KR100581028B1 - Prefabricated Wall Using Panel - Google Patents
Prefabricated Wall Using Panel Download PDFInfo
- Publication number
- KR100581028B1 KR100581028B1 KR1020050063065A KR20050063065A KR100581028B1 KR 100581028 B1 KR100581028 B1 KR 100581028B1 KR 1020050063065 A KR1020050063065 A KR 1020050063065A KR 20050063065 A KR20050063065 A KR 20050063065A KR 100581028 B1 KR100581028 B1 KR 100581028B1
- Authority
- KR
- South Korea
- Prior art keywords
- reinforcement
- panel
- coupled
- lower rail
- rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/72—Non-load-bearing walls of elements of relatively thin form with respect to the thickness of the wall
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/02—Connecting or fastening means for non-metallic forming or stiffening elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
본 발명은 판넬을 이용한 조립식 벽체에 관한 것으로서, 바닥에 설치되는 하부레일의 상면에 복수개의 결착고리를 돌출 형성시키되, 각 결착고리의 간격을 판넬 넓이에 맞추어 등 간격 배치되어 형성되도록 하고, 상기 하부레일 상에 수직하게 보강재를 결합하되, 보강재의 몸체 하단 끝에 L자형상으로 형성한 결착돌기를 수평방향으로 이동시켜 하부레일 상의 결착고리와 결합되도록 하며, 상기 보강재가 결합되는 방향의 정면에서 수결합부에 의해 보강재가 감싸지도록 일측 판넬이 결합되도록 하고, 상기 보강재가 결합되는 방향의 배면에서 상기 보강재 및 일측 판넬의 수결합부가 암결합부에 의해 동시에 감싸지도록 타측 판넬이 결합되도록 하며, 상기 암/수 결합된 복수개의 판넬과 보강재를 상측에서 덮도록 상부레일을 결합시키되, 상기 보강재의 몸체 상단 끝에 일정 길이 연장 형성시킨 볼트부재가 관통되도록 하는 복수개의 볼트관통홀이 등 간격 배치되어 형성되도록 하고, 상기 볼트관통홀을 통과한 볼트부재를 상부레일의 상측에서 너트부재로 체결시켜 고정 결합하되, 너트부재의 체결력에 의해 보강재의 결착돌기와 하부레일의 결착고리가 견고하게 밀착 고정되도록 하는 구성으로 이루어지는 것을 특징으로 한다.The present invention relates to a prefabricated wall using a panel, protruding and forming a plurality of binding rings on the upper surface of the lower rail to be installed on the bottom, so that the interval of each binding ring is formed to be equally spaced to the panel width, the lower portion Combine the reinforcement vertically on the rail, the binding projection formed in the L-shape at the lower end of the body of the reinforcement to move in the horizontal direction to be combined with the binding ring on the lower rail, the water coupling in the front of the direction in which the reinforcement is coupled One side panel is coupled so that the reinforcement is wrapped by the part, and the other panel is coupled so that the male coupling portion of the reinforcement and one side panel is simultaneously wrapped by the female coupling portion at the back in the direction in which the reinforcement is coupled, the female / The upper rail is coupled to cover the plurality of panels and the reinforcement from the upper side, the beam A plurality of bolt through holes through which the bolt member formed to extend a predetermined length at the upper end of the ash is formed at equal intervals, and the bolt members passing through the bolt through holes are fastened by a nut member from the upper side of the upper rail. Coupled to, characterized in that consisting of a fastening force of the nut member and the binding ring of the reinforcing material and the binding ring of the lower rail tightly fixed.
조립식 벽체, 판넬, 보강재 Prefabricated Walls, Panels, and Reinforcements
Description
도 1은 본 발명의 일실시예에 의한 판넬을 이용한 조립식 벽체의 설치구조를 보인 분해사시도.1 is an exploded perspective view showing an installation structure of a prefabricated wall using a panel according to an embodiment of the present invention.
도 2는 본 발명의 일 실시예에 따른 하부레일을 설명하기 위한 사시도.Figure 2 is a perspective view for explaining a lower rail according to an embodiment of the present invention.
도 3은 도 2의 하부레일 간 연결 구조를 보인 사시도.Figure 3 is a perspective view showing a connection structure between the lower rail of FIG.
도 4는 본 발명의 일 실시예에 따른 보강재를 나타낸 사시도.4 is a perspective view showing a reinforcing material according to an embodiment of the present invention.
도 5는 본 발명의 일 실시예에 따른 판넬을 나타낸 사시도.5 is a perspective view showing a panel according to an embodiment of the present invention.
도 6은 본 발명의 일 실시예에 따른 상부레일을 나타낸 사시도.Figure 6 is a perspective view of the upper rail according to an embodiment of the present invention.
도 7은 도 6의 상부레일 간 연결 구조를 보인 사시도.7 is a perspective view illustrating a connection structure between upper rails of FIG. 6.
도 8은 본 발명의 일 실시예에 따른 하부레일과 보강재의 결합상태를 도시한 결합상태 사시도.8 is a perspective view showing a coupled state of the lower rail and the reinforcing material according to an embodiment of the present invention.
