KR100481968B1 - An incline protection block for river - Google Patents

An incline protection block for river Download PDF

Info

Publication number
KR100481968B1
KR100481968B1 KR10-2004-0055397A KR20040055397A KR100481968B1 KR 100481968 B1 KR100481968 B1 KR 100481968B1 KR 20040055397 A KR20040055397 A KR 20040055397A KR 100481968 B1 KR100481968 B1 KR 100481968B1
Authority
KR
South Korea
Prior art keywords
block
river
installation structure
facility
river bank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
KR10-2004-0055397A
Other languages
Korean (ko)
Other versions
KR20040068912A (en
Inventor
김길평
성수복
Original Assignee
한국기술개발 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국기술개발 주식회사 filed Critical 한국기술개발 주식회사
Priority to KR10-2004-0055397A priority Critical patent/KR100481968B1/en
Publication of KR20040068912A publication Critical patent/KR20040068912A/en
Application granted granted Critical
Publication of KR100481968B1 publication Critical patent/KR100481968B1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/60Ecological corridors or buffer zones

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Revetment (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)

Abstract

본 발명은 하천제방블록 설치구조에 관한 것으로서, 하천 제방의 유실을 방지하도록 설치되는 제방블록을 간단하게 조립할 수 있도록 구성하여 시공성을 향상시키고 공사비용을 최대한 절감할 수 있도록 하고, 제방블록 전면에는 물고기 보호시설을 설치하여 대홍수나 우기시 수중생명체에 피난처를 제공하여 수중생태계도 보호할 수 있도록 하는 하천제방블록 설치구조에 관한 것이다.The present invention relates to a river dike block installation structure, to easily assemble a dike block installed to prevent the loss of the river dike to improve the construction and to reduce the construction cost as much as possible, the front of the dike block The present invention relates to a river embankment block installation structure that provides protection facilities for the aquatic ecosystem by providing a protection facility to provide a refuge for aquatic life during flooding or rainy season.

본 발명은, 하천의 제방에 설치되는 하천제방블록 설치구조에 있어서, 상기 하천제방블록 설치구조는, 하천의 양측에 기초블록을 설치하고, 그 상부에 E자형 블록을 마주보도록 수직으로 체결 적층하며, 상기 E자형 블록 전,후면에는 물고기 보호시설과 전단보강시설을 설치하여 하천제방블록을 구성하는 것을 특징으로 하는 하천제방블록 설치구조를 제공한다.The present invention, in the river bank block installation structure is installed on the bank of the river, the river bank block installation structure, the foundation block is installed on both sides of the river, vertically fastened and laminated so as to face the E-shaped block on the top In addition, the front and rear of the E-shaped block provides a river bank block installation structure, characterized in that by forming a river bank block by installing a fish protection facility and shear reinforcement facility.

Description

하천제방블록 설치구조{AN INCLINE PROTECTION BLOCK FOR RIVER}River bank block installation structure {AN INCLINE PROTECTION BLOCK FOR RIVER}

본 발명은 하천제방블록 설치구조에 관한 것으로서, 하천 제방의 유실을 방지하도록 설치되는 제방블록을 간단하게 조립할 수 있도록 구성하여 시공성을 향상시키고 공사비용을 최대한 절감할 수 있도록 하고, 제방블록 전면에는 물고기 보호시설을 설치하여 대홍수나 우기시 수중생명체에 피난처를 제공하여 수중생태계도 보호할 수 있도록 하는 하천제방블록 설치구조에 관한 것이다.The present invention relates to a river dike block installation structure, to easily assemble a dike block installed to prevent the loss of the river dike to improve the construction and to reduce the construction cost as much as possible, the front of the dike block The present invention relates to a river embankment block installation structure that provides protection facilities for the aquatic ecosystem by providing a protection facility to provide a refuge for aquatic life during flooding or rainy season.

일반적으로 하천(10)에는 도 1과 같이 제방(20)의 보호를 위하여 옹벽구조물 (30)을 설치한다.In general, the retaining wall structure 30 is installed in the river 10 for the protection of the embankment 20 as shown in FIG. 1.

