JPH08151767A - Backing structure for building - Google Patents
Backing structure for buildingInfo
- Publication number
- JPH08151767A JPH08151767A JP29638894A JP29638894A JPH08151767A JP H08151767 A JPH08151767 A JP H08151767A JP 29638894 A JP29638894 A JP 29638894A JP 29638894 A JP29638894 A JP 29638894A JP H08151767 A JPH08151767 A JP H08151767A
- Authority
- JP
- Japan
- Prior art keywords
- slab
- base material
- building
- base
- adjustment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000000463 material Substances 0.000 claims abstract description 173
- 239000002184 metal Substances 0.000 claims abstract description 36
- 229910052751 metal Inorganic materials 0.000 claims abstract description 36
- 239000004567 concrete Substances 0.000 description 32
- 230000000694 effects Effects 0.000 description 13
- 239000011324 bead Substances 0.000 description 12
- 238000010276 construction Methods 0.000 description 12
- 239000000872 buffer Substances 0.000 description 11
- 238000000034 method Methods 0.000 description 9
- 238000003825 pressing Methods 0.000 description 8
- 229910000831 Steel Inorganic materials 0.000 description 5
- 230000009471 action Effects 0.000 description 5
- 239000010959 steel Substances 0.000 description 5
- 241000256602 Isoptera Species 0.000 description 4
- 238000005452 bending Methods 0.000 description 4
- 230000002093 peripheral effect Effects 0.000 description 4
- 238000006116 polymerization reaction Methods 0.000 description 4
- 230000003014 reinforcing effect Effects 0.000 description 3
- 238000007796 conventional method Methods 0.000 description 2
- 238000005520 cutting process Methods 0.000 description 2
- 239000003292 glue Substances 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- 229920003051 synthetic elastomer Polymers 0.000 description 2
- 239000005061 synthetic rubber Substances 0.000 description 2
- 238000012935 Averaging Methods 0.000 description 1
- 238000004026 adhesive bonding Methods 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000001035 drying Methods 0.000 description 1
- 238000009408 flooring Methods 0.000 description 1
- 239000006260 foam Substances 0.000 description 1
- 239000011381 foam concrete Substances 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 239000011810 insulating material Substances 0.000 description 1
- 150000002739 metals Chemical class 0.000 description 1
- 238000009428 plumbing Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000009958 sewing Methods 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 229920003002 synthetic resin Polymers 0.000 description 1
- 239000000057 synthetic resin Substances 0.000 description 1
- 238000013022 venting Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Landscapes
- Floor Finish (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本願発明は、建造物用下地構造に
関し、さらに詳しくは建造物における床用、壁用あるい
は天井用の下地構造に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a base structure for a building, and more particularly to a base structure for a floor, a wall or a ceiling in a structure.
【0002】[0002]
【従来の技術】例えば、建造物の床用下地構造として
は、日本工業規格JISA6519体育館用鋼製床下地
材を用いたものがある。また、コンピュータルーム等の
OAフロア用として開発された特殊構造の床下地材も知
られている。さらに、建築物(特に、一般住宅用)の床
下地構造としては、床下スラブ上に木製の大引を配置
し、該大引上に交叉して木製の根太を配置し、その上に
床材を配置するようにしたものがあり、この場合、シロ
アリ対策として木製の大引および根太にシロアリ駆除用
の薬品を染み込ませて使用する場合が多い。2. Description of the Related Art For example, as a floor base structure for a building, there is one using a Japanese industrial standard JIS A6519 steel floor base material for a gymnasium. Further, there is also known a floor base material having a special structure developed for an OA floor such as a computer room. Further, as a floor substructure of a building (particularly for general houses), a wooden Daibiki is arranged on an underfloor slab, a wooden joist is arranged on the Daibiki, and a floor material is arranged on the wooden joist. In this case, as a measure against termites, it is often the case that wooden daiiki and joists are soaked with a chemical for termite control.
【0003】ところで、近年、建築物(特に、高層建築
物)における各階の高さを低くすることにより、有効階
層数を多くする試みがなされてきており、そのために
は、床下地構造の低床化が求められている。By the way, in recent years, attempts have been made to increase the number of effective floors by reducing the height of each floor in a building (in particular, a high-rise building). Is required.
【0004】ところが、上記した体育館用鋼製床下地材
を用いた床下地構造の場合、体育館用に限定されている
ため構造上から低床化が困難であるばかりでなく、汎用
性に欠けるとともに高コストであるため一般に普及しに
くいという問題がある。However, in the case of the above-mentioned floor substructure using the steel floor substructure for a gymnasium, since it is limited to a gymnasium, it is difficult to lower the floor because of its structure, and it lacks versatility. There is a problem that it is generally difficult to spread because of its high cost.
【0005】また、OAフロア用のものは、床下スラブ
と床材との間に複雑な構造を有する多くの支持部材を介
設することとされており、各支持部材と床材との結合部
は、床材下面に特殊な加工を施して支持部材の上端を嵌
め込む構造とされるところから、構造の複雑化を余儀な
くされるとともに、部品点数および加工工数も多くな
り、コストアップをまぬがれないという問題がある。ま
た、各支持部材の高さ調整に多くの手間がかかるところ
から作業性も悪くなる。しかも、OAフロア専用である
ため汎用性に欠け、一般に普及しにくいという問題もあ
る。Further, in the OA floor, many supporting members having a complicated structure are provided between the underfloor slab and the floor material, and the connecting portion between each supporting member and the floor material is arranged. Is a structure in which the lower surface of the floor material is specially processed and the upper end of the support member is fitted, so the structure is inevitably complicated and the number of parts and processing man-hours increase, which inevitably leads to cost increase. There is a problem. In addition, workability is deteriorated because it takes a lot of time and effort to adjust the height of each support member. Moreover, since it is exclusively for the OA floor, it lacks general versatility, and there is a problem that it is difficult to popularize it in general.
【0006】さらに、木製の大引と根太との組み合わせ
による床下地構造を構成する場合、床下地構造の低床化
に限界があるとともに、構成自体が複雑となり、組立作
業も複雑とならざるを得ないという問題がある。しか
も、使用木材に薬品を染み込ませるだけでは、シロアリ
対策としては完全ではないという不具合も存する。[0006] Further, when a floor substructure is constructed by a combination of wooden haul and joists, there is a limit to lowering the floor substructure, and the construction itself becomes complicated, and the assembling work must be complicated. There is a problem of not getting. Moreover, there is also a problem that simply impregnating the used wood with chemicals is not a complete countermeasure against termites.
【0007】なお、一般住宅において、金属製の床下地
材が使用されていなかった大きな理由の一つに、構造お
よび施行方法等が複雑なため大工が使用を好まないこと
が挙げられる。[0007] One of the main reasons why metal floor substrata are not used in general houses is that carpenters do not like to use them due to their complicated structure and construction method.
【0008】建造物におけるふかし壁用の下地構造とし
ては、壁用スラブに沿って上下に配置した一対のラン
ナーに天井等に使用されるWバー等を所定間隔で嵌め込
み、各ダブルバーの中間部分を止め金具等を使用してノ
リ付けあるいはビス止めにて固定するもの、ランナー
を使用せず、壁用スラブにWバーを固定するための複数
の固定装置を所定位置に点配置し、直線上に並ぶ固定装
置に対してWバーを嵌め込んで固定するもの、従来型
鋼製角型柱を上下ランナーに嵌め込み、その中間部分に
対応する壁用スラブに特殊構造のレールを直交に固定
し、該レールに嵌め込まれた特殊クリップと従来型鋼製
角型柱をビス止め結合するもの、壁用スラブにノリを
貼り付け、これに上貼りボードを直貼りするもの(一般
に、GL工法と呼ばれている)がある。As a base structure for puffed walls in a building, a W bar used for a ceiling or the like is fitted at a predetermined interval into a pair of runners arranged vertically along a wall slab, and an intermediate portion of each double bar. Is fixed by shaving or using screws with a metal fitting, and multiple fixing devices for fixing the W bar to the wall slab without using a runner are arranged at points in a predetermined position and placed on a straight line. W-bars are fixed to the fixing devices lined up in line with each other, conventional steel square pillars are fitted to the upper and lower runners, and the special-structure rails are fixed orthogonally to the wall slab corresponding to the middle part, A special clip fitted to the rail and a conventional steel square column are fixed with screws, a wall slab is pasted with glue, and a top board is directly pasted onto it (generally called the GL method) ing There is.
【0009】ところが、上記した従来のふかし壁用下地
構造の場合、〜の従来技術のいずれも施工作業に多
くの時間と労力がかかるとともに、種々の部品を組み合
わせなければならないところからコストアップを免れ難
いという問題がある。しかも、ふかし壁用の下地構造に
おいては、壁用スラブからのふかし幅(即ち、壁用スラ
ブと上貼りボードとの間隔)をできるだけ小さくするの
が望ましいにもかかわらず、これらの従来技術では構造
的に限界があるという問題もある。また、上記の従来
技術では、ふかし幅は小さくできるものの、ノリを使用
しているため、乾燥時間を長くとらないと、上貼りボー
ド表面にカビが生じるという問題があるとともに、壁面
の水平を出すには熟練を要するという問題もある。However, in the case of the conventional puffer wall base structure described above, all of the prior arts (1) to (3) require a lot of time and labor for the construction work, and the cost increase is avoided because various parts must be combined. There is a problem of difficulty. Moreover, in the foundation structure for puffed walls, it is desirable to make the puffed width from the wall slab (that is, the distance between the wall slab and the overlaid board) as small as possible. There is also a problem that there is a limit. In addition, in the above-mentioned conventional technique, although the puff width can be made small, since the glue is used, if the drying time is not taken long, there is a problem that mold is generated on the surface of the top-pasted board and the wall surface is leveled. Also has the problem of requiring skill.
【0010】建造物における天井用の下地構造として
は、天井用スラブに既設されたインサートに吊ボルト
をねじ込み、該吊ボルトの下端にハンガーを固定し、該
ハンガーに野縁受け(即ち、チャンネル)を嵌合し、該
野縁受けに対して格子状にシングルあるいはダブル野縁
をクリップにて固定するもの、天井用スラブの両端部
に配置した一対のランナーに対して従来型鋼製角型柱を
所定間隔で嵌め込むもの等がある。As a base structure for a ceiling in a building, a hanging bolt is screwed into an insert already installed in a ceiling slab, a hanger is fixed to the lower end of the hanging bolt, and a hoop receiver (that is, a channel) is attached to the hanger. Which are fitted to each other and fix single or double fields to the field frame with clips, and a conventional steel square column for a pair of runners arranged at both ends of the ceiling slab. There is one that fits at a predetermined interval.
