JPS63103122A - Driving of pile into rubble layer - Google Patents
Driving of pile into rubble layerInfo
- Publication number
- JPS63103122A JPS63103122A JP24832686A JP24832686A JPS63103122A JP S63103122 A JPS63103122 A JP S63103122A JP 24832686 A JP24832686 A JP 24832686A JP 24832686 A JP24832686 A JP 24832686A JP S63103122 A JPS63103122 A JP S63103122A
- Authority
- JP
- Japan
- Prior art keywords
- pile
- casing
- piles
- driving
- driven
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 claims abstract description 12
- 239000000463 material Substances 0.000 claims description 6
- 238000009412 basement excavation Methods 0.000 claims description 3
- 238000005553 drilling Methods 0.000 claims 1
- 239000004576 sand Substances 0.000 abstract description 13
- 239000000945 filler Substances 0.000 abstract description 8
- 239000011435 rock Substances 0.000 abstract description 8
- 238000010276 construction Methods 0.000 abstract description 5
- 239000011083 cement mortar Substances 0.000 abstract 1
- 239000012528 membrane Substances 0.000 description 6
- 239000004570 mortar (masonry) Substances 0.000 description 3
- 230000000694 effects Effects 0.000 description 1
Abstract
Description
【発明の詳細な説明】 〔産業上の利用分野〕 本発明は捨石層への杭打設方法に関するものである。[Detailed description of the invention] [Industrial application field] The present invention relates to a method for driving piles into a rubble layer.
通常の地盤に杭を打設する場合は、ディーゼルハンマ、
バイブロハンマ等の打込機ヲ用いて杭の打込みが行なわ
れるが、その地盤が大きな岩石などを含む捨石層である
場合には、上記の打込機をそのまま用いて杭を打込むこ
とは不可能である。When driving piles into normal ground, use a diesel hammer,
Piles are driven using a driving machine such as a vibro hammer, but if the ground is a rubble layer containing large rocks, it is impossible to drive piles using the above-mentioned driving machine as is. It is.
そこで、従来、このような捨石層に杭を打設する場合に
は、グラブバケットなどを用いて大きな岩石を排除し、
しかる後に上記の打込機を用いて杭の打込みが行なわれ
ていた。Conventionally, when driving piles into such a rubble layer, large rocks are removed using a grab bucket, etc.
Thereafter, the piles were driven using the above-mentioned driving machine.
また、大きな岩石を排除することが不可能か、著しく困
難な場合には、設計上他の場所へ杭を打設することを考
えなければならなかった。Additionally, if it was impossible or extremely difficult to remove large rocks, consideration had to be given to driving piles elsewhere in the design.
しかしながら、大きな岩石を排除するためには多大な労
力を必要とし、特に、打設すべき杭の本数が多い場合に
は、これに費される労力は莫大なものとなる。However, removing large rocks requires a great deal of effort, and especially when a large number of piles are to be driven, the effort required is enormous.
また、設計上他の場所へ杭を打設することが許容される
場合は問題がないが、必ずしもこのような設計変更が許
容される場合ばかりとは限らない。Further, if the design allows driving the piles in other locations, there is no problem, but such a design change is not always allowed.
そこで、上記の問題を解消するため、先端に地盤掘削用
刃部が形成された回転可能な円筒状のケーシングと、そ
のケーシング内に嵌装されたオーガースクリューとを用
いて捨石層に縦穴を掘削し、次いで、オーガースクリュ
ーのみを抜取り、その跡に置換砂を投入して砂杭を形成
し、しかる後に、前記ケーシングを抜取って前記砂杭に
杭を打込むことにより、大きな岩石を排除することなく
、ディーゼルハンマ、バイブロハンマ等の通常の打込機
を用いることが可能な捨石層への杭の打設方法に関する
特公昭61−17972の発明がなされている。Therefore, in order to solve the above problem, a vertical hole was excavated in the rubble layer using a rotatable cylindrical casing with a ground excavation blade formed at the tip and an auger screw fitted inside the casing. Then, only the auger screw is removed, replacement sand is poured into the remains to form a sand pile, and then the casing is removed and the pile is driven into the sand pile to remove large rocks. Japanese Patent Publication No. 17972/1983 has been made regarding a method for driving piles into a rubble layer using a conventional driving machine such as a diesel hammer or a vibro hammer.
しかしながら、上記の方法では、ケーシング内に置換砂
を投入して砂柱を形成した後に、ケーシングを抜取り、
その砂杭中に杭を打込むため、砂杭の施工精度と杭打の
施工精度との両方が要求されることになり、正確な杭打
精度を得るのが難しく、また充填材に砂以外のモルタル
等を使用することが難しいという問題があった。However, in the above method, after putting replacement sand into the casing to form a sand column, the casing is removed,
Since the piles are driven into the sand piles, both sand pile construction accuracy and pile driving accuracy are required, making it difficult to obtain accurate pile driving accuracy, and using filler materials other than sand. There was a problem that it was difficult to use mortar etc.
