KR100607978B1 - Electric boiler - Google Patents

Electric boiler Download PDF

Info

Publication number
KR100607978B1
KR100607978B1 KR1020050013883A KR20050013883A KR100607978B1 KR 100607978 B1 KR100607978 B1 KR 100607978B1 KR 1020050013883 A KR1020050013883 A KR 1020050013883A KR 20050013883 A KR20050013883 A KR 20050013883A KR 100607978 B1 KR100607978 B1 KR 100607978B1
Authority
KR
South Korea
Prior art keywords
heating
water supply
hot water
supply hose
electric boiler
Prior art date
Application number
KR1020050013883A
Other languages
Korean (ko)
Inventor
최도화
Original Assignee
최도화
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 최도화 filed Critical 최도화
Priority to KR1020050013883A priority Critical patent/KR100607978B1/en
Application granted granted Critical
Publication of KR100607978B1 publication Critical patent/KR100607978B1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/18Water-storage heaters
    • F24H1/20Water-storage heaters with immersed heating elements, e.g. electric elements or furnace tubes
    • F24H1/201Water-storage heaters with immersed heating elements, e.g. electric elements or furnace tubes using electric energy supply
    • F24H1/202Water-storage heaters with immersed heating elements, e.g. electric elements or furnace tubes using electric energy supply with resistances
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D13/00Electric heating systems
    • F24D13/04Electric heating systems using electric heating of heat-transfer fluid in separate units of the system
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H3/00Air heaters
    • F24H3/02Air heaters with forced circulation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/18Arrangement or mounting of grates or heating means
    • F24H9/1809Arrangement or mounting of grates or heating means for water heaters
    • F24H9/1818Arrangement or mounting of electric heating means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H2250/00Electrical heat generating means
    • F24H2250/02Resistances

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

본 발명은 전기 보일러에 관한 것으로, 더욱 상세하게는 단시간에 난방과 온수 공급은 물론 온풍을 난방지역에 공급할 수 있는 매우 효율적인 전기 보일러에 관한 것이다.The present invention relates to an electric boiler, and more particularly to a very efficient electric boiler capable of supplying hot air to the heating zone as well as heating and hot water supply in a short time.

즉, 본 발명은 보일러 케이스 내부에 발열수단이 내장된 발열통체를 설치함에 있어서, 상기 원통형으로 형성되는 발열통체의 내부에는 상,중,하단의 구획공간이 형성되며, 상기 상단 구획공간에는 상면에 난방지역에 온풍을 공급하는 덕트와 연결되는 결합공이 형성되고, 상기 열전도체유가 충전된 중단 구획공간에는 석연관 히터와 상기 석연관 히터의 외주연을 따라 코일 형태로 수단, 수회에 걸쳐 감기는 난방수 및 온수 공급관과 상기 난방수 및 온수 공급관의 둘레를 감싸는 다수개의 스크루핀이 내장되고, 상기 하단 구획공간에는 저면에 하단 구획공간 내부로 바람을 불어 넣을 수 있는 송풍기가 결합되는 결합공이 형성됨을 기술적 구성상의 특징으로 한다.That is, in the present invention, in installing a heating cylinder in which a heating means is built in a boiler case, upper, middle, and lower partition spaces are formed inside the cylindrical heating cylinder, and the upper partition space has an upper surface. A coupling hole is formed to be connected to a duct for supplying a warm air to a heating zone. The suspended compartment filled with the thermal conductor oil is a coil winding along the outer circumference of the quartz tube heater and the quartz tube heater. The water and hot water supply pipe and a plurality of screwpins surrounding the circumference of the heating water and hot water supply pipe are built-in, and the lower compartment has a coupling hole coupled with a blower capable of blowing air into the lower compartment on the bottom. It is characterized by the configuration.

전기, 보일러, 온수, 열전도체유, 석연관 Electricity, Boiler, Hot Water, Thermal Conductor Oil, Quartz Pipe

Description

전기 보일러 {Electric boiler}Electric boiler

도 1은 본 발명의 일실시예에 따른 전체구성도.1 is an overall configuration according to an embodiment of the present invention.

도 2는 본 발명의 일실시예에 따른 발열통체의 평단면도.Figure 2 is a plan sectional view of the heating cylinder according to an embodiment of the present invention.

도 3은 본 발명의 일실시예에 따른 발열통체가 보일러 케이스에 내장된 상태를 도시한 단면도.Figure 3 is a cross-sectional view showing a state in which the heating cylinder is built in the boiler case according to an embodiment of the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

1:전기 보일러 2:보일러 케이스 10:발열통체1: electric boiler 2: boiler case 10: heating body

11:상단 구획공간 12:중단 구획공간 13:하단 구획공간11: Upper compartment 12: Intermediate compartment 13: Lower compartment

14:결합공 15:열전도체유 16:송풍기14: coupling hole 15: heat conductive oil 16: blower

17:덕트 20:석연관 히터 21:석연관17: duct 20: quartz tube heater 21: quartz tube

22:히터 30:난방수 공급관 31:난방수 공급호스22: heater 30: heating water supply pipe 31: heating water supply hose

32:순환펌프 33:이물질제거 필터 40:온수 공급관32: circulating pump 33: foreign material removal filter 40: hot water supply pipe

41:온수 공급호스 42:적외선 히터 43:염소제거 필터41: hot water supply hose 42: infrared heater 43: chlorine removal filter

50:스크루핀 51:관통공 52:스크루50: screw pin 51: through hole 52: screw

60:보조 발열통체 61:공간60: auxiliary heat generating body 61: space

본 발명은 전기 보일러에 관한 것으로, 더욱 상세하게는 단시간에 난방과 온수 공급은 물론 온풍을 난방지역에 공급할 수 있는 매우 효율적인 전기 보일러에 관한 것이다.  The present invention relates to an electric boiler, and more particularly to a very efficient electric boiler capable of supplying hot air to the heating zone as well as heating and hot water supply in a short time.

일반적으로 가스 또는 석유 보일러는 급수원으로부터 공급된 물을 순간적으로 가열하여 난방지역에는 난방수를 공급하여 난방을 하고, 욕실 등에는 온수를 공급하게 된다.In general, a gas or oil boiler instantly heats water supplied from a water supply source, supplies heating water to a heating area, and supplies hot water to a bathroom.

그리고 전기 보일러는 급수원으로부터 공급된 물을 저장하는 별도의 대용량의 저장탱크 및 저장탱크 내부에 수용된 물을 가열하는 전기히터가 구비되어 저장탱크 내에서 가열된 난방수를 난방지역에 공급하여 난방을 하는 것으로서, 주로 심야에 싼 전기요금을 이용하여 전기히터를 작동시켜 물을 가열한 후 주간에는 심야에 가열된 물의 축열을 이용하여 난방을 하기 때문에 매우 경제적이며 공해가 없어 근자에 급속도로 보급되고 있다.In addition, the electric boiler is equipped with a separate large-capacity storage tank for storing the water supplied from the water supply source and an electric heater for heating the water contained in the storage tank to supply the heating water heated in the storage tank to the heating area. It is mainly economical because it uses electric heat to operate the electric heater using the low electricity rate in the middle of the night and heats the heat by using the heat storage of the water heated in the middle of the night. .

그러나 이와 같은 기존의 전기 보일러는 온수가 필요할 경우 일시적으로 데워서 그때그때 사용하기 때문에 24시간 내내 온수를 공급할 수 없으며, 온수의 공급량이 적을 뿐만 아니라, 전기 보일러 자체 내에서 온풍을 형성하여 난방지역에 공급할 수 있는 수단이 없어 온풍에 의한 난방은 별도의 장치를 사용해야 하는 번 거로운 문제점이 있었다.However, such a conventional electric boiler is temporarily heated when hot water is needed, and then it is not available to supply hot water for 24 hours since it is used at that time, and the amount of hot water is low, and the hot air is generated in the electric boiler itself to supply the heating area. There is no means that can be heated by warm air has a cumbersome problem of using a separate device.

따라서 본 발명은 상기와 같은 문제를 해결하기 위해 안출된 것으로, 보일러 케이스 내에 발열수단이 내장된 발열통체를 설치하여 단시간에 난방수와 온수를 공급함은 물론 온풍을 난방지역에 공급하여 온풍에 의한 난방이 가능하도록 한 전기 보일러를 제공함에 그 목적이 있다.Therefore, the present invention has been made to solve the above problems, by installing a heating cylinder with a built-in heating means in the boiler case to supply heating water and hot water in a short time, as well as supplying warm air to the heating zone heating by warm air The aim is to provide an electric boiler that makes this possible.

상기와 같은 기술적 과제를 해결하기 위해 본 발명은, 보일러 케이스 내부에 발열수단이 내장된 발열통체를 설치함에 있어서, 상기 원통형으로 형성되는 발열통체의 내부에는 상,중,하단의 구획공간이 형성되며, 상기 상단 구획공간에는 상면에 난방지역에 온풍을 공급하는 덕트와 연결되는 결합공이 형성되고, 상기 열전도체유가 충전된 중단 구획공간에는 석연관 히터와 상기 석연관 히터의 외주연을 따라 코일 형태로 수단, 수회에 걸쳐 감기는 난방수 및 온수 공급관과 상기 난방수 및 온수 공급관의 둘레를 감싸는 다수개의 스크루핀이 내장되고, 상기 하단 구획공간에는 저면에 하단 구획공간 내부로 바람을 불어 넣을 수 있는 송풍기가 결합되는 결합공이 형성됨을 기술적 구성상의 특징으로 한다.In order to solve the above technical problem, the present invention, in the installation of a heat generating cylinder in which the heating means is built in the boiler case, inside of the heat generating cylinder formed in the cylindrical partition space is formed in the upper, middle, lower The upper compartment has a coupling hole connected to a duct for supplying warm air to a heating area on an upper surface thereof, and the suspended compartment space filled with the heat conductor oil has a coil shape along the outer circumference of the quartz tube heater and the quartz tube heater. Means, a heating water and hot water supply pipe wound several times and a plurality of screwpins surrounding the heating water and hot water supply pipe is built-in, the lower compartment is a blower capable of blowing air into the lower compartment in the bottom Characterized in the technical configuration that the coupling hole is formed to be combined.

또한, 본 발명의 스크루핀은, 내부와 연통되는 다수개의 관통공이 상하로 형성되며 내부에는 바람이 이동되는 스크루가 내장됨을 특징으로 한다.In addition, the screw of the present invention, a plurality of through-holes communicated with the inside is formed up and down, and the inside is characterized in that the screw to move the wind is built.

또한, 본 발명의 스크루핀의 상단은 상단 관통공이 상기 발열통체 내부의 상단 구획공간과 연통되도록 상단 구획공간에 노출 설치하고, 상기 스크루핀의 하단은 하단 관통공이 하단 구획공간와 연통되도록 하단 구획공간에 노출 설치함으로써, 상기 하단 구획공간의 결합공을 통해 공급된 송풍기의 바람이 상기 스크루핀의 하단 관통공과 내부의 스크루 및 상단 관통공을 통과하여 덕트를 통해 난방지역에 온풍을 공급할 수 있도록 구성됨을 특징으로 한다.In addition, the upper end of the screw fin of the present invention is installed in the upper compartment so that the upper through hole communicates with the upper compartment in the heating cylinder, the lower end of the screw pin is in the lower compartment so that the lower through hole communicates with the lower compartment By installing exposed, the wind of the blower supplied through the coupling hole of the lower compartment space is configured to supply hot air to the heating zone through the duct through the lower through hole and the inner screw and the upper through hole of the screw pin. It is done.

또한, 본 발명의 온수가 배출되는 온수 공급관의 끝단부는, 온수 공급호스가 연결되며 이 온수 공급호스 일단에는 적외선 히터를 설치하여 상기 온수 공급호스가 적외선 히터의 외주연을 따라 코일 형태로 감기면서 지나가도록 함으로써, 상기 온수 공급호스 내부의 온수를 살균처리하여 공급함을 특징으로 한다.In addition, the end portion of the hot water supply pipe discharging the hot water of the present invention, the hot water supply hose is connected to one end of the hot water supply hose is installed with an infrared heater is passed while the hot water supply hose is wound in a coil form along the outer periphery of the infrared heater By soaking, the hot water inside the hot water supply hose is characterized in that the sterilization treatment.

또한, 본 발명의 온수 공급호스의 일단에는, 온수에 잔류하는 염소를 제거하는 염소제거 필터가 부착됨을 특징으로 한다.In addition, one end of the hot water supply hose of the present invention is characterized in that a chlorine removal filter for removing chlorine remaining in the hot water.

또한, 본 발명의 난방수가 공급되는 난방수 공급관의 끝단부는, 난방수 공급호스가 연결되며 이 난방수 공급호스의 일단에는 순환펌프와 난방수에 잔류하는 이물질을 걸러주는 이물질제거 필터가 부착됨을 특징으로 한다.In addition, the end portion of the heating water supply pipe to which the heating water of the present invention is supplied, the heating water supply hose is connected, and one end of the heating water supply hose is attached to the circulating pump and the foreign matter removal filter for filtering foreign substances remaining in the heating water. It is done.

또한, 본 발명의 발열통체 일측에는, 난방수 공급관 및 난방수 공급호스와 연결되며 일정온도 이하에서 일시적으로 작동되어 내부로 공급된 물을 단시간에 데워 난방수 공급호스로 보내 난방지역을 난방하는 보조 발열통체가 설치됨을 특징으로 한다.In addition, one side of the heat generating cylinder of the present invention, connected to the heating water supply pipe and the heating water supply hose and is temporarily operated at a predetermined temperature or less to assist in heating the heating area by heating the water supplied to the heating water supply hose for a short time. It is characterized in that the heating body is installed.

또한, 본 발명의 보조 발열통체는, 내부에 물이 유입되는 공간을 가지도록 석연관 히터가 설치됨을 특징으로 한다.In addition, the auxiliary heating cylinder of the present invention, it characterized in that the quartz tube heater is installed to have a space in which water is introduced.

도 1은 본 발명의 일실시예에 따른 전체구성도이고, 도 2는 본 발명의 일실시예에 따른 발열통체의 평단면도이며, 도 3은 본 발명의 일실시예에 따른 발열통체가 보일러 케이스에 내장된 상태를 도시한 단면도를 각각 도시한 것으로서, 이하 첨부되는 도면을 참조하여 본 발명의 구성을 설명하면 다음과 같다.1 is an overall configuration diagram according to an embodiment of the present invention, Figure 2 is a plan sectional view of a heating cylinder according to an embodiment of the present invention, Figure 3 is a heating casing boiler case according to an embodiment of the present invention The cross-sectional view showing the state embedded in each is shown as follows, the configuration of the present invention with reference to the accompanying drawings as follows.

도 1 내지 3에 도시된 바와 같이, 본 발명의 전기 보일러(1)는 내부에 발열수단이 내장된 원통형의 발열통체(10)가 설치된다.As shown in Figures 1 to 3, the electric boiler 1 of the present invention is provided with a cylindrical heating tube 10 with a heat generating means therein.

상기 발열통체(10)는, 내부에 상,중,하단의 구획공간(11,12,13)이 형성된다.The heat generating cylinder 10 has upper, middle, and lower partition spaces 11, 12, and 13 formed therein.

이중 상기 발열통체(10)의 상단 구획공간(11)은, 상면에 상단 구획공간(11)과 연통되면서 난방지역에 온풍을 공급할 수 있도록 덕트(17)와 연결되는 결합공(14)이 형성된다.The upper partition space 11 of the heat generating cylinder 10 has a coupling hole 14 connected to the duct 17 so as to communicate with the upper partition space 11 on the upper surface to supply hot air to the heating zone. .

상기 발열통체(10)의 중단 구획공간(12)은, 내부에 열전도체유(15)가 충전된 상태로 석연관 히터(20)와, 상기 석연관 히터(20) 외주연에 코일 형태로 감기는 난방수 및 온수 공급관(30,40)과, 상기 난방수 및 온수 공급관(30,40)의 둘레를 감싸는 다수개의 스크루핀(50)으로 구성되는 발열수단이 내장된다.The interruption partition space 12 of the heat generating cylinder 10 is wound in the form of a coil in the form of a coil heater 20 and an outer circumference of the filter tube heater 20 in a state in which the thermal conductor oil 15 is filled therein. The heating water and hot water supply pipe (30, 40), and the heating means composed of a plurality of screw pins 50 surrounding the circumference of the heating water and hot water supply pipe (30, 40) is built.

상기 열전도체유(15)는, 발열통체(10)의 중단 구획공간(12)에 충전되는 것으로서, 석연관 히터(20)에서 발생된 열을 단시간에 난방수 및 온수 공급관(30,40)에 전달하여 난방수 및 온수 공급관(30,40) 내부를 흐르는 물을 급속도로 데울 수 있도록 하는 촉매 역할을 하며, 또한 물의 온도가 급격히 떨어지는 것을 방지하는 역할을 한다.The thermal conductor oil 15 is filled in the interruption compartment 12 of the heat generating cylinder 10, and heats generated from the quartz tube heater 20 to the heating water and hot water supply pipes 30 and 40 in a short time. It serves to serve as a catalyst to rapidly heat the water flowing in the heating water and hot water supply pipes (30, 40), and also serves to prevent the temperature of the water drops sharply.

상기 석연관 히터(20)는, 절연성이 우수한 석연관(21) 내부에 히터(22)가 내장되어 구성된 것으로서, 자체에서 발생된 열을 열전도체유(15)와 난방수 및 온수 공급관(30,40)에 전달하여 난방수 및 온수 공급관(30,40) 내부의 물을 단시간에 데워 난방수 및 온수를 만드는 역할을 한다.The quartz tube heater 20 is configured as a heater 22 is built in the quartz tube 21 having excellent insulation, and heat generated from the heat conductive oil 15 and the heating water and hot water supply pipe 30, 40) by heating the water inside the heating water and hot water supply pipe (30, 40) in a short time serves to create the heating water and hot water.

또한, 상기 석연관 히터(20)는, 히터(22)가 절연성이 우수한 석연관(21)에 내입되어 있어 히터(22)의 누전을 완벽하게 차단하여 전기 보일 사용자의 안전을 보장할 수 있다.In addition, the quartz tube heater 20, the heater 22 is embedded in the quartz tube 21 having excellent insulation properties can completely block the leakage of the heater 22 to ensure the safety of the electric boiler user.

상기 난방수 및 온수 공급관(30,40)은, 석연관 히터(20)의 외주연을 따라 수단, 수회에 걸쳐 코일 형태로 감기는 것으로서, 난방수 및 온수의 공급 량을 늘리고 싶을 경우에는 난방수 및 온수 공급관(30,40)의 감김 단수와 횟수를 늘려서 상기 석연과 히터(20)의 외주연에 감아주면 된다. The heating water and hot water supply pipes 30 and 40 are wound along the outer circumference of the quartz tube heater 20 in a coil form over the means and several times, and when the supply amount of the heating water and hot water is to be increased, the heating water is used. And it may be wound around the outer periphery of the lime and the heater 20 by increasing the number and number of turns of the hot water supply pipe (30, 40).

상기 난방수 공급관(30)의 일단은 수도와 호스 등의 연결수단에 의해 연결되고 타단은 난방수 공급호스(31)와 연결된다.One end of the heating water supply pipe 30 is connected by connecting means such as water and a hose, and the other end is connected to the heating water supply hose 31.

이때, 상기 난방수 공급호스(31)의 일단에는 순환펌프(32)와 상기 난방수 공 급호스(31)를 따라 공급되는 난방수에 잔류하는 이물질을 걸러내는 이물질제거 필터(33)가 부착된다.At this time, one end of the heating water supply hose 31 is attached to the foreign matter removal filter 33 for filtering foreign matter remaining in the heating water supplied along the circulation pump 32 and the heating water supply hose 31. .

물론 상기 난방수 공급호스(31)는, 난방지역 내의 난방호스와 연결되어 난방수를 보냄으로써 난방지역에 난방이 이루어지도록 한다.Of course, the heating water supply hose 31 is connected to the heating hose in the heating zone to send the heating water to be heated in the heating zone.

상기 온수 공급관(40)의 일단은 수도와 호스 등의 연결수단에 의해 연결되고 타단은 온수 공급호스(41)와 연결되며, 상기 온수 공급호스(41)의 일단에는 적외선 히터(42)가 설치된다.One end of the hot water supply pipe 40 is connected by a connecting means such as water and hose, the other end is connected to the hot water supply hose 41, one end of the hot water supply hose 41 is provided with an infrared heater 42. .

