KR100593838B1 - Breakage prevention structure of water and sewage pipe in soft ground of multi-family house - Google Patents
Breakage prevention structure of water and sewage pipe in soft ground of multi-family house Download PDFInfo
- Publication number
- KR100593838B1 KR100593838B1 KR1020050127152A KR20050127152A KR100593838B1 KR 100593838 B1 KR100593838 B1 KR 100593838B1 KR 1020050127152 A KR1020050127152 A KR 1020050127152A KR 20050127152 A KR20050127152 A KR 20050127152A KR 100593838 B1 KR100593838 B1 KR 100593838B1
- Authority
- KR
- South Korea
- Prior art keywords
- water
- fixing
- spring
- fixed
- sewage pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/06—Accessories therefor, e.g. anchors
- F16L1/11—Accessories therefor, e.g. anchors for the detection or protection of pipes in the ground
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/028—Laying or reclaiming pipes on land, e.g. above the ground in the ground
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/06—Accessories therefor, e.g. anchors
- F16L1/10—Accessories therefor, e.g. anchors for aligning
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Sewage (AREA)
Abstract
본 발명은 공동주택 연약지반 내의 상하수관 파손방지구조에 관한 것으로서, 더욱 상세하게는 공공주택의 상하수도관을 매설할때 연약지반으로 인하여 상하수관이 뒤틀림에 의해 파손되는 것을 방지하도록 보강한 공동주택의 수직하중으로 인한 파손 방지 상하수관에 관한 것이며, 상면 중앙에 반원형 안착홈(14)이 형성되고, 상면 측부로 볼트홀(13)이 형성되며, 몸체 내부에 양측에 와이어 관통홀(12)이 형성되고, 와이어관통홀(12)의 양단에는 와이어고정부(11)가 형성되는 하부지지대(10)와, 2개의 반구형 몸체로 이루어지고, 상하수관(30)을 감싸면서 반원형 안착홈(14)에 안착되는 상하수관 보호 이피에스(EPS) 덮개(20)와, 상하수관보호 이피에스 덮개(20) 위로 고정되고, 고정플랜지(41)가 형성되며, 고정플랜지(41)에 고정볼트홀(42)이 형성되는 상부덮개(40)와, 플렉시블한 재질로 단면이 반원형인 몸체의 양단에 플랜지(53)가 형성되고, 플랜지(53)에 고정볼트홀(54)이 형성되며, 외측면에 반원형돌기부(51)가 길이방향으로 형성되고, 스프링장착공간(52)의 양측에 스프링고정마개(56)가 고정되며, 그 사이에 스프링(55)이 고정 연결되는 연결덮개(50)로 구성되는 것을 특징으로 한다.The present invention relates to a structure for preventing damage to water and sewage pipes in a soft ground of a multi-family house, and more particularly, to a structure of a multi-family house reinforced to prevent damage to water and sewage pipes due to soft ground when buried water and sewage pipes of a public house. It relates to a water and sewage pipe preventing damage due to vertical load, the semi-circular seating groove 14 is formed in the center of the upper surface, the bolt hole 13 is formed on the upper surface side, the wire through hole 12 is formed on both sides inside the body At both ends of the wire through hole 12, the lower support 10 is formed with a wire fixing part 11 and two hemispherical bodies, and surrounds the water and sewage pipe 30 in the semi-circular seating groove (14). The water and sewage pipe protection EPS (20) to be seated, and fixed to the water and sewage pipe protection EP cover 20, the fixing flange 41 is formed, the fixing bolt hole 42 in the fixing flange 41 The upper cover 40 is formed The flange 53 is formed at both ends of the semi-circular body of the flexible material, the fixing bolt hole 54 is formed in the flange 53, the semi-circular projection 51 is formed on the outer surface in the longitudinal direction , The spring fixing stopper 56 is fixed to both sides of the spring mounting space 52, characterized in that consisting of a connecting cover 50, the spring 55 is fixedly connected therebetween.
상하수관보호 이피에스 덮개, 상하수관, 연결덮개, 하부지지대 Water and sewer pipe protection CS cover, water and sewage pipe, connecting cover, lower support
Description
도 1은 본 발명의 공동주택 연약지반 내의 상하수관 파손방지구조를 도시한 사시도.1 is a perspective view showing the structure of the water and sewage pipe breakage in the soft ground of the multi-family house of the present invention.
도 2는 본 발명의 공동주택 연약지반 내의 상하수관 파손방지구조를 도시한 분해사시도.Figure 2 is an exploded perspective view showing the structure of the water and sewage pipe breakage in the soft ground of the multi-family house of the present invention.
도 3은 본 발명의 공동주택 연약지반 내의 상하수관 파손방지구조를 도시한 단면도.Figure 3 is a cross-sectional view showing the structure of the water and sewage pipe breakage in the soft ground of the multi-family house of the present invention.