本発明は前記従来の問題点を解消し、捨石層に対しても
グラブバケットなどを用いて大きな岩石を排除する作業
を必要とせず、通常の打込機を用いて杭を容易に打設可
能で、しかもその打込精度の高い杭打膜が可能で、更に
充填材を変えることができると共に、部材強度の低い杭
でも施工可能な捨石層への杭打膜方法を提供することを
目的としたものである。The present invention solves the above-mentioned conventional problems, and makes it possible to easily drive piles into the rubble layer using a normal driving machine without the need for removing large rocks using a grab bucket or the like. The purpose of the present invention is to provide a pile driving method for a rubble layer that enables pile driving membranes with high driving accuracy, allows changing the filling material, and allows construction even with piles with low member strength. This is what I did.
上記の目的を達成するため本発明の捨石層への杭打膜方
法は、先端に地盤掘削用カッターを有するケーシング付
オーガースクリューを用いて捨石層に縦穴を掘削した後
、該オーガースクリューのみを抜き取り、その中に打込
杭を打込み、ケーシングと打込杭との間に充填材を充填
した後、ケーシングを抜き取ることを特徴としたもので
ある。In order to achieve the above object, the method of driving piles into a rubble layer according to the present invention involves excavating a vertical hole in a rubble layer using an auger screw with a casing having a cutter for ground excavation at the tip, and then extracting only the auger screw. , a driven pile is driven into the driven pile, a filler material is filled between the casing and the driven pile, and then the casing is removed.
以下図面を参照して本発明の詳細な説明するが、第1図
から第8図までは本発明の捨石層への杭打膜方法による
杭打膜の一実施例における手順を説明する一連の側断面
図である。The present invention will be described in detail below with reference to the drawings, and FIGS. 1 to 8 are a series of steps illustrating an embodiment of the piling membrane method of the present invention for piling membranes on rubble layers. FIG.
まず、杭打膜を行なう捨石層5の所望地上Gの個所に、
オーガースクリュー1とケーシング2をセットし、オー
ガースクリュー1及びケーシング2を互に逆回転させ、
第1図に示すごとくオーガースクリューlの先端のカッ
ター3及びケーシング2の先端の刃部4により捨石層5
に縦穴を掘削してゆき、第2図のごとく杭打述部の捨石
を排除する。First, on the desired ground G of the rubble layer 5 where the piling membrane is to be applied,
Set the auger screw 1 and casing 2, rotate the auger screw 1 and casing 2 in opposite directions,
As shown in FIG. 1, the cutter 3 at the tip of the auger screw l and the blade part 4 at the tip of the casing 2 cut into a rubble layer 5.
A vertical hole is excavated in the area, and rubble from the pile driving area is removed as shown in Figure 2.
次に、第3図に示すごとく、ケーシング2はそのまま残
してオーガースクリュー1のみを抜き取り、そのケーシ
ング2の中に第4図に示すごとく、打込杭6を打込み、
第5図に示すごとく、ケーシング2の内周と打込杭6の
外周との間に、砂、モルタル、その他所定の充填材7を
地上Gから充填し、第6図の状態とする。Next, as shown in FIG. 3, leave the casing 2 as it is and remove only the auger screw 1, and drive the driving pile 6 into the casing 2 as shown in FIG.
As shown in FIG. 5, between the inner periphery of the casing 2 and the outer periphery of the driven pile 6, sand, mortar, or other predetermined filler 7 is filled from the ground G, resulting in the state shown in FIG.
そこで、第7図のごとく、ケーシング2を抜き取り、第
8図に示す杭打膜が完了する。Then, as shown in FIG. 7, the casing 2 is removed, and the piling membrane shown in FIG. 8 is completed.
以上の手順からなる杭打膜方法によれば、打込杭6の打
ち込み時にはケーシング2が残っており、しかも充填材
7は未充填であり、打込杭6は先行掘削した捨石層5の
下部迄確実に、かつ正確に打込みができ、る。According to the pile driving method consisting of the above-mentioned steps, when the driven pile 6 is driven, the casing 2 remains, and the filler material 7 is not yet filled, and the driven pile 6 is placed under the previously excavated rubble layer 5. This allows for reliable and accurate driving.
また、この場合、打込杭6を打込み後に充填材7を充填
するので、部材強度の低い打込杭6でも施工でき、しか
もその打込杭6の外周は砂以外のどのような充填物7、
例えばモルタルの充填も可能であり、強度の高い杭が打
設されることになる。Furthermore, in this case, since the filler 7 is filled after driving the driven pile 6, construction can be performed even with the driven pile 6 having a low member strength, and the outer periphery of the driven pile 6 can be filled with any type of filler 7 other than sand. ,
For example, filling with mortar is also possible, and high-strength piles will be driven.
以上に説明したごとく、本発明の杭打膜方法を採用すれ
ば、捨石層に対してもグラブバケットなどを用いて大き
な岩石を排除する作業を必要とせず、通常の打込機を用
いて杭を容易に打設可能で、しかもその打込精度の高い
杭打膜が可能で、更に充填材を変えることもできると共
に、部材強度の低い杭でも施工可能になるという効果が
ある。As explained above, if the pile driving method of the present invention is adopted, it is not necessary to remove large rocks using a grab bucket or the like even in the rubble layer, and piles can be piled using a normal driving machine. It is possible to easily drive piles with high driving accuracy, and the filling material can be changed, and even piles with low member strength can be used for construction.
更に、本発明の杭打膜方法では、打込杭を打ち込んだ後
に、その外周に砂を充填することになるので、打込杭の
分だけ充填に使用する砂の量が少なくてすむという利点
がある。Furthermore, in the pile driving membrane method of the present invention, the outer periphery of the driven pile is filled with sand after driving the pile, so the advantage is that the amount of sand used for filling can be reduced by the amount of the driven pile. There is.
第1図から第8図までは本発明の捨石層への杭打段方法
による杭打段の一実施例における手順を説明する一連の
側断面図である。
1・・・オーガースクリュー、2・・・ケーシング、3
・・・カッター、4・・・刃部、5・・・捨石層、6・
・・打込杭、7・・・充填物。FIG. 1 to FIG. 8 are a series of side sectional views illustrating the steps in one embodiment of the method for driving piles into a riprap layer according to the present invention. 1... Auger screw, 2... Casing, 3
... cutter, 4 ... blade part, 5 ... rubble layer, 6.
... Driven pile, 7... Filling.
Claims (1)
ースクリューを用いて捨石層に縦穴を掘削した後、該オ
ーガースクリューのみを抜き取り、その中に打込杭を打
込み、ケーシングと打込杭との間に充填材を充填した後
、ケーシングを抜き取る捨石層への杭打設方法。After drilling a vertical hole in the rubble layer using an auger screw with a casing that has a cutter for ground excavation at the tip, remove only the auger screw, drive a driven pile into it, and fill it between the casing and the driven pile. A method of driving piles into a rubble layer where the casing is removed after filling with material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP24832686A JPS63103122A (en) | 1986-10-21 | 1986-10-21 | Driving of pile into rubble layer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP24832686A JPS63103122A (en) | 1986-10-21 | 1986-10-21 | Driving of pile into rubble layer |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS63103122A true JPS63103122A (en) | 1988-05-07 |
Family
ID=17176414
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP24832686A Pending JPS63103122A (en) | 1986-10-21 | 1986-10-21 | Driving of pile into rubble layer |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS63103122A (en) |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6047116A (en) * | 1983-08-24 | 1985-03-14 | Marutoku Kigyo:Kk | Pile hole formation work |
-
1986
- 1986-10-21 JP JP24832686A patent/JPS63103122A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6047116A (en) * | 1983-08-24 | 1985-03-14 | Marutoku Kigyo:Kk | Pile hole formation work |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS62288218A (en) | Settlement caisson | |
CN209958343U (en) | Connecting joint for connecting reinforced concrete cast-in-place piles | |
GB2154630A (en) | Construction method for foundation piling | |
JPS63103122A (en) | Driving of pile into rubble layer | |
JP2019173278A (en) | Cutoff wall construction method | |
JPH06228947A (en) | Construction of landslide protection wall in ground filled up with wastes | |
JPS58189414A (en) | Construction of sheathing wall | |
JPS6332930B2 (en) | ||
JP3052195B2 (en) | Drilling method and equipment for large diameter pits | |
JP2836808B2 (en) | Drill stirrer for soil cement pile method | |
JPS63289114A (en) | Head for drill casing | |
JPH0442493B2 (en) | ||
JPH0959984A (en) | Simple subsurface construction structure | |
JPS61221413A (en) | Skew pile driving work | |
JPS6192214A (en) | Method of pulling out pile | |
JPS6117972B2 (en) | ||
JPH07102557A (en) | Rotation drive method for surface casing for underground vertical shaft excavation work | |
JPH0384115A (en) | Excavated casing | |
JPH06185049A (en) | Construction of straight pipe type large bore cast-in-place piling | |
JP3424117B2 (en) | Construction method of continuous underground wall | |
JP2022129955A (en) | Removal method of existing concrete pile | |
JP2620034B2 (en) | Vertical and horizontal drilling rig, vertical and horizontal drilling method and vertical and horizontal tunnel | |
JPH04269210A (en) | Construction method for underground continuous wall | |
JP2001164550A (en) | Improvement method of construction ground for underground structure | |
JPS63236812A (en) | Improving work for hard clayey ground |