JPS6038318B2 - Quay cargo handling crane - Google Patents
Quay cargo handling craneInfo
- Publication number
- JPS6038318B2 JPS6038318B2 JP11279077A JP11279077A JPS6038318B2 JP S6038318 B2 JPS6038318 B2 JP S6038318B2 JP 11279077 A JP11279077 A JP 11279077A JP 11279077 A JP11279077 A JP 11279077A JP S6038318 B2 JPS6038318 B2 JP S6038318B2
- Authority
- JP
- Japan
- Prior art keywords
- hanging
- trolley
- boom
- hoisting
- cargo handling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 230000007246 mechanism Effects 0.000 claims description 14
- 235000019645 odor Nutrition 0.000 description 13
- 239000003638 chemical reducing agent Substances 0.000 description 4
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 238000004804 winding Methods 0.000 description 2
- 210000001015 abdomen Anatomy 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
Landscapes
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
Description
【発明の詳細な説明】
本発明は岸壁荷役クレーンに係り、特にコンテナ船に対
して同時に複数個のコンテナを船舶こ複数の地上車線上
、またはその車線上を走る荷役車師へ荷役ができるよう
に構成した岸壁クレーンに関するものである。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a quayside cargo handling crane, which is particularly capable of simultaneously handling a plurality of containers from a container ship onto multiple ground lanes of the ship or onto a stevedore running on the lanes. The present invention relates to a quay crane constructed in the following manner.
船舶による海上輸送の革命的なシステムとして荷役作業
の高速化、省略化を実行できるコンテナ船およびコンテ
ナャードの開発が行われ、実施されてきている。Container ships and container yards, which can speed up and simplify cargo handling operations, have been developed and put into practice as revolutionary systems for marine transportation by ships.
このようなコンテナシステムが実施されても、より高速
な荷役の要請はなされ、岸壁クレーンによってコンテナ
を1個ずつ吊下げていたものを同時に複数個吊下げて荷
役が行えることができるような岸壁クレーンが提案され
ている。例えば特公昭47−401y号、実公昭49−
14828号公報記載の岸壁荷役クレーンがそれである
。ところが、これらの公知のクレーンはコンテナ船の長
手方向に沿って隣合ったコンテナを同時に荷役すること
ができるように構成されている。即ち、第1図において
コンテナ船1の船腹に一定の間隔で上下左右に整然と積
上げられたコンテナ2をコンテナ船の長手方向に沿って
隣接して吊下げられた2個の吊具3,4によってコンテ
ナ船1の長手方向に隣接するコンテナ2を吊下げて荷没
しようとするものである。しかし、このような構造を採
用すると、4・型の20フィートのコンテナを2個同時
に荷没しようとするだけならそれほどではないが、40
フィートのコンテナを2個あるいは20フィートのコン
テナを3個以上同時に荷役できるようにするには岸壁ク
レーンの岸壁に沿った脚間の間隙Lを拡げる必要があり
、岸壁クレーンが極めて大型化し、構造的にも経済的に
も不利であり実用化が困難であるという欠点があった。Even if such a container system is implemented, there will be a demand for faster cargo handling, and quay cranes have been introduced that can suspend multiple containers at the same time instead of suspending them one by one using quay cranes. is proposed. For example, Tokko No. 47-401y, Jikko No. 49-
This is the quay cargo handling crane described in Publication No. 14828. However, these known cranes are configured so that they can simultaneously load and unload containers that are adjacent to each other along the longitudinal direction of a container ship. That is, as shown in FIG. 1, containers 2 stacked up, down, left, and right at regular intervals on the belly of a container ship 1 are stacked vertically and horizontally on the side of a container ship 1 by two hanging devices 3 and 4 that are hung adjacent to each other along the longitudinal direction of the container ship. Containers 2 adjacent to the container ship 1 in the longitudinal direction are suspended and unloaded. However, if such a structure is adopted, it is not so much if you are just trying to unload two 4-inch 20-foot containers at the same time.
In order to be able to simultaneously handle two 20-foot containers or three or more 20-foot containers, it is necessary to widen the gap L between the legs of the quay crane along the quay wall. However, it has disadvantages in that it is economically disadvantageous and difficult to put into practical use.
また、このような構造の岸壁クレーンを用いと荷役すれ
ば同時に荷役した複数個のコンテナを同一車線上に荷卸
しすることになり、地上でのコンテナ・ハンドリングを
複雑にするという難点がある。Furthermore, if a quayside crane with such a structure is used for cargo handling, a plurality of containers loaded and unloaded at the same time must be unloaded on the same lane, which poses the problem of complicating container handling on the ground.
′本発明の
目的は複数個のコンテナを岸壁荷役クレーンの大型化を
伴わずに荷役でき、かつ地上でのコンテナ・ハンドリン
グを容易にできるように構成した岸壁荷役クレーンを得
るにある。本発明によれば上記の目的はクレーンガータ
およびブームに沿って吊具間の距離を地上車線間隔、ま
たは船上コンテナ間隔に合わせる機構を有するトロリと
、このトロリから吊下げられた吊具にも吊臭間隔を調整
し得る吊具連結機構を備え、2個の吊具がお互いに関連
を保ちながら吊具の地上または船上における位置決めを
行えるように構成することによって達成される。'An object of the present invention is to provide a quayside cargo handling crane that is capable of handling a plurality of containers without increasing the size of the quayside cargo handling crane and is configured to facilitate container handling on the ground. According to the present invention, the above object is to provide a trolley having a mechanism that adjusts the distance between the hanging tools along the crane gutter and boom to the ground lane spacing or onboard container spacing, and also to suspend the hanging tools suspended from the trolley. This is achieved by providing a hanging device connection mechanism that can adjust the odor interval and configuring the two hanging devices to be positioned on the ground or on a ship while maintaining a relationship with each other.
以下、図面に示す実施例と共に本発明の詳細を説明する
。Hereinafter, details of the present invention will be explained in conjunction with embodiments shown in the drawings.
第2図以下は本発明の一実施例を説明するもので、図中
第1図と同一部分は同一符号をもって示してある。FIG. 2 and subsequent figures illustrate one embodiment of the present invention, in which the same parts as in FIG. 1 are designated by the same reference numerals.
図において全体を符号5で示すものは岸壁荷役クレーン
で岸壁6上に沿って敷設された軌条7上を走行できるよ
うに構成された脚8と、この脚8により支持されたガー
ダ9とを備え、このガーダ9上には駆動機械室10が設
けられている。In the figure, the crane designated as a whole by reference numeral 5 is a quay cargo handling crane that is equipped with legs 8 configured to be able to run on rails 7 laid along the quay 6, and a girder 9 supported by the legs 8. A driving machine room 10 is provided on the girder 9.
そして、ガーダ9の海側にはブーム11が上方に起伏で
きるように軸承されている。また、岸壁6上には車線用
Wを有するストラドルキヤリア、トレーラあるいはレー
ルカー等のコンテナを搬送する車軸が走行する車線A,
B・・・が敷設されている。A boom 11 is rotatably supported on the sea side of the girder 9 so as to be able to rise and fall upward. In addition, on the quay 6, there is a straddle carrier with a lane W, a lane A on which an axle for transporting containers such as a trailer or a rail car runs,
B... has been installed.
一方、ガーダ9およびブーム11にはトロリ12が横行
できる横行レールが敷設されており、この横行レール上
をトロリ12が移動するわけであるが、その操作はトロ
リの一端に設けられた運転室13内で行う。このトロリ
ー2は本実施例の場合、ブーム11の延在方向に沿って
並ぶ2つの吊具14×,14Yを有する。・なお、本船
上のコンテナの幅方向の中心間隔wは前述した車線間隔
Wよりも小さいのが現状である。さて、本発明の要部を
なすトロリー2と吊具14×,14Yは第3図以下に示
されている。On the other hand, a traversing rail on which the trolley 12 can traverse is installed on the girder 9 and the boom 11, and the trolley 12 moves on this traversing rail. Do it inside. In the case of this embodiment, the trolley 2 has two hanging tools 14x and 14Y arranged along the extending direction of the boom 11. - Note that the center spacing w of the containers on the ship in the width direction is currently smaller than the lane spacing W described above. Now, the trolley 2 and the hanging tools 14X, 14Y, which constitute the essential parts of the present invention, are shown in FIGS. 3 and below.
第3図以下においては、わかりやすくするために本発明
と直接関連のない部分である運転室、トロリ横行機構等
は省略して示されている。ここで、幅方向の間隔wをも
って本船上に並べられたコンテナ2の内、吊具14×で
吊上げられるコンテナを2×、吊具14Yで吊上げられ
るものを2Yとし、それぞれ別の巻上げ系統である×系
統とおよびY系統等によって巻上げられるものとする。From FIG. 3 onward, parts not directly related to the present invention, such as the driver's cab and trolley traverse mechanism, are omitted for clarity. Here, among the containers 2 arranged on the ship with an interval w in the width direction, the container that can be lifted by the lifting device 14× is 2×, and the container that can be lifted by the lifting device 14Y is 2Y, and each has a different hoisting system. It is assumed that the winding is carried out by the × system, the Y system, etc.
なお、符号14で示すものは吊具14×,14Yの隅部
に設けられた公知の吊下げ装置である。一方、トロリ1
2は第2図、第3図から明らかなようにブーム11の延
在方向に並ぶ適宜数のトロリ、すなわち、主トロリー2
Aとその両側に位置する補助トロリ12B,12B2か
らなり、吊具14Xに設けられたローププーリ15xは
補助トロリ12B,のプーリ15Xに、プーリ16xは
主トロリ12Aのプーリ16Xにロープを介して吊下げ
られており、吊具14Yのプーリ16yは主トロリ12
Aのプーリ16Yに、またプーリ17yは補助トロリ1
2B2のプーリ17Yにロープを介して吊下げられてい
る。In addition, what is shown by the code|symbol 14 is a well-known hanging device provided in the corner part of hanging tools 14x and 14Y. On the other hand, trolley 1
As is clear from FIGS. 2 and 3, 2 is an appropriate number of trolleys lined up in the extending direction of the boom 11, that is, the main trolley 2.