도 4는 본 발명의 공동주택 연약지반 내의 상하수관 파손방지구조를 도시한 횡방향 수직단면도.Figure 4 is a horizontal vertical cross-sectional view showing the structure of the water and sewage pipe breakage in the soft ground of the multi-family house of the present invention.
도 5는 도 4의 A부를 도시한 확대도.5 is an enlarged view of a portion A of FIG. 4;
도 6은 본 발명의 공동주택의 수직하중으로 인한 파손 방지 상하수관을 도시한 설치 상태도.Figure 6 is an installation state showing the damage prevention water and sewage pipes due to the vertical load of the multi-unit house of the present invention.
도 7은 본 발명의 공동주택 연약지반 내의 상하수관 파손방지구조가 하중을 받은 상태를 도시한 상태도.Figure 7 is a state diagram showing a state in which the water and sewage pipe breakage prevention structure in the multi-family soft ground of the present invention under load.
< 도면의 주요 부분에 대한 부호의 간단한 설명 ><Brief description of symbols for the main parts of the drawings>
10 : 하부지지대 11 : 와이어고정부10: lower support 11: wire fixing
12 : 와이어관통홀 13 : 볼트홀12: wire through hole 13: bolt hole
14 : 반원형 안착홈 15 : 와이어14: semi-circular seating groove 15: wire
20 : 상하수관보호 이피에스 덮개 30 : 상하수관20: water and sewage pipe protection IPS cover 30: water and sewage pipe
40 : 상부덮개 41 : 고정플랜지40: upper cover 41: fixed flange
42 : 고정볼트홀 43 : 고정볼트42: fixing bolt hole 43: fixing bolt
50 : 연결덮개 51 : 반원형돌기부50: connecting cover 51: semi-circular projection
52 : 스프링장착공간 53 : 플랜지52: spring mounting space 53: flange
54 : 고정볼트홀 55 : 스프링54: fixing bolt hole 55: spring
56 : 스프링고정마개 57 : 고리56: spring stopper 57: ring
561 : 걸림턱561: jamming jaw
본 발명은 공동주택 연약지반 내의 상하수관 파손방지구조에 관한 것으로서, 더욱 상세하게는 공공주택의 상하수도관을 매설할때 연약지반으로 인하여 상하수관이 뒤틀림에 의해 파손되는 것을 방지하도록 보강한 공동주택의 수직하중으로 인한 파손 방지 상하수관에 관한 것이다.The present invention relates to a structure for preventing damage to water and sewage pipes in a soft ground of a multi-family house, and more particularly, to a structure of a multi-family house reinforced to prevent damage to water and sewage pipes due to soft ground when buried water and sewage pipes of a public house. It relates to a water and sewage pipe preventing damage caused by vertical load.
일반적으로 공공주택의 건설시 오,폐수로관 공사시나, 상수도관 공사시 지면에 매설하여 사용되는 제품은 콘크리트 흄관 또는 합성수지제 나선관등을 주로 사용되었다.Generally, concrete fume pipes or synthetic resin spiral pipes were mainly used for the construction of public and residential water pipes and water pipes.
그러나, 지중 매설하기 위하여 더파기되는 토양은 성토 및 연약지반을 통과하는 경우가 많으며, 또한 지역에 따라 자갈 등이 섞여있어서 배수로관의 배수 구베를 배수가 원활하게 이루어지도록 일정하게 이루어지는 작업이 어려운 경우가 많은 현실이다.또한, 더파기하는 배수관로는 지면에서 일정깊이로 더파기하면서 상기 설명된 바와 같이 배수 구베를 유지하기 위하는 공정이 시공 현장의 악조건하에서는 문제가 많은 현실이다.However, soil that is dug to be buried under the ground often passes through the fill and soft ground, and also the gravel is mixed depending on the region, so if the work that is constantly made to smoothly drain the drain pipe of the drainage pipe In addition, the process of maintaining the drain pipe as described above while digging to a certain depth from the ground while the dug drainage channel is a lot of reality under the bad conditions of the construction site.
또한, 매설된 배수로관의 매설에 대한 공정은 일정깊이로 더파기되는 토양을 이용하여 대부분 되뫼움하는 공정으로 마무리를 하므로, 상기 되뫼움하는 토양은 토양의 보강력이 낮아서 매설 공정에서 다져주는 공정이 필요하는데, 시공현장에서의 조건상 별도의 장비가 소요되며, 이에 따른 배수로관의 외토압에 대한 보강을 위하여 다딤 작업에서 매설되는 배수로관의 양측 벽면에 대하여 다짐작업을 보강하여 주어야한다.In addition, the buried drainage pipe is buried in the process of laying the soil to be dug back to the depth of the process, most of the process, because the soil reinforcement is low soil reinforcement, the process of compacting in the buried process This requires a separate equipment due to the conditions at the construction site, and to reinforce the external pressure of the drainage pipe, it is necessary to reinforce the compaction work on both side walls of the drainage pipe buried in the damming work.
