KR100430243B1 - Prestressed composition pile and the manufacturing process - Google Patents
Prestressed composition pile and the manufacturing process Download PDFInfo
- Publication number
- KR100430243B1 KR100430243B1 KR10-2000-0044092A KR20000044092A KR100430243B1 KR 100430243 B1 KR100430243 B1 KR 100430243B1 KR 20000044092 A KR20000044092 A KR 20000044092A KR 100430243 B1 KR100430243 B1 KR 100430243B1
- Authority
- KR
- South Korea
- Prior art keywords
- pile
- bending
- bending moment
- earth wall
- prestressed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/58—Prestressed concrete piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
- E02D5/30—Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
이 발명은 켄틸레버식 토류벽, 자유단 지지법에 의한 앵커된 토류벽, 고정단 지지법에 의한 앵커된 토류벽의 상부파일의 휨모맨트 구간 양단 또는 휨모맨트 구간을 연결한 두개를 휨모맨트 구간 양단을 지지점으로하고 최대 휨모맨트점 부근을 하중 작용점으로 하여 I형강의 일측 플랜지에 휨인장을 발생시킨 상태에서 휨인장이 발생된 플랜지에 케이싱 콘크리트를 타설 양생한 후 하중을 제거하고 파일 단위로 나머지 강형에 케이싱 콘크리트를 타설 양생하여 콘크리트 피복된 파일에 휨모맨트 분포에 대응되는 프리스트레스트 저항 모맨트를 도입한 프리스트레스트 합성파일 및 그 제작방법을 제공한다. 이 발명에 의하면 강재의 부식 발생을 최소화 하며, 강재의 단면적을 감소시켜 경제성을 높이며, 버팀대의 사용을 최소화 또는 기피할 수 있어 작업 공간의 장애물을 줄일 수 있고, 토류벽의 토압에 의한 파일의 휨모멘트 대응형으로 저항 모멘트를 분포시킨 합성파일 및 그 제작 방법을 제공하는 것이다.The present invention supports the two ends connecting the bending moment section or both ends of the bending moment section of the upper pile of the cantilevered earth wall, the anchored earth wall by the free end support method, and the anchored earth wall by the fixed end support method. After the bending tension is generated on one side flange of I-beams with the maximum bending moment point as the load action point, the casing concrete is cast on the flange where the bending tension has occurred, the load is removed, and the casing is applied to the remaining steels in pile units. The present invention provides a prestressed composite pile and a manufacturing method thereof in which a prestressed resistance component corresponding to a bending moment distribution is introduced into a concrete coated pile by curing the concrete. According to the present invention, it is possible to minimize the occurrence of corrosion of the steel, to increase the economics by reducing the cross-sectional area of the steel, to minimize or avoid the use of the brace to reduce the obstacles in the working space, the bending moment of the pile due to the earth pressure of the earth wall The present invention provides a synthetic pile having a resistance moment distributed therein and a method of manufacturing the same.
Description
이 발명은 토류벽 또는 안벽을 시공하기 위한 휨 모멘트 대응형 프리스트레스트 합성파일 및 그 제작방법에 관한 것이다.The present invention relates to a bending moment-adaptive prestressed composite pile for constructing an earth wall or a quay wall, and a manufacturing method thereof.
지하공사를 안전하고 원활하게 할 수 있도록 또한 굴착벽면의 암괴나 토사 등의 유입을 방지하기 위하여 설치하는 토류벽의 지지 파일은 주로 I형강을 사용하여 토압에 저항하게 하였다. 토류벽의 지지파일로서 설치하는 I형강은 토사와 접하며 대개는 지하수에 접속되고 있어 부식이 크고, 굴착깊이가 깊어질 수록 큰 토압을 저항할 수 있도록 단면이 거대해지고, 상당수의 버팀대(strut)를 설치하여 횡방향 변형에 대비해야만 했다. 이러한 버팀대는 작업공간의 장애물이되고 설치 및 제거공사가 요구되어 공사비용과 공사기간의 증대 요인이 되기도 한다.To support the underground construction safely and smoothly, and to prevent the inflow of excavation wall and earth and sand, the supporting pile of the earth wall was mainly made of I-shaped steel to resist the earth pressure. The I-beam, which is installed as a supporting pile of the earth wall, is in contact with the soil and is usually connected to the groundwater, so that the corrosion is high, and the deeper the excavation depth, the larger the cross section to resist the large earth pressure, and a large number of struts are installed. To prepare for transverse deformation. These braces are obstacles to the work space and require installation and removal work, which can increase construction costs and construction periods.