이때, 상기 온수 공급관(40)을 적외선 필터(42)의 외주연에 코일 형태로 감기게 하여, 상기 적외선 히터(42)에서 방출된 적외선이 온수 공급관(40)을 투과하여 온수 공급관(40)의 내부의 온수가 살균처리되게 한다.At this time, the hot water supply pipe 40 is wound around the outer periphery of the infrared filter 42 in the form of a coil, and the infrared rays emitted from the infrared heater 42 penetrate the hot water supply pipe 40 so that the hot water supply pipe 40 Allow the hot water inside to be sterilized.

또한, 상기 온수 공급호스(41)의 일단에 염소를 제거할 수 있는 염소제거 필터(43)를 설치하여 온수에 잔류하는 염소를 제거할 수 있도록 한다.In addition, by installing a chlorine removal filter 43 that can remove chlorine at one end of the hot water supply hose 41 to remove the chlorine remaining in the hot water.

따라서, 온수 공급호스(41)를 흐르는 온수는 적외선 히터(42)와 염소제거 필터(43)를 통과하게 되므로 피부에 좋은 매우 위생적인 온수를 공급할 수 있다.Therefore, the hot water flowing through the hot water supply hose 41 is passed through the infrared heater 42 and the chlorine removal filter 43, it is possible to supply very hygienic hot water to the skin.

물론 상기 적외선 히터(42)와 염소제거 필터(43)를 동시에 설치할 수도 있고 필요에 따라 각각 개별로 설치할 수도 있다.Of course, the infrared heater 42 and the chlorine removal filter 43 may be installed at the same time or may be separately installed as necessary.

상기 스크루핀(50)은, 상기 난방수 및 온수 공급관(30,40)의 둘레를 감싸도록 형성되는데 보통 난방수 및 온수 공급관(30,40)의 둘레에 8개가 설치되며 상기 스크루핀(50)의 수는 필요에 따라 가감될 수 있다.The screw pin 50 is formed to surround the circumference of the heating water and hot water supply pipes 30 and 40. Usually, eight screws are installed around the heating water and hot water supply pipes 30 and 40, and the screw pin 50 is disposed. The number of can be added or subtracted as needed.

상기 스크루핀(50)은, 난방지역에 온풍을 공급하여 온풍 난방이 가능하도록 하는 역할을 하는 것으로서, 상,하단에 다수개로 형성되는 관통공(51)과 내부의 스크루(52)로 구성된다. The screw pin 50 serves to enable warm air heating by supplying warm air to the heating area, and includes a plurality of through-holes 51 and inner screws 52 formed in a plurality of upper and lower ends.

상기 스크루핀(50)은 난방지역에 온풍을 공급할 수 있도록 상단은 발열통체(10)의 상단 구획공간(11)에 노출되게 설치되고, 하단은 하단 구획공간(13)에 노출되게 설치된다.The screw pin 50 is installed so that the upper end is exposed to the upper compartment 11 of the heating cylinder 10, the lower end is exposed to the lower compartment 13 so as to supply warm air to the heating zone.

즉, 스크루핀(50)의 상,하단이 상,하단 구획공간(11,13)에 노출 설치되어 있기 때문에 송풍기(16)의 바람을 스크루핀(50) 하단의 관통공(51)을 통해 스크루핀(50) 내부로 공급하면, 바람이 스크루(52)를 따라 이동되면서 온풍으로 바뀌고 이 온풍은 스크루핀(50) 상단의 관통공(51)을 통하여 발열통체(10)의 상단 구획공간(11)을 경유하여 결합공(14)에 연결된 닥터(17)로 이동되어 난방지역에 공급된다.That is, since the upper and lower ends of the screw pin 50 are installed in the upper and lower partition spaces 11 and 13, the wind of the blower 16 is screwed through the through holes 51 at the bottom of the screw pin 50. When supplied into the fin 50, the wind is moved along the screw 52 to change the warm air and the warm air through the through hole 51 of the top of the screw fin 50, the upper compartment space 11 of the heat generating cylinder (10) It is moved to the doctor 17 connected to the coupling hole 14 via) and supplied to the heating zone.

상기 발열통체(10)의 하단 구획공간(13)은, 저면에 하단 구획공간(13)가 연통되면서 송풍기(16)와 연결되는 결합공(14)이 형성된다.The lower partition space 13 of the heating cylinder 10, the lower partition space 13 is communicated to the bottom surface is formed with a coupling hole (14) connected to the blower (16).

한편, 발열통체(10) 일측에는, 난방수 공급관(30) 및 난방수 공급호스(31)와 연결되며 일정온도 이하 일 때 일시적으로 작동되어 내부로 공급된 물을 단시간에 데워 난방수를 공급하는 보조 발열통체(60)가 형성된다.On the other hand, on one side of the heat generating cylinder 10, it is connected to the heating water supply pipe 30 and the heating water supply hose 31 and is temporarily operated when the temperature is below a predetermined temperature to supply the heating water by heating the water supplied to the inside for a short time. An auxiliary heating cylinder 60 is formed.

상기 보조 발열통체(60) 내부에는, 물이 유입되는 공간(61)이 형성되며 석연 관 히터(20)가 설치된다.Inside the auxiliary heat generating cylinder 60, a space 61 into which water flows is formed, and a quartz tube heater 20 is installed.

한편, 상기 석연관 히터(20), 순환펌프(32), 적외선 히터(42) 등은 각종 센서 및 제어부(미도시)에 의해 전기적으로 연결되어 작동이 이루어진다.Meanwhile, the quartz tube heater 20, the circulation pump 32, the infrared heater 42, and the like are electrically connected to each other by various sensors and controllers (not shown).

이상에서 상세히 살펴본 바와 같이, 본 고안의 전기 보일러(1)는, 난방수에 의한 난방은 물론 자체 내로 형성된 온풍을 난방지역에 공급하여 온풍에 의한 난방을 가능하도록 하고, 온수를 24시간 내내 공급할 수 있는 매우 효율적이며 획기적인 전기 보일러(1)에 관한 것으로, 이하 첨부되는 도면을 참조의 본 발명의 전기 보일러(1)의 작동과정을 살펴보면 다음과 같다.As described in detail above, the electric boiler 1 of the present invention, as well as heating by the heating water to supply the warm air formed in itself to the heating area to enable the heating by the warm air, can supply hot water 24 hours a day. Regarding a very efficient and breakthrough electric boiler 1, the operation of the electric boiler 1 of the present invention with reference to the accompanying drawings as follows.

도 1내지 3에 도시된 바와 같이, 먼저 전원을 연결하고 전기 보일러(1)를 작동시키면 석연관 히터(20)가 발열되어 발열통체(10) 내부가 데워진다.As shown in Figures 1 to 3, when the power source is first connected and the electric boiler 1 is operated, the quartz tube heater 20 is heated to heat the inside of the heat generating cylinder 10.

즉, 상기 석연관 히터(20)가 발열되면 상기 석연관 히터(20)의 외주연에 감긴 난방수 및 온수 공급관(30,40)에 열이 전달됨과 동시에 열전도체유(15)에 급속도로 열이 전달되어 난방수 및 온수 공급관(30,40) 내의 물을 단시간에 데워 난방지역에는 난방수를 공급하고, 주방, 욕실 등에는 온수를 공급한다.That is, when the duct tube heater 20 generates heat, heat is transferred to the heating water and hot water supply pipes 30 and 40 wound around the outer circumference of the duct tube heater 20 and rapidly heated to the heat conductor oil 15. The water is delivered to heat the water in the heating water and the hot water supply pipes 30 and 40 in a short time to supply the heating water to the heating area, and to supply the hot water to the kitchen and the bathroom.

그리고 열전도체유(15)에 의해 난방수 및 온수 공급관(30,40) 둘레에 설치되는 스크루핀(50)에도 열이 전달되어 난방지역에 온풍을 공급할 수 있다.In addition, heat is transferred to the screw fin 50 installed around the heating water and hot water supply pipes 30 and 40 by the heat conductive oil 15, thereby supplying warm air to the heating area.

이때, 난방지역에 공급되는 난방수는 난방수 공급관(30)의 일단에 부착된 이물질제거 필터(33)를 거쳐 이물질이 완전히 제거된 상태로 난방지역으로 공급된다.At this time, the heating water supplied to the heating zone is supplied to the heating zone while the foreign matter is completely removed through the foreign matter removal filter 33 attached to one end of the heating water supply pipe 30.

그리고 주방이나 욕실로 공급되는 온수는 온수 공급호스(41) 일단에 설치된 적외선 히터(42)와 염소제거 필터(43)를 거쳐 살균과 염소 제거가 된 상태로 공급되기 때문에 매우 위생적이다.And the hot water supplied to the kitchen or bathroom is very hygienic because it is supplied in the sterilization and chlorine removal state through the infrared heater 42 and the chlorine removal filter 43 installed at one end of the hot water supply hose (41).

또한, 본 발명의 전기 보일러(1)는 난방수와 온수를 공급함은 물론 온풍을 난방지역에 공급할 수 있다.In addition, the electric boiler 1 of the present invention can supply hot water to the heating zone as well as supply heating water and hot water.

즉, 발열통체(10)의 하단 구획공간(13)의 결합공(14)과 연결된 송풍기(16)를 작동하여 하단 구획공간(13) 내에 바람을 공급하면, 상기 바람은 스크루핀(50)의 하단 관통공(51)을 통해 내부의 스크루(52)를 따라 이동되면서 온풍으로 바뀌게 되고 이 온풍은 스크루핀(50)의 상단 관통공(51)을 통해 발열통체(10)의 상단 구획공간(11)으로 유입되며 다시 결합공(14)과 연결된 덕트(17)를 경유하여 난방지역에 공급된다.That is, by operating the blower 16 connected to the coupling hole 14 of the lower compartment 13 of the heat generating cylinder 10 to supply the wind in the lower compartment 13, the wind of the screw pin 50 It moves along the screw 52 therein through the lower through hole 51 and is changed into warm air. The warm air is divided into the upper partition space 11 of the heat generating cylinder 10 through the upper through hole 51 of the screw fin 50. ) Is supplied to the heating zone via the duct 17 connected to the coupling hole 14 again.

상기 본 발명의 전기 보일러(1)에서 제공하는 난방수, 온풍, 온수의 공급은 동시에 사용할 수도 있으며 필요시 개별적으로 사용할 수도 있는 것으로서, 예를 들어 난방수 및 온수 공급호스(31,41)에 설치된 밸브(미도시)를 닫고 온풍만 난방지역에 공급할 수 있다.The supply of heating water, warm air, and hot water provided by the electric boiler 1 of the present invention may be used at the same time and may be used separately as necessary, for example, installed in the heating water and hot water supply hoses 31 and 41. Close the valve (not shown) and supply only warm air to the heating zone.