또한, 지중 매설하여 사용되는 배수로관은 제조 및 운반상 일정길이로 제조하는바, 이를 매설하는 시공현장에서 연속적으로 연결하여 사용하는데, 매설되는 배수관로 부위가 폭우 등으로 연약지반에서 주저앉거나 함몰되는 경우 연결부위가 서로 비틀려주면서 누수가 되는 문제가 발생하는바, 이를 위하여 매설토의 보강이 요구되는 경우가 많았다.In addition, the drainage pipe used by laying underground is manufactured to a certain length during manufacture and transportation, and is continuously connected at the construction site to bury it, and the drainage pipe is buried in the ground due to heavy rain, etc. If the connection part is twisted to each other, the problem of water leakage occurs, for this purpose reinforcement of buried soil was often required.
본 발명에서는 배수로관을 지중 매몰시켜 장기간 사용하는 경우 외토압의 하중은 배수로관의 상측부위가 많이 받으며 양측부위는 상측부위의 토압하중에 따를 굽힘응력을 견고하게 지지하여 주는 부위로서 더파기한 지반의 토양으로 되뫼움할 때 다짐공정이 철저히 요구되는 부위이며 하측부위는 연결부위에서 누수방지 역할이 요구되어 왔다.In the present invention, when the drainage pipe is buried under the ground for a long time, the load of external soil receives a lot of the upper part of the drainage pipe, and both sides are the parts that firmly support the bending stress according to the earth pressure load of the upper part. The compaction process is required when the soil is back into the soil, and the lower part has been required to prevent leakage at the connecting part.
따라서 이의 상응하는 해결을 위하여 상시 사용된 콘크리트 흄관은 견고하고 외압강도가 높으나 연결부위의 견고성에는 문제점이 있으며 또 합성수지제 나선관은 외압 강도가 낮은 연성관이며 특히 지중 매설되어서 집중 하중을 받는 경우 나선관의 중간부위가 파손되어서 배수관로 역할 불가능 정도가 되는 문제가 발생한다.Therefore, the concrete fume pipe used for the corresponding solution is firm and has high external pressure strength, but there is a problem in the strength of the joints, and the synthetic resin spiral pipe is a flexible pipe with low external pressure strength, especially when it is buried in the ground and receives a concentrated load. The middle part of the pipe is broken and the problem that the role of the drain pipe becomes impossible.
또한 연약지반 또는 붕괴가 빈번한 곳에 매설된 상하수도관이 외력에 의해 뒤틀리거나 휘는 것이 발생한다.In addition, water and sewage pipes buried in the soft ground or collapse frequently occur or warp due to external force.
일반적으로, 공장, 주택 및 각종 시설에 상수를 공급하는 상수도관과, 사용된 하폐수를 원격지의 하수처리시설로 이송시킬 수 있는 하수도관은 지상의 공간확보 및 생활환경미화를 위해 지하에 매설된다.In general, water pipes for supplying water to factories, houses, and various facilities, and sewer pipes for transporting used sewage to remote sewage treatment facilities are buried underground to secure ground space and to beautify living environment.
상하수도관의 매설은, 일정한 직경과 길이를 갖는 다수의 상하수도관을 일렬로 연통되게 연결한 구조물이 안착될 수 있는 충분한 공간으로 지면을 절개하고, 이곳에 상기 상하수도관 구조물을 길이방향을 따라 순차적으로 안착시킨 후 토사로 매몰함으로서 이루어진다. 이러한 종래 매설방법을 보면 단순히 땅을 파서 그곳에 상하수도관을 넣은 후 다시 땅을 덮는 방식이므로, 시공이 간편하여 널리 활용되고 있다. 특히, 도심지의 경우에는 상하수도관의 주변부에 위치되는 토사를 다져 토사들간의 조밀도를 높이는 한편, 상하수도관이 매설된 지면상에 콘크리트나 아스팔트등을 도포함으로서, 지반의 침하 및 붕괴로 인한 상하수도관의 파손위험이 최소화 되었다. 따라서, 상하수도관의 매설에 있어서 별도의 보강공사 없이도 상기한 시공법만으로도 충분히 그 목적을 달성할 수 있었으며, 상하수도관의 안정성에도 별문제는 없었다.Buried water and sewage pipes, the ground is cut into a sufficient space for seating the structure that connects a plurality of water and sewage pipes having a constant diameter and length in a line, where the water and sewage pipe structure sequentially in the longitudinal direction This is done by burying in earth and sand after being seated. Looking at the conventional method of embedding simply because digging the ground and put the water and sewage pipe there and then cover the ground again, the construction is easy and widely used. In particular, in urban areas, water and sewage pipes are formed by digging soils located at the periphery of water and sewage pipes to increase the density between the soils and by including concrete or asphalt on the ground where water and sewage pipes are buried. The risk of breakage is minimized. Therefore, in laying the sewage pipes, the above-mentioned construction method alone was sufficient to achieve the purpose without additional reinforcement work, and there was no problem in the stability of the water pipes.
