KR100358994B1 - Apparatus for waterway - Google Patents
Apparatus for waterway Download PDFInfo
- Publication number
- KR100358994B1 KR100358994B1 KR1019990038448A KR19990038448A KR100358994B1 KR 100358994 B1 KR100358994 B1 KR 100358994B1 KR 1019990038448 A KR1019990038448 A KR 1019990038448A KR 19990038448 A KR19990038448 A KR 19990038448A KR 100358994 B1 KR100358994 B1 KR 100358994B1
- Authority
- KR
- South Korea
- Prior art keywords
- waterway
- front wall
- side walls
- coupled
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B13/00—Irrigation ditches, i.e. gravity flow, open channel water distribution systems
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Sewage (AREA)
Abstract
수로장치가 개시된다.개시된 본 발명은 배수관의 기능을 하는 관체: 상기 관체의 일단부가 결합되는 홀이 구비된 전면벽; 상기 전면벽의 양단부에 결합 설치되며 배수시 가이드의 기능을 하는 양측벽; 상기 양측벽의 하단부에 연장 설치된 바닥벽; 상기 관체의 일측에 끼워져 고정되는 고정링; 및 일단부는 상기 고정링과 일체로 결합되고 타단부는 상기 전면벽과 양측벽 그리고 바닥벽에 대해 연결된 복수개의 보강리브로 구비된다.Disclosed is a water pipe apparatus which functions as a drain pipe: a front wall having a hole to which one end of the water pipe is coupled; Both side walls coupled to both ends of the front wall and serves as a guide when draining; Bottom walls extending to lower ends of the both side walls; A fixed ring fitted to one side of the tube; And one end is integrally coupled with the fixing ring and the other end is provided with a plurality of reinforcing ribs connected to the front wall, both side walls and the bottom wall.
따라서, 수로공사를 용이하게 할 뿐만 아니라 수로의 제조과정과 공사기간을 단축한다.Therefore, it not only facilitates waterway construction but also shortens the manufacturing process and construction period of the waterway.
Description
본 발명은 수로(水路)장치에 관한 것으로, 더욱 상세하게는 수로공사(水路工事)를 용이하게 할 뿐만 아니라 수로의 제조과정과 공사기간을 단축시킴으로써 그에 따라 노동인력과 작업경비를 줄이며 생산성을 향상시킬 수 있는 수로장치에 관한 것이다.The present invention relates to a waterway device, and more particularly, to facilitate waterway work, and to shorten the manufacturing process and construction period of the waterway, thereby reducing labor manpower and work expenses and improving productivity. It relates to a water channel device that can be made.
일반적으로 알려진 바와 같이, 논(畓)농사를 주로 하는 농지에는 논농사에 필요한 물을 지속적으로 공급받기 위해 저수지 또는 강물 등의 농수 공급원으로부터 공급된 물을 소정의 경로를 통해 피 공급처인 농지 및 농수로에 대해 공급할 수 있도록 수로가 구획되어 있다.As is generally known, farmland mainly for paddy farming supplies water supplied from agricultural or agricultural sources, such as reservoirs or rivers, to the farmland and waterway to be supplied through a predetermined path in order to continuously supply water for paddy farming. The channel is divided so that it can be supplied.
도 1에는 일반적인 수로의 일예가 설치된 상태를 보인 사시도가 도시되어 있다.1 is a perspective view showing a state in which an example of a general water channel is installed.
즉, 기존의 수로(100)는 통상적으로 콘크리트를 원료로 구획되었었는데, 이와 같이 콘크리트에 의해 수로를 구획하기 위해서는 먼저 토지를 파내고 그곳에 금속으로 제작된 관체(200)(또는 배수관)를 매립한다.That is, the conventional waterway 100 has been generally divided into concrete as a raw material, in order to partition the waterway by the concrete in this way, first digging out the land and embeds the tubular body 200 (or drain pipe) made of metal there. .
상기와 같이 관체(200)의 매립이 완료되면 거푸집 설치를 한 후 전면벽(110)과 양측의 날개벽(120)을 양생한 후 바닥벽(130)을 양생해야 했다.When the filling of the tubular body 200 is completed as described above, after the formwork is installed, the front wall 110 and the wing walls 120 on both sides have to be cured, and then the bottom wall 130 is cured.
