JPS58156620A - Construction work of foundation pile - Google Patents

Construction work of foundation pile

Info

Publication number
JPS58156620A
JPS58156620A JP3718182A JP3718182A JPS58156620A JP S58156620 A JPS58156620 A JP S58156620A JP 3718182 A JP3718182 A JP 3718182A JP 3718182 A JP3718182 A JP 3718182A JP S58156620 A JPS58156620 A JP S58156620A
Authority
JP
Japan
Prior art keywords
concrete
steel pipe
pipe column
ground
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP3718182A
Other languages
Japanese (ja)
Other versions
JPS6143489B2 (en
Inventor
Yasuhei Ogawa
小川 泰平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sato Kogyo Co Ltd
Original Assignee
Sato Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sato Kogyo Co Ltd filed Critical Sato Kogyo Co Ltd
Priority to JP3718182A priority Critical patent/JPS58156620A/en
Publication of JPS58156620A publication Critical patent/JPS58156620A/en
Publication of JPS6143489B2 publication Critical patent/JPS6143489B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/44Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile

Abstract

PURPOSE:To construct a pile having a multi-stage spherical footing by a method in which a rubber bag is set with a steel pipe under the ground, and concrete is placed into the bag. CONSTITUTION:A steel pipe 1 whose outside is covered with a rubber bag 2 and the tip is fitted with a shoe 3 is set under soft ground, and while concrete 8 is placed into the steel pipe 1 from a concrete placing pipe 7, the steel pipe 1 is pulled up. In this case, the rubber bag 2 is expanded sideways under the pressure of the concrete 8, and the expansion is stopped at the time when the soil pressure is balanced with the concrete pressure. By this, the places where soil pressure is small of the rubber bag 2 are projectionally expanded into wens form and thereby a pile with a multi-stage spherical footing can be constructed without wasting concrete.

Description

【発明の詳細な説明】 本発明は軟弱電鍍における基礎杭の一工法の改良に係る
ものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to an improvement in a construction method for foundation piles in soft electric plating.

軟弱地盤に既製杭な貫入する場合、横圧に対する抵抗力
に対して十分な杭群な1kgIL−rるためには。
When penetrating ready-made piles into soft ground, a pile group of 1kg IL-r must be sufficient for resistance to lateral pressure.

膨大な本数の杭を必要とし、また地中攪拌によって一エ
されるアースコンクリート杭においては。
Earth concrete piles require a huge number of piles and are ground concrete piles by underground agitation.

使用コンクリート量fついて大針な無駄が予測される。A large amount of concrete is expected to be wasted in terms of the amount of concrete used f.

本発明は前記従来工法の欠点な除去するためにII#さ
れたものであって、鋼管柱の外局虻長尺の弾性気一体I
k−嵌着するとともに、同気嚢体の先端部を前記鋼管柱
の先端に″嵌装された内側前金物及び同前金物の外11
に配設された外側沓金物との間r挟着し1、前記鋼管柱
な地中に所定深度まで嵌入したのち、同鋼管柱な内部に
コンクリートを打設しながら引抜舞、前記−双の膏金物
を気嚢体ケ挟着したまま地中和残留せしめるととも(、
同気嚢体を打設コンクリート圧(よって地中に膨腰せし
めることを特徴とする基礎杭暢工方法に係るものである
The present invention has been developed in order to eliminate the disadvantages of the conventional construction method, and is to provide a long elastic gas integral I
k- At the same time, the tip of the air envelope is fitted to the tip of the steel pipe column, and the inner front metal fitting and the outer front metal fitting 11 are fitted.
1. After inserting the steel pipe column into the ground to a predetermined depth, the steel pipe column is pulled out while pouring concrete inside the steel pipe column. By neutralizing the plaster metal and leaving it in the ground with the air bag sandwiched between them (
This relates to a foundation pile construction method characterized by placing an air bladder under concrete pressure (thus causing it to swell into the ground).

本発明は前記したよう虻、鋼管柱(長尺の弾性気嚢体な
嵌着するととも虻、同気嚢体の先端を鋼管柱の先端に嵌
装された内ms会物と、その外周r配設された外lI膏
会物とによって挟着し、この状態で前記鋼管柱をその外
@に能着された弾性気嚢体とともに地中に所定深度まで
貫入し、しかるのち前記鋼管柱内にコンクリートな打設
するようにしたので、同打設コンクリートの自重によっ
て前記雨音金物が弾性気嚢体を挾着したまま沓金物の到
達地点に残留する。
As described above, the present invention has a structure in which a steel pipe column (a long elastic air bladder body) is fitted, an inner structure in which the tip of the air bladder body is fitted to the tip of the steel tube column, and an outer periphery thereof. In this state, the steel pipe column is penetrated into the ground to a predetermined depth along with the elastic air bag attached to the outside, and then concrete is inserted into the steel pipe column. Since the concrete is poured, the rain sound metal fittings remain at the destination of the shoe metal fittings while holding the elastic air bladder due to the weight of the poured concrete.

而して前記鋼管柱なこれにコンクリートな打設しながら
引抜くことによって、打設コンクリートの圧力(より前
記気嚢体が外局地盤の性状(応じて拡大膨張し、同地盤
内には外龍面を気嚢体で被覆され、且つ外周地盤圧と〕
2ランス【また多段球根状のコンクリート杭一体が造成
されるものである。
By pulling out the steel pipe column while pouring concrete into it, the pressure of the poured concrete (due to the pressure of the poured concrete) causes the air sac to expand and expand in accordance with the properties of the external ground. The surface is covered with an air sac, and the outer ground pressure is
2 lances [Also, multi-stage bulbous concrete piles are constructed.

このように本発fIAvcよれば簡単な輪重で、外局地
盤に圧着された多段球根状の基礎杭が造成され。
In this way, according to the fIAvc of this invention, a multi-stage bulbous foundation pile that is crimped to the external ground can be created using a simple wheel load.

十分な支持力と、横圧に対する抵抗力とt/11する杭
躯体が造成されるものである。また同杭躯体は外聞土庄
とバランスした状11[まで地中r拡大膨張された多段
球根状の躯体[@成されるので、使用コンクリートr無
駄を生じることがなく、杭躯体造成用コンクリートは硬
化に至るまで前記弾性気嚢体虻よって保護され、地中泥
水、土砂等の混入によって劣化する慣れがない等、本発
明は多くの利点を有するものである。
A pile frame with sufficient bearing capacity and resistance to lateral pressure of t/11 will be constructed. In addition, the pile structure is a multi-stage bulbous structure that has been expanded and expanded into the ground up to 11 degrees, which is balanced with the shape of Gaimon Tosho.Therefore, there is no waste of concrete used, and the concrete for constructing the pile structure is hardened. The present invention has many advantages, such as being protected by the elastic air sac body fly and not being subject to deterioration due to contamination with underground mud water, earth and sand, etc.

以下本発明を図示の実権例について説明する。The present invention will now be described with reference to the illustrated example.

(11は鋼管柱で、七の外1111に弾性気嚢体として
長尺のゴム袋(21が装着され、同ゴ五袋121の先端
部は鋼管柱(11の先端に嵌装された内側前金物(31
及びその外I8に配設された外側資金物(4)によって
挾着されている。
(11 is a steel pipe column, and a long rubber bag (21) is installed as an elastic air bag on the outside 1111 of the 7th column, and the tip of the 5th bag 121 is a steel tube column (inner front metal fitting fitted on the tip of 11). (31
In addition, it is clamped by an outer fund (4) disposed on the outside I8.

図中(51は地表面(a)または海底面め近傍において
鋼管柱(1)に装着された。鋼管柱(1)の摺−すべき
硬質ゴム筒、(61はゴム袋(2)に連結されたゴム管
で。
In the figure (51 is attached to the steel pipe column (1) near the ground surface (a) or the seabed surface. The hard rubber cylinder to be slid on the steel pipe column (1), (61 is connected to the rubber bag (2) with rubber tube.