하지만, 하천유역 또는 강수량이 많은 산간지역 등 지반의 붕괴와 부분적인 침하가 빈번한 곳에서는 상기한 시공법만으로는 상하수도관을 매설하는데 한계가 있다. 즉, 상기한 시공법은 상하수도관이 일방향으로 길게 연결되어 횡압력에 대한 지지력이 극히 미약하므로, 상하수도관 매설지의 경미한 지반침하로도 상하수도관이 쉽게 휘거나 뒤틀리면서 그 일부의 파손 및 틈이 발생될 수 있고, 이러한 틈을 통해 누수 및 외부 이물질의 유입이 발생될 수 있다.However, in the case of frequent ground collapse and partial settlement, such as river basins or mountainous areas with high rainfall, there is a limit to laying water and sewage pipes only by the above construction method. That is, in the above-described construction method, since the water supply and drainage pipes are long connected in one direction, the bearing capacity for the transverse pressure is extremely weak, and even a slight ground subsidence of the water supply and drainage pipe buried site may easily cause the breakage and gaps of the water supply and drainage pipe to be bent or twisted. In addition, leakage and inflow of foreign matter may occur through such gaps.
이러한 문제를 해소하기 위해 지면에 각각 고정된 다수의 앵커와 연결된 와이어가 지하에 매설된 상하수도관의 외주면과 단단히 연결되어, 부분적인 지반침하에도 상하수도관의 휨이나 뒤틀림없이 어느정도 지지될 수 있도록 된 구조가 실용신안등록번호 제318224호에 선출원된 바 있다.In order to solve this problem, the wires connected to the plurality of anchors fixed to the ground are firmly connected to the outer circumferential surface of the sewer pipe, which is buried underground, so that the sewer pipe can be supported to some extent without bending or twisting the sewer pipe even when partial ground subsidence. Was previously filed in Utility Model Registration No. 318224.
하지만, 선출원된 고안은 지탱할 수 있는 힘에 한계가 있어, 상기된 문제의 근원적인 해소는 이루지 못하였다.However, the pre-invented design has a limit to the strength it can sustain, so that the fundamental solution of the problem described above has not been achieved.
따라서 공공주택의 지반에 설치하는 상하수도관이 상하 압력 뿐만 아니라 여러 방향의 뒤틀림에도 불구하고, 파손되지 않고, 안정적으로 지지되는 구조가 필요하게 되었다.Therefore, there is a need for a structure in which water and sewage pipes installed on the ground of public housings are not damaged and stably supported in spite of up and down pressure as well as twisting in various directions.
본 발명은 전술한 바와 같은 문제를 해결하기 위하여 안출한 것으로서, 발포 폴리스티렌(EPS)으로 상하수관 주위를 둘러싸고, 상하수관을 여러개의 하부지지대와 상부덮개가 고정하며, 하부지지대와 상부덮개를 연결덮개로 요동자재하게 고정시켜 상하수도관이 연약지반의 침하와 비틀림에도 안정적으로 지지되어 상하수도관의 파손이 일어나지 않게 하는 공동주택 연약지반 내의 상하수관 파손방지구조를 제공하고자 하는 목적이 있다.The present invention has been made in order to solve the problems as described above, surrounding the upper and lower sewer pipes with expanded polystyrene (EPS), the upper and lower sewage pipes fixed a plurality of lower supports and the upper cover, connecting the lower support and the upper cover The purpose of the present invention is to provide a structure for preventing damage to the sewage pipes in the soft ground of the apartment house where the water and sewage pipes are stably supported to settle and torsion of the soft ground so that the water and sewer pipes do not break.
본 발명은 전술한 목적을 달성하기 위하여 공동주택의 상하수관 연결구조에 있어서, 상면 중앙에 반원형 안착홈이 길이 방향으로 형성되고, 상면 측부로 다수개의 볼트홀이 형성되며, 몸체 내부에 길이 방향으로 양측에 와이어 관통홀이 다수개 형성되고, 와이어관통홀의 양단에는 와이어고정부가 형성되는 하부지지대; 발포폴리스티렌 재질로 2개의 반구형 몸체가 서로 마주보게 하여 하나의 원통형 몸체를 이루도록 형성되고, 상하수관을 감싸면서 반원형 안착홈에 안착되는 상하수관 보호 이피에스(EPS) 덮개; 상하수관; 상하수관보호 이피에스 덮개(20) 위로 고정되고, 단면이 반원형인 몸체 양단에 고정플랜지가 형성되며, 고정플랜지에 고정볼트홀이 형성되어 고정볼트로 고정볼트홀과 볼트홀을 동시에 관통하여 하부지지대에 고정하는 상부덮개; 플렉시블한 재질로 각각의 하부지지대 사이에 형성된 간격의 변형시 이탈방지와 탄력적 지지를 위해 고정되고, 단면이 반원형인 몸체의 양단에 플랜지가 형성되고, 플랜지에 고정볼트홀이 형성되며, 외측면에 스프링장착공간이 형성된 다수개의 반원형돌기부가 길이방향으로 형성되고, 스프링장착공간의 양측 개구부에 스프링고정마개가 고정되며, 양쪽 스프링고정마개 사이에 스프링이 고정 연결되는 연결덮개; 하부지지대의 와이어관통홀에 삽입 설치되는 와이어;로 구성되는 것을 특징으로 하고, 와이어의 일단에는 볼트머리부가 형성되고, 타단에는 나사부가 형성되어 와이어관통홀에 삽입된 상태에서 너트 체결되며, 와이어고정부는 볼트부와 너트부가 콘크리트 내부로 파고들지 않도록 철판을 대고, 철판에 홀을 형성하여 이루어지며, 스프링고정마개의 몸체 일측에는 고리가 형성되어 고리와 스프링을 연결하여 고정되고, 타측에는 걸림턱이 형성되어 스프링장착공간으로 밀려들어가지 않게 하는 것을 특징으로 하는 공동주택 연약지반 내의 상하수관 파손방지구조를 제공한다.The present invention in the water and sewage pipe connection structure of the multi-unit housing in order to achieve the above object, a semi-circular seating groove is formed in the longitudinal direction in the center of the upper surface, a plurality of bolt holes are formed in the upper side, in the longitudinal direction inside the body A plurality of wire through-holes are formed at both sides, and lower supports having wire fixing portions at both ends of the wire through-holes; Two hemispherical bodies made of expanded polystyrene face each other to form one cylindrical body, and the upper and lower sewer pipe protective EPs (EPS) covers the upper and lower sewer pipes and is seated in the semicircular seating grooves; Water and sewage pipe; The top and bottom pipe protection is fixed on the
이하 첨부된 도면을 참조하여 본 고안의 구성을 상세히 설명하면 다음과 같다.Referring to the configuration of the present invention in detail with reference to the accompanying drawings as follows.
본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석하여서는 되지 않고, 발명자는 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.The terms or words used in the present specification and claims should not be interpreted as being limited to the ordinary or dictionary meanings, and the inventors may appropriately define the concept of terms in order to best explain the invention of their own. Based on the principle, it should be interpreted as meaning and concept corresponding to the technical idea of the present invention.
본 발명의 공동주택 연약지반 내의 상하수관 파손방지구조는 하부지지대(10), 상하수관 보호 이피에스(EPS) 덮개(20), 상하수관(30), 상부덮개(40), 연결덮개(50), 와이어(15)를 주요 구성으로 한다.Water and sewage pipe breakage prevention structure in the soft ground of the multi-unit house of the present invention, the lower support (10), water and sewer pipe protection EP (EPS)
하부지지대(10)는 상면 중앙에 반원형 안착홈(14)이 길이 방향으로 형성되고, 상면 측부로 다수개의 볼트홀(13)이 형성된다.The
하부지지대(10)의 몸체 내부에 길이 방향으로 양측에 와이어 관통홀(12)을 다수개 형성하고, 와이어관통홀(12)의 양단에는 와이어고정부(11)를 형성한다. 와이어고정부(11)는 볼트부와 너트부가 콘크리트 내부로 파고들지 않도록 철판을 대고, 철판에 홀을 형성하여 이루어진다.A plurality of wire through
여러개의 하부지지대(10)에 형성된 와이어관통홀(12)에 하나의 와이어(15)를 동시에 삽입하여 각각의 하부지지대(10)가 이탈하지 않도록 지지하여 준다. 이때 와이어(15)의 일단에는 볼트머리부가 형성되고, 타단에는 나사부가 형성되어 와이어관통홀(12)에 삽입된 상태에서 너트 체결된다.At the same time, one
반원형 안착홈(14)에 안착될 수 있도록 상하수관보호 이피에스 덮개(20)를 구성하고, 상하수관보호 이피에스 덮개(20)는 2개의 반구형 몸체가 서로 마주보게 하여 하나의 원통형 몸체를 이루도록 형성한다. 상하수관(30)의 주위를 상기 상하수관보호 이피에스 덮개(20)로 덮어 보호하여 하부지지대(10)의 반원형안착홈(14)에 안착시킨다.Water and sewage pipe
이피에스 즉 발포폴리스티렌(EPS; Expandable Polystyrene)은 폴리스티렌수지에 펜탄(Pantane : C5H12)이나 부탄과 같은 발포제를 첨가시켜 가열 경화시킴과 동시에 기포를 발생시켜 발포수지로 만든 것으로서 스티렌모노머(Styrene Monomer : C8H8)를 중합시켜 제조한다.EPS (Expandable Polystyrene) is made of foamed resin by adding foaming agent such as pentane (C5H12) or butane to the polystyrene resin and generating heat and foaming at the same time. ) Is polymerized.
스티로폴은 발포제를 함유하고 있는 스티렌 중합체 또는 공중합체로서 종류에 따라 직경 0.2m~0.3m 의 조그만 비이드(Bead)나 길이 약 2.5m, 직경 약 0.6m 인 원주형 펠레트(pellets) 상태로서 공급된다.Styropol is a styrene polymer or copolymer containing a blowing agent and is supplied in the form of small beads having a diameter of 0.2 m to 0.3 m or cylindrical pellets having a length of about 2.5 m and a diameter of about 0.6 m depending on the type. do.
희고 가벼우며, 내수성, 단열성, 방음성, 완충성 등이 우수하기 때문에 포장 재료, 건축재료, 부자. 구명조끼 . 장식품, 절연재 및 일용품 등으로 널리 이용된다. 스티로폴 제품(EPS) 은 체적의 98%가 공기이고, 수지는 2% 정도이다.It is white and light and has excellent water resistance, heat insulation, soundproofing and cushioning properties. life jacket . Widely used as ornaments, insulation materials and daily necessities. In Styropol products (EPS), 98% of the volume is air and the resin is about 2%.
플라스틱의 거품 속에 공기를 밀폐시킨 발포체 구조가 완충성, 단열성, 방음성, 방수성, 자립성 등이 뛰어난 특성이 있는 재질이다.The foam structure in which air is sealed in the foam of plastic is a material with excellent characteristics such as cushioning, heat insulation, soundproofing, waterproofing, and independence.
상하수관(30)이 상하수관보호 이피에스 덮개(20)에 덮혀 반원형 안착홈(14)에 안착된 상태에서, 그 위로 상부덮개(40)를 고정한다.The water and
상부덮개(40)는 단면이 반원형인 몸체 양단에 고정플랜지(41)를 형성하고, 고정플랜지(41)에는 고정볼트홀(42)을 형성한다.The
고정볼트(43)로 고정볼트홀(42)과 볼트홀(13)을 동시에 관통 고정하여 상하수관(30)의 이탈을 방지한다.Fixing
2개의 하부지지대(10) 사이에는 요동을 위한 간격이 형성되고, 이러한 간격 사이의 변형시 이탈방지와 지지를 위한 연결덮개(50)를 고정한다.A gap for swinging is formed between the two
연결덮개(50)는 단면이 반원형인 몸체의 양단에 플랜지(53)를 형성하고, 플랜지(53)에 고정볼트홀(54)을 형성한다. 연결덮개(50)의 외측면에 내부가 비어 있는 다수개의 반원형돌기부(51)를 길이방향으로 형성하고, 반원형돌기부(51)의 내부빈 공간에는 스프링장착공간(52)을 형성한다. 스프링장착공간(52)의 양측 개구부를 스프링고정마개(56)로 막고, 양쪽 스프링고정마개(56) 사이에 스프링(55)을 고정하여 연결한다.The connecting
스프링고정마개(56)의 몸체 일측에는 고리(57)가 형성되어 고리(57)와 스프링(55)을 연결하여 고정하고, 타측에는 걸림턱(561)이 형성되어 스프링장착공간 (52)으로 밀려들어가지 않게 잡아준다.A
스프링(55)은 연결덮개(50)에 변형이 일어났을 때, 탄성적으로 지지하는 역할을 하고, 연결덮개(50)는 우레탄이나 고무등의 플렉시블한 재질로 이루어진다. 연결덮개(50)에 변형이 일어나려고 할때 스프링(55)은 변형이 일어나지 않는 방향으로 힘을 가하게 되므로 연결덮개(50)가 탄력적으로 지지된다.The
여러개의 하부지지대(10)중 침하되거나 변형 압력을 받는 것이 아래로 내려오거나 밀리면, 와이어(15)에 의해 일차 지지되고, 연결덮개(50)가 늘어나 변형되는 것을 스프링(55)이 당겨주며 2차 지지된다.When the lowering or being pushed down of several
하부지지대(10)가 변형되더라도, 내부의 상하수관(30)은 상하수관 보호 이피에스 덮개(20)가 변형압력을 흡수하여 상하수관 자체에는 손상이 가지 않는다.Even if the
이상과 같이 본 발명은 상하수관이 수직 방향의 압력을 받거나 연약지반 침하시 발생하는 변형 압력을 부분적이나 전체적으로 받을 때, 상하수관보호 이피에스덮개가 그 압력을 흡수하여 상하수관이 파손되지 않게 하는 효과가 있고, 하부지지대 사이의 변형압력은 연결덮개가 흡수하여 다시 복원하려는 방향의 힘이 작용하므로 탄력지지 되는 효과가 있으며, 하부지지대 내부를 관통하여 고정되는 다수개의 와이어가 하부지지대의 과다한 이탈을 방지하게 하는 효과가 있다.As described above, the present invention has an effect of preventing the water and sewer pipes from being damaged by absorbing the pressure when the water and sewage pipes are partially or totally subjected to the deformation pressure generated in the vertical direction or the soft ground subsidence. And, the deformation pressure between the lower support is absorbed by the connecting cover absorbs the force acting in the direction to restore again has the effect of being elastically supported, a plurality of wires fixed through the inside of the lower support to prevent excessive separation of the lower support. It's effective.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020050127152A KR100593838B1 (en) | 2005-12-21 | 2005-12-21 | Breakage prevention structure of water and sewage pipe in soft ground of multi-family house |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020050127152A KR100593838B1 (en) | 2005-12-21 | 2005-12-21 | Breakage prevention structure of water and sewage pipe in soft ground of multi-family house |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| KR100593838B1 true KR100593838B1 (en) | 2006-06-28 |
Family
ID=37183250
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR1020050127152A Expired - Fee Related KR100593838B1 (en) | 2005-12-21 | 2005-12-21 | Breakage prevention structure of water and sewage pipe in soft ground of multi-family house |
Country Status (1)
| Country | Link |
|---|---|