합성파일에 고려되어야 할 측압 분포도는 도3 켄틸레버식 토류벽 모멘트도와 도4 자유단 지지법에 의한 앵커된 토류벽 휨모멘트도와 도7 고정단 지지법에 의한 앵커된 토류벽 휨모멘트도와 같다. 이러한 휨모멘트들은 시공된 파일이 임계 측압을 받았을 때 휘어지는 작용점을 제시하는 것으로서, 합성파일의 제작은 측압 대응형으로 제작 할 것이 아니라 휨모멘트에 부합되도록 제작되어져야 최대 임계 버팀응력을 나타낼 수 있음을 의미한다.The lateral pressure distribution to be considered in the composite pile is shown in FIG. 3 cantilevered earth wall moment, anchored earth wall bending moment by the free end support method and anchored earth wall bending moment by the fixed end support method. These bending moments suggest the point of action when the constructed pile is subjected to critical lateral pressure. The composite pile is not designed to be pressure-sensitive, but must be manufactured to meet the bending moment to indicate the maximum critical brace stress. it means.
그러나 프리스트레스트 합성파일을 측압 대응형으로 제작한다면 도4에서와 같이 최대 모멘트점이 자유단으로부터 0.2L에 위치할 경우 실제의 최대 모멘트보다 1.25배가 많은 휨모멘트가 일어나도록 제작하여야 하므로 휨 모멘트 대응형에 비하여 매우 비경제적이다.However, if the prestressed composite pile is manufactured in the side pressure response type, as shown in Fig. 4, when the maximum moment point is located at 0.2L from the free end, the bending moment must be made to be 1.25 times more than the actual maximum moment. It is very uneconomical.
이 발명의 목적은 I형강과 이를 콘크리트로 피복하여 콘크리트에 프리스트레스트 응력을 도입시켜 강재와 콘크리트의 재료 역학적 잇점을 응용하는 토류벽 지지용 합성 파일을 제공함에 있다.An object of the present invention is to provide a composite pile for supporting earth walls applying I-shaped steel and concrete by applying prestress stress to concrete to apply the mechanical and mechanical advantages of steel and concrete.
이 발명의 다른 목적은 지지파일의 강재에 콘크리트를 피복함으로써 부식 발생을 최소화 하며 , 강재의 단면적을 감소시켜 경제성을 높이며, 버팀대의 사용을 최소화 또는 기피할 수 있어 작업 공간의 장애물을 줄일 수 있는 토류벽 지지용 합성파일을 제공함에 있다.Another object of the present invention is to minimize the occurrence of corrosion by coating concrete on the steel of the support pile, to reduce the cross-sectional area of the steel to increase the economics, to minimize or avoid the use of the brace earth wall that can reduce the obstacle of the work space In providing a supporting composite file.
이 발명의 다른 목적은 켄틸레버식 토류벽, 자유단 지지법에 의한 앵커된 토류벽 또는 고정단 지지법에 의한 앵커된 토류벽에 시공되는 합성파일을 제공함에 있어서, 이들 토류벽의 토압에 의한 파일의 휨모멘트 대응형으로 제작한 합성파일및 그 제작 방법을 제안함에 목적이 있다.Another object of the present invention is to provide a composite pile which is constructed on a cantilevered earth wall, an anchored earth wall by the free end support method, or an anchored earth wall by the fixed end support method, and the bending moment of the pile due to the earth pressure of these earth walls. It is an object of the present invention to propose a synthetic file and a method of manufacturing the same.
도1은 토류벽 지지파일에 가해지는 측압 분포도1 is a lateral pressure distribution diagram applied to a soil wall support pile
도2는 프리스트레스트 합성파일 제작공정도Figure 2 is a prestress composite file manufacturing process
도3은 켄틸레버식 토류벽의 일반적인 휨 모멘트도3 is a general bending moment diagram of a cantilevered earth wall
도4는 자유단 지지법에 의한 앵커된 토류벽의 일반적인 모멘트도Figure 4 is a general moment diagram of the anchored earth wall by the free end support method
도5는 켄틸레버식 토류벽과 자유단 지지법에 의한 앵커된 토류벽용 프리스트레스트 합성파일 제작 공정도Fig. 5 is a process chart of manufacturing prestressed composite piles for anchored earth walls by the cantilever type earth walls and free end support method.
도6은 켄틸레버식 토류벽과 자유단 지지법에 의한 앵커된 토류벽용 프리스트레스트 합성파일 제작도 공정도6 is a manufacturing process chart of the prestressed composite pile for anchored earth wall by the cantilever type earth wall and free end support method
도7은 고정단 지지법에 의한 앵커된 토류벽의 일반적인 휨 모멘트도Figure 7 is a general bending moment diagram of the anchored earth wall by the fixed end support method
도8은 고정단 지지법에 의한 앵커된 토류벽용 상부 프리스트레스트 합성파일 제작공정도8 is a manufacturing process diagram of the upper prestressed composite pile for anchored earth wall by the fixed end support method
도9는 고정단 지지법에 의한 앵커된 토류벽용 상부 프리스트레스트 합성파일 제작공정도9 is a manufacturing process diagram of the upper prestressed composite pile for anchored earth walls by the fixed end support method
도10은 고정단 지지법에 의한 앵커된 토류벽용 하부 프리스트레스트 합성파일 제작공정도10 is a manufacturing process diagram of the lower prestress composite pile for anchored earth wall by the fixed end support method
도11은 고정단 지지법에 의한 앵커된 토류벽용 상부와 하부파일 결합공정도11 is a process diagram of the upper and lower pile coupling for anchored earth wall by the fixed end support method
도1은 토류벽 지지파일에 가해지는 측압 분포도, 도2는 토류벽 지지용 프리스트레스트 합성파일 제작과정을 도시한 것이다.1 is a side pressure distribution diagram applied to the earth wall support pile, and FIG. 2 shows a process of manufacturing the prestressed composite pile for supporting the earth wall.