コンクリート投入時において鋼管柱(11内の余刺な空
気、若しくは水な吐出するものである。
When concrete is poured, extra air or water is discharged from the steel pipe column (11).

而して前記のように!五袋鬼21が嵌着され、且つ同J
五袋(21の先端が前記沓金物(3%(4)で挾着され
た鋼管柱(11を軟弱地#(b)内の所定深度まで貫入
し、(第1図参照) 次いでコンクリート配送用可撓管(71を介してコンク
リート+81を前記鋼管柱(IIK:投入するととも虻
And as mentioned above! Gobukuro Oni 21 is fitted, and the same J
Penetrate the steel pipe column (11) to which the tip of the five bags (21 is clamped with the above-mentioned foot metal fittings (3% (4)) to a predetermined depth in soft ground #(b) (see Figure 1). Next, use it for concrete delivery. Concrete +81 is poured into the steel pipe column (IIK) through the flexible pipe (71).

同鋼管柱(11を引抜くと、コンクリートC8)の自重
(よって前記沓金物(3)(4)は軟弱地盤(−内にお
ける沓金物到達地点に残留し、一方!五袋(ツは投設コ
ンクリート181の圧力によって廖鰻しつつ、同コンク
リート(粉を確保する。($11295参照)[[前記
鋼管柱川内に対するコンクリート薔8塾の打設を継続し
、同打設コンクIJ −) 181の量に対応して鋼管
柱(1111−m4に引上げてい<、(鎮5図参照) かくして鋼管柱(1)[投入されたコンクリート(81
は下部より次第に1郷していくが、:/五袋121な介
してその外側地盤の性質に応じて拡大11m+l、地盤
壁圧とバランスした時点で膨張が止まり、鋼管柱(11
の引上げが完了したとき、軟弱地盤内に多段球根状の杭
が構築される。なおこの際前記ゴム管(6)よりモルタ
ル(8′)が漏出し、電工の完了が分る。
When the steel pipe column (11) is pulled out, the dead weight of the concrete C8 (thus, the foot metal fittings (3) and (4) remain at the point where the foot metal fittings are reached in the soft ground (-), while the five bags (tsu) are While the concrete 181 was being crushed by the pressure, the same concrete (powder was secured. (See $11,295) The steel pipe column (1) was raised to 1111-m4 (see Figure 5).
The column gradually expands from the bottom to 11 meters, but expands to 11 m+l depending on the nature of the ground outside the column through the five bags.When it reaches a balance with the ground wall pressure, the expansion stops and the steel pipe column (11
When the lifting is completed, multi-stage bulbous piles are constructed in the soft ground. At this time, the mortar (8') leaks from the rubber tube (6), indicating that the electrical work is complete.

(第4図参jl) なおコンクリ−) 181の廖鰻する状態とIA袋12
1の展張する状態を、コンクリート投入量と鋼管柱(1
)の引上量とな注意深くIIIIIすることKよって監
視し、ゴム袋121の破裂を防止することができる。
(See Figure 4) Concrete) 181's sagging condition and IA bag 12
The expanding state of 1 is determined by the amount of concrete input and the steel pipe column (1
) can be carefully monitored to prevent the rubber bag 121 from bursting.

なお以上の輪工は無筋コンクリート杭であるので、鉄筋
コンクリート杭を電工するには、必要な時期に鉄筋篭(
91を挿入するとよい。なおく1(Iは杭完成の時点で
打設される最上位のコンクリートである。
In addition, since the above-mentioned wheel works are unreinforced concrete piles, in order to perform electrical work on reinforced concrete piles, reinforcing bar cages (
It is recommended to insert 91. Note 1 (I is the top layer of concrete that will be placed when the pile is completed.

なお本発明は小規模な構造物の基礎杭の電工。The present invention relates to electric work for foundation piles of small-scale structures.

大規模工事rおける大ケーソン底面より!!ニ下部に杭
な必要とする場合の基礎杭の−I勢に適用されるもので
ある。
From the bottom of a large caisson during large-scale construction work! ! This applies to the -I type of foundation pile when a pile is required at the bottom.

