JPH0932171A - Joining part structure of precast floor plate and construction method thereof - Google Patents
Joining part structure of precast floor plate and construction method thereofInfo
- Publication number
- JPH0932171A JPH0932171A JP18960195A JP18960195A JPH0932171A JP H0932171 A JPH0932171 A JP H0932171A JP 18960195 A JP18960195 A JP 18960195A JP 18960195 A JP18960195 A JP 18960195A JP H0932171 A JPH0932171 A JP H0932171A
- Authority
- JP
- Japan
- Prior art keywords
- cotter
- precast
- hole
- precast floor
- floorboard
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明はプレキャスト床板接
合部構造及びその構築方法に関し、更に詳細には鉄骨造
建物において鉄骨梁上に対向して並べられたプレキャス
ト床板同志の接合部構造及びその構築方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a precast floor board joint structure and a method of constructing the same, and more particularly to a joint structure of precast floor boards which are arranged opposite to each other on a steel beam in a steel frame building and a method of constructing the joint structure. Regarding
【0002】[0002]
【従来の技術】従来、鉄骨造建物におけるスラブ即ち床
の構築方法は、鉄骨建て方終了後にデッキプレートを敷
き、その上にワイヤーメッシュや鉄筋を配筋してコンク
リートを打設することで構築するのが一般的であった。2. Description of the Related Art Conventionally, a method of constructing a slab, that is, a floor, in a steel frame building is constructed by laying a deck plate after the steel frame is built, and laying a wire mesh or a reinforcing bar on the deck plate and placing concrete. Was common.
【0003】[0003]
【発明が解決しようとする課題】しかしながら、前述し
たような従来のスラブの構築方法では、デッキプレート
上に配筋してコンクリートを打設するまでは実質的に資
材等を置くことはできず、別途作業用資材を置くための
仮設構台等を設ける必要があった。また、床構築後の仕
上げ工事や設備工事の際には資材の揚重が錯綜し、これ
を解決するために揚重設備を増設する必要があり、工期
の遅れや工事費増の要因となっていた。However, in the conventional method for constructing a slab as described above, it is impossible to practically place materials and the like until the concrete is laid and placed on the deck plate. It was necessary to provide a temporary gantry to put work materials separately. In addition, the lifting of materials is complicated during finishing work and equipment work after floor construction, and it is necessary to add lifting equipment to solve this, which causes a delay in construction period and an increase in construction costs. Was there.
【0004】本発明の目的は、かかる従来の問題点を解
決するためになされたもので、予め工場等で形成したプ
レキャスト床板を用いて鉄骨造建物のスラブを構築する
際、鉄骨梁上に配列された前記プレキャスト床板の端部
を簡単に且つ所定の強度で接合し、資材等を置くことが
できるようにするプレキャスト床板接合部構造及びその
構築方法を提供することにある。The object of the present invention is to solve the above-mentioned conventional problems, and when a slab of a steel frame building is constructed using a precast floor board formed in advance in a factory or the like, it is arranged on a steel beam. It is an object of the present invention to provide a precast floor board joint structure and a method for constructing the precast floor board, which allows the end portions of the precast floor board to be easily joined to each other with a predetermined strength so that materials and the like can be placed.
【0005】[0005]
【課題を解決するための手段】本発明はプレキャスト床
板接合部構造及びその構築方法であり、前述した技術的
課題を解決するために以下のように構成されている。す
なわち、本発明のプレキャスト床板接合部構造は、プレ
キャスト床板の端部に形成された凸部及び凹部から構成
され且つ隣接する前記プレキャスト床板端部の前記凸部
及び前記凹部とが噛み合うように鉄骨梁上に並べて設置
されたコッター部と、前記コッター部に形成された少な
くとも一つのジベル筋挿入用の穴と、前記コッター部に
設けられた前記穴に配置されて前記鉄骨梁に固着された
ジベル筋と、隣接する前記プレキャスト床板の前記コッ
ター部間の間隙部及び前記ジベル筋が入れられた前記コ
ッター部の前記穴内に打設された無収縮モルタルとから
構成されていることを特徴とする(請求項1に対応)。The present invention relates to a precast floor board joint structure and a method for constructing the same, which is configured as follows to solve the above-mentioned technical problems. That is, the precast floorboard joint structure of the present invention is composed of a convex portion and a concave portion formed at an end portion of the precast floorboard, and a steel beam so that the convex portion and the concave portion of the adjacent precast floorboard end portion are engaged with each other. A cotter portion installed side by side on top of the cotter portion, at least one hole for insertion of the gibel muscle formed in the cotter portion, and a gibel muscle fixed to the steel beam arranged in the hole provided in the cotter portion And a non-shrinkage mortar cast in the gap between the cotter portions of the adjacent precast floorboards and in the hole of the cotter portion in which the gibber streak is placed (claim) (Corresponding to item 1).
【0006】更に、本発明のプレキャスト床板接合構造
では、前記プレキャスト床板内部の配筋構造が前記穴の
周囲に配置されたスパイラル状の補強筋と前記穴の周囲
をめぐるように配置されたU型鉄筋部を有するスラブ筋
とを少なくとも備え、前記スラブ筋のU型鉄筋部に前記
補強筋を配筋するようにすることも好ましい(請求項2
に対応)。Further, in the precast floor board joining structure of the present invention, the reinforcing structure inside the precast floor board is arranged in a spiral shape around the hole and a U-shape arranged around the hole. It is also preferable that at least a slab reinforcement having a reinforcing bar portion is provided, and the reinforcing bar is arranged in the U-shaped reinforcing bar portion of the slab reinforcement (claim 2).
Corresponding to).
