by a predetermined height.

상기 배수재는 측방에 구멍이 없는 무공형인 것을 일 특징으로 한다.The drain material is characterized in that the non-porous form without a hole in the side.

상기 감압 작업공정은: 상기 배수재에 별도의 관을 연결하는 시공방법을 포함하고, 상기 관은 상기 배수재의 위치로부터 소정 높이만큼 상승한 후 하강되는 형상인 것임을 일 특징으로 한다.The depressurizing work process includes: a construction method for connecting a separate pipe to the drain material, wherein the pipe is characterized in that the shape is to be lowered after ascending by a predetermined height from the position of the drain material.

상기 감압 작업공정은 상기 버림콘크리트 타설공정 후에 상기 배수로를 소정 높이만큼 상승한 후 하강되도록 하는 것을 일 특징으로 한다.The depressurizing work process is characterized in that after the discarded concrete pouring process, the drainage path is raised and lowered by a predetermined height.

상기 감압 작업공정은 바닥콘크리트를 타설한 후에 상기 배수로를 소정 높이만큼 상승한 후 하강되도록 하는 것을 일 특징으로 한다.The depressurizing work process is characterized in that after the bottom concrete is poured, the drainage path is raised and lowered by a predetermined height.

상기 관은 무공관인 것을 일 특징으로 한다.The pipe is characterized in that the air pipe.

상기 관은 벽체 또는 기둥 내에 밀폐되도록 설치되는 것을 일 특징으로 한다.The pipe is characterized in that it is installed to be sealed in the wall or pillar.

상기 관은 상기 배수재로부터 연결되어 상기 버림콘크리트의 상부에 타설된 바닥콘크리트층 내에서 소정 높이만큼 상승한 후 하강되어 집수정측과 연결되도록 하여, 상기 바닥콘크리트층 내에 밀폐되도록 설치된 것을 일 특징으로 한다.The pipe is connected to the drainage material and ascends by a predetermined height in the bottom concrete layer placed on top of the discarded concrete, and then descends to be connected to the sump collecting side, characterized in that it is installed to be sealed in the bottom concrete layer.

상기 관의 하강되는 부분의 단부는 별도의 제2배수재와 연결되는 것임을 일 특징으로 한다.End of the lower portion of the pipe is characterized in that it is connected to a separate second drain.

상기 버림콘크리트의 상부에 타설된 바닥콘크리트층에는 상기 배수재와 연결되는 상방 수로가 형성되고, 상기 상방 수로에는 상기 관이 연결되는 것을 일 특징으로 한다.The bottom concrete layer placed on top of the discarded concrete is formed with an upper channel connected to the drainage material, and the tube is connected to the upper channel.

상기 관은 소정 높이만큼 상승한 후 하강하면서 상기 바닥콘크리트층에 형성된 하방 수로와 연결되고, 상기 하방 수로는 집수정측으로 바로 연결되거나, 별도의 제2배수재와 연결되는 것을 일 특징으로 한다.The pipe is ascending and then descending by a predetermined height is connected to the lower channel formed in the bottom concrete layer, the lower channel is characterized in that it is directly connected to the collecting well side, or connected to a separate second drain.

상기 버림콘크리트에는 상기 배수재와 연결되는 상방 수로가 형성되고, 상기 상방 수로에는 상기 관이 연결되는 것을 일 특징으로 한다.The discarded concrete is characterized in that the upper channel is connected to the drainage is formed, the pipe is connected to the upper channel.

상기 관은 소정 높이만큼 상승한 후 하강하여 상기 버림콘크리트의 상측에서 집수정측으로 연결되는 것을 일 특징으로 한다.The pipe is raised by a predetermined height and then lowered, characterized in that connected to the water collecting well side from the upper side of the discarded concrete.

상기 관은 소정 높이만큼 상승한 후 하강하면서 상기 버림콘크리트층에 형성된 하방 수로와 연결되고, 상기 하방 수로는 집수정측으로 바로 연결되거나, 별도의 제2배수재와 연결되는 것을 일 특징으로 한다.The pipe is ascending and then descending by a predetermined height is connected to the lower channel formed in the discarded concrete layer, the lower channel is characterized in that it is directly connected to the collecting well side, or connected to a separate second drain.

상기 관의 하강되는 부분의 단부는 상기 굴토마감면에 형성된 집수정과 연결되는 것을 일 특징으로 한다.An end of the descending portion of the pipe is characterized in that it is connected to the sump formed on the gulto finish surface.

상기 관의 하강하는 부분의 전부 또는 일부 단면적은 상기 관의 상승하는 부분의 단면적보다 넓은 형태인 것임을 일 특징으로 한다.All or a partial cross-sectional area of the descending portion of the tube is characterized in that it is wider than the cross-sectional area of the rising portion of the tube.

상기 관의 상승하는 부분 상단부에는 상승하는 부분의 상기 관 단면적보다 큰 상단수용공간이 구비되는 것을 일 특징으로 한다.The upper portion of the rising portion of the tube is characterized in that the upper receiving space larger than the cross-sectional area of the rising portion is provided.

상기 상단수용공간의 일측에 형성된 하강하는 부분의 관 단면적은 상기 관의 상승하는 부분의 단면적보다 넓은 형태인 것임을 일 특징으로 한다.The pipe cross-sectional area of the descending portion formed on one side of the upper accommodating space is characterized in that the shape is wider than the cross-sectional area of the rising portion of the pipe.

상기와 같은 목적을 달성하기 위한 본 발명의 다른 방법은, 굴토 후의 상면 자체 또는 잔토층, 자갈층, 버럭층 등을 이용하여 굴토마감면이 수평을 이루도록 정지하는 수평정지 작업공정; 상기 굴토마감면의 일측에 집수정을 설치하는 집수정 설치공정; 상기 수평정지 작업공정을 거친 상기 굴토마감면에 배수로 기능을 위한 배수재를 설치하는 배수재 설치공정; 상기 집수정측에 지하수를 배출하기 위한 배수로의 단부측이 상기 굴토마감면으로부터 소정 높이만큼 상승 및 하강하도록 하는 감압 작업공정; 및 상기 굴토마감면 위에 몰탈을 소정 높이로 타설하여 버림콘크리트층을 형성하는 버림콘크리트 타설공정;을 포함하여 구성되는 것을 일 특징으로 한다.Another method of the present invention for achieving the above object is a horizontal stop working process for stopping the gulto finish surface horizontally by using the upper surface itself after the gulto, or the after-layer layer, gravel layer, the barrier layer; A collecting well installation step of installing a collecting well on one side of the gulto finish surface; A drainage installing step of installing drainage for drainage function on the gulto finish surface after the horizontal stop working process; A decompression operation step of allowing the end side of the drainage passage for discharging groundwater to the sump collecting side to rise and fall by a predetermined height from the gulting finish surface; And a discarding concrete placing step of forming a discarding concrete layer by pouring mortar on the gulting finish surface to a predetermined height.

