KR100627102B1 - 리프팅트레블러를 이용한 프리캐스트 세그먼트교량상부시공방법 - Google Patents
리프팅트레블러를 이용한 프리캐스트 세그먼트교량상부시공방법 Download PDFInfo
- Publication number
- KR100627102B1 KR100627102B1 KR1020040051783A KR20040051783A KR100627102B1 KR 100627102 B1 KR100627102 B1 KR 100627102B1 KR 1020040051783 A KR1020040051783 A KR 1020040051783A KR 20040051783 A KR20040051783 A KR 20040051783A KR 100627102 B1 KR100627102 B1 KR 100627102B1
- Authority
- KR
- South Korea
- Prior art keywords
- lifting
- segment
- traveler
- main girder
- girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 24
- 238000000034 method Methods 0.000 claims abstract description 14
- 238000004873 anchoring Methods 0.000 claims description 3
- 230000000452 restraining effect Effects 0.000 claims description 2
- 238000009434 installation Methods 0.000 description 10
- 238000004519 manufacturing process Methods 0.000 description 3
- 230000005484 gravity Effects 0.000 description 2
- 239000004593 Epoxy Substances 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000001174 ascending effect Effects 0.000 description 1
- 235000013527 bean curd Nutrition 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/10—Cantilevered erection
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D11/00—Suspension or cable-stayed bridges
- E01D11/04—Cable-stayed bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (7)
- 캔틸레버방식으로 교각 상부에서 이동식작업차를 이용하여 세그먼트를 가설하는 교량시공방법에 있어서,교각 상부에 자주식이동이 가능한 1개의 리프팅 트레블러를 설치한 상태에서, 상기 리프팅 트레블러의 제 1인양수단을 이용하여 교각 하부로부터 세그먼트를 인양하여 교각을 사이에 두고 좌,우대칭으로 세그먼트를 먼저 설치한 후,상기 세그먼트 상부면에 리프팅 트레블러의 이동로 역할을 하는 이동레일(130)을 연장 설치하는 단계; 및 상기 이동레일을 따라 리프팅 트레블러를 세그먼트 선단에 이동시킨 후 고정시킨 상태에서, 상기 제 1인양수단으로 다른 세그먼트를 인양하여 기 설치된 세그먼트에 연결시키는 단계;를 반복하여 교량을 완성시키되, 상기 교각 상부에 리프팅 트레블러가 설치될 수 있도록 서포트장치를 더 설치하되, 상기 서포트장치는 교각 상부면에 리프팅 트레블러의 이동높이를 고려하여 받침지지대를 먼저 설치하고, 상기 받침지지대 상부면에 주탑을 사이에 두고 좌,우대칭으로 횡방향으로 연장된 횡방향지지대를 소정의 간격으로 이격시켜 설치하여, 리프팅 트레블러가 상기 횡방향지지대 상부면에 길이방향으로 설치되도록 하는 것을 특징으로 하는 리프팅트레블러를 이용한 프리캐스트 세그먼트 교량상부시공방법.
- 삭제
- 제 1항에 있어서, 상기 리프팅 트레블러는 기 설치된 이동레일을 따라 자주식으로 이동할 수 있도록 구동제어수단 및 동력수단이 설치된 이동식작업차로써,이동레일을 따라 이동할 수 있도록 하부에 하부이동수단이 설치되며, 상기 하부이동수단에 의하여 지지되도록 설치된 트러스 또는 빔 형태의 메인거더; 및상기 메인거더 상부면을 따라 길이방향으로 이동할 수 있도록 구동휠이 구비된 상부이동수단에 지지되어 메인거더 사이를 가로질러 설치되며, 메인거더 사이 공간에 세그먼트를 인양시킬 수 있는 상기 제 1인양수단이 설치된 횡거더;를 포함하는 것을 특징으로 하는 리프팅트레블러를 이용한 프리캐스트 세그먼트 교량상부시공방법.
- 제 3항에 있어서, 상기 리프팅 트레블러는 세그먼트에 리프팅 트레블러 고정을 위한 고정수단을 더 설치하되,상기 고정수단은 메인거더 선단 하부에 부착되어 유압잭에 의하여 길이가 조절되면서 승강이 가능하도록 설치된 고정레그; 및 메인거더 선단 하부에 부착된 앵커링 바;인 것을 특징으로 하는 리프팅트레블러를 이용한 프리캐스트 세그먼트 교량상부시공방법.