한편, 발열통체(10) 일측에는 보조 발열통체(60)가 형성되어 있어 보일러(1)를 오랫동안 사용하지 않았을 경우 난방수의 공급이 늦어 난방이 지연되는 것을 방 지할 수 있다.On the other hand, the auxiliary heat generating cylinder 60 is formed on one side of the heat generating cylinder 10, so that when the boiler 1 is not used for a long time, the supply of heating water is delayed, thereby preventing the heating from being delayed.

즉, 보조 발열통체(60)는 일정온도 이하 일 때 이를 감지하여 발열통체(10) 보다 먼저 물을 데워서 난방수를 난방지역에 공급한다.That is, the auxiliary heating cylinder 60 senses when the temperature is below a predetermined temperature and heats the water before the heating cylinder 10 to supply the heating water to the heating zone.

상기 보조 발열통체(60)는 일시적으로 작동되는 것으로서 발열통체(10)에서 난방수가 공급되면 상기 보조 발열통체(60)는 작동을 멈추게 된다.The auxiliary heating cylinder 60 is temporarily operated, and when the heating water is supplied from the heating cylinder 10, the auxiliary heating cylinder 60 is stopped.

이상에서 상세히 살펴본 바와 같이 본 발명은 난방수에 의한 난방은 물론 자체내로 형성된 온풍을 난방지역에 공급하여 온풍에 의한 난방을 가능하도록 하고, 온수를 24시간 내내 공급할 수 있는 장점이 있다.As described in detail above, the present invention has the advantage of supplying warm air formed in itself as well as heating by heating water to a heating area to enable heating by warm air, and supplying hot water 24 hours a day.

비록 본 발명이 첨부되는 도면에 의해 설명되었을 지라도 본 발명은 이에 한정되는 것이 아니라 하기의 특허청구범위 내에서 많은 수정 및 변형이 있을 수 있음은 물론이다.Although the present invention has been described by the accompanying drawings, the present invention is not limited thereto, but many modifications and variations can be made within the scope of the following claims.

Claims (8)