도2(a)는 동시에 2개의 프리플렉스 합성보를 만들기 위하여, 하향으로 처지게 소성된 I형강 2개를 볼트로 연결하고, 중앙부가 부상되게 뒤집어 양단의 지지점(ㅿ,ㆁ)위에 거치한 상태도이다.Fig. 2 (a) is a state diagram in which two I-beams sintered downwards are bolted together to make two preflex composite beams at the same time, and the center part is inverted so as to be mounted on the support points at both ends. .
도2(b)는 중앙의 연결부에 상부 플랜지(30)에 하중P를 가하여 I형강의 하부 플랜지(20)에 휨 인장이 일어나도록 하였다. I형강에 내재한 휨 인장력은 적분도와 같이 연결부를 꼭지점으로하는 이등변 삼각형이다.Figure 2 (b) is to apply a load P to the upper flange 30 in the connecting portion in the center so that the bending tension occurs in the lower flange 20 of the I-shaped steel. The flexural tension inherent in I-beams is an isosceles triangle with vertices as the integral.
도2(c)는 하중 P를 가한 상태에서 I형강 하부 플랜지에 케이싱 콘크리트(20)를 피복시켜 양생한다.Figure 2 (c) is to cover the casing concrete 20 to the I-shaped steel lower flange in the state of applying the load P to cure.
도2(d)는 하중 P을 제거하고 중앙의 연결부를 분리한 상태도이다. 하중 P을 제거하면 하부 플랜지에 내재한 휨 인장력은 케이싱 콘크리트의 프리스트레스트 응력으로 전환되고, 2개의 I형강을 분리하면 저항 모맨트 분포는 적분도와 같이 I형강 대분에 걸친 직각 삼각형의 모양이 된다.Fig. 2 (d) is a state diagram in which the load P is removed and the connecting portion in the center is separated. When the load P is removed, the flexural tension inherent in the lower flange is converted to the prestressed stress of the casing concrete, and when the two I-beams are separated, the resistance moment distribution becomes a right-angled triangle over the majority of the I-beams as an integral.
도2(e)에서 나머지 강형에 콘크리트(40)를 피복하여 합성파일을 완성하였다. 완성된 합성파일에 직각삼각형의 모양으로 프리스트레스트 응력이 분포 됨으로써 도1의 측압 분포에 대응되는 합성파일을 얻는것이다.In Figure 2 (e) to cover the concrete 40 to the remaining steel to complete the composite pile. The prestressed stress is distributed in the shape of a right triangle to the completed composite file, thereby obtaining a composite file corresponding to the lateral pressure distribution of FIG. 1.
도2(f)는 완성된 합성파일의 사도이다. 이 파일의 일측 플랜지에 측압 대응 분포의 저항 프리스트레스트 응력을 내재 하고있다.Fig. 2 (f) is an oblique view of the completed composite file. On one side flange of this pile is inherent the resistive prestress stress of the lateral pressure response distribution.
도2와같은 프리스트레스트 합성파일은 도1의 측압분포 대응형 합성파일로서 파일이 시공 후 측압을 받았을 때 최대 버팀 응력을 발휘하지 못하여 임계 버팀응력이 낮아지는 결점을 가진다.The prestressed composite pile as shown in FIG. 2 is a side pressure distribution-responsive composite pile of FIG. 1, which has a drawback in that the critical support stress is lowered when the pile is not subjected to side pressure after construction.
휨 모멘트 대응형 합성파일을 만들기 위하여 먼저 먼저 토압에 의한 파일의 휨모멘트의 유형을 살펴보면, 도3의 켄틸레버식 토류벽의 토압에 의한 일반적인 휨모멘트와 도4의 자유단 지지법에 의한 앵커(ANCHOR)된 토류벽의 정모멘트구간의 토압에 의한 일반적인 휨모멘트는 유사성이 많다. 이 휨모멘트가 유사한 토류벽 합성파일은 같은 제조과정으로 제조할 수 있다.In order to make the bending moment-responsive composite pile, first of all, the type of bending moment of the pile due to earth pressure is shown. The general bending moment due to the earth pressure of the cantilevered earth wall of FIG. 3 and the anchor by the free end supporting method of FIG. The general bending moment due to the earth pressure of the static moment section of the earthquake wall is similar. Earth wall composite piles with similar bending moments can be produced by the same manufacturing process.
도3, 도4 휨모멘트에 대응되는 합성파일의 제조법을 도5의 실시예로서 설명한다.The manufacturing method of the composite pile corresponding to FIG. 3, FIG. 4 bending moment is demonstrated as an Example of FIG.
도5(a)에서 동시에 2개의 프리플렉스 합성보를 만들기 위하여, 하향으로 처지게 소성된 I형강 2개를 볼트로 연결하고, 중앙부가 부상되게 뒤집어 양단의 지지점(ㅿ,ㆁ)위에 거치한 상태도이다. 프리스트레스트 I형강 지지점(ㅿ,ㆁ)은 휨모멘트상의 압축력 발생구간(L)의 양단점이다. 상세히 도3의 휨모멘트에서 휨 발생구간 양단은 연결된 I형강의 양단에 있다. 도4의 휨모멘트에서 휨 발생점은 휨모멘트 변곡점으로서 I형강의 일단에서 앵커 부모멘트 구간 α를 들어간 모멘트 변곡점과 I형강의 타단이다. 지지점지지점(ㅿ)을 모멘트변곡점으로 설정하면 구간 α에는 휨인장과 프리스트레스트 압축력이 되입되지 않는다.5 (a) is a state diagram in which two I-beams sintered downwardly are bolted together to form two preflex composite beams at the same time, and the center part is inverted so as to be mounted on the support points at both ends. . The prestressed I-beam support points are the opposite ends of the compressive force generation section L on the bending moment. In detail, in the bending moment of FIG. 3, both ends of the bending generation section are located at both ends of the connected I-beam. In the bending moment of Fig. 4, the bending occurrence point is a bending moment inflection point, which is a moment inflection point that enters the anchor parent section a at one end of the I-beam and the other end of the I-beam. When the support point is set as the moment inflection point, the bending tension and the prestress compressive force are not fed back into the interval α.
도5(b)는 연결한 I형강재 상부플랜지(30)에 도3내지 도4에서 표기된 최대 모멘트점(Mmax)에 하중 P,P 를 가하여 아래플랜지(10)에 휨인장이 일어나도록 한다. 이때 최대 휨모멘트가 일어나는 부근의 하중점은 1개 이상으로 할 수 있다. I형강에 내재한 휨 인장력의 적분도에서 하중점 P,P가 사다리꼴의 평행 단변 양단점이 됨을 볼 수 있다.FIG. 5 (b) applies loads P and P to the maximum moment point Mmax indicated in FIGS. 3 to 4 to the connected I-shaped steel upper flange 30 so that bending tension may occur in the lower flange 10. At this time, one or more load points in the vicinity of the maximum bending moment may occur. It can be seen that the loading points P and P become both end points of the trapezoidal parallel short side in the integral degree of the bending tensile force inherent in the I-beam.
도5(c)는 휨인장이 일어난 I형강의 아래플랜지(10)에 케이싱 콘크리트(20)를 타설한 상태도이다. 콘크리트는 휨모멘트구간(L)에서 일측으로 약간 치우쳐 있다.Fig. 5 (c) is a state diagram in which casing concrete 20 is poured into the lower flange 10 of the I-beams in which bending tension is generated. Concrete is slightly biased to one side in the bending moment section (L).
도5(d)에서 I형강재의 하부플랜지(10)에 타설한 콘크리트(20)가 양생된 후, 하중 P를 제거하고 연결된 중앙을 분리하여 I형강재의 복원력으로 I형강재의 하부플랜지(10)를 감싼 콘크리트(20)에 프리스트레스트 압축력을 도입 하였다. 도시된 압축력의 적분도 즉, 저항모맨트는 휨모멘트구간(L)의 일부에 위치하고 휨모멘트에 대응되는 이등변 삼각형이 됨을 보여준다.5 (d) after the concrete 20 placed on the lower flange 10 of the I-shaped steel is cured, the load P is removed and the connected center is separated and the lower flange of the I-shaped steel with the restoring force of the I-shaped steel ( 10) prestressed compressive force was introduced into the concrete 20 wrapped. The integral degree of compressive force, that is, the resistance moment, is located in a part of the bending moment section L and shows that it becomes an isosceles triangle corresponding to the bending moment.
도5(e)는 I형강재의 상부플랜지(30)를 감싸는 콘크리트(40)를 타설하여 양생시켜 2개의 파일을 완성한 상태도이다. 완성된 합성파일에서도 도시된 압축력 적분도는 휨모멘트구간(L)에서 휨모멘트에 대응됨을 보여준다.5 (e) is a state diagram in which two piles are completed by pouring and curing concrete 40 surrounding the upper flange 30 of the I-shaped steel. The compression force integrals shown in the finished composite file show that they correspond to the bending moment in the bending moment section (L).
도5(f)는 완성된 프리스트레스트 합성파일의 사시도이다. 합성 파일의 일측 플랜지의 케이싱 콘크리트에 상술한 휨 모멘트 대응형 압축력이 도입되어 있으며타측의 콘트리트에는 압축력이 도입되지 않다.Fig. 5 (f) is a perspective view of the completed prestressed composite pile. The bending moment-adaptive compressive force described above is introduced into the casing concrete of one flange of the composite pile, and the compressive force is not introduced into the concrete on the other side.
이와 같이 이 발명은 콘크리트와 강재의 재료공학적 특성을 정밀하게 이용하여 합성파일에 내재하는 저항 모멘트 분포를 토압에 의한 휨모멘트 분포에 정밀하게 일치시켜 토류벽 시공시 발생하는 휨력에 경제적이고 효과적으로 대응할 수 있게 하는 것이다.As such, the present invention precisely uses the material engineering properties of concrete and steel to precisely match the resistance moment distribution inherent in the composite pile to the bending moment distribution caused by earth pressure so that it can respond economically and effectively to the bending force generated during the construction of the earth wall. It is.
다른 실시예 도6을 인용하여 휨모멘트 대응 복합파일의 제작방법을 설명하고자 한다.Another embodiment will be described with reference to Figure 6 the manufacturing method of the bending moment corresponding composite file.
도6(a)는 중앙이 부상되게 소성시킨 1개의 I형강을 지지점(ㅿ,ㆁ)에 거치한 상태이다. 이때 지지점은 I형강재 일측으로 부터 도4에서 표기된 앵커 부모멘트구간 α의 내측에 위치하는 휨모멘트 변곡점과 I형강재의 타단이다.Fig. 6 (a) shows a state in which one I-shaped steel which is fired so that its center is floated is mounted on a support point. At this time, the supporting point is the bending moment inflection point and the other end of the I-shaped steel located inside the anchor parent moment section α shown in Figure 4 from one side of the I-shaped steel.
켄틸레버식 널말뚝에 필요한 파일은 지지점을 I형강재의 양단으로 한다.The piles required for cantilevered piles are to be supported at both ends of section I steel.
도6(b)는 I형강 상부플랜지(30)상에서 도3, 도4의 최대 모멘트점(Mmax)에 하중 P를 작용시켜 아래플랜지(10)에 휨인장이 일어나도록 한다. 이때 최대 휨모멘트가 일어나는 부근의 하중점은 1개 이상으로 할 수 있다. 아래 적분도에서 하중 P에의한 휨 인장 분포가 휨모멘트 구간(L)을 밑변으로 하고 하중점 P를 꼭지점으로 하는 삼각형이 됨을 볼수 있다.FIG. 6 (b) shows a bending tension in the lower flange 10 by applying a load P to the maximum moment point Mmax of FIGS. 3 and 4 on the upper flange 30 of the I-beam. At this time, one or more load points in the vicinity of the maximum bending moment may occur. In the integral diagram below, it can be seen that the bending tension distribution by the load P becomes a triangle with the bending moment section (L) as the base and the load point P as the vertex.
도6(c)는 하중 P로 휨인장이 일어난 I형강의 아래플랜지(10)에 압축 콘크리트(20)를 타설한 상태도이다.Fig. 6 (c) is a state diagram in which the compressed concrete 20 is poured into the lower flange 10 of the I-shaped steel in which bending tension is generated under the load P.
도6(d)는 하중 P를 제거하여 양생된 하부플랜지 콘크리트에 프리스트레스트압축력이 도입된 상태도이다. 프리스트레스트 압축력은 휨모멘트 구간(L)을 밑변으로 하고 하중점 P를 꼭지점으로 하는 삼각형이 됨을 볼수 있다.Figure 6 (d) is a state diagram in which the prestress compression force is introduced to the lower flange concrete cured by removing the load P. It can be seen that the prestressed compressive force becomes a triangle with the bending moment section (L) as the base and the load point P as the vertex.
도6(e)는 I형강의 상부플랜지(30)를 감싸는 콘크리트(40)를 타설하여 1개의 파일을 완성한 상태도이다. 완성된 합성파일에 프리스트레스트 압축력이 휨모멘트 구간(L)을 밑변으로 하고 하중점 P를 꼭지점으로 하는 삼각형으로 분포되어 있다.6 (e) is a state diagram in which one pile is completed by pouring concrete 40 surrounding the upper flange 30 of the I-beam. The prestressed compressive force is distributed in a triangle with the bending moment section (L) as the base and the load point P as the vertex.
이와 같이 완성된 합성파일에 분포된 저항 모멘트 분포는 토압에 의한 휨모멘트 분포에 정밀하게 대응되어 경제적이고 효율적으로 토압을 감당할 수 있게 하는 것이다.Thus, the distribution of the resistance moment distributed in the completed composite pile is to precisely correspond to the distribution of the bending moment due to the earth pressure, so that the earth pressure can be economically and efficiently handled.
도6(f)는 완성된 프리스트레스트 합성파일의 사시도이다.Fig. 6 (f) is a perspective view of the completed prestressed composite pile.
도7은 고정단 지지법에 의한 앵커된 토류벽의 토압에 의한 휨모멘트도이다.7 is a bending moment diagram of the earth pressure of the anchored earth wall by the fixed end support method.
도7의 변곡점은 앵커(ANCHOR) 부모맨트 구간 α내측의 변곡점과 고정단 부모멘트 구간 내측의 A부분 2개소이다.The inflection points in FIG. 7 are the inflection point inside the anchor parent section [alpha] and two A portions inside the fixed end section.
도7 휨모맨트 대응 합성파일을 제작하기 위하여 도7의 변곡점 A를 경계로 상부파일과 하부파일 2개의 파일로 분할하고, 도8, 도9의 과정으로 플랜지 케이싱 콘크리트에 프리스트레스트 응력을 도입한 후 도11과 같이 각각 제작된 합성파일을 연결하여 도7 휨모맨트 대응형 합성파일을 얻는다.Fig. 7 After the bending point A of Fig. 7 is divided into two piles of the upper pile and the lower pile in order to fabricate the bending pile corresponding composite, and the prestress stress is introduced into the flange casing concrete by the process of Figs. The composite files produced as shown in Fig. 11 are connected to each other to obtain a compound file corresponding to the flexural component of Fig. 7.
상기 상부파일은 자유단 지지법의 앵커된 토류벽용 프리스트레스트 합성파일 제작방법과 동일하게 도8, 도9에 따라 제작한다. 도8, 도9의 제작과정은 각각 도5,도6의 과정에 준한다. 상기 하부파일은 도10에 따라 제작한다. 도10 제작 과정은 도2 제작과정에 준한다.The upper pile is manufactured according to FIGS. 8 and 9 in the same manner as the method of manufacturing the prestressed synthetic pile for anchored earth wall of the free end supporting method. 8 and 9 are similar to those of FIGS. 5 and 6, respectively. The lower pile is manufactured according to FIG. The manufacturing process of FIG. 10 follows the manufacturing process of FIG.
도11은 도8, 9에서 제작한 상부 프리스트레스트 합성파일과 도10에서 제작한 하부 프리스트레스트 합성파일을 결합하는 공정도이다.FIG. 11 is a process diagram of combining the upper prestressed composite file produced in FIGS. 8 and 9 and the lower prestressed composite file produced in FIG.
도11(a)에서 상부 프리스트레스트 합성파일과 하부 프리스트레스트 합성파일의 I형강을 연결하였다.In Fig. 11 (a), the I-beams of the upper prestressed composite pile and the lower prestressed composite pile are connected.
연결상태에서 합성파일의 프리스트레스트 압축력의 분포를 보면 도8에서 제작한 상부파일과 도10에서 제작한 하부파일을 결합한 저항모멘트 분포가 도11(a)(1)과 같고, 도9에서 제작한 상부파일과 도10에서 제작한 하부파일을 결합한 저항모멘트 분포가 도11(a)(2)와 같다. 저항모멘트가 서로 반대방향으로 배치되므로 도11의 합성파일은 도7의 토압에 의한 휨모멘트 분포와 유사하여 경제적이고 확실성이 확보된 프리스트레스트 합성파일을 얻을 수 있는 것이다.In the connection state, the distribution of the prestressed compressive force of the composite pile is shown in Fig. 11 (a) (1) and the distribution of the resistance moment combining the upper pile manufactured in FIG. 8 and the lower pile manufactured in FIG. Distribution of the resistance moment combining the upper pile and the lower pile manufactured in FIG. 10 is shown in FIG. 11 (a) (2). Since the resistance moments are arranged in opposite directions, the composite pile of FIG. 11 is similar to the bending moment distribution due to the earth pressure of FIG. 7, thereby obtaining a prestress composite pile having economical and reliable reliability.
상기와 같이 이 발명은 I형강과 이를 콘크리트로 피복하여 콘크리트에 프리스트레스트 응력을 도입시켜 강재와 콘크리트의 재료 역학적 잇점을 응용하는 토류벽 지지용 합성 파일을 제공하는 것으로서, 지지파일의 강재에 콘크리트를 피복함으로써 부식 발생을 최소화 하며 , 강재의 단면적을 감소시켜 경제성을 높이며, 버팀대의 사용을 최소화 또는 기피할 수 있어 작업 공간의 장애물을 줄일 수 있고,더 나아가 켄틸레버식 토류벽, 자유단 지지법에 의한 앵커된 토류벽 또는 고정단 지지법에 의한 앵커된 토류벽에 시공되는 합성파일을 제공함에 있어서, 이들 토류벽의 토압에 의한 파일의 휨모멘트 대응형으로 제작한 합성파일 및 그 제작 방법을 제공하는 것이다.As described above, the present invention is to provide a composite pile for supporting the earth wall to apply I-shaped steel and the concrete to the concrete and to apply the prestress stress to the concrete to apply the material mechanical advantages of the steel and concrete, to cover the steel of the support pile This minimizes the occurrence of corrosion, reduces the cross-sectional area of the steel, improves the economy, and minimizes or avoids the use of braces, thereby reducing obstacles in the work space.Furthermore, anchors using cantilevered earth walls and free end support The present invention provides a composite pile fabricated on a fixed earth wall or anchored earth wall by a fixed end support method, and provides a composite pile manufactured in a manner corresponding to the bending moment of a pile due to earth pressure of these earth walls, and a manufacturing method thereof.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR10-2000-0044092A KR100430243B1 (en) | 2000-07-29 | 2000-07-29 | Prestressed composition pile and the manufacturing process |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR10-2000-0044092A KR100430243B1 (en) | 2000-07-29 | 2000-07-29 | Prestressed composition pile and the manufacturing process |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR2020000022155U Division KR200217588Y1 (en) | 2000-08-03 | 2000-08-03 | Prestressed composition pile |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| KR20020010390A KR20020010390A (en) | 2002-02-04 |
| KR100430243B1 true KR100430243B1 (en) | 2004-05-03 |
Family
ID=19680829
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR10-2000-0044092A Expired - Lifetime KR100430243B1 (en) | 2000-07-29 | 2000-07-29 | Prestressed composition pile and the manufacturing process |
Country Status (1)
| Country | Link |
|---|---|
| KR (1) | KR100430243B1 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100779991B1 (en) | 2006-05-11 | 2007-11-27 | 주식회사 쏘일텍 | Freestanding Thumb Pile Method with Initial Tension |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100473375B1 (en) * | 2002-07-03 | 2005-03-10 | (주)세일엔지니어링 | Retaining wall using phc pile |
| KR100768031B1 (en) * | 2006-06-29 | 2007-10-19 | (주)스틸엔콘크리트 | Composite piles in which steel piles are connected to concrete composite piles with prestress and pile construction method |
| CN107761743A (en) * | 2017-11-14 | 2018-03-06 | 福建省建研工程顾问有限公司 | A kind of deformation and the controllable earthing recurvation formula cantilever design of internal force |
| KR102324327B1 (en) * | 2019-04-24 | 2021-11-09 | 오세연 | Method of manufacturing support beam for retaining wall and support beam for retaining wall using the same |
| KR102340926B1 (en) * | 2019-04-24 | 2021-12-31 | (주)후즈랩 | Method of manufacturing prestress charge support beam for retaining wall and prestress charge support beam using the same |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR19980071920A (en) * | 1998-07-03 | 1998-10-26 | 구민세 | Construction method of preflex composite type by factory production |
-
2000
- 2000-07-29 KR KR10-2000-0044092A patent/KR100430243B1/en not_active Expired - Lifetime
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR19980071920A (en) * | 1998-07-03 | 1998-10-26 | 구민세 | Construction method of preflex composite type by factory production |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100779991B1 (en) | 2006-05-11 | 2007-11-27 | 주식회사 쏘일텍 | Freestanding Thumb Pile Method with Initial Tension |
Also Published As
| Publication number | Publication date |
|---|---|
| KR20020010390A (en) | 2002-02-04 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5373979B2 (en) | Construction Method of Steel Composite Girder Bridge {ConstructionMethod SteelCompositeGirderBridge} | |
| CN101080534B (en) | Manufacturing method for prestressed steel composite girder | |
| KR100837608B1 (en) | J.K Bracket Method | |
| KR100430243B1 (en) | Prestressed composition pile and the manufacturing process | |
| CN117758601B (en) | Assembled pier without bearing platform for high-intensity areas and construction method | |
| CN109577176B (en) | Composite connection type concrete filled steel tube pier and construction method thereof | |
| CN101240533A (en) | Pile foundation reinforcement prestressing pile locking method | |
| CN205088688U (en) | Shaped steel and prestressed reinforced concrete combination structure support | |
| KR20100109654A (en) | Prestressed concrete girder with plural steel wires disposed at shear surface of tension port, manufacturing method thereof, and assembling bridge construction method using the same | |
| KR101297706B1 (en) | Construction method for prestressed girder using jack-up beam | |
| KR200217588Y1 (en) | Prestressed composition pile | |
| KR100402235B1 (en) | Construction method of pile pile for earth wall using preflex composite beam | |
| CN1043183A (en) | Method for relieving pressure or load of original building structure and stressing or restoring deformed original building structure | |
| JP2007270600A (en) | Prestress introducing method to filling part between precast concrete members | |
| KR100602152B1 (en) | Precast concrete panel and construction method and structure | |
| KR20020067078A (en) | The method of preflex composite beam made by using the hunch concrete represtressing the lower casing concrete | |
| KR100341342B1 (en) | Method of constructing and reparing of prestressed composite beam structure using up and down of temporary support | |
| KR20030006681A (en) | Apparatus and method for reinforcing a construction by enlarging its' size | |
| CN110805304A (en) | Construction method for reinforcing structure of concrete beam | |
| JP4219746B2 (en) | Lightweight embankment structure and construction method thereof | |
| KR100416217B1 (en) | Composite structural material | |
| KR200234512Y1 (en) | The preflex composite beam made by unite the hunch concrete represtressing the lower casing concrete | |
| JPH05156605A (en) | Construction method of arch concrete by arch form support. | |
| KR200306923Y1 (en) | Apparatus for controlling displacement of prestressed concrete composite pile | |
| KR100465436B1 (en) | Apparatus for controlling displacement of prestressed concrete composite pile and method for manufacturing composite pile using the apparatus |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A201 | Request for examination | ||
| PA0109 | Patent application |
Patent event code: PA01091R01D Comment text: Patent Application Patent event date: 20000729 |
|
| PA0201 | Request for examination | ||
