KR0174725B1 - Process for building a concrete structure in loose matter, from ground level and equipment for carrying out said process - Google Patents

Process for building a concrete structure in loose matter, from ground level and equipment for carrying out said process Download PDF

Info

Publication number
KR0174725B1
KR0174725B1 KR1019900701981A KR900701981A KR0174725B1 KR 0174725 B1 KR0174725 B1 KR 0174725B1 KR 1019900701981 A KR1019900701981 A KR 1019900701981A KR 900701981 A KR900701981 A KR 900701981A KR 0174725 B1 KR0174725 B1 KR 0174725B1
Authority
KR
South Korea
Prior art keywords
head
erosion
liquefaction
concrete
unit
Prior art date
Application number
KR1019900701981A
Other languages
Korean (ko)
Other versions
KR910700383A (en
Inventor
오. 호크스루드 나르스
Original Assignee
오. 호크스루드 나르스
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to NO890420A priority Critical patent/NO167051C/en
Priority to NO890,420 priority
Priority to NO890.420 priority
Application filed by 오. 호크스루드 나르스 filed Critical 오. 호크스루드 나르스
Priority to PCT/NO1990/000025 priority patent/WO1990008855A1/en
Publication of KR910700383A publication Critical patent/KR910700383A/en
Application granted granted Critical
Publication of KR0174725B1 publication Critical patent/KR0174725B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/29Obtaining a slurry of minerals, e.g. by using nozzles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil

Abstract

설정된 깊이까지 지면(A)속으로 동시에 상호중심거리(C)와 평행하게 굴착하는 침식유니트(2)와 액상화 유니트(3)의 구성요소를 각각 형성하는 드릴수단(2b 및 3b) 갖춘 회전하는 액상화헤드(3a)와 회전하는 침식헤드(2a)를 사용하여 지면수준으로부터 입자가 큰 물질 안에 콘크리트구조를 짓는 방법. 침식헤드(2a)는 팽창된 굴삭공(4a)을 그라우팅하는 압력과 침식된 입자가 큰 물질(E)의 동시제거될 때 액상화물질, 즉, 콘크리트를 공급하는 동안 액상화헤드(3a)가 침식헤드(2a)에 관해 약간 밑으로 움직여 상승됨과 동시에 굴삭공(4)벽이 침식 되는 동안 상승된다.Rotating liquefaction with drill means 2b and 3b which form components of the liquefaction unit 3 and the erosion unit 2 which simultaneously excavate into the ground A at the same time and parallel to the mutual center distance C to the set depth. A method of constructing a concrete structure in a large particle material from the ground level using the head (3a) and the rotating erosion head (2a). The erosion head 2a is the erosion head 3a during the supply of liquefaction material, that is, concrete when the pressure grouting the inflated excavation hole 4a and the eroded particles are simultaneously removed. At the same time, it moves up slightly with respect to (2a) and at the same time as the wall of the hole (4) is eroded.

Description

지면높이 이하로 입자가 큰 물질 안에 콘크리트구조를 구축하는 방법과 상기 방법을 수행하는 장치Method of constructing concrete structure in material with large particle below ground level and apparatus for performing the above method
제1도는 침식과 그라우팅(grouting)작용이 개시되기전 완전히 구멍뚫기가 되어있는 위치를 보여주는 본 발명에 따른 과정을 수행하는 장치를 개략적으로 도시하는 정면도.1 is a front view schematically showing an apparatus for carrying out the process according to the present invention showing the position where it is fully perforated before the erosion and grouting action is initiated.
제2도는 캐터필러(caterpillar)장치상에 마련된 장치를 본 개략적인 입면도.2 is a schematic elevation view of a device provided on a caterpillar device.
제3도 내지 제5도는 드릴(drill)구멍의 침식이 개시되고, 침식에 의해 굴삭공이 팽창되고 콘크리트와 함께 굴삭공이 동시에 그라우팅될 때 높이 방향으로 굴삭공의 계속된 팽창을 보여주는 세단계과정의 원리를 보여주는 도면들.3 to 5 show the principle of the three-step process showing the continued expansion of the excavator in the height direction when the erosion of the drill hole is initiated and the excavator is inflated by the erosion and the excavator is grouted simultaneously with the concrete. Figures showing.
* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings
2 : 침식유니트 2a : 침식헤드2: Erosion Unit 2a: Erosion Head
2b : 드릴수단 2c : 침식노즐2b: Drilling means 2c: Erosion nozzle
3 : 액상화유니트 3a : 액상화헤드3: liquefaction unit 3a: liquefaction head
3b : 드릴수단 4a : 굴삭공3b: drill means 4a: excavator
5a : 제트 6a, 6b : 프레임5a: jet 6a, 6b: frame
7a : 신축식로드 8a : 베어링7a: telescopic rod 8a: bearing
8b : 모터 9 : 액상화파이프8b: motor 9: liquefied pipe
9a : 베어링 9b : 모터9a: bearing 9b: motor
10, 11 : 관 10a, 11a : 스위벨수단10, 11: pipe 10a, 11a: swivel means
12 : 게이지(gauge)12: gauge
본 발명은 뒤에 기술될 독립적인 방법 특허청구범위 제1항의 서문에 보다 자세히 설명되는 것처럼 드릴수단을 가진 액상화헤드(grouting head)와 회전하는 침섹헤드(erosion head)의 사용에 의해 지면수준으로부터 입자가 큰 물질(여기서 입자가 큰 물질이란 토사, 점토 등을 함유하는 조약돌과 같은 거친입자를 가진 물질을 의미한다.) 안에 콘크리트구조를 구축하는 방법에 관한 것이다. 본 발명은 상술한 바와 같은 과정을 수행하는 장비에도 연관되어 있다.The present invention provides for particles from ground level by the use of a rotating head and a rotating erosion head with drill means, as described in more detail in the preamble to the independent method claims described later. It relates to the construction of concrete structures in large materials (where large particles mean materials with coarse particles, such as pebbles containing soil, clay, etc.). The present invention also relates to equipment for performing the above process.
본 발명은 또는 일시적인 어떠한 안전조처와 예비로 통상적인 굴착작업이 필요치 않은 때 입자가 큰 물질 안에 영구구조요소를 구축하는 것에 관련되어 있다. 일반적으로, 현재까지 입자가 큰 물질 안에 영구구조요소를 짓기 위해 사용된 대부분의 과정은 40-50년 전에 소개된 과정을 비교적 조금 개량시킨 것에 불과하다. 본 기술은 또한 많은 부분이 수작업으로 하게 되어 있어 한 번에 한 부분을 파고(digging) 성형(casting)하고, 보딩(boarding) 함에 있어서 높은 전체 비용이 발생한다.The present invention relates to the construction of permanent structural elements in large particulate matter when no temporary safety measures and conventional excavation work are required. In general, most of the processes used to build permanent structural elements in large-sized materials to date are only relatively minor improvements to the processes introduced 40-50 years ago. The technology is also largely manual, resulting in high overall costs for digging, casting, and boarding one portion at a time.
고가의 일시적 구조체, 즉 인젝션(injection) 및 지면보강을 위한, 내력 파일벽(braced sheet pile wall)은 영구구조가 세워지기 전에 세워 져야만 한다.Expensive temporary structures, ie, braced pile pile walls, for injection and ground reinforcement, must be erected before the permanent structure is established.
본 발명에 따라 과정의 유리한 점은 내부 또는 외부에서 지면수준으로 부터 토양의 종류에 관계없이 방수되며 영구적인 구조의 필요한 수준까지, 입자가 큰 물질 내로 구멍을 파 내려갈 수 있다는 것이다. 지면 안에 구조를 완성함에 있어 표면 위에 보이는 지역에서의 유일한 흠집은, 보통의 핀프릭(pinprick) 즉, 15㎝ 정도의 직경을 가진 구멍일 것이다.An advantage of the process according to the invention is that the particles can dig into the larger material from the ground level inside or outside to the required level of waterproof and permanent structure regardless of the type of soil. The only scratch in the area visible on the surface in completing the structure in the ground would be a normal pinprick, a hole about 15 cm in diameter.
본 발명에 따른 방법과 장비는 일련의 다른 종래의 장황한 여러 가지 작업 즉, 동결(freezing), 인젝션 (injection), 굴착(digging), 보딩(boarding), 성형(casting), 우물 퍼올리기, 토양보상 및 불편에 대한 보상과 같은 흙 안정화 작업을 불필요하게 하며, 또한 공기도 단축시킨다.The method and the apparatus according to the present invention provide a series of other conventional and verbose tasks, namely freezing, injection, digging, boarding, casting, well drilling, soil compensation. And soil stabilization work such as compensation for inconvenience, and also shortens air.
본 발명에 따르면, 상술한 사람들은, 후술할 독립적인 방법 특허청구범위 제1항과 그의 종속항들의 범위에 의해 달성된다. 공지된 방법들에 의해 턴널구조가 토양속에 건설될 때 턴널 안에 남아있는 입자가 큰 물질은 파내어지게 된다. 이것은 콘크리트 쉘(shell)이 설정되어 경화한 후 입자가 큰 물질이 제거되어야만 한다는 것을 의미한다.According to the invention, the above-mentioned people are attained by the scope of the independent method claims 1 and its dependent claims, which will be described later. When the tunnel structure is constructed in the soil by known methods, the large particles remaining in the tunnel are excavated. This means that after the concrete shell has been set and cured, the larger particles should be removed.
대규모의 굴착작업과 입자가 큰 물질을 안정화시키는 작업 없이 입자가 큰 물질 안에 턴널(tunnel)을 구축하는 것은, 현재의 기술로는 사실상 불가능하다.It is virtually impossible with current technology to build tunnels in large particles without the need for large-scale excavation and stabilizing large particles.
본 발명에 따른 방법과 장비는 기차선이나 길을 가로 지르는 데 있어 교통을 방해함이 없이 현존하는 기차 선로나 길 밑으로 턴널(배수도랑)을 건설하는데 효과적이다. 이것은 종래의 방법으로는 비용이 많이 드는 일시적인 보조길이나 보조선로에 의해서만 해결할 수 있는 문제인 것이다.The method and equipment according to the present invention is effective in constructing tunnels (drainage ditches) under existing train tracks or roads without obstructing traffic in traversing train lines or roads. This is a problem that can be solved only by a costly temporary auxiliary road or auxiliary line in the conventional method.
제1도는 침식에 의해 확장된 굴삭공의 그라우팅 주입전과 파여진 굴삭공의 침식 전에 지면 안으로 굴착되어 도달된 위치에 있는 장비를 보여준다.Figure 1 shows the equipment in the position reached and excavated into the ground prior to grouting injection of the diggers expanded by erosion and before erosion of the excavated excavation.
장비는 두 유니트 즉, 침식유니트(2)와 콘크리트로 그라우팅(grouting)하기 위한 액상화 유니트(3)로 포함한다.The equipment comprises two units, an erosion unit 2 and a liquefaction unit 3 for grouting with concrete.
침식유니트는 최하단에 드릴수단(2b)을 가진 침식헤드(2a)를 포함하며, 액상화유니트(3)위에 침식노즐(2c) 이 형성되고 이것은 물과 공기의 방사상의 제트(jet)흐름을 분출하는 공기노즐에 둘러싸인 물노즐을 갖고 있다.The erosion unit comprises an erosion head (2a) having a drill means (2b) at the bottom, an erosion nozzle (2c) is formed on the liquefaction unit (3), which ejects a radial jet flow of water and air It has a water nozzle surrounded by an air nozzle.
또한, 침식유니트는 상술한 부분들이 장착되오 그것을 통해 물과 공기관이 상기 침식노즐(2c)을 공급하기 위해 연장된 가이드관(8)을 포함한다.The erosion unit also includes a guide tube 8, through which the above-mentioned parts are mounted, through which water and air tubes are fed to supply the erosion nozzle 2c.
상기 가이드관(8)은 회전할 뿐만 아니라 상승 및 하강될 수 있도록 베어링(8a)안에 장착되고 회전모터(8b)는 프레임(6)안에 결합된다. 가이드관(8)은 스위벨수단(10a)을 통해 각각 물과 공기의 공급관(10 및 11)을 제공하도록 최상단부에 연결되어 있다.The guide tube 8 is mounted in the bearing 8a so that it can be raised and lowered as well as rotated, and the rotary motor 8b is coupled in the frame 6. The guide tube 8 is connected to the uppermost end to provide the supply pipes 10 and 11 of water and air, respectively, via the swivel means 10a.
액상화헤드(3a)와 드릴수단(3b)을 가진 액상화유니트(3)는 베어링(9a)안에서 하강 및 상승할 수 있고, 회전할 수도 있는 회전모터(9b)는 프레임(6b)안에 마련되며 유니트(3)는 수위벨수단(11a)을 통해 콘크리트 공급관을 가지고 최상단 끝에 연결되어 있다.The liquefaction unit 3 with the liquefaction head 3a and the drill means 3b can be lowered and raised in the bearing 9a, and the rotating motor 9b, which may rotate, is provided in the frame 6b and the unit ( 3) is connected to the top end with a concrete supply pipe through the water level bell means (11a).
프레임(6a 및 6b)들은 프레임(6a, 6b)사이에 있는 상호공간의 조정 수단(7)을 갖고 있는 래크(6)를 함께 구성한다. 래크(6)는 제2도에 보여진 것과 같은 공지된 방법으로 압력실린더에 의해 장비를 경사질 수 있게 하는 것과 마찬가지로 장비를 상승 및 하강할 수 있고, 제2도에 도시된 것처럼 공지된 수단(1F)에 의해 장치(F) 예컨데, 캐터필러장치에 조정 가능하도록 부착하게 된다.The frames 6a and 6b together constitute a rack 6 having means for adjusting the interspace between the frames 6a and 6b. The rack 6 is capable of raising and lowering the equipment as well as allowing the equipment to be inclined by the pressure cylinder in a known manner as shown in FIG. 2, and known means 1F as shown in FIG. ) To the apparatus F, for example, to be adjustable to the caterpillar apparatus.
따라서 침식헤드(2a)와 액상화헤드(3a)는 독립적으로 각각 상승 및 하강할 수 있고 회전할 수 있도록 작동된다. 프레임(6a, 6b)은 침식헤드(2a)와 액상화헤드(3a)사이에 있는 중심거리(C)의 조정을 위해 각각 움직일 수 있다.Thus, the erosion head 2a and the liquefaction head 3a can be raised and lowered independently and operated to rotate, respectively. The frames 6a and 6b can each move for adjustment of the center distance C between the erosion head 2a and the liquefaction head 3a.
제1도에 나와있는 것처럼 조정수단(7)은 프레임(6a및 6b)을 연결하는 조정가능한 신축식로드(telescopic rod)로 구성되어 있다.As shown in FIG. 1, the adjusting means 7 consists of an adjustable telescopic rod connecting the frames 6a and 6b.
콜러(collar)(12)는 침식된 공간 즉, 팽창된 공간의 양을 계산하게 해주는 질량과 밀도게이지를 통해 조정된 방법으로 굴삭공으로부터 침식된 입자가 큰 물질을 유도하고 수집하기 위해 가이드관(8)주위에 형성되어 있다.Collar 12 is guided to guide and collect eroded particles from the excavation hole in a manner adjusted through mass and density gauges that allow the amount of eroded space, ie, expanded space, to be calculated. 8) It is formed around.
조정가능한 스페이서수단(7a)의 도움으로 침식헤드(2a)와 액상화헤드(3a)간의 중심거리는 팽창된 굴삭공(4a)의 돌출된 직경에 따라 조정가능하다.With the aid of the adjustable spacer means 7a the center distance between the eroding head 2a and the liquefaction head 3a is adjustable in accordance with the protruding diameter of the expanded excavation hole 4a.
액상화 유니트(13)는 연장가능한 액상화 파이프(9)를 구성한다.The liquefaction unit 13 constitutes an extendable liquefaction pipe 9.
상기 장비로 상술한 과정을 수행하는데 있어서, 침식유니트(2)와 액상화 유니트(3)는 유니트(2 및 3)사이에 있는 미리 설정된 중심거리(C)만큼 운반될 수 있는 지면이나 바위를 파고 들어간다.In carrying out the above-described process with the equipment, the erosion unit 2 and the liquefaction unit 3 dig into the ground or rock that can be carried by a predetermined center distance C between the units 2 and 3. .
굴착시 상기 유니트를 바위에 잘 접촉시키기 위해 침식헤드(2a)상에서 단지 하향방향의 침식노즐(2d)이 사용된다. 바위표면의 침식시, 침식헤드 (2a)와 가이드관(8)은 도시되지 않은 상승수단에 의해 밀러 올려진다.Only the downward erosion nozzle 2d is used on the erosion head 2a to bring the unit into good contact with the rock during the excavation. In the erosion of the rock surface, the erosion head 2a and the guide tube 8 are lifted up by the lifting means not shown.
가이드관의 상승은 가이드관이 일정하게 회전하며, 물과 공기노즐(2c)로부터 100-1000 바아의 높은 압력으로 고도로 압축된 물과 공기가 동시에 분출되는 동안 천천히 진행된다. 공기로 둘러싸인 상기 물제트(jet)는 입자구조룰 부수고 침식머리(2a)의 드릴수단에 의해 뚫려진 굴삭공(4)안에서 흙을 해체시킨다.The ascension of the guide tube proceeds slowly while the guide tube rotates constantly and simultaneously ejects highly compressed water and air from the water and air nozzles 2c at a high pressure of 100-1000 bar. The jet of water surrounded by air breaks up the grain structure and dismantles the soil in the excavation hole 4 drilled by the drill means of the erosion head 2a.
이때 미리 설정된 직경을 가진 팽창된 굴삭공(4a)이 형성되고, 이 직경은 여기서는 상세하게 기술되지 않은 공지된 장비의 도움으로 측정된다. 이와 같은 방법으로 원통형의 침식되는 공간이 상기 굴삭공(4a)을 구성하며 형성된다. 노즐(2)로부터 높은 압력의 제트 (5a)에 의해 생기는 과압력 때문에 분출되어 내려온 물질(E)은 굴삭공(4)과 상기 콜러(12)를 통해 표면쪽으로 강제로 움직인다.At this time, an expanded excavation hole 4a having a preset diameter is formed, which diameter is measured with the aid of known equipment, which is not described in detail here. In this way, a cylindrical eroded space is formed constituting the excavation hole (4a). The substance E ejected and ejected due to the overpressure generated by the jet 5a of the high pressure from the nozzle 2 is forced to the surface through the excavation hole 4 and the collar 12.
동시에 공간(4a)이 형성되면 고품질의 콘크리트(D)는 공간(4a)을 채우는 액상화헤드(3a)를 가진 액상화 파이프(9)를 통하여 밀려올라가며 공간(4a)은 역시 분출에 의해 부서져 내려오는 물질(E)의 굴삭공(4)을 통해 제거된다.At the same time, when the space 4a is formed, high-quality concrete D is pushed through the liquefaction pipe 9 having the liquefaction head 3a filling the space 4a, and the space 4a is also broken down by the ejection material. It is removed through the excavation hole 4 of (E).
콘크리트(D)에 방수재가 첨가됨에 따라, 침식제트(5a)에 의해 공간(4a)에서 발생되는 흐름은, 최소한의 경화제(binder)가 콘크리트(D)로부터 씻겨 나가도록 한다.As the waterproofing material is added to the concrete D, the flow generated in the space 4a by the eroding jet 5a causes the minimal binder to be washed away from the concrete D.
침식헤드(2)를 가진 가이드관(8)과 액상화헤드(3a)가 장착된 액상화파이프(9)가 위로 올려질 때, 액상화헤드(3a)는 액상화 파이프가 작동중이라면 콘크리트(D)로부터 경화제(binder)를 씻겨나가게 하는 침식된 공간에 있는 해로운 흐름을 줄이기 위해 침식제트노즐(2c) 및 최소한 0.5m에 위치하는 것이 바람직하다.When the guide tube 8 with the erosion head 2 and the liquefaction pipe 9 equipped with the liquefaction head 3a are lifted up, the liquefaction head 3a is hardened from the concrete D if the liquefaction pipe is in operation. It is desirable to be located at the erosion jet nozzle 2c and at least 0.5 m in order to reduce the harmful flow in the eroded space to flush out the binder.
굴삭공(4)은 침식헤드(2a)가 상승할 때 설정된 높이(H)까지 공기와 물제트(5c)에 의해 침식되고 이때 침식이 멈춰진다. 콘코리트(D)가 있는 공간(4a)의 그라우팅은 공간(4a)이 채워질 때까지 액상화 파이프(9)가 동시 상승되는 동안 계속된다.The excavation hole 4 is eroded by the air and the water jet 5c to the set height H when the erosion head 2a is raised, at which time the erosion is stopped. Grouting of the space 4a with concrete D continues while the liquefaction pipe 9 is simultaneously raised until the space 4a is filled.
상기 작동은 굴삭공(4)을 통하여 강제로 상승되어진 침식된 물질에 의해 저지된다. 공간(4a)이 완전히 채워지게되면 상기 물질은 콘크리트(D)로부터 밀어올려진 시멘트 경화제로 교체된다.This operation is prevented by the eroded material being forced up through the excavation hole (4). When the space 4a is completely filled, the material is replaced with cement hardener pushed up from the concrete D.
제3도는 지면(A)으로 설정된 깊이까지 굴착하고, 암석지반을 청소하기위해 침식헤드(2a)로부터 하향방향으로 침식제트분사(5b)를 마치게 되는 액상화헤드(3a)와 침식헤드(2a)를 도시한다.3 shows the liquefaction head 3a and the erosion head 2a which are excavated to the depth set to the ground A and finish the erosion jet spray 5b downward from the erosion head 2a to clean the rock ground. Illustrated.
상기 침식제트(5b)분사가 끝날 때 노즐(2c)로부터 침식비임(5a)이 굴삭공(4)을 팽창시키기 시작하고 팽창된 굴삭공(4a)이 형성되며 따라서 제5도에 도시된 것처럼 설정된 높이(H)와 직경(B)을 가진 제4도에 도시된 설정된 공간이 형성된다.At the end of the spray of the eroding jet 5b, the erosion beam 5a from the nozzle 2c begins to expand the excavation hole 4 and an expanded excavation hole 4a is formed and thus set as shown in FIG. The set space shown in FIG. 4 having a height H and a diameter B is formed.
제4도는 침식헤드(2a)의 회전과 상승동안 굴삭공(4)의 조기 팽창을 보여주며 여기서 액상화헤드(3a)를 가진 공급파이프(9)가 팽창된 굴삭공(4a)의 하단 주변에 정지해 있음을 보여준다.4 shows premature expansion of the excavation hole 4 during the rotation and ascent of the erosion head 2a, where the feed pipe 9 with the liquefaction head 3a stops around the bottom of the expanded excavation hole 4a. Shows that it is.
제5도는 다음단계를 보여주는데 침식헤드(2a)는 설정된 높이(H)의 팽창된 굴삭공까지 대략 밀려 올라가고 콘크리트(D)는 팽창된 굴삭공(4a)을 채우기 위해 공급파이프(9)를 통해 공급된다. 이 작동은 팽창된 굴삭공(4a)이 채워질 때까지 계속된다.5 shows the next step: the erosion head 2a is pushed up to the expanded digging hole of the set height H and the concrete D is fed through the feed pipe 9 to fill the expanded digging hole 4a. do. This operation continues until the inflated excavator hole 4a is filled.
제4도 및 제5도에서 실제적으로 원형 크로스섹션(cross section)과 설정된 직경(B)을 가진 팽창된 굴삭공(4a)이 보여지며 결국에는 콘크리트(D)의 원통형 구조가 되어 있음을 보여주는 것이다.In Figures 4 and 5, the expanded excavation hole 4a is shown with a substantially circular cross section and a set diameter B, which in turn shows a cylindrical structure of concrete D. .
침식제트, 즉 공기와 물제트(5a)를 침식헤드(2a)의 상응하는 회전에 의해 부채꼴을 가로질러 앞뒤로 흔들리게 함으로써 상응하는 크로스섹션을 가진 콘크리트구조가 형성된다.The eroding jet, i.e. air and water jet 5a, is shaken back and forth across the fan shape by the corresponding rotation of the eroding head 2a to form a concrete structure with a corresponding cross section.
공기-물제트(5)의 침식압력을 동시 조종하는 침식헤드(2a)의 완전한 회전에 의해 회전헤드(2a)의 회전각에 따라 타원형 횡단면을 갖는, 즉 타원형으로 적층된 콘크리트구조를 형성하는 것이 가능하다.By the complete rotation of the erosion head 2a which simultaneously controls the erosion pressure of the air-water jet 5, it is possible to form a concrete structure having an elliptical cross section, that is, an oval shape, according to the rotation angle of the rotation head 2a. It is possible.
본 발명에 다른 과정은 모든 종류의 지면에서 수행될 수 있다. 그리하여 이 과정은 충전재, 퇴석(堆石) 그리고 소택지의 흙 또는 토탄(土炭)의 대부분의 종류와 진흙, 침니(沈泥), 모래 그리고 자갈에 적용될 수 있다.Other processes of the present invention can be carried out on all kinds of pages. Thus, this process can be applied to most types of soil, peat, mud, chimneys, sand, and gravel in fillers, stones, and flats.
점착성 흙에서는 침식과 과정이, 선택적인, 두 상태로 수행될 수 있다. 왜냐하면 점착성 흙에서의 과도기 인장은 물로 채워진다면 일반적으로 침식된 공간이 무너지는 것을 방지하기 때문이다. 상술한 두 작동에서 침식과 그라우팅 과정을 수행하는데 있어 여러 가지 장점이 있다.In cohesive soils, erosion and process can be performed in two states, optionally. This is because transitional tension in cohesive soils generally prevents the eroded space from collapsing if filled with water. There are several advantages in performing the erosion and grouting processes in the two operations described above.
1. 물밑에서 공간(보딩)의 평상적인 캐스팅처럼 그라우팅이 행해지므로 입자가 큰 물질이 부분적으로 콘크리트와 섞이는 것을 방지한다.1. As the grouting is performed like a normal casting of space (boarding) under water, it prevents large particles from mixing with concrete.
2. 침식제트(5a)로부터 첨가된 물과 침식된 물질을 이루는 굴삭공(4)을 통해 귀환된 물질 안에 콘크리트를 존재하지 않는다. 만약 귀환된 물질의 양과 밀도가 굴삭공(4)안에 있는 쿨러(12)와 연결된 질량과 밀도게이지(12)안에서 계속적으로 측정된다면 결과적으로 침식된 공간(4a)의 양을 계산하는 것이 가능하다.2. There is no concrete in the material returned through the excavation hole 4 which constitutes the eroded material with the water added from the eroding jet 5a. If the amount and density of the returned material are continuously measured in the mass and density gauges 12 connected to the cooler 12 in the excavation hole 4, it is possible to calculate the amount of eroded space 4a as a result.
공간(4a)의 높이(H)-굴삭공(4)이 기울거나 수평하다면 길이도 가능)는 항상알려지고 평균직경(B)도 역시 계산될 수 있다.The height H of the space 4a-the length may be known if the digging hole 4 is tilted or horizontal) is always known and the mean diameter B can also be calculated.
3. 공간밑으로 내려가는 음향학 탐침의 도움으로 공간(4a)의 넓이를 정확하게 도표로 나타내는 것이 가능하다. 탐침이 끌러올려질 때 탐침을 체계적으로 회전시킴으로써 전넓이, 보통 직경(B)이 도표에 나타내질 수 있다.3. With the aid of acoustic probes descending into the space it is possible to accurately plot the area of the space 4a. The full width, usually diameter (B), can be plotted by systematically rotating the probe when the probe is pulled up.
마찰력이 있는 흙에서는 양 작동, 즉 침식과 그라우팅은 한 작동에서 수행되어야만 한다. 왜냐하면, 마련된 공간(4a)은 일반적으로 콘크리트(D)의 그라우팅이 완료되기 전에 무너지기 때문이다. 공간, 즉 팽창된 굴삭공(4a)은 무거운 안정액, 즉 벤토나이트(bentonite)가 공간 안으로 삽입된다면 안정되어진다.In frictional soil, both operations, erosion and grouting, must be performed in one operation. This is because the provided space 4a is generally collapsed before the grouting of the concrete D is completed. The space, i.e., the inflated excavation hole 4a, is stabilized if a heavy stabilizer, i.e. bentonite, is inserted into the space.
그러나 상기 액은 돌아온 물질 즉, 침식된 흙과 분출하는 물과 섞이게 되어서 범위, 즉 적층구조의 넓이(B)는 음향학 탐침이나 공간(4a) 안에 던져지는 콘크리트(D)의 양을 측정함으로써만 측정될 수 있다.However, the liquid is mixed with the returned material, ie eroded soil and erupting water, so that the range, i.e., the area B of the laminated structure, is measured only by measuring the amount of concrete D thrown into the acoustic probe or the space 4a. Can be.
침식헤드(2a)와 액상화헤드(3a)사이의 거리가 로크(6)에 있는 신축식로드(7a)에 의해 조정가능하다는 것은 상술한 바 있다. 따라서, 지면(A)을 뚫고 들어갈 때 침식헤드(2a)와 액상화헤드(3a)가 설정된 상호중심거리를 수용하고 받아들이는 액상화헤드(3a)를 제4도 및 제5도에 도시된 것처럼 침식 또는 팽창된 굴삭공(4a)의 주변에 위치하는 것을 확실하게 한다.It has been described above that the distance between the erosion head 2a and the liquefaction head 3a is adjustable by the telescopic rod 7a in the lock 6. Accordingly, the liquefaction head 3a, which receives and receives the mutual center distance set by the erosion head 2a and the liquefaction head 3a when penetrating the ground A, is eroded as shown in FIGS. 4 and 5. It is ensured to be located around the expanded excavator hole 4a.
결과적으로 비교적 두꺼운 공급파이프(9)를 통해 분출된 콘크리트(D)는 구멍벽의 위치로부터 팽창된 굴삭공(4a)을 채우게 되고 따라서, 침식된 물질과 굴삭공(4)을 통해 올라온 물을 배출하게 된다.As a result, the concrete D ejected through the relatively thick supply pipe 9 fills the inflated excavation hole 4a from the position of the hole wall, thereby discharging the eroded material and the water raised through the excavation hole 4. Done.

Claims (6)

  1. 단단한 지면까지 즉, 설정된 높이까지 지면안으로 굴착하며 하강하는 드릴수단을 형성하는 회전하는 침식헤드와 액상화헤드의 사용에 의하여 또 굴착된 구멍은 결과적으로 굴삭공을 통하여 상부와 외부로 흘러나오는 침식된 입자가 큰 물질을 침식헤드가 끌어올림과 동시에, 설정된 넓이와 높이까지 공기 또는 물제트의 도움으로 침식에 의해 팽창되며, 액상화헤드에 의해 공급되는 액상화물질에 의해 팽창된 굴삭공이 동시에 그라우팅됨에 따라, 지면수준에서부터 입자가 큰 물질 안에 콘크리트구조를 구축하는데 있어서, 드릴수단(2b)을 가진 침식헤드(2a)와 드릴수단(3b)을 가진 침식유니트(2)가 액상화 유니트(3)의 성분을 형성하는 액사오하헤드와 침식헤드(2a)가 굴삭공(4)벽이 동시 침식되는 동안 회전하고 상승되는 상호 중심거리(C)를 가지고, 지면(A)으로 밑으로 평행하게 동시에 굴착되며, 액상화 물질 즉 팽창된 굴삭공을 그라우팅하기 위한 압력하에서 콘크리트가 공급되고, 동시에 침식된 입자가 큰 물질이 제거되는 동안, 액상화 헤드(3a)는 동시에 상승하지만, 침식 헤드(2a)에 비해 다소 하측방향으로 위치하는 것을 특징으로 하는 입자가 큰 물질에서 콘크리트 구조체를 구축하는 시공방법.Holes excavated by the use of rotating erosion heads and liquefaction heads that form drill means for digging and descending into the ground up to a solid surface, i. As the erosion head is pulled up, the larger material is expanded by erosion with the aid of air or water jet to the set width and height, and the ground is expanded as the excavator is expanded by the liquefaction material supplied by the liquefaction head. In constructing the concrete structure in the granular material from the level, the erosion head 2a with the drill means 2b and the erosion unit 2 with the drill means 3b form the components of the liquefaction unit 3. The Axao lower head and the erosion head 2a have a mutual center distance C which rotates and rises while the wall of the excavation hole 4 is simultaneously eroded, and the ground ( The liquefaction head 3a rises at the same time while the concrete is fed under pressure to grout the liquefied material, i. , Construction method for constructing a concrete structure from a large particle material, characterized in that located in the lower direction than the erosion head (2a).
  2. 제1항에 있어서, 침식헤드(2a)와 액상화헤드(3a)사이의 중심거리(C)가 침식에 의해 형성되는 팽창된 굴삭공(4a)의 평균반지름까지 지면안으로 낮춰지기 전에 조정됨으로 특징으로 하는 시공방법.The method according to claim 1, characterized in that the central distance (C) between the erosion head (2a) and the liquefaction head (3a) is adjusted before being lowered into the ground until the average radius of the expanded digging hole (4a) formed by erosion. Construction method
  3. 제1항에 있어서, 콘크리트가 통과할 수 있는 크기를 갖는 개방구를 가진 액상화헤드(3a)가 사용되는 것을 특징으로 하는 시공방법.The method according to claim 1, wherein a liquefaction head (3a) having an opening having a size through which concrete can pass is used.
  4. 제1항에 있어서, 상호거리 조종수단(7)이 있는 래크(6)안에 액상화헤드(3)와 침식유니트(2)가 있고 래크는 공지된 수단(F1)에 의해 장비(F)의 조정될 수 있게 매달려 있으며, 침식헤드(2a)와 상기 침식유니트(2)의 액상화헤드(3a) 및 액상화 유니트(3)가 독립적으로 각각 회전할 수 있고, 하강 및 상승할 수 있도록 작동하는 것을 툭징으로 하는 장비.2. The liquefaction head (3) and erosion unit (2) in the rack (6) with mutual distance control means (7) and the rack can be adjusted of the equipment (F) by known means (F1). Equipment, which is suspended by the erosion head 2a and the liquefaction head 3a and the liquefaction unit 3 of the erosion unit 2, respectively, which are capable of independently rotating, lowering and raising. .
  5. 제4항에 있어서, 래크(6)는 베어링(8a, 9a)과 액상화헤드(3a)의 가이딩과 그라우팅 파이트(9)와 침식헤드(2a)의 관(8)을 유도하는 회전모터(8b, 9b)를 가진 두 프레임(6a, 6b)을 포함하며, 상기 파이프(8, 9)는 각각 콘크리트와 물 또는 공기의 공급판(10, 11)의 연결을 위해 상부에 회전하는 연결(10a, 11a)를 형성되며, 상기 두 프레임(6a, 6b)이 침식헤드(2a)와 액상화헤드(3a)사이의 중심거리(C)의 조정을 위해 서로 같은 방향과 다른 방향으로 서로 움직이는 것을 특징으로 하는 장비.The rack (6) according to claim 4, wherein the rack (6) is a rotary motor (8b) for guiding the bearings (8a, 9a) and the liquefaction head (3a) and the guiding and grouting pipe (9) and the tube (8) of the erosion head (2a). And two frames 6a and 6b with 9b, the pipes 8 and 9 respectively rotating at the top for connection of concrete and water or air supply plates 10 and 11, respectively. 11a), characterized in that the two frames 6a, 6b move in the same direction and in different directions to adjust the center distance C between the erosion head 2a and the liquefaction head 3a. equipment.
  6. 제5항에 있어서, 상기 프레임(6a, 6b)이 고정가능한 신축식로드(7a)에 의해 연결되어 있는 것을 특징으로 하는 장비.Equipment according to claim 5, characterized in that the frames (6a, 6b) are connected by a retractable telescopic rod (7a).
KR1019900701981A 1989-02-02 1990-02-01 Process for building a concrete structure in loose matter, from ground level and equipment for carrying out said process KR0174725B1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
NO890420A NO167051C (en) 1989-02-02 1989-02-02 PROCEDURE FOR THE ESTABLISHMENT OF CONCRETE CONSTRUCTIONS IN LOANS, FROM THE TERRACE LEVEL, AND EQUIPMENT FOR EXERCISING THE PROCEDURE
NO890,420 1989-02-02
NO890.420 1989-02-02
PCT/NO1990/000025 WO1990008855A1 (en) 1989-02-02 1990-02-01 A process for building a concrete structure in loose matter, from ground level, and equipment for carrying out said process

Publications (2)

Publication Number Publication Date
KR910700383A KR910700383A (en) 1991-03-15
KR0174725B1 true KR0174725B1 (en) 1999-02-18

Family

ID=19891690

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019900701981A KR0174725B1 (en) 1989-02-02 1990-02-01 Process for building a concrete structure in loose matter, from ground level and equipment for carrying out said process

Country Status (10)

Country Link
EP (1) EP0457813B1 (en)
JP (1) JP2532751B2 (en)
KR (1) KR0174725B1 (en)
AU (1) AU5090090A (en)
DE (1) DE69002615T2 (en)
DK (1) DK0457813T3 (en)
FI (1) FI92506C (en)
NO (1) NO167051C (en)
RU (1) RU2042012C1 (en)
WO (1) WO1990008855A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2701973B1 (en) * 1993-02-22 1995-04-07 Sif Airlock installation for soil treatment device by rotary jet (s).
US6957220B2 (en) 2000-11-07 2005-10-18 Research Investment Networks, Inc. System, method and article of manufacture for tracking and supporting the distribution of content electronically
SE0202501L (en) * 2002-08-23 2004-02-24 Soilex Ab Ways to make a pole and / or a tie rod
CN109441441A (en) * 2018-11-15 2019-03-08 华北科技学院 Seat earth multi-angle oblique bored grouting Analog Experiment for Discharges device and method under a kind of pressure-bearing influence of dynamic water

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FI65833C (en) * 1977-12-27 1984-07-10 Kajima Corp SPRUTANORDNING FOER CEMENTVAELLING
SE444195B (en) * 1982-08-16 1986-03-24 Nit Co Ltd A method and apparatus for the injection of solidifying material into a depth of soil

Also Published As

Publication number Publication date
RU2042012C1 (en) 1995-08-20
JPH07507362A (en) 1995-08-10
DE69002615D1 (en) 1993-09-09
WO1990008855A1 (en) 1990-08-09
DE69002615T2 (en) 1993-11-11
EP0457813B1 (en) 1993-08-04
FI92506B (en) 1994-08-15
AU5090090A (en) 1990-08-24
KR910700383A (en) 1991-03-15
EP0457813A1 (en) 1991-11-27
NO167051B (en) 1991-06-17
DK0457813T3 (en) 1993-12-27
NO167051C (en) 1991-09-25
NO890420L (en) 1990-08-03
FI913689A0 (en) 1991-08-02
JP2532751B2 (en) 1996-09-11
NO890420D0 (en) 1989-02-02
FI92506C (en) 1994-11-25

Similar Documents

Publication Publication Date Title
US5542782A (en) Method and apparatus for in situ installation of underground containment barriers under contaminated lands
US2782605A (en) Process and apparatus for grouting porous formations
US5765965A (en) Apparatus for in situ installation of underground containment barriers under contaminated lands
US5957624A (en) Apparatus and method for in Situ installation of underground containment barriers under contaminated lands
CN203452083U (en) Rotary expanding pile construction equipment and grout feeding device
CN110424385A (en) The construction of major diameter high verticality jet grouting stake in ovum rubble stratum
CN1236146C (en) Method and apparatus for forming shaped pile by drilling, high-pressure letting to enlarge hole and pressure pouring of concrete
KR0174725B1 (en) Process for building a concrete structure in loose matter, from ground level and equipment for carrying out said process
CN1206417C (en) Forming method for water-proof pile fender and screw drill therefor
CN107338789B (en) A kind of construction method of down-the-hole percussion triple-pipe high pressure jet grouting stake
EP0546154B1 (en) Apparatus and methods for cutting soil and in situ construction of subsurface containment barriers
CN112196494A (en) Construction process and construction equipment for geological pipeline jointed between rock and soil layer
CN110258598B (en) Construction method of large-diameter pebble geological cofferdam leading hole replacement filling structure
JP3217038B2 (en) Ground drilling equipment and method of forming cylindrical underground structure
JP3428917B2 (en) Auger screw and excavation method using it
KR100645893B1 (en) Agitating device for improving ground
JPH1150443A (en) Underground consolidated body construction device and construction method thereof
CN110984852B (en) Triaxial stirring stake machine with function of rectifying
CN112281826B (en) Construction method for forming pile by rotary spraying in ovoid gravel stratum
JP3752345B2 (en) Casing construction method
US10889955B2 (en) Cutting tool adapter and method of underpinning structures using cutting tool adapter for soil mixing
EP3260650B1 (en) Device and method for drilling a shaft in a substrate
RU207747U1 (en) REINFORCEMENT FRAME FOR DRILL PILES WITH GROUND-CEMENT EXTENSIONS IN THE ZONE OF WEAK SOILS
JP2958426B2 (en) Differential settlement correction method
JPH0676689B2 (en) Method and device for removing existing piles

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20121019

Year of fee payment: 15

EXPY Expiration of term