【0011】ところが、上記した従来の天井用下地構造
の場合、の従来技術では、組付工程が極めて複雑で、
部品の種類も多くならざるを得ず、施工に多くの手間を
要するとともに、施工にはかなりの熟練を要するという
問題がある。また、最近のマンション工事等ではできる
だけ部屋面積を多くするためにふところの浅い天井が要
求されるが、の従来技術では、構造的に限界があって
ふところを浅くできないという問題もある。また、の
従来技術では、中間部分に固定手段がないため、天井の
幅の狭いもの(例えば、約1.5m以内のもの)には適
用できるものの、天井の幅が広くなると、中間部分が下
方にだれるおそれがあり、適用が難しいという問題があ
る。However, in the case of the above-mentioned conventional base structure for a ceiling, in the prior art, the assembly process is extremely complicated,
There is a problem that the number of types of parts is inevitably large, the construction requires a lot of labor, and the construction requires considerable skill. Further, in recent condominium construction and the like, a shallow ceiling is required to increase the room area as much as possible, but the conventional technique has a problem in that the ceiling cannot be made shallow due to structural limitations. Further, in the prior art, since there is no fixing means in the middle part, it can be applied to a narrow ceiling width (for example, within about 1.5 m), but when the ceiling width becomes wider, the middle part is lowered. There is a problem that it may drip and it is difficult to apply.
【0012】[0012]
【発明が解決しようとする課題】上記のような事情か
ら、内装材とスラブとの間に、固定ピンにより前記スラ
ブに対して固定された金属製の下地材を所定間隔をおい
て平行状態で介設することにより構成される建造物用下
地構造への期待が高まっている。Under the circumstances described above, a metal base material fixed to the slab by fixing pins is provided between the interior material and the slab in a parallel state at a predetermined interval. Expectations are increasing for a groundwork structure for buildings constructed by interposing.
【0013】この建造物用下地構造は、極めて構造が簡
単で、特別な技術を要することなく低コストで工事でき
るものであるが、スラブの表面を平坦となすのが技術的
に難しいところから、下地材とスラブとの間に生ずる隙
間を埋めるとともに、下地材の水平調整あるいは鉛直調
整を行う部材が必要となる。This foundation structure for a building has a very simple structure and can be constructed at a low cost without requiring any special technique, but it is technically difficult to make the surface of the slab flat, A member for filling the gap between the base material and the slab and for horizontally adjusting or vertically adjusting the base material is required.
【0014】上記した水平あるいは鉛直調整部材として
厚さの異なる複数枚の板材を用意しておき、これらの組
み合わせにより水平調整あるいは鉛直調整を行うことが
考えられるが、予め厚さの異なる板材を多く用意しなけ
ればならず、部品点数の増加を招くとともに、現場にお
いて板材の組み合わせを決めなければならず、作業性が
悪くなるという不具合がある。It is conceivable to prepare a plurality of plate materials having different thicknesses as the above-mentioned horizontal or vertical adjusting members and perform horizontal adjustment or vertical adjustment by combining these, but many plate materials having different thicknesses are prepared in advance. There is a problem that the number of parts must be increased and the combination of the plate materials must be decided on site, resulting in poor workability.
【0015】本願発明は、上記の点に鑑みてなされたも
ので、床用、壁用あるいは天井用としての建造物用下地
構造において、下地材の水平調整あるいは鉛直調整を、
少ない部品点数で、極めて容易且つ作業性よく実施でき
るようにすることを目的とするものである。The present invention has been made in view of the above points, and in a building structure for a floor, a wall or a ceiling, horizontal adjustment or vertical adjustment of a base material is performed.
It is an object of the present invention to make it possible to carry out extremely easily and with good workability with a small number of parts.
【0016】[0016]
【課題を解決するための手段】本願発明の基本構成で
は、上記課題を解決するための手段として、内装材1と
スラブ2(床用、壁用あるいは天井用スラブ)との間
に、固定ピン8により前記スラブ2に対して固定された
金属製の下地材3を所定間隔をおいて平行状態で介設し
てなる建造物用下地構造において、前記スラブ2と下地
材3との間に、前記固定ピン8により共縫いされ且つ前
記下地材3の長手方向に対して直交するテーパ面11
a,12aで互いに当接され、それぞれの反テーパ面側
が互いに平行な平行面11b,12bとされている楔状
の一対の調整ピース11,12をスライド可能に介設す
るとともに、該両調整ピース11,12におけるテーパ
面11a,12aに、スライド方向に延び且つ互いにス
ライド自在に嵌合し合う凸条15および凹溝16をそれ
ぞれ形成している。In the basic structure of the present invention, a fixing pin is provided between the interior material 1 and the slab 2 (floor, wall or ceiling slab) as means for solving the above problems. In a building underlayer structure in which a metal undercoat material 3 fixed to the slab 2 by 8 is interposed in parallel at a predetermined interval, between the slab 2 and the undercoat material 3, Tapered surface 11 which is sewn together by the fixing pin 8 and is orthogonal to the longitudinal direction of the base material 3.
A pair of wedge-shaped adjusting pieces 11 and 12 abutted against each other at a and 12a and having parallel surfaces 11b and 12b opposite to each other are slidably interposed. Projections 15 and grooves 16 extending in the sliding direction and slidably fitted to each other are formed on the tapered surfaces 11a and 12a of the projections 12 and 12, respectively.
【0017】本願発明の基本構成においては、次のよう
な好ましい実施の態様がある。The basic configuration of the present invention has the following preferred embodiments.
【0018】即ち、前記調整ピース11,12のうち前
記下地材3側に位置する調整ピース11におけるスライ
ド方向先端部に、スライド方向と直交するように部分的
に切除してなるマーク基準端17と、該マーク基準端1
7より突出し且つ前記両調整ピース11,12を結合す
る位置決め用止着子19の止着部となる位置決め用突部
18とを形成するのが水平調整あるいは鉛直調整後であ
って固定ピン8による共縫い前において両調整ピース1
1,12の位置決めを容易に行い得る点で好ましく、そ
の場合において、前記両調整ピース11,12の裏面側
に、それらの中央部を刳り貫いてなる凹部34,30を
それぞれ形成すれば、固定ピン8の打ち込み時に生ずる
おそれのある調整ピース11,12の割れが防止できる
点でより好ましい。That is, of the adjusting pieces 11 and 12, the adjusting piece 11 located on the side of the base material 3 has a mark reference end 17 formed by cutting off a part thereof in the sliding direction so as to be orthogonal to the sliding direction. , The mark reference end 1
After the horizontal adjustment or the vertical adjustment, it is formed by the fixing pin 8 that forms the positioning protrusion 18 that protrudes from 7 and serves as the fixing portion of the positioning stopper 19 that joins both the adjusting pieces 11 and 12. Both adjustment pieces 1 before joint sewing
This is preferable in that the positioning of the first and the second positioning members 12 can be easily performed. In that case, if the recesses 34 and 30 are formed on the back surface side of the two adjusting pieces 11 and 12, respectively, the central portions thereof are hollowed out. It is more preferable in that the cracks of the adjusting pieces 11 and 12 that may occur when the pin 8 is driven can be prevented.
【0019】また、前記下地材3を、中空な金属製四角
筒となすとともに、その内装材1側の端面3aに、作業
用穴として利用される複数の切欠穴7を前記固定ピン8
の固定位置に対応して形成するのが軽量且つ堅牢で作業
性に優れた低コストな下地構造が得られる点で好まし
い。The base material 3 is a hollow metal rectangular tube, and a plurality of cutout holes 7 used as working holes are formed in the end surface 3a of the interior material 1 side of the fixing pin 8.
It is preferable to form the structure corresponding to the fixed position in order to obtain a low-cost base structure that is lightweight, robust, and excellent in workability.
【0020】また、前記下地材3を、スラブ2側が開放
され、内装材1側よりスラブ2側の幅を幅狭となしたコ
字状断面形状を有し且つスラブ2側の両端部に長手方向
に連続する固定ピン取付用のフランジ部25,25を有
する金属製部材となすのが調整ピース11,12のスラ
イド方向長さを長くしなくともスライド調整量を確保で
きる点と、軽量且つ堅牢で作業性に優れた低コストな下
地構造が得られる点とで好ましい。Further, the base material 3 has a U-shaped cross-sectional shape in which the slab 2 side is opened and the width of the slab 2 side from the interior material 1 side is narrowed, and the base material 3 is elongated at both ends on the slab 2 side. The metal member having the flange portions 25, 25 for mounting the fixed pin continuous in the direction makes it possible to secure the slide adjustment amount without increasing the length of the adjustment pieces 11, 12 in the sliding direction, and is lightweight and robust. Is preferable in that a low-cost base structure having excellent workability can be obtained.
【0021】また、前記下地材3を、スラブ2側の端面
3bに長手方向に連続する開口26を有する金属製四角
筒となすとともに、前記開口26の長手方向口縁に跨が
って固定ピン取付用の取付板27を所定間隔で配設し且
つ前記下地材3の内装材1側の端面3aに、作業用穴と
して利用される複数の切欠穴7を前記取付板27に対応
して形成するのが軽量且つ堅牢で作業性に優れた低コス
トな下地構造が得られる点で好ましい。The base material 3 is a metal square tube having an opening 26 continuous in the longitudinal direction on the end surface 3b on the slab 2 side, and a fixing pin is provided across the longitudinal edge of the opening 26. Mounting plates 27 for mounting are arranged at predetermined intervals, and a plurality of cutout holes 7 used as working holes are formed in the end face 3a of the base material 3 on the side of the interior material 1 corresponding to the mounting plate 27. It is preferable that it is lightweight, robust, and excellent in workability because a low-cost base structure can be obtained.
【0022】[0022]
【作用】本願発明の基本構成では、上記手段によって次
のような作用が得られる。In the basic configuration of the present invention, the following actions can be obtained by the above means.
【0023】即ち、スラブ2上に下地材3を配置した状
態で、下地材3とスラブ2との間の隙間に調整ピース1
1,12を配設し、両調整ピース11,12をテーパ面
11a,12aに沿ってスライドさせれば、両者の当接
状態(即ち、互いのテーパ面11a,12aの重合度)
に応じて隙間の微調整(即ち、下地材3の水平調整ある
いは鉛直調整)が容易に行える。この際、両調整ピース
11,12は凸条15と凹溝16との嵌合スライド作用
によりスライド方向以外へのズレが防止され、円滑なス
ライド調整が行える。That is, with the base material 3 placed on the slab 2, the adjustment piece 1 is placed in the gap between the base material 3 and the slab 2.
By disposing 1, 12 and sliding both adjusting pieces 11, 12 along the tapered surfaces 11a, 12a, the contact state between the two (that is, the degree of polymerization of the tapered surfaces 11a, 12a)
Accordingly, fine adjustment of the gap (that is, horizontal adjustment or vertical adjustment of the base material 3) can be easily performed. At this time, the adjusting pieces 11 and 12 are prevented from being displaced in a direction other than the sliding direction due to the fitting sliding action of the convex strip 15 and the concave groove 16, and smooth slide adjustment can be performed.
【0024】本願発明の好ましい実施の態様では、次の
ような作用が得られる。In the preferred embodiment of the present invention, the following actions are obtained.
【0025】即ち、前記調整ピース11,12のうち前
記下地材3側に位置する調整ピース11におけるスライ
ド方向先端部に、スライド方向と直交するように部分的
に切除してなるマーク基準端17と、該マーク基準端1
7より突出し且つ前記両調整ピース11,12を結合す
る位置決め用止着子19の止着部となる位置決め用突部
18とを形成した場合、調整ピース11,12による水
平調整あるいは鉛直調整後であって固定ピン8による共
縫い前においてマーク基準端17に基づいてスラブ2側
に位置する調整ピース12に位置決め基準マークを記
し、その後位置決め基準マークとマーク基準端17とを
合わせた状態で位置決め用突部18から位置決め用止着
子19により両調整ピース11,12を結合することに
より、両調整ピース11,12の位置決めが容易に行え
ることとなる。That is, of the adjusting pieces 11 and 12, the adjusting piece 11 located on the side of the base material 3 has a mark reference end 17 formed at the leading end in the sliding direction and partially cut away so as to be orthogonal to the sliding direction. , The mark reference end 1
In the case where the positioning projection 18 which is projected from 7 and serves as a fastening portion of the positioning fastening piece 19 that joins the both adjustment pieces 11 and 12 is formed, after the horizontal adjustment or the vertical adjustment by the adjustment pieces 11 and 12. Therefore, before co-sewn with the fixing pin 8, the positioning reference mark is marked on the adjustment piece 12 located on the slab 2 side based on the mark reference end 17, and then the positioning reference mark and the mark reference end 17 are aligned for positioning. By connecting the adjusting pieces 11 and 12 from the protrusion 18 with the positioning stoppers 19, the positioning of the adjusting pieces 11 and 12 can be easily performed.
【0026】また、前記両調整ピース11,12の裏面
側に、それらの中央部を刳り貫いてなる凹部34,30
をそれぞれ形成した場合、固定ピン8の打ち込み時の衝
撃力により生ずるおそれのある調整ピース11,12の
割れが防止できる。Further, on the back side of both the adjusting pieces 11 and 12, concave portions 34 and 30 formed by hollowing out the central portions thereof are formed.
When each is formed, it is possible to prevent the adjustment pieces 11 and 12 from being cracked, which may be caused by an impact force when the fixing pin 8 is driven.
【0027】また、前記下地材3を、中空な金属製四角
筒となすとともに、その内装材1側の端面3aに、作業
用穴として利用される複数の切欠穴7を前記固定ピン8
の固定位置に対応して形成した場合、切欠穴7を作業穴
として利用して該切欠穴7と対応する位置において固定
ピン8を介して下地材3とスラブ2とを結合するという
極めて簡単な構成および作業により堅牢な下地構造が得
られることとなる。The base material 3 is formed of a hollow metal rectangular tube, and a plurality of cutout holes 7 used as working holes are formed on the end surface 3a of the interior material 1 on the fixing pin 8.
When it is formed so as to correspond to the fixed position, the cutout hole 7 is used as a working hole, and the base material 3 and the slab 2 are joined together via the fixing pin 8 at a position corresponding to the cutout hole 7, which is extremely simple. A robust base structure can be obtained by the structure and the work.
【0028】また、前記下地材3を、スラブ2側が開放
され、内装材1側よりスラブ2側の幅を幅狭となしたコ
字状断面形状を有し且つスラブ2側の両端部に長手方向
に連続する固定ピン取付用のフランジ25,25部を有
する金属製部材となした場合、下地材3のスラブ2側の
幅が狭くなっているため調整ピース11,12のスライ
ド方向長さを長くしなくとも調整スライド量(換言すれ
ば、高さ調整量)を確保できるとともに、フランジ部2
5,25への固定ピン8の打ち込みにより下地材3の固
定が容易に得られ、極めて簡単な構成および作業により
堅牢な下地構造が得られることとなる。Further, the base material 3 has a U-shaped cross-sectional shape in which the slab 2 side is opened and the width of the slab 2 side from the interior material 1 side is narrowed, and the base material 3 is elongated at both ends on the slab 2 side. When a metal member having flanges 25, 25 for mounting fixed pins that are continuous in the direction is formed, the width of the base material 3 on the slab 2 side is narrow, so the length of the adjustment pieces 11, 12 in the sliding direction is reduced. The adjustment slide amount (in other words, the height adjustment amount) can be secured without increasing the length, and the flange portion 2
The base material 3 can be easily fixed by driving the fixing pins 8 into 5, 5, and a solid base structure can be obtained by an extremely simple structure and work.
【0029】また、前記下地材3を、スラブ2側の端面
3bに長手方向に連続する開口26を有する金属製四角
筒となすとともに、前記開口26の長手方向口縁に跨が
って固定ピン取付用の取付板27を所定間隔で配設し且
つ前記下地材3の内装材1側の端面3aに、作業用穴と
して利用される複数の切欠穴7を前記取付板27に対応
して形成した場合、切欠穴7を作業穴として利用して該
切欠穴7と対応する位置において取付板27を介して固
定ピン8により下地材3とスラブ2とを結合するという
極めて簡単な構成および作業により堅牢な下地構造が得
られることとなる。Further, the base material 3 is a metal square tube having an opening 26 continuous in the longitudinal direction on the end face 3b on the slab 2 side, and a fixing pin straddling the longitudinal edge of the opening 26. Mounting plates 27 for mounting are arranged at predetermined intervals, and a plurality of cutout holes 7 used as working holes are formed in the end face 3a of the base material 3 on the side of the interior material 1 corresponding to the mounting plate 27. In this case, by using the cutout hole 7 as a work hole, the base material 3 and the slab 2 are joined by the fixing pin 8 via the mounting plate 27 at a position corresponding to the cutout hole 7 by an extremely simple structure and work. A solid foundation structure can be obtained.
【0030】[0030]
【発明の効果】本願発明によれば、内装材1とスラブ2
(床用、壁用あるいは天井用スラブ)との間に、固定ピ
ン8により前記スラブ2に対して固定された金属製の下
地材3を所定間隔をおいて平行状態で介設してなる建造
物用下地構造において、前記スラブ2と下地材3との間
に、前記固定ピン8により共縫いされ且つ前記下地材3
の長手方向に対して直交するテーパ面11a,12aで
互いに当接され、それぞれの反テーパ面側が互いに平行
な平行面11b,12bとされている楔状の一対の調整
ピース11,12をスライド可能に介設するとともに、
該両調整ピース11,12におけるテーパ面11a,1
2aに、スライド方向に延び且つ互いにスライド自在に
嵌合し合う凸条15および凹溝16をそれぞれ形成して
いるので、凸条15と凹溝16との嵌合スライド作用を
利用しつつ両調整ピース11,12をテーパ面11a,
12aに沿ってスライドさせることにより、両者の当接
状態(即ち、互いのテーパ面11a,12aの重合度)
に応じて隙間の微調整(即ち、下地材3の水平調整ある
いは鉛直調整)が容易に行えることとなり、両調整ピー
ス11,12のスライド方向以外へのズレを防止しつ
つ、円滑なスライド調整が行えるという優れた効果があ
る。According to the present invention, the interior material 1 and the slab 2 are
A construction in which a metal base material 3 fixed to the slab 2 by a fixing pin 8 is provided in parallel with (slab for floor, wall or ceiling) at a predetermined interval. In the underlying structure for objects, the slab 2 and the underlying material 3 are sewn together by the fixing pin 8 and the underlying material 3 is sewn together.
Slidable a pair of wedge-shaped adjusting pieces 11, 12 which are abutted against each other by taper surfaces 11a, 12a orthogonal to the longitudinal direction of the pair and parallel surfaces 11b, 12b of which anti-taper surfaces are parallel to each other. With the installation
Tapered surfaces 11a, 1 of the two adjusting pieces 11, 12
Since the ridge 15 and the concave groove 16 which extend in the sliding direction and are slidably fitted to each other are formed on the 2a, both adjustments are performed while utilizing the fitting sliding action of the ridge 15 and the concave groove 16. The pieces 11 and 12 are tapered surfaces 11a,
By sliding along 12a, the contact state between the two (that is, the degree of polymerization of the tapered surfaces 11a, 12a of each other)
Therefore, fine adjustment of the gap (that is, horizontal adjustment or vertical adjustment of the base material 3) can be easily performed, and smooth slide adjustment can be performed while preventing deviation of the both adjustment pieces 11 and 12 in directions other than the slide direction. There is an excellent effect that it can be done.
【0031】また、一対の調整ピース11,12のみで
の調整が可能なので、従来技術に比べて部品点数が少な
くて済み、施工に要する作業時間およびコストを大幅に
低減できるという効果もある。Further, since the adjustment can be performed only with the pair of adjusting pieces 11 and 12, the number of parts can be reduced as compared with the prior art, and the working time and cost required for the construction can be greatly reduced.
【0032】さらに、床用、ふかし壁用あるいは天井用
として用いた場合、床下高さ、ふかし幅あるいはふとこ
ろの深さに対応して、一対の調整ピース11,12の最
高高さの異なる複数種のものを製作しておけば、施工現
場の状況に合わせた施工が容易に実施できるという効果
もある。Further, when used for a floor, a puffed wall or a ceiling, a plurality of types of maximum heights of the pair of adjusting pieces 11, 12 are different depending on the underfloor height, puff width or depth of the pavement. If one is manufactured, there is also an effect that the construction can be easily performed according to the situation of the construction site.
【0033】[0033]
【実施例】以下、添付の図面を参照して、本願発明の幾
つかの好適な実施例を説明する。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Some preferred embodiments of the present invention will be described below with reference to the accompanying drawings.
【0034】実施例1 図1ないし図8には、本願発明の実施例1にかかる建造
物用下地構造が示されている。Embodiment 1 FIGS. 1 to 8 show a building base structure according to Embodiment 1 of the present invention.
【0035】本実施例の建造物用下地構造は、床用の下
地構造であり、図1および図2に示すように、内装材
(以下、本実施例では床材という)1とコンクリート製
の床用のスラブ2との間に中空な金属製四角筒からなる
下地材3を所定間隔をおいて横置き平行状態で介設する
ことにより構成されている。The building base structure of the present embodiment is a floor base structure, and as shown in FIGS. 1 and 2, is made of an interior material (hereinafter referred to as a floor material) 1 and concrete. It is configured by interposing a base material 3 made of a hollow metal square tube between the floor slab 2 and the floor slab 2 at a predetermined interval in a horizontal state in a parallel state.
【0036】前記下地材3は、所定幅に切断された金属
板をその両端がコーナの一点において接するように四角
筒状に折曲して構成されており、前記金属板の一方の端
部には、下地材3の内側に折曲され、さらにその先端部
を外側に向かって折曲されてなる逆J字状折曲部5が設
けられ、前記金属板の他方の端部には、内側に逆U字状
に折曲されてなる逆U字状折曲部6が設けられ、両者を
連続して嵌合圧着せしめて上下方向に連続するコーナ型
接続部4として成形されている。そして、この下地材3
は、コーナ型接続部4が上に位置するように配置され、
床材1側端面(以下、本実施例では上面という)3aが
床材1の貼付面とされ、スラブ2側端面(以下、本実施
例では下面という)3bが後述する調整ピース11,1
2を介してスラブ2との結合面とされることとなってい
る。このように構成すると、薄肉の金属板により下地材
3が構成できるところから、軽量且つ堅牢で低コストな
床下地構造が得られとともに、下地材3とスラブ2との
結合時の衝撃がコーナ型接続部4に影響しにくくなる。The base material 3 is formed by bending a metal plate cut into a predetermined width into a square tube shape so that both ends contact each other at one corner, and one end of the metal plate is provided. Is provided with an inverted J-shaped bent portion 5 formed by bending the inside of the base material 3 and further bending the tip end of the inside toward the outside. The other end of the metal plate has an inside An inverted U-shaped bent portion 6 formed by being bent in an inverted U shape is provided, and both are continuously fitted and pressure-bonded to each other to form a corner-type connecting portion 4 which is continuous in the vertical direction. And this base material 3
Is arranged so that the corner-type connecting portion 4 is located above,
The floor material 1-side end surface (hereinafter, referred to as an upper surface in this embodiment) 3a is a surface to which the floor material 1 is attached, and the slab 2-side end surface (hereinafter, referred to as a lower surface in this embodiment) 3b is an adjustment piece 11, 1 described later.
It is supposed to be a connecting surface with the slab 2 via 2. According to this structure, since the base material 3 can be composed of a thin metal plate, a lightweight, robust, and low-cost floor base structure can be obtained, and the impact when the base material 3 and the slab 2 are joined is a corner type. The connection portion 4 is less affected.
【0037】前記下地材3の上面3aには、複数の切欠
穴7が長手方向に所定間隔をおいて形成されている。該
切欠穴7は、下地材3とスラブ2との結合時に固定ピン
(本実施例の場合、コンクリートピン8)を打ち込むた
めのクギ打ち銃を挿入するための作業用穴として利用さ
れるものであり、クギ打ち銃が挿入できる程度の開口面
積があればよく、その形状は、図示の矩形状の他、適宜
なものを選択できる。なお、下地材3の両端において
は、当該部分での端面開口9が作業用穴として利用され
る。On the upper surface 3a of the base material 3, a plurality of cutout holes 7 are formed at predetermined intervals in the longitudinal direction. The notch hole 7 is used as a working hole for inserting a nailing gun for driving a fixing pin (concrete pin 8 in this embodiment) when the base material 3 and the slab 2 are joined. It is sufficient that the opening area is such that a nail gun can be inserted, and the shape thereof can be appropriately selected from the rectangular shape shown in the figure. At both ends of the base material 3, the end face openings 9 in the corresponding portions are used as working holes.
【0038】前記下地材3における下面3bと前記スラ
ブ2とは、前記端面開口9の口縁部および前記各切欠穴
7の下方部において複数(本実施例では、下地材3の長
手方向と直交する方向に並ぶ2本)のコンクリートピン
8,8を介して結合されるが、該各コンクリートピン8
の頭部8aと下地材3の下面3bとの間には、コンクリ
ートピン8,8に共用の金属製押さえ板13および硬質
合成ゴム製の緩衝板14が介設されている。該金属製押
さえ板13は、下地材下面3bの横幅とほぼ同一の横幅
を有しており、コンクリートピン8の打ち込み時におい
て、コンクリートピン8の頭部8aを受け止める作用
と、下地材下面3bを押さえ付ける作用とをなし、下地
材3とスラブ2との結合度強化に寄与する。また、緩衝
板14は、金属同士の接触により生ずるおそれのある床
軋みの発生を防止する作用を有する。A plurality of lower surfaces 3b of the base material 3 and the slabs 2 are provided at the rim of the end face opening 9 and below each of the notched holes 7 (in the present embodiment, orthogonal to the longitudinal direction of the base material 3). The concrete pins 8 are connected through two concrete pins 8 arranged in the direction
Between the head portion 8a and the lower surface 3b of the base material 3, a metal pressing plate 13 and a buffer plate 14 made of hard synthetic rubber, which are common to the concrete pins 8 and 8, are provided. The metal pressing plate 13 has a width substantially the same as the width of the lower surface 3b of the base material. When the concrete pin 8 is driven, the metal pressing plate 13 receives the head 8a of the concrete pin 8 and the lower surface 3b of the base material. It acts to hold down and contributes to strengthening the degree of bonding between the base material 3 and the slab 2. Further, the buffer plate 14 has a function of preventing the generation of floor squeezing which may occur due to contact between metals.