A and the auxiliary trolleys 12B and 12B2 located on both sides thereof, the rope pulley 15x provided on the hanging tool 14X is suspended from the pulley 15X of the auxiliary trolley 12B, and the pulley 16x is suspended from the pulley 16X of the main trolley 12A via a rope. The pulley 16y of the hanging tool 14Y is connected to the main trolley 12.
A pulley 16Y, and pulley 17y are auxiliary trolley 1.
It is suspended from the pulley 17Y of 2B2 via a rope.
なお、第3図において実線で示す状態は、コンテナ間の
間隔がwの状態であり、鎖線で示す状態はWの間隔に拡
げられた状態を示す。上述した各トロリは横行レール1
9上を車輪18を介して横行される。In addition, the state shown by the solid line in FIG. 3 is the state where the interval between the containers is w, and the state shown by the chain line is the state where the interval is widened to W. Each trolley mentioned above is a transverse rail 1
9 via wheels 18.
ところで、主トロリ12Aと補助トロリ128,12B
2上には各トロリ間の間隔を調整する間隔調整装置が取
付けられている。By the way, the main trolley 12A and the auxiliary trolleys 128, 12B
A spacing adjustment device for adjusting the spacing between each trolley is attached on top of the trolley.
いま、間隔調整装置のうち、X系統について説明すると
次の如くである。Now, of the interval adjusting devices, the X system will be explained as follows.
即ち、主トロリ12A上に設けられたモータ等の駆動源
24×(第4図)により減速機22×,23×を介して
減速機22×に具備されたねじ22×,を回転させ、こ
のめねじ22×,に螺合しているねじ軸20×を進退さ
せる構造を採用している。ねじ軸20×は、その一端を
補助トロリ12B,上にサポート21Xにより取りつけ
られている。従って、めねじ22×が回転されれば、ね
じ軸20×は進退され、補助トロリ12B,は主トロリ
12Aとの間隔を調整することができる。以上は×系統
についてのみ説明したが、Y系統も全く同様に構成され
ており、同一部分は同一符号をもって示し、ただ添字を
Yで示してある。That is, a drive source 24x (FIG. 4) such as a motor provided on the main trolley 12A rotates a screw 22x provided on the reducer 22x via the reducers 22x and 23x. A structure is adopted in which the screw shaft 20×, which is screwed into the female screw 22×, is moved back and forth. The screw shaft 20X has one end attached to the auxiliary trolley 12B and a support 21X mounted thereon. Therefore, when the female screw 22x is rotated, the screw shaft 20x is moved back and forth, and the distance between the auxiliary trolleys 12B and the main trolley 12A can be adjusted. Although only the x system has been described above, the Y system is constructed in exactly the same way, and the same parts are indicated by the same reference numerals, and the subscript is simply indicated by Y.
なお、第4図中、25×,25Yはブレーキを示す。以
上のような構成になるトロリと吊具がどのように巻上げ
駆動装置とワイヤリングされているかを示す一例が第5
図で、同図においてはX,Y系統中の一系統についての
み示してある。In addition, in FIG. 4, 25X and 25Y indicate brakes. An example of how the trolley and hanging device configured as above are wired with the hoisting drive device is shown in the fifth example.
In the figure, only one of the X and Y systems is shown.
同図中符号Tで示すものはトロリ取付のプーリ、Sで示
すものは吊具上に取付けられたブーリ、Bはブーム末端
取付のプーリ、B2はガーダ末端取付のプーリ、26は
巻上げドラムを示し、通常は前述した駆動機械室10内
に設けられている。ところで、上述の機構では、トロリ
の加減遠などの理由により、吊下げた2個のコンテナが
それぞれ自由勝手に横行方向に揺動する場合も生じる。In the same figure, the symbol T indicates a pulley attached to a trolley, the symbol S indicates a pulley attached to a lifting device, B indicates a pulley attached to the end of a boom, B2 indicates a pulley attached to an end of a girder, and 26 indicates a hoisting drum. , is normally provided within the drive machine room 10 described above. By the way, in the above-mentioned mechanism, the two hanging containers may swing freely in the transverse direction due to reasons such as the adjustment of the trolley.
このような場合に備え、さらに作業効率を向上させるに
は、前記吊臭連結機構が有用となる。In preparation for such a case and to further improve work efficiency, the above-mentioned odor hanging connection mechanism is useful.
第6図以下に示すものは上述した間隔調整と共に重要な
役割を果たす吊具の連結機構の一例を示すものである。
即ち、主トロリ12Aは第6図に示すように二段に構成
し、主トロリの下段に設けられた支持フレーム12A,
上には後述する連結部を操作する連結部巻上げ機構が取
付けられている。即ち、第7図に示すように支持フレー
ム12A,上には、駆動源であるモータ27によって減
速機28を介して回転されるドラム29が一対取付けら
れており、これらドラム29に巻回されたワイヤ30は
プーリ31を介して支持フレーム12A,の更に下方に
位置する連結具32(第6図)のブラケット33上に連
結されている。符号34で示すものはブレーキである。
巻上げ駆動源たるモータ27の必要トルクはロープ30
のたるみを巻取る程度以上あれば良いが、ブレーキ34
は連結臭32を保持しておくだけのブレーキトルクを必
要とする。モータ27は通常前述した巻上げドラム26
6の駆動源と連動して作動される。一方、連結具32の
両端部には突起35×,35yが設けられており、これ
ら突起は吊具14×,14Y上に設けられた受口36×
,36y中に鉄着できる構造とされている。受口36×
,36yは第8図以下に示すように吊臭14×,14Y
上を横断して設けられた移動装置によって移動される。
即ち、この移動装置はモータ等の駆動源37×,37y
によって減速機38×,38yを介して駆動される駆動
スプロケット39×,39yを有し、駆動スプロケット
と対向して配置された従動スプロケット40×,40y
との間に張架されたチェーン41×,41yを有する。What is shown in FIG. 6 and subsequent figures shows an example of a connection mechanism of the hanging tool, which plays an important role in addition to the above-mentioned interval adjustment.
That is, the main trolley 12A is constructed in two stages as shown in FIG.
A connecting part winding mechanism for operating the connecting part, which will be described later, is attached to the top. That is, as shown in FIG. 7, a pair of drums 29 are mounted on the support frame 12A, and the drums 29 are rotated by a motor 27 as a drive source via a reducer 28. The wire 30 is connected via a pulley 31 to a bracket 33 of a connector 32 (FIG. 6) located further below the support frame 12A. What is indicated by the reference numeral 34 is a brake.
The required torque of the motor 27, which is the hoisting drive source, is the rope 30.
The brake should be at least enough to take up the slack, but the brake
requires a brake torque sufficient to maintain the connection odor 32. The motor 27 is usually the hoisting drum 26 mentioned above.
It is operated in conjunction with the drive source No. 6. On the other hand, projections 35x and 35y are provided at both ends of the connecting tool 32, and these projections are connected to sockets 36x provided on the hanging tools 14x and 14Y.
, 36y. Socket 36x
, 36y are hanging odor 14x, 14Y as shown in Figure 8 and below.
It is moved by a moving device provided across the top.
That is, this moving device uses drive sources 37x, 37y such as motors.
Drive sprockets 39x, 39y are driven by speed reducers 38x, 38y, and driven sprockets 40x, 40y are arranged opposite to the driving sprockets.
It has chains 41x, 41y stretched between.
そして、これらチェーン41×,41yにはフレーム4
2×,42yを介して前記受口36×,36yが取付け
られ、フレーム42×,42yには車輪43が取付けら
れている。従って、駆動源37×,37yが始動される
と受□36×,36yを介して吊臭14×,14Y相互
に接近、または離間することができる。また、第8図に
おいて符号44×,44yはブレーキを示す。第8図中
では説明を判りやすくするために連結具32の片側を一
部切断して図示してある。次に以上のように構成された
実施例の動作につき説明する。And these chains 41x, 41y have a frame 4.
The sockets 36x, 36y are attached via the frames 42x, 42y, and wheels 43 are attached to the frames 42x, 42y. Therefore, when the drive sources 37x, 37y are started, the hanging odor 14x, 14Y can approach or separate from each other via the receivers 36x, 36y. Further, in FIG. 8, symbols 44x and 44y indicate brakes. In FIG. 8, one side of the connector 32 is partially cut away to make the explanation easier to understand. Next, the operation of the embodiment configured as above will be explained.
本発明では、コンテナ船よりの地上への荷揚時について
解説することとし、これとは逆の積込時については説明
を省略する。まず、コンテナ船が着岸すると、岸壁荷役
クレーン5が所定の位置まで軌条7上を走行して停止し
、作業開始態勢を整える。In the present invention, the time of unloading from a container ship to the ground will be explained, and the explanation of the reverse loading time will be omitted. First, when the container ship docks, the quayside cargo handling crane 5 travels on the rails 7 to a predetermined position and stops, preparing to start work.
この時、吊具14×,14Yの間隔は本船上に積載され
たコンテナ間隔wに合わされている。この状態で車輪1
8を回転させてトロリ12を移動させ、コンテナ船上に
積載されたコンテナの所定位置上で停止される。次に巻
上げドラム26を駆動させ、巻上げロープを繰り出し、
荷役せんとするコンテナ上まで吊具14×,14Yを降
ろす。そして、吊下げ装置14によってコンテナ2X,
2Yをそれぞれの吊具に鞍着させ巻上げドラム26を逆
回転してコンテナを吊下げた状態の吊臭14×,14Y
を巻上げる。次いで、トロリ車輪18を逆回転させ、ト
ロリを岸壁側へ移動させる。この途中において、王およ
び補助トロリ間の間隔調整装置の駆動源24×,24Y
を起動してねじ軸20×,20Yを繰り出し、コンテナ
間の間隔が地上車線間隔Wに見合った吊具間隔となる位
置で止め、ブレーキ25×,25Yで保持する。一方、
駆動源24×,24Yの起動と同時に連結部移動装置の
駆動源37×,37yを起動させ、リンクチェーン41
×,41yを移動させ、受□36×,36y間の間隔を
地上車線間隔Wに見合った吊具間隔となる位置でブレー
キ44×,44yを作動させて停止させる。At this time, the spacing between the hanging tools 14x and 14Y is adjusted to the spacing w of the containers loaded on the ship. In this state, wheel 1
8 is rotated to move the trolley 12, and the trolley 12 is stopped at a predetermined position of a container loaded on a container ship. Next, the hoisting drum 26 is driven to let out the hoisting rope,
Lower the hoisting tools 14X and 14Y onto the container to be handled. Then, the container 2X,
Hanging odor 14×, 14Y with 2Y attached to each hanging tool and the hoisting drum 26 rotated in reverse to hang the container.
wind up. Next, the trolley wheels 18 are reversely rotated to move the trolley toward the quay side. During this process, drive sources 24×, 24Y of the distance adjusting device between the king and auxiliary trolleys
is activated to let out the screw shafts 20x, 20Y, and stop at a position where the interval between the containers becomes a hanging tool interval commensurate with the ground lane interval W, and is held by the brakes 25x, 25Y. on the other hand,
At the same time as the drive sources 24
x, 41y are moved, and the brakes 44x, 44y are activated to stop the vehicle at a position where the spacing between the receivers □ 36x, 36y becomes a hanging tool spacing commensurate with the ground lane spacing W.
この状態で吊具14×,14Yの間隔をWに保持したま
まコンテナを降ろし、地上もしくは地上に停止している
トレーラ上にそれぞれコンテナ2×,2Yを降ろし、吊
下げ装置14を開放し、吊具14×,14Yとコンテナ
2×,2Yとの連結を外す。然る後、吊具14×,14
Yの巻上げに移り、ブーム上を海側に移動させつつ主お
よび補助トロリ間隔、吊具間隔をWとなるように調整し
、次の荷役サイクルに移る。以上の説明は吊具14×,
14Yがそれぞれ同時に動く状態を対称にして説明し、
連結臭32の突起35×,35yは通常受口36×,3
6y中に舷合した状態で操作されたが、以下に説明する
ような場合においても荷役ができる。In this state, lower the container while maintaining the distance between the hanging devices 14x and 14Y at W, lower the containers 2x and 2Y onto the ground or a trailer stopped on the ground, open the hanging device 14, and hang the container. Disconnect the tools 14x, 14Y and the containers 2x, 2Y. After that, hanger 14×, 14
Moving on to hoisting Y, while moving the boom to the sea side, adjust the main and auxiliary trolley intervals and the hoisting interval to W, and move on to the next cargo handling cycle. The above explanation is for hanging tools 14×,
Explaining the state in which 14Y move simultaneously, symmetrically,
The protrusions 35x, 35y of the connecting odor 32 are normally the sockets 36x, 3
Although the operation was carried out in a state in which the ships were joined together during the 6y, cargo handling can also be carried out in cases such as those described below.
即ち、コンテナ船内のコンテナ置場に仕切壁等の船体構
造物があり、これが術役せんとする二つのコンテナの中
央に位置している時には連結臭32は上記構造物にさえ
ぎられて巻下げられない。That is, when there is a ship structure such as a partition wall in the container storage area of a container ship, and this structure is located in the center of two containers to be operated, the connecting odor 32 is blocked by the structure and cannot be lowered. .
このような場合には連結具32の突起35×,35yを
受〇36×,36yから外し、連結臭32を切離して吊
具14×,14Yがそれぞれ単独に船槌内に降下される
。この場合連結具32はブレーキ34によって保持され
ている。そして、船槍より吊具が出ていく場合には上方
に待機している連結臭32と鉄着され、吊具と一体的と
なって操作される。更に、コンテナ船上に積載されたコ
ンテナの積荷状況、または地上のコンテナハンドリング
の都合により複数個のコンテナを同時に荷役するよりも
、単に一個ずつ荷没した方が、良い場合には吊具14×
,14Yの内、どちらか一方だけを連結具32から分離
し、その吊具だけを操作して荷役をすれば良い。In such a case, the protrusions 35x, 35y of the connector 32 are removed from the receivers 36x, 36y, the connector 32 is cut off, and the hanging tools 14x, 14Y are individually lowered into the ram. In this case, the coupling 32 is held by a brake 34. When the hanging tool comes out from the ship's spear, it is connected to the connecting rod 32 waiting above, and is operated integrally with the hanging tool. Furthermore, depending on the loading status of the containers on board the container ship or the convenience of container handling on land, if it is better to simply unload one container at a time rather than unloading multiple containers at the same time, use the lifting device 14×.
, 14Y, it is sufficient to separate only one of them from the connecting tool 32 and operate only that hanging tool for cargo handling.
この時、使用しない吊具はトロリの近くで巻上げられた
状態で保持されている。なお、以上の説明においては巻
上ドラム26を駆動機械室10内に設置した例として示
したが、巻上げドラムの位置は駆動機械室内に限らず、
適切な位置であれば何処でも良い。また、トロリは主ト
ロリ、補助トロリ2個の合計3個に分割した例を示した
が、トロリを2台に分割し、それぞれに吊具を吊下げる
構造としても良い。また、吊臭間の間隔調整装置として
ねじ軸を使用した例を示したが、トロリ上にはこれらの
機構を設けず、ガーダ、またはブーム上に設けても良く
、トロリは1台として構成し、トロリ上のローププーリ
群の一部または全部を水平移動できるようにトロリ上を
動き得る別個の台車に取付けてもよい。At this time, unused hanging tools are held in a rolled up state near the trolley. In addition, in the above explanation, the hoisting drum 26 was shown as an example installed in the drive machine room 10, but the position of the hoist drum is not limited to the drive machine room.
Any suitable location is fine. Further, although an example has been shown in which the trolley is divided into a total of three parts, a main trolley and two auxiliary trolleys, it is also possible to have a structure in which the trolley is divided into two parts and a hanging tool is hung from each part. In addition, although we have shown an example in which a screw shaft is used as a spacing adjustment device between hanging odor, these mechanisms may not be provided on the trolley, but may be provided on the girder or boom, and the trolley may be configured as one unit. , some or all of the rope pulleys on the trolley may be mounted on a separate carriage movable on the trolley for horizontal movement.
更に、吊臭連結機構として上記実施例においては連結部
をトロリから吊下げ、かつ間隔を調節するために受〇と
りンクチェーンを用いているが、吊具間隔をトロリの動
きに合わせ調整し得る連結機構であれば他のどのような
機構を使用しても良い。Furthermore, in the above embodiment, the connecting part is suspended from the trolley as the hanging odor connecting mechanism, and a link chain is used to adjust the spacing, but the spacing between the hanging tools can be adjusted according to the movement of the trolley. Any other coupling mechanism may be used.
例えば、連続部を主トロリ上にある巻上げドラム29に
より吊下げているが、巻上げドラム29の位置はガーダ
9上であっても良い。更に、連結部移動装置は本実施例
ではそれぞれの吊具上に設けてあるが、連結部上に設け
ても差支えなく、連結具そのものを伸縮ビームとして吊
臭間隔を調整するように構成しても良い。For example, although the continuous portion is suspended by the hoisting drum 29 on the main trolley, the hoisting drum 29 may be positioned on the girder 9. Further, in this embodiment, the connecting part moving device is provided on each hanging tool, but it may also be provided on the connecting part, and the connecting tool itself can be configured as a telescopic beam to adjust the hanging distance. Also good.
その他、本発明の主旨を逸脱しない範囲で各種の構造を
採用することができる。In addition, various structures can be adopted without departing from the spirit of the present invention.
以上の説明から明らかなように本発明によれば、複数個
のコンテナを同時に船舶と地上車線上、またはその車線
上を走る荷役車鯛間で荷役させることができ、荷役能率
が大幅に向上する。As is clear from the above description, according to the present invention, a plurality of containers can be simultaneously handled by a ship and a ground lane, or between cargo handling vehicles running on the lane, and cargo handling efficiency is greatly improved. .
また、複数個の吊臭が通常連結臭によってお互いにその
位置を規制し合うため吊具相互の間隔を正確に保って各
吊具を同時に昇降させることができ、船舶上、または地
上の所定位置に吊具、または吊具より吊下げられたコン
テナを正確に位置づけして巻下ろすのに便利であり、複
数個のコンテナの荷役時における作業性が大幅に向上す
るとともに、複数個のコンテナをブームやガーダに沿っ
て移動させたり、あるいは昇降させている時に、コンテ
ナ相互が衝突して破損するような不都合も防止すること
ができる。また、更に、コンテナ船の幅方向(すなわち
、ブームの延在する方向)に隣接した複数個のコンテナ
を同時に荷役するように構成されているため、岸壁クレ
ーンの走行方向の脚柱間隔を拡幅する必要がなく、従来
のクレーンの大きさをあまり変更せずに構成できるとい
う優れた経済的効果も得られる。In addition, since the positions of multiple hanging odors are normally controlled by the connected odors, each hanging rig can be raised and lowered at the same time while maintaining accurate spacing between the hanging rigs. It is convenient for accurately positioning and unloading containers suspended from a hoisting device or from a hoisting device, and greatly improves work efficiency when handling multiple containers. It is also possible to prevent inconveniences such as containers colliding with each other and being damaged when being moved along a girder or raised or lowered. Furthermore, since the structure is configured to simultaneously handle multiple containers adjacent to each other in the width direction of the container ship (i.e., the direction in which the boom extends), the distance between the pillars in the traveling direction of the quay crane is increased. There is also an excellent economical effect in that it can be configured without requiring much modification to the size of conventional cranes.
