JPH11336471A - How to relocate aboveground railway lines to underground - Google Patents

How to relocate aboveground railway lines to underground

Info

Publication number
JPH11336471A
JPH11336471A JP14103698A JP14103698A JPH11336471A JP H11336471 A JPH11336471 A JP H11336471A JP 14103698 A JP14103698 A JP 14103698A JP 14103698 A JP14103698 A JP 14103698A JP H11336471 A JPH11336471 A JP H11336471A
Authority
JP
Japan
Prior art keywords
tunnel
ground
underground
railway
shield
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP14103698A
Other languages
Japanese (ja)
Inventor
Akio Shiseki
彰男 志関
Takaaki Kubota
敬昭 窪田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toda Corp
Original Assignee
Toda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toda Corp filed Critical Toda Corp
Priority to JP14103698A priority Critical patent/JPH11336471A/en
Publication of JPH11336471A publication Critical patent/JPH11336471A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

(57)【要約】 【課題】 地上作業をできるだけ地下で行うことによ
り、工期の短縮および工期の節減を図るとともに、地上
の鉄道営業線の地下への移設方法を提供する。 【解決手段】 地上に設置された鉄道営業線を地下に移
設する方法であって、前記鉄道営業線の下方地盤の所定
位置にシールドトンネル4を構築する工程と、該シール
ドトンネル4内から、前記鉄道営業線の縦断方向におけ
る両側面の外方に複数の柱部材5を地表面に向けて立設
する工程と、該柱部材5間に桁部材6を架け渡す工程
と、該桁部材6に前記鉄道営業線の軌道施設を支持させ
る工程と、前記柱部材を土留杭壁兼用として、前記桁部
材6及び柱部材5に囲まれた空間を所定深さまで掘削す
る工程と、該掘削空間に、前記鉄道営業線の縦断方向に
トンネル空間を有するトンネル躯体3を構築する工程
と、該トンネル躯体3のトンネル空間に軌道施設2を新
設する工程と、前記柱部材に支持された軌道施設2を撤
去する工程とを含むことである。
(57) [Summary] [PROBLEMS] To provide a method of relocating a railway business line on the ground to an underground, while shortening the construction period and saving the construction period by performing ground work as much as possible underground. A method for relocating a railway operating line installed on the ground to an underground, comprising the steps of: constructing a shield tunnel 4 at a predetermined position on the ground below the railway operating line; Erecting a plurality of column members 5 outwardly on both sides in the longitudinal direction of the railway operating line toward the ground surface, bridging a girder member 6 between the column members 5, A step of supporting the track facility of the railway business line, a step of excavating a space surrounded by the girder member 6 and the column member 5 to a predetermined depth by using the column member as a retaining pile wall, A step of constructing a tunnel skeleton 3 having a tunnel space in the longitudinal direction of the railway business line, a step of newly establishing a track facility 2 in the tunnel space of the tunnel skeleton 3, and removing the track facility 2 supported by the column members And the step of It is.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は地上の鉄道営業線の
地下への移設方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for relocating a railway business line on the ground to an underground.

【0002】[0002]

【従来の技術】地上を走る鉄道は市街地において多くの
踏切をかかえており、これが交通混雑の原因となるため
解消が求められている。このため連続立体交差が考えら
れるが、高架式鉄道とすると日照障害、列車騒音、電波
障害などの悪影響があるために地下化のニーズも多くな
っている。
2. Description of the Related Art A railroad running on the ground has many railroad crossings in an urban area, which causes traffic congestion, and is required to be resolved. For this reason, continuous grade separation is conceivable. However, if an elevated railway is used, it has adverse effects such as sunshine obstruction, train noise, radio wave obstruction, etc., and the need for underground construction is increasing.

【0003】従来、地上の鉄道営業線を地下へ移設する
ために、地下トンネルを構築する方法として、円形シー
ルド工法と開削工法とがある。しかし、図7に示すよう
な円形シールド工法は以下のような問題がある。 一般に複線用の地下トンネルとして必要な建築限界
を確保するためには、直径10m以上の円形シールドト
ンネルが必要となり、鉄道敷地幅を越える場合が多く、
用地買収や借地を行う必要がある。 施工上、少なくとも直径分の土被り厚さ(図7の1
・D以上)が必要となり、発進および到達用の立坑もそ
れに応じた深さに構築しなければならず、工期および工
費の面で問題がある。 地下に駅部をつくる必要がある場合は、別途開削工
法などによる建設が必要となる。
Conventionally, there are a circular shield method and an open-cut method as a method of constructing an underground tunnel to relocate a railway operating line on the ground to an underground. However, the circular shield method shown in FIG. 7 has the following problems. In general, a circular shield tunnel with a diameter of 10m or more is required to secure the construction limit required for an underground tunnel for a double track, often exceeding the railway site width.
Land acquisition and lease are required. Due to the construction, the thickness of the earth covering at least for the diameter (1 in FIG.
・ D or more) is required, and the shaft for starting and arriving must also be constructed at the corresponding depth, which is problematic in terms of construction period and cost. If it is necessary to build a station underground, it will be necessary to construct a separate excavation method.