- 제 3항에 있어서, 상기 하부이동수단은이동레일을 따라 구동휠이 하부에 설치되며, 상부에는 메인거더의 하부가 지지되어 이동될 수 있도록 롤러가 설치된 프레임을 포함하는 것을 특징으로 하는 리프팅트레블러를 이용한 프리캐스트 세그먼트 교량상부시공방법.
- 제 5항에 있어서, 상기 리프팅 트레블러의 제 1인양수단을 이용한 다른 세그먼트데크의 인양은,메인거더에 설치된 고정수단인 고정레그를 하강시켜 메인거더가 기 설치된 세그먼트 상부면에 지지되어 고정되도록 하여 메인거더의 위치 이동을 구속하는 단계;메인거더 하부에 적어도 2개가 설치된 하부이동수단 중 제 1하부이동수단의 구동휠을 작동시켜 메인거더를 따라 제 1하부이동수단이 전방으로 위치되도록 이동시킴과 더불어 제 2하부이동수단의 구동휠을 전방 이동된 제 1하부이동수단과 이격되어 전방으로 위치되도록 이동시키는 단계;상기 하강된 고정레그를 상승시켜 메인거더의 구속을 해제시키고 하부이동수단의 롤러를 따라 메인거더만을 전방으로 이동시킨 상태에서 메인거더 후단에 설치된 앵커링 바에 의하여 메인거더를 세그먼트데크에 고정시키는 단계;횡거더에 설치된 제 1인양수단으로부터 와이어를 풀어 교각 하부에 위치한 세그먼트에 상기 와이어를 연결시킨 후 인양시키는 단계;를 포함하는 것을 특징으로 하는 리프팅트레블러를 이용한 프리캐스트 세그 먼트 교량상부시공방법.
- 제 3항에 있어서, 상기 횡거더에는횡거더 하부를 따라 횡방향으로 이동되는 구동휠을 수용하면서, 상기 구동휠 하부에 일체로 형성된 지지대가 더 설치되며, 상기 지지대에는 제 2인양수단이 설치된 것을 특징으로 하는 리프팅트레블러를 이용한 프리캐스트 세그먼트 교량상부시공방법.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040051783A KR100627102B1 (ko) | 2004-07-03 | 2004-07-03 | 리프팅트레블러를 이용한 프리캐스트 세그먼트교량상부시공방법 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040051783A KR100627102B1 (ko) | 2004-07-03 | 2004-07-03 | 리프팅트레블러를 이용한 프리캐스트 세그먼트교량상부시공방법 |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR20-2004-0018952U Division KR200363059Y1 (ko) | 2004-07-05 | 2004-07-05 | 리프팅트레블러를 이용한 프리캐스트 세그먼트교량상부시공시스템 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20060002650A KR20060002650A (ko) | 2006-01-09 |
KR100627102B1 true KR100627102B1 (ko) | 2006-09-25 |
Family
ID=37105580
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020040051783A Expired - Fee Related KR100627102B1 (ko) | 2004-07-03 | 2004-07-03 | 리프팅트레블러를 이용한 프리캐스트 세그먼트교량상부시공방법 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100627102B1 (ko) |
Families Citing this family (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100935655B1 (ko) * | 2008-01-11 | 2010-01-07 | (주)부국이엔지 | 편중 가능한 데릭 크레인 |
CN108203934A (zh) * | 2018-02-02 | 2018-06-26 | 中交二公局第工程有限公司 | 基于偏载横移的斜拉桥叠合梁整节段吊装桥面吊机 |
CN110055904B (zh) * | 2019-06-03 | 2024-11-05 | 核工业长沙中南建设工程集团公司 | 桥梁施工装置及桥梁施工方法 |
CN110407109A (zh) * | 2019-08-08 | 2019-11-05 | 中冶天工集团有限公司 | 一种高大空间超大型风管的组装装置及施工方法 |
CN113047177B (zh) * | 2021-03-22 | 2025-01-28 | 中铁大桥局集团第四工程有限公司 | 一种移动模架底模工作车及其过孔系统和方法 |
CN114108446B (zh) * | 2021-10-26 | 2023-12-12 | 中铁广州工程局集团有限公司 | 一种高速铁路斜拉索大桥结构及施工方法 |
CN114232488B (zh) * | 2021-12-15 | 2023-11-28 | 中交路桥建设有限公司 | 一种大跨径斜拉桥主梁架设方法 |
CN114232487B (zh) * | 2021-12-15 | 2024-04-19 | 中交路桥建设有限公司 | 一种大跨径斜拉桥主梁架设施工系统 |
CN114855618B (zh) * | 2022-04-22 | 2023-06-20 | 河南交通职业技术学院 | 一种道路桥梁工程用可调节的建筑桁架结构 |
CN115094781A (zh) * | 2022-08-12 | 2022-09-23 | 中国铁建重工集团股份有限公司 | 一种造桥机及其施工方法 |
CN116289637B (zh) * | 2022-09-08 | 2025-03-14 | 中铁广州工程局集团有限公司 | 一种高塔上横梁现浇支架整体安拆的施工方法 |