第1図は従釆のクレーンを説明する正面図、第2図以下
は本発明の一実施例を説明するもので、第2図は全体の
側面図、第3図は要部の側面図、第4図は平面図、第5
図はワイヤリングの説明図、第6図は第4図のW−W線
断面図、第7図は第6図の血−風線断面図、第8図は第
6図の風−畑線断面図、第9図は受口移動機構部分の平
面図、第10図は第9図のX−X線断面図、第11図は
第9図の幻一丸線断面図である。
9……ガーダ、11……フーム、12,12A,12B
,,12星・・・・・・トロリ、14×,14Y……吊
具、26……巻き上げドラム、30……ワイヤロープ、
32・・・・・・連結臭、35×,35y・・・・・・
突起、26×,36y・・…・受口。
第1図第2図
第3図
第4図
第7図
第5図
第9図
第10図
第11図
第6図
第8図Fig. 1 is a front view illustrating a subordinate crane, Fig. 2 and the following are illustrative of an embodiment of the present invention, Fig. 2 is an overall side view, Fig. 3 is a side view of main parts, Figure 4 is a plan view, Figure 5
The figure is an explanatory diagram of the wiring, Figure 6 is a cross-sectional view taken along the line W-W in Figure 4, Figure 7 is a cross-sectional view taken along the blood-wind line in Figure 6, and Figure 8 is a cross-sectional view taken along the wind-field line in Figure 6. 9 is a plan view of the socket moving mechanism portion, FIG. 10 is a sectional view taken along the line X--X of FIG. 9, and FIG. 11 is a sectional view taken along the line of FIG. 9. 9...Garda, 11...Hoom, 12, 12A, 12B
,,12 stars...Trolley, 14x, 14Y...Hanging tool, 26...Hoisting drum, 30...Wire rope,
32...Connection odor, 35x, 35y...
Projection, 26x, 36y...Socket. Figure 1 Figure 2 Figure 3 Figure 4 Figure 7 Figure 5 Figure 9 Figure 10 Figure 11 Figure 6 Figure 8
Claims (1)
ともに脚の走行方向にほぼ直行する方向に延在するガー
ダと、着岸したコンテナ船側に位置したガーダの端部に
取り付けられて該ガーダを延長した如くコンテナ船側に
突出するブームと、該ブームおよびガーダに沿つて走行
するトロリと、該トロリに昇降可能に吊り下げられるコ
ンテナ用の吊具とを備えて、前記コンテナ船と岸壁との
間での荷役を行う岸壁荷役クレーンであつて、ブームの
延在方向に沿つて同時に複数個のコンテナを吊り下げら
れるように、前記トロリが前記ブームの延在方向に沿つ
て適宜数並べられるとともに前記吊具が前記ブームの延
在方向に沿つて複数個並べられ、かつ、前記適宜数のト
ロリを相互に連結するとともにトロリ相互間の間隔を調
整する間隔調整装置と、隣合う吊具相互の間隔を調整す
る移動装置を持ち、複数個の吊具を相互に連結するとと
もに隣合う吊具相互の間隔を所定の値に保持する吊具連
結機構と、複数個の吊具相互の間隔が前述のトロリ相互
の間隔調整によつて設定されるように吊具からトロリに
ワイヤロープが掛け渡されるとともに該ワイヤロープを
巻回操作して前記吊具を昇降させる巻き上げドラムを具
備した巻き上げ装置とが備えられたことを特徴とする岸
壁荷役クレーン。 2 前記吊具連結機構が、隣合う吊具のそれぞれに設け
た受口に上方から嵌入する突起を有し、これらの受口と
突起との嵌合によつて隣合う連結具と、前記受口を吊具
上で移動させることによつて隣合う吊具相互の間隔を調
整する移動装置と、前記連結具をワイヤロープを介して
トロリに吊すとともにそのワイヤロープを巻回操作する
ことによつて前記連結具を昇降させる連結部巻き上げ機
構とを備えたことを特徴とする特許請求の範囲第1項記
載の岸壁荷役クレーン。[Scope of Claims] 1. A leg that can run along a quay, a girder fixed to the leg and extending in a direction substantially perpendicular to the traveling direction of the leg, and an end of the girder located on the side of a berthed container ship. a boom that is attached to the container ship and projects toward the side of the container ship as if it were an extension of the girder; a trolley that runs along the boom and the girder; and a container hoist that is movably suspended from the trolley; The quayside cargo handling crane performs cargo handling between the container ship and the quay, and the trolley is arranged in the direction of extension of the boom so that a plurality of containers can be simultaneously suspended along the direction of extension of the boom. an appropriate number of trolleys are arranged along the boom, a plurality of the hanging tools are arranged along the extending direction of the boom, and a spacing adjustment device that interconnects the appropriate number of trolleys and adjusts the spacing between the trolleys; , a hanging device connecting mechanism that has a moving device that adjusts the distance between adjacent hanging devices, connects the plurality of hanging devices to each other, and maintains the distance between the adjacent hanging devices at a predetermined value; A hoisting drum that extends a wire rope from the hoisting devices to the trolley so that the spacing between the hoisting devices is set by adjusting the spacing between the trolleys, and also winds the wire rope to raise and lower the hoisting device. A quay cargo handling crane characterized by being equipped with a hoisting device equipped with. 2. The hanging tool connection mechanism has a protrusion that fits from above into a socket provided in each of the adjacent hanging tools, and the fitting between the sockets and the projections connects the adjacent connecting tool and the receiver. A moving device that adjusts the distance between adjacent hanging devices by moving the opening on the hanging device, and a moving device that suspends the connecting device from a trolley via a wire rope and winds the wire rope. 2. The quayside cargo handling crane according to claim 1, further comprising a connecting portion hoisting mechanism for raising and lowering said connecting device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP11279077A JPS6038318B2 (en) | 1977-09-20 | 1977-09-20 | Quay cargo handling crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP11279077A JPS6038318B2 (en) | 1977-09-20 | 1977-09-20 | Quay cargo handling crane |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS5447264A JPS5447264A (en) | 1979-04-13 |
JPS6038318B2 true JPS6038318B2 (en) | 1985-08-31 |
Family
ID=14595572
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP11279077A Expired JPS6038318B2 (en) | 1977-09-20 | 1977-09-20 | Quay cargo handling crane |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS6038318B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008528406A (en) * | 2005-02-02 | 2008-07-31 | エヌエスエル エンジニアリング ピーティーイー リミテッド | Trolley and spreader assembly |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1297469C (en) * | 2003-07-30 | 2007-01-31 | 上海振华港口机械(集团)股份有限公司 | Container crane capable of lifting dual 40 feet box |
CN2811252Y (en) * | 2005-04-06 | 2006-08-30 | 上海振华港口机械(集团)股份有限公司 | Dual lifting mechanism for bis-40' quayside container crane |
JP4838021B2 (en) * | 2006-03-13 | 2011-12-14 | 三井造船株式会社 | Container crane |
JP4838020B2 (en) * | 2006-03-13 | 2011-12-14 | 三井造船株式会社 | Container crane |
KR101112156B1 (en) * | 2010-04-08 | 2012-02-22 | 한국과학기술원 | Container crane with multi-stage trolley |
JP2020158249A (en) * | 2019-03-26 | 2020-10-01 | 鹿島建設株式会社 | Lifting device and lifting method of suspended load |
-
1977
- 1977-09-20 JP JP11279077A patent/JPS6038318B2/en not_active Expired
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008528406A (en) * | 2005-02-02 | 2008-07-31 | エヌエスエル エンジニアリング ピーティーイー リミテッド | Trolley and spreader assembly |
Also Published As
Publication number | Publication date |
---|---|
JPS5447264A (en) | 1979-04-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3598440A (en) | Rotatable container-hoisting apparatus | |
US5775866A (en) | Cargo loading crane | |
KR100719031B1 (en) | Loading device for iso containers | |
US3051321A (en) | Gantry type crane assembly | |
JP5127535B2 (en) | Shuttle type gate crane | |
US3786942A (en) | Dry sail marina | |
KR19980086506A (en) | Container crane | |
US4256230A (en) | Cantilever straddle carrier | |
US3241686A (en) | Anti-sway linkage for container engaging means | |
JPS6038318B2 (en) | Quay cargo handling crane | |
JP2003040577A (en) | Bridge crane | |
JPH01294121A (en) | Container transferrer | |
US3102642A (en) | List compensating device | |
JPH01150695A (en) | Multi-container-carrier-loader | |
JPH07315212A (en) | Rescue vehicle for cable railway and method of lifting and lowering said rescue vehicle | |
JP7127993B2 (en) | portal crane | |
EP0422894A2 (en) | Container vehicle | |
JP3470801B2 (en) | Hanging equipment swing steady rest device | |
JPH03194013A (en) | Mooring facility in dam or the like and method of mooring ship | |
US1064385A (en) | Apparatus for handling freight. | |
CN220098380U (en) | Hanging well receiving platform | |
JPS61248827A (en) | Insertion handling gear | |
JPH1179409A (en) | Container terminal | |
JP2007269426A (en) | Winding mechanism for container crane | |
JPS5815389Y2 (en) | Dolly moving device such as unloader |