【0007】更に、本発明はプレキャスト床板接合部構
造の構築方法であり、前述の技術的課題を解決するため
に以下ように構成されている。すなわち、本発明のプレ
キャスト床板接合部構造の構築方法は、少なくとも1つ
のジベル筋挿入用の穴を開けたコッター部を4辺にそれ
ぞれ形成した複数のプレキャスト床板を前記コッター部
の凸部と凹部とが噛み合うように鉄骨梁上に設置し、そ
の際前記プレキャスト床板に設けられた前記穴の位置に
対応して鉄骨梁上に予め固着されたジベル筋が前記各穴
に相対的に挿入されるか又は前記各プレキャスト床板を
前記鉄骨梁上に並べて設置した後に前記コッター部の前
記各穴からそれぞれジベル筋を入れて前記鉄骨梁に固着
して立設し、隣接する前記プレキャスト床板の前記コッ
ター部の間隙部及び前記ジベル筋が入れられた前記コッ
ター部の前記穴内に無収縮モルタルを打設し、これによ
り前記プレキャスト床板と前記鉄骨梁とを一体化させる
ことを特徴とする(請求項3に対応)。Further, the present invention is a method for constructing a precast floor board joint structure, which is configured as follows in order to solve the above-mentioned technical problems. That is, the method for constructing a precast floorboard joint structure according to the present invention comprises a plurality of precast floorboards each having a cotter portion having a hole for insertion of at least one perforation on each side and a convex portion and a concave portion of the cotter portion. Are installed on the steel beam so that they mesh with each other, and at that time, the gibber streak pre-fixed on the steel beam corresponding to the position of the hole provided in the precast floor board is relatively inserted into each hole. Alternatively, after each precast floor board is installed side by side on the steel beam, each of the holes of the cotter section is provided with a Gibel streak and fixedly erected on the steel beam, and the cotter section of the adjacent precast floor board is installed. A non-shrink mortar is placed in the hole of the cotter part in which the gap part and the gibber streak are inserted, whereby the precast floor plate and the steel beam are integrated. And characterized in that (corresponding to claim 3).
【0008】また、本発明のプレキャスト床板接合部構
造を次のような方法で構築することもできる。その構築
方法は、少なくとも1つのジベル筋挿入用の穴を開けた
コッター部を4辺にそれぞれ形成したプレキャスト床板
と、少なくとも1つのジベル筋挿入用の穴を開けたコッ
ター部を4辺にそれぞれ形成し、対向する一組のコッタ
ー部が小梁に乗るようにして小梁を予め取り付けた小梁
付きプレキャスト床板とをそれぞれ複数予め準備し、複
数の前記小梁付きプレキャスト床板を小梁の取り付けら
れていない両端側の前記コッター部を大梁に乗せ且つ連
続するプレキャスト床板配置予定位置に1つ置きに設置
して前記小梁と前記大梁とを連結し、次いで前記小梁付
きプレキャスト床板間に小梁の付かない前記プレキャス
ト床板を位置決めして各コッター部を隣接するプレキャ
スト床板のコッター部とが噛み合うように前記大梁と前
記小梁付きプレキャストの小梁上に設置し、その際前記
プレキャスト床板のコッター部に設けられた前記穴の位
置に対応して大梁上に予め固着されたジベル筋が前記各
穴に相対的に挿入されるか又は前記各プレキャスト床板
を前記大梁上に並べて設置した後に前記コッター部の前
記各穴からそれぞれジベル筋を入れて前記大梁に固着し
て立設し、その後隣接する前記プレキャスト床板の前記
コッター部の間隙部及び前記大梁に乗っている前記コッ
ター部の前記穴内に無収縮モルタルを打設し、これによ
り前記プレキャスト床板と前記鉄骨梁とを一体化させる
ことである(請求項4に対応)。The precast floor board joint structure of the present invention can also be constructed by the following method. The construction method is as follows: Precast floorboards with at least one hole for insertion of the dowel muscle on each side and precast floorboards with at least one hole for insertion of the dober muscle on each of the four sides. Then, prepare a plurality of precast floor boards with girders in which beamlets are pre-attached so that a pair of opposing cotter parts ride on the beam, and a plurality of precast floorboards with girders can be attached to beamlets. The cotters on both ends which are not mounted are placed on a girder and installed at every other precast floorboard placement planned position to connect the girder and the girder, and then the girder between the precast floorboards with girders With the large beam and the small beam so that the precast floor plate without sticking is positioned so that each cotter part meshes with the cotter part of the adjacent precast floor plate. Is installed on the precast beam, and at that time, the gibber pre-fixed on the girder corresponding to the position of the hole provided in the cotter portion of the precast floorboard is relatively inserted into each hole? Or, after the precast floor boards are installed side by side on the girder, each hole of the cotter portion is provided with a Gibel streak and fixed to the girder to stand upright, and then a gap between the cotter portions of the adjacent precast floor boards. The non-shrink mortar is cast in the hole of the cotter portion that is on the bridge portion and the girder, thereby integrating the precast floorboard and the steel beam (corresponding to claim 4).
【0009】更に、上述のプレキャスト床板接合構造の
構築方法において、前記小梁付きプレキャスト床板が予
め準備される際、前記小梁に固着されたジベル筋がこの
小梁に乗せられた前記コッター部の前記穴内に位置し、
前記ジベル筋が配置された前記穴内に無収縮モルタルを
打設することで小梁を一体化することができる(請求項
5に対応)。Furthermore, in the method for constructing the precast floor plate joint structure described above, when the precast floor plate with beam is prepared in advance, the gibber streak fixed to the beam is attached to the cotter portion mounted on the beam. Located in the hole,
The beam can be integrated by driving non-shrink mortar into the hole in which the gibber streak is arranged (corresponding to claim 5).
【0010】[0010]
【発明の実施の形態】以下、本発明のプレキャスト床板
接合部構造及びその構築方法を図に示される実施形態に
ついて更に詳細に説明する。この実施形態に係るプレキ
ャスト床板接合部構造では、独特なプレキャスト床板
(以下、単に床板と称する)10を使用する。この床板
は工場などで大量生産されるパネルであり、一般的には
鉄筋コンクリートパネルである。これを建造物の床とし
て用いるような仕様で形成する時プレキャスト床板と称
されている。BEST MODE FOR CARRYING OUT THE INVENTION The precast floor board joint portion structure and its construction method of the present invention will be described below in more detail with reference to the embodiments shown in the drawings. The precast floorboard joint structure according to this embodiment uses a unique precast floorboard (hereinafter simply referred to as floorboard) 10. This floorboard is a panel mass-produced in factories, etc., and is generally a reinforced concrete panel. It is called a precast floorboard when it is designed to be used as a building floor.
【0011】この床板10は4辺に形成されたコッター
部11を備えている。このコッター部11とは、図1に
示されるように凸部11aと凹部11bを交互に形成し
た部分を言う。このコッター部11における各凸部11
aには、床板10の表裏を貫通する穴12が少なくとも
1つ以上形成されている。The floor board 10 has cotter portions 11 formed on four sides. The cotter portion 11 is a portion in which convex portions 11a and concave portions 11b are alternately formed as shown in FIG. Each convex portion 11 in this cotter portion 11
At least one hole 12 penetrating the front and back of the floor plate 10 is formed in a.
【0012】この穴12は、スタッドボルト等を用いた
ジベル筋を挿入するためのもので、従ってこのジベル筋
より大きな直径で形成されている。この床板10内部の
配筋構造としてはこの穴12を取り巻くようにその周囲
に螺旋状に配置された補強筋13と、穴12の周囲をめ
ぐるように配置されたU型鉄筋部14aを備えるスラブ
筋14とを少なくとも備えている。そして、このスラブ
筋14のU型鉄筋部14aに前述の補強筋13が配筋さ
れている。The hole 12 is for inserting a gibber line using a stud bolt or the like, and therefore has a diameter larger than that of the gibbel line. As a reinforcing structure inside the floor plate 10, a slab having reinforcing bars 13 spirally arranged around the hole 12 and a U-shaped reinforcing bar portion 14a arranged so as to surround the hole 12. At least the muscle 14 is provided. The above-mentioned reinforcing bar 13 is arranged on the U-shaped reinforcing bar portion 14a of the slab bar 14.
【0013】このようなプレキャスト床板10は、従来
から行われているように型枠を用いて形成される。その
時、コッター部11の凸部11aに設けられるジベル筋
挿入用の穴12は円筒形の型枠を対向する表面型枠間に
配置することで形成され、また補強筋筋13はその円筒
形型枠の周囲に配置することで配筋される。勿論、この
場合、穴12形成用の円筒形型枠は他の型枠と共に完成
されたプレキャスト床板10から取り外される。Such a precast floorboard 10 is formed by using a mold as is conventionally done. At that time, the hole 12 for the insertion of the gibber muscle provided in the convex portion 11a of the cotter portion 11 is formed by arranging a cylindrical mold between the surface molds facing each other, and the reinforcing muscle 13 is formed in the cylindrical mold. It is reinforced by placing it around the frame. Of course, in this case, the cylindrical formwork for forming the holes 12 is removed from the completed precast floorboard 10 together with the other formwork.
【0014】しかし、このジベル筋挿入用の穴12とそ
の周囲の補強筋13は次のような方法でも形成すること
もできる。すなわち、図3に示されるように薄い鉄板を
円筒状に形成してジベル筋挿入用穴の型枠兼補強板19
とし、その外周囲にスパイラル状の補強筋13を巻き付
けて離脱しない程度に各部を固着する。However, the hole 12 for inserting the gibber muscle and the reinforcing muscle 13 around it can also be formed by the following method. That is, as shown in FIG. 3, a thin iron plate is formed into a cylindrical shape, and a formwork / reinforcing plate 19 for a perforation of a dowel insertion
The spiral reinforcing bar 13 is wound around the outer periphery of the reinforcing member 13 so that each part is fixed to the extent that it does not separate.
【0015】このような補強筋13の付いた型枠兼補強
板19をプレキャスト床板用表面型枠間の所定位置に配
置する。そして、これらの表面型枠及び他の側面型枠で
囲まれる空間部に例えばコンクリートを充填する。この
時、当然その空間部にはスラブ筋等必要な配筋がなされ
ていることは言うまでもない。A formwork / reinforcement plate 19 having such reinforcing bars 13 is arranged at a predetermined position between the surface molds for the precast floorboard. Then, for example, concrete is filled in the space surrounded by these surface formwork and other side formwork. At this time, needless to say, necessary rebars such as slabs are naturally provided in the space.
【0016】その後、コンクリートが硬化したところで
表面型枠及び側面型枠を脱型する。しかし、ジベル筋挿
入用の穴12を形成するために使用した型枠兼補強板1
9はそのまま埋め殺しにする。このようにしてプレキャ
スト床板10を形成すると、補強筋13の配筋やジベル
筋挿入穴形成用型枠の設置並びにその後の処理が非常に
簡単になり、プレキャスト床板の製造の能率が向上す
る。After that, when the concrete is hardened, the surface form and the side form are removed. However, the formwork / reinforcement plate 1 used to form the hole 12 for inserting the dowel
9 is buried as it is. When the precast floorboard 10 is formed in this manner, the reinforcement bar 13 and the installation of the form for forming the gibber insertion hole and the subsequent treatment are very simple, and the efficiency of manufacturing the precast floorboard is improved.
【0017】このようなプレキャスト床板10を用いて
形成されるプレキャスト床板接合部構造は、次の通りで
ある。すなわち、このプレキャスト床板接合部構造は、
プレキャスト床板10の端部に形成された凸部11a及
び凹部11bから構成され、隣接するプレキャスト床板
の対向する端部に形成された凹部11b及び凸部11a
とに噛み合うように大梁15aと小梁15bとからなる
鉄骨梁15上に並べて設置されたコッター部11を含
む。The precast floorboard joint structure formed using such a precast floorboard 10 is as follows. That is, this precast floorboard joint structure is
Concave portion 11a and concave portion 11b formed at the end portion of the precast floorboard 10, and concave portion 11b and convex portion 11a formed at the opposite end portions of the adjacent precast floorboards.
It includes a cotter portion 11 installed side by side on a steel frame beam 15 composed of a large beam 15a and a small beam 15b so as to mesh with.
【0018】このコッター部11の各凸部11aには少
なくとも一つのジベル筋挿入用の穴12が形成されてい
ることは既に説明したとおりである。コッター部11の
各凸部11aに設けられた穴12にはジベル筋16が挿
入されて鉄骨梁15に固着されている。そして、隣接す
るプレキャスト床板10のコッター部11間の間隙部1
7とジベル筋16が入れられたコッター部11の穴12
内には無収縮モルタル18が打設されている。As described above, at least one hole 12 for inserting the gibber muscle is formed in each convex portion 11a of the cotter portion 11. A gibber streak 16 is inserted into the hole 12 provided in each convex portion 11 a of the cotter portion 11 and fixed to the steel beam 15. And the gap part 1 between the cotter parts 11 of the adjacent precast floor boards 10
Hole 12 in the cotter part 11 in which 7 and the dovetail muscle 16 are put
A non-shrink mortar 18 is placed therein.
【0019】このプレキャスト床板接合部構造を構築す
る方法としては、最初に、複数のプレキャスト床板10
をコッター部11の凸部11aと凹部11bとが噛み合
うように鉄骨梁15上に設置する。その後、各プレキャ
スト床板10のコッター部10の凸部11aに設けられ
た穴12からジベル筋16を入れ、鉄骨梁15に固着し
て立設する。As a method for constructing this precast floorboard joint structure, first, a plurality of precast floorboards 10 are used.
Is installed on the steel beam 15 so that the convex portion 11a and the concave portion 11b of the cotter portion 11 mesh with each other. After that, the gibber streak 16 is inserted from the hole 12 provided in the convex portion 11a of the cotter portion 10 of each precast floorboard 10 and fixed to the steel beam 15 to stand upright.
【0020】そして、隣接するプレキャスト床板10の
コッター部11の間隙部17及びジベル筋16が入れら
れたコッター部11の穴12内に無収縮モルタル18が
打設される。これにより鉄骨梁15上に対向して載置さ
れたプレキャスト床板10端部同士が接合されると共に
同時に鉄骨梁15とも一体化される。Then, a non-shrinkable mortar 18 is cast into the hole 12 of the cotter portion 11 in which the gap 17 and the gibber streak 16 of the cotter portion 11 of the adjacent precast floorboard 10 are inserted. As a result, the end portions of the precast floor board 10 placed on the steel beam 15 so as to face each other are joined together and, at the same time, integrated with the steel beam 15.
【0021】なお、前述した実施例では、プレキャスト
床板10を鉄骨梁上15上に配列してからジベル筋16
をコッター部11に形成した穴12に入れて鉄骨梁15
に固着したが、予め鉄骨梁15上にジベル筋16を所定
の位置に固定しておいてもよい。この場合における「所
定の位置」とはプレキャスト床板10を鉄骨梁15上に
配列した時コッター部11の穴12が設計上位置するこ
とになる鉄骨梁15上の箇所である。In the above-described embodiment, the precast floor boards 10 are arranged on the steel beam tops 15 and then the gibber reinforcement 16 is provided.
The steel beam 15 into the hole 12 formed in the cotter portion 11.
However, it is also possible to fix the gibber streak 16 on the steel beam 15 at a predetermined position in advance. In this case, the "predetermined position" is the position on the steel beam 15 where the holes 12 of the cotter portion 11 are located by design when the precast floorboards 10 are arranged on the steel beam 15.
【0022】更に、本発明に係るプレキャスト床板接合
部構造の構築は、次のような方法で行うこともできる。
すなわち、他のプレキャスト床板接合部構造の構築方法
は、最初に、前述したプレキャスト床板10と、図5に
示されるようにこのプレキャスト床板に小梁15bを予
め取り付けた小梁付きプレキャスト床板20とを工場で
予め製造して準備しておく。Further, the precast floor board joint structure according to the present invention can be constructed by the following method.
That is, in another construction method of the precast floor board joint structure, first, the precast floor board 10 described above and the precast floor board 20 with beam girders in which the beam 15b is attached in advance to this precast floor board as shown in FIG. It is manufactured and prepared in advance at the factory.
【0023】このような小梁付きプレキャスト床板20
は、次のようにして製造される。すなわち、小梁をプレ
キャスト床板10の相対向する2辺のコッター部11に
沿って配置する。その際、プレキャスト床板10に設け
られた穴12の位置に対応して小梁15b上に予め固着
されたジベル筋16が各穴12に相対的に挿入するよう
にするか、或いはジベル筋16をコッターの各穴12か
ら挿入して小梁15bに固着するかしてジベル筋16を
コッター部11の各穴12に位置させる。Precast floor board 20 with such a beam
Is manufactured as follows. That is, the beam is arranged along the cotter portions 11 on the two sides of the precast floor board 10 that face each other. At that time, in correspondence with the position of the hole 12 provided in the precast floor board 10, the gibber streak 16 fixed in advance on the beam 15b is inserted relatively into each hole 12, or The gibber streak 16 is positioned in each hole 12 of the cotter portion 11 by inserting it from each hole 12 of the cotter and fixing it to the beam 15b.
【0024】その後、小梁に固着されたジベル筋16が
配置されたコッター部11の各穴12内に無収縮モルタ
ルが打設され、これによりプレキャスト床板10と小梁
15bとの一体化が図られる。このようにして製造され
たプレキャスト床板10と小梁付きプレキャスト床板2
0とを工場から建築現場に搬送し、図4に示されるよう
に、最初に、小梁付きプレキャスト床板20を小梁の取
り付けられていない両端側のコッター部を大梁15aに
乗せ且つ連続するプレキャスト床板配置予定位置に1つ
置きに設置する。After that, non-shrink mortar is placed in each hole 12 of the cotter portion 11 in which the gibber streak 16 fixed to the beam is placed, whereby the precast floor board 10 and the beam 15b are integrated. To be Precast floorboard 10 and precast floorboard 2 with crossbeams manufactured in this way
0 is transported from the factory to the construction site, and as shown in FIG. 4, first, the precast floor board 20 with a beam is placed on the girder 15a with the cotter portions on both ends where the beam is not attached and the continuous precast. Install every other one at the planned floorboard location.
【0025】そして、小梁15bと大梁15aとを溶接
或いは高張力ボルト等を周知の手段を用いて連結し、次
いで小梁付きプレキャスト床板20間に小梁の付かない
プレキャスト床板10を位置決めして各コッター部11
を隣接するプレキャスト床板のコッター部11とが噛み
合うように大梁15aと小梁付きプレキャスト20の小
梁15b上に設置する。Then, the small beam 15b and the large beam 15a are welded or connected to each other by using a high tension bolt or the like by a well-known means, and then the precast floor plate 10 without the beam is positioned between the precast floor plates 20 with the small beam. Each cotter section 11
Is installed on the large beam 15a and the small beam 15b of the precast 20 with the small beam so that the cotter portions 11 of the adjacent precast floor plates are engaged with each other.
【0026】その際、プレキャスト床板10及び小梁付
きプレキャスト床板20のコッター部11に設けられた
穴12の位置に対応して大梁15a上にジベル筋16を
予め固着しておき、コッター部11の各穴12に相対的
に挿入するようにするか、又は各プレキャスト床板1
0、20を大梁15a上に設置した後にコッター部11
の各穴12からそれぞれジベル筋16を入れて大梁15
aに固着するかのいずれかの方法で、大梁15aに固定
されたジベル筋16をコッター部11の各穴12内に配
置する。At this time, the gibber streak 16 is pre-fixed on the girder 15a corresponding to the position of the hole 12 provided in the cotter portion 11 of the precast floor board 10 and the precast floor board 20 with a small beam, and the cotter portion 11 of Insert into each hole 12 relative to each other, or each precast floorboard 1
After installing 0 and 20 on the girder 15a, the cotter part 11
Girber 16 is inserted from each hole 12 of
The gibber streak 16 fixed to the girder 15a is arranged in each hole 12 of the cotter portion 11 by any method of fixing to the a.
【0027】その後、隣接するプレキャスト床板のコッ
ター部の間隙部及び大梁15aに乗っているコッター部
11の各穴12内に無収縮モルタルを打設する。このよ
うにしてプレキャスト床板を鉄骨梁に配置して一体化さ
せる。Thereafter, non-shrinkage mortar is placed in the gaps between the cotter portions of the adjacent precast floorboards and in the holes 12 of the cotter portion 11 on the girder 15a. In this way, the precast floorboard is placed on the steel beam and integrated.
【0028】[0028]
【実施例】本発明に係るプレキャスト床板接合部構造の
具体例として、4辺にコッター部11を形成したプレキ
ャスト床板10は、鉄筋コンクリートで作ることができ
る。その際、コッター部11に設けられるジベル挿入用
の穴12は各凸部11aにそれぞれ2つ形成されてい
る。EXAMPLES As a concrete example of the precast floorboard joint structure according to the present invention, the precast floorboard 10 having the cotter portions 11 formed on four sides can be made of reinforced concrete. At that time, two dowel insertion holes 12 provided in the cotter portion 11 are formed in each of the convex portions 11a.
【0029】通常使用される厚みが150mmのプレキ
ャスト床板10のコッター部11における凸部11aの
突出長さは約200mmである。そして、コッター部1
1に形成される穴12は上部開口径が下部開口径よりも
若干大きい断面台形状を呈している。勿論、この穴12
の形状としては上部開口径と下部開口径とがほぼ同一の
断面円筒状でもよいことは言うまでもない。The protrusion length of the protrusion 11a in the cotter portion 11 of the precast floor board 10 having a thickness of 150 mm which is usually used is about 200 mm. And the cotter part 1
The hole 12 formed in No. 1 has a trapezoidal cross section in which the upper opening diameter is slightly larger than the lower opening diameter. Of course, this hole 12
Needless to say, the shape of the above may be a cylindrical shape in which the upper opening diameter and the lower opening diameter are substantially the same.
【0030】また、この穴12の周囲を取り巻くように
配置されている補強筋13の上端部及び下端部からプレ
キャスト床板表面までのコンクリート被り寸法は約10
mm程度になる。The dimension of concrete covering from the upper and lower ends of the reinforcing bar 13 arranged so as to surround the hole 12 to the surface of the precast floorboard is about 10.
It becomes about mm.
【0031】この補強筋13は正にスパイラルで形成さ
れたものであれば入手の容易さや安価であることか非常
に好ましいが、多数のリングを間隔をあけて積み重ねこ
れを細い棒筋で連結したようなものであってもよい。It is very preferable that the reinforcing bar 13 is a spirally formed one because it is easily available and inexpensive. However, a large number of rings are stacked at intervals and connected by thin bar bars. It may be something like this.
【0032】また、ジベル筋16として最も利用可能性
のあるスタッドボルトは大梁15a或いは小梁15bに
対して溶接等の手段で固着される。そして、プレキャス
ト床板のコッター部凸部にジベル筋挿入用穴を形成する
一方法として先に紹介した薄い鉄板からなる円筒形の型
枠兼補強板19とその外周囲に配置するスパイラル状の
補強筋との固着も溶接でなされる。The stud bolt, which is most applicable as the gibber streak 16, is fixed to the large beam 15a or the small beam 15b by means such as welding. Then, as a method of forming a hole for inserting a gibber streak in the cotter convex portion of the precast floor plate, a cylindrical form frame / reinforcing plate 19 made of a thin iron plate and a spiral reinforcing bar to be arranged around its outer periphery are introduced. It is also fixed by welding.
【0033】[0033]
【発明の効果】以上説明したように、本発明のプレキャ
スト床板接合部構造によれば、端部に形成されたコッタ
ー部の凸部及び凹部を隣接するプレキャスト床板のコッ
ター部に噛み合うように鉄骨梁上に配列支持され、コッ
ター部に設けられた穴にはジベル筋が配置されていて鉄
骨梁に固着されており、対向するコッター部間とジベル
筋が入れられた穴とに無収縮モルタルを打設することに
よりプレキャスト床板端部同士及び鉄骨梁の強固な接合
を得ることができる。As described above, according to the structure of the precast floor board joint portion of the present invention, the steel beam is used so that the projections and the recesses of the cotter portion formed at the end are engaged with the cotter portions of the adjacent precast floor boards. The bellows are arrayed and supported on the top, and the gibber streak is placed in the hole provided in the cotter part and is fixed to the steel beam. By arranging, it is possible to obtain a strong joint between the ends of the precast floor board and the steel beam.
【0034】その結果、鉄骨造建物においてこの床にい
つでも工事用資材等を仮置きすることができ、換言すれ
ば早期に資材ストックヤードとして使用できる床を形成
することができることから、仕上げ材等の先行揚重によ
り揚重量を削減して揚重設備を最小限に抑えることがで
き、しかも従来のように別途作業用資材を置く仮設構台
を設置する必要もないため、この仮設構台の費用などが
掛からず非常に経済的となる。As a result, construction materials and the like can be temporarily placed on this floor in a steel building at any time, in other words, a floor that can be used as a material stockyard can be formed at an early stage. Since the lifting weight can be reduced by the preceding lifting and the lifting equipment can be minimized, and there is no need to install a temporary gantry for placing work materials as in the past, the cost of this temporary gantry is It will be very economical without cost.
【0035】また、本発明に係るプレキャスト床板接合
部構造の構築方法によれば、鉄骨造建物において前述し
たようなプレキャスト床板接合構造を備える非常に強度
の高いスラブ即ち床を極めて短期間に且つ能率的に構築
することができる。Further, according to the method of constructing the precast floor board joint structure according to the present invention, a very strong slab or floor having the precast floor board joint structure as described above in a steel frame building can be used in an extremely short period of time and efficiently. Can be built in the same way.
【0036】また、本発明のプレキャスト床板接合部構
造によれば、鉄骨造建物において早期に床の構築が完了
できるため、これが屋根となって以後の作業が天候に左
右されなくなると共に、早期に通路及び作業スペースが
確保されるため、作業環境が向上し、鉄骨建て方後の仕
上げ工事などへスムースに移行することができるなど多
大な効果を奏する。Further, according to the precast floor board joint structure of the present invention, since the floor construction can be completed in a steel frame building at an early stage, it becomes a roof and the work thereafter is not affected by the weather, and the passage is early. Further, since the work space is secured, the work environment is improved, and it is possible to smoothly shift to the finishing work after the steel frame is built, which is a great effect.
【図1】本発明の一実施形態に係るプレキャスト床板接
合部構造における接合部を示す平面図である。FIG. 1 is a plan view showing a joint portion in a precast floor board joint portion structure according to an embodiment of the present invention.
【図2】図1の2−2線に沿って切断して示すプレキャ
スト床板接合部の断面図である。FIG. 2 is a cross-sectional view of a precast floor board joint section taken along line 2-2 in FIG.
【図3】プレキャスト床板のコッター部凸部にジベル筋
挿入用穴を形成する一方法に使用する薄い鉄板からなる
円筒形の型枠兼補強板とその外周に取り付けた補強筋を
示す斜視図である。FIG. 3 is a perspective view showing a cylindrical formwork / reinforcement plate made of a thin iron plate used in a method of forming a hole for inserting a dowel reinforcement on a convex part of a cotter part of a precast floor plate and a reinforcement bar attached to the outer periphery thereof. is there.
【図4】本発明の他の実施形態に係るプレキャスト床板
接合部構造の構築方法を示す説明図である。FIG. 4 is an explanatory view showing a method for constructing a precast floor board joint structure according to another embodiment of the present invention.
【図5】本発明の他の実施形態に係るプレキャスト床板
接合部構造に用いられる小梁付きプレキャスト床板を概
略的に示す構成説明図である。FIG. 5 is a structural explanatory view schematically showing a precast floorboard with crossbeams used in a precast floorboard joint structure according to another embodiment of the present invention.
10 プレキャスト床板 11 コッター部 11a 凸部 11b 凹部 12 ジベル筋挿入用の穴 13 補強筋 14 スラブ筋 14a U型鉄筋部 15 鉄骨梁 15a 大梁 15b 小梁 16 ジベル筋 17 間隙部 18 無収縮モルタル 19 ジベル筋挿入用穴を形成するための型枠兼補強板 20 小梁付きプレキャスト床板 10 Precast Floor Board 11 Cotter Part 11a Convex Part 11b Recess 12 Hole for Gibel Reinforcement 13 Reinforcing Bar 14 Slab Reinforcement 14a U-Shaped Reinforcing Bar 15 Steel Beam 15a Large Beam 15b Small Beam 16 Gibel Rein 17 Gap 18 Non-shrink Mortar 19 Gibel Rein Formwork and reinforcing plate for forming insertion holes 20 Precast floorboard with beam
───────────────────────────────────────────────────── フロントページの続き (72)発明者 津田 聡史 東京都千代田区富士見二丁目10番26号 前 田建設工業株式会社内 ─────────────────────────────────────────────────── ─── Continued Front Page (72) Inventor Satoshi Tsuda 2-10-10 Fujimi, Chiyoda-ku, Tokyo Maeda Construction Industry Co., Ltd.
Claims (5)
部及び凹部から構成され且つ隣接する前記プレキャスト
床板端部の前記凸部及び前記凹部とが噛み合うように鉄
骨梁上に並べて設置されたコッター部と、前記コッター
部に形成された少なくとも一つのジベル筋挿入用の穴
と、前記コッター部に設けられた前記穴に配置されて前
記鉄骨梁に固着されたジベル筋と、隣接する前記プレキ
ャスト床板の前記コッター部間の間隙部及び前記ジベル
筋が入れられた前記コッター部の前記穴内に打設された
無収縮モルタルとから構成されていることを特徴とする
プレキャスト床板接合部構造。1. A cotter which is composed of a convex portion and a concave portion formed at an end portion of a precast floor plate and which are arranged side by side on a steel beam so that the convex portion and the concave portion of the end portion of the adjacent precast floor plate mesh with each other. Portion, a hole for inserting at least one gibber muscle formed in the cotter portion, a gibber muscle fixed to the steel beam arranged in the hole provided in the cotter portion, and the adjacent precast floorboard A non-shrink mortar that is cast in the gap between the cotter parts and in the hole of the cotter part in which the gibber streak is inserted.
前記穴の周囲に配置されたスパイラル状の補強筋と前記
穴の周囲をめぐるように配置されたU型鉄筋部を有する
スラブ筋とを少なくとも備え、前記スラブ筋のU型鉄筋
部に前記補強筋が配筋されていることを特徴とする請求
項1に記載のプレキャスト床板接合部構造。2. A rebar structure inside the precast floorboard has at least a spiral reinforcing bar arranged around the hole and a slab bar having a U-shaped rebar part arranged so as to surround the hole. The precast floorboard joint structure according to claim 1, wherein the reinforcing bar is arranged in a U-shaped reinforcing bar portion of the slab reinforcement.
開けたコッター部を4辺にそれぞれ形成した複数のプレ
キャスト床板を前記コッター部の凸部と凹部とが噛み合
うように鉄骨梁上に設置し、その際前記プレキャスト床
板に設けられた前記穴の位置に対応して鉄骨梁上に予め
固着されたジベル筋が前記各穴に相対的に挿入されるか
又は前記各プレキャスト床板を前記鉄骨梁上に並べて設
置した後に前記コッター部の前記各穴からそれぞれ前記
ジベル筋を入れて前記鉄骨梁に固着して立設し、隣接す
る前記プレキャスト床板の前記コッター部の間隙部及び
前記ジベル筋が入れられた前記コッター部の前記穴内に
無収縮モルタルを打設し、これにより前記プレキャスト
床板と前記鉄骨梁とを一体化させるプレキャスト床板接
合部構造の構築方法。3. A plurality of precast floor boards each having at least one cotter portion having a hole for insertion of a dowel muscle formed on each of four sides are installed on a steel beam so that the convex portion and the concave portion of the cotter portion mesh with each other. , At that time, corresponding to the position of the hole provided in the precast floor plate, the gibber pre-fixed on the steel beam is relatively inserted into each hole, or each precast floor plate is placed on the steel beam After being installed side by side, each of the holes of the cotter part is inserted into the gibber streak and fixedly erected on the steel beam, and the gap part and the gibber streak of the cotter part of the adjacent precast floorboard are inserted. A method for constructing a precast floorboard joint structure in which a non-shrink mortar is cast in the hole of the cotter portion, thereby integrating the precast floorboard and the steel beam. .
開けたコッター部を4辺にそれぞれ形成したプレキャス
ト床板と、少なくとも1つのジベル筋挿入用の穴を開け
たコッター部を4辺にそれぞれ形成し、対向する一組の
コッター部が小梁に乗るようにして小梁を予め取り付け
た小梁付きプレキャスト床板とをそれぞれ複数予め準備
し、複数の前記小梁付きプレキャスト床板を小梁の取り
付けられていない両端側の前記コッター部を大梁に乗せ
且つ連続するプレキャスト床板配置予定位置に1つ置き
に設置して前記小梁と前記大梁とを連結し、次いで前記
小梁付きプレキャスト床板間に小梁の付かない前記プレ
キャスト床板を位置決めして各コッター部を隣接するプ
レキャスト床板のコッター部とが噛み合うように前記大
梁と前記小梁付きプレキャストの小梁上に設置し、その
際前記プレキャスト床板のコッター部に設けられた前記
穴の位置に対応して大梁上に予め固着されたジベル筋が
前記各穴に相対的に挿入されるか又は前記各プレキャス
ト床板を前記大梁上に並べて設置した後に前記コッター
部の前記各穴からそれぞれジベル筋を入れて前記大梁に
固着して立設し、その後隣接する前記プレキャスト床板
の前記コッター部の間隙部及び前記大梁に乗っている前
記コッター部の前記穴内に無収縮モルタルを打設し、こ
れにより前記プレキャスト床板と前記鉄骨梁とを一体化
させるプレキャスト床板接合部構造の構築方法。4. A precast floorboard in which at least one cotter portion for perforating the perforations is formed on each of four sides, and at least one cotter portion for perforating each perforation is formed on each of the four sides. Then, prepare a plurality of precast floor boards with girders in which beamlets are pre-attached so that a pair of opposing cotter parts ride on the beam, and a plurality of precast floorboards with girders can be attached to beamlets. The cotters on both ends which are not mounted are placed on a girder and installed at every other precast floorboard placement planned position to connect the girder and the girder, and then the girder between the precast floorboards with girders Positioning the precast floor board without a sticker so that each cotter portion engages with the cotter portion of the adjacent precast floor board so that the girders and the girders are attached. Is it installed on the beam of the recast, at that time, corresponding to the position of the hole provided in the cotter portion of the precast floor board, is the gibber pre-fixed on the girder inserted relative to each of the holes? Or, after the precast floor boards are installed side by side on the girder, each hole of the cotter portion is provided with a Gibel streak and fixed to the girder to stand upright, and then a gap between the cotter portions of the adjacent precast floor boards. A method for constructing a precast floor board joint structure in which non-shrink mortar is cast in the holes of the cotter portion on the bridge and the girder, thereby integrating the precast floor board and the steel beam.
備される際、前記小梁に固着されたジベル筋がこの小梁
に乗せられた前記コッター部の前記穴内に位置し、前記
ジベル筋が配置された前記穴内に無収縮モルタルを打設
することで小梁が一体化されていることを特徴とする請
求項4に記載のプレキャスト床板接合部構造の構築方
法。5. When the precast floorboard with girders is prepared in advance, the gibber reinforcement fixed to the girders is located in the hole of the cotter portion placed on the girders, and the gibber reinforcements are arranged. The method for constructing a precast floor board joint structure according to claim 4, wherein the beam is integrated by casting non-shrink mortar in the hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP18960195A JPH0932171A (en) | 1995-07-25 | 1995-07-25 | Joining part structure of precast floor plate and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP18960195A JPH0932171A (en) | 1995-07-25 | 1995-07-25 | Joining part structure of precast floor plate and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH0932171A true JPH0932171A (en) | 1997-02-04 |
Family
ID=16244048
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP18960195A Pending JPH0932171A (en) | 1995-07-25 | 1995-07-25 | Joining part structure of precast floor plate and construction method thereof |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0932171A (en) |
-
1995
- 1995-07-25 JP JP18960195A patent/JPH0932171A/en active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3678831B2 (en) | Steel-concrete composite floor slab bridge and its construction method | |
JP2781155B2 (en) | Precast concrete board | |
JP2005256341A (en) | Corrugated steel-plate web u component bridge | |
JP2522714B2 (en) | Construction method of building frame | |
JPH11158812A (en) | Hollow floor slab bridge and construction thereof | |
JP3176309B2 (en) | Precast concrete slab for bridge structure and joining method thereof | |
JP2006183286A (en) | Connection structure of corrugated steel web for corrugated steel web u-shaped component bridge | |
JP2002038420A (en) | Corrugated steel plate for bridge | |
JPH08184121A (en) | Precast flooring joint structure | |
JP3579167B2 (en) | Deck for road surface and its laying method | |
JP2520354B2 (en) | Construction method of precast concrete beams and columns, and earthquake-resistant walls using them | |
JPH08184120A (en) | Precast flooring joint structure | |
JPH0932172A (en) | Precast floor plate | |
JPH11166294A (en) | Steel frame-contained concrete beam and floor construction method using the concrete beam | |
JPH09195438A (en) | Reinforced structures for precast concrete boards and buildings | |
JPH0932171A (en) | Joining part structure of precast floor plate and construction method thereof | |
KR100461000B1 (en) | Longitudinal Connecting Method of Composite Beam Stiffened with Prestressed Concrete Panel having Novel Connecting Structure | |
JP3418606B2 (en) | Girder members for PC bridge | |
JPH084110A (en) | Construction of reinforced concrete structure, and block for column/beam connection | |
JPH11166207A (en) | Form for floor slab | |
JP2010281040A (en) | Steel concrete composite floor slab, panel for constructing the steel concrete composite floor slab, and construction method for steel concrete composite floor slab | |
JP3245106B2 (en) | Steel composite composite bridge using precast prestressed concrete slab | |
JP2853528B2 (en) | Construction method of composite floorboard | |
JP2006118226A (en) | Construction method of floor board with precast concrete slab | |
JPH02296948A (en) | Construction method of reinforced concrete construction slab |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20040622 |
|
A131 | Notification of reasons for refusal |
Effective date: 20041214 Free format text: JAPANESE INTERMEDIATE CODE: A131 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20050614 |