따라서, 수로(100)공사를 하기 위해서는 땅을 파내어 관체(200)를 매립하여 거푸집 공사를 하고, 그 거푸집에 대해 레미콘에 의해 콘크리트를 붓고 나서 다시 그 콘크리트가 양생될 때까지 기다린 후 양생이 완료되면 다시 바닥벽(130)을 설치하기 위한 또 다른 거푸집과 상기한 동작에 의한 콘크리트 공사를 다시 해야하는 번거로운 문제점이 있었다.Therefore, in order to construct the waterway 100, the land is dug up and the tube 200 is filled with formwork, and after the concrete is poured by the ready-mixed concrete for the formwork, it is waited until the concrete is cured again. Another formwork for installing the bottom wall 130 and there was a cumbersome problem of having to reconstruct the concrete construction by the above operation.
또 수로를 제작하기 위해서는 여러 가지 과정의 콘크리트 양생시간을 기다려야 하므로 수로의 제작과정이 길어 공사기간이 지연되고 작업경비가 과다하게 소요되는 문제점도 있었다.In addition, in order to manufacture a waterway, it is necessary to wait for concrete curing time of various processes, so that the process of manufacturing waterway is long, so the construction period is delayed and the work cost is excessively required.
또한 레미콘 등의 작업차량의 통행이 어려운 협소한 길이나 산골 등에서 상술했던 바와 같은 수로공사를 할 때에는 상기 문제점은 더욱 가중된 문제점으로 지적될 뿐만 아니라 오히려 레미콘 등의 차량 소지자들은 작업을 꺼려하게 까지 하는 또 다른 문제점도 있었다.In addition, when the waterway construction as described above in the narrow road or the mountain valley, which is difficult to pass the work vehicle such as ready-mixed concrete, the above problem is not only pointed out as a more serious problem, but rather the vehicle owners such as ready-mixed concrete are reluctant to work. There was another problem.
뿐만 아니라 콘크리트를 원료로 한 수로공사를 하게 되면 자연경관이 훼손되며 환경이 파괴되는 문제점도 뒤따랐다.In addition, the construction of waterways using concrete as raw materials undermined the natural scenery and the environmental damage.
따라서, 본 발명이 해결하고자 하는 기술적 과제, 즉, 본 발명의 목적은, 종래와 같은 콘크리트 양생에 의한 수로의 공사시 발생되었던 문제점을 해결하기 위하여 창출한 것으로, 수로공사를 용이하게 할 뿐만 아니라 수로의 제조과정과 공사기간을 단축시킴으로써 그에 따라 노동인력과 작업경비를 줄일 수 있는 수로장치를 제공하는데 있다.Therefore, the technical problem to be solved by the present invention, that is, the object of the present invention was created in order to solve the problems caused during the construction of the waterway by the concrete curing as in the prior art, not only to facilitate the waterway construction By shortening the manufacturing process and construction period of the project, it is to provide a waterway system that can reduce labor and work expenses.
본 발명의 다른 목적은 작업차량의 통행이 어려운 협소한 길이나 산골 등에서도 수로공사를 용이하게 할 수 있는 수로장치를 제공하는데 있다.Another object of the present invention is to provide a waterway apparatus that can facilitate the waterway construction even in narrow lengths or valleys where the work vehicle is difficult to pass.
본 발명의 또 다른 목적은 수로공사시 자연경관을 보호하며 환경이 파괴되는것을 방지하는 수로장치를 제공하는데 있다.Still another object of the present invention is to provide a waterway device that protects the natural landscape during waterway construction and prevents the environment from being destroyed.