그러나 기존의 옹벽구조물(30)은 설치시 하천 물의 유도가 어려워 우기시에는 구조물의 품질관리에 시공상 여러가지 문제점이 발생되고 있으며, 또한 수중생명체의 서식을 보호하는 시설이 전혀 구비되어 있지 않아 수중생태계에 막대한 악영향을 미치고 있는 실정이다.However, the existing retaining wall structure (30) is difficult to induce the river water when installed, there are various problems in construction quality control during the rainy season, and also there is no facility to protect the habitat of the underwater life, so the underwater ecosystem The situation is having a huge adverse effect on.

본 발명은 상술한 문제점을 감안하여, 본 발명은, 하천에 설치되는 제방블록을 조립식으로 간단하게 설치할 수 있도록 하여 시공성을 향상시키고, 공사기간을 단축시켜 공사비용을 최대한 절감할 수 있도록 하였으며, 또한 전방에는 생태계를 보호하는 시설까지 설치하여 자연을 보호하여 자연과의 일체성을 향상시킬 수 있도는 하는 것을 그 목적으로 한다.The present invention in view of the above problems, the present invention, it is possible to easily install the embankment block to be installed in the river to be prefabricated to improve the workability, shorten the construction period to reduce the construction cost as much as possible, and Its purpose is to protect the nature by installing facilities that protect the ecosystem to improve its integrity with nature.

본 발명은 상술한 목적달성을 위해, 본 발명은, 하천의 제방에 설치되는 하천제방블록 설치구조에 있어서, 상기 하천제방블록 설치구조는, 하천의 양측에 기초블록을 설치하고, 그 상부에 E자형 블록을 마주보도록 수직으로 체결 적층하며, 상기 E자형 블록 전,후면에는 물고기 보호시설과 전단보강시설을 설치하는 구조로 하천제방블록을 구성하도록 하는 한편, 상기 기초블록은, 상부는 ㄱ자형 형태를 형성하고, 하부는 평판부 형태로 구성되도록 현장에서 콘크리트 타설되며, 상기 E자형 블록은, 한측에 2개의 ㄷ자형 홈이 형성되고, 상,하부에는 반원형 체결홈이 형성되며, 측면에는 체결홀이 형성되어 체결핀에 의해 측방향으로 연속적으로 연결설치되고, 상기 물고기 보호시설은, 한측이 타원형 형태를 구성하여 전방에 생태계 이동홀이 형성되고, 타측은 상기 E자형 블록에 체결되도록 양측으로 볼록부가 형성된 체결부가 형성되며, 상기 전단보강시설은, 한측이 홈부가 형성된 결합부가 형성되어 홈부에 전단보강망을 설치하여 체결볼트로 고정시켜 상기 하천제방블록 토사의 내부에 설치되어 시설물을 보강하도록 구성되는 것을 특징으로 하는 하천제방블록 설치구조를 제공한다.The present invention, in order to achieve the above object, the present invention, in the river bank block installation structure is installed on the bank of the river, the river bank block installation structure, the base block is provided on both sides of the river, the upper portion E Vertically fastened and stacked to face the female block, and the front and rear of the E-shaped block to configure the river bank block structure to install a fish protection facility and shear reinforcement facilities, while the base block, the upper portion of the L-shape To form, the lower portion is cast in the field to be configured in the form of a flat plate, the E-shaped block, two c-shaped grooves are formed on one side, semi-circular fastening grooves are formed on the upper and lower sides, fastening holes on the side Is formed is continuously connected in the lateral direction by the fastening pins, the fish protection facility, one side is formed of an elliptical form, the ecosystem movement hole is formed in the front, The side is formed with a fastening portion formed with convex portions on both sides to be fastened to the E-shaped block, the shear reinforcement facility is formed with a coupling portion formed with a groove portion on one side is provided with a shear reinforcing network to the groove fixing the fastening bolt It is installed inside the earth and sand to provide a river bank block installation structure, characterized in that configured to reinforce the facility.

이하, 첨부 도면을 참조하여 본 발명의 구성을 설명한다.EMBODIMENT OF THE INVENTION Hereinafter, the structure of this invention is demonstrated with reference to an accompanying drawing.

도 2는 본 발명의 하천제방블록 설치구조를 나타내는 단면도이다.2 is a cross-sectional view showing a river bank block installation structure of the present invention.