CN116122625B (zh) * | 2022-12-30 | 2024-12-06 | 扬州昱辉钢业有限公司 | 一种多层钢结构厂房主梁节点连接工装 |
-
2004
- 2004-07-03 KR KR1020040051783A patent/KR100627102B1/ko not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
KR20060002650A (ko) | 2006-01-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11634877B2 (en) | Method for removal of temporary support system for road bridge pre-fabricated small box girder-type concealed bent cap, and equipment therefor | |
US5511268A (en) | Construction of large structures by robotic crane placement of modular bridge sections | |
CN110093865B (zh) | 一种架桥机 | |
WO1996005375A9 (en) | Construction of large structures by robotic crane placement of modular bridge sections | |
KR20140084107A (ko) | 셀프-런칭 이동식 비계공법 | |
KR100627102B1 (ko) | 리프팅트레블러를 이용한 프리캐스트 세그먼트교량상부시공방법 | |
JP2008274637A (ja) | 連続高架橋の施工方法 | |
CN217378620U (zh) | 一种智能架桥系统 | |
JP5184248B2 (ja) | 立体交差の施工方法 | |
CN115305835A (zh) | 一种运用架梁起重机架设双节间整节段钢桁梁的施工方法 | |
CN110468743B (zh) | 一种用于旧桥墩帽改造的移动式吊架及施工方法 | |
JP2768283B2 (ja) | 橋梁の架設方法 | |
CN215925692U (zh) | 一种超长多跨装配式一体化多功能架桥机 | |
CN114875810A (zh) | 一种桥梁架设方法 | |
CN114803882A (zh) | 自爬升起重机 | |
KR200363059Y1 (ko) | 리프팅트레블러를 이용한 프리캐스트 세그먼트교량상부시공시스템 | |
KR101373098B1 (ko) | 복합 트러스 에프씨엠 교량시공장치 및 이를 이용한 복합 트러스 에프씨엠 교량시공방법 | |
CN210856954U (zh) | 上承式拱桥用钢拱架的无支架缆索吊装施工结构 | |
CN112160246B (zh) | 组合梁安装方法 | |
CN211973152U (zh) | 一种实现高度控制的大吨位箱梁架设施工系统 | |
CN210315233U (zh) | 一种不设置前支腿的双工作面一体化架桥机 | |
KR102557944B1 (ko) | 가설 하로 트러스를 이용한 교량 상부구조 해체 방법 | |
CN112211112A (zh) | 一种在既有桥梁上采用双导梁架桥机的钢箱梁安装方法 | |
CN219218724U (zh) | 一种用于组合梁斜拉桥的主梁吊铺一体机 | |
CN114250711B (zh) | 一种公路架桥机及过孔方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
PA0109 | Patent application |
Patent event code: PA01091R01D Comment text: Patent Application Patent event date: 20040703 |
|
PA0201 | Request for examination | ||
PG1501 | Laying open of application | ||
E902 | Notification of reason for refusal | ||
PE0902 | Notice of grounds for rejection |
Comment text: Notification of reason for refusal Patent event date: 20060331 Patent event code: PE09021S01D |
|
E701 | Decision to grant or registration of patent right | ||
PE0701 | Decision of registration |
Patent event code: PE07011S01D Comment text: Decision to Grant Registration Patent event date: 20060622 |
|
GRNT | Written decision to grant | ||
PR0701 | Registration of establishment |
Comment text: Registration of Establishment Patent event date: 20060915 Patent event code: PR07011E01D |
|
PR1002 | Payment of registration fee |
Payment date: 20060918 End annual number: 3 Start annual number: 1 |
|
PG1601 | Publication of registration | ||
LAPS | Lapse due to unpaid annual fee | ||
PC1903 | Unpaid annual fee |