| KR (1) | KR100593838B1 (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100706163B1 (en) * | 2006-10-14 | 2007-04-13 | 주식회사 삼안 | Soft ground sewer pipe reinforcement structure |
| KR100905548B1 (en) | 2009-02-06 | 2009-07-01 | 주식회사 삼안 | Multipurpose sewage pipe buried underground in residential land development complex |
| KR101048025B1 (en) * | 2009-04-28 | 2011-07-13 | 주식회사 대우엔텍 | Impact protection device and method of buried pipe |
| CN111877508A (en) * | 2020-08-01 | 2020-11-03 | 深圳市德嘉工程管理有限公司 | Rainwater pipe embedding structure and method thereof |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR200255495Y1 (en) | 2001-07-28 | 2001-12-13 | 주식회사 한국종합기술개발공사 | A steep slope ground sewer connect structure using a tension bolt |
-
2005
- 2005-12-21 KR KR1020050127152A patent/KR100593838B1/en not_active Expired - Fee Related
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR200255495Y1 (en) | 2001-07-28 | 2001-12-13 | 주식회사 한국종합기술개발공사 | A steep slope ground sewer connect structure using a tension bolt |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100706163B1 (en) * | 2006-10-14 | 2007-04-13 | 주식회사 삼안 | Soft ground sewer pipe reinforcement structure |
| KR100905548B1 (en) | 2009-02-06 | 2009-07-01 | 주식회사 삼안 | Multipurpose sewage pipe buried underground in residential land development complex |
| KR101048025B1 (en) * | 2009-04-28 | 2011-07-13 | 주식회사 대우엔텍 | Impact protection device and method of buried pipe |
| CN111877508A (en) * | 2020-08-01 | 2020-11-03 | 深圳市德嘉工程管理有限公司 | Rainwater pipe embedding structure and method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US12241567B2 (en) | System and method for protection of under-slab utilities from changes in soil volume | |
| US4596491A (en) | Internally reinforced extruded plastic pipe | |
| KR100593838B1 (en) | Breakage prevention structure of water and sewage pipe in soft ground of multi-family house | |
| US20240102583A1 (en) | System and Method for Protection of Under-Slab Utilities From Changes in Soil Volume | |
| KR100593414B1 (en) | Water and sewage pipe connection structure with breakage prevention device | |
| KR100564234B1 (en) | Water and sewage pipes to prevent damage caused by vertical load of multi-unit houses | |
| KR102156736B1 (en) | Anchor structure system of transmission steel tower | |
| KR200313164Y1 (en) | Relief point structure for treatment of up-lifting water pressure affecting underground structure | |
| KR100326868B1 (en) | Drain Board and Drainage method using the same | |
| KR100598898B1 (en) | Apartment sewer pipe connection useful for vertical pressure | |
| JP2849805B2 (en) | Seismic isolation method for structures | |
| KR100654249B1 (en) | Connection structure of water and sewage pipes that behave integrally with the support | |
| KR101262964B1 (en) | Braket for supporting water and waste pipe of apartment house | |
| KR200261920Y1 (en) | sewage pipe rods | |
| KR100808574B1 (en) | Fixing means of pipelines formed in the ground | |
| KR100659397B1 (en) | Sewage pipe connection structure that can withstand horizontal and vertical earth pressure | |
| JPH084950A (en) | Connection structure between concrete structure and buried pipe | |
| KR200406776Y1 (en) | Cushion mat support structure for preventing settlement of soft ground water and sewage pipe | |
| KR200413253Y1 (en) | Impact absorption structure for conduits used for sewerage, water supply, road, river and landfill leachate drainage works | |
| JP2004316410A (en) | Pile head structure and foundation structure using it | |
| KR102698170B1 (en) | Piping fixing device placed in pipeline trench | |
| KR100546240B1 (en) | Sewage pipe sedimentation prevention structure | |
| KR200184230Y1 (en) | A supporting device of undergraund pipe | |
| KR100611057B1 (en) | Connection structure of sewage pipe in apartment complex that absorbs side pressure and horizontal pressure | |
| KR100748065B1 (en) | Rail connection structure of water pipe |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A201 | Request for examination | ||
| PA0109 | Patent application |
St.27 status event code: A-0-1-A10-A12-nap-PA0109 |
|
| PA0201 | Request for examination |
St.27 status event code: A-1-2-D10-D11-exm-PA0201 |
|
| N231 | Notification of change of applicant | ||
| PN2301 | Change of applicant |
St.27 status event code: A-3-3-R10-R13-asn-PN2301 St.27 status event code: A-3-3-R10-R11-asn-PN2301 |
|
| A302 | Request for accelerated examination | ||
| PA0302 | Request for accelerated examination |
St.27 status event code: A-1-2-D10-D17-exm-PA0302 St.27 status event code: A-1-2-D10-D16-exm-PA0302 |
|
| N231 | Notification of change of applicant | ||
| PN2301 | Change of applicant |
St.27 status event code: A-3-3-R10-R13-asn-PN2301 St.27 status event code: A-3-3-R10-R11-asn-PN2301 |
|
| D13-X000 | Search requested |
St.27 status event code: A-1-2-D10-D13-srh-X000 |
|
| D14-X000 | Search report completed |
St.27 status event code: A-1-2-D10-D14-srh-X000 |
|
| E902 | Notification of reason for refusal | ||
| PE0902 | Notice of grounds for rejection |
St.27 status event code: A-1-2-D10-D21-exm-PE0902 |
|
| P11-X000 | Amendment of application requested |
St.27 status event code: A-2-2-P10-P11-nap-X000 |
|
| P13-X000 | Application amended |
St.27 status event code: A-2-2-P10-P13-nap-X000 |
|
| E701 | Decision to grant or registration of patent right | ||
| GRNT | Written decision to grant | ||
| PE0701 | Decision of registration |
St.27 status event code: A-1-2-D10-D22-exm-PE0701 |
|
| PR0701 | Registration of establishment |
St.27 status event code: A-2-4-F10-F11-exm-PR0701 |
|
| PR1002 | Payment of registration fee |
St.27 status event code: A-2-2-U10-U11-oth-PR1002 Fee payment year number: 1 |
|
| PG1601 | Publication of registration |
St.27 status event code: A-4-4-Q10-Q13-nap-PG1601 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R13-asn-PN2301 St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R13-asn-PN2301 St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 4 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 5 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R13-asn-PN2301 St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R13-asn-PN2301 St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 6 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 7 |
|
| FPAY | Annual fee payment |
Payment date: 20130715 Year of fee payment: 8 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 8 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| P14-X000 | Amendment of ip right document requested |
St.27 status event code: A-5-5-P10-P14-nap-X000 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| FPAY | Annual fee payment |
Payment date: 20140618 Year of fee payment: 9 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 9 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 10 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| P22-X000 | Classification modified |
St.27 status event code: A-4-4-P10-P22-nap-X000 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| LAPS | Lapse due to unpaid annual fee | ||
| PC1903 | Unpaid annual fee |
St.27 status event code: A-4-4-U10-U13-oth-PC1903 Not in force date: 20160621 Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| PC1903 | Unpaid annual fee |
St.27 status event code: N-4-6-H10-H13-oth-PC1903 Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE Not in force date: 20160621 |
|
| P22-X000 | Classification modified |
St.27 status event code: A-4-4-P10-P22-nap-X000 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R13-asn-PN2301 St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R13-asn-PN2301 St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R13-asn-PN2301 St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R13-asn-PN2301 St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |