- JPWO2024062672A5 JPWO2024062672A5 JP2024548075A JP2024548075A JPWO2024062672A5 JP WO2024062672 A5 JPWO2024062672 A5 JP WO2024062672A5 JP 2024548075 A JP2024548075 A JP 2024548075A JP 2024548075 A JP2024548075 A JP 2024548075A JP WO2024062672 A5 JPWO2024062672 A5 JP WO2024062672A5
- Authority
- JP
- Japan
- Prior art keywords
- temperature
- acquisition unit
- acquired
- target time
- value
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2022151072 | 2022-09-22 | ||
| JP2022151072 | 2022-09-22 | ||
| PCT/JP2023/017827 WO2024062672A1 (ja) | 2022-09-22 | 2023-05-12 | 送電線管理装置、送電線温度推定方法および送電線温度推定プログラム |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JPWO2024062672A1 JPWO2024062672A1 (https=) | 2024-03-28 |
| JPWO2024062672A5 true JPWO2024062672A5 (https=) | 2025-02-28 |
| JP7722594B2 JP7722594B2 (ja) | 2025-08-13 |
Family
ID=90454206
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2024548075A Active JP7722594B2 (ja) | 2022-09-22 | 2023-05-12 | 送電線管理装置、送電線温度推定方法および送電線温度推定プログラム |
Country Status (2)
| Country | Link |
|---|---|
| JP (1) | JP7722594B2 (https=) |
| WO (1) | WO2024062672A1 (https=) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7722594B2 (ja) * | 2022-09-22 | 2025-08-13 | 住友電気工業株式会社 | 送電線管理装置、送電線温度推定方法および送電線温度推定プログラム |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3127767B2 (ja) * | 1995-02-28 | 2001-01-29 | 日新電機株式会社 | 電線路の温度監視方法 |
| JP4919903B2 (ja) | 2007-09-07 | 2012-04-18 | 中国電力株式会社 | 架空送電線の電流容量動的決定装置、これに用いるコンピュータプログラム及び架空送電線の電流容量動的決定方法 |
| JP7722594B2 (ja) | 2022-09-22 | 2025-08-13 | 住友電気工業株式会社 | 送電線管理装置、送電線温度推定方法および送電線温度推定プログラム |
-
2023
- 2023-05-12 JP JP2024548075A patent/JP7722594B2/ja active Active
- 2023-05-12 WO PCT/JP2023/017827 patent/WO2024062672A1/ja not_active Ceased
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101795090B (zh) | 预测光伏器件的电力产量的方法 | |
| CN109492315B (zh) | 一种基于Copula函数的时空相关风光序列模拟方法 | |
| Lackner et al. | Uncertainty analysis in wind resource assessment and wind energy production estimation | |
| BR112019017649A2 (pt) | Método para determinar uma potência disponível de um parque eólico, parque eólico, e, instalação de energia eólica. | |
| EP2707781B1 (fr) | Procede de prevision de la consommation energetique d'un batiment | |
| JP5823459B2 (ja) | 流入量予測装置、流入量予測方法、水位予測装置およびプログラム | |
| CN103900541B (zh) | 一种海况估计器 | |
| JP4998039B2 (ja) | 観測データ同化方法 | |
| CN103778572A (zh) | 一种基于wrf模式的海上风资源评估方法 | |
| JP2018081100A5 (https=) | ||
| CN117353300A (zh) | 一种基于大数据的农村用电需求量分析方法 | |
| JPWO2024062672A5 (https=) | ||
| CN103348135B (zh) | 用于确定损失能量的方法 | |
| CN106971032A (zh) | 基于非参数核密度估计与数值天气预报的风速预测方法 | |
| CN119226704A (zh) | 一种海上风电场风资源评估方法、装置、电子设备及可读存储介质 | |
| US20240378340A1 (en) | Method, device and storage medium for evaluating wind energy resources in complex terrain | |
| CN113167922B (zh) | 计算与拟建风力涡轮机场所处的回归时段相关的风速的方法 | |
| CN102819050B (zh) | 一种测定流域蒸发量的方法 | |
| Sanusi et al. | Estimation of solar radiation at Ibadan, Nigeria | |
| Lüers et al. | The effect of misleading surface temperature estimations on the sensible heat fluxes at a high Arctic site–the Arctic Turbulence Experiment 2006 on Svalbard (ARCTEX-2006) | |
| CN113112094A (zh) | 量化风况影响的热负荷预测方法、系统、装置及存储介质 | |
| CN111325440A (zh) | 一种风电场测风塔自由流风速的估算方法及装置 | |
| CN105893743A (zh) | 一种基于气象站的输电线路标准冰厚的计算方法 | |
| CN109359772B (zh) | 河流逐时水温预报方法 | |
| JP5383767B2 (ja) | 流入量予測装置、流入量予測方法、及びプログラム |