| N231 | Notification of change of applicant | ||
| PN2301 | Change of applicant |
Patent event date: 20011008 Comment text: Notification of Change of Applicant Patent event code: PN23011R01D |
|
| PG1501 | Laying open of application | ||
| E801 | Decision on dismissal of amendment | ||
| PE0801 | Dismissal of amendment |
Patent event code: PE08012E01D Comment text: Decision on Dismissal of Amendment Patent event date: 20030213 Patent event code: PE08011R01I Comment text: Amendment to Specification, etc. Patent event date: 20001104 Patent event code: PE08011R01I Comment text: Amendment to Specification, etc. Patent event date: 20000828 Patent event code: PE08011R01I Comment text: Amendment to Specification, etc. Patent event date: 20000803 |
|
| E801 | Decision on dismissal of amendment | ||
| PE0801 | Dismissal of amendment |
Patent event code: PE08012E01D Comment text: Decision on Dismissal of Amendment Patent event date: 20030410 Patent event code: PE08011R01I Comment text: Amendment to Specification, etc. Patent event date: 20001104 Patent event code: PE08011R01I Comment text: Amendment to Specification, etc. Patent event date: 20000828 Patent event code: PE08011R01I Comment text: Amendment to Specification, etc. Patent event date: 20000803 |
|
| N231 | Notification of change of applicant | ||
| PN2301 | Change of applicant |
Patent event date: 20030507 Comment text: Notification of Change of Applicant Patent event code: PN23011R01D |
|
| E801 | Decision on dismissal of amendment | ||
| PE0801 | Dismissal of amendment |
Patent event code: PE08012E01D Comment text: Decision on Dismissal of Amendment Patent event date: 20030512 Patent event code: PE08011R01I Comment text: Amendment to Specification, etc. Patent event date: 20001104 Patent event code: PE08011R01I Comment text: Amendment to Specification, etc. Patent event date: 20000828 Patent event code: PE08011R01I Comment text: Amendment to Specification, etc. Patent event date: 20000803 |
|
| E902 | Notification of reason for refusal | ||
| PE0902 | Notice of grounds for rejection |
Comment text: Notification of reason for refusal Patent event date: 20030723 Patent event code: PE09021S01D |
|
| E701 | Decision to grant or registration of patent right | ||
| PE0701 | Decision of registration |
Patent event code: PE07011S01D Comment text: Decision to Grant Registration Patent event date: 20040127 |
|
| GRNT | Written decision to grant | ||
| PR0701 | Registration of establishment |
Comment text: Registration of Establishment Patent event date: 20040422 Patent event code: PR07011E01D |
|
| PR1002 | Payment of registration fee |
Payment date: 20040423 End annual number: 3 Start annual number: 1 |
|
| PG1601 | Publication of registration | ||
| FPAY | Annual fee payment |
Payment date: 20070409 Year of fee payment: 6 |
|
| PR1001 | Payment of annual fee |
Payment date: 20070409 Start annual number: 4 End annual number: 6 |
|
| FPAY | Annual fee payment |
Payment date: 20100402 Year of fee payment: 9 |
|
| PR1001 | Payment of annual fee |
Payment date: 20100402 Start annual number: 7 End annual number: 9 |
|
| FPAY | Annual fee payment |
Payment date: 20130409 Year of fee payment: 10 |
|
| PR1001 | Payment of annual fee |
Payment date: 20130409 Start annual number: 10 End annual number: 10 |
|
| FPAY | Annual fee payment |
Payment date: 20140407 Year of fee payment: 11 |
|
| PR1001 | Payment of annual fee |
Payment date: 20140407 Start annual number: 11 End annual number: 11 |
|
| FPAY | Annual fee payment |
Payment date: 20150407 Year of fee payment: 12 |
|
| PR1001 | Payment of annual fee |
Payment date: 20150407 Start annual number: 12 End annual number: 12 |
|
| FPAY | Annual fee payment |
Payment date: 20160331 Year of fee payment: 13 |
|
| PR1001 | Payment of annual fee |
Payment date: 20160331 Start annual number: 13 End annual number: 13 |
|
| FPAY | Annual fee payment |
Payment date: 20170331 Year of fee payment: 14 |
|
| PR1001 | Payment of annual fee |
Payment date: 20170331 Start annual number: 14 End annual number: 14 |
|
| FPAY | Annual fee payment |
Payment date: 20180330 Year of fee payment: 15 |
|
| PR1001 | Payment of annual fee |
Payment date: 20180330 Start annual number: 15 End annual number: 15 |
|
| FPAY | Annual fee payment |
Payment date: 20190329 Year of fee payment: 16 |
|
| PR1001 | Payment of annual fee |
Payment date: 20190329 Start annual number: 16 End annual number: 16 |
|
| FPAY | Annual fee payment |
Payment date: 20200330 Year of fee payment: 17 |
|
| PR1001 | Payment of annual fee |
Payment date: 20200330 Start annual number: 17 End annual number: 17 |
|
| EXPY | Expiration of term | ||
| PC1801 | Expiration of term |