以上本発明を実總例について説明したが、本発明は勿論
このような実権例にだけ局限されるものではなく、本発
明の精神を逸脱【、ない範囲内で種々の設計の改変を總
しうるものである。
Although the present invention has been described above with reference to actual examples, the present invention is of course not limited to such actual examples, and various modifications of the design may be made within the scope of departing from the spirit of the present invention. It is something that can be used.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図乃至第4図は本発t14に係る基礎杭輪重方法の
一夾總例のニーを示す縦断面図、第5図は鉄筋篭な使用
l、た場合の実總例を示す縦断面図である。 (1)・・・鋼管柱     12ト・・ゴム袋(3)
・・・内側前金物   (4)・・・外aS童物18)
・・・コンクリート 代理人 弁理士 開本重文 外2名
Figures 1 to 4 are vertical cross-sectional views showing an example of the foundation pile wheel loading method according to the present invention t14, and Figure 5 is a vertical cross-sectional view showing an actual example of the case where reinforcing bars are used in a cage. It is a front view. (1)...Steel pipe column 12t...Rubber bag (3)
...Inner front hardware (4)...Outer aS doll 18)
... Concrete agent Patent attorney 2 people who are not members of Kaihon Important Cultural Properties

Claims (1)

【特許請求の範囲】[Claims] 鋼管柱の外1llWC長尺の弾性気嚢体を鉦着するとと
もに、同気嚢体の先端部を前記鋼管柱の先端に嵌装され
た内側前金物及び同音金物〇外gB配設された外儒責金
物との関に挟着し、前記鋼管柱を地中(所定深度まで嵌
入したのち、同鋼管柱な内部vcコンクリートを打設し
ながら引抜き、前記−双の沓金物な気嚢体を挟着したま
ま地中に@留せしめるとともに、同気嚢体を打設コンク
リート圧によって地中KIIIHせt、めることを特徴
とする基礎杭電工方法。
A long elastic air sac is attached to the outside of the steel pipe column, and the tip of the air sac is attached to the tip of the steel pipe column. After inserting the steel pipe column into the ground (to a predetermined depth), the steel pipe column was pulled out while pouring VC concrete inside the steel pipe column, and the above-mentioned twin metal air sac bodies were sandwiched. A foundation pile electric construction method characterized by fixing the same air bladder underground underground and also fixing the same air envelope into the ground by pouring concrete pressure.
JP3718182A 1982-03-11 1982-03-11 Construction work of foundation pile Granted JPS58156620A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3718182A JPS58156620A (en) 1982-03-11 1982-03-11 Construction work of foundation pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3718182A JPS58156620A (en) 1982-03-11 1982-03-11 Construction work of foundation pile

Publications (2)

Publication Number Publication Date
JPS58156620A true JPS58156620A (en) 1983-09-17
JPS6143489B2 JPS6143489B2 (en) 1986-09-27

Family

ID=12490412

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3718182A Granted JPS58156620A (en) 1982-03-11 1982-03-11 Construction work of foundation pile

Country Status (1)

Country Link
JP (1) JPS58156620A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6286222A (en) * 1985-10-09 1987-04-20 Asahi Chem Ind Co Ltd Construction of prefabricated pile
JPS6436821A (en) * 1987-07-31 1989-02-07 Asahi Chemical Ind Construction of hardened column
JPS6475712A (en) * 1987-09-14 1989-03-22 Asahi Chemical Ind Formation of hardened column
JPH02311617A (en) * 1989-05-25 1990-12-27 Hatsurou Shiyouji Construction of foundation pile
JPH04222678A (en) * 1990-12-21 1992-08-12 Hazama Gumi Ltd Waste disposal method
NL1016436C2 (en) * 2000-10-18 2002-04-22 Voorbij Groep Bv Method for producing concrete pile in ground involves use of boring unit to create tubular opening in ground and after its withdrawal volume of opening is filled with concrete
KR20020030907A (en) * 2000-10-18 2002-04-26 김상수 Method of Constructing Pile With Basement
KR20020035369A (en) * 2000-11-06 2002-05-11 김상수 Method of Constructing Pile With Basement
WO2006111786A1 (en) * 2005-04-22 2006-10-26 Bozidar Miljovski A method for construction of piles and caissons and soil improvement by using rubber hoses
CN107130633A (en) * 2017-07-12 2017-09-05 蔡荪萍 A kind of steel tube concrete clay model bag stake is combined soil-baffling structure construction technology
CN113653041A (en) * 2021-09-17 2021-11-16 河海大学 Expanded casing concrete pile and construction method thereof

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6286222A (en) * 1985-10-09 1987-04-20 Asahi Chem Ind Co Ltd Construction of prefabricated pile
JPS6436821A (en) * 1987-07-31 1989-02-07 Asahi Chemical Ind Construction of hardened column
JPS6475712A (en) * 1987-09-14 1989-03-22 Asahi Chemical Ind Formation of hardened column
JPH02311617A (en) * 1989-05-25 1990-12-27 Hatsurou Shiyouji Construction of foundation pile
JPH04222678A (en) * 1990-12-21 1992-08-12 Hazama Gumi Ltd Waste disposal method
NL1016436C2 (en) * 2000-10-18 2002-04-22 Voorbij Groep Bv Method for producing concrete pile in ground involves use of boring unit to create tubular opening in ground and after its withdrawal volume of opening is filled with concrete
KR20020030907A (en) * 2000-10-18 2002-04-26 김상수 Method of Constructing Pile With Basement
KR20020035369A (en) * 2000-11-06 2002-05-11 김상수 Method of Constructing Pile With Basement
WO2006111786A1 (en) * 2005-04-22 2006-10-26 Bozidar Miljovski A method for construction of piles and caissons and soil improvement by using rubber hoses
CN107130633A (en) * 2017-07-12 2017-09-05 蔡荪萍 A kind of steel tube concrete clay model bag stake is combined soil-baffling structure construction technology
CN113653041A (en) * 2021-09-17 2021-11-16 河海大学 Expanded casing concrete pile and construction method thereof

Also Published As

Publication number Publication date
JPS6143489B2 (en) 1986-09-27

Similar Documents

Publication Publication Date Title
JPS58156620A (en) Construction work of foundation pile
CN104563147B (en) Composite structure pile foundation applied to karst area and construction method of composite structure pile foundation
CN109024609B (en) Foundation pit supporting structure based on old row piles and construction method thereof
JP2619704B2 (en) Underground structure lifting prevention method
JP3506350B2 (en) Construction method of foundation pile
CN1482310A (en) Support method for construction foundation ditch
JPH04149313A (en) Construction method of cast-in-place pile
JPH05132923A (en) Improving method for soft ground
JPH02311620A (en) Underground structure construction method
JPS5873619A (en) Construction work of bulb pile and tremie tube
JPS58123925A (en) Method of constructing new structure in ground below existing structure and filling body used in said method
JPS59161515A (en) Construction of hollow on-site concrete pile
JP3082053B2 (en) Large-scale, deep steel continuous basement wall and method of constructing the same
CN214738305U (en) Anti-floating system of permanent-temporary combined structure of underground engineering in soft soil area
CN211285628U (en) Inner support structure and foundation pit support system
JP2000355941A (en) Building and its construction method
JPH0584773B2 (en)
JPH0726405B2 (en) Method for constructing hollow concrete structure in the ground
JPH04155010A (en) Construction method for retaining
CN116695729A (en) Hanging foot pile supporting structure and construction method
JPH03233018A (en) Steel tubular concrete pile
JPH05247936A (en) Inside excavation bottom widening method of pile
CN204626412U (en) A kind of building foundation pit quaternity abnormity interlocking pile supporting and protection structure
CN2356064Y (en) Pile end pressure slip casting device
CN106284364A (en) A kind of building foundation pit quaternity abnormity interlocking pile supporting construction