도 1은 종래 콘크리트에 의한 수로가 설치된 상태를 보인 사시도1 is a perspective view showing a state in which a conventional waterway is installed by concrete
도 3은 본 발명에 따른 수로장치의 실시예가 관체에 연결된 상태를 보인 사시도Figure 3 is a perspective view showing a state in which the embodiment of the waterway device according to the invention connected to the tube
도 4는 본 발명에 따른 수로장치의 실시예가 설치된 상태를 보인 단면 구성도Figure 4 is a cross-sectional view showing a state in which an embodiment of the waterway apparatus according to the present invention is installed
도 6은 본 발명에 따른 수로장치의 실시예가 설치된 상태를 보인 단면 구성도Figure 6 is a cross-sectional view showing a state in which an embodiment of the waterway apparatus according to the present invention is installed
* 도면의 주요 부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings
10;관체 20;수로장치10; tube 20; waterway device
21;전면벽 22;홀21; front wall 22; hole
23;양측벽 24;바닥벽23; two side walls 24; bottom wall
25;고정링 26;보강리브25; retaining ring 26; reinforcing rib
상기한 목적을 달성하기 위하여 본 발명은 배수관의 기능을 하는 관체; 상기 관체의 일단부가 결합되는 홀이 구비된 전면벽; 상기 전면벽의 양단부에 결합 설치되며 배수시 가이드의 기능을 하는 양측벽; 상기 양측벽의 하단부에 연장 설치된 바닥벽; 상기 관체의 일측에 끼워져 고정되는 고정링; 및 일단부는 상기 고정링과 일체로 결합되고 타단부는 상기 전면벽과 양측벽 그리고 바닥벽에 대해 연결된 복수개의 보강리브로 구비된 수로장치를 제공한다.In order to achieve the above object, the present invention provides a pipe that functions as a drain pipe; A front wall having a hole to which one end of the tube is coupled; Both side walls coupled to both ends of the front wall and serves as a guide when draining; Bottom walls extending to lower ends of the both side walls; A fixed ring fitted to one side of the tube; And one end is integrally coupled with the fixing ring and the other end provides a waterway device provided with a plurality of reinforcing ribs connected to the front wall, both side walls and the bottom wall.
바람직하게는, 상기 전면벽과 양측벽 그리고 상기 바닥벽은 아연이 도금된 강판으로 제작되는 것이 바람직하다.Preferably, the front wall, both side walls and the bottom wall is preferably made of a zinc plated steel sheet.
이하에서는 상기한 목적을 달성하는 본 발명의 바람직한 실시 예를 첨부된 도면을 참조하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings, preferred embodiments of the present invention for achieving the above object will be described in detail.
도 2는 본 발명에 따른 수로장치의 실시예를 보인 사시도이고, 도 4는 본 발명에 따른 실시예의 사용상태를 보인 단면도이다.2 is a perspective view showing an embodiment of a waterway apparatus according to the present invention, Figure 4 is a cross-sectional view showing a state of use of the embodiment according to the present invention.
도시된 바와 같이, 본 발명에 따른 수로장치(20)은 배수관의 기능을 하는 관체(10)의 일단부에 대해 결합되는 홀(22)이 구비된 전면벽(21)이 구비된다.As shown, the waterway device 20 according to the present invention is provided with a front wall 21 having a hole 22 coupled to one end of the pipe body 10 serving as a drain pipe.
상기 관체(10)의 일단부는 상기 홀(22)의 내주면 또는 홀의 가장자리측에 대해 용접 등과 같은 접착수단 또는 볼트 등과 같은 체결수단에 의해 일체로 결합될 수 있다.One end of the tubular body 10 may be integrally coupled to the inner circumferential surface of the hole 22 or the edge side of the hole by an adhesive means such as welding or a fastening means such as a bolt.
또 상기 전면벽(21)의 양단부에는 후술하는 배수시 가이드의 기능을 하는 양측벽(23)이 확관된 형상으로 설치되며, 상기 양측벽(23)의 하단부는 바닥벽(24)과 일체로 결합된다.In addition, both end portions of the front wall 21 are installed in a shape in which both side walls 23 functioning as guides for drainage, which will be described later, are expanded, and the lower ends of the both side walls 23 are integrally coupled to the bottom wall 24. do.
물론, 상기 전면벽(21)과 양측벽(23) 그리고 상기 바닥벽(24)은 상술했던 바와 같이 용접 등의 접착수단과 볼트 등의 결합수단에 의해 선택적으로 결합된다.Of course, the front wall 21, the side wall 23 and the bottom wall 24 are selectively coupled by bonding means such as bolts and the like bonding means such as welding as described above.
바람직하게는, 상기 전면벽(21)과 양측벽(23) 그리고 상기 바닥벽(24)은 아연 등과 같이 내수성에 강하며 쉽게 부식되지 않는 비철금속 중 선택된 어느 하나가 도금되어 사용되는 것이 바람직하지만 아연으로 도금되는 것이 바람직하다.Preferably, the front wall 21, both side walls 23 and the bottom wall 24 is preferably zinc plated any one selected from non-ferrous metals, such as zinc, which is strong in water resistance and not easily corroded. It is preferable to be plated.
물론, 단일체의 아연강판으로 사용될 수도 있지만, 이때에는 제조단가와 하중에 따른 강도를 고려해야 한다.Of course, it can also be used as a single-piece zinc steel sheet, but the production cost and the strength according to the load should be considered.
또한, 상기 전면벽(21)과 양측벽(23)의 상단부는 그대로 사용해도 무관하지만, 그들 상단면에 대해 보강재의 기능을 하는 여러 가지의 강재가 선택적으로 용접 및 볼트에 의해 부착된 상태에서 사용될 수 있다.In addition, although the upper ends of the front wall 21 and the two side walls 23 may be used as they are, various steels serving as reinforcement materials with respect to their upper surfaces may be used in a state where they are selectively attached by welding and bolts. Can be.
그러나, 전면벽(21)과 양측벽(23)의 상단면 폭 등을 고려하여 "ㄱ"자 형강이 부착되는 것이 바람직하다.However, it is preferable that the "a" shaped steel is attached in consideration of the width of the top surface of the front wall 21 and the both side walls 23 and the like.
또한, 전면벽(21)에 형성된 홀(22)과 상응하는 위치의 후방에 상기 관체(10)에 끼워지는 별도의 고정링(25)이 설치되고, 그 고정링(25)은 전면벽(21)과 양측벽(23)에 대해 복수개의 보강리브(26)에 의해 연결 설치되는 것이다.In addition, a separate fixing ring 25 fitted to the tubular body 10 is installed at the rear of the position corresponding to the hole 22 formed in the front wall 21, the fixing ring 25 is the front wall 21 ) And both side walls 23 are connected by a plurality of reinforcing ribs 26.
물론 구성요소인 고정링(25)과 보강리브(26) 역시 용접 등의 접착수단 및 볼트 등의 결합수단에 의해 선택된 위치에 결합된다.Of course, the fixing ring 25 and the reinforcing rib 26, which is a component, are also coupled to a position selected by an adhesive means such as welding and a coupling means such as a bolt.
상기와 같이 구성된 본 발명의 동작에 대해 설명한다.The operation of the present invention configured as described above will be described.
즉, 본 발명에 실시예에 의한 수로장치를 설치한 상태의 참고도면은 도 6과 같은 상태일 것이다.That is, the reference drawing of the water channel installation state according to the embodiment of the present invention will be in the same state as in FIG.
또 상기와 같은 상태에서 물 공급원으로부터 공급된 물은 관체(10)를 통하여 유수된 후 바닥벽(24)의 상측으로 흘러 농지 또는 농수로를 향해 유수되며 종래의 콘크리트로 제작된 수로와 동일한 기능을 할 것이다.In addition, the water supplied from the water source in the above state flows through the tubular body 10, flows to the upper side of the bottom wall 24 and flows toward the farmland or agricultural water channel, and functions as a conventional concrete channel. will be.
다만 본 발명에서의 특징부는 수로공사를 하기 위해 땅을 파고 또 그곳에 관체(10)를 매설한 상태에서 본 발명에 따른 수로장치의 실시예를 설치한다.However, the feature in the present invention is to install an embodiment of the waterway device according to the present invention in a state of digging the ground for the waterway construction and embedding the tubular body 10 there.
즉, 본 고안의 실시예에 의한 수로장치를 설치할 때에는 관체(10)의 일단부를 홀(22) 내, 외주면에 대해 용접 등의 접착수단 및 볼트 등의 결합수단에 의해 결합시킨 후 전면벽(21)에 대해 양측벽(23)과 바닥벽(24)을 마찬가지로 용접 및 볼트에 의해 결합시킨 상태에서 흙과 골재 등으로 매립하여 그 상측에 대해 통로를 형성한다.That is, when installing the waterway apparatus according to the embodiment of the present invention, one end of the tube 10 is coupled to the outer circumferential surface of the tubular body 10 by an adhesive means such as welding and a coupling means such as a bolt and the front wall 21. In the state where both the side wall 23 and the bottom wall 24 are similarly joined together by welding and bolts, they are embedded with soil, aggregate, etc. to form a passage on the upper side thereof.
또한, 관체(10)의 일측에 대해 고정링(25)을 끼워 결합한 후 그 고정링(25)을 관체(10)에 대해 일체로 용접하거나 볼트에 의해 결합한다.In addition, the fixing ring 25 is fitted to one side of the tubular body 10 and then the fixing ring 25 is integrally welded to the tubular body 10 or coupled by bolts.
상기와 같이 관체(10)에 대해 고정링(25)의 결합이 완료되면 전면벽(21)과 양측벽(23),그리고 바닥벽(24)을 결합한 후 전면벽(21)과 양측벽(23)의 후방 적당한 곳과 고정링(25)을 보강리브(26)에 의해 일체로 연결 설치한다.When the coupling of the fixing ring 25 to the tubular body 10 is completed as described above, the front wall 21 and the both side walls 23, and the bottom wall 24 are combined with the front wall 21 and the side walls 23. The rear appropriate place and the fixing ring 25 are integrally connected by the reinforcing rib 26.
물론, 상기와 같이 설치가 완료되면 상술했던 것과 마찬가지로 흙과 골재에 의해 매립한 후 그 상측에 대해 통로를 형성한다.Of course, when the installation is completed as described above, after filling up with soil and aggregate as in the above form a passage for the upper side.
따라서, 수로공사를 용이하게 할 뿐만 아니라 수로의 제조과정과 공사기간을 단축시킴은 물론 그에 따라 노동인력과 작업경비를 줄일 수 있다.Therefore, not only can the waterway work be facilitated, but also the manufacturing process and construction period of the waterway can be shortened, and accordingly, labor manpower and work expenses can be reduced.
상기와 같은 구성의 본 발명은, 종래와 같이 수로공사시 관체의 매립이 완료되면 콘크리트를 타설하기 위한 거푸집 설치를 한 후 전면벽과 양측의 날개벽을 양생한 후 다시 바닥벽을 양생해야 했고, 그에 따라 공사가 번거로웠던 문제점은 적극적으로 해결된다.The present invention of the configuration as described above, after the completion of the filling of the pipe during the construction of the waterway as before, after installing the formwork for placing concrete, and curing the front wall and the wing wall of both sides, and then curing the bottom wall, Therefore, the troublesome construction work is actively resolved.
또 수로의 제작과정이 길어 공사기간이 지연되고 그에 따라 작업경비가 과다하게 소요되었던 종래의 문제점도 해결된다.In addition, the production process of the waterway is long, the construction period is delayed, and accordingly, the conventional problem of excessive work expenses is solved.
또한, 레미콘 등의 작업차량의 통행이 어려운 협소한 길이나 산골 등에서 수로공사를 원활하게 할 수 없었던 종래의 문제점도 해결된다.In addition, the conventional problem that the waterway construction could not be performed smoothly in narrow lengths or valleys where it is difficult to pass work vehicles such as ready-mixed concrete is also solved.
뿐만 아니라 콘크리트 공사에 의해 수로를 구획할 때 자연경관이 훼손되며 환경이 파괴되었던 종래의 문제점도 적극적으로 해결된다.In addition, when the waterway is partitioned by concrete construction, the natural landscape is damaged and the conventional problem that the environment is destroyed is actively solved.
이상에서 상세히 설명한 바와 같이 본 발명에 의하면, 수로공사를 용이하게 할 뿐만 아니라 수로의 제조과정과 공사기간을 단축시킴으로써 그에 따라 노동인력과 작업경비를 줄이며 생산성을 향상시킬 수 있는 특징이 있다.As described in detail above, according to the present invention, not only the waterway construction can be facilitated, but also the manufacturing process and the construction period of the waterway can be shortened, thereby reducing labor manpower and work expenses and improving productivity.
또 본 발명은 작업차량의 통행이 어려운 협소한 길이나 산골 등에서도 수로공사를 용이하게 할 수 있는 특징이 있다.In addition, the present invention is characterized in that the waterway construction can be easily carried out even in narrow lengths, valleys, etc., which is difficult to pass the work vehicle.
또한 본 발명은 수로공사시 자연경관을 보호하며 환경이 파괴되는 것을 방지하는 특징도 있다.In addition, the present invention also protects the natural landscape during waterway construction and has the feature of preventing the environment from being destroyed.
지금까지는 본 발명에 따른 실시예의 수로장치가 수로를 형성하는 공사시 그 전면벽과 양측벽 그리고 바닥면 및 고정링과 보강리브를 용접에 의한 부착수단 및 볼트에 의한 결합수단에 의해 동시에 작업하는 것에 대하여 한정하여 설명하였지만, 이에 한정하지 않고, 실시예에 따른 수로장치를 다량으로 제작한 상태에서 수로공사의 규모에 대응하여 선택적으로 운반 결합함으로써, 사용할 수도 있다.Up to now, the waterway apparatus of the embodiment according to the present invention simultaneously works on the front wall, both side walls, the bottom surface, the fixing ring and the reinforcing rib by welding means and the coupling means by bolts when constructing the waterway. Although limited to this, it is not limited to this, It can also use by selectively conveying and coupling according to the magnitude | size of a waterway construction in the state which produced the water channel apparatus in a large quantity.
물론 이를 위해서는 수로의 규모, 즉, 배수하고자 하는 배수량에 따라 각각 달라지는 관체의 직경을 고려하여 크기가 다른 여러 개의 수로장치를 제작한 후 선택적으로 사용해야 할 것이다.Of course, for this purpose, it is necessary to selectively use a plurality of waterway devices having different sizes in consideration of the size of the waterway, that is, the diameter of the tubular body, which varies depending on the amount of water to be drained.
또 지금까지는 본 발명에 따른 수로장치에 대한 바람직한 실시예에 대하여 한정하여 도시하고 또 설명하였지만 이에 한정하지 않고 다양한 형상으로 변경 사용이 가능함은 물론이며, 그와 같은 변경은 당 분야에서 통상의 지식을 가진자에 의해 가능하지만, 그와 같은 변경은 본 발명의 권리범위에 속함이 명백하다.In addition, it has been shown and described with respect to the preferred embodiment of the waterway device according to the present invention up to now, but not limited to this can be used in a variety of shapes, of course, such changes are common knowledge in the art It is apparent that such modifications are possible by those who have such a scope, within the scope of the present invention.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1019990038448A KR100358994B1 (en) | 1999-09-09 | 1999-09-09 | Apparatus for waterway |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1019990038448A KR100358994B1 (en) | 1999-09-09 | 1999-09-09 | Apparatus for waterway |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| KR20010026937A KR20010026937A (en) | 2001-04-06 |
| KR100358994B1 true KR100358994B1 (en) | 2002-10-30 |
Family
ID=19610816
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR1019990038448A Expired - Lifetime KR100358994B1 (en) | 1999-09-09 | 1999-09-09 | Apparatus for waterway |
Country Status (1)
| Country | Link |
|---|---|
| KR (1) | KR100358994B1 (en) |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS57128629U (en) * | 1981-01-30 | 1982-08-11 |
-
1999
- 1999-09-09 KR KR1019990038448A patent/KR100358994B1/en not_active Expired - Lifetime
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS57128629U (en) * | 1981-01-30 | 1982-08-11 |
Also Published As
| Publication number | Publication date |
|---|---|
| KR20010026937A (en) | 2001-04-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6004600B1 (en) | Drainage channel by thin plate member for drainage channel formation and construction method of the drainage channel | |
| KR101599403B1 (en) | Method for constructing clean sewer pipe | |
| KR100358994B1 (en) | Apparatus for waterway | |
| KR101469603B1 (en) | Pipe for piperoof with multipurpose solidarizing tube and construction method using this pipe | |
| KR101485041B1 (en) | the precast concrete fixing block for hume pipe and the hume pipe construction method using the same | |
| KR100472106B1 (en) | A concrete absolutely-type merger septic tank structure and an assembly set and the construction way to establish the above-mentioned merger septic tank structure | |
| JP3683069B2 (en) | Earth retaining method for shafts | |
| JP3697525B2 (en) | Pipeline repair and rehabilitation method | |
| JPH101961A (en) | Mounting plate with cylindrical hole for repair or extension construction work of side-face hole in existing manhole | |
| KR101653722B1 (en) | A structure for drainage and this method using the same | |
| KR200462219Y1 (en) | Constructing device for hume pipe underground | |
| KR200384437Y1 (en) | A drainer for raising the groung level area | |
| KR100751969B1 (en) | Field production pipeline installation method | |
| KR102326135B1 (en) | Direction conversion socket of bench flume channel | |
| KR101657279B1 (en) | Permanent embedded anchor type slope ditch water way and slope ditch water way construction method using thereof | |
| JP2964141B1 (en) | How to repair sewer inverts | |
| KR100465921B1 (en) | Reinforcement device for sewage pipe safety in civil engineering and road construction | |
| KR200294160Y1 (en) | The device of the iron manhole for the electric wire or communicalion line | |
| KR200391844Y1 (en) | Structure for culvert | |
| KR20000002077A (en) | Mold for connecting drain tube and connecting method thereof | |
| KR200192432Y1 (en) | Prefabricated Yugong Structure of Farm | |
| KR0135801Y1 (en) | Drain pipe | |
| JP4344637B2 (en) | Concrete pipe | |
| KR200304181Y1 (en) | Spiral pipe for drainage pipe | |
| KR100465104B1 (en) | Reinforcement device for buried soil in water and sewage pipe in civil engineering and road construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A201 | Request for examination | ||
| PA0109 | Patent application |
Patent event code: PA01091R01D Comment text: Patent Application Patent event date: 19990909 |
|
| PA0201 | Request for examination | ||
| PG1501 | Laying open of application | ||
| E902 | Notification of reason for refusal | ||
| PE0902 | Notice of grounds for rejection |
Comment text: Notification of reason for refusal Patent event date: 20020329 Patent event code: PE09021S01D |
|
| E701 | Decision to grant or registration of patent right | ||
| PE0701 | Decision of registration |
Patent event code: PE07011S01D Comment text: Decision to Grant Registration Patent event date: 20020718 |
|
| GRNT | Written decision to grant | ||
| PR0701 | Registration of establishment |
Comment text: Registration of Establishment Patent event date: 20021017 Patent event code: PR07011E01D |
|
| PR1002 | Payment of registration fee |
Payment date: 20021018 End annual number: 3 Start annual number: 1 |
|
| PG1601 | Publication of registration | ||
| PR1001 | Payment of annual fee |
Payment date: 20051018 Start annual number: 4 End annual number: 4 |
|
| PR1001 | Payment of annual fee |
Payment date: 20061017 Start annual number: 5 End annual number: 5 |
|
| PR1001 | Payment of annual fee |
Payment date: 20071018 Start annual number: 6 End annual number: 6 |
|
| PR1001 | Payment of annual fee |
Payment date: 20081017 Start annual number: 7 End annual number: 7 |
|
| PR1001 | Payment of annual fee |
Payment date: 20091019 Start annual number: 8 End annual number: 8 |
|
| PR1001 | Payment of annual fee |
Payment date: 20101015 Start annual number: 9 End annual number: 9 |
|
| PR1001 | Payment of annual fee |
Payment date: 20111017 Start annual number: 10 End annual number: 10 |
|
| FPAY | Annual fee payment |
Payment date: 20121016 Year of fee payment: 11 |
|
| PR1001 | Payment of annual fee |
Payment date: 20121016 Start annual number: 11 End annual number: 11 |
|
| FPAY | Annual fee payment |
Payment date: 20131016 Year of fee payment: 12 |
|
| PR1001 | Payment of annual fee |
Payment date: 20131016 Start annual number: 12 End annual number: 12 |
|
| FPAY | Annual fee payment |
Payment date: 20141017 Year of fee payment: 13 |
|
| PR1001 | Payment of annual fee |
Payment date: 20141017 Start annual number: 13 End annual number: 13 |
|
| FPAY | Annual fee payment |
Payment date: 20151019 Year of fee payment: 14 |
|
| PR1001 | Payment of annual fee |
Payment date: 20151019 Start annual number: 14 End annual number: 14 |
|
| FPAY | Annual fee payment |
Payment date: 20161017 Year of fee payment: 15 |
|
| PR1001 | Payment of annual fee |
Payment date: 20161017 Start annual number: 15 End annual number: 15 |
|
| FPAY | Annual fee payment |
Payment date: 20171016 Year of fee payment: 16 |
|
| PR1001 | Payment of annual fee |
Payment date: 20171016 Start annual number: 16 End annual number: 16 |
|
| FPAY | Annual fee payment |
Payment date: 20181017 Year of fee payment: 17 |
|
| PR1001 | Payment of annual fee |
Payment date: 20181017 Start annual number: 17 End annual number: 17 |
|
| EXPY | Expiration of term | ||
| PC1801 | Expiration of term |
Termination date: 20200309 Termination category: Expiration of duration |