【0004】一方、前記開削工法には以下のような問題
がある。 狭い鉄道用地内では杭打ちなどの作業スペースの確
保が困難であり、資機材の搬出入、取扱いが難しく、安
全性も確保しがたい。この場合は、一時的な借地や用地
買収が必要であるが、これが困難な場合も多い。 線路が閉鎖されている間に作業する必要があるため
夜間作業が必然的に多くなり、工事に伴う振動および騒
音が沿線住民の生活を妨げる。 夜間作業は労働環境が劣悪となり、安全性の低下・
工期の長期化を招く。 山留壁が残置されて地下水脈の遮断を引き起こし易
い。 開削に伴う山留壁の変位により、周辺施設や軌道施
設に沈下などの変状を招きやすい。
On the other hand, the above-mentioned open-cutting method has the following problems. It is difficult to secure work space such as pile driving in narrow railway lands, making it difficult to carry in and out materials and handling equipment, and it is also difficult to secure safety. In this case, temporary leasehold or land acquisition is necessary, but this is often difficult. The need to work while the track is closed increases nighttime work inevitably, and the vibration and noise associated with the construction hinders the lives of residents along the railway. Night work has a poor working environment,
This leads to a longer construction period. Retaining walls are likely to be left to block groundwater veins. Displacement of the retaining wall due to excavation tends to cause deformation such as settlement in surrounding facilities and track facilities.

【0005】[0005]

【発明が解決しようとする課題】本発明は、このような
問題に鑑みてなされたものであり、その目的は、地上作
業をできるだけ地下で行うことによって、工期を短く
すること、借地や用地買収を最小限とすること、夜
間作業や保線作業を少なくすること、線路閉鎖時間を
短くすること、コストを圧縮することのできる地上の
鉄道営業線の地下への移設方法を提供することである。
SUMMARY OF THE INVENTION The present invention has been made in view of the above problems, and has as its object to shorten the construction period by performing ground work as much as possible underground, to acquire leased land and land. It is an object of the present invention to provide a method for relocating a railway business line on the ground to an underground, which can reduce nighttime work and track maintenance work, shorten a track closing time, and reduce costs.

【0006】[0006]

【課題を解決するための手段】以上の課題を解決するた
めの手段は、請求項1における地上の鉄道営業線の地下
への移設方法が、地上に設置された鉄道営業線を地下に
移設する方法であって、前記鉄道営業線の下方地盤の所
定位置にシールドトンネルを構築する工程と、該シール
ドトンネル内から、前記鉄道営業線の縦断方向における
両側面の外方に複数の柱部材を地表面に向けて立設する
工程と、該柱部材間に桁部材を架け渡す工程と、該桁部
材に前記鉄道営業線の軌道施設を支持させる工程と、前
記柱部材を土留杭兼用として、前記桁部材及び柱部材に
囲まれた空間を所定深さまで掘削する工程と、該掘削空
間に、前記鉄道営業線の縦断方向にトンネル空間を有す
るトンネル躯体を構築する工程と、該トンネル躯体のト
ンネル空間に軌道施設を新設する工程と、前記柱部材に
支持された軌道施設を撤去する工程とを含むことを特徴
とする。
According to a first aspect of the present invention, there is provided a method of relocating a railway business line on the ground to an underground according to claim 1, wherein the railway business line installed on the ground is moved to an underground. A method for constructing a shield tunnel at a predetermined position on the ground below the railway business line, and grounding a plurality of pillar members from inside the shield tunnel to both outsides of both sides in the longitudinal direction of the railway business line. Erecting toward the surface, bridging a girder member between the column members, and supporting the girder member on a track facility of the railway business line, and using the column member as an earth retaining pile, Excavating a space surrounded by the girder member and the column member to a predetermined depth; constructing a tunnel body having a tunnel space in a longitudinal direction of the railway operating line in the excavation space; and a tunnel space of the tunnel body. To orbit A step of newly established set, characterized in that it comprises a step of removing the support trajectory facilities to the pillar member.

【0007】請求項1の発明によれば、柱部材の立設作
業をシールドトンネル内から行うことにより地上作業を
低減させるとともに、夜間作業や保線作業の低減が可能
となって工期の短縮・コストダウンおよび安全性の向上
を図ることができる。
According to the first aspect of the present invention, the work for erecting the pillar member is performed from within the shield tunnel, thereby reducing the work on the ground and the work at night and the maintenance of the track can be reduced. Down and safety can be improved.

【0008】また請求項2における地上の鉄道営業線の
地下への移設方法が、請求項1において、前記シールド
トンネルの断面を略矩形に構築することを特徴とする。
[0008] According to a second aspect of the present invention, there is provided a method for relocating a railway operating line on the ground to an underground, wherein the section of the shield tunnel is constructed to be substantially rectangular.

【0009】請求項2の発明によれば、柱部材の立設作
業が容易となり、トンネル躯体とシールドトンネルとの
一体化も容易となる。特に、縦長の矩形断面とすること
により、作業効率の著しい向上を図ることができる。
According to the second aspect of the present invention, the work of erecting the column member is facilitated, and the integration of the tunnel frame and the shield tunnel is also facilitated. In particular, by adopting a vertically long rectangular cross section, the working efficiency can be significantly improved.

【0010】また請求項3における地上の鉄道営業線の
地下への移設方法が、請求項1または2において、前記
シールドトンネル内にコンクリートを打設し、前記柱部
材を根固めする工程を含むことを特徴とする。
[0010] The method for relocating a railway operating line on the ground to an underground according to claim 3 includes a step of casting concrete in the shield tunnel and consolidating the column members according to claim 1 or 2. It is characterized by.

【0011】請求項3の発明によれば、柱部材がシール
ドトンネル内のコンクリートに根固めされているので、
掘削作業やトンネル躯体構築時の安全性がさらに向上す
るとともに、周辺地盤に与える水平変位や沈下などの悪
影響を極めて小さくすることができる。
According to the third aspect of the present invention, since the column member is fixed to the concrete in the shield tunnel,
The safety during excavation work and construction of the tunnel skeleton is further improved, and adverse effects such as horizontal displacement and settlement on the surrounding ground can be extremely reduced.

【0012】また請求項4における地上の鉄道営業線の
地下への移設方法が、請求項1〜3のいずれかにおい
て、前記シールドトンネルと前記トンネル躯体の少なく
とも一部分とを一体化する工程を含むことを特徴とす
る。
The method for relocating a railway operating line above ground to an underground according to claim 4 includes a step of integrating the shield tunnel with at least a part of the tunnel frame according to any one of claims 1 to 3. It is characterized by.

【0013】請求項4の発明によれば、トンネル躯体を
シールドトンネルで支持することになり、トンネル躯体
下方の地盤の支持力が不足する場合でも、シールドトン
ネルを良好な地盤に構築することにより、トンネル躯体
の長期的な安全性をさらに向上させることができる。ま
たトンネル躯体の長さ方向の剛性が強化される。
According to the fourth aspect of the present invention, the tunnel frame is supported by the shield tunnel, and the shield tunnel can be constructed on a good ground even when the supporting force of the ground below the tunnel frame is insufficient. Long-term safety of the tunnel body can be further improved. In addition, the rigidity in the longitudinal direction of the tunnel body is enhanced.

【0014】請求項5における地上の鉄道営業線の地下
への移設方法が、請求項1〜4のいずれかにおいて、前
記柱部材に支持された軌道施設を撤去した跡地に緑化・
植栽を施す工程を含むことを特徴とする。
According to a fifth aspect of the present invention, there is provided a method of relocating a railway business line on the ground to an underground according to any one of the first to fourth aspects, wherein the track facility supported by the column member is greened on the site where it was removed.
The method includes a step of planting.

【0015】請求項5の発明によれば、従来の鉄道営業
線の跡地を公園、避難路などとして有効利用できる。
According to the invention of claim 5, the former site of the conventional railway business line can be effectively used as a park, an evacuation route and the like.

【0016】また請求項6における地上の鉄道営業線の
地下への移設方法が、請求項1〜5のいずれかにおい
て、前記トンネル躯体の縦断方向の適宜間隔ごとに、該
トンネル躯体の横断方向に地下水の流路となる地下水連
通手段を設置する工程を含むことを特徴とする。
According to a sixth aspect of the present invention, there is provided a method of relocating a railway business line on the ground to an underground according to any one of the first to fifth aspects, wherein the railway business line is moved in the transverse direction of the tunnel frame at appropriate intervals in the longitudinal direction of the tunnel frame. The method is characterized by including a step of installing groundwater communication means serving as a groundwater flow path.

【0017】また請求項6の発明によれば、トンネル躯
体の構築によって地下水の流れが遮断されることなく、
自然の地下水環境が保全されるため、井戸枯れ等の悪影
響が生じない。
According to the invention of claim 6, the construction of the tunnel body does not interrupt the flow of groundwater.
Since the natural groundwater environment is preserved, no adverse effects such as well withering occur.

【0018】[0018]

【発明の実施の形態】以下、本発明の実施の形態を図面
に基づいて説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0019】図1における地下トンネル1はトンネル躯
体3と、該トンネル躯体3を支持するシールドトンネル
4と、シールドトンネル4から地表面に延設した柱部材
5とから構成されている。前記トンネル躯体3は鉄筋コ
ンクリート構造、鉄骨コンクリート構造、鉄骨鉄筋コン
クリート構造および鉄骨構造で構築できるが、本実施の
形態では鉄筋コンクリート構造としたものである。
The underground tunnel 1 in FIG. 1 comprises a tunnel frame 3, a shield tunnel 4 supporting the tunnel frame 3, and a column member 5 extending from the shield tunnel 4 to the ground surface. The tunnel skeleton 3 can be constructed of a reinforced concrete structure, a steel frame concrete structure, a steel frame reinforced concrete structure, and a steel frame structure. In the present embodiment, the tunnel frame 3 has a reinforced concrete structure.

【0020】トンネル躯体3は所定深さの地中内に形成
された矩形断面のトンネルであり、その内部空間34は
軌道施設2を収容するのに十分な大きさを備えている。
なお、トンネル躯体3は、直接基礎とすることもできる
が、後述のシールドトンネル4を基礎として設計するこ
とが好ましい。
The tunnel frame 3 is a tunnel having a rectangular cross section formed in the ground at a predetermined depth, and its internal space 34 is large enough to accommodate the track facility 2.
Although the tunnel body 3 can be directly used as a base, it is preferable to design the tunnel body 3 based on a shield tunnel 4 described later.

【0021】トンネル躯体3の下面には軸線方向に沿っ
て断面矩形のシールドトンネル4が少なくとも2本並列
に形成され、各シールドトンネル4内にはコンクリート
7が打設されている。このシールドトンネル4は、トン
ネル躯体3の構築前に断面矩形のシールド掘進機で横坑
が掘削され、該横坑の壁面に鋼製または鉄筋コンクリー
ト製のセグメント8を覆工して構築される。
At least two shield tunnels 4 each having a rectangular cross section are formed in parallel on the lower surface of the tunnel frame 3 along the axial direction, and concrete 7 is cast in each shield tunnel 4. The shield tunnel 4 is constructed by excavating a horizontal shaft using a shield machine having a rectangular cross section before constructing the tunnel frame 3, and lining a steel or reinforced concrete segment 8 on the wall surface of the horizontal shaft.

【0022】シールドトンネル4からは土留杭兼用の柱
部材5が、トンネル躯体3の側壁3aの外方に地表面付
近まで延設されている。土留杭兼用の柱部材5は適宜長
さの鋼管11を接続しつつ地表面に向けて立設され、そ
の下部がシールドトンネル4内のコンクリート7に根固
めされている。なお柱部材5は鋼管11に限らず、鋼管
矢板で形成することもできる。
From the shield tunnel 4, a pillar member 5 also serving as a retaining pile extends outside the side wall 3a of the tunnel frame 3 to near the ground surface. The pillar member 5, which also serves as a soil retaining pile, is erected toward the ground surface while connecting steel pipes 11 of an appropriate length, and the lower part thereof is fixed to concrete 7 in the shield tunnel 4. Note that the column member 5 is not limited to the steel pipe 11 and may be formed of a steel pipe sheet pile.

【0023】さらに、地下トンネル1を横断するような
地下水流がある場合には、次のような通水連絡手段を設
ける。すなわち、図2に示すように、地下トンネル1に
対する上流側13および下流側14において、それぞれ
適宜間隔ごとの柱部材5に集水部15および排水部16
と、これら集水部15および排水部16とを連結する通
水路17とをトンネル躯体3の両側面、および下部に設
けておく(図6参照)。これらの集水部15、排水部1
6、通水路17には透水性の良好な砂礫等が充填され、
通水連絡手段として地下水が地下トンネル1によって遮
断されないように機能する。すなわち、図6の(2)に
示すように、上流側13の地下水は、ストレーナ15a
から集水部15に流入し、該集水部15に接続された通
水路17を通って排水部16へ流出し、該排水部のスト
レーナから16aから下流側に流出されるようになって
いる。
Further, when there is a groundwater flow that crosses the underground tunnel 1, the following water communication means is provided. That is, as shown in FIG. 2, on the upstream side 13 and the downstream side 14 with respect to the underground tunnel 1, the water collecting part 15 and the drain
And a water passage 17 connecting the water collecting portion 15 and the drainage portion 16 are provided on both sides and a lower portion of the tunnel frame 3 (see FIG. 6). These water collecting section 15 and drain section 1
6. The water passage 17 is filled with good permeable gravel,
It functions so that the groundwater is not blocked by the underground tunnel 1 as a water communication means. That is, as shown in (2) of FIG. 6, the groundwater on the upstream side 13 is supplied to the strainer 15a.
The water flows into the water collecting part 15, flows through the water passage 17 connected to the water collecting part 15, flows out to the drain part 16, and flows out from the strainer 16a of the drain part to the downstream side. .

【0024】以下、図1〜図5に基づいて地上の鉄道営
業線の地下への移設方法を説明する。まず、図2および
図3に示すように、軌道施設2の両側に適宜距離をおい
て立坑21、22を複数組掘削形成し、ここからシール
ドトンネル4の発進用と到達用の横坑23a、23b
を、軌道施設2の横断方向にそれぞれ形成する。そし
て、これらの横坑23a、23b間の地山の所定位置に
断面矩形のシールドトンネル4を少なくとも2本(図1
の例では3本)並列状に構築する。すなわち、地下トン
ネル1の構築予定位置の最深部の地中に、地下トンネル
1の両側面に沿って、少なくとも2本のシールドトンネ
ル4を構築する。
Hereinafter, a method of relocating a railway business line on the ground to an underground will be described with reference to FIGS. First, as shown in FIG. 2 and FIG. 3, a plurality of sets of shafts 21 and 22 are excavated and formed at appropriate distances on both sides of the track facility 2, and from there, horizontal shafts 23 a for starting and reaching the shield tunnel 4, 23b
Are formed in the transverse direction of the track facility 2 respectively. At least two shield tunnels 4 each having a rectangular cross section are provided at predetermined positions in the ground between the horizontal shafts 23a and 23b (see FIG. 1).
(Three in the example). That is, at least two shield tunnels 4 are constructed along the both sides of the underground tunnel 1 in the deepest part of the underground tunnel 1 at the deepest planned position.

【0025】これら複数のシールドトンネル4はシール
ド掘進機で掘削した坑の壁面に鋼製またはコンクリート
製のセグメント8を組み立てて構築する。これら複数の
シールドトンネル4は同時に構築することもできるが、
経済性を考慮すると1本づつ順番に構築することが好ま
しい。
The plurality of shield tunnels 4 are constructed by assembling steel or concrete segments 8 on the wall of a pit excavated by a shield machine. Although these shield tunnels 4 can be constructed simultaneously,
It is preferable to construct one by one in consideration of economy.

【0026】このようなシールドトンネル4の断面形状
としては、通常の円形断面でもよいが、好ましくは矩形
状断面で、かつ縦長とすることが望ましい。その理由と
しては、後述の柱部材5の延設作業やトンネル躯体3と
の一体化作業が容易に効率化できるからである。このよ
うな矩形状断面のシールドトンネル4を掘削形成するた
めには、図5に示すようなシールド掘進機24が好適で
ある。同図の(1)のシールド掘進機24は、各一対の
ドラムカッタ25と、リングカッタ26とから構成され
た掘進ユニット27が横方向に2連、縦方向に4連接続
されたものであり、縦長の矩形状断面を掘削するもので
ある。また同図の(2)に示すシールド掘進機24は、
円盤状のビット本体40の回転に伴って、公転しながら
自転する遊星カッタ41により矩形断面を掘削するもの
である。なお、42は矩形断面のシールドフレームを示
している。
The sectional shape of the shield tunnel 4 may be an ordinary circular cross section, but is preferably a rectangular cross section and vertically long. The reason for this is that the work of extending the pillar member 5 and the work of integrating the pillar member 5 with the tunnel frame 3 can be easily and efficiently performed. In order to excavate and form the shield tunnel 4 having such a rectangular cross section, a shield excavator 24 as shown in FIG. 5 is suitable. In the shield machine 24 shown in FIG. 1A, two units in the horizontal direction and four units in the vertical direction are connected to the excavating unit 27 including a pair of drum cutters 25 and a ring cutter 26. Excavates a vertically long rectangular section. The shield machine 24 shown in FIG.
A rectangular cross section is excavated by a planetary cutter 41 that rotates while revolving with the rotation of the disk-shaped bit body 40. Reference numeral 42 denotes a shield frame having a rectangular cross section.

【0027】このようなシールドトンネル4の構築後
に、図4に示すように、各シールドトンネル4内から地
表面に向けて適宜長さ、すなわち前記シールドトンネル
4の内空高さより短い長さの鋼管11を溶接して継ぎ足
しながら小口径推進工法で押し出し、柱部材5または中
間杭39として形成する。この中間杭39は地下トンネ
ル1の横断方向の幅が大きい場合に形成し、この設置位
置にもシールドトンネル4を構築する。これらの柱部材
5はトンネルの軸方向に適宜間隔で、かつ構築予定の地
下トンネル1の両側面の外方に構築される。
After the construction of such a shield tunnel 4, as shown in FIG. 4, a steel pipe having a proper length from the inside of each shield tunnel 4 toward the ground surface, that is, a length shorter than the inner space height of the shield tunnel 4. 11 is extruded by a small-diameter propulsion method while being welded and added to form a column member 5 or an intermediate pile 39. The intermediate pile 39 is formed when the width of the underground tunnel 1 in the transverse direction is large, and the shield tunnel 4 is also constructed at this installation position. These pillar members 5 are constructed at appropriate intervals in the axial direction of the tunnel, and on both sides of the underground tunnel 1 to be constructed.

【0028】このようにシールドトンネル4内から柱部
材5を構築することにより、地表面においては工事用の
作業スペースが不要となって、線路閉鎖や夜間工事を行
う必然性がなくなる。なお、柱部材5の外方地盤(トン
ネル躯体3の背面地盤)は、注入工法などによって必要
に応じて地盤改良を施しておく。
By constructing the pillar members 5 from the inside of the shield tunnel 4 in this manner, no work space for construction is required on the ground surface, and the necessity of closing tracks and performing night work is eliminated. The outer ground of the column member 5 (the back ground of the tunnel frame 3) is subjected to ground improvement as necessary by an injection method or the like.

【0029】次に、各シールドトンネル4内において柱
部材5および中間杭39の下部にスタッドジベル28を
取り付けるとともに、これらの周囲に補強配筋をする。
そして、シールドトンネル4内の少なくとも柱部材5及
び中間杭39の設置位置周辺にコンクリート7を打設し
て柱部材5および中間杭39を根固めする。なお、コン
クリート7が打設されていないトンネル空間7aは、資
機材などの運搬通路として利用できる。
Next, a stud dowel 28 is attached to a lower portion of the column member 5 and the intermediate pile 39 in each shield tunnel 4, and reinforcement reinforcement is provided around these.
Then, concrete 7 is cast at least around the installation positions of the column members 5 and the intermediate piles 39 in the shield tunnel 4 to solidify the column members 5 and the intermediate piles 39. In addition, the tunnel space 7a in which the concrete 7 is not cast can be used as a transport passage for materials and equipment.

【0030】このように根固めされた柱部材5を適宜間
隔で構築予定のトンネル躯体3の両側面の外方に列状に
構築することにより、土留杭として兼用することが可能
となる。この場合、シールドトンネル4が土留壁の根入
れ部として機能することもあいまって、掘削時の土留壁
および周辺地盤の変形量を著しく低減することができ
る。
By arranging the column members 5 thus solidified at appropriate intervals in a row outside both side surfaces of the tunnel frame 3 to be constructed, the pillar members 5 can also be used as earth retaining piles. In this case, coupled with the fact that the shield tunnel 4 functions as an embedding portion of the retaining wall, the amount of deformation of the retaining wall and the surrounding ground during excavation can be significantly reduced.

【0031】以上のようにして、図2に示す横坑23
a、23b間に2列の柱部材5が構築されると、その頭
部を同一レベルに揃えて、トンネル軸方向の柱部材5の
頭部同士を枕桁18でボルト接合などによってつなぐ
(図4参照)。そして、この区間の線路を閉鎖して枕木
9、レール10や砕石29などの軌道施設2を撤去し、
トンネル縦断方向の適宜間隔ごとに、枕桁18上に横桁
19を架設する。次いで、予めこの区間長さに応じてセ
ットしておいたレール10と枕木9を支持する縦桁30
のユニットを、ゴムパットなどの緩衝材20を介して横
桁19に支持させる。したがってレール10と枕木9な
どの軌道施設2が、縦桁30、横桁19および枕桁18
からなる桁部材6によって受け替えられる。
As described above, the shaft 23 shown in FIG.
When the two rows of column members 5 are constructed between a and 23b, their heads are aligned at the same level, and the heads of the column members 5 in the tunnel axial direction are connected to each other by bolts or the like with the pillows 18 (FIG. 4). Then, the track in this section is closed, and the track facilities 2 such as the sleepers 9, the rails 10 and the crushed stones 29 are removed,
A horizontal beam 19 is erected on the pillow beam 18 at appropriate intervals in the longitudinal direction of the tunnel. Next, a vertical girder 30 supporting the rail 10 and the sleeper 9 previously set according to the section length.
Is supported by the cross beam 19 via a cushioning material 20 such as a rubber pad. Therefore, the track facility 2 such as the rail 10 and the sleeper 9 is composed of the beam 30, the beam 19 and the beam 18.
Is replaced by a spar member 6 consisting of:

【0032】このように柱部材5の頭部で枕木9とレー
ル10を支持した状態で、隣接する列状の柱部材5同士
を鋼板12で溶接して図6に示すような土留壁50a、
50bを形成するとともに、切梁31と腹起し32を設
置しながら柱部材5および桁部材6で囲まれた地盤を上
面からシールドトンネル4の上面まで開削して所定の大
きさの空間部33を形成する。
With the sleepers 9 and the rails 10 supported by the heads of the column members 5 in this manner, the adjacent column-shaped column members 5 are welded to each other with the steel plate 12 to retain the retaining wall 50a as shown in FIG.
50b is formed, and the ground surrounded by the column members 5 and the girder members 6 is cut from the upper surface to the upper surface of the shield tunnel 4 while the cutting beams 31 and the bulges 32 are being installed to form a space 33 having a predetermined size. Form.

【0033】そして、前記空間部33の底面地盤に捨て
コンクリート51を打設し、その上にトンネル躯体3の
底盤部3bを構築するとともに、切梁31、腹起し3
2、中間杭39を撤去しながら側壁3aと上床部3cを
構築して、その上部を埋戻すことによりトンネル躯体3
を完成させる。なおトンネル躯体3の横断方向に地下水
流がある場合には、その構築作業に先立って通水連絡手
段を設置しておくことにより、図1に示すような地下ト
ンネル1が構築される。この地下トンネル1は、例えば
2〜3kmの長さを一単位として連続的に構築し、これ
らを接続することによって所定の地下用のトンネルを完
成することができる。
Then, concrete 51 is poured into the ground at the bottom of the space 33, and the bottom 3b of the tunnel frame 3 is constructed thereon.
2. While removing the intermediate pile 39, construct the side wall 3a and the upper floor portion 3c, and bury the upper part thereof to form the tunnel frame 3
To complete. When there is a groundwater flow in the transverse direction of the tunnel body 3, the underground tunnel 1 as shown in FIG. 1 is constructed by installing a water communication means prior to the construction work. The underground tunnel 1 is continuously constructed with a length of, for example, 2 to 3 km as one unit, and by connecting these, a predetermined underground tunnel can be completed.

【0034】その後、完成したトンネル内に新たな軌道
施設2を設置し、地下の鉄道営業線として開通させる。
そして、地上の軌道施設2をすべて撤去することによ
り、地上の鉄道営業線の地下への移設が完了する。この
場合、不要となった桁部材6や中間杭39および柱部材
5の一部は全て撤去する。なお、地上の軌道施設2を撤
去した跡地には緑化・植栽を施し、公園や災害時の避難
地などとして有効利用することが望ましい。
Thereafter, a new track facility 2 is installed in the completed tunnel, and is opened as an underground railway business line.
Then, by completely removing the track facility 2 on the ground, the relocation of the railway business line on the ground to the basement is completed. In this case, all of the unnecessary girder member 6, intermediate pile 39 and column member 5 that are no longer needed are removed. It is desirable that the site where the track facility 2 on the ground has been removed be greened and planted so that it can be effectively used as a park or an evacuation site in the event of a disaster.

【0035】[0035]

【発明の効果】柱部材の立設作業をシールドトンネル内
から行うことにより、地上作業を低減するとともに、夜
間作業や保線作業の低減が可能となって工期の短縮・コ
ストダウンおよび安全性の向上を図ることができる。
According to the present invention, the work for erecting the pillar members is performed from within the shield tunnel, thereby reducing the work on the ground and the night work and track maintenance work, thereby shortening the construction period, reducing costs and improving safety. Can be achieved.

【0036】柱部材の立設作業が容易となり、トンネル
躯体とシールドトンネルとの一体化も容易となる。特
に、縦長の矩形断面とすることにより、作業効率の著し
い向上を図ることができる。
The work of erecting the column member is facilitated, and the integration of the tunnel frame and the shield tunnel is also facilitated. In particular, by adopting a vertically long rectangular cross section, the working efficiency can be significantly improved.

【0037】柱部材がシールドトンネル内のコンクリー
トに根固めされているので、掘削作業やトンネル躯体構
築時の安全性がさらに向上するとともに、周辺地盤に与
える水平変位や沈下などの悪影響を極めて小さくするこ
とができる。
Since the pillar members are fixed to the concrete in the shield tunnel, the safety during excavation work and construction of the tunnel frame is further improved, and the adverse effects such as horizontal displacement and settlement on the surrounding ground are extremely reduced. be able to.