보일러 케이스 내부에 발열수단이 내장된 발열통체를 설치함에 있어서,In installing the heat generating cylinder in which the heating means is built in the boiler case, 상기 원통형으로 형성되는 발열통체의 내부에는 상,중,하단의 구획공간이 형성되며,Inside the heating cylinder formed in the cylindrical partition spaces of the upper, middle, lower is formed, 상기 상단 구획공간에는, 상면에 난방지역에 온풍을 공급하는 덕트와 연결되는 결합공이 형성되고,In the upper partition space, the coupling hole is connected to the duct for supplying warm air to the heating area on the upper surface, 상기 열전도체유가 충전된 중단 구획공간에는, 석연관 히터와 상기 석연관 히터의 외주연을 따라 코일 형태로 수단, 수회에 걸쳐 감기는 난방수 및 온수 공급관과 상기 난방수 및 온수 공급관의 둘레를 감싸는 다수개의 스크루핀이 내장되고,In the interruption partition space filled with the thermal conductor oil, the heating water and hot water supply pipe wound in the form of a coil along the outer circumference of the quartz tube heater and the quartz tube heater, several times, and the circumference of the heating water and hot water supply pipe Multiple screwpins are built in, 상기 하단 구획공간에는, 저면에 하단 구획공간 내부로 바람을 불어 넣을 수 있는 송풍기가 결합되는 결합공이 형성됨을 특징으로 하는 전기 보일러.The lower compartment, the electric boiler characterized in that the coupling hole is coupled to the blower that can blow air into the lower compartment in the bottom surface is formed. 제1항에 있어서,The method of claim 1, 상기 스크루핀은, 내부와 연통되는 다수개의 관통공이 상하로 형성되며 내부에는 바람이 이동되는 스크루가 내장됨을 특징으로 하는 전기 보일러.The screw pin, a plurality of through-holes communicated with the inside is formed up and down, the inside of the electric boiler characterized in that the screw is moved to the wind. 제 1항 또는 2항에 있어서,The method according to claim 1 or 2, 상기 스크루핀의 상단은 상단 관통공이 상기 발열통체 내부의 상단 구획공간과 연통되도록 상단 구획공간에 노출 설치하고, 상기 스크루핀의 하단은 하단 관통공이 하단 구획공간와 연통되도록 하단 구획공간에 노출 설치함으로써, 상기 하단 구획공간의 결합공을 통해 공급된 송풍기의 바람이 상기 스크루핀의 하단 관통공과 내부의 스크루 및 상단 관통공을 통과하여 덕트를 통해 난방지역에 온풍을 공급할 수 있도록 구성됨을 특징으로 하는 전기 보일러.By installing the upper end of the screw fin exposed in the upper compartment so that the upper through hole communicates with the upper compartment in the heating cylinder, the lower end of the screw pin is installed in the lower compartment so that the lower through hole communicates with the lower compartment, An electric boiler characterized in that the wind of the blower supplied through the coupling hole of the lower compartment space passes the lower through hole of the screw pin and the inner screw and the upper through hole to supply hot air to the heating zone through the duct. . 제 1항에 있어서,The method of claim 1, 상기 온수가 배출되는 온수 공급관의 끝단부는, 온수 공급호스가 연결되며 이 온수 공급호스 일단에는 적외선 히터를 설치하여 상기 온수 공급호스가 적외선 히터의 외주연을 따라 코일 형태로 감기면서 지나가도록 함으로써, 상기 온수 공급호스 내부의 온수를 살균처리하여 공급함을 특징으로 하는 전기 보일러.An end portion of the hot water supply pipe through which the hot water is discharged is connected to a hot water supply hose, and an infrared heater is installed at one end of the hot water supply hose so that the hot water supply hose passes by winding in a coil form along the outer circumference of the infrared heater. An electric boiler characterized by supplying sterilized water to the hot water supply hose. 제 4항에 있어서,The method of claim 4, wherein 상기 온수 공급호스의 일단에는, 온수에 잔류하는 염소를 제거하는 염소제거 필터가 부착됨을 특징으로 하는 전기 보일러.One end of the hot water supply hose, characterized in that the chlorine removal filter for removing the chlorine remaining in the hot water. 제 1항에 있어서,The method of claim 1, 상기 난방수가 공급되는 난방수 공급관의 끝단부는, 난방수 공급호스가 연결되며 이 난방수 공급호스의 일단에는 순환펌프와 난방수에 잔류하는 이물질을 걸러주는 이물질제거 필터가 부착됨을 특징으로 하는 전기 보일러.An end portion of the heating water supply pipe to which the heating water is supplied is connected to a heating water supply hose, and one end of the heating water supply hose is equipped with a foreign matter removal filter for filtering foreign substances remaining in the circulation pump and heating water. . 제 1항에 있어서,The method of claim 1, 상기 발열통체 일측에는, 난방수 공급관 및 난방수 공급호스와 연결되며 일정온도 이하에서 일시적으로 작동되어 내부로 공급된 물을 단시간에 데워 난방수 공급호스로 보내 난방지역을 난방하는 보조 발열통체가 설치됨을 특징으로 하는 전기 보일러.One side of the heating body is connected to the heating water supply pipe and the heating water supply hose, and the auxiliary heating body is installed to heat the heating area by heating the water supplied to the heating water supply hose for a short time by temporarily operating under a predetermined temperature. An electric boiler, characterized in that. 제 7항에 있어서,The method of claim 7, wherein 상기 보조 발열통체는, 내부에 물이 유입되는 공간을 가지도록 석연관 히터가 설치됨을 특징으로 하는 전기 보일러.The auxiliary heating cylinder, the electric boiler, characterized in that the heater is installed so that the quartz tube has a space in which water is introduced.
KR1020050013883A 2005-02-19 2005-02-19 Electric boiler KR100607978B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050013883A KR100607978B1 (en) 2005-02-19 2005-02-19 Electric boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050013883A KR100607978B1 (en) 2005-02-19 2005-02-19 Electric boiler

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2005-0004490U Division KR200383138Y1 (en) 2005-02-19 2005-02-19 Electric boiler

Publications (1)

Publication Number Publication Date
KR100607978B1 true KR100607978B1 (en) 2006-08-03

Family

ID=37184928

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050013883A KR100607978B1 (en) 2005-02-19 2005-02-19 Electric boiler

Country Status (1)

Country Link
KR (1) KR100607978B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101166459B1 (en) 2009-04-08 2012-07-20 서영철 Boiler having fan heater

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101166459B1 (en) 2009-04-08 2012-07-20 서영철 Boiler having fan heater

Similar Documents

Publication Publication Date Title
KR20070000493U (en) hot water circulation system of non-driving pump
KR100607978B1 (en) Electric boiler
KR200383138Y1 (en) Electric boiler
CN102342819A (en) Water-carrying home appliance, particularly dish-washing machine
JP2007225251A (en) Electric water heater with water purifier
CN205514111U (en) Pipeline water dispenser with high frequency pulsed magnetic field sterilizing equipment
KR101719206B1 (en) Induction boiler and heating system using this
KR101576830B1 (en) Hot water tank
KR20010008335A (en) Electric boiler using thermal oil
KR200434072Y1 (en) Boiler for mat
KR101895706B1 (en) Boiler for hot water mat using induction heating apparatus
KR20110006913A (en) Electric instant water heater
KR20110030035A (en) Warm water heating tube for electric boiler and electric boiler using the same
KR100838814B1 (en) Hot water mattress and bed using the same
KR20020040230A (en) Heat exchanger for hot water equipment using night electric
KR200277360Y1 (en) Electrical boiler
KR101113100B1 (en) Seat type seam bath with drying function
KR101051492B1 (en) Humidifier using heat of hot water boiler
KR20170002105U (en) Warm water supply device for warm water circulation mat
KR100292244B1 (en) Rapid heating device for electric boiler
KR200179637Y1 (en) hot water heating &amp; cycling system
JP2005095826A (en) High temperature water washing apparatus
KR20160020091A (en) Control System of Steam Fan Heater Using Water
KR101981070B1 (en) Staight type hot water supply device
KR101416656B1 (en) Cold and Hot water boiler with water filter

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee