KR100430243B1 - Prestressed composition pile and the manufacturing process - Google Patents

Prestressed composition pile and the manufacturing process Download PDF

Info

Publication number
KR100430243B1
KR100430243B1 KR10-2000-0044092A KR20000044092A KR100430243B1 KR 100430243 B1 KR100430243 B1 KR 100430243B1 KR 20000044092 A KR20000044092 A KR 20000044092A KR 100430243 B1 KR100430243 B1 KR 100430243B1
Authority
KR
South Korea
Prior art keywords
pile
bending
bending moment
earth wall
prestressed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
KR10-2000-0044092A
Other languages
Korean (ko)
Other versions
KR20020010390A (en
Inventor
김회준
Original Assignee
(주)스틸엔콘크리트
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)스틸엔콘크리트 filed Critical (주)스틸엔콘크리트
Priority to KR10-2000-0044092A priority Critical patent/KR100430243B1/en
Publication of KR20020010390A publication Critical patent/KR20020010390A/en
Application granted granted Critical
Publication of KR100430243B1 publication Critical patent/KR100430243B1/en
Assigned to 주식회사 젬콘 reassignment 주식회사 젬콘 권리지분의 일부이전등록 Assignors: (주)스틸엔콘크리트
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

이 발명은 켄틸레버식 토류벽, 자유단 지지법에 의한 앵커된 토류벽, 고정단 지지법에 의한 앵커된 토류벽의 상부파일의 휨모맨트 구간 양단 또는 휨모맨트 구간을 연결한 두개를 휨모맨트 구간 양단을 지지점으로하고 최대 휨모맨트점 부근을 하중 작용점으로 하여 I형강의 일측 플랜지에 휨인장을 발생시킨 상태에서 휨인장이 발생된 플랜지에 케이싱 콘크리트를 타설 양생한 후 하중을 제거하고 파일 단위로 나머지 강형에 케이싱 콘크리트를 타설 양생하여 콘크리트 피복된 파일에 휨모맨트 분포에 대응되는 프리스트레스트 저항 모맨트를 도입한 프리스트레스트 합성파일 및 그 제작방법을 제공한다. 이 발명에 의하면 강재의 부식 발생을 최소화 하며, 강재의 단면적을 감소시켜 경제성을 높이며, 버팀대의 사용을 최소화 또는 기피할 수 있어 작업 공간의 장애물을 줄일 수 있고, 토류벽의 토압에 의한 파일의 휨모멘트 대응형으로 저항 모멘트를 분포시킨 합성파일 및 그 제작 방법을 제공하는 것이다.The present invention supports the two ends connecting the bending moment section or both ends of the bending moment section of the upper pile of the cantilevered earth wall, the anchored earth wall by the free end support method, and the anchored earth wall by the fixed end support method. After the bending tension is generated on one side flange of I-beams with the maximum bending moment point as the load action point, the casing concrete is cast on the flange where the bending tension has occurred, the load is removed, and the casing is applied to the remaining steels in pile units. The present invention provides a prestressed composite pile and a manufacturing method thereof in which a prestressed resistance component corresponding to a bending moment distribution is introduced into a concrete coated pile by curing the concrete. According to the present invention, it is possible to minimize the occurrence of corrosion of the steel, to increase the economics by reducing the cross-sectional area of the steel, to minimize or avoid the use of the brace to reduce the obstacles in the working space, the bending moment of the pile due to the earth pressure of the earth wall The present invention provides a synthetic pile having a resistance moment distributed therein and a method of manufacturing the same.

Description

프리스트레스트 합성파일 및 그 제조방법 { PRESTRESSED COMPOSITION PILE AND THE MANUFACTURING PROCESS }Prestressed composite pile and its manufacturing method {PRESTRESSED COMPOSITION PILE AND THE MANUFACTURING PROCESS}

이 발명은 토류벽 또는 안벽을 시공하기 위한 휨 모멘트 대응형 프리스트레스트 합성파일 및 그 제작방법에 관한 것이다.The present invention relates to a bending moment-adaptive prestressed composite pile for constructing an earth wall or a quay wall, and a manufacturing method thereof.

지하공사를 안전하고 원활하게 할 수 있도록 또한 굴착벽면의 암괴나 토사 등의 유입을 방지하기 위하여 설치하는 토류벽의 지지 파일은 주로 I형강을 사용하여 토압에 저항하게 하였다. 토류벽의 지지파일로서 설치하는 I형강은 토사와 접하며 대개는 지하수에 접속되고 있어 부식이 크고, 굴착깊이가 깊어질 수록 큰 토압을 저항할 수 있도록 단면이 거대해지고, 상당수의 버팀대(strut)를 설치하여 횡방향 변형에 대비해야만 했다. 이러한 버팀대는 작업공간의 장애물이되고 설치 및 제거공사가 요구되어 공사비용과 공사기간의 증대 요인이 되기도 한다.To support the underground construction safely and smoothly, and to prevent the inflow of excavation wall and earth and sand, the supporting pile of the earth wall was mainly made of I-shaped steel to resist the earth pressure. The I-beam, which is installed as a supporting pile of the earth wall, is in contact with the soil and is usually connected to the groundwater, so that the corrosion is high, and the deeper the excavation depth, the larger the cross section to resist the large earth pressure, and a large number of struts are installed. To prepare for transverse deformation. These braces are obstacles to the work space and require installation and removal work, which can increase construction costs and construction periods.

합성파일에 고려되어야 할 측압 분포도는 도3 켄틸레버식 토류벽 모멘트도와 도4 자유단 지지법에 의한 앵커된 토류벽 휨모멘트도와 도7 고정단 지지법에 의한 앵커된 토류벽 휨모멘트도와 같다. 이러한 휨모멘트들은 시공된 파일이 임계 측압을 받았을 때 휘어지는 작용점을 제시하는 것으로서, 합성파일의 제작은 측압 대응형으로 제작 할 것이 아니라 휨모멘트에 부합되도록 제작되어져야 최대 임계 버팀응력을 나타낼 수 있음을 의미한다.The lateral pressure distribution to be considered in the composite pile is shown in FIG. 3 cantilevered earth wall moment, anchored earth wall bending moment by the free end support method and anchored earth wall bending moment by the fixed end support method. These bending moments suggest the point of action when the constructed pile is subjected to critical lateral pressure. The composite pile is not designed to be pressure-sensitive, but must be manufactured to meet the bending moment to indicate the maximum critical brace stress. it means.

그러나 프리스트레스트 합성파일을 측압 대응형으로 제작한다면 도4에서와 같이 최대 모멘트점이 자유단으로부터 0.2L에 위치할 경우 실제의 최대 모멘트보다 1.25배가 많은 휨모멘트가 일어나도록 제작하여야 하므로 휨 모멘트 대응형에 비하여 매우 비경제적이다.However, if the prestressed composite pile is manufactured in the side pressure response type, as shown in Fig. 4, when the maximum moment point is located at 0.2L from the free end, the bending moment must be made to be 1.25 times more than the actual maximum moment. It is very uneconomical.

이 발명의 목적은 I형강과 이를 콘크리트로 피복하여 콘크리트에 프리스트레스트 응력을 도입시켜 강재와 콘크리트의 재료 역학적 잇점을 응용하는 토류벽 지지용 합성 파일을 제공함에 있다.An object of the present invention is to provide a composite pile for supporting earth walls applying I-shaped steel and concrete by applying prestress stress to concrete to apply the mechanical and mechanical advantages of steel and concrete.

이 발명의 다른 목적은 지지파일의 강재에 콘크리트를 피복함으로써 부식 발생을 최소화 하며 , 강재의 단면적을 감소시켜 경제성을 높이며, 버팀대의 사용을 최소화 또는 기피할 수 있어 작업 공간의 장애물을 줄일 수 있는 토류벽 지지용 합성파일을 제공함에 있다.Another object of the present invention is to minimize the occurrence of corrosion by coating concrete on the steel of the support pile, to reduce the cross-sectional area of the steel to increase the economics, to minimize or avoid the use of the brace earth wall that can reduce the obstacle of the work space In providing a supporting composite file.

이 발명의 다른 목적은 켄틸레버식 토류벽, 자유단 지지법에 의한 앵커된 토류벽 또는 고정단 지지법에 의한 앵커된 토류벽에 시공되는 합성파일을 제공함에 있어서, 이들 토류벽의 토압에 의한 파일의 휨모멘트 대응형으로 제작한 합성파일및 그 제작 방법을 제안함에 목적이 있다.Another object of the present invention is to provide a composite pile which is constructed on a cantilevered earth wall, an anchored earth wall by the free end support method, or an anchored earth wall by the fixed end support method, and the bending moment of the pile due to the earth pressure of these earth walls. It is an object of the present invention to propose a synthetic file and a method of manufacturing the same.

도1은 토류벽 지지파일에 가해지는 측압 분포도1 is a lateral pressure distribution diagram applied to a soil wall support pile

도2는 프리스트레스트 합성파일 제작공정도Figure 2 is a prestress composite file manufacturing process

도3은 켄틸레버식 토류벽의 일반적인 휨 모멘트도3 is a general bending moment diagram of a cantilevered earth wall

도4는 자유단 지지법에 의한 앵커된 토류벽의 일반적인 모멘트도Figure 4 is a general moment diagram of the anchored earth wall by the free end support method

도5는 켄틸레버식 토류벽과 자유단 지지법에 의한 앵커된 토류벽용 프리스트레스트 합성파일 제작 공정도Fig. 5 is a process chart of manufacturing prestressed composite piles for anchored earth walls by the cantilever type earth walls and free end support method.

도6은 켄틸레버식 토류벽과 자유단 지지법에 의한 앵커된 토류벽용 프리스트레스트 합성파일 제작도 공정도6 is a manufacturing process chart of the prestressed composite pile for anchored earth wall by the cantilever type earth wall and free end support method

도7은 고정단 지지법에 의한 앵커된 토류벽의 일반적인 휨 모멘트도Figure 7 is a general bending moment diagram of the anchored earth wall by the fixed end support method

도8은 고정단 지지법에 의한 앵커된 토류벽용 상부 프리스트레스트 합성파일 제작공정도8 is a manufacturing process diagram of the upper prestressed composite pile for anchored earth wall by the fixed end support method

도9는 고정단 지지법에 의한 앵커된 토류벽용 상부 프리스트레스트 합성파일 제작공정도9 is a manufacturing process diagram of the upper prestressed composite pile for anchored earth walls by the fixed end support method

도10은 고정단 지지법에 의한 앵커된 토류벽용 하부 프리스트레스트 합성파일 제작공정도10 is a manufacturing process diagram of the lower prestress composite pile for anchored earth wall by the fixed end support method

도11은 고정단 지지법에 의한 앵커된 토류벽용 상부와 하부파일 결합공정도11 is a process diagram of the upper and lower pile coupling for anchored earth wall by the fixed end support method

도1은 토류벽 지지파일에 가해지는 측압 분포도, 도2는 토류벽 지지용 프리스트레스트 합성파일 제작과정을 도시한 것이다.1 is a side pressure distribution diagram applied to the earth wall support pile, and FIG. 2 shows a process of manufacturing the prestressed composite pile for supporting the earth wall.