상기 감압 작업공정은: 상기 배수재에 별도의 무공관을 연결하는 시공방법을 포함하고, 상기 무공관은 상기 배수재의 위치로부터 소정 높이만큼 상승한 후 상기 집수정을 향해 하강되는 형상인 것임을 일 특징으로 한다.The depressurizing work process includes: a construction method for connecting a separate non-tubular pipe to the drain material, wherein the pipeless pipe is shaped to be lowered toward the water collecting well after ascending by a predetermined height from the position of the drain material. .

상기 감압 작업공정은: 상기 배수재에 별도의 무공관을 연결하는 시공방법을 포함하고, 상기 무공관은 상기 배수재의 위치로부터 소정 높이만큼 상승한 후 별도로 형성된 트랜치를 향해 하강되는 형상인 것임을 일 특징으로 한다.The depressurizing work process includes: a construction method for connecting a separate non-pipe to the drain, wherein the pipe is shaped to descend toward a trench formed separately after ascending by a predetermined height from the position of the drain. .

상기 무공관의 하강하는 부분의 전부 또는 일부 단면적은 상기 무공관의 상 승하는 부분의 단면적보다 넓은 형태인 것임을 일 특징으로 한다.All or part of the cross-sectional area of the lower portion of the tube is characterized in that the shape is wider than the cross-sectional area of the rising portion of the tube.

상기 무공관의 상승하는 부분 상단부에는 상승하는 부분의 상기 무공관 단면적보다 큰 상단수용공간이 구비되는 것을 일 특징으로 한다.The upper end of the rising portion of the tube is characterized in that the upper receiving space larger than the cross-sectional area of the tube of the rising portion is provided.

상기 상단수용공간의 일측에 형성된 하강하는 부분의 무공관 단면적은 상기 무공관의 상승하는 부분의 단면적보다 넓은 형태인 것임을 일 특징으로 한다.The non-tubular cross-sectional area of the descending portion formed on one side of the upper receiving space is characterized in that the shape is wider than the cross-sectional area of the rising portion of the non-empty tube.

상기 무공관의 상단부측에는 홀이 형성되는 것을 일 특징으로 한다.The hole is formed on the upper end side of the pipe.

상기 관의 상단부측에는 개폐 가능한 홀이 형성되는 것을 일 특징으로 한다.The upper end side of the tube is characterized in that the opening and closing hole is formed.

이하 첨부된 도면에 도시된 본 발명 구성의 실시례를 참조하여, 본 발명의 구성을 상세히 살펴보도록 한다.Hereinafter, the configuration of the present invention will be described in detail with reference to embodiments of the present invention shown in the accompanying drawings.

도 3은 본 발명의 다양한 배수로 시공 방법을 나타내는 도면이다. 도 3을 참조하면, 다양한 방식의 배수로가 도시되어 있다. A, B, C, D 와 같이 다양한 방식으로 배수로를 구성할 수 있다.3 is a view showing a variety of drainage construction method of the present invention. Referring to FIG. 3, various ways of drainage are shown. Drainage can be constructed in a variety of ways, such as A, B, C, and D.

굴토마감면(1) 위의 배수재(10)로부터 상방으로 일정 높이를 갖도록 하면서, 버림콘크리트(20)와 바닥구체콘크리트(40) 보다 높은 위치까지 배수로가 상승하였다가 하강하도록 한다. 이로써, 배수재(10)를 흐르던 지하수의 상향수압이 상승한 위치까지의 수두차에 못미치면 배수가 안되다가, 이를 넘어서면 배수가 되도록 한다. 이로 인해 조그만 상향수압에도 많은 양의 지하수가 배출되는 것을 방지할 수 있게 된다.The drainage path is raised and lowered to a position higher than the discarded concrete 20 and the bottom concrete concrete 40 while having a predetermined height upward from the drainage material 10 on the gulting finish surface 1. As a result, if the water head difference to the position where the upward water pressure of the groundwater flowing through the drain 10 rises below the water level, the water is not drained. This prevents a large amount of groundwater from being discharged even at the slight upward pressure.

A는 배수재(10) 자체가 상방 및 하방으로 일정 높이를 갖도록 형성하는 방식 이고, B는 배수재(10)에 별도의 (뒤집어진)U자형 관을 연결하여 집수정(30)측으로 연결하는 방식이고, C는 U자형 관의 상방 관 단면적에 비해 하방 관의 단면적이 더 크도록 구성하는 방식이고, D는 집수정(30)측 단부에서 U자형 관이 배출을 담당하도록 하는 방식이다.A is a method of forming the drainage (10) itself to have a predetermined height upward and downward, B is a method of connecting to the sump (30) by connecting a separate (upside down) U-shaped pipe to the drainage (10) and , C is a way to configure the cross-sectional area of the lower pipe compared to the upper pipe cross-sectional area of the U-shaped pipe, D is a way to let the U-shaped pipe is responsible for the discharge at the sump (30) side end.

도 4는 다양한 위치와 경로를 갖는 본 발명의 배수로 시공 방법을 나타내는 도면이다. 도 4를 참조하면, 도 3의 A 방식의 다양한 예를 나타낸다. (a)는 일반적인 방식의 실시례이다. 굴토마감면(1)에 배치된 배수재(10)를 버림콘크리트(20)와 바닥구체콘크리트(40)를 지나 상측으로 소정 높이만큼 상승시켰다가, 다시 하강시켜 집수정측으로 연장하는 방식이다.4 is a view showing a drainage construction method of the present invention having various positions and paths. Referring to FIG. 4, various examples of the method A of FIG. 3 are illustrated. (a) is an embodiment of a general scheme. The drainage material 10 disposed on the gulting finish surface 1 is raised by a predetermined height upward through the discarded concrete 20 and the bottom concrete concrete 40, and then lowered again to extend to the water collecting well side.

(b)는 (a)형태와 유사하되, 다만 건물 벽체(42)나 기둥 내에 모든 구성(E)이 위치되도록 하는 방식이다.(b) is similar to (a) except that all components (E) are located within the building wall 42 or column.

(c)는 (b)형태와 유사하되, 다만 건물 벽체(42) 내에 일부 구성(F)이 위치되고, 나머지 부분(G)은 벽체(42) 외측으로 노출되도록 하는 방식이다. 이 때 배수재(10)의 상승측이 벽체(42) 내에 삽입되도록 할 수도 있으며, 하강측이 벽체(42) 내에 삽입되도록 할 수도 있다.(c) is similar to (b), except that some configuration F is located within the building wall 42 and the remaining portion G is exposed outside the wall 42. At this time, the rising side of the drain 10 may be inserted into the wall 42, the lower side may be inserted into the wall 42.

(d)는 배수재(10)의 수평 위치가 달라지는 형태이다. 배수재(10)의 원위치는 굴토마감면(1) 상에 놓이는데, 상승 및 하강 후의 배수재(10)는 버림콘크리트(20)의 상측에 위치시킬 수 있다. 경우에 따라서는 버림콘크리트(20)층 내에 위치시키거나, 버림콘크리트(20)의 상면에 위치시킬 수도 있다.(d) is a form in which the horizontal position of the drain 10 is different. The original position of the drain 10 is placed on the gulting finish surface 1, the drain 10 after the rise and fall can be located above the discarded concrete 20. In some cases, it may be located in the discarded concrete 20 layer or on the upper surface of the discarded concrete 20.

(e)는 (d)형태와 유사하되, 다만, 하강 후의 배수재(10)가 굴토마감면(1) 내에 삽입되는 방식이다. 이 때 단순히 굴토마감면(1)을 파내고 위치시킬 수도 있으며, 별도의 트랜치를 형성하여 구성할 수도 있다.(e) is similar to the form (d), except that the drainage material 10 after the lowering is inserted into the gulting finish surface (1). At this time, the gulto finish surface (1) may be dug and positioned, or may be formed by forming a separate trench.

(f)는 배수재(10)의 사이에 별도의 커넥터(12)를 사용하여 뒤집어진 U자형의 형상이 되도록 하는 방식이다. 커넥터(12)의 형상에는 제한이 없으며, 일정 높이를 갖도록 상승 및 하강시키는 수로 구조라면 다양하게 형성할 수 있다. 커넥터(12)는 일측에 연결된 배수재(10)와 별개로 집수정측 또는 외부측을 향하는 별도의 제2배수재(10a)와 연결되도록 한다. 이 때 배수재(10)와 제2배수재(10a)는 상호 연통되지 않도록 하여야 하며, 연통되는 경우에는 감압작용이 불가능하게 된다.(f) is a system in which a separate connector 12 is used between the drainage material 10 so as to have an inverted U-shaped shape. The shape of the connector 12 is not limited, and can be variously formed as long as the channel structure to raise and lower to have a predetermined height. The connector 12 is connected to a separate second drain 10a facing the collecting well side or the outside separately from the drain 10 is connected to one side. At this time, the drainage material 10 and the second drainage material (10a) should not be in communication with each other, if the communication will be impossible to decompress.

배수재, 커넥터, 관 등의 구성은 상승 및 하강을 하는 구조로서 무공형이어야 한다. 즉, 내부의 지하수가 외부로 배출되지 않도록 밀폐된 구조이어야 한다. 만약 외부와 연통되는 구멍이나 홀이 있는 경우에는, 지하수가 반대방향으로 흐를 수 있기 때문이다. 따라서 감압위치 주변에서의 배수재, 커넥터, 관은 모두 무공관으로 구성하여야 하며, 무공형이 아닌 경우에는 외부와 연통되지 않도록 콘크리트 속에 밀폐시키거나, 벽체 내에 매설하여 외부로 지하수가 배출되거나 외부로부터 유입될 수 없도록 하여야 한다.Drainage, connectors, pipes, etc. are to be raised and lowered and to be non-porous. That is, the internal groundwater should be sealed so that it does not discharge to the outside. If there is a hole or a hole communicating with the outside, groundwater may flow in the opposite direction. Therefore, drains, connectors, and pipes around the decompression position should all be made of non-perforated pipes. If they are not non-formed, they should be sealed in concrete to prevent communication with the outside, or be buried in a wall to discharge groundwater to the outside or inflow from the outside. It should not be possible.

상기 배수구조는 다양한 방식으로 구성할 수 있으며, 시공 순서도 자유롭게 변경될 수 있다. 이는 이하에서 설명할 시공 공정에서도 마찬가지이다. 일반적으로는 굴토마감면(1)에 배수재(10)를 위치시키고, 버림콘크리트(20)를 타설한 후, 바 닥콘크리트(40)를 타설하게 된다. 이 때, 버림콘크리트(20)와 바닥콘크리트(40) 타설에 앞서 배수재(10) 또는 무공관 기타 배수 경로가 미리 자리를 잡도록 형성하는 것이 바람직하다.The drainage structure can be configured in various ways, and the construction order can also be changed freely. This also applies to the construction process to be described below. Generally, the drain material 10 is placed on the gulting finish surface 1, and the bottom concrete 20 is poured, and then the floor concrete 40 is poured. At this time, prior to placing the discarded concrete 20 and the bottom concrete 40, it is preferable to form the drainage material 10 or a non-vacant pipe or other drainage path in advance.

그런데 시공 순서를 바꾸어 배수재(10)를 일부 배치한 후에, 버림콘크리트(20)와 바닥콘크리트(40) 등을 타설하고, 해당 위치에 구멍을 뚫어 무공관 등을 삽입하거나 슬리브, 커넥터 등을 연결하여 배수 경로를 형성할 수도 있으며, 버림콘크리트(20)와 바닥콘크리트(40) 등을 타설할 때에, 슬리브, 커넥터 등을 배수재와 미리 연결시켜 상방 또는 하방 수로를 형성해 놓은 후에, 타설 공정이 끝난 후 무공관, 별도의 커넥터 등을 연결하는 방식을 사용할 수도 있다. 또는 바닥콘크리트층이나 버림콘크리트층에 구멍을 뚫어 수로를 형성하는 것도 가능하다. However, after disposing the drainage material 10 in part by changing the construction order, the casting concrete 20 and the bottom concrete 40 are poured, and a hole is inserted in the corresponding position to insert an empty pipe or connect a sleeve or a connector. The drainage path may be formed, and when casting the discarded concrete 20 and the bottom concrete 40, etc., after connecting the sleeve and the connector with the drainage material in advance to form the upper or lower waterway, after finishing the pouring process It is also possible to use a method of connecting a mission, a separate connector, and the like. Alternatively, it is also possible to form a channel by drilling a hole in the bottom concrete layer or the discarded concrete layer.

예컨대, 배수재의 단부에 슬리브를 미리 연결시켜 놓은 후, 버림콘크리트(20)와 바닥콘크리트(40)를 타설하며 슬리브를 상방으로 노출되도록 빼놓은 후, 추후 타측의 배수재, 관과 연결된 슬리브와 연결될 수도 있고, 타측의 배수재, 관으로 직통시켜 연결시킬 수도 있다. 전체적인 방식은 청구항에 기재된 공정이 모두 포함되기만 하면, 그 순서는 청구항에 기재된 순서에 제약되지 않는다.For example, after the sleeve is connected to the end of the drainage in advance, the cast concrete 20 and the bottom concrete 40 are poured and the sleeve is exposed to be exposed upward, and then the other side is connected to the drain and the sleeve connected to the pipe. It can also be made to be connected directly to the other drainage material and a pipe. The order is not limited to the order set forth in the claims as long as the overall manner includes all the steps set forth in the claims.

또한 관을 통해 상승 및 하강된 배수로는 바닥콘크리트의 위, 내부 또는 아래, 버림콘크리트의 위, 내부 또는 아래를 통해 다양한 루트로 집수정측을 향해 연결될 수 있다.In addition, the drainage channel is raised and lowered through the pipe can be connected to the water collecting well side by various routes through the top, inside or bottom of the bottom concrete, above, inside or below the discarded concrete.

도 5는 다양한 위치와 경로를 갖는 본 발명의 다른 배수로 시공 방법을 나타 내는 도면이다. 도 5를 참조하면, 배수재(10)와는 별도로 집수정까지의 배수로를 형성하는 방식이다. 배수재(10)에는 다양한 방식으로 무공관(50)이 연결된다. 무공관(50)은 집수정과 연결될 수도 있으며, 외부의 주배수로와 연결되어 자연배수를 도모하도록 할 수도 있다.5 is a view showing another drainage construction method of the present invention having various positions and paths. Referring to FIG. 5, a drainage path to the sump is separately formed from the drainage material 10. The drainage pipe 10 is connected to the non-empty tube 50 in various ways. Non-public pipe 50 may be connected to the sump well, it may be connected to the external main drainage to facilitate natural drainage.

(a)를 참조하면, 무공관(50)은 버림콘크리트(20)와 바닥구체콘크리트(40) 상측으로 관통하여 일정 높이만큼 상승한 후 다시 하강하는 형태로서, 하강 후에는 바닥구체콘크리트(40)의 하측 버림콘크리트(20) 위나, 버림콘크리트(20) 아래에서 집수정까지 연장된다.Referring to (a), the hollow pipe 50 penetrates to the upper side of the discarded concrete 20 and the bottom concrete concrete 40, and ascends by a predetermined height, and then descends again. After falling, the bottom concrete concrete 40 It extends to the water collecting well above the lower discarded concrete 20 or below the discarded concrete 20.

(b)를 참조하면, 무공관(50)이 상방으로 연장된 후 다시 굴토마감면(1)의 아래 쪽으로 삽입된 위치에서 연장되는 방식이다. 이 때 굴토마감면(1)을 소정 깊이 파내어 삽입할 수도 있고, 별도의 트랜치를 형성하여 삽입할 수도 있다.Referring to (b), the air pipe 50 is extended upward and then extends again at the position inserted below the gulto finish surface (1). At this time, the gulting finish surface (1) may be dug into a predetermined depth, or may be inserted to form a separate trench.

(c)를 참조하면, 배수재(10)와 무공관(50) 사이에 별도의 커넥터(52)를 사용하여 상호 연결되는 방식을 사용할 수도 있다.Referring to (c), it is also possible to use a method that is connected to each other using a separate connector 52 between the drain 10 and the non-pipe (50).

도 6은 다양한 위치와 경로를 갖는 본 발명의 또 다른 배수로 시공 방법을 나타내는 도면이다. 도 6을 참조하면, 집수정(30)측 단부를 일정 높이만큼 상승 및 하강시켜 집수정(30)으로 배출시키는 방식이다.6 is a view showing another drainage construction method of the present invention having a variety of positions and paths. Referring to FIG. 6, the end of the sump 30 is raised and lowered by a predetermined height to be discharged to the sump 30.

(a)를 참조하면, 굴토마감면(1) 상에 위치한 배수재(10)와 연결된 무공관(60)이 소정 높이 상승 및 하강하여 하방으로 배출되는 방식이다.Referring to (a), the vacant pipe 60 connected to the drainage material 10 located on the gulto finish surface 1 is discharged downward by raising and lowering a predetermined height.

(b)를 참조하면, 굴토마감면(1) 상에는 배수재(10)가 위치하고. 배수재(10) 와 연결된 무공관(60)이 별도로 구비되는 방식이다. 이 때 시공 초기에는 배수재(10)의 집수정(30)측 출구를 개방시켜 놓으나, 시공이 완료된 후에는 집수정(30)측 출구(H)를 밸브(미도시) 등으로 막아, 배수재(10)로 흐르던 지하수가 무공관(30)을 따라 배출되도록 한다. 시공 초기에는 지하수의 상향 수압이 발생하지 않으므로, 감압이 필요 없어 별도의 감압 수단을 통과시키지 않도록 하며, 시공 후에는 상향 수압이 발생되므로, 감압 수단을 통과시키게 된다. 이 때 배수재(10)의 출구(H)를 폐쇄시키지 않으면, 지하수가 감압 수단을 거치지 않고 바로 배출되므로, 이를 막아야 한다.Referring to (b), the drain material 10 is located on the gulto finish surface (1). The air pipe 60 connected to the drain 10 is provided in a separate manner. At this time, in the initial stage of construction, the outlet of the sump well 30 of the drain material 10 is opened, but after the completion of the construction, the outlet H of the sump well 30 is blocked by a valve (not shown) or the like. 10) to be discharged along the non-empty pipe (30) flowing through the ground water. Since the initial pressure of the groundwater does not occur in the initial stage of construction, it is not necessary to reduce the pressure so that a separate pressure reducing means does not pass, and after the construction, upward pressure is generated, thereby passing the pressure reducing means. If the outlet (H) of the drain 10 is not closed at this time, the groundwater is discharged immediately without passing through the decompression means, it should be prevented.

(c)를 참조하면, 배수재(10)와 무공관(60)이 버림콘크리트(20) 위에서 서로 연결되는 방식이다.Referring to (c), the drain 10 and the non-pipe 60 is connected to each other on the discarded concrete 20.

(d)를 참조하면, 배수재(10)와 무공관(60)이 굴토마감면(1)의 하부에 위치, 연결되는 방식이다. 배수재(10) 또는 무공관(60)은 트랜치 내에 위치되어 상호 연결될 수도 있다.Referring to (d), the drainage material 10 and the non-pipes 60 are located in the lower part of the gulto finish surface (1), is connected. Drainage 10 or duct 60 may be located within the trench and interconnected.

아울러 무공관(60)이 직접 집수정(30)으로 물을 낙하시키지 않고, 집수정과 연결된 별도의 트랜치로 낙하시켜, 트랜치로 낙하된 지하수가 집수정으로 흘러 내리도록 할 수도 있다.In addition, the air pipe 60 may not fall directly into the sump 30, but fall to a separate trench connected to the sump, so that the groundwater dropped into the trench flows into the sump.

도 7은 사이펀 효과를 방지하기 위한 본 발명 배수로의 다양한 형태를 나타내는 도면이다. 도 7을 참조하면, 사이펀 효과를 방지하기 위한 다양한 형상의 무공관이 개시되어 있다.7 is a view showing various forms of the present invention drainage for preventing the siphon effect. Referring to Figure 7, there is disclosed a hollow tube of various shapes for preventing the siphon effect.

본 발명은 지하수의 과도한 상향수압을 방지하기 위해 지하수를 배출시키는 목적뿐만 아니라, 과도한 지하수 배출로 인해 지반 침하 현상이 발생되는 것을 방지하는 목적도 갖는다. 무공관(50, 60)의 경우 내부 단면적을 가득 채워 흐르는 지하수에 의해 사이펀 현상이 발생하기도 한다. The present invention not only discharges groundwater to prevent excessive upward water pressure of groundwater, but also has an object of preventing ground subsidence due to excessive groundwater discharge. In the case of air pipes 50 and 60, a siphon phenomenon may occur due to the groundwater flowing through the internal cross-sectional area.

즉, 초기에 흐르는 지하수가 하강하면서, 내부적으로 저압, 진공상태가 형성되어, 하측에 있던 지하수가 끌려 올라와 배출되는 현상이 발생하게 된다. 이 경우, 전술한 수압유지 수단에도 불구하고, 낮은 위치의 지하수들도 배출되어 버리게 된다.That is, while the groundwater flowing initially falls, a low pressure and a vacuum state are formed internally, and the groundwater which was in the lower side is attracted and discharged. In this case, in spite of the above-mentioned hydraulic pressure holding means, groundwater at a lower position is also discharged.

이러한 사이펀 현상을 방지하기 위해 다양한 형상의 무공관을 사용한다. (a)를 참조하면, 상방배출관(52)의 단면적보다 하방배출관(54)의 단면적을 크게 한다. 이 경우 하방으로 흐르는 지하수가 단면을 모두 채워 밀폐시키지 아니하며, 빈 공간이 발생하므로, 상방배출관(52)의 지하수가 딸려 올라오는 것을 방지할 수 있게 된다.In order to prevent such a siphon phenomenon, various shapes of hollow tubes are used. Referring to (a), the cross-sectional area of the lower discharge pipe 54 is made larger than that of the upper discharge pipe 52. In this case, the groundwater flowing downwards does not fill all the cross sections, and since the empty space is generated, the groundwater of the upper discharge pipe 52 may be prevented from coming up.

(b)를 참조하면, 상방배출관(52)과 하방배출관(54)의 사이, 상단부에 상단수용공간(56)을 형성한다. 상단수용공간(56)은 일정 부피의 밀폐 공간으로서 단면적이 넓은 하방배출관(54)과 함께 넓은 단면적을 갖게 된다. 따라서 상방배출관(52)을 따라 상승한 지하수는 상단수용공간(56)에 이르면서, 하방배출관(52)으로 사이펀 현상 없이 흘러내리게 된다.Referring to (b), the upper receiving space 56 is formed in the upper end between the upper discharge pipe 52 and the lower discharge pipe 54. The upper accommodating space 56 is a sealed volume of a predetermined volume and has a large cross-sectional area with the lower discharge pipe 54 having a large cross-sectional area. Therefore, the groundwater rising along the upper discharge pipe 52 reaches the upper receiving space 56 and flows down to the lower discharge pipe 52 without siphoning.

(c)를 참조하면, 집수정측으로 배출하는 무공관(60)에서의 사이펀 방지 구조를 나타낸다. 상기 (b) 및 (c)와 같이 하방배출관(64)의 단면적을 넓게 형성하는 것도 가능하고, 이에 별도로 상측에 홀(68)을 형성할 수 있다. 홀(68)은 무공관(60) 내부로 공기를 공급해 주므로, 무공관(60) 내에서 저압, 진공 상태가 발생되지 않도록 하는 역할을 한다.Referring to (c), the anti-siphon structure in the empty pipe 60 discharged to the water collecting well side is shown. As described above (b) and (c) it is also possible to form a wide cross-sectional area of the lower discharge pipe 64, it can be formed separately in the hole (68). Since the hole 68 supplies air into the hollow tube 60, the hole 68 serves to prevent the low pressure and vacuum from occurring in the hollow tube 60.

(d)를 참조하면, 홀(68)과 함께 하방배출관(64)의 단면적을 크게 하여, 홀(68)의 기능과 동시에 작용되도록 할 수도 있게 된다.Referring to (d), it is possible to increase the cross-sectional area of the lower discharge pipe 64 together with the hole 68 so as to act simultaneously with the function of the hole 68.

아울러 홀(68)은 상방배출관과 하방배출관의 내부를 세척하는데 효과적으로 사용될 수도 있다. 홀(68)을 통해 배출관 내부로 물을 뿜어 배출관에 침전, 누적되고 있는 부유물, 침전물을 집수정쪽으로 강제적으로 배수시키는데 사용될 수도 있다. 아울러 홀(68)은 선택에 따라 밸브(미도시)를 통해 개방시키거나, 폐쇄시킬 수 있도록 하는 것이 바람직하다. 특히 홀(68)이 집수정측 감압 수단이 아닌, 배수로의 중간 중간에 설치된 감압 수단에 형성된 경우에는, 갑작스런 상향수압 증가에 의한 고압력의 지하수가 홀쪽으로 넘치는 것을 방지하기 위해 밸브를 구비하여야 한다.In addition, the hole 68 may be effectively used to clean the inside of the upper discharge pipe and the lower discharge pipe. It may be used to force water through the hole 68 into the discharge pipe to forcibly drain the sediment accumulated and accumulated in the discharge pipe to the sump. In addition, the hole 68 may be opened or closed through a valve (not shown) according to a selection. In particular, in the case where the hole 68 is formed in the decompression means provided in the middle of the drainage passage instead of the collecting well-side decompression means, a valve must be provided to prevent the high pressure groundwater from overflowing into the hole due to a sudden increase in the water pressure.

상기와 같은 배수로 시공에 따라, 배수로의 중간 중간마다, 배수재 및 배출관에 가해지는 압력을 적절히 감압시킬 수 있으며, 아울러 집수정 측 단부에서 배출되는 부분에서도 압력을 조절할 수 있게 된다. 이로 인해, 배수재 및 배출관에 과도하게 미치는 압력을 감소시킴은 물론, 약간의 상향수압에서도 많은 양의 지하수가 배출되는 것을 방지하는 작용을 하게 된다.According to the construction of the drainage as described above, it is possible to appropriately reduce the pressure applied to the drainage material and the discharge pipe every middle of the drainage path, and also to adjust the pressure in the portion discharged from the sump side. This reduces the excessive pressure on the drain and the discharge pipe, and serves to prevent a large amount of groundwater from being discharged even at a slight upward pressure.

아울러 배수재, 관, 무공관의 형상, 재질과 종류에는 특별한 제한이 없으며 당업자의 선택에 따라 다양하게 사용할 수 있는데, 예컨대 배수판, 다발관, 중공관, 호스, 플라스틱관, P.E관, 강관 등을 사용할 수 있으며, 중공 형상으로 거푸집을 형성하여 관형태가 되도록 하는 것도 그 범위에 포함될 수 있다. 아울러 본 발명은 도면에 도시된 배수재, 무공관의 경로와 형태에 제한되지 아니하며, 다양한 실시례로 구성할 수 있다.In addition, there are no particular restrictions on the shape, material, and type of the drainage, pipe, and non-pipe, and may be variously used by those skilled in the art. For example, a drain plate, a bundle pipe, a hollow pipe, a hose, a plastic pipe, a PE pipe, a steel pipe, etc. may be used. It may be, to form a form in a hollow shape to be in the form of a tube may be included in the range. In addition, the present invention is not limited to the path and shape of the drainage, non-empty tube shown in the drawings, it can be configured in various embodiments.

본 발명은 지하수의 상향수압을 방지하기 위한 배수로를 시공함에 있어, 배수로의 일정 위치마다 또는 집수정측 단부에 일정 수두차를 갖도록 배수로를 상향 및 하향으로 올라갔다 내려가도록 구성함으로써, 일정 구간마다 고르게 압력이 분포되도록 하여 건물 바닥면에 미치는 상향수압을 일정하게 유지, 조절하는 동시에, 과도한 지하수 배출을 방지하는 효과를 갖는다.The present invention in constructing the drainage to prevent the up-water pressure of the groundwater, by configuring the drainage up and down to go up and down to have a certain head head at a predetermined position of the drainage or at the end of the sump side, evenly by a certain section The pressure is distributed to maintain and regulate the constant water pressure up to the floor of the building, and at the same time has the effect of preventing excessive groundwater discharge.

본 발명은 배출관의 단면적을 서로 다르게 하거나, 또는 별도의 홀을 무공관에 형성하도록 하여, 배출관 내에 저압 또는 진공 상태가 되는 것을 방지하여 사이펀 효과로 인한 지하수의 과도한 배출을 방지하는 효과를 갖는다.The present invention has an effect of preventing the excessive discharge of ground water due to the siphon effect by preventing the cross-sectional area of the discharge pipe to be different from each other, or to form a separate hole in the non-empty pipe to prevent the low pressure or vacuum state in the discharge pipe.

Claims (27)

지하 건축 구조물의 바닥 하부에서 발생되는 지하수의 수두차에 의한 높은 상향수압을 방지하고 적정한 수압을 유지시키기 위한 배수로 시공방법에 있어서,In the drainage construction method to prevent the high up water pressure caused by the water head difference of the ground water generated in the bottom of the underground building structure and to maintain the proper water pressure, 굴토 후의 상면 자체 또는 잔토층, 자갈층, 버럭층 등을 이용하여 굴토마감면이 수평을 이루도록 정지하는 수평정지 작업공정;A horizontal stop working step of stopping the gulto finish surface horizontally by using the upper surface itself after the gulting or the remaining soil layer, the gravel layer, the buffing layer, etc .; 상기 수평정지 작업공정을 거친 상기 굴토마감면에 배수로 기능을 위한 배수재를 설치하는 배수재 설치공정;A drainage installing step of installing drainage for drainage function on the gulto finish surface after the horizontal stop working process; 상기 배수로가 상기 굴토마감면으로부터 소정 높이만큼 상승 및 하강하도록 하는 감압 작업공정; 및A decompression work step of allowing the drainage path to ascend and descend by a predetermined height from the gulting finish surface; And 상기 굴토마감면 위에 몰탈을 소정 높이로 타설하여 버림콘크리트층을 형성하는 버림콘크리트 타설공정;을 포함하여 구성되는 것을 특징으로 하는 적정수압 유지를 위한 배수로 시공방법.A casting method for drainage construction for maintaining proper hydraulic pressure, characterized in that it comprises a; cast concrete mortar on the gulting finish surface to form a discarded concrete layer to form a cast concrete layer. 제 1 항에 있어서, 상기 감압 작업공정은:The process of claim 1 wherein the depressurization process is: 상기 배수재가 소정 높이만큼 상승한 후 하강되도록 하는 시공방법을 포함하는 것을 특징으로 하는 적정수압 유지를 위한 배수로 시공방법.The drainage construction method for maintaining the proper hydraulic pressure, characterized in that it comprises a construction method for raising and descending the drainage by a predetermined height. 제 2 항에 있어서,The method of claim 2, 상기 배수재는 측방에 구멍이 없는 무공형인 것을 특징으로 하는 적정수압 유지를 위한 배수로 시공방법.The drainage method is a drainage construction method for maintaining the proper hydraulic pressure, characterized in that the non-porous form without a hole in the side. 제 1 항에 있어서, 상기 감압 작업공정은:The process of claim 1 wherein the depressurization process is: 상기 배수재에 별도의 관을 연결하는 시공방법을 포함하고,Including a construction method for connecting a separate pipe to the drain, 상기 관은 상기 배수재의 위치로부터 소정 높이만큼 상승한 후 하강되는 형상인 것임을 특징으로 하는 적정수압 유지를 위한 배수로 시공방법.The pipe is a drainage construction method for maintaining a suitable hydraulic pressure, characterized in that the descending shape after rising by a predetermined height from the position of the drain. 제 1 항에 있어서, The method of claim 1, 상기 감압 작업공정은 상기 버림콘크리트 타설공정 후에 상기 배수로를 소정 높이만큼 상승한 후 하강되도록 하는 것을 특징으로 하는 적정수압 유지를 위한 배수로 시공방법.The decompression work step is a drainage construction method for maintaining the proper hydraulic pressure, characterized in that to drop after raising the drainage by a predetermined height after the cast concrete pouring process. 제 1 항에 있어서,The method of claim 1, 상기 감압 작업공정은 바닥콘크리트를 타설한 후에 상기 배수로를 소정 높이만큼 상승한 후 하강되도록 하는 것을 특징으로 하는 적정수압 유지를 위한 배수로 시공방법.The decompression work step is a drainage construction method for maintaining the proper hydraulic pressure, characterized in that after the bottom concrete is poured to increase the drainage by a predetermined height and lowered. 제 4 항에 있어서, 상기 관은 무공관인 것을 특징으로 하는 적정수압 유지를 위한 배수로 시공방법.5. The method of claim 4, wherein the pipe is a non-empty pipe. 제 4 항에 있어서, 상기 관은 벽체 또는 기둥 내에 밀폐되도록 설치되는 것을 특징으로 하는 적정수압 유지를 위한 배수로 시공방법.5. The method of claim 4, wherein the pipe is installed to be sealed in a wall or a pillar. 제 4 항에 있어서,The method of claim 4, wherein 상기 관은 상기 배수재로부터 연결되어 상기 버림콘크리트의 상부에 타설된 바닥콘크리트층 내에서 소정 높이만큼 상승한 후 하강되어 집수정측과 연결되도록 하여, 상기 바닥콘크리트층 내에 밀폐되도록 설치된 것을 특징으로 하는 적정수압 유지를 위한 배수로 시공방법.The pipe is connected to the drainage and ascends by a predetermined height in the bottom concrete layer placed on top of the discarded concrete, and then descends to be connected to the water collecting well side, and is installed to be sealed in the bottom concrete layer. Drainage construction method for maintenance. 제 4 항에 있어서,The method of claim 4, wherein 상기 관의 하강되는 부분의 단부는 별도의 제2배수재와 연결되는 것임을 특 징으로 하는 적정수압 유지를 위한 배수로 시공방법.An end of the descending portion of the pipe is a drainage construction method for maintaining a proper water pressure, characterized in that the connection with a separate second drain. 제 4 항에 있어서,The method of claim 4, wherein 상기 버림콘크리트의 상부에 타설된 바닥콘크리트층에는 상기 배수재와 연결되는 상방 수로가 형성되고,The bottom concrete layer placed on top of the discarded concrete is formed with an upper channel connected to the drainage material, 상기 상방 수로에는 상기 관이 연결되는 것을 특징으로 하는 적정수압 유지를 위한 배수로 시공방법.The drainage construction method for maintaining an appropriate water pressure, characterized in that the pipe is connected to the upper waterway. 제 11 항에 있어서,The method of claim 11, 상기 관은 소정 높이만큼 상승한 후 하강하면서 상기 바닥콘크리트층에 형성된 하방 수로와 연결되고, 상기 하방 수로는 집수정측으로 바로 연결되거나, 별도의 제2배수재와 연결되는 것을 특징으로 하는 적정수압 유지를 위한 배수로 시공방법.The pipe is connected to a lower channel formed in the bottom concrete layer while rising and lowered by a predetermined height, and the lower channel is directly connected to a collecting well side, or connected to a separate second drainage. Drainage construction method. 제 4 항에 있어서,The method of claim 4, wherein 상기 버림콘크리트에는 상기 배수재와 연결되는 상방 수로가 형성되고,The discarded concrete is formed with an upper channel connected to the drainage material, 상기 상방 수로에는 상기 관이 연결되는 것을 특징으로 하는 적정수압 유지 를 위한 배수로 시공방법.Drainage construction method for maintaining the proper hydraulic pressure, characterized in that the pipe is connected to the upper waterway. 제 13 항에 있어서,The method of claim 13, 상기 관은 소정 높이만큼 상승한 후 하강하여 상기 버림콘크리트의 상측에서 집수정측으로 연결되는 것을 특징으로 하는 적정수압 유지를 위한 배수로 시공방법.The pipe ascends by a predetermined height and then descends to the drainage construction method for maintaining the proper hydraulic pressure, characterized in that connected to the water collecting well side from the upper side of the discarded concrete. 제 13 항에 있어서,The method of claim 13, 상기 관은 소정 높이만큼 상승한 후 하강하면서 상기 버림콘크리트층에 형성된 하방 수로와 연결되고, 상기 하방 수로는 집수정측으로 바로 연결되거나, 별도의 제2배수재와 연결되는 것을 특징으로 하는 적정수압 유지를 위한 배수로 시공방법.The pipe is raised and lowered by a predetermined height while being connected to the lower channel formed in the discarded concrete layer, the lower channel is connected directly to the water collecting well side, or connected to a separate second drainage for maintaining the proper hydraulic pressure Drainage construction method. 제 4 항에 있어서,The method of claim 4, wherein 상기 관의 하강되는 부분의 단부는 상기 굴토마감면에 형성된 집수정과 연결되는 것을 특징으로 하는 적정수압 유지를 위한 배수로 시공방법.End of the descending portion of the pipe drainage construction method for maintaining a suitable hydraulic pressure, characterized in that connected to the water collecting well formed on the gulto finish surface. 제 4 항에 있어서,The method of claim 4, wherein 상기 관의 하강하는 부분의 전부 또는 일부 단면적은 상기 관의 상승하는 부분의 단면적보다 넓은 형태인 것임을 특징으로 하는 적정수압 유지를 위한 배수로 시공방법.All or a partial cross-sectional area of the descending portion of the pipe is wider than the cross-sectional area of the rising portion of the pipe is a drainage construction method for maintaining the proper hydraulic pressure. 제 4 항에 있어서,The method of claim 4, wherein 상기 관의 상승하는 부분 상단부에는 상승하는 부분의 상기 관 단면적보다 큰 상단수용공간이 구비되는 것을 특징으로 하는 적정수압 유지를 위한 배수로 시공방법.The upper part of the rising portion of the pipe is a drainage construction method for maintaining a suitable hydraulic pressure, characterized in that the upper receiving space larger than the pipe cross-sectional area of the rising portion is provided. 제 18 항에 있어서,The method of claim 18, 상기 상단수용공간의 일측에 형성된 하강하는 부분의 관 단면적은 상기 관의 상승하는 부분의 단면적보다 넓은 형태인 것임을 특징으로 하는 적정수압 유지를 위한 배수로 시공방법.Pipe cross-sectional area of the descending portion formed on one side of the upper accommodating space is a drainage construction method for maintaining a suitable hydraulic pressure, characterized in that the wider than the cross-sectional area of the rising portion of the pipe. 지하 건축 구조물의 바닥 하부에서 발생되는 지하수의 수두차에 의한 높은 상향수압을 방지하고 적정한 수압을 유지시키기 위한 배수로 시공방법에 있어서,In the drainage construction method to prevent the high up water pressure caused by the water head difference of the ground water generated in the bottom of the underground building structure and to maintain the proper water pressure, 굴토 후의 상면 자체 또는 잔토층, 자갈층, 버럭층 등을 이용하여 굴토마감면이 수평을 이루도록 정지하는 수평정지 작업공정;A horizontal stop working step of stopping the gulto finish surface horizontally by using the upper surface itself after the gulting or the remaining soil layer, the gravel layer, the buffing layer, etc .; 상기 굴토마감면의 일측에 집수정을 설치하는 집수정 설치공정;A collecting well installation step of installing a collecting well on one side of the gulto finish surface; 상기 수평정지 작업공정을 거친 상기 굴토마감면에 배수로 기능을 위한 배수재를 설치하는 배수재 설치공정;A drainage installing step of installing drainage for drainage function on the gulto finish surface after the horizontal stop working process; 상기 집수정측에 지하수를 배출하기 위한 배수로의 단부측이 상기 굴토마감면으로부터 소정 높이만큼 상승 및 하강하도록 하는 감압 작업공정; 및A decompression operation step of allowing the end side of the drainage passage for discharging groundwater to the sump collecting side to rise and fall by a predetermined height from the gulting finish surface; And 상기 굴토마감면 위에 몰탈을 소정 높이로 타설하여 버림콘크리트층을 형성하는 버림콘크리트 타설공정;을 포함하여 구성되는 것을 특징으로 하는 적정수압 유지를 위한 배수로 시공방법.A casting method for drainage construction for maintaining proper hydraulic pressure, characterized in that it comprises a; cast concrete mortar on the gulting finish surface to form a discarded concrete layer to form a cast concrete layer. 제 20 항에 있어서, 상기 감압 작업공정은:The process of claim 20 wherein the depressurization process is: 상기 배수재에 별도의 무공관을 연결하는 시공방법을 포함하고,Including a construction method for connecting a separate non-empty tube to the drain, 상기 무공관은 상기 배수재의 위치로부터 소정 높이만큼 상승한 후 상기 집수정을 향해 하강되는 형상인 것임을 특징으로 하는 적정수압 유지를 위한 배수로 시공방법.The pipe is a drainage construction method for maintaining the proper hydraulic pressure, characterized in that the shape of the descending toward the sump after rising by a predetermined height from the position of the drain. 제 20 항에 있어서, 상기 감압 작업공정은:The process of claim 20 wherein the depressurization process is: 상기 배수재에 별도의 무공관을 연결하는 시공방법을 포함하고,Including a construction method for connecting a separate non-empty tube to the drain, 상기 무공관은 상기 배수재의 위치로부터 소정 높이만큼 상승한 후 별도로 형성된 트랜치를 향해 하강되는 형상인 것임을 특징으로 하는 적정수압 유지를 위한 배수로 시공방법.The pipe is a drainage construction method for maintaining the proper hydraulic pressure, characterized in that the ascending downwards toward the trench formed separately after ascending by a predetermined height from the position of the drain. 제 21 항 또는 제 22 항에 있어서,The method of claim 21 or 22, 상기 무공관의 하강하는 부분의 전부 또는 일부 단면적은 상기 무공관의 상승하는 부분의 단면적보다 넓은 형태인 것임을 특징으로 하는 적정수압 유지를 위한 배수로 시공방법.All or a partial cross-sectional area of the descending portion of the tube is a drainage construction method for maintaining a suitable hydraulic pressure, characterized in that the wider than the cross-sectional area of the rising portion of the tube. 제 21 항 또는 제 22 항에 있어서,The method of claim 21 or 22, 상기 무공관의 상승하는 부분 상단부에는 상승하는 부분의 상기 무공관 단면적보다 큰 상단수용공간이 구비되는 것을 특징으로 하는 적정수압 유지를 위한 배수로 시공방법.The drainage construction method for maintaining a suitable hydraulic pressure, characterized in that the upper end of the rising portion of the pipe is provided with an upper receiving space larger than the cross-sectional area of the pipe of the raised portion. 제 21 항 또는 제 22 항에 있어서,The method of claim 21 or 22, 상기 상단수용공간의 일측에 형성된 하강하는 부분의 무공관 단면적은 상기 무공관의 상승하는 부분의 단면적보다 넓은 형태인 것임을 특징으로 하는 적정수압 유지를 위한 배수로 시공방법.The non-pipe section of the descending portion formed on one side of the upper receiving space is a drainage construction method for maintaining a suitable hydraulic pressure, characterized in that the wider than the cross-sectional area of the rising portion of the pipe. 제 21 항 또는 제 22 항에 있어서,The method of claim 21 or 22, 상기 무공관의 상단부측에는 홀이 형성되는 것을 특징으로 하는 적정수압 유지를 위한 배수로 시공방법.The drainage construction method for maintaining the proper hydraulic pressure, characterized in that the hole is formed on the upper end side of the pipe. 제 4 항에 있어서,The method of claim 4, wherein 상기 관의 상단부측에는 개폐 가능한 홀이 형성되는 것을 특징으로 하는 적정수압 유지를 위한 배수로 시공방법.The drainage construction method for maintaining the proper hydraulic pressure, characterized in that the opening and closing hole is formed on the upper end side of the pipe.
KR1020050123582A 2005-12-15 2005-12-15 The construction method of basement drainage KR100665986B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050123582A KR100665986B1 (en) 2005-12-15 2005-12-15 The construction method of basement drainage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050123582A KR100665986B1 (en) 2005-12-15 2005-12-15 The construction method of basement drainage

Publications (1)

Publication Number Publication Date
KR100665986B1 true KR100665986B1 (en) 2007-01-10

Family

ID=37867245

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050123582A KR100665986B1 (en) 2005-12-15 2005-12-15 The construction method of basement drainage

Country Status (1)

Country Link
KR (1) KR100665986B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100693807B1 (en) 2006-05-22 2007-03-14 박옥교 The construction method of basement drainage
KR100965002B1 (en) 2007-12-14 2010-06-21 홍종인 under ground water drainage device
KR101062576B1 (en) * 2008-12-24 2011-09-06 엄기형 Water collecting well with discharge control to maintain proper water pressure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100693807B1 (en) 2006-05-22 2007-03-14 박옥교 The construction method of basement drainage
KR100965002B1 (en) 2007-12-14 2010-06-21 홍종인 under ground water drainage device
KR101062576B1 (en) * 2008-12-24 2011-09-06 엄기형 Water collecting well with discharge control to maintain proper water pressure

Similar Documents

Publication Publication Date Title
EP0439890A1 (en) System for draining land areas
KR100710920B1 (en) Apparatus for draining subsurface water
KR100753556B1 (en) De-pressure drainage method and the system
KR100665986B1 (en) The construction method of basement drainage
JP4764084B2 (en) Seismic reinforcement method for existing manholes
KR200411498Y1 (en) Vertical type basement drainage system
KR100710917B1 (en) Apparatus and Method for draining subsurface water and the connecting device for the same
KR100556820B1 (en) chamber for uplift reduction processing, and it&#39;s construction method
KR100666102B1 (en) Vertical type basement drainage system
KR100719356B1 (en) Plumbing for Draining Underground Water and Controlled De-watering System with Target Water Level Using the Plumbing
KR200411497Y1 (en) Plumbing for Draining Underground Water and Controlled De-watering System
KR100656410B1 (en) Vertical type basement drainage system
KR200446848Y1 (en) Vertical type basement drainage system
KR101103051B1 (en) Apparatus for draining subsurface water
KR200445948Y1 (en) Vertical type basement drainage system
KR200412083Y1 (en) Vertical type basement drainage system
KR200413300Y1 (en) Vertical type basement drainage system
KR100693807B1 (en) The construction method of basement drainage
KR100665985B1 (en) The construction method of basement self drainage
KR100665984B1 (en) The construction method of basement self drainage
KR200419448Y1 (en) Over pressure durable basement drainage system
KR100730586B1 (en) Vertical type basement drainage system
JP4809728B2 (en) manhole
KR200413305Y1 (en) Convertible de-pressure drainage system
KR100666103B1 (en) Convertible de-pressure drainage method and the system

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120103

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee