JPH108422A - Reinforcement structure of bridge pier - Google Patents
Reinforcement structure of bridge pierInfo
- Publication number
- JPH108422A JPH108422A JP15835296A JP15835296A JPH108422A JP H108422 A JPH108422 A JP H108422A JP 15835296 A JP15835296 A JP 15835296A JP 15835296 A JP15835296 A JP 15835296A JP H108422 A JPH108422 A JP H108422A
- Authority
- JP
- Japan
- Prior art keywords
- studs
- reinforcing
- footing
- reinforcing structure
- reinforcement structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Bridges Or Land Bridges (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、既設橋脚の柱の下
端部を補強し、かつ柱とフーチングとの連結強度の向上
を図るためなどに好適に実施することができる橋脚の補
強構造に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pier reinforcement structure which can be suitably implemented to reinforce the lower end of a column of an existing pier and to improve the connection strength between the column and the footing.
【0002】[0002]
【従来の技術】図15は、典型的な従来の技術を示す既
設橋脚1の断面図である。既設橋脚1は、複数の基礎杭
2によって支持されるフーチング3に柱4が立設され、
この柱4の上部には複数の主桁5を支承する梁6が設け
られ、各主桁5上には、床版7が敷設される。前記フー
チング3、柱4および梁6は、鉄筋コンクリート構造で
あって一体に形成される。フーチング3には、複数のア
ンカーボルト8がフーチング3内に埋設されるアンカー
フレーム16に固定され、各アンカーボルト8は、柱4
を取巻くようにして周方向に相互に間隔をあけて配置さ
れ、フーチング3から上方に突出している。柱4の少な
くとも下端部は、図15の紙面に垂直な軸直角断面が矩
形であり、鋼鉄製の外フレーム9内にコンクリートが充
填された構造とされ、外フレーム9には上下2段のフラ
ンジ10,11が複数のウェブ12によって連結された
ブラケット13が溶接して固定される。各ウェブ12間
には、各フランジ10,11を挿通して前記アンカーボ
ルト8がそれぞれ配置され、各アンカーボルト8の上フ
ランジ10から上方に突出する上端部にはナット14が
螺着され、このようにして柱4の下端部が補強され、既
設橋脚1が構成されている。2. Description of the Related Art FIG. 15 is a sectional view of an existing pier 1 showing a typical conventional technique. In the existing pier 1, a pillar 4 is erected on a footing 3 supported by a plurality of foundation piles 2,
A beam 6 for supporting a plurality of main girders 5 is provided on the upper part of the column 4, and a floor slab 7 is laid on each main girder 5. The footing 3, the column 4, and the beam 6 are a reinforced concrete structure and are integrally formed. In the footing 3, a plurality of anchor bolts 8 are fixed to an anchor frame 16 embedded in the footing 3, and each anchor bolt 8 is
Are circumferentially spaced apart from each other in the circumferential direction, and project upward from the footing 3. At least the lower end of the pillar 4 has a rectangular cross section perpendicular to the plane of the paper of FIG. 15 and has a structure in which concrete is filled in an outer frame 9 made of steel. A bracket 13 in which the webs 10 and 11 are connected by a plurality of webs 12 is fixed by welding. The anchor bolts 8 are respectively arranged between the webs 12 through the flanges 10 and 11, and a nut 14 is screwed to an upper end portion of the anchor bolt 8 projecting upward from the upper flange 10. Thus, the lower end of the pillar 4 is reinforced, and the existing pier 1 is configured.
【0003】ベース部15は、上および下フランジ1
0,11、アンカーボルト8、複数のウェブ12、外フ
レーム9によって構成される。前記ベース部15の周囲
は、根巻コンクリート20によって覆われる。[0003] The base portion 15 includes an upper and lower flange 1.
0, 11, an anchor bolt 8, a plurality of webs 12, and an outer frame 9. The periphery of the base portion 15 is covered with a root concrete 20.
【0004】図16は図15の柱4の下端部の拡大断面
図であり、図17は図15の切断面線XVII−XVI
Iから見た拡大断面図である。FIG. 16 is an enlarged sectional view of the lower end portion of the column 4 of FIG. 15, and FIG. 17 is a sectional line XVII-XVI of FIG.
It is the expanded sectional view seen from I.
【0005】上部補強ベースプレート25、下部補強ベ
ースプレート26は、上フランジ10、下フランジ11
にそれぞれ溶接によって固定される。上部補強ベースプ
レート25から下部補強ベースプレート26にわたっ
て、補強リブ27が上部補強ベースプレート25、下部
補強ベースプレート26、上フランジ10の一部28
a、下フランジ11の一部28bおよび各ウェブ12の
端面29において溶接によって固定され、複数設けられ
る。また、上部ベースプレート13および上部補強ベー
スプレート25の上面には、台形状補強リブ30が外プ
レート9の側面31a、上フランジ10の上面31bお
よび上部補強ベースプレート25の上面31cにそれぞ
れ溶接によって固定される。The upper reinforcing base plate 25 and the lower reinforcing base plate 26 are composed of an upper flange 10 and a lower flange 11.
Are fixed by welding. From the upper reinforcing base plate 25 to the lower reinforcing base plate 26, the reinforcing ribs 27 are formed by the upper reinforcing base plate 25, the lower reinforcing base plate 26, and a part 28 of the upper flange 10.
a, a plurality of fixing portions 28b of the lower flange 11 and an end face 29 of each web 12 are fixed by welding. On the upper surfaces of the upper base plate 13 and the upper reinforcing base plate 25, trapezoidal reinforcing ribs 30 are fixed to the side surface 31a of the outer plate 9, the upper surface 31b of the upper flange 10, and the upper surface 31c of the upper reinforcing base plate 25 by welding.
【0006】さらに、上部補強ベースプレート25およ
び下部補強ベースプレート26には、後打ちアンカーボ
ルト32が挿通する挿通孔33a,33bがそれぞれ複
数設けられる。各挿通孔33a,33bには、それぞれ
後打ちアンカーボルトが挿通され、上部補強ベースプレ
ート25の上方にナット34が螺着されて、柱4の下端
部が補強される。Further, the upper reinforcing base plate 25 and the lower reinforcing base plate 26 are provided with a plurality of insertion holes 33a and 33b, respectively, into which the trailing anchor bolts 32 are inserted. A post-anchor anchor bolt is inserted into each of the insertion holes 33a and 33b, and a nut 34 is screwed above the upper reinforcing base plate 25 to reinforce the lower end of the column 4.
【0007】[0007]
【発明が解決しようとする課題】従来の補強構造では、
上部補強ベースプレート25、下部補強ベースプレート
26、長方形状補強リブ27、台形状補強リブ30、後
打ちアンカーボルト32およびナット34によって構成
される補強構造体は、現場において、1つの前記ベース
部に対して、複数の前記補強構造体を溶接することとな
り、現場での溶接箇所が多く、施工の効率が悪い。また
現場では、上部構造体上を自動車などの車両の通過を許
容したままで補強工事を行うときには、橋脚に作用する
荷重がたえず変動し、それに伴い、橋脚が微振動し、確
実な溶接を行うため手間がかかり、施工性が悪い。さら
に、前記溶接部は溶接時の熱によって機械的強度が低下
するため、このような溶接部は少ないことが望ましく、
さらに溶接部には溶接残留応力が発生するため、この残
留応力によって溶接部の許容し得る応力が低減してしま
う。In the conventional reinforcing structure,
The reinforcing structure including the upper reinforcing base plate 25, the lower reinforcing base plate 26, the rectangular reinforcing ribs 27, the trapezoidal reinforcing ribs 30, the post-anchored anchor bolts 32, and the nuts 34 is provided on the site to one base portion. Therefore, a plurality of the reinforcing structures are to be welded, so that there are many welding spots on site, and the construction efficiency is poor. Also, at the site, when performing reinforcement work while allowing vehicles such as automobiles to pass on the upper structure, the load acting on the pier fluctuates constantly, with which the pier vibrates slightly and performs reliable welding. Therefore, it takes time and the workability is poor. Further, since the mechanical strength of the welded portion is reduced by heat at the time of welding, it is desirable that such a welded portion be small.
Furthermore, since a welding residual stress is generated in the welded portion, the residual stress reduces the allowable stress of the welded portion.
【0008】既設橋脚1に図15の紙面に垂直な橋軸方
向およびこの橋軸方向に垂直な横方向荷重が作用したと
き、橋脚1にモーメントが発生するが、たとえば図15
の既設橋脚1に、橋軸方向に垂直で右方向の横荷重PH
が作用したとき、このモーメントによって、図15の橋
軸よりも左側の前記アンカーボルト8、前記後打ちアン
カーボルト32には、それぞれ引張り力が生じ、図15
の橋軸よりも右側の前記アンカーボルト8、前記後打ち
アンカーボルト32には、それぞれ圧縮力が生じる。前
記引張り力および前記圧縮力は、前記溶接部に対してせ
ん断力を発生させ、上記諸因子のために、前記溶接部の
強度に問題を生じる。When a load is applied to the existing pier 1 in the direction of the bridge axis perpendicular to the plane of FIG. 15 and in the transverse direction perpendicular to the direction of the bridge axis, a moment is generated in the pier 1.
On the existing pier 1, a lateral load P H perpendicular to the bridge axis and rightward
15 acts on the anchor bolt 8 and the post-anchor bolt 32 on the left side of the bridge shaft in FIG.
A compression force is generated in the anchor bolts 8 and the post-anchor anchor bolts 32 on the right side of the bridge shaft. The tensile force and the compressive force generate a shearing force on the weld and cause problems in the strength of the weld due to the above factors.
【0009】本発明の目的は、現場での溶接作業を少な
くして施工性の向上を図ることができる橋脚の補強構造
を提供することである。An object of the present invention is to provide a pier reinforcement structure capable of improving workability by reducing welding work on site.
【0010】[0010]
【課題を解決するための手段】本発明は、地中に埋設さ
れる鉄筋コンクリート製のフーチングに柱が一体的に形
成され、柱の上部には上部構造体を支持する梁が一体的
に形成される橋脚の補強構造において、前記柱の少なく
とも下端部には、鋼鉄製の内補強構造体が設けられ、前
記内補強構造体には、外側方に突出する複数の第1スタ
ッドが相互に間隔をあけて植設され、前記内補強構造体
の外側方には、複数の第2スタッドが各第1スタッドと
ほぼ平行に軸直角方向に間隔をあけて予め植設された外
補強構造体が前記フーチングの上面に支持された状態で
設けられ、前記内補強構造体と前記外補強構造体との間
には、前記第1および第2スタッドが配置される空間が
形成され、この空間には充填材を充填して硬化させるこ
とを特徴とする橋脚の補強構造である。 本発明に従えば、現場において、複数の第1スタッドが
植設された内補強構造体と予め複数の第2スタッドが植
設された外補強構造体との間の空間に、充填材を充填し
て硬化させることによって、第1スタッドおよび第2ス
タッドを充填材に定着させ、内補強構造体と外補強構造
体を一体化させるので、柱の下端部が補強され、かつ柱
とフーチングとの連結強度の向上を図ることができる。
このようにして、施工現場における溶接作業を少なくし
て、かつ、施工性を向上することができる。According to the present invention, a pillar is integrally formed on a reinforced concrete footing buried in the ground, and a beam for supporting an upper structure is integrally formed on an upper portion of the pillar. In a reinforcing structure for a bridge pier, a steel inner reinforcing structure is provided at least at a lower end portion of the pillar, and the inner reinforcing structure has a plurality of first studs protruding outwardly spaced from each other. An outer reinforcing structure, which is implanted at an interval and is externally implanted with a plurality of second studs pre-planted at an interval in a direction perpendicular to the axis substantially in parallel with each of the first studs, on the outer side of the inner reinforcing structure. A space is provided in a state supported on the upper surface of the footing, and a space in which the first and second studs are arranged is formed between the inner reinforcing structure and the outer reinforcing structure. Bridge characterized by filling and curing It is the reinforcement structure. According to the present invention, at a site, a filler is filled in a space between an inner reinforcing structure in which a plurality of first studs are implanted and an outer reinforcing structure in which a plurality of second studs are implanted in advance. The first stud and the second stud are fixed to the filler by hardening, and the inner reinforcing structure and the outer reinforcing structure are integrated, so that the lower end of the column is reinforced and the column and the footing are fixed. The connection strength can be improved.
In this way, welding work at the construction site can be reduced, and the workability can be improved.
【0011】また本発明は、前記外補強構造体と前記フ
ーチングとは、連結手段によって連結されることを特徴
とする。 本発明に従えば、外補強構造体とフーチングとが連結手
段によって連結され、これによって、柱の引張り側と圧
縮側の両側に設けられる内補強構造体と外補強構造体の
双方でモーメントに抗することができ、これによって内
補強構造体と外補強構造体とに荷重が分担して負荷さ
れ、このようにして内補強構造体および外補強構造体の
両者で同時に荷重を負担することができるので、内補強
構造体および外補強構造体の構成、特に、第1および第
2スタッドの本数および径などを少なくして、施工コス
トの低減を図ることができる。Further, the present invention is characterized in that the outer reinforcing structure and the footing are connected by connecting means. According to the present invention, the outer reinforcing structure and the footing are connected by the connecting means, whereby the inner reinforcing structure and the outer reinforcing structure provided on both the tension side and the compression side of the column resist the moment. This allows the load to be shared and applied to the inner reinforcing structure and the outer reinforcing structure, and thus both the inner reinforcing structure and the outer reinforcing structure can simultaneously bear the load. Therefore, the construction of the inner reinforcing structure and the outer reinforcing structure, in particular, the number and diameter of the first and second studs can be reduced, and the construction cost can be reduced.
【0012】[0012]
【発明の実施の形態】図1は本発明の実施の一形態の既
設橋脚51の補強構造を示す橋軸76に垂直な平面で切
断した断面図であり、図2は柱53の下端部53bの拡
大断面図である。FIG. 1 is a sectional view taken along a plane perpendicular to a bridge shaft 76 showing a reinforcing structure of an existing pier 51 according to an embodiment of the present invention, and FIG. It is an expanded sectional view of.
【0013】既設橋脚51は、複数の基礎杭55によっ
て支持されるフーチング52に柱53が立設され、この
柱53の上部53aには複数の主桁59を支承する梁5
4が設けられ、各主桁59上にはコンクリート床版60
が敷設される。前記フーチング52、柱53および梁5
4は鉄筋コンクリート構造であって一体的に形成され
る。フーチング52には、複数のアンカーボルト58が
フーチング52内に埋設されるアンカーフレーム56に
固定され、各アンカーボルト58は、柱53を取巻くよ
うにして周方向に相互に間隔をあけて配置され、フーチ
ング52から上方に突出している。In the existing pier 51, a column 53 is erected on a footing 52 supported by a plurality of foundation piles 55, and a beam 5 supporting a plurality of main girders 59 is provided on an upper portion 53a of the column 53.
4 and a concrete floor slab 60 is provided on each main girder 59.
Is laid. The footing 52, the pillar 53 and the beam 5
Reference numeral 4 denotes a reinforced concrete structure which is integrally formed. In the footing 52, a plurality of anchor bolts 58 are fixed to an anchor frame 56 embedded in the footing 52, and the anchor bolts 58 are circumferentially spaced from each other so as to surround the column 53, It protrudes upward from the footing 52.
【0014】柱53の下端部53bには、鋼鉄製の内補
強構造体57が設けられる。前記内補強構造体57は、
前記フーチング52の上面に設けられ、前記複数のアン
カーボルト58の上端部が挿通する複数の挿通孔81を
有するベースプレート80と、柱53の下端部53bの
予め定められた領域の表面に設けられる内補強板82
と、前記ベースプレート80と間隔をあけて、前記内補
強板82の外側方に前記内補強板82に対して垂直に設
けられ、各アンカーボルト58の上端部が挿通する複数
の挿通孔83を有する支持板62と、前記ベースプレー
ト80から前記支持板62にわたって、前記内補強板8
2を外囲して、互いに周方向に間隔をあけて設けられる
複数のリブ84とによって構成される。An inner reinforcing structure 57 made of steel is provided at the lower end 53b of the column 53. The inner reinforcing structure 57 includes:
A base plate 80 provided on the upper surface of the footing 52 and having a plurality of insertion holes 81 through which upper ends of the plurality of anchor bolts 58 are inserted, and a base plate 80 provided on a surface of a predetermined region of a lower end 53b of the column 53 Reinforcement plate 82
And a plurality of insertion holes 83 that are provided perpendicularly to the inner reinforcing plate 82 on the outer side of the inner reinforcing plate 82 at a distance from the base plate 80 and through which the upper ends of the anchor bolts 58 are inserted. A support plate 62 and the inner reinforcing plate 8 extending from the base plate 80 to the support plate 62.
2 and a plurality of ribs 84 provided circumferentially at intervals from each other.
【0015】前記アンカーボルト58の上端部には、前
記各挿通孔81,83を挿通し、前記支持板62の上方
にワッシャ85が装着され、ナット86が螺着され、前
記フーチング52と前記内補強構造体57とが固定され
る。The upper ends of the anchor bolts 58 are inserted through the respective insertion holes 81 and 83, and a washer 85 is mounted above the support plate 62, a nut 86 is screwed, and the footing 52 and the inner The reinforcing structure 57 is fixed.
【0016】前記支持板62よりも上方の前記内補強板
82の外表面には、複数の第1スタッド63がスタッド
溶接によって植設され、前記複数の第1スタッド63の
外側方には、各第1スタッド63と鉛直方向および水平
方向に間隔をあけて配置される複数の第2スタッド64
が予め植設された断面形状が略L字状の外補強構造体6
5が、前記フーチング52の上面に支持された状態で設
けられる。On the outer surface of the inner reinforcing plate 82 above the support plate 62, a plurality of first studs 63 are implanted by stud welding, and outside the plurality of first studs 63, A plurality of second studs 64 spaced apart from the first stud 63 in the vertical and horizontal directions
Is an external reinforcing structure 6 having a substantially L-shaped cross-section and implanted in advance.
5 is provided in a state supported by the upper surface of the footing 52.
【0017】前記外補強構造体65は、前記フーチング
52の上面に支持され、後述の補強アンカーボルト69
の軸部が挿通する挿通孔70が形成される支圧板66
と、前記支圧板66の上面の前記内補強構造体57側の
一側部に直角に設けられる外補強板67と、前記支圧板
66および前記外補強板67に溶接された複数の台形状
のリブ68と、前記支圧板66と前記フーチングを連結
するための連結手段としての補強アンカーボルト69と
によって構成される。The outer reinforcing structure 65 is supported on the upper surface of the footing 52 and has a reinforcing anchor bolt 69 described later.
Support plate 66 in which an insertion hole 70 through which the shaft portion is inserted is formed.
An outer reinforcing plate 67 provided at a right angle to one side of the upper surface of the supporting plate 66 on the inner reinforcing structure 57 side, and a plurality of trapezoidal shapes welded to the supporting plate 66 and the outer reinforcing plate 67. It is constituted by ribs 68 and reinforcing anchor bolts 69 as connecting means for connecting the supporting plate 66 and the footing.
【0018】前記補強アンカーボルト69の軸部は、前
記挿通孔70に挿通され、前記補強アンカーボルト69
に上端部からワッシャ71が装着され、ナット72が螺
着されて、前記外補強構造体65と前記フーチング52
とが連結される。The shaft of the reinforcing anchor bolt 69 is inserted into the insertion hole 70, and the reinforcing anchor bolt 69
A washer 71 is attached from the upper end to the nut, and a nut 72 is screwed into the outer reinforcing structure 65 and the footing 52.
Are linked.
【0019】前記内補強構造体57と前記外補強構造体
65との間の空間77には、中詰コンクリート75を充
填し一定期間養生して硬化させることによって、前記第
1および第2スタッド63,64を定着させて内補強構
造体57と外補強構造体65とが一体化され、前記柱5
3の下端部53bと前記外補強構造体65とが補強さ
れ、かつ前記柱53と前記フーチング52との連結強度
の向上を図ることができる。The space 77 between the inner reinforcing structure 57 and the outer reinforcing structure 65 is filled with an infill concrete 75, cured for a certain period of time, and hardened, thereby forming the first and second studs 63. , 64 are fixed, the inner reinforcing structure 57 and the outer reinforcing structure 65 are integrated, and the column 5
3 and the outer reinforcement structure 65 are reinforced, and the connection strength between the column 53 and the footing 52 can be improved.
【0020】図1を参照して、フーチング52は、鉄筋
コンクリート構造であり、大きさの把握のために寸法の
一例を述べると、橋軸76に垂直な方向(図1の左右方
向)の幅Bは、たとえば6m程度であり、高さHはたと
えば2m程度である。柱53は、図1の紙面に垂直に切
断したときの断面形状が長方形であり、寸法は橋軸76
方向の幅hはたとえば2m程度であり、橋軸76に垂直
な方向の幅bはたとえば1m程度であり、柱53の長さ
Lはたとえば5m程度である。基礎杭55はたとえばP
C杭である。Referring to FIG. 1, footing 52 is a reinforced concrete structure, and an example of dimensions for grasping the size is as follows: width B in a direction perpendicular to bridge axis 76 (left-right direction in FIG. 1). Is, for example, about 6 m, and the height H is, for example, about 2 m. The pillar 53 has a rectangular cross-sectional shape when cut perpendicularly to the plane of FIG.
The width h in the direction is, for example, about 2 m, the width b in the direction perpendicular to the bridge axis 76 is, for example, about 1 m, and the length L of the column 53 is, for example, about 5 m. The foundation pile 55 is, for example, P
It is a C pile.
【0021】図3は、図2の切断面線III−IIIか
ら見た拡大断面図であり、図4は図2の切断面線IV−
IVから見た拡大断面図である。前記内補強構造体57
および前記外補強構造体65は、それぞれ4つの構造体
部分によって構成され、前記内補強構造体57は第1〜
第4内側構造体73a,73b,73c,73dによっ
て構成され、前記外補強構造体65は第1〜第4外構造
体74a,74b,74c,74dによって構成され
る。FIG. 3 is an enlarged sectional view taken along line III-III of FIG. 2, and FIG. 4 is a sectional view taken along line IV-III of FIG.
It is the expanded sectional view seen from IV. The inner reinforcing structure 57
And the outer reinforcing structure 65 is composed of four structural parts, and the inner reinforcing structure 57 is
The outer reinforcement structure 65 is constituted by first to fourth outer structures 74a, 74b, 74c, 74d.
【0022】前記第1内構造体73aの外表面には、複
数の第1スタッド63が互いに間隔をあけて植設され
る。残余の第2〜第4内構造体73b,73c,73d
も、上記の第1内構造体73aと同様な構成を有してい
る。On the outer surface of the first inner structure 73a, a plurality of first studs 63 are implanted at intervals. The remaining second to fourth inner structures 73b, 73c, 73d
Also has a configuration similar to that of the first internal structure 73a.
【0023】前記第1外構造体74aは、前記支圧板6
6の上面に前記外補強板67が設けられ、前記リブ68
が互いに間隔をあけて複数設けられる。前記各リブ68
の間には、前記挿通孔70が複数設けられ、前記各挿通
孔70には複数の前記補強アンカーボルト69の軸部が
挿通され、各補強アンカーボルト69の上端部には、ワ
ッシャ71が装着され、ナット72が螺着される。前記
第1外補強構造体74aの前記外補強板67の前記リブ
68が設けられる側とは、反対側の表面には、前記複数
の第2スタッド64が植設される。残余の第2〜第4外
構造体74b,74c,74dも上記の第1外構造体7
4aと同様な構成を有している。The first outer structure 74a includes the support plate 6
The outer reinforcing plate 67 is provided on the upper surface of the
Are provided at intervals from each other. Each of the ribs 68
A plurality of the insertion holes 70 are provided between them, and the shaft portions of the plurality of reinforcement anchor bolts 69 are inserted into the respective insertion holes 70, and a washer 71 is attached to the upper end of each reinforcement anchor bolt 69. Then, the nut 72 is screwed. The plurality of second studs 64 are implanted on the surface of the first outer reinforcing structure 74a opposite to the side on which the ribs 68 of the outer reinforcing plate 67 are provided. The remaining second to fourth outer structures 74b, 74c, 74d are also the first outer structure 7 described above.
It has the same configuration as 4a.
【0024】図5は、図3および図4の切断面線V−V
から見た断面図である。前記第1内構造体73aの第1
スタッド63は、前記支持板62よりも上方となる領域
に鉛直方向に間隔Δd1をあけ、かつ、水平方向に間隔
Δd2をあけて、前記鉛直方向および水平方向に整列し
て配置される。FIG. 5 is a sectional view taken along the line V--V of FIGS. 3 and 4.
It is sectional drawing seen from. The first inner structure 73a
The studs 63 are arranged in a region above the support plate 62 with a gap Δd1 in the vertical direction and with a gap Δd2 in the horizontal direction so as to be aligned in the vertical and horizontal directions.
【0025】前記鉛直方向の間隔Δd1は、たとえば1
00mmに選ばれ、前記水平方向の間隔Δd2は、たと
えば150mmに選ばれる。前記複数の第1スタッド6
3の長さL1は、たとえば400mm程度であり、D2
2,D25,D29,D32などの異形鉄筋が適宜選択
して用いられてもよい。残余の第2〜第4内構造体73
b,73c,73dも上記第1内構造体73aと同様な
構成を有している。The vertical interval Δd1 is, for example, 1
The horizontal distance Δd2 is set to, for example, 150 mm. The plurality of first studs 6
3, the length L1 is, for example, about 400 mm, and D2
Deformed reinforcing bars such as 2, D25, D29, and D32 may be appropriately selected and used. The remaining second to fourth inner structures 73
b, 73c, 73d also have the same configuration as the first inner structure 73a.
【0026】図6は、図3および図4の切断面線VI−
VIから見た断面図である。前記第4外構造体74dの
第2スタッド64は、鉛直方向において、前記間隔Δd
1の1/2ずつずれ、かつ、水平方向において、前記間
隔Δd2の1/2ずつ第1スタッド63とずれて配置さ
れる。前記第2スタッド64は、前記第1スタッド63
と同様の形状、材質である。また前記第1スタッド63
と前記第2スタッド64には、図2のように軸線方向に
重なった領域を有しており、そのラップ長ΔLはたとえ
ば200mm程度である。残余の第1〜第3外構造体7
4a,74b,74cも上記の第4外構造体74dと同
様な構成を有している。FIG. 6 is a sectional view taken along the line VI-- in FIG. 3 and FIG.
It is sectional drawing seen from VI. The second stud 64 of the fourth outer structure 74d is vertically spaced from the distance Δd
The first stud 63 is displaced from the first stud 63 by 1/2 of the interval Δd2 in the horizontal direction. The second stud 64 is provided with the first stud 63.
It has the same shape and material as. The first stud 63
The second stud 64 has a region overlapping in the axial direction as shown in FIG. 2, and its wrap length ΔL is, for example, about 200 mm. Remaining first to third outer structures 7
4a, 74b, and 74c have the same configuration as the above-described fourth outer structure 74d.
【0027】図7および図8は、実施の形態の施工手順
を示す図である。図7は、橋脚51の補強工事の手順を
示す図1の切断面線VII−VIIから見た簡略化した
断面図であり、図8は、橋脚51の補強工事の手順を示
す橋軸76に垂直に切断した簡略化した断面図である。
図7(1)および図8(1)に示す施工前の橋脚の状態
から、図7(2)および図8(2)に示されるように、
前記第1〜第4内構造体73a,73b,73c,73
dの外表面には、現場において、複数の第1スタッド6
3が互いに予め定められた間隔をあけて、スタッド溶接
によって植設される。次に、図7(3)および図8
(3)に示されるように、前記第1〜第4内構造体73
a,73b,73c,73dの外側方には、予め前記複
数の第2スタッド64が植設された前記第1〜第4外構
造体74a,74b,74c,74dが前記フーチング
52の上面に支持された状態で設置される。次に、図7
(4)および図8(4)に示されるように、前記空間7
7に、中詰コンクリート75を充填して、一定期間養生
して硬化させるとともに、前記補強アンカーボルト69
によって、前記外補強構造体65と前記フーチング52
とが連結される。このようにして、柱53の下端部53
bが補強され、かつ前記柱53と前記フーチング52と
の連結強度の向上を図ることができる。したがって上記
のように、現場での溶接作業量が軽減し、かつ施工性を
向上することができる。FIGS. 7 and 8 are diagrams showing the construction procedure of the embodiment. FIG. 7 is a simplified cross-sectional view taken along section line VII-VII in FIG. 1 showing a procedure for reinforcing the pier 51. FIG. 8 is a cross-sectional view of a bridge shaft 76 showing the procedure for reinforcing the pier 51. FIG. 4 is a simplified cross-sectional view cut vertically.
From the state of the pier before construction shown in FIGS. 7 (1) and 8 (1), as shown in FIGS. 7 (2) and 8 (2),
The first to fourth inner structures 73a, 73b, 73c, 73
d, on the outer surface, a plurality of first studs 6
3 are implanted at predetermined intervals from each other by stud welding. Next, FIG. 7 (3) and FIG.
As shown in (3), the first to fourth inner structures 73
The first to fourth outer structures 74a, 74b, 74c, and 74d, on which the plurality of second studs 64 are implanted in advance, are supported on the upper surface of the footing 52 outside a, 73b, 73c, and 73d. It is installed in the state where it was done. Next, FIG.
As shown in (4) and FIG. 8 (4), the space 7
7 is filled with a filling concrete 75 and cured and hardened for a certain period.
The outer reinforcing structure 65 and the footing 52
Are linked. Thus, the lower end 53 of the pillar 53
b is reinforced, and the connection strength between the column 53 and the footing 52 can be improved. Therefore, as described above, the amount of welding work on site can be reduced, and the workability can be improved.
【0028】図9は、図1〜図8に示される実施の形態
の橋脚51の力の伝達系統を説明するための図である。
たとえば、地震などによって、柱53の軸線53cに垂
直な右方向の水平力PH が作用したとき、柱53の下端
部53bには、時計まわりのモーメントMが生じ、この
作用モーメントMによって、前記第2および第4内構造
体73b,73dには、それぞれ、圧縮力PV、引張り
力−PVが生じる。引張り側において、前記引張り力−
PV は、第4内構造体73d、第1スタッド63、コン
クリート75、第2スタッド64、第4外構造体74
d、補強アンカーボルト69を介してフーチング52に
伝達される。FIG. 9 is a view for explaining a force transmission system of the pier 51 of the embodiment shown in FIGS.
For example, when a rightward horizontal force P H perpendicular to the axis 53c of the column 53 is applied due to an earthquake or the like, a clockwise moment M is generated at the lower end 53b of the column 53. the second and fourth in the structure 73b, the 73d, respectively, the compressive force P V, the tensile force -P V occurs. On the tension side, the tensile force
P V is the fourth in the structure 73d, the first stud 63, concrete 75, the second stud 64, the fourth outer structure 74
d, transmitted to the footing 52 via the reinforcing anchor bolt 69.
【0029】したがって引張り側では、第4内構造体7
3dに作用する引張り力−PV は、第4外構造体に74
dの反力RV によって抗され、第4内構造体73dと第
4外構造体74dの間には、せん断力が生じる。このせ
ん断力は、第1および第2スタッド63,64ならびに
中詰コンクリート75によって抗される。このようにし
て既設の柱53による負担荷重が低減されて補強され、
引張り力−PV を許容することができる。Therefore, on the tension side, the fourth inner structure 7
Tension -P V acting on 3d is 74 the fourth outer structure
The shear force is generated between the fourth inner structure 73d and the fourth outer structure 74d by the reaction force R V of d. This shear force is resisted by the first and second studs 63 and 64 and the filling concrete 75. In this way, the load imposed by the existing columns 53 is reduced and reinforced,
It can tolerate the tensile force -P V.
【0030】圧縮側において、第2内構造体73b、第
2外構造体74bおよび前記コンクリート75の構成
は、引張り側の構成と同様な構成となっている。第2内
構造体73bに作用する圧縮力PV は、第2内構造体7
3b、第1スタッド63、第2スタッド64、第2外構
造体74bの支圧板66を介して、フーチング52に伝
達される。On the compression side, the configuration of the second inner structure 73b, the second outer structure 74b and the concrete 75 is the same as the configuration on the tension side. Compressive force P V acting on the second structure body 73b, the second structure body 7
3b, the first stud 63, the second stud 64, and the supporting force 66 of the second outer structure 74b are transmitted to the footing 52.
【0031】したがって圧縮側では、第2内構造体73
bに作用する圧縮力PVと、前記支圧板66の反力−RV
によって、第2内構造体73bと第2外構造体74bの
間には、せん断力が生じる。このせん断力は、引張り側
と同様に第1および第2スタッド63,64ならびに中
詰コンクリート75によって抗される。このようにし
て、既設の柱53による負担荷重が低減されて補強さ
れ、圧縮力PV を許容することができる。Therefore, on the compression side, the second internal structure 73
and the compressive force P V acting on b, the reaction force -R V of the Bearing plate 66
Thereby, a shearing force is generated between the second inner structure 73b and the second outer structure 74b. This shearing force is resisted by the first and second studs 63 and 64 and the filling concrete 75 similarly to the pulling side. In this way, the burden load by existing posts 53 is reinforced is reduced, it is possible to allow the compressive force P V.
【0032】前述の水平力PH の負荷状態において、補
強アンカーボルト69が設けられていないとき、第4外
構造体74dはフーチング52の上面から浮きが生じ、
前述のせん断力は、圧縮側の第1および第2スタッド6
3,64だけによって抗されるので、前記第1および第
2スタッド63,64の本数を増加させ、または、各第
1および第2スタッド63,64の径を大きくするなど
して強度を大きくしなければならない。このような不都
合をなくすために引張り側に補強アンカーボルト69を
設けることによって、前述のような強度の増加をなくす
ことができ、構成の小形化による施工コストの削減を図
ることができる。When the reinforcing anchor bolt 69 is not provided under the load state of the above-described horizontal force P H , the fourth outer structure 74 d floats from the upper surface of the footing 52,
The aforementioned shear force is applied to the first and second studs 6 on the compression side.
3 and 64, the strength is increased by increasing the number of the first and second studs 63 and 64 or increasing the diameter of each of the first and second studs 63 and 64. There must be. By providing the reinforcing anchor bolt 69 on the pulling side to eliminate such inconvenience, the increase in strength as described above can be eliminated, and the construction cost can be reduced by downsizing the configuration.
【0033】図1〜図9に示される上記の実施の形態で
は、内補強構造体57の全周に外補強構造体65を設置
する補強構造であるが、前記水平力PH の作用する方向
に応じて、第1および第3外構造体74a,74cまた
は第2および第4外構造体74b,74dのいずれかの
組合わせだけを設ける構成であってもよい。[0033] In the above embodiment shown in FIGS. 1-9, is a reinforcing structure for installing an outer reinforcing structure 65 to the entire periphery of the inner reinforcing structure 57, the direction of action of the horizontal force P H Depending on the configuration, only one combination of the first and third outer structures 74a and 74c or the second and fourth outer structures 74b and 74d may be provided.
【0034】図1〜図9に示される上記の実施の形態で
は、外補強構造体65の外補強板67と支圧板66とは
断面形状が略L字状に連結されているけれども、本発明
の実施の他の形態として、逆T字状などの他の断面形状
であってもよい。逆T字状としたときには、外補強板6
7の両側で補強アンカーボルト69によって大きな強度
で支圧板66をフーチング52に固定することができる
とともに、大きな支圧面積を得ることができる。In the above embodiment shown in FIGS. 1 to 9, the outer reinforcing plate 67 and the supporting plate 66 of the outer reinforcing structure 65 are connected to each other in a substantially L-shaped cross section. In another embodiment of the present invention, another cross-sectional shape such as an inverted T-shape may be used. When it is formed in an inverted T shape, the outer reinforcing plate 6
The supporting plate 66 can be fixed to the footing 52 with great strength by the reinforcing anchor bolts 69 on both sides of the base 7, and a large bearing area can be obtained.
【0035】図10、図11および図12は、本発明の
実施の他の形態の図1の既設橋脚51の柱53を、紙面
に垂直に切断したときの断面形状が円形状であるときの
橋脚の補強構造を示す。図10は、柱53の下端部53
bの拡大断面図であり、図11は、図10の切断面線X
I−XIから見た断面図であり、図12は、図10の切
断面線XII−XIIから見た断面図である。FIGS. 10, 11 and 12 show another embodiment of the present invention in which the pillar 53 of the existing pier 51 of FIG. 1 is cut in a direction perpendicular to the plane of FIG. The pier reinforcement structure is shown. FIG. 10 shows the lower end 53 of the pillar 53.
FIG. 11 is an enlarged cross-sectional view of FIG.
It is sectional drawing seen from I-XI, and FIG. 12 is sectional drawing seen from cutting surface line XII-XII of FIG.
【0036】柱53の下端部53bには、円形状内補強
構造体90が設けられ、円形状支持板91の上方の円筒
状内補強板92の外表面には、複数の第1スタッド93
が、スタッド溶接によって植設される。前記複数の第1
スタッド93の外側方には、各第1スタッド93と鉛直
方向および水平方向に間隔をあけて配置される複数の第
2スタッド94が予め植設された断面形状が略L字状
で、外形が円形状の外補強構造体95が、前記フーチン
グ52の上面に支持された状態で設けられ、前記各第2
スタッド94のピッチは前記各第1スタッド93のピッ
チよりも広く設けられている。At the lower end 53b of the column 53, a circular inner reinforcing structure 90 is provided. On the outer surface of the cylindrical inner reinforcing plate 92 above the circular support plate 91, a plurality of first studs 93 are provided.
Are implanted by stud welding. The plurality of first
On the outer side of the stud 93, a plurality of second studs 94, which are arranged at intervals in the vertical and horizontal directions from each of the first studs 93, are preliminarily planted. A circular outer reinforcing structure 95 is provided in a state supported on the upper surface of the footing 52,
The pitch of the studs 94 is provided wider than the pitch of each of the first studs 93.
【0037】前記外補強構造体95は、前記フーチング
52の上面に支持され、後述の補強アンカーボルト99
の軸部が挿通する挿通孔100が形成される環状の支圧
板96と、前記支圧板96の上面の前記内補強構造体9
0側の一側部に直角に設けられる円筒状の外補強板97
と、前記支圧板96と前記外補強板97を補強する複数
の台形状リブ98と、前記支圧板96と前記フーチング
を連結するための複数の補強アンカーボルト99とによ
って構成される。The outer reinforcing structure 95 is supported on the upper surface of the footing 52 and has a reinforcing anchor bolt 99 to be described later.
Annular support plate 96 in which an insertion hole 100 through which a shaft portion of the support member is inserted is formed, and the inner reinforcement structure 9 on the upper surface of the support plate 96.
A cylindrical outer reinforcing plate 97 provided at a right angle on one side of the zero side
And a plurality of trapezoidal ribs 98 for reinforcing the support plate 96 and the outer reinforcing plate 97, and a plurality of reinforcing anchor bolts 99 for connecting the support plate 96 and the footing.
【0038】各補強アンカーボルト99の軸部は各挿通
孔100に挿通され、前記補強アンカーボルト99の上
端部にワッシャ101を装着し、ナット102が螺着し
て、前記外補強構造体95と前記フーチング52とが連
結される。The shaft portion of each reinforcing anchor bolt 99 is inserted into each insertion hole 100, a washer 101 is mounted on the upper end of the reinforcing anchor bolt 99, and a nut 102 is screwed into the reinforcing anchor bolt 99. The footing 52 is connected.
【0039】前記内補強構造体90と前記外補強構造体
95との間の空間104には、コンクリート103が充
填され、一定期間養生させて、硬化させることによっ
て、前記第1および第2スタッド93,94を定着さ
せ、前記柱53の下端部53bと前記外補強構造体95
とが補強され、かつ前記柱53と前記フーチング52と
の連結強度の向上を図ることができる。The space 104 between the inner reinforcing structure 90 and the outer reinforcing structure 95 is filled with concrete 103, cured for a certain period of time, and hardened to form the first and second studs 93. , 94 are fixed, and the lower end portion 53b of the column 53 and the outer reinforcing structure 95 are fixed.
And the connection strength between the column 53 and the footing 52 can be improved.
【0040】前記柱53の下端部53bにモーメントが
作用したとき、作用モーメントによって補強部に生じる
せん断力は、前述の実施の形態と同様に、前記第1およ
び第2スタッド93,94によって抗される。When a moment acts on the lower end 53b of the column 53, the shearing force generated in the reinforcing portion by the acting moment is resisted by the first and second studs 93 and 94, as in the above-described embodiment. You.
【0041】前述の実施の各形態では、橋脚形状がT字
形の橋脚について示しているが、橋脚形状が逆L字形の
梁54が片持ち形式の橋脚であってもよい。In each of the above embodiments, the pier has a T-shaped pier shape, but the inverted L-shaped beam 54 may be a cantilever type pier.
【0042】図13および図14は、本発明の実施のさ
らに他の形態を示す橋脚の鋼管杭110と柱111の連
結の例を示す。図13は、前記鋼管杭110と柱111
の連結部付近の断面図であり、図14は、図13の切断
面線XIV−XIVから見た断面図である。FIGS. 13 and 14 show an example of a connection between a steel pipe pile 110 and a pillar 111 of a pier showing still another embodiment of the present invention. FIG. 13 shows the steel pipe pile 110 and the pillar 111.
14 is a cross-sectional view taken along the line XIV-XIV in FIG. 13.
【0043】鋼管杭110は、地中に打設され、前記鋼
管杭110の上端部には、予め定められた長さL2だけ
柱111が挿入される。前記柱111は、複数の第1ス
タッド112が表面に植設可能であり、前記複数の第1
スタッド112は、前記柱111の表面に互いに間隔を
あけて、放射状にスタッド溶接によって溶接される。The steel pipe pile 110 is cast in the ground, and a column 111 is inserted into the upper end of the steel pipe pile 110 by a predetermined length L2. The pillar 111 has a plurality of first studs 112 implantable on a surface thereof, and
The studs 112 are radially welded to the surface of the pillar 111 at intervals from each other by stud welding.
【0044】前記鋼管杭110の内周面には、各第1ス
タッド112と互いに間隔をあけて、第2スタッド11
3が放射状に、かつ、各第2スタッド113のピッチ
が、各第1スタッド112のピッチよりも大きくなるよ
うに植設される。On the inner peripheral surface of the steel pipe pile 110, the second studs 11 are spaced apart from the respective first studs 112.
3 are radially implanted such that the pitch of each second stud 113 is larger than the pitch of each first stud 112.
【0045】前記鋼管杭110と前記柱111の間の空
間115には、中詰コンクリート114が充填され、一
定期間養生させて、硬化させることによって、前記第1
および第2スタッド112,113を定着して、前記鋼
管杭110と前記柱111とが連結される。The space 115 between the steel pipe pile 110 and the pillar 111 is filled with a filling concrete 114, cured for a certain period of time, and hardened, thereby forming the first concrete.
Then, the second studs 112 and 113 are fixed, and the steel pipe pile 110 and the column 111 are connected.
【0046】前記柱111にモーメントが作用したと
き、作用モーメントによって連結部分に生じるせん断力
は、前述の各実施の形態と同様に、前記第1および第2
スタッド112,113および中詰コンクリート114
によって抗される。When a moment acts on the column 111, the shearing force generated at the connecting portion by the acting moment is the same as the first and second embodiments described above.
Studs 112 and 113 and filled concrete 114
Be resisted by
【0047】前述の実施の各形態では、充填材としてコ
ンクリートを充填しているが、本発明の実施のさらに他
の形態として、セメントモルタルを充填材として用いて
もよい。In each of the above embodiments, concrete is filled as a filler, but as still another embodiment of the present invention, cement mortar may be used as a filler.
【0048】[0048]
【発明の効果】以上のように本発明によれば、外補強構
造体に第2スタッドを予め植設して現場での溶接作業が
削減され、これによって現場において、溶接作業は複数
の第1スタッドを内補強構造体に植設するだけなので、
現場における溶接作業を格段に軽減させることができ
る。施工作業は、内補強構造体の周囲に外補強構造体を
設置して、内補強構造体と外補強構造体の間の空間に充
填材を充填するだけなので、現場での作業工程数が少な
くてすみ、施工性を向上することができ、柱の下端部を
補強し、かつ柱とフーチングとの連結強度の向上を図る
ことができる。また外補強構造体へ第2スタッドを溶接
するための作業ヤードが不用となり、路上などにおける
補強工事に必要な占有作業ヤードを少なくすることがで
きる。As described above, according to the present invention, the welding work on site is reduced by implanting the second studs in advance in the outer reinforcing structure. Since only studs are planted in the inner reinforcement structure,
Welding work on site can be significantly reduced. The construction work involves installing an outer reinforcing structure around the inner reinforcing structure and filling the space between the inner and outer reinforcing structures with filler, so the number of work steps on site is small. Corners and workability can be improved, the lower end of the column can be reinforced, and the connection strength between the column and the footing can be improved. Further, a work yard for welding the second stud to the outer reinforcing structure is not required, and the occupied work yard required for reinforcement work on a road or the like can be reduced.
【0049】また本発明によれば、外補強構造体とフー
チングとを連結手段によって連結するので、柱に作用す
るモーメントに対して、その柱の引張り側と圧縮側にそ
れぞれ配置される内補強構造体と外補強構造体の両者
で、前記モーメントに抗することができる。これによっ
て内補強構造体および外補強構造体の荷重分担が軽減さ
れ、内補強構造体および外補強構造体の構成、特に、第
1および第2スタッドの本数および径などを少なくして
断面構造を小形化し、施工コストの低減を図ることがで
きる。Further, according to the present invention, since the outer reinforcing structure and the footing are connected by the connecting means, the inner reinforcing structures disposed on the tension side and the compression side of the column with respect to the moment acting on the column, respectively. Both the body and the outer stiffening structure can withstand the moment. As a result, the load sharing between the inner reinforcing structure and the outer reinforcing structure is reduced, and the structure of the inner reinforcing structure and the outer reinforcing structure, in particular, the number and diameter of the first and second studs are reduced to reduce the cross-sectional structure. The size can be reduced, and the construction cost can be reduced.
【図1】本発明の実施の一形態の橋脚の補強構造を示す
断面図である。FIG. 1 is a sectional view showing a pier reinforcement structure according to an embodiment of the present invention.
【図2】図1の柱53の下端部53bの拡大断面図であ
る。FIG. 2 is an enlarged sectional view of a lower end 53b of a pillar 53 of FIG.
【図3】図2の切断面線III−IIIから見た拡大断
面図である。FIG. 3 is an enlarged cross-sectional view taken along the line III-III of FIG. 2;
【図4】図2の切断面線IV−IVから見た拡大断面図
である。FIG. 4 is an enlarged cross-sectional view taken along the line IV-IV of FIG. 2;
【図5】図3および図4の切断面線V−Vから見た断面
図である。FIG. 5 is a cross-sectional view taken along line VV of FIGS. 3 and 4;
【図6】図3および図4の切断面線VI−VIから見た
断面図である。FIG. 6 is a sectional view taken along section line VI-VI in FIGS. 3 and 4;
【図7】橋脚51の補強工事の手順を示す図1の切断面
線VII−VIIから見た簡略化した断面図であり、図
7(1)は施工前の橋脚の状態を示し、図7(2)は第
1〜第4内構造体の外表面に複数の第1スタッドが植設
された状態を示し、図7(3)は第1〜第4内構造体の
外側方に予め複数の第2スタッドが植設された第1〜第
4外構造体が設置された状態を示し、図7(4)は内補
強構造体と外補強構造体との間の空間に中詰コンクリー
トを充填して、補強アンカーボルトによって外補強構造
体とフーチングが連結された状態を示す。7 is a simplified cross-sectional view showing the procedure of reinforcing work of the pier 51 viewed from a section line VII-VII in FIG. 1, and FIG. 7A shows a state of the pier before construction; (2) shows a state in which a plurality of first studs are implanted on the outer surface of the first to fourth inner structures, and FIG. FIG. 7D shows a state in which the first to fourth outer structures in which the second studs are planted are installed, and FIG. 7D shows a state in which filled concrete is filled in a space between the inner reinforcing structure and the outer reinforcing structure. It shows a state in which the outer reinforcing structure and the footing are connected by the reinforcing anchor bolt after filling.
【図8】橋脚51の補強工事の手順を示す簡略化した断
面図であり、図8(1)は施工前の橋脚の状態を示し、
図8(2)は第1〜第4内構造体の外表面に複数の第1
スタッドが植設された状態を示し、図8(3)は第1〜
第4内構造体の外側方に予め複数の第2スタッドが植設
された第1〜第4外構造体が設置された状態を示し、図
8(4)は内補強構造体と外補強構造体との間の空間に
中詰コンクリートを充填して、補強アンカーボルトによ
って外補強構造体とフーチングが連結された状態を示
す。FIG. 8 is a simplified cross-sectional view showing a procedure for reinforcing the pier 51, and FIG. 8 (1) shows a state of the pier before construction;
FIG. 8 (2) shows a plurality of first structures on the outer surface of the first to fourth inner structures.
FIG. 8 (3) shows a state in which the studs have been implanted.
FIG. 8D shows a state in which first to fourth outer structures in which a plurality of second studs are implanted in advance outside the fourth inner structure are installed. FIG. 8D shows the inner reinforcing structure and the outer reinforcing structure. FIG. 6 shows a state in which the space between the outer reinforcement structure and the footing is connected to each other with the reinforcement anchor bolts after filling the space between the bodies with the filled concrete.
【図9】図1〜図8に示される実施の形態の橋脚の力の
伝達系統を説明するための図である。FIG. 9 is a view for explaining a force transmission system of the pier according to the embodiment shown in FIGS. 1 to 8;
【図10】本発明の実施の他の形態の柱53の下端部5
3bの拡大断面図である。FIG. 10 is a lower end portion 5 of a pillar 53 according to another embodiment of the present invention.
It is an expanded sectional view of 3b.
【図11】図10の切断面線XI−XIから見た断面図
である。FIG. 11 is a cross-sectional view taken along the line XI-XI of FIG. 10;
【図12】図10の切断面線XII−XIIから見た断
面図である。FIG. 12 is a cross-sectional view taken along the line XII-XII of FIG. 10;
【図13】本発明の実施のさらに他の形態を示す橋脚の
鋼管杭110と柱111との連結部付近の断面図であ
る。FIG. 13 is a cross-sectional view showing the vicinity of a connection portion between a steel pipe pile 110 and a pillar 111 of a pier showing still another embodiment of the present invention.
【図14】図13の切断面線XIV−XIVから見た断
面図である。FIG. 14 is a sectional view taken along section line XIV-XIV in FIG. 13;
【図15】典型的な従来の技術を示す既設橋脚1の断面
図である。FIG. 15 is a sectional view of an existing pier 1 showing a typical conventional technique.
【図16】図15の柱の下端部の拡大断面図である。FIG. 16 is an enlarged sectional view of a lower end portion of the column in FIG.
【図17】図15の切断面線XVII−XVIIから見
た拡大断面図である。FIG. 17 is an enlarged cross-sectional view as viewed from a section line XVII-XVII in FIG. 15;
51 既設橋脚 52 フーチング 53 柱 57,90 内補強構造体 63,93,112 第1スタッド 64,94,113 第2スタッド 65,95 外補強構造体 69,99 補強アンカーボルト 75,103,114 中詰コンクリート 77,104,115 空間 51 Existing pier 52 Footing 53 Pillar 57,90 Inner reinforcing structure 63,93,112 First stud 64,94,113 Second stud 65,95 Outer reinforcing structure 69,99 Reinforcing anchor bolt 75,103,114 Filling Concrete 77,104,115 space
Claims (2)
フーチングに柱が一体的に形成され、柱の上部には上部
構造体を支持する梁が一体的に形成される橋脚の補強構
造において、 前記柱の少なくとも下端部には、鋼鉄製の内補強構造体
が設けられ、 前記内補強構造体には、外側方に突出する複数の第1ス
タッドが相互に間隔をあけて植設され、 前記内補強構造体の外側方には、複数の第2スタッドが
各第1スタッドとほぼ平行に軸直角方向に間隔をあけて
予め植設された外補強構造体が前記フーチングの上面に
支持された状態で設けられ、 前記内補強構造体と前記外補強構造体との間には、前記
第1および第2スタッドが配置される空間が形成され、
この空間には充填材を充填して硬化させることを特徴と
する橋脚の補強構造。1. A pier reinforcement structure in which a pillar is integrally formed on a reinforced concrete footing buried underground, and a beam for supporting an upper structure is integrally formed above the pillar. At least at the lower end of the pillar, an inner reinforcing structure made of steel is provided, and a plurality of first studs projecting outward are implanted in the inner reinforcing structure at an interval from each other. A state in which a plurality of second studs are pre-planted on the outer surface of the reinforcing structure at intervals in the direction perpendicular to the axis substantially parallel to the first studs, and are supported on the upper surface of the footing. A space in which the first and second studs are arranged is formed between the inner reinforcing structure and the outer reinforcing structure;
A bridge pier reinforcement structure characterized by filling and curing this space with filler.
は、連結手段によって連結されることを特徴とする請求
項1記載の橋脚の補強構造。2. The pier reinforcement structure according to claim 1, wherein the outer reinforcement structure and the footing are connected by connecting means.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP15835296A JPH108422A (en) | 1996-06-19 | 1996-06-19 | Reinforcement structure of bridge pier |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP15835296A JPH108422A (en) | 1996-06-19 | 1996-06-19 | Reinforcement structure of bridge pier |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH108422A true JPH108422A (en) | 1998-01-13 |
Family
ID=15669786
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP15835296A Pending JPH108422A (en) | 1996-06-19 | 1996-06-19 | Reinforcement structure of bridge pier |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH108422A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100440092B1 (en) * | 2001-08-07 | 2004-07-14 | 선암산업개발주식회사 | Pannel for Repair and Reinforcement Method of Pier and Utilize Pannel Repair and Reinforcement Method |
KR100446360B1 (en) * | 2001-08-07 | 2004-09-01 | 선암산업개발주식회사 | Utilize Stone Repair and Reinforcement Method of Pier |
JP2007321354A (en) * | 2006-05-30 | 2007-12-13 | Jfe Engineering Kk | Reinforcing structure for square pier stud, reinforcing structure for base of the square pier stud, and method of constructing the same |
CN103243662A (en) * | 2013-05-28 | 2013-08-14 | 中铁上海设计院集团有限公司 | Reconstruction and reinforcement method for existing railroad bridge |
JP2015172274A (en) * | 2014-03-11 | 2015-10-01 | 首都高速道路株式会社 | Bridge pier reinforcement structure |
CN112329295A (en) * | 2020-10-28 | 2021-02-05 | 华南理工大学 | Trapezoidal rib orthotropic plate welding residual stress distribution calculation method |
CN114351603A (en) * | 2021-09-26 | 2022-04-15 | 重庆大学 | Easily-repaired pier foot wrapped with steel and repairing method thereof |
-
1996
- 1996-06-19 JP JP15835296A patent/JPH108422A/en active Pending
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100440092B1 (en) * | 2001-08-07 | 2004-07-14 | 선암산업개발주식회사 | Pannel for Repair and Reinforcement Method of Pier and Utilize Pannel Repair and Reinforcement Method |
KR100446360B1 (en) * | 2001-08-07 | 2004-09-01 | 선암산업개발주식회사 | Utilize Stone Repair and Reinforcement Method of Pier |
JP2007321354A (en) * | 2006-05-30 | 2007-12-13 | Jfe Engineering Kk | Reinforcing structure for square pier stud, reinforcing structure for base of the square pier stud, and method of constructing the same |
JP4544202B2 (en) * | 2006-05-30 | 2010-09-15 | Jfeエンジニアリング株式会社 | Reinforcing structure of rectangular pedestal, reinforcing structure of base of rectangular pedestal, and construction method thereof |
CN103243662A (en) * | 2013-05-28 | 2013-08-14 | 中铁上海设计院集团有限公司 | Reconstruction and reinforcement method for existing railroad bridge |
JP2015172274A (en) * | 2014-03-11 | 2015-10-01 | 首都高速道路株式会社 | Bridge pier reinforcement structure |
CN112329295A (en) * | 2020-10-28 | 2021-02-05 | 华南理工大学 | Trapezoidal rib orthotropic plate welding residual stress distribution calculation method |
CN112329295B (en) * | 2020-10-28 | 2024-03-26 | 华南理工大学 | Calculation method for welding residual stress distribution of trapezoid rib orthotropic plate |
CN114351603A (en) * | 2021-09-26 | 2022-04-15 | 重庆大学 | Easily-repaired pier foot wrapped with steel and repairing method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100969586B1 (en) | Rhamen bridge and construction method there of | |
US20100319280A1 (en) | Precast Temporary Facility Structure and a Construction Method for the Same | |
JP2001159140A (en) | Landslide-countermeasure structure | |
KR20090041707A (en) | Connection for pile head, connection structure and method of pile and precast concrete pier structure | |
KR100946879B1 (en) | Connection for Steel Pile Head, Connection Structure and Method of Pile and Precast Concrete Pier Structure | |
JP2006104747A (en) | Pier stud connection structure and pier stud connecting method | |
JP2004285738A (en) | Box girder bridge structure and method of constructing the same | |
JP3899354B2 (en) | Seismic isolation building | |
KR20200143987A (en) | Reinforcement unit for support point of steel girder and construction method thereof | |
JP3690437B2 (en) | Seismic reinforcement structure for existing buildings | |
JPH108422A (en) | Reinforcement structure of bridge pier | |
JP2001303584A (en) | Structure for connecting head of foundation pile with footing | |
JP3752999B2 (en) | Upper and lower integrated bridge and its construction method | |
JP2750556B2 (en) | Manufacturing method of prestressed concrete girder | |
JP3671344B2 (en) | Joint structure between foundation pile and column base and its construction method | |
JP5221191B2 (en) | Building basic structure and construction method | |
JPH10331436A (en) | Earthquake-resisting reinforcing structure for beam-column in existing structure | |
KR102244029B1 (en) | Rahmen bridge without abuttment and construction method thereof | |
JP3929006B2 (en) | Construction method for expanded seismic walls | |
KR102200400B1 (en) | Precast segment, pillar structure including the same and construction method of pillar structure usinging the same | |
JP2006316495A (en) | Foundation structure of bridge pier and its construction method | |
JP3849234B2 (en) | Reinforced concrete underground outer wall construction method | |
JP4449595B2 (en) | Column-beam joint structure, method for constructing column-beam joint structure, method for constructing underground structure, and building | |
JP7269197B2 (en) | ROAD STRUCTURE AND METHOD FOR MANUFACTURING ROAD STRUCTURE | |
JPH09324418A (en) | Foundation pile structure and construction method therefor |