【0038】トンネル躯体の少なくとも一部分をシール
ドトンネルと一体化するので、トンネル躯体下方の地盤
の支持力が不足する場合でも、シールドトンネルを良好
な地盤に構築することにより、トンネル躯体の長期的な
安全性をさらに向上させることができるとともに、トン
ネルの軸方向の剛性が強化される。
Since at least a part of the tunnel frame is integrated with the shield tunnel, even if the ground support below the tunnel frame is insufficient, by constructing the shield tunnel on a good ground, the long-term safety of the tunnel frame can be improved. And the axial rigidity of the tunnel is enhanced.

【0039】従来の鉄道営業線の跡地を公園、避難路な
どとして有効利用できる。
The site of the conventional railway business line can be effectively used as a park, an evacuation route, or the like.

【0040】地下トンネルの構築によって地下水の流れ
が遮断されることなく、自然の地下水環境が保全される
ため、井戸枯れ等の悪影響が生じない。
Since the construction of the underground tunnel does not interrupt the flow of groundwater and preserves the natural groundwater environment, there is no adverse effect such as well withering.

【図面の簡単な説明】[Brief description of the drawings]

【図1】地上の鉄道営業線の地下への移設方法を示す断
面図である。
FIG. 1 is a cross-sectional view illustrating a method of relocating a railway business line on the ground to an underground.

【図2】地上の鉄道営業線の地下への移設方法を示す平
面図である。
FIG. 2 is a plan view showing a method of relocating a railway operating line on the ground to an underground.

【図3】地上の鉄道営業線の地下への移設方法を示す側
面図である。
FIG. 3 is a side view showing a method of relocating a railway operating line on the ground to an underground.

【図4】地上の鉄道営業線の地下への移設方法を示す断
面図である。
FIG. 4 is a cross-sectional view illustrating a method of relocating a railway business line on the ground to an underground.

【図5】(1)および(2)はシールド掘進機の正面図
ある。
FIGS. 5 (1) and (2) are front views of the shield machine.

【図6】(1)および(2)は柱部材および地下水連通
手段の平面図および断面図である。
FIGS. 6 (1) and (2) are a plan view and a sectional view of a column member and groundwater communicating means.

【図7】従来の地下トンネルの構築方法を示す概略図で
ある。
FIG. 7 is a schematic view showing a conventional method of constructing an underground tunnel.

【符号の説明】[Explanation of symbols]

1 地下トンネル 2 軌道施設 3 トンネル躯体 4 シールドトンネル 5 柱部材 6 桁部材 7 コンクリート 8 セグメント 9 枕木 10 レール 11 鋼管 12 鋼板 13 上流側 14 下流側 15 集水部 16 排水部 17 通水路 18 枕桁 19 横桁 20 緩衝材 21、22 立坑 23a、23b 横坑 DESCRIPTION OF SYMBOLS 1 Underground tunnel 2 Track facility 3 Tunnel frame 4 Shield tunnel 5 Column member 6 Girder member 7 Concrete 8 Segment 9 Sleepers 10 Rail 11 Steel pipe 12 Steel plate 13 Upstream side 14 Downstream side 15 Water collecting part 16 Drainage part 17 Water passage 18 Pillow girder 19 Cross girder 20 Buffer material 21,22 Vertical shaft 23a, 23b Horizontal shaft

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 地上に設置された鉄道営業線を地下に移
設する方法であって、前記鉄道営業線の下方地盤の所定
位置にシールドトンネルを構築する工程と、該シールド
トンネル内から、前記鉄道営業線の縦断方向における両
側面の外方に複数の柱部材を地表面に向けて立設する工
程と、該柱部材間に桁部材を架け渡す工程と、該桁部材
に前記鉄道営業線の軌道施設を支持させる工程と、前記
柱部材を土留杭兼用として、前記桁部材及び柱部材に囲
まれた空間を所定深さまで掘削する工程と、該掘削空間
に、前記鉄道営業線の縦断方向にトンネル空間を有する
トンネル躯体を構築する工程と、該トンネル躯体のトン
ネル空間に軌道施設を新設する工程と、前記柱部材に支
持された軌道施設を撤去する工程とを含むことを特徴と
する地上の鉄道営業線の地下への移設方法。
1. A method for relocating a railway operating line installed on the ground to an underground, comprising the steps of: constructing a shield tunnel at a predetermined position in the ground below the railway operating line; Erecting a plurality of column members outwardly on both sides in the longitudinal direction of the business line toward the ground surface, bridging a girder member between the column members, and A step of supporting a track facility, a step of excavating a space surrounded by the girder member and the column member to a predetermined depth by using the column member as a retaining pile, and in the excavation space, in a longitudinal direction of the railway business line. A step of constructing a tunnel body having a tunnel space, a step of newly establishing a track facility in the tunnel space of the tunnel body, and a step of removing the track facility supported by the column member, Railway sales How to relocate lines underground.
【請求項2】 請求項1において、前記シールドトンネ
ルの断面を略矩形に構築することを特徴とする地上の鉄
道営業線の地下への移設方法。
2. The method according to claim 1, wherein a section of the shield tunnel is constructed in a substantially rectangular shape.
【請求項3】 請求項1または2において、前記シール
ドトンネル内にコンクリートを打設し、前記柱部材を根
固めする工程を含むことを特徴とする地上の鉄道営業線
の地下への移設方法。
3. The method according to claim 1, further comprising a step of placing concrete in the shield tunnel and solidifying the column members.
【請求項4】 請求項1〜3のいずれかにおいて、前記
シールドトンネルと前記トンネル躯体の少なくとも一部
分とを一体化する工程を含むことを特徴とする地上の鉄
道営業線の地下への移設方法。
4. The method according to claim 1, further comprising a step of integrating the shield tunnel with at least a part of the tunnel frame.
【請求項5】 請求項1〜4のいずれかにおいて、前記
柱部材に支持された軌道施設を撤去した跡地に緑化・植
栽を施す工程を含むことを特徴とする地上の鉄道営業線
の地下への移設方法。
5. The underground railroad business line according to claim 1, further comprising a step of greening and planting the site where the track facility supported by the pillar member has been removed. How to relocate to.
【請求項6】 請求項1〜5のいずれかにおいて、前記
トンネル躯体の縦断方向の適宜間隔ごとに、該トンネル
躯体の横断方向に地下水の流路となる地下水連通手段を
設置する工程を含むことを特徴とする地上の鉄道営業線
の地下への移設方法。
6. The method according to claim 1, further comprising the step of providing groundwater communicating means serving as a flow path of groundwater in a transverse direction of the tunnel skeleton at appropriate intervals in a longitudinal direction of the tunnel skeleton. A method of relocating a railway business line above the ground to the basement.
JP14103698A 1998-05-22 1998-05-22 How to relocate aboveground railway lines to underground Pending JPH11336471A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14103698A JPH11336471A (en) 1998-05-22 1998-05-22 How to relocate aboveground railway lines to underground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14103698A JPH11336471A (en) 1998-05-22 1998-05-22 How to relocate aboveground railway lines to underground

Publications (1)

Publication Number Publication Date
JPH11336471A true JPH11336471A (en) 1999-12-07

Family

ID=15282749

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14103698A Pending JPH11336471A (en) 1998-05-22 1998-05-22 How to relocate aboveground railway lines to underground

Country Status (1)

Country Link
JP (1) JPH11336471A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007308995A (en) * 2006-05-19 2007-11-29 Kajima Corp Underpass construction method and underpass
CN111469862A (en) * 2020-05-09 2020-07-31 上海市城市建设设计研究总院(集团)有限公司 Rapid transfer structure of railway and urban rail transit line 2 and 4
CN119737160A (en) * 2024-11-04 2025-04-01 中车城市交通规划设计研究院有限公司 An assembled tunnel structure and construction method suitable for reconstruction of existing operating lines
KR20250160269A (en) 2024-05-03 2025-11-12 한국철도기술연구원 Exchange method for undergrounding downtown operating train within night train interruption time, and underground railway constructed using the same

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007308995A (en) * 2006-05-19 2007-11-29 Kajima Corp Underpass construction method and underpass
CN111469862A (en) * 2020-05-09 2020-07-31 上海市城市建设设计研究总院(集团)有限公司 Rapid transfer structure of railway and urban rail transit line 2 and 4
KR20250160269A (en) 2024-05-03 2025-11-12 한국철도기술연구원 Exchange method for undergrounding downtown operating train within night train interruption time, and underground railway constructed using the same
CN119737160A (en) * 2024-11-04 2025-04-01 中车城市交通规划设计研究院有限公司 An assembled tunnel structure and construction method suitable for reconstruction of existing operating lines

Similar Documents

Publication Publication Date Title
CN109914456B (en) Design and construction method for adjacent and simultaneous construction of bridge and subway tunnel
CN110159294B (en) Construction method for lengthening open cut tunnel at tunnel junction section of high and steep terrain bridge
JP7503730B1 (en) Separated subway station structure and its construction method in land-sea junction area
CN102071607A (en) Railroad bed repair method without affecting existing running conditions
CN113565525A (en) Construction protection system and construction method for newly-built shield tunnel super-close ultra-shallow buried upper-span existing tunnel
CN211144503U (en) High steep topography bridge tunnel meets section open cut tunnel and connects long structure
CN107514262A (en) The construction method of shield piping lane
CN114575852A (en) Underground excavation construction method for expanding excavation of station on shield tunnel of subway station
CN112983493A (en) Reinforcing structure for shield to closely penetrate large-section bridge and culvert downwards and construction method
JP3586864B2 (en) Underground structure construction method and elevated traffic path
CN112982481B (en) Structure construction method for crossing subway intersection node on pipe gallery
CN118481664A (en) Tunnel crossing thin top plate solution cavity treatment method
CN115450221B (en) A construction method for subway crossing a river
CN216765941U (en) Tunnel decompression load shedding structure under bias voltage state
JP3930954B2 (en) Construction method of structure
CN112343654B (en) Maintainable drainage system for extremely water-rich stratum tunnel and tunnel
KR100509707B1 (en) None open cut tunnelling of arch type with hume pipe and con'c rib
CN109915165B (en) Bilateral proximity bias tunnel portal section structure and construction method thereof
CN209324377U (en) Ledge method tunneling subway station arch springing ruggedized construction
JP2000291398A (en) Underground structure and its construction method
CN116517051B (en) Isolation structures and methods for reducing railway pile foundation displacement caused by shield tunneling.
CN116427936B (en) Arrayed rectangular tunnel structure and construction method for forming interconnected underground spaces
Koyama Railway construction in Japan
CN102628278B (en) 'U-pipe pier' urban underground railroad
JPH11336470A (en) Underground tunnel and its construction method