도 9는 도 8의 후속 공정으로서, 판넬 결합과정을 도시한 결합상태 사시도.FIG. 9 is a perspective view illustrating a panel joining process as a subsequent process of FIG. 8;
도 10은 도 9의 후속 공정으로서, 상부레일 결합과정을 도시한 결합상태 사시도.FIG. 10 is a perspective view illustrating a coupling state of the upper rail as a subsequent process of FIG. 9;
도 11은 도 10의 공정으로 완성된 조립식 벽체의 구조를 보인 종단면도.Figure 11 is a longitudinal sectional view showing the structure of the prefabricated wall completed in the process of Figure 10;
<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>
100 : 하부레일 110 : 결착고리100: lower rail 110: binding ring
120 : 방수턱 130 : 하부레일 연결고리120: waterproof jaw 130: lower rail connecting ring
140 : 하부레일 연결홈 140: lower rail connecting groove
200 : 보강재 210 : 결착돌기200: reinforcement 210: binding protrusion
220 : 볼트부재 230: 너트부재220: bolt member 230: nut member
300 : 상부레일 310 : 볼트관통홀300: upper rail 310: bolt through hole
320 : 상부레일 연결고리 330 : 상부레일 연결홈320: upper rail connecting ring 330: upper rail connecting groove
340 : 트러스 고정 플레이트 340: Truss Fixing Plate
400 : 판넬 410: 수결합부400 panel 410: male coupling portion
420 : 암결합부 420: female coupling portion
본 발명은 판넬을 이용한 조립식 벽체에 관한 것으로, 더욱 상세하게는 판넬의 암/결합부 사이에 보강재를 내재시켜 판넬간 연결부위의 지지력을 강화하고 용이한 조립을 통한 시공상의 편리성의 증대를 통해 작업시간을 단축하고, 작업능률을 향상시켜 비용 절감 및 시공성을 극대화시킬 수 있도록 해주는 판넬을 이용한 조립식 벽체에 관한 것이다.The present invention relates to a prefabricated wall using a panel, and more particularly, by reinforcing material between the arm / coupling portion of the panel to strengthen the bearing capacity of the inter-panel connection and work through the increase in construction convenience through easy assembly The present invention relates to a prefabricated wall using panel that shortens time, improves work efficiency and maximizes cost reduction and constructability.
일반적으로 조립식 공장이나 조립식 집 등과 같이 조립식 건축물의 벽체에 사용되는 판넬은 내측에 스티로폼이나 유리섬유 등을 충진한 단열재 양면에 얇은 금속강판을 덧부착한 구조를 가지고 있으며, 이러한 판넬을 이용한 조립식 건축물의 벽체는 상기의 판넬과 판넬을 횡으로 연결 조립하는 것이 일반적이다.In general, the panels used in the walls of prefabricated buildings, such as prefabricated factories or prefabricated houses, have a structure in which thin metal steel sheets are attached to both sides of a heat insulating material filled with styrofoam or glass fiber inside, and the prefabricated buildings using such panels It is common for the wall to connect and assemble the panel and the panel laterally.
이와 같이, 종래의 판넬을 이용한 조립식 벽체를 구성하는 일반적인 방법은 크게 두 가지가 사용되고 있는 데, 첫 번째 방법은 판넬의 일측면에 형성된 삽입부에 또 다른 판넬의 돌출부를 끼워 넣고 순차적으로 판넬을 조립하여 벽체를 구성하고 있으나, 이러한 조립식 벽체는 단순히 철판만 구부려 끼워넣는 상태이므로 판넬간의 연결부위의 지지력이 약하여 전체적으로 조립된 벽체의 보강력에 큰 문제점이 있었다.As such, two general methods for constructing a prefabricated wall using a conventional panel are used. The first method is to assemble the panels sequentially by inserting another panel protrusion into an insertion part formed on one side of the panel. However, the prefabricated wall has a big problem in the reinforcement of the overall assembled wall because the prefabricated wall simply bends the iron plate, so the support between the panels is weak.
한편, 상술한 종래의 조립식 벽체의 문제점을 극복하기 위해 판넬과 판넬 사이에 별도의 연결부재를 끼워넣은 후 그 연결부위를 중심으로 볼트 및 너트 등을 사용하여 벽체를 구성하는 방법이 새로이 사용되고 있으나, 이러한 조립식 벽체는 판넬간 연결부위의 지지력은 강화되는 장점은 있으나 시공이 복잡하게 이루어짐에 따라 전문성이 요구되고, 그로인한 작업능률의 저하 및 공사 지연으로 인한 공사 단가가 증가되는 등의 문제점이 있었다.On the other hand, in order to overcome the problems of the conventional prefabricated wall described above, after inserting a separate connection member between the panel and the panel and using the bolt and nut, etc. centering around the connection portion is newly used, These prefabricated walls have the advantage of strengthening the bearing capacity of the inter-panel connection part, but as the construction is complicated, professionalism is required, resulting in a decrease in work efficiency and an increase in construction cost due to construction delay.