하천(100)에는 제방(200)을 보호하고, 수중생태계의 파괴를 방지하기 위하여 기초블록(300)과 E자형 블록(400), 물고기 보호시설(500), 전단보강시설(600)을 설치하여 하천제방블록을 구성한다.In the river 100, the foundation block 300 and the E-shaped block 400, the fish protection facility 500, and the shear reinforcement facility 600 are installed to protect the embankment 200 and prevent destruction of the aquatic ecosystem. It constitutes a river bank block.

상기 하천제방블록은, 하천(100)의 양측에 기초블록(300)을 설치하고, 그 상부에 E자형 블록(400)을 마주보도록 수직으로 체결 적층하며, 상기 E자형 블록(400) 전,후면에는 물고기 보호시설(500)과 전단보강시설(600)을 설치하는 구조로 하천제방블록을 구성한다.The river bank block, the foundation block 300 is installed on both sides of the river 100, vertically fastened and laminated to face the E-shaped block 400, the front, the E-shaped block 400, In the structure to install the fish protection facility 500 and the shear reinforcement facility 600 constitutes the river bank block.

도 3은 본 발명의 하천제방블록의 제작상태를 나타내는 개념도로서, 하천제방블록의 설치구조는, 기초블록(300)과 E자형 블록(400), 물고기 보호시설(500), 전단보강시설(600)로 구성되며,3 is a conceptual diagram showing the production state of the river bank block of the present invention, the installation structure of the river bank block, the base block 300 and E-shaped block 400, fish protection facility 500, shear reinforcement facility 600 ),

상기 기초블록(300)은, 상부는 ㄱ자형 형태(320)를 형성하고, 하부는 평판부 형태(310)로 구성되도록 현장에서 콘크리트 타설되며,The foundation block 300, the upper portion is formed of the L-shaped form 320, the lower portion is cast in the field to be configured as a flat plate portion 310,

상기 E자형 블록(400)은, 한측에 2개의 ㄷ자형 홈(410)이 형성되고, 상,하부에는 반원형 체결홈(420)이 형성되며, 측면에는 체결홀(430)이 형성되어 체결핀(440)에 의해 측방향으로 연속적으로 연결설치되고,The E-shaped block 400, two c-shaped grooves 410 are formed on one side, semi-circular fastening grooves 420 are formed on the upper and lower sides, and fastening pins 430 are formed on the side surfaces thereof. 440 is continuously connected laterally,

상기 물고기 보호시설(500)은, 한측이 타원형 형태(510)를 구성하여 전방에 생태계 이동홀(520)이 형성되고, 타측은 상기 E자형 블록(400)에 체결되도록 양측으로 볼록부가 형성된 체결부(530)가 형성되며,The fish protection facility 500, one side constitutes an elliptical shape 510, the ecosystem moving hole 520 is formed in the front, the other side is a fastening portion formed with convex portions on both sides to be fastened to the E-shaped block 400 530 is formed,

상기 전단보강시설(600)은, 한측이 홈부가 형성된 결합부(610)가 형성되어 홈부에 전단보강망(620)을 설치하여 체결볼트(630)로 고정시켜 상기 하천제방블록 토사의 내부에 설치되어 시설물을 보강하도록 구성된다.The shear reinforcement facility 600, one side is formed with a coupling portion 610 is formed with a groove portion is provided with a shear reinforcement network 620 in the groove portion is fixed to the fastening bolt 630 is installed inside the river bank block sediment And to reinforce the facility.

상술한 설명에서 알 수 있는 바와 같이, 상기 하천제방블록 설치구조는, 하천제방에 설치되는 시설의 구조를 조립식으로 간단하게 설치하여 시공성을 향상시키고, 또한 제방블록 전면에는 물고기 보호시설을 구비하여 수중생태계를 보호할 수 있도록 한다.As can be seen from the above description, the river bank block installation structure is to install the structure of the facility installed on the river bank simply prefabricated to improve the workability, and also has a fish protection facility on the front of the bank block underwater Protect the ecosystem.

상술한 본 발명의 구성에 의한 효과를 설명한다.The effect by the structure of this invention mentioned above is demonstrated.

