KR100198231B1 - Time division fixing method for complex apparatus of multi-functional electric power applied - Google Patents
Time division fixing method for complex apparatus of multi-functional electric power applied Download PDFInfo
- Publication number
- KR100198231B1 KR100198231B1 KR1019940036566A KR19940036566A KR100198231B1 KR 100198231 B1 KR100198231 B1 KR 100198231B1 KR 1019940036566 A KR1019940036566 A KR 1019940036566A KR 19940036566 A KR19940036566 A KR 19940036566A KR 100198231 B1 KR100198231 B1 KR 100198231B1
- Authority
- KR
- South Korea
- Prior art keywords
- time zone
- communication
- function
- date
- power failure
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R21/00—Arrangements for measuring electric power or power factor
- G01R21/133—Arrangements for measuring electric power or power factor by using digital technique
- G01R21/1333—Arrangements for measuring electric power or power factor by using digital technique adapted for special tariff measuring
- G01R21/1335—Tariff switching circuits
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R13/00—Arrangements for displaying electric variables or waveforms
- G01R13/02—Arrangements for displaying electric variables or waveforms for displaying measured electric variables in digital form
- G01R13/029—Software therefor
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R13/00—Arrangements for displaying electric variables or waveforms
- G01R13/40—Arrangements for displaying electric variables or waveforms using modulation of a light beam otherwise than by mechanical displacement, e.g. by Kerr effect
- G01R13/401—Arrangements for displaying electric variables or waveforms using modulation of a light beam otherwise than by mechanical displacement, e.g. by Kerr effect for continuous analogue, or simulated analogue, display
- G01R13/403—Arrangements for displaying electric variables or waveforms using modulation of a light beam otherwise than by mechanical displacement, e.g. by Kerr effect for continuous analogue, or simulated analogue, display using passive display devices, e.g. liquid crystal display or Kerr effect display devices
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R22/00—Arrangements for measuring time integral of electric power or current, e.g. electricity meters
- G01R22/06—Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
- G01R22/061—Details of electronic electricity meters
- G01R22/063—Details of electronic electricity meters related to remote communication
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Selective Calling Equipment (AREA)
- Arrangements For Transmission Of Measured Signals (AREA)
Abstract
본 발명은 다기능 전력 수급용 복합계기의 시간대 분할설정 방법에 관한 것으로, 정전이 아닌 상태에서 사용자가 통신을 요구하면, 통신의 전송조건이 일치한 경우에만 통신이 이루어지도록 하고, 날짜가 평일, 토요일, 일요일 또는 휴일인가를 각각 판단하여 날짜를 세팅하고, 시간대를 세팅하여 통신이 완료되면 설정된 화면을 표시하는 과정에 의하여 수행되도록 함으로써 계기의 검침이 날짜의 종류와 시간대에 따라 정밀하게 수행 될 수 있도록 한 것이다.The present invention relates to a time zone division setting method of a multi-function power supply and demand multi-function multi-function instrument, when the user requests communication in the state of non-outage, the communication is made only if the transmission conditions of the communication is matched, the date is weekday, Saturday Set the date by judging whether it is a Sunday or a holiday, and set the time zone so that the communication is completed by displaying the set screen so that the meter reading can be performed precisely according to the date type and time zone. It is.
Description
제1도는 본 발명의 개략적인 구성을 나타낸 블럭도.1 is a block diagram showing a schematic configuration of the present invention.
제2도는 본 발명의 동작과정을 나타낸 플로우차트.2 is a flowchart showing the operation of the present invention.
* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings
2 : 중앙제어부 4 : 부제어부2: central control unit 4: sub-control unit
6 : 표시장치 구동부 7 : 제1표시부6: display device driver 7: first display unit
8 : 제2표시부 10 : 전송신호 입출력회로8: second display unit 10: transmission signal input and output circuit
11 : 신호변환회로11: signal conversion circuit
본 발명은 다기능 전력수급용 복합계기의 시간대 분할설정 방법에 관한 것으로, 특히 전력량, 역률등을 평일, 토요일, 일요일(휴일)의 종류에 따라 계량의 시간대를 선택설정하도록 한 다기능 전력수급용 복합계기의 시간대 분할설정 방법에 관한 것이다.The present invention relates to a time zone division setting method of a multi-function power supply multi-function multi-function power supply, multi-function power supply multi-function multimeter for selecting the time zone of metering according to the type of power, power factor, etc. according to weekdays, Saturday, Sunday (holiday) It relates to a time zone division setting method.
일반적으로 적산전력량계라 하면 일정한 시간내에 소비되는 전력의 합계를 누산 표시하면서 요금을 산정하기 위하여 유효전력량등을 검침하도록 한 것임은 이미 잘 알려진 사실이다.In general, it is well known that an integrated electricity meter is used to read an effective amount of electricity in order to calculate a charge while accumulating and displaying the sum of power consumed within a certain time.
그리고 유효전력량을 측정하기 위하여 보통의 전력량계를 이용하면서 전일전력량과 최대수요전력의 정밀한 측정을 위해 정밀전력계를 사용하고, 다시 역률측정에 의한 무효전력량을 측정하기 위하여 타임스위치와 무효전력량계를 추가로 설치하여야 하였다.In addition, a normal power meter is used to measure the effective power amount, and a precision power meter is used to accurately measure the daily power and the maximum demand power, and a time switch and a reactive power meter are additionally installed to measure the reactive power amount by power factor measurement. It should be.
특히 업무용이나 산업용 수용가에서 평일이나 토요일 또는 일요일(휴일)에 따라 전력의 사용상태가 바뀌므로 계량을 할때 이에 따른 적절한 시간대의 설정이 필요하다.In particular, the use of power is changed according to weekdays, Saturdays or Sundays (holidays) in business or industrial customers, so it is necessary to set an appropriate time zone according to the weighing.
그러나 종래에는 전력량계에서 단순히 일일의 전력량만을 검칠할 수 있을 뿐이므로 칼렌다에 의거한 날짜별로 임의니 시간대를 구분 설정하여 정밀한 검침을 행할 수 없는 단점이 있었다.However, in the related art, since only a daily power amount can be read in the electricity meter, a random time zone can be set for each date based on the calendar, so that accurate meter reading cannot be performed.
이에따라 본 발명은 외부에서 복합계기의 측정시간대를 임의로 설정할 수 있도록 한 다기능 전력수급용 복합계기의 시간대 분할설정 방법을 제공함을 그 목적으로 한다.Accordingly, an object of the present invention is to provide a time zone division setting method of a multi-function power supply and demand multi-function multi-function instrument that allows to set the measurement time zone of the multi-instrument from outside.
이와같은 목적을 달성하기 위한 본 발명은 정전이 아닌 상태에서 사용자가 통신을 요구하면, 통신의 전송조건이 일치한 경우에만 통신이 이루어지도록 하고, 날짜가 평일, 토요일, 일요일 또는 휴일인가를 각각 판단하여 날짜를 세팅하고, 시간대를 세팅하여 통신이 완료되면 설정된 화면을 표시하는 과정에 의하여 수행되도록 함으로써 계기의 검침이 날짜의 종류와 시간대에 따라 정밀하게 수행될 수 있도록 한 것이다.According to the present invention for achieving the above object, when the user requests communication without a power failure, the communication is performed only when the transmission conditions of the communication are matched, and each determines whether the date is a weekday, Saturday, Sunday or a holiday. By setting the date and setting the time zone, the communication is completed by displaying the set screen when the communication is completed, so that the meter reading can be precisely performed according to the date type and time zone.
이하 본 발명을 첨부도면에 의거 상세히 기술하면 다음과 같다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.
도면에 도시하지 않은 유효전력연산회로, 지상무효전력연산회로, 진상 무효전력연산회로, 주파수 검출회로 및 정전검출회로에서 부터 각각 입력되는 유효전력펄스주파수(WPI), 지상무효전력펄스주파수(WP2), 진상무효전력펄스주파수(WP3), 전원주파수동기신호(Acp) 및 정전검출신호(Acon)는 입력보상부(1)를 경유하는 중에 신호전달과정에서 발생하는 손실을 보상하도록 하고, 상기의 입력보상부(1)를 경유한 주파수(WP1)(WP2)(WP3)와 신호(Acp)(Acon)를 입력받는 중앙제어부(2)에서는 클럭발생기(3)로부터 공급되는 시스템 클럭에 동기되어 동작을 제어하면서 정밀전력량계용 계량펄스신호의 계수와 기억, 만년칼렌다 시계기능, 로드서베이(Load survey)기능, 데이타 통신기능, 자기검사기능, 최대수요전력복귀기능, 월간 역률계산기능, 경고기능, 계량치와 기록치 및 설정치의 송수신기능, 통신에 의한 각종 설정치 변경기능 등을 수행하도록 하고, 상기의 중앙제어부(2)와 정보를 주고받는 부제어부(4)에서는 클럭발생기(5)로부터 동작의 동기 및 시간계산에 필요한 클럭을 입력받으면서 시계신호의 제어기능, 조작부 스위치제어기능, 표시장치구동의 제어기능, 인터럽트신호의 제어기능, 사용전원 주파수 제어기능, 리세트 제어기능, 전력량 펄스파형의 제어기능, 시한펄스파형의 제어기능, 업/출력 어드레스와 데이타 제어의 기능 등을 수행하도록 하고, 상기 부제어부(4)로부터 출력되는 제어신호에 따라 표시장치구동부(6)에서는 유효전력량, 지상무효전력량, 진상무효전력량 및 무계량의 계량동작표시를 제1표시부(7)에 LCD로 표시하면서 표시항목번호, 부속표시 및 데이타 내용을 제2표시부(8)에 LCD로 표시하고, 상기 중앙제어부(2)로부터 출력되는 제어신호에 따라 펄스출력부(9)에서는 유효의 계량펄스주파수(P1), 지상무효의 계량펄스주파수(P2) 및 진상무효의 계량펄스주파수(P3)를 외부로 출력하도록 하고, 상기 중앙제어부(2)에 연결된 전송신호입출력회로(10)에서는 외부의 퍼스널컴퓨터 등에 의해 동작조건의 확인 및 설정에 따라 각종 기록을 송수신하면서 원격검침이 가능하도록하고, 상기 부제어부(4)에 연결된 신호변환회로(11)에서는 외부의 외장형 모뎀(Modem)과 연결하여 동작조건의 확인 및 설정에 따라 각종기록을 송수신하면서 원격검침이 가능하도록 하고, 상기 부제어부(4)에 연결된 스위치조작부(12)에서는 표시의 이동이나 전환시 사용하는 디스플레이 스위치(SW1)와 계기의 자기검사시 사용하는 테스트 스위치(SW2) 및 최대수요전력 복귀시 사용하는 디멘드(Demend) 리세트 스위치(SW3)들을 구비하여 사용자의 선택사양을 입력할 수 있도록 한 것이다.Active power pulse frequency (WPI) and ground reactive power pulse frequency (WP2) input from the active power operation circuit, the ground reactive power operation circuit, the advanced reactive power operation circuit, the frequency detection circuit, and the power failure detection circuit, which are not shown in the figure. , Phase reactive power pulse frequency (WP3), power frequency synchronization signal (Acp) and power failure detection signal (Acon) to compensate for the loss in the signal transmission process via the input compensator (1), the input The central control unit 2, which receives the frequencies WP1, WP2, WP3 and the signal Acon, via the compensator 1, operates in synchronization with the system clock supplied from the clock generator 3. Counting and memorizing pulse signal for precision power meter while controlling, perpetual calendar clock function, load survey function, data communication function, self-check function, maximum demand power return function, monthly power factor calculation function, warning function, weighing value Records and descriptions The sub-control unit 4 which performs the transmission / reception function of the stationary function, the change of various set values by communication, and the like, and exchanges information with the central control unit 2 is necessary for synchronization and time calculation of the operation from the clock generator 5. Clock signal control function, control panel switch control function, display device drive control function, interrupt signal control function, power supply frequency control function, reset control function, power amount pulse waveform control function, time pulse waveform The control function, the up / output address and the data control function, and the like, and according to the control signal output from the sub-control part 4, the display device driver 6 has an effective amount of power, a ground reactive power, a phase reactive power amount, and no power. While displaying the weighing operation indication of the weighing by the LCD on the first display unit 7, the display item number, the accessory display and the data content are displayed on the second display unit 8 by the LCD. According to the control signal output from the angular control section 2, the pulse output section 9 sends the effective metering pulse frequency P1, the ground invalid metering pulse frequency P2 and the phase invalid metering pulse frequency P3 to the outside. In the transmission signal input / output circuit 10 connected to the central control unit 2, a remote meter reading is possible while transmitting and receiving various recordings according to the confirmation and setting of an operating condition by an external personal computer or the like. The signal conversion circuit 11 connected to 4) is connected to an external external modem to enable remote meter reading while transmitting and receiving various recordings according to the checking and setting of an operating condition, and a switch connected to the sub-control unit 4. In the operation unit 12, the display switch SW1 used for moving or switching the display, the test switch SW2 used for self-inspection of the instrument, and the demand used for returning the maximum demand power De mend) It is provided with reset switches (SW3) to input the user's options.
이와같이 구성한 본 발명의 전력수급용 복합계기의 시간대 분할설정방법은 사용자가 시간대분할의 설정을 위한 통신을 전송신호 입출력회로를 통해 요구하면(단계 20), 통신을 초기화하고(단계21), 정전의 상태인가를 확인한다(단계 22).The time zone division setting method of the power supply / demand composite device of the present invention configured as described above initiates communication (step 21) when the user requests communication for setting time zone division through the transmission signal input / output circuit (step 21). Check if it is in status (step 22).
정전이면 정전경고의 처리를 하면서(단계 23), 정전상태임을 'AC-OFF'로 제2표시부(8)에 표시하는 한편(단계 24), 정전이 아니면 전송속도가 일치하고, 전송타이밍이 일치하고, 명령(Command)과 메시지(Message)에 에러가 없는 전송조건에 일치한 가를 확인한다(단계 25).In the case of power failure, the power failure warning is processed (step 23), and the power failure state is displayed on the second display unit 8 as 'AC-OFF' (step 24). Then, it is checked whether the command and the message match the transmission condition without error (step 25).
전송조건이 맞으면 선택된 날짜를 읽어들이고(단계 26), 그 날짜가 평일인가(단계27), 토요일인가(단계 28), 일요일 인가(단계29), 또는 휴일인가를 각각 확인하도록 한다(단계 30).If the transfer condition is correct, the selected date is read (step 26), and the date is confirmed as a weekday (step 27), a Saturday (step 28), a Sunday license (step 29), or a holiday (step 30). .
날짜를 세팅한 상태에서(단계 31), 사용자의 시간대 설정이 있는가를 확인하여(단계 32) 있는 경우에는 1일을 최대 8개의 시간대로 분할하고 1개의 시간대를 다시 4단계로 나누면서 1일을 최대 24분한까지 행할 수 있는 시간대 분할을 수행한다(단계 33).With the date set (step 31), check to see if there is a user's time zone setting (step 32) and if so, divide the day into up to eight time zones and divide one time zone back into four steps, up to 24 days Time zone division that can be performed up to minutes is performed (step 33).
시간대 분할설정이 끝나면서 통신이 완료되었으면(단계 34), 설정된 내용을 제2표시부(8)에 표시한 다음 종료한다(단계 35).If communication has been completed at the end of the time zone division setting (step 34), the set content is displayed on the second display unit 8 and then ends (step 35).
따라서 본 발명의 다기능 전력수급용 복합계기의 시간대 분할설정 방법에 의하여서는 계기의 계측을 날짜와 시간대에 따라 적절히 분할하여 부하의 사용 상태에 따른 정밀한 계량이 가능하도록 한 것이다.Therefore, according to the time zone division setting method of the multi-function power supply-demand composite device of the present invention, the measurement of the instrument is appropriately divided according to the date and the time zone to enable precise metering according to the use state of the load.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019940036566A KR100198231B1 (en) | 1994-12-24 | 1994-12-24 | Time division fixing method for complex apparatus of multi-functional electric power applied |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019940036566A KR100198231B1 (en) | 1994-12-24 | 1994-12-24 | Time division fixing method for complex apparatus of multi-functional electric power applied |
Publications (2)
Publication Number | Publication Date |
---|---|
KR960024386A KR960024386A (en) | 1996-07-20 |
KR100198231B1 true KR100198231B1 (en) | 1999-06-15 |
Family
ID=19403335
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1019940036566A KR100198231B1 (en) | 1994-12-24 | 1994-12-24 | Time division fixing method for complex apparatus of multi-functional electric power applied |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100198231B1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100977550B1 (en) * | 2007-12-28 | 2010-08-24 | 한국전기연구원 | Method and device for producing lunar holiday data in electric Watt-meter |
-
1994
- 1994-12-24 KR KR1019940036566A patent/KR100198231B1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
KR960024386A (en) | 1996-07-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2126974C1 (en) | Method of electronic measurement of electric energy and device for its realization (variants) | |
US4218737A (en) | Revenue metering system for power companies | |
US6762598B1 (en) | Method for providing optical test signals for electronic meter testing | |
EP0015120B1 (en) | Meters for measuring electrical energy consumption | |
US20080097708A1 (en) | System and method utilizing virtual switching for electrical panel metering | |
WO1998054583A1 (en) | Commodity consumption meter | |
CA1275304C (en) | Time-of-use-meter with a calendar of cyclic events | |
US4514685A (en) | Integrating circuit for use with Hall effect sensors having offset compensation means | |
US4654588A (en) | Time-of-use watt-hour meter with demand profile capability | |
KR100198229B1 (en) | Electric power applied complex apparatus enable to remotely control and watch | |
KR100198231B1 (en) | Time division fixing method for complex apparatus of multi-functional electric power applied | |
GB2096370A (en) | Electrical energy consumption meter | |
KR100198230B1 (en) | Data setting and display method for complex apparatus of multi-functional electric power applied | |
JPS626176A (en) | Solid-state electronic type pulse-scaler using ratio of two integer | |
KR0157644B1 (en) | Data control method of watt hour meter | |
Kingston et al. | Multi function polyphase metering-an integrated approach | |
EP0511573A2 (en) | Clock with clock adjusting data memory | |
US5115190A (en) | Freezing items for display in electronic watthour register | |
KR100198232B1 (en) | Lcd self check method of complex meters with multi-function power receiver | |
JP3100835B2 (en) | Hourly trading instruments | |
KR0174036B1 (en) | Self-Check and Warning Method for Multifunction Power Supply | |
JP3642185B2 (en) | Separate electronic energy meter | |
JP3383437B2 (en) | Time measurement method and clock | |
KR0157645B1 (en) | Metering method of watt hour meter | |
RU2082176C1 (en) | Device for changing-over electricity meter tariffs |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20110221 Year of fee payment: 13 |
|
LAPS | Lapse due to unpaid annual fee |