또한, 상술한 종래의 조립식 벽체의 문제점을 극복하기 위해 판체의 양단을 각각 암결합부와 수결합부로 형성시키고, 상기 암결합부와 수결합부를 반복 결합시킴으로서 측면 연장이 이루어지도록 한 판넬과, 상기 판넬의 바닥면과 상면을 각각 지지시키는 하부레일 및 상부레일과, 상기 하부레일 및 상부레일 사이를 수직으로 연결하는 동시에 판넬의 암/수결합부 사이에 위치되어 수직하중을 지탱하도록 된 사각파이프 형상의 보강재로 구성된 조립식 벽체를 제안하게 되었다.In addition, in order to overcome the problems of the conventional prefabricated wall described above, both ends of the plate formed by the female coupling portion and the male coupling portion, respectively, by repeatedly coupling the female coupling portion and the male coupling panel and the side panel is made so that, Lower and upper rails supporting the bottom and top surfaces of the panel, respectively, and a square pipe shape positioned vertically between the lower and upper rails and positioned between female and male coupling parts of the panel to support vertical loads. A prefabricated wall composed of stiffeners was proposed.
그러나, 상기 종래기술의 조립식 벽체는 하부레일 상면에 홈을 형성하고, 여기에 보강재의 하단에 형성시킨 결합돌기를 끼움 결합시킴으로서, 하부레일에 고인 빗물 등이 상기 홈으로 스며들어 건물 내부 바닥이 침수되는 문제가 있었다.However, the prefabricated wall of the prior art by forming a groove on the upper surface of the lower rail, and by fitting the engaging projection formed on the lower end of the reinforcement, the rainwater accumulated in the lower rail is infiltrated into the groove, flooded the floor of the building interior. There was a problem.
상기와 같은 종래의 문제점을 해결하기 위한 본 발명의 목적은 조립식 건축물의 벽체를 구성함에 있어서, 판넬의 암/결합부 사이에 보강재를 내재시켜 판넬간 연결부위의 지지력을 강화하고 용이한 조립을 통한 시공상의 편리성의 증대를 통해 작업시간을 단축하고, 작업능률을 향상시켜 비용 절감 및 시공성을 극대화시킬 수 있도록 해주는 판넬을 이용한 조립식 벽체를 제공하는 데 있다.An object of the present invention for solving the conventional problems as described above is to construct a wall of the prefabricated building, by embedding a reinforcement between the arm / coupling portion of the panel to strengthen the bearing capacity of the inter-panel connection portion and through easy assembly The purpose of the present invention is to provide a prefabricated wall using a panel that can shorten working time and improve work efficiency by maximizing construction convenience, thereby reducing cost and maximizing workability.
본 발명의 다른 목적은 하부레일 상면에 보강재를 설치하기 위한 결착고리를 홈을 파지 않고 돌출 형성하여 보강재의 결착돌기와 정합되도록 함으로써, 빗물이 침투되이 방지되도록 하는 판넬을 이용한 조립식 벽체를 제공하는데 있다.Another object of the present invention is to provide a prefabricated wall using a panel to prevent rain water from penetrating by forming a binding ring for installing the reinforcing material on the upper surface of the lower rail without protruding grooves to match with the binding projection of the reinforcing material.
본 발명의 또 다른 목적은 보강재 상단에 형성한 볼트부재를 상부레일과 결합 후 너트부재를 이용해 체결되도록 하여 조립이 간편하고, 너트부재의 체결력에 의해 보강재의 결착돌기와 하부레일의 결착고리가 견고하게 밀착 고정되도록 하는 판넬을 이용한 조립식 벽체를 제공하는데 있다.Another object of the present invention is to assemble the bolt member formed on the upper end of the reinforcement to the upper rail and then fasten using a nut member, the assembly is easy, and the binding ring of the reinforcing member and the lower rail by the fastening force of the nut member firmly. It is to provide a prefabricated wall using a panel to be tightly fixed.