본 발명의 하천제방블록 설치구조는, 하천에 설치되는 제방보호시설을 콘크리트 기성품을 이용하여 간단하게 설치하도록 구성하여 구조물의 품질을 확보할 수 있도록 하고, 수중생태계의 서식지를 제공토록 하여 수중생명체를 보호토록 한다.The river embankment block installation structure of the present invention is configured to simply install the embankment protection facility installed in the river by using concrete ready-made products to ensure the quality of the structure, and to provide a habitat for underwater ecosystems. Protect it.

도 1은 기존에 설치된 하천구조물의 문제점을 나타내는 단면도.1 is a cross-sectional view showing a problem of the existing river structure installed.

도 2는 본 발명의 하천제방블록 설치구조를 나타내는 단면도.Figure 2 is a cross-sectional view showing a river bank block installation structure of the present invention.

도 3은 본 발명의 하천제방블록의 제작상태를 나타내는 개념도.3 is a conceptual diagram showing a manufacturing state of the river embankment block of the present invention.

< 도면의 주요부분에 대한 부호의 설명 ><Description of Symbols for Major Parts of Drawings>

100: 하천 200: 제방100: river 200: dike

300: 기초블록 400: E자형 블록300: basic block 400: E-shaped block

500: 물고기 보호시설 600: 전단보강시설500: fish protection facility 600: shear reinforcement facility

Claims (1)

하천의 제방에 설치되는 하천제방블록 설치구조에 있어서,In the river bank block installation structure installed on the bank of the river, 상기 하천제방블록 설치구조는, 하천(100)의 양측에 기초블록(300)을 설치하고, 그 상부에 E자형 블록(400)을 마주보도록 수직으로 체결 적층하며, 상기 E자형 블록(400) 전,후면에는 물고기 보호시설(500)과 전단보강시설(600)을 설치하는 구조로 하천제방블록을 구성하도록 하는 한편,The river bank block installation structure, the foundation block 300 is installed on both sides of the river 100, vertically fastened and laminated so as to face the E-shaped block 400, the E-shaped block 400 before On the back, the fish protection facility 500 and the shear reinforcement facility 600 to install the river bank block structure, 상기 기초블록(300)은, 상부는 ㄱ자형 형태(320)를 형성하고, 하부는 평판부 형태(310)로 구성되도록 현장에서 콘크리트 타설되며,The foundation block 300, the upper portion is formed of the L-shaped form 320, the lower portion is cast in the field to be configured as a flat plate portion 310, 상기 E자형 블록(400)은, 한측에 2개의 ㄷ자형 홈(410)이 형성되고, 상,하부에는 반원형 체결홈(420)이 형성되며, 측면에는 체결홀(430)이 형성되어 체결핀(440)에 의해 측방향으로 연속적으로 연결설치되고,The E-shaped block 400, two c-shaped grooves 410 are formed on one side, semi-circular fastening grooves 420 are formed on the upper and lower sides, and fastening pins 430 are formed on the side surfaces thereof. 440 is continuously connected laterally, 상기 물고기 보호시설(500)은, 한측이 타원형 형태(510)를 구성하여 전방에 생태계 이동홀(520)이 형성되고, 타측은 상기 E자형 블록(400)에 체결되도록 양측으로 볼록부가 형성된 체결부(530)가 형성되며,The fish protection facility 500, one side constitutes an elliptical shape 510, the ecosystem moving hole 520 is formed in the front, the other side is a fastening portion formed with convex portions on both sides to be fastened to the E-shaped block 400 530 is formed, 상기 전단보강시설(600)은, 한측이 홈부가 형성된 결합부(610)가 형성되어 홈부에 전단보강망(620)을 설치하여 체결볼트(630)로 고정시켜 상기 하천제방블록 토사의 내부에 설치되어 시설물을 보강하도록 구성되는 것을 특징으로 하는 하천제방블록 설치구조.The shear reinforcement facility 600, one side is formed with a coupling portion 610 is formed with a groove portion is provided with a shear reinforcement network 620 in the groove portion is fixed to the fastening bolt 630 is installed inside the river bank block sediment River bank block installation structure, characterized in that configured to reinforce the facility.
KR10-2004-0055397A 2004-07-16 2004-07-16 An incline protection block for river Expired - Fee Related KR100481968B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2004-0055397A KR100481968B1 (en) 2004-07-16 2004-07-16 An incline protection block for river

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2004-0055397A KR100481968B1 (en) 2004-07-16 2004-07-16 An incline protection block for river

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2004-0022262U Division KR200367279Y1 (en) 2004-08-04 2004-08-04 An incline protection block for river

Publications (2)

Publication Number Publication Date
KR20040068912A KR20040068912A (en) 2004-08-02
KR100481968B1 true KR100481968B1 (en) 2005-04-19

Family

ID=37357906

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2004-0055397A Expired - Fee Related KR100481968B1 (en) 2004-07-16 2004-07-16 An incline protection block for river

Country Status (1)

Country Link
KR (1) KR100481968B1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100735673B1 (en) * 2005-09-13 2007-07-04 주식회사 건화 Revetment box retaining wall structure for ecosystem protection
KR102228751B1 (en) * 2020-05-04 2021-03-17 주식회사 무성건설 Prefabricated Covering Block for Breakwater

Also Published As

Publication number Publication date
KR20040068912A (en) 2004-08-02

Similar Documents

Publication Publication Date Title
KR100481968B1 (en) An incline protection block for river
KR200367279Y1 (en) An incline protection block for river
KR100542457B1 (en) River block protection structure for river embankment
KR200350402Y1 (en) Ecological embankment construction of river
KR100542136B1 (en) Floor block installation structure to protect river ecosystem
KR100576181B1 (en) River dike blocks for ecosystem protection
KR200367277Y1 (en) An incline protection block for river
KR100922219B1 (en) Prefab Clap Block
KR200369910Y1 (en) Ecological embankment construction for river
KR200367309Y1 (en) An incline protection block for river
KR20040081730A (en) Ecological embankment construction for river
KR100722157B1 (en) Sliding dike block of river dike to prevent loss
KR20040081721A (en) Ecological embankment construction for river
KR200367395Y1 (en) Ecological embankment construction for river
KR100651231B1 (en) Steel composite PC pile fabrication installation structure
KR200367383Y1 (en) Ecological embankment construction for river
KR100513751B1 (en) Ecological embankment construction for river
KR200367338Y1 (en) Ecological embankment construction for river
KR200367288Y1 (en) An incline protection block for river
KR200367278Y1 (en) An incline protection block for river
JP2004270369A (en) Bridge structure and its construction method
KR100452152B1 (en) Ecological embankment construction of river
KR20040068895A (en) An incline protection block for river
KR200361683Y1 (en) Reinforce construction of embankment
KR100466892B1 (en) Ecological embankment construction for river

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

Patent event code: PA01091R01D

Comment text: Patent Application

Patent event date: 20040716

PA0201 Request for examination
PG1501 Laying open of application
A302 Request for accelerated examination
N231 Notification of change of applicant
PA0302 Request for accelerated examination

Patent event date: 20040924

Patent event code: PA03022R01D

Comment text: Request for Accelerated Examination

Patent event date: 20040716

Patent event code: PA03021R01I

Comment text: Patent Application

PN2301 Change of applicant

Patent event date: 20040924

Comment text: Notification of Change of Applicant

Patent event code: PN23011R01D

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

Patent event code: PE07011S01D

Comment text: Decision to Grant Registration

Patent event date: 20041208

GRNT Written decision to grant
N231 Notification of change of applicant
PN2301 Change of applicant

Patent event date: 20050330

Comment text: Notification of Change of Applicant

Patent event code: PN23011R01D

PR0701 Registration of establishment

Comment text: Registration of Establishment

Patent event date: 20050330

Patent event code: PR07011E01D

PR1002 Payment of registration fee

Payment date: 20050331

End annual number: 3

Start annual number: 1

PG1601 Publication of registration
FPAY Annual fee payment

Payment date: 20080317

Year of fee payment: 4

PR1001 Payment of annual fee

Payment date: 20080317

Start annual number: 4

End annual number: 4

LAPS Lapse due to unpaid annual fee
PC1903 Unpaid annual fee

Termination category: Default of registration fee

Termination date: 20100210