도2(a)는 동시에 2개의 프리플렉스 합성보를 만들기 위하여, 하향으로 처지게 소성된 I형강 2개를 볼트로 연결하고, 중앙부가 부상되게 뒤집어 양단의 지지점(ㅿ,ㆁ)위에 거치한 상태도이다.Fig. 2 (a) is a state diagram in which two I-beams sintered downwards are bolted together to make two preflex composite beams at the same time, and the center part is inverted so as to be mounted on the support points at both ends. .

도2(b)는 중앙의 연결부에 상부 플랜지(30)에 하중P를 가하여 I형강의 하부 플랜지(20)에 휨 인장이 일어나도록 하였다. I형강에 내재한 휨 인장력은 적분도와 같이 연결부를 꼭지점으로하는 이등변 삼각형이다.Figure 2 (b) is to apply a load P to the upper flange 30 in the connecting portion in the center so that the bending tension occurs in the lower flange 20 of the I-shaped steel. The flexural tension inherent in I-beams is an isosceles triangle with vertices as the integral.

도2(c)는 하중 P를 가한 상태에서 I형강 하부 플랜지에 케이싱 콘크리트(20)를 피복시켜 양생한다.Figure 2 (c) is to cover the casing concrete 20 to the I-shaped steel lower flange in the state of applying the load P to cure.

도2(d)는 하중 P을 제거하고 중앙의 연결부를 분리한 상태도이다. 하중 P을 제거하면 하부 플랜지에 내재한 휨 인장력은 케이싱 콘크리트의 프리스트레스트 응력으로 전환되고, 2개의 I형강을 분리하면 저항 모맨트 분포는 적분도와 같이 I형강 대분에 걸친 직각 삼각형의 모양이 된다.Fig. 2 (d) is a state diagram in which the load P is removed and the connecting portion in the center is separated. When the load P is removed, the flexural tension inherent in the lower flange is converted to the prestressed stress of the casing concrete, and when the two I-beams are separated, the resistance moment distribution becomes a right-angled triangle over the majority of the I-beams as an integral.

도2(e)에서 나머지 강형에 콘크리트(40)를 피복하여 합성파일을 완성하였다. 완성된 합성파일에 직각삼각형의 모양으로 프리스트레스트 응력이 분포 됨으로써 도1의 측압 분포에 대응되는 합성파일을 얻는것이다.In Figure 2 (e) to cover the concrete 40 to the remaining steel to complete the composite pile. The prestressed stress is distributed in the shape of a right triangle to the completed composite file, thereby obtaining a composite file corresponding to the lateral pressure distribution of FIG. 1.

도2(f)는 완성된 합성파일의 사도이다. 이 파일의 일측 플랜지에 측압 대응 분포의 저항 프리스트레스트 응력을 내재 하고있다.Fig. 2 (f) is an oblique view of the completed composite file. On one side flange of this pile is inherent the resistive prestress stress of the lateral pressure response distribution.

도2와같은 프리스트레스트 합성파일은 도1의 측압분포 대응형 합성파일로서 파일이 시공 후 측압을 받았을 때 최대 버팀 응력을 발휘하지 못하여 임계 버팀응력이 낮아지는 결점을 가진다.The prestressed composite pile as shown in FIG. 2 is a side pressure distribution-responsive composite pile of FIG. 1, which has a drawback in that the critical support stress is lowered when the pile is not subjected to side pressure after construction.

휨 모멘트 대응형 합성파일을 만들기 위하여 먼저 먼저 토압에 의한 파일의 휨모멘트의 유형을 살펴보면, 도3의 켄틸레버식 토류벽의 토압에 의한 일반적인 휨모멘트와 도4의 자유단 지지법에 의한 앵커(ANCHOR)된 토류벽의 정모멘트구간의 토압에 의한 일반적인 휨모멘트는 유사성이 많다. 이 휨모멘트가 유사한 토류벽 합성파일은 같은 제조과정으로 제조할 수 있다.In order to make the bending moment-responsive composite pile, first of all, the type of bending moment of the pile due to earth pressure is shown. The general bending moment due to the earth pressure of the cantilevered earth wall of FIG. 3 and the anchor by the free end supporting method of FIG. The general bending moment due to the earth pressure of the static moment section of the earthquake wall is similar. Earth wall composite piles with similar bending moments can be produced by the same manufacturing process.

도3, 도4 휨모멘트에 대응되는 합성파일의 제조법을 도5의 실시예로서 설명한다.The manufacturing method of the composite pile corresponding to FIG. 3, FIG. 4 bending moment is demonstrated as an Example of FIG.

도5(a)에서 동시에 2개의 프리플렉스 합성보를 만들기 위하여, 하향으로 처지게 소성된 I형강 2개를 볼트로 연결하고, 중앙부가 부상되게 뒤집어 양단의 지지점(ㅿ,ㆁ)위에 거치한 상태도이다. 프리스트레스트 I형강 지지점(ㅿ,ㆁ)은 휨모멘트상의 압축력 발생구간(L)의 양단점이다. 상세히 도3의 휨모멘트에서 휨 발생구간 양단은 연결된 I형강의 양단에 있다. 도4의 휨모멘트에서 휨 발생점은 휨모멘트 변곡점으로서 I형강의 일단에서 앵커 부모멘트 구간 α를 들어간 모멘트 변곡점과 I형강의 타단이다. 지지점지지점(ㅿ)을 모멘트변곡점으로 설정하면 구간 α에는 휨인장과 프리스트레스트 압축력이 되입되지 않는다.5 (a) is a state diagram in which two I-beams sintered downwardly are bolted together to form two preflex composite beams at the same time, and the center part is inverted so as to be mounted on the support points at both ends. . The prestressed I-beam support points are the opposite ends of the compressive force generation section L on the bending moment. In detail, in the bending moment of FIG. 3, both ends of the bending generation section are located at both ends of the connected I-beam. In the bending moment of Fig. 4, the bending occurrence point is a bending moment inflection point, which is a moment inflection point that enters the anchor parent section a at one end of the I-beam and the other end of the I-beam. When the support point is set as the moment inflection point, the bending tension and the prestress compressive force are not fed back into the interval α.

도5(b)는 연결한 I형강재 상부플랜지(30)에 도3내지 도4에서 표기된 최대 모멘트점(Mmax)에 하중 P,P 를 가하여 아래플랜지(10)에 휨인장이 일어나도록 한다. 이때 최대 휨모멘트가 일어나는 부근의 하중점은 1개 이상으로 할 수 있다. I형강에 내재한 휨 인장력의 적분도에서 하중점 P,P가 사다리꼴의 평행 단변 양단점이 됨을 볼 수 있다.FIG. 5 (b) applies loads P and P to the maximum moment point Mmax indicated in FIGS. 3 to 4 to the connected I-shaped steel upper flange 30 so that bending tension may occur in the lower flange 10. At this time, one or more load points in the vicinity of the maximum bending moment may occur. It can be seen that the loading points P and P become both end points of the trapezoidal parallel short side in the integral degree of the bending tensile force inherent in the I-beam.

도5(c)는 휨인장이 일어난 I형강의 아래플랜지(10)에 케이싱 콘크리트(20)를 타설한 상태도이다. 콘크리트는 휨모멘트구간(L)에서 일측으로 약간 치우쳐 있다.Fig. 5 (c) is a state diagram in which casing concrete 20 is poured into the lower flange 10 of the I-beams in which bending tension is generated. Concrete is slightly biased to one side in the bending moment section (L).

도5(d)에서 I형강재의 하부플랜지(10)에 타설한 콘크리트(20)가 양생된 후, 하중 P를 제거하고 연결된 중앙을 분리하여 I형강재의 복원력으로 I형강재의 하부플랜지(10)를 감싼 콘크리트(20)에 프리스트레스트 압축력을 도입 하였다. 도시된 압축력의 적분도 즉, 저항모맨트는 휨모멘트구간(L)의 일부에 위치하고 휨모멘트에 대응되는 이등변 삼각형이 됨을 보여준다.5 (d) after the concrete 20 placed on the lower flange 10 of the I-shaped steel is cured, the load P is removed and the connected center is separated and the lower flange of the I-shaped steel with the restoring force of the I-shaped steel ( 10) prestressed compressive force was introduced into the concrete 20 wrapped. The integral degree of compressive force, that is, the resistance moment, is located in a part of the bending moment section L and shows that it becomes an isosceles triangle corresponding to the bending moment.

도5(e)는 I형강재의 상부플랜지(30)를 감싸는 콘크리트(40)를 타설하여 양생시켜 2개의 파일을 완성한 상태도이다. 완성된 합성파일에서도 도시된 압축력 적분도는 휨모멘트구간(L)에서 휨모멘트에 대응됨을 보여준다.5 (e) is a state diagram in which two piles are completed by pouring and curing concrete 40 surrounding the upper flange 30 of the I-shaped steel. The compression force integrals shown in the finished composite file show that they correspond to the bending moment in the bending moment section (L).

도5(f)는 완성된 프리스트레스트 합성파일의 사시도이다. 합성 파일의 일측 플랜지의 케이싱 콘크리트에 상술한 휨 모멘트 대응형 압축력이 도입되어 있으며타측의 콘트리트에는 압축력이 도입되지 않다.Fig. 5 (f) is a perspective view of the completed prestressed composite pile. The bending moment-adaptive compressive force described above is introduced into the casing concrete of one flange of the composite pile, and the compressive force is not introduced into the concrete on the other side.

이와 같이 이 발명은 콘크리트와 강재의 재료공학적 특성을 정밀하게 이용하여 합성파일에 내재하는 저항 모멘트 분포를 토압에 의한 휨모멘트 분포에 정밀하게 일치시켜 토류벽 시공시 발생하는 휨력에 경제적이고 효과적으로 대응할 수 있게 하는 것이다.As such, the present invention precisely uses the material engineering properties of concrete and steel to precisely match the resistance moment distribution inherent in the composite pile to the bending moment distribution caused by earth pressure so that it can respond economically and effectively to the bending force generated during the construction of the earth wall. It is.

다른 실시예 도6을 인용하여 휨모멘트 대응 복합파일의 제작방법을 설명하고자 한다.Another embodiment will be described with reference to Figure 6 the manufacturing method of the bending moment corresponding composite file.

도6(a)는 중앙이 부상되게 소성시킨 1개의 I형강을 지지점(ㅿ,ㆁ)에 거치한 상태이다. 이때 지지점은 I형강재 일측으로 부터 도4에서 표기된 앵커 부모멘트구간 α의 내측에 위치하는 휨모멘트 변곡점과 I형강재의 타단이다.Fig. 6 (a) shows a state in which one I-shaped steel which is fired so that its center is floated is mounted on a support point. At this time, the supporting point is the bending moment inflection point and the other end of the I-shaped steel located inside the anchor parent moment section α shown in Figure 4 from one side of the I-shaped steel.

켄틸레버식 널말뚝에 필요한 파일은 지지점을 I형강재의 양단으로 한다.The piles required for cantilevered piles are to be supported at both ends of section I steel.

도6(b)는 I형강 상부플랜지(30)상에서 도3, 도4의 최대 모멘트점(Mmax)에 하중 P를 작용시켜 아래플랜지(10)에 휨인장이 일어나도록 한다. 이때 최대 휨모멘트가 일어나는 부근의 하중점은 1개 이상으로 할 수 있다. 아래 적분도에서 하중 P에의한 휨 인장 분포가 휨모멘트 구간(L)을 밑변으로 하고 하중점 P를 꼭지점으로 하는 삼각형이 됨을 볼수 있다.FIG. 6 (b) shows a bending tension in the lower flange 10 by applying a load P to the maximum moment point Mmax of FIGS. 3 and 4 on the upper flange 30 of the I-beam. At this time, one or more load points in the vicinity of the maximum bending moment may occur. In the integral diagram below, it can be seen that the bending tension distribution by the load P becomes a triangle with the bending moment section (L) as the base and the load point P as the vertex.

도6(c)는 하중 P로 휨인장이 일어난 I형강의 아래플랜지(10)에 압축 콘크리트(20)를 타설한 상태도이다.Fig. 6 (c) is a state diagram in which the compressed concrete 20 is poured into the lower flange 10 of the I-shaped steel in which bending tension is generated under the load P.

도6(d)는 하중 P를 제거하여 양생된 하부플랜지 콘크리트에 프리스트레스트압축력이 도입된 상태도이다. 프리스트레스트 압축력은 휨모멘트 구간(L)을 밑변으로 하고 하중점 P를 꼭지점으로 하는 삼각형이 됨을 볼수 있다.Figure 6 (d) is a state diagram in which the prestress compression force is introduced to the lower flange concrete cured by removing the load P. It can be seen that the prestressed compressive force becomes a triangle with the bending moment section (L) as the base and the load point P as the vertex.

도6(e)는 I형강의 상부플랜지(30)를 감싸는 콘크리트(40)를 타설하여 1개의 파일을 완성한 상태도이다. 완성된 합성파일에 프리스트레스트 압축력이 휨모멘트 구간(L)을 밑변으로 하고 하중점 P를 꼭지점으로 하는 삼각형으로 분포되어 있다.6 (e) is a state diagram in which one pile is completed by pouring concrete 40 surrounding the upper flange 30 of the I-beam. The prestressed compressive force is distributed in a triangle with the bending moment section (L) as the base and the load point P as the vertex.

이와 같이 완성된 합성파일에 분포된 저항 모멘트 분포는 토압에 의한 휨모멘트 분포에 정밀하게 대응되어 경제적이고 효율적으로 토압을 감당할 수 있게 하는 것이다.Thus, the distribution of the resistance moment distributed in the completed composite pile is to precisely correspond to the distribution of the bending moment due to the earth pressure, so that the earth pressure can be economically and efficiently handled.

도6(f)는 완성된 프리스트레스트 합성파일의 사시도이다.Fig. 6 (f) is a perspective view of the completed prestressed composite pile.

도7은 고정단 지지법에 의한 앵커된 토류벽의 토압에 의한 휨모멘트도이다.7 is a bending moment diagram of the earth pressure of the anchored earth wall by the fixed end support method.

도7의 변곡점은 앵커(ANCHOR) 부모맨트 구간 α내측의 변곡점과 고정단 부모멘트 구간 내측의 A부분 2개소이다.The inflection points in FIG. 7 are the inflection point inside the anchor parent section [alpha] and two A portions inside the fixed end section.

도7 휨모맨트 대응 합성파일을 제작하기 위하여 도7의 변곡점 A를 경계로 상부파일과 하부파일 2개의 파일로 분할하고, 도8, 도9의 과정으로 플랜지 케이싱 콘크리트에 프리스트레스트 응력을 도입한 후 도11과 같이 각각 제작된 합성파일을 연결하여 도7 휨모맨트 대응형 합성파일을 얻는다.Fig. 7 After the bending point A of Fig. 7 is divided into two piles of the upper pile and the lower pile in order to fabricate the bending pile corresponding composite, and the prestress stress is introduced into the flange casing concrete by the process of Figs. The composite files produced as shown in Fig. 11 are connected to each other to obtain a compound file corresponding to the flexural component of Fig. 7.

상기 상부파일은 자유단 지지법의 앵커된 토류벽용 프리스트레스트 합성파일 제작방법과 동일하게 도8, 도9에 따라 제작한다. 도8, 도9의 제작과정은 각각 도5,도6의 과정에 준한다. 상기 하부파일은 도10에 따라 제작한다. 도10 제작 과정은 도2 제작과정에 준한다.The upper pile is manufactured according to FIGS. 8 and 9 in the same manner as the method of manufacturing the prestressed synthetic pile for anchored earth wall of the free end supporting method. 8 and 9 are similar to those of FIGS. 5 and 6, respectively. The lower pile is manufactured according to FIG. The manufacturing process of FIG. 10 follows the manufacturing process of FIG.

도11은 도8, 9에서 제작한 상부 프리스트레스트 합성파일과 도10에서 제작한 하부 프리스트레스트 합성파일을 결합하는 공정도이다.FIG. 11 is a process diagram of combining the upper prestressed composite file produced in FIGS. 8 and 9 and the lower prestressed composite file produced in FIG.

도11(a)에서 상부 프리스트레스트 합성파일과 하부 프리스트레스트 합성파일의 I형강을 연결하였다.In Fig. 11 (a), the I-beams of the upper prestressed composite pile and the lower prestressed composite pile are connected.

연결상태에서 합성파일의 프리스트레스트 압축력의 분포를 보면 도8에서 제작한 상부파일과 도10에서 제작한 하부파일을 결합한 저항모멘트 분포가 도11(a)(1)과 같고, 도9에서 제작한 상부파일과 도10에서 제작한 하부파일을 결합한 저항모멘트 분포가 도11(a)(2)와 같다. 저항모멘트가 서로 반대방향으로 배치되므로 도11의 합성파일은 도7의 토압에 의한 휨모멘트 분포와 유사하여 경제적이고 확실성이 확보된 프리스트레스트 합성파일을 얻을 수 있는 것이다.In the connection state, the distribution of the prestressed compressive force of the composite pile is shown in Fig. 11 (a) (1) and the distribution of the resistance moment combining the upper pile manufactured in FIG. 8 and the lower pile manufactured in FIG. Distribution of the resistance moment combining the upper pile and the lower pile manufactured in FIG. 10 is shown in FIG. 11 (a) (2). Since the resistance moments are arranged in opposite directions, the composite pile of FIG. 11 is similar to the bending moment distribution due to the earth pressure of FIG. 7, thereby obtaining a prestress composite pile having economical and reliable reliability.

상기와 같이 이 발명은 I형강과 이를 콘크리트로 피복하여 콘크리트에 프리스트레스트 응력을 도입시켜 강재와 콘크리트의 재료 역학적 잇점을 응용하는 토류벽 지지용 합성 파일을 제공하는 것으로서, 지지파일의 강재에 콘크리트를 피복함으로써 부식 발생을 최소화 하며 , 강재의 단면적을 감소시켜 경제성을 높이며, 버팀대의 사용을 최소화 또는 기피할 수 있어 작업 공간의 장애물을 줄일 수 있고,더 나아가 켄틸레버식 토류벽, 자유단 지지법에 의한 앵커된 토류벽 또는 고정단 지지법에 의한 앵커된 토류벽에 시공되는 합성파일을 제공함에 있어서, 이들 토류벽의 토압에 의한 파일의 휨모멘트 대응형으로 제작한 합성파일 및 그 제작 방법을 제공하는 것이다.As described above, the present invention is to provide a composite pile for supporting the earth wall to apply I-shaped steel and the concrete to the concrete and to apply the prestress stress to the concrete to apply the material mechanical advantages of the steel and concrete, to cover the steel of the support pile This minimizes the occurrence of corrosion, reduces the cross-sectional area of the steel, improves the economy, and minimizes or avoids the use of braces, thereby reducing obstacles in the work space.Furthermore, anchors using cantilevered earth walls and free end support The present invention provides a composite pile fabricated on a fixed earth wall or anchored earth wall by a fixed end support method, and provides a composite pile manufactured in a manner corresponding to the bending moment of a pile due to earth pressure of these earth walls, and a manufacturing method thereof.

Claims (3)

켄틸레버식 토류벽, 자유단 지지법에 의한 앵커된 토류벽, 고정단 지지법에 의한 앵커된 토류벽의 상부파일의 휨모맨트 구간 양단 또는 휨모맨트 구간을 연결한 두개를 휨모맨트 구간 양단을 지지점으로하고 최대 휨모맨트점 부근을 하중 작용점으로 하여 I형강의 일측 플랜지에 휨인장을 발생시킨 상태에서 휨인장이 발생된 플랜지에 케이싱 콘크리트를 타설 양생한 후 하중을 제거하고 파일 단위로 나머지 강형에 케이싱 콘크리트를 타설 양생하여 콘크리트 피복된 파일에 휨모맨트 분포에 대응되는 프리스트레스트 저항 모맨트를 도입한 프리스트레스트 합성파일.Both ends of the bending part section or the connecting part of the bending part section of the upper pile of the cantilever type earth wall, the anchored earth wall by the free end support method, and the anchored earth wall by the fixed end support method are used as the supporting points at both ends of the bending moment section. Load the casing concrete to the flange where the bending tension has occurred while bending tension is generated on one side flange of the I-beam with the load acting point near the bending moment point, then remove the load and cast the casing concrete to the remaining steel in the pile unit. A prestressed composite pile incorporating a prestressed resistance component corresponding to the flexural moment distribution on a concrete-coated pile. 휨모맨트 분포에 대응되는 프리스트레스트 저항 모맨트를 도입한 합성파일을 상부파일로하고 상부파일에 측압 분포에 대응되도록 저항모맨트를 도입한 합성파일을 하부파일을 연결하되, 연결상태에서 상하 합성파일의 프리스트레스트 압축력의 대응 방향을 고정단 지지법에 의한 앵커된 토류벽의 휨 모맨트에 대응시키고, 연결부에 콘크리트를 타설하여 얻는 프리스트레스트 합성파일.Combine the lower pile with the composite file with the prestressed resistance component corresponding to the flexural load distribution as the upper pile, and the lower pile with the combined pile with the resistance component to correspond to the lateral pressure distribution. A prestressed composite pile obtained by placing concrete in the connecting part by making the corresponding direction of the prestressing compressive force corresponding to the bending moment of the anchored earth wall by the fixed end support method. 켄틸레버식 토류벽, 자유단 지지법에 의한 앵커된 토류벽, 고정단 지지법에 의한 앵커된 토류벽의 상부파일의 휨모맨트 구간 양단 또는 휨모맨트 구간을 연결한 두개를 휨모맨트 구간 양단을 지지점으로하고 최대 휨모맨트점 부근을 하중 작용점으로 하여 I형강의 일측 플랜지에 휨인장을 발생시킨 상태에서 휨인장이 발생된 플랜지에 케이싱 콘크리트를 타설 양생한 후 하중을 제거하고 파일 단위로 나머지 강형에 케이싱 콘크리트를 타설 양생하여 피복된 파일에 휨모맨트 분포에 대응되는 프리스트레스트 저항 모맨트를 조성하는 과정을 특징으로하는 프리스트레스트 합성파일 제조방법.Both ends of the bending part section or the connecting part of the bending part section of the upper pile of the cantilever type earth wall, the anchored earth wall by the free end support method, and the anchored earth wall by the fixed end support method are used as the supporting points at both ends of the bending moment section. Load the casing concrete to the flange where the bending tension has occurred while bending tension is generated on one side flange of the I-beam with the load acting point near the bending moment point, then remove the load and cast the casing concrete to the remaining steel in the pile unit. A method of manufacturing a prestressed synthetic pile, characterized by forming a prestressed resistance component corresponding to the bending moment distribution on the coated pile.
KR10-2000-0044092A 2000-07-29 2000-07-29 Prestressed composition pile and the manufacturing process Expired - Lifetime KR100430243B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2000-0044092A KR100430243B1 (en) 2000-07-29 2000-07-29 Prestressed composition pile and the manufacturing process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2000-0044092A KR100430243B1 (en) 2000-07-29 2000-07-29 Prestressed composition pile and the manufacturing process

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR2020000022155U Division KR200217588Y1 (en) 2000-08-03 2000-08-03 Prestressed composition pile

Publications (2)

Publication Number Publication Date
KR20020010390A KR20020010390A (en) 2002-02-04
KR100430243B1 true KR100430243B1 (en) 2004-05-03

Family

ID=19680829

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2000-0044092A Expired - Lifetime KR100430243B1 (en) 2000-07-29 2000-07-29 Prestressed composition pile and the manufacturing process

Country Status (1)

Country Link
KR (1) KR100430243B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100779991B1 (en) 2006-05-11 2007-11-27 주식회사 쏘일텍 Freestanding Thumb Pile Method with Initial Tension

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100473375B1 (en) * 2002-07-03 2005-03-10 (주)세일엔지니어링 Retaining wall using phc pile
KR100768031B1 (en) * 2006-06-29 2007-10-19 (주)스틸엔콘크리트 Composite piles in which steel piles are connected to concrete composite piles with prestress and pile construction method
CN107761743A (en) * 2017-11-14 2018-03-06 福建省建研工程顾问有限公司 A kind of deformation and the controllable earthing recurvation formula cantilever design of internal force
KR102324327B1 (en) * 2019-04-24 2021-11-09 오세연 Method of manufacturing support beam for retaining wall and support beam for retaining wall using the same
KR102340926B1 (en) * 2019-04-24 2021-12-31 (주)후즈랩 Method of manufacturing prestress charge support beam for retaining wall and prestress charge support beam using the same

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR19980071920A (en) * 1998-07-03 1998-10-26 구민세 Construction method of preflex composite type by factory production

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR19980071920A (en) * 1998-07-03 1998-10-26 구민세 Construction method of preflex composite type by factory production

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100779991B1 (en) 2006-05-11 2007-11-27 주식회사 쏘일텍 Freestanding Thumb Pile Method with Initial Tension

Also Published As

Publication number Publication date
KR20020010390A (en) 2002-02-04

Similar Documents

Publication Publication Date Title
JP5373979B2 (en) Construction Method of Steel Composite Girder Bridge {ConstructionMethod SteelCompositeGirderBridge}
CN101080534B (en) Manufacturing method for prestressed steel composite girder
KR100837608B1 (en) J.K Bracket Method
KR100430243B1 (en) Prestressed composition pile and the manufacturing process
CN117758601B (en) Assembled pier without bearing platform for high-intensity areas and construction method
CN109577176B (en) Composite connection type concrete filled steel tube pier and construction method thereof
CN101240533A (en) Pile foundation reinforcement prestressing pile locking method
CN205088688U (en) Shaped steel and prestressed reinforced concrete combination structure support
KR20100109654A (en) Prestressed concrete girder with plural steel wires disposed at shear surface of tension port, manufacturing method thereof, and assembling bridge construction method using the same
KR101297706B1 (en) Construction method for prestressed girder using jack-up beam
KR200217588Y1 (en) Prestressed composition pile
KR100402235B1 (en) Construction method of pile pile for earth wall using preflex composite beam
CN1043183A (en) Method for relieving pressure or load of original building structure and stressing or restoring deformed original building structure
JP2007270600A (en) Prestress introducing method to filling part between precast concrete members
KR100602152B1 (en) Precast concrete panel and construction method and structure
KR20020067078A (en) The method of preflex composite beam made by using the hunch concrete represtressing the lower casing concrete
KR100341342B1 (en) Method of constructing and reparing of prestressed composite beam structure using up and down of temporary support
KR20030006681A (en) Apparatus and method for reinforcing a construction by enlarging its' size
CN110805304A (en) Construction method for reinforcing structure of concrete beam
JP4219746B2 (en) Lightweight embankment structure and construction method thereof
KR100416217B1 (en) Composite structural material
KR200234512Y1 (en) The preflex composite beam made by unite the hunch concrete represtressing the lower casing concrete
JPH05156605A (en) Construction method of arch concrete by arch form support.
KR200306923Y1 (en) Apparatus for controlling displacement of prestressed concrete composite pile
KR100465436B1 (en) Apparatus for controlling displacement of prestressed concrete composite pile and method for manufacturing composite pile using the apparatus

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

Patent event code: PA01091R01D

Comment text: Patent Application

Patent event date: 20000729

PA0201 Request for examination
N231 Notification of change of applicant
PN2301 Change of applicant

Patent event date: 20011008

Comment text: Notification of Change of Applicant

Patent event code: PN23011R01D

PG1501 Laying open of application
E801 Decision on dismissal of amendment
PE0801 Dismissal of amendment

Patent event code: PE08012E01D

Comment text: Decision on Dismissal of Amendment

Patent event date: 20030213

Patent event code: PE08011R01I

Comment text: Amendment to Specification, etc.

Patent event date: 20001104

Patent event code: PE08011R01I

Comment text: Amendment to Specification, etc.

Patent event date: 20000828

Patent event code: PE08011R01I

Comment text: Amendment to Specification, etc.

Patent event date: 20000803

E801 Decision on dismissal of amendment
PE0801 Dismissal of amendment

Patent event code: PE08012E01D

Comment text: Decision on Dismissal of Amendment

Patent event date: 20030410

Patent event code: PE08011R01I

Comment text: Amendment to Specification, etc.

Patent event date: 20001104

Patent event code: PE08011R01I

Comment text: Amendment to Specification, etc.

Patent event date: 20000828

Patent event code: PE08011R01I

Comment text: Amendment to Specification, etc.

Patent event date: 20000803

N231 Notification of change of applicant
PN2301 Change of applicant

Patent event date: 20030507

Comment text: Notification of Change of Applicant

Patent event code: PN23011R01D

E801 Decision on dismissal of amendment
PE0801 Dismissal of amendment

Patent event code: PE08012E01D

Comment text: Decision on Dismissal of Amendment

Patent event date: 20030512

Patent event code: PE08011R01I

Comment text: Amendment to Specification, etc.

Patent event date: 20001104

Patent event code: PE08011R01I

Comment text: Amendment to Specification, etc.

Patent event date: 20000828

Patent event code: PE08011R01I

Comment text: Amendment to Specification, etc.

Patent event date: 20000803

E902 Notification of reason for refusal
PE0902 Notice of grounds for rejection

Comment text: Notification of reason for refusal

Patent event date: 20030723

Patent event code: PE09021S01D

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

Patent event code: PE07011S01D

Comment text: Decision to Grant Registration

Patent event date: 20040127

GRNT Written decision to grant
PR0701 Registration of establishment

Comment text: Registration of Establishment

Patent event date: 20040422

Patent event code: PR07011E01D

PR1002 Payment of registration fee

Payment date: 20040423

End annual number: 3

Start annual number: 1

PG1601 Publication of registration
FPAY Annual fee payment

Payment date: 20070409

Year of fee payment: 6

PR1001 Payment of annual fee

Payment date: 20070409

Start annual number: 4

End annual number: 6

FPAY Annual fee payment

Payment date: 20100402

Year of fee payment: 9

PR1001 Payment of annual fee

Payment date: 20100402

Start annual number: 7

End annual number: 9

FPAY Annual fee payment

Payment date: 20130409

Year of fee payment: 10

PR1001 Payment of annual fee

Payment date: 20130409

Start annual number: 10

End annual number: 10

FPAY Annual fee payment

Payment date: 20140407

Year of fee payment: 11

PR1001 Payment of annual fee

Payment date: 20140407

Start annual number: 11

End annual number: 11

FPAY Annual fee payment

Payment date: 20150407

Year of fee payment: 12

PR1001 Payment of annual fee

Payment date: 20150407

Start annual number: 12

End annual number: 12

FPAY Annual fee payment

Payment date: 20160331

Year of fee payment: 13

PR1001 Payment of annual fee

Payment date: 20160331

Start annual number: 13

End annual number: 13

FPAY Annual fee payment

Payment date: 20170331

Year of fee payment: 14

PR1001 Payment of annual fee

Payment date: 20170331

Start annual number: 14

End annual number: 14

FPAY Annual fee payment

Payment date: 20180330

Year of fee payment: 15

PR1001 Payment of annual fee

Payment date: 20180330

Start annual number: 15

End annual number: 15

FPAY Annual fee payment

Payment date: 20190329

Year of fee payment: 16

PR1001 Payment of annual fee

Payment date: 20190329

Start annual number: 16

End annual number: 16

FPAY Annual fee payment

Payment date: 20200330

Year of fee payment: 17

PR1001 Payment of annual fee

Payment date: 20200330

Start annual number: 17

End annual number: 17

EXPY Expiration of term