상기와 같은 목적을 달성하기 위한 본 발명에 따른 판넬을 이용한 조립식 벽체는 판체의 양단을 각각 암결합부와 수결합부로 형성시키고, 상기 암결합부와 수결합부를 반복 결합시킴으로서 측면 연장이 이루어지도록 한 판넬과, 상기 판넬의 바닥면과 상면을 각각 지지시키는 하부레일 및 상부레일과, 상기 하부레일 및 상부레일 사이를 수직으로 연결하는 동시에 판넬의 암/수결합부 사이에 위치되어 수직하중을 지탱하도록 된 보강재로 구성된 조립식 벽체에 있어서,The prefabricated wall using the panel according to the present invention for achieving the above object is formed by the female coupling portion and the male coupling portion at both ends of the plate, respectively, so that the side extension is made by repeatedly coupling the female coupling portion and the male coupling portion. A panel, a lower rail and an upper rail for supporting the bottom and top surfaces of the panel, and a vertical connection between the lower rail and the upper rail, and positioned between the female / male coupling portions of the panel to support vertical loads. In the prefabricated wall composed of reinforced reinforcement,
바닥에 설치되는 하부레일의 상면에 복수개의 결착고리를 돌출 형성시키되, 각 결착고리의 간격을 판넬 넓이에 맞추어 등 간격 배치되어 형성되도록 하고, 상기 하부레일 상에 수직하게 보강재를 결합하되, 보강재의 몸체 하단 끝에 L자형상으로 형성한 결착돌기를 수평방향으로 이동시켜 하부레일 상의 결착고리와 결합되도록 하며,Protrude and form a plurality of binding rings on the upper surface of the lower rail to be installed on the floor, to be arranged at equal intervals to match the width of each binding ring, and to combine the reinforcement vertically on the lower rail, L-shaped binding protrusion formed at the lower end of the body is moved in the horizontal direction to be combined with the binding ring on the lower rail,
상기 보강재가 결합되는 방향의 정면에서 수결합부에 의해 보강재가 감싸지도록 일측 판넬이 결합되도록 하고, 상기 보강재가 결합되는 방향의 배면에서 상기 보강재 및 일측 판넬의 수결합부가 암결합부에 의해 동시에 감싸지도록 타측 판넬이 결합되도록 하며,One side panel is coupled so that the reinforcement is wrapped by the male coupling portion in the front of the direction in which the reinforcing material is coupled, and the male coupling portion of the reinforcement and one side panel is simultaneously wrapped by the female coupling portion on the back side of the reinforcing member is coupled To allow the other panel to be joined,
상기 암/수 결합된 복수개의 판넬과 보강재를 상측에서 덮도록 상부레일을 결합시키되, 상기 보강재의 몸체 상단 끝에 일정 길이 연장 형성시킨 볼트부재가 관통되도록 하는 복수개의 볼트관통홀이 등 간격 배치되어 형성되도록 하고, 상기 볼트관통홀을 통과한 볼트부재를 상부레일의 상측에서 너트부재로 체결시켜 고정 결합하되, 너트부재의 체결력에 의해 보강재의 결착돌기와 하부레일의 결착고리가 견고하게 밀착 고정되도록 하는 구성으로 이루어지는 것을 특징으로 한다.The upper rails are coupled to cover the plurality of female / male coupled panels and the reinforcement from above, and the plurality of bolt through holes are formed at equal intervals to allow the bolt members to extend a predetermined length to the upper end of the body of the reinforcement. The bolt member passing through the bolt through hole is fastened and fastened to the nut member from the upper side of the upper rail, and the binding ring of the reinforcement and the binding ring of the lower rail are tightly fixed by the fastening force of the nut member. Characterized in that consists of.
여기서, 상기 하부레일은 상면에 사각틀 형상으로 제작된 결착고리가 등 간격으로 복수 개 배치되고, 하부레일 간의 연결 조립이 용이하도록 일측 끝단에 역ㄴ자 형상의 하부레일 연결고리가 형성되며, 다른 일측 끝단으로 상기 역ㄴ자 형상의 하부레일 연결고리와 대응하여 연결 조립되는 하부레일 연결홈이 형성되는 구성으로 이루어지는 것이 바람직하다.Here, the lower rail has a plurality of binding rings made in a rectangular frame shape on the upper surface at equal intervals, the lower rail connecting ring of the inverted shape is formed at one end to facilitate connection assembly between the lower rail, the other side It is preferable that the end is made of a configuration in which the lower rail connecting groove is formed to be connected to correspond to the lower rail connecting ring of the inverted shape.
여기서, 상기 하부레일에는 길이 방향으로 일정 높이를 가지는 방수턱이 일측에 추가로 형성는 것이 바람직하다.Here, the lower jaw preferably has a waterproof jaw having a predetermined height in the longitudinal direction is further formed on one side.
여기서, 상기 보강재는 사각 파이프형상의 몸체를 형성하고, 상기 몸체 하단의 내면 한 곳에 L자형상으로 제작된 결착돌기를 연장형성하며, 상기 몸체 상단 내면 한 곳 일정길이 연장되는 볼트부재를 접합시키는 구성으로 이루어지는 것이 바람직하다.Here, the reinforcement is formed to form a rectangular pipe-shaped body, extending the binding projections produced in the L-shape at one inner surface of the lower end of the body, the upper portion of the inner surface of the body is configured to join the bolt member extending a certain length It is preferable that it consists of.
여기서, 상기 상부레일은 상면에 보강재의 볼트부재가 관통되기 위한 볼트관통홀이 복수개 형성되고, 상기 볼트관통홀 일측에 지붕 트러스 또는/및 이층구조 트러스와의 연결 조립시 사용되는 트러스 홀이 형성된 트러스 고정 플레이트가 복수개 형성되며, 상부레일 간의 연결 조립이 용이하도록 일측 끝단에 역ㄴ자 형상의 상부레일 연결고리가 형성되고, 다른 일측 끝단으로 상기 역ㄴ자 형상의 상부레일 연결고리와 대응하여 연결 조립되는 상부레일 연결홈이 형성되는 구성으로 이루어지는 것이 바람직하다.Here, the upper rail is formed with a plurality of bolt through holes for penetrating the bolt member of the reinforcing material on the upper surface, a truss with a truss hole used for connection assembly with the roof truss or / and double-layered truss on one side of the bolt through hole A plurality of fixing plates are formed, and in order to facilitate connection assembly between the upper rails, an inverted upper rail connection ring is formed at one end, and the other end is connected in correspondence with the upper rail connecting ring of the inverted b shape. It is preferable that the upper rail connection groove is formed to be formed.
이하, 본 발명의 바람직한 실시 예에 따른 판넬을 이용한 조립식 벽체에 대하여 첨부된 도면을 참조하여 상세히 설명하면 다음과 같다.Hereinafter, with reference to the accompanying drawings for the prefabricated wall using a panel according to a preferred embodiment of the present invention will be described in detail.
도 1은 본 발명의 일실시예에 의한 판넬을 이용한 조립식 벽체의 설치구조를 보인 분해사시도로서, 동 도면에서 보여지는 바와 같은 본 발명의 일 실시예에 의한 판넬을 이용한 조립식 벽체는 하부레일(100), 보강재(200), 상부레일(300), 및 판넬(400)로 구성된다.1 is an exploded perspective view showing an installation structure of a prefabricated wall using a panel according to an embodiment of the present invention, the prefabricated wall using a panel according to an embodiment of the present invention as shown in the Figure is a lower rail (100) ), The
도 2는 본 발명의 일 실시예에 따른 하부레일을 설명하기 위한 사시도로서, 동 도면에서 보여지는 바와 같은 본 발명의 하부레일(100)은 조립식 건축물의 벽체를 구성함에 있어, 바닥에 고정되게 설치되어 상부에 올려지는 판넬(400)을 지지하는 역할을 하며, 이러한 하부레일(100)은 수평으로 길이가 긴 바 형상으로 제작되고, 그 상면에 사각틀 형상으로 제작된 결착고리(110)가 등 간격으로 복수 개 배치된다.Figure 2 is a perspective view for explaining the lower rail according to an embodiment of the present invention, the
이때, 상기 하부레일(100)의 상면 일단에는 길이 방향으로 일정 높이를 가지는 방수턱(120)이 추가로 형성되어 조립식 벽체의 하부로 빗물 등이 침투되는 것이 방지되도록 한다.At this time, one end of the upper surface of the
도 3은 도 2의 하부레일 간 연결 구조를 보인 사시도로서, 동 도면에서 보여지는 바와 같은 하부레일(100)은 복수개가 연속 반복적으로 연결되는 구조로 이루어지는데, 하부레일(100)간 연결 조립이 용이하도록 하기 위해, 일측 끝단에 역ㄴ 자 형상의 하부레일 연결고리(130)가 형성되고, 또 다른 일측 끝단으로 상기 역ㄴ자 형상의 하부레일 연결고리(130)와 연결 조립되는 하부레일 연결홈(140)이 형성되도록 한다.3 is a perspective view illustrating a connection structure between the lower rails of FIG. 2, and the
도 4는 본 발명의 일 실시예에 따른 보강재를 나타낸 사시도로서, 동 도면에서 보여지는 바와 같은 본 발명의 보강재(200)는 하부레일(100)과 상부레일(300) 사이에 설치되어 판넬(400)과 더불어 건물의 수직하중을 지탱하는 역할을 하게 되는데, 하부레일(100) 및 상부레일(300)과의 결합을 위해 사각 파이프형상의 몸체 하단의 내면 한 곳에 L자형상으로 제작된 결착돌기(210)를 연장형성하며, 상기 몸체 상단 내면 한 곳 일정길이 연장되는 볼트부재(220)를 접합시키는 구성으로 이루어진다.4 is a perspective view showing a reinforcing material according to an embodiment of the present invention, the
도 5는 본 발명의 일 실시예에 따른 판넬을 나타낸 사시도로서, 동 도면에서 보는 바와 같은 본 발명의 판넬(400)은 내측에 스티로폼이나 유리섬유 등을 충전한 단열재 양면에 얇은 금속강판을 덧부착한 구조로서 이루어지는데, 판체의 양단을 각각 암결합부(420)와 수결합부(410)로 형성시키고, 상기 암결합부(420)와 수결합부(410)를 반복 결합시킴으로써, 측면 연장이 이루어지도록 한다.Figure 5 is a perspective view showing a panel according to an embodiment of the present invention, the
이때, 상기 수결합부(410) 및 암결합부(420)는 금속강판을 제외한 내부 단열재가 제거된 상태의 홈을 형성하는데, 상기 수결합부(410) 내의 홈에는 보강재(200)가 삽입되고, 상기 수결합부(410)는 이보다 넓은 홈을 형성하는 암결합부 (420)에 의해 감싸지듯이 결합된다.In this case, the
도 6은 본 발명의 일 실시예에 따른 상부레일을 나타낸 사시도로서, 동 도면에서 보는 바와 같은 상부레일(300)은 수평으로 길이가 긴 하부가 개방된 캡 형상으로 이루어지는데, 그 상면에 보강재(200)의 볼트부재(220)가 관통되기 위한 볼트관통홀(310)이 복수개 형성되고, 상기 볼트관통홀(310) 일측에 지붕 트러스 또는/및 이층구조 트러스와의 연결 조립시 사용되는 트러스 고정 플레이트(340)가 복수개 형성되며, 상부레일(300) 간의 연결 조립이 용이하도록 일측 끝단에 역ㄴ자 형상의 상부레일 연결고리(320)가 형성되고, 다른 일측 끝단으로 상기 역ㄴ자 형상의 상부레일 연결고리(320)와 대응하여 연결 조립되는 상부레일 연결홈(330)이 형성되는 구성으로 이루어진다.Figure 6 is a perspective view showing an upper rail according to an embodiment of the present invention, the
도 7은 도 6의 상부레일 간 연결 구조를 보인 사시도로서, 동 도면에서 보는 바와 같이 본 발명의 상부레일(300)은 좌우측으로 연속해서 연장 결합될 수 있다.FIG. 7 is a perspective view illustrating a connection structure between the upper rails of FIG. 6, and the
이하, 상기와 같은 구성을 갖는 판넬을 이용한 조립식 벽체의 조립 과정을 첨부된 도면을 참조하여 좀 더 상세히 설명하기로 한다.Hereinafter, the assembly process of the prefabricated wall using the panel having the configuration as described above will be described in more detail with reference to the accompanying drawings.
도 8은 본 발명의 일 실시예에 따른 하부레일과 보강재의 결합상태를 도시한 결합상태 사시도이고, 도 9는 도 8의 후속 공정으로서, 판넬 결합과정을 도시한 결합상태 사시도이며, 도 10은 도 9의 후속 공정으로서, 상부레일 결합과정을 도시한 결합상태 사시도이고, 도 11은 도 10의 공정으로 완성된 조립식 벽체의 구조를 보인 종단면도 이다.8 is a perspective view showing a coupling state of the lower rail and the reinforcing member according to an embodiment of the present invention, Figure 9 is a subsequent state of Figure 8, a coupled state perspective view showing a panel coupling process, Figure 10 is As a subsequent process of Figure 9, it is a perspective view of the coupling state showing the upper rail coupling process, Figure 11 is a longitudinal cross-sectional view showing the structure of the prefabricated wall completed by the process of FIG.
우선, 도 8에서 보는 바와 같이 바닥에 하부레일(100)이 설치되고, 상기 하부레일(100) 상에 수직하게 보강재(200)가 설치되도록 한다.First, as shown in FIG. 8, the
이때, 상기 보강재(200)의 하단에 형성시킨 L자형상의 결착돌기(210)를 수평 이동시켜 하부레일(100)의 결착고리(110)와 결합되도록 한다.At this time, the L-shaped
그리고, 상기 보강재(100)의 결합방향 정면측에서 상기 보강재(100)가 감싸지도록 일측 판넬(400)의 수결합부(410)를 결합시킨다.Then, the
그런 다음, 도 9에서 보는 바와 같이 상기 보강재(200)가 결합되는 방향의 배면에서 상기 보강재(200) 및 일측 판넬(400)의 수결합부(410)가 타측 판넬(400)의 암결합부(420)에 의해 동시에 감싸지도록 결합된다.Then, as shown in FIG. 9, the
상기와 같이 하부레일(100) 상에 보강재(200)와 판넬(400)이 설치되면, 도 10에서 보는 바와 같이 암/수 결합된 복수개의 판넬(400)과 보강재(200)를 상측에서 덮도록 상부레일(300)을 결합한다.When the
이때, 상기 보강재(200)의 몸체 상단 끝에 일정 길이 연장 형성시킨 볼트부재(220)가 관통되도록 하는 복수개의 볼트관통홀(310)이 등 간격 배치되도록 한다.At this time, the plurality of bolt through-
그리고, 상기 볼트관통홀(310)을 통과한 볼트부재(220)를 상부레일(300)의 상측에서 너트부재(230)로 체결시켜 고정 결합한다.Then, the
도 11은 도 10의 공정으로 완성된 조립식 벽체의 구조를 보인 종단면도로서, 동 도면에서 보여지는 바와 같이 본 발명의 너트부재(230)를 보강재(200)의 볼트부재(220)와 체결하게 되면, 그 체결력에 의해 보강재(200)의 하단에 형성시킨 결착돌기(210)와 하부레일(100)의 결착고리(110)가 밀착 고정되고, 이로 인해 하부레일(100) 및 상부레일(300)과 보강재(200) 사이의 결합이 견고하게 이루어지게 된다.Figure 11 is a longitudinal cross-sectional view showing the structure of the prefabricated wall completed in the process of Figure 10, when the
본 발명은 상술한 과정의 반복을 통해 판넬(400)과 판넬(400)을 횡으로 연속하여 연결 조립함에 따라 조립식 벽체의 구성을 손쉽게 이룰 수 있고, 하부레일(100)을 통해 빗물이 건물 내부로 침수되는 것을 방지할 수 있게 된다.The present invention can easily achieve the configuration of the prefabricated wall by connecting the
상술한 바와 같이 본 발명에 의한 판넬을 이용한 조립식 벽체에 의하면, 조립식 건축물의 벽체를 구성함에 있어 판넬의 암/결합부 사이에 보강재를 내재시켜 판넬 간 연결부위의 강도를 보강하는 효과가 있다.As described above, according to the prefabricated wall using the panel according to the present invention, in constructing the wall of the prefabricated building, there is an effect of reinforcing the strength of the connection between the panels by embedding a reinforcement between the arm / coupling portion of the panel.
그리고, 본 발명의 보강재의 몸체 상/하부에 각각 볼트부재 및 ㄴ자형 결착돌기를 형성하고, 상기 볼트부재 및 ㄴ자형 결착돌기를 이용하여 하부레일과 상부레일을 결합함으로써, 쉽게 조립할 수 있어 비전문가에 의한 시공이 가능한 이점이 있고, 이로 인해 작업시간의 절감 및 작업공정의 간소화로 인해 작업능률이 향상되고, 인건비와 원자재 가격을 절감할 수 있는 효과가 있다.And, by forming the bolt member and the N-shaped binding projections on the upper and lower parts of the body of the reinforcement of the present invention, respectively, by combining the lower rail and the upper rail using the bolt member and the N-shaped binding projection, it can be easily assembled to the non-expert There is an advantage that can be installed by this, and thus, the work efficiency is improved due to the reduction of working time and the simplification of the work process, and the labor cost and raw material price can be reduced.
또한, 본 발명의 하부레일 상면에 보강재를 설치하기 위한 결착고리를 홈을 파지 않고 돌출 형성함으로써, 빗물이 침입되는 것을 방지하는 효과가 있다.In addition, by forming a binding ring for installing the reinforcing material on the upper surface of the lower rail of the present invention without protruding grooves, there is an effect of preventing rain water from invading.
그리고, 본 발명의 보강재 상단에 형성한 볼트부재를 상부레일과 결합 후 너트부재를 이용해 체결함으로써, 조립이 간편할 뿐 아니라, 상기 너트부재의 체결력에 의해 보강재의 결착돌기와 하부레일의 결착고리가 견고하게 밀착 고정되도록 함으로서, 견고한 조립식 벽체를 시공할 수 있게 되는 효과가 있다.In addition, by fastening the bolt member formed on the upper end of the reinforcement of the present invention by using a nut member after coupling with the upper rail, the assembly is easy, and the binding ring of the reinforcing member and the lower rail are firmly secured by the fastening force of the nut member. By tightly fixed, it is effective to be able to construct a solid prefabricated wall.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020050063065A KR100581028B1 (en) | 2005-07-13 | 2005-07-13 | Prefabricated Wall Using Panel |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020050063065A KR100581028B1 (en) | 2005-07-13 | 2005-07-13 | Prefabricated Wall Using Panel |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| KR100581028B1 true KR100581028B1 (en) | 2006-05-16 |
Family
ID=37181645
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR1020050063065A Expired - Lifetime KR100581028B1 (en) | 2005-07-13 | 2005-07-13 | Prefabricated Wall Using Panel |
Country Status (1)
| Country | Link |
|---|---|
| KR (1) | KR100581028B1 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101035423B1 (en) | 2009-06-25 | 2011-05-20 | (주)블루폼 | Reinforcement beam for formwork and system panel using the same |
| CN107447889A (en) * | 2017-07-04 | 2017-12-08 | 北京工业大学 | A kind of mounting structure for building assembled wall |
-
2005
- 2005-07-13 KR KR1020050063065A patent/KR100581028B1/en not_active Expired - Lifetime
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101035423B1 (en) | 2009-06-25 | 2011-05-20 | (주)블루폼 | Reinforcement beam for formwork and system panel using the same |
| CN107447889A (en) * | 2017-07-04 | 2017-12-08 | 北京工业大学 | A kind of mounting structure for building assembled wall |
| CN107447889B (en) * | 2017-07-04 | 2019-12-31 | 北京工业大学 | A kind of installation structure of building prefabricated wall |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3782817B1 (en) | Structural type and construction method of steel house | |
| JP2017503942A (en) | Three-dimensional lightweight steel frame formed by bidirectional continuous double beams | |
| KR101776129B1 (en) | Built-up type precast double structure for slab and wall and double precast wall construction method using the same | |
| KR102402790B1 (en) | Stiffeners for metallic logs structures | |
| KR101447360B1 (en) | Method for installing ALC panel to concrete slab | |
| US20060236627A1 (en) | Combination lift and anchor connector for fabricated wall and floor panels | |
| JP2010095956A (en) | External heat insulating panel and external heat insulating structure | |
| KR101385558B1 (en) | Prefabricated construction using half slab | |
| KR101827146B1 (en) | Outside strengthen type prefabricated water tank and construction method thereof | |
| KR101178168B1 (en) | Inverted multi tee slab | |
| CN215907025U (en) | Connecting joint of U-shaped steel-clad concrete beam and steel-reinforced concrete precast column | |
| KR102174760B1 (en) | Roof structure for culvert houses | |
| KR200325599Y1 (en) | Prefabricated building using container box | |
| KR101385554B1 (en) | Prefabricated construction using half slab | |
| KR100727383B1 (en) | Prefabricated Panels and Prefabricated Walls Using the Same | |
| KR100913603B1 (en) | Prefabricated building panels | |
| JP2007162252A (en) | Heat insulating construction method for exterior wall and roof of steel-frame building | |
| CN213296663U (en) | Detachable assembly type steel structure house | |
| CN216360839U (en) | Double-deck heat preservation prefabricated wallboard | |
| JP5629195B2 (en) | building | |
| CN217175347U (en) | Assembled die mould skeleton composite wall panel | |
| KR102741515B1 (en) | Modular assembly and its assembly method | |
| KR20160116274A (en) | Wing Wall With Integrated Structural | |
| KR200325622Y1 (en) | a panel for wall | |
| CN222183881U (en) | An assembled roof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A201 | Request for examination | ||
| PA0109 | Patent application |
St.27 status event code: A-0-1-A10-A12-nap-PA0109 |
|
| PA0201 | Request for examination |
St.27 status event code: A-1-2-D10-D11-exm-PA0201 |
|
| A302 | Request for accelerated examination | ||
| PA0302 | Request for accelerated examination |
St.27 status event code: A-1-2-D10-D17-exm-PA0302 St.27 status event code: A-1-2-D10-D16-exm-PA0302 |
|
| D13-X000 | Search requested |
St.27 status event code: A-1-2-D10-D13-srh-X000 |
|
| D14-X000 | Search report completed |
St.27 status event code: A-1-2-D10-D14-srh-X000 |
|
| E902 | Notification of reason for refusal | ||
| PE0902 | Notice of grounds for rejection |
St.27 status event code: A-1-2-D10-D21-exm-PE0902 |
|
| T11-X000 | Administrative time limit extension requested |
St.27 status event code: U-3-3-T10-T11-oth-X000 |
|
| E13-X000 | Pre-grant limitation requested |
St.27 status event code: A-2-3-E10-E13-lim-X000 |
|
| P11-X000 | Amendment of application requested |
St.27 status event code: A-2-2-P10-P11-nap-X000 |
|
| P13-X000 | Application amended |
St.27 status event code: A-2-2-P10-P13-nap-X000 |
|
| E701 | Decision to grant or registration of patent right | ||
| PE0701 | Decision of registration |
St.27 status event code: A-1-2-D10-D22-exm-PE0701 |
|
| GRNT | Written decision to grant | ||
| PR0701 | Registration of establishment |
St.27 status event code: A-2-4-F10-F11-exm-PR0701 |
|
| PR1002 | Payment of registration fee |
St.27 status event code: A-2-2-U10-U11-oth-PR1002 Fee payment year number: 1 |
|
| PG1601 | Publication of registration |
St.27 status event code: A-4-4-Q10-Q13-nap-PG1601 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 4 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 7 |
|
| FPAY | Annual fee payment |
Payment date: 20130311 Year of fee payment: 8 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 8 |
|
| FPAY | Annual fee payment |
Payment date: 20140509 Year of fee payment: 9 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 9 |
|
| P14-X000 | Amendment of ip right document requested |
St.27 status event code: A-5-5-P10-P14-nap-X000 |
|
| P16-X000 | Ip right document amended |
St.27 status event code: A-5-5-P10-P16-nap-X000 |
|
| Q16-X000 | A copy of ip right certificate issued |
St.27 status event code: A-4-4-Q10-Q16-nap-X000 |
|
| FPAY | Annual fee payment |
Payment date: 20150428 Year of fee payment: 10 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 10 |
|
| FPAY | Annual fee payment |
Payment date: 20160316 Year of fee payment: 11 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 11 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R14-asn-PN2301 |
|
| P22-X000 | Classification modified |
St.27 status event code: A-4-4-P10-P22-nap-X000 |
|
| FPAY | Annual fee payment |
Payment date: 20170223 Year of fee payment: 12 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 12 |
|
| FPAY | Annual fee payment |
Payment date: 20180222 Year of fee payment: 13 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 13 |
|
| FPAY | Annual fee payment |
Payment date: 20190227 Year of fee payment: 14 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 14 |
|
| FPAY | Annual fee payment |
Payment date: 20200220 Year of fee payment: 15 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 15 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 16 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 17 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 18 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 19 |
|
| PC1801 | Expiration of term |
St.27 status event code: N-4-6-H10-H14-oth-PC1801 Not in force date: 20250714 Ip right cessation event data comment text: Termination Category : EXPIRATION_OF_DURATION |