【0039】また、本実施例においては、前記下地材3
の両側面3c,3dには、縦方向に延びる複数のビード
10,10・・が長手方向に所定間隔で形成されてい
る。該ビード10,10・・は、下地材両側面3c,3
dの一部を内側に凹まされてなる縦長凹条により構成さ
れている。このように構成したことにより、下地材3の
耐荷重性が向上することとなり、同一荷重に耐えるもの
では薄肉化が図れ、同一肉厚のものでは上下方向荷重に
耐える力が増大するためコストの低減につながる。な
お、下地材3の剛性が十分得られる場合には、前記ビー
ド10を形成する必要はない。Further, in this embodiment, the base material 3 is used.
A plurality of beads 10 extending in the vertical direction are formed on both side surfaces 3c, 3d of the same at predetermined intervals in the longitudinal direction. The beads 10, 10, ... Are the side surfaces 3c, 3 of the base material.
It is composed of a vertically elongated groove formed by indenting a part of d. With such a configuration, the load resistance of the base material 3 is improved, and the one that can withstand the same load can be made thin, and the one having the same thickness can increase the force to withstand the vertical load, resulting in cost reduction. It leads to reduction. The bead 10 need not be formed when the rigidity of the base material 3 is sufficiently obtained.
【0040】前記下地材3の下面3bと前記スラブ2と
の間には、前記コンクリートピン8によって共縫いされ
且つ互いにテーパ面11a,12aで相接する上下一対
の調整ピース11,12がスライド自在に介設されてい
る。該調整ピース11,12は、テーパ面11a,12
aで互いに当接され、それぞれの反テーパ面側が互いに
平行な平行面11b,12bとされている楔形状を有し
ており、スラブ2側に位置する下部調整ピース12は、
スラブ2に対して予めノリ付けするのが好ましい。ま
た、調整ピース11,12の材質は、両者のテーパ面1
1a,12aでの摺接抵抗を少なくし得る点から硬質低
発泡合成樹脂板とするのが望ましい。この調整ピース1
1,12は、テーパ面11a,12aを互いに接した状
態でのスライド重合度によりスラブ2と下地材3との隙
間を埋めて下地材3の水平調整を行う作用をなす。Between the lower surface 3b of the base material 3 and the slab 2, a pair of upper and lower adjusting pieces 11 and 12 which are sewn together by the concrete pin 8 and contact each other with tapered surfaces 11a and 12a are slidable. Is installed in. The adjustment pieces 11 and 12 have tapered surfaces 11a and 12
The lower adjustment piece 12 positioned on the slab 2 side has a wedge shape in which the anti-tapered surfaces are abutted against each other at a and parallel side surfaces 11b and 12b are parallel to each other.
It is preferable to paste the slab 2 in advance. The material of the adjusting pieces 11 and 12 is the tapered surface 1 of both.
It is desirable to use a hard low-foam synthetic resin plate because the sliding contact resistance at 1a and 12a can be reduced. This adjustment piece 1
Reference numerals 1 and 12 serve to horizontally adjust the base material 3 by filling a gap between the slab 2 and the base material 3 by a slide polymerization degree in a state where the tapered surfaces 11a and 12a are in contact with each other.
【0041】そして、前記調整ピース11,12のスラ
イド方向両側端部には、スライド方向に延び且つ互いに
スライド自在に嵌合し合う凸条15,15および凹溝1
6,16がそれぞれ形成されている(図3参照)。さら
に、本実施例の場合、両調整ピース11,12のスライ
ド方向長さは同一とされており、前記上部調整ピース1
1のスライド方向先端部には、スライド方向両側端部を
スライド方向と直交するように部分的に切除してなるマ
ーク基準端17,17と該マーク基準端17,17より
突出する位置決め用突部18とが形成されている。な
お、前記各凸条15のスライド方向後端部は、水平に切
除してなる水平部15aとされており、これにより、上
部調整ピース11のスライド初期において凸条15とス
ラブ2との接触が回避されることとなっている。At both ends of the adjusting pieces 11 and 12 in the sliding direction, the ridges 15 and 15 and the groove 1 extending in the sliding direction and slidably fitted to each other are formed.
6 and 16 are formed (see FIG. 3). Further, in the case of the present embodiment, the lengths of both adjusting pieces 11, 12 in the sliding direction are the same, and the upper adjusting piece 1
At the tip of the slide direction 1, mark reference ends 17, 17 are formed by partially cutting both side ends of the slide direction so as to be orthogonal to the slide direction, and a positioning projection protruding from the mark reference ends 17, 17. And 18 are formed. The slide-direction rear end of each of the ridges 15 is formed as a horizontal portion 15a that is cut off horizontally, so that the ridges 15 and the slab 2 come into contact with each other at the initial sliding stage of the upper adjustment piece 11. It is supposed to be avoided.
【0042】前記マーク基準端17,17は、上下調整
ピース11,12による水平調整時において上下両調整
ピース11,12の位置合わせが完了した際に下部調整
ピース12上に位置決め基準マークを施す基準となるも
のである。一方、前記位置決め用突部18は、両調整ピ
ース11,12の位置決め後に該位置決め用突部18か
ら位置決め用止着子であるビス19をねじ込んで両調整
ピース11,12を結合するためのものである。The mark reference ends 17 and 17 are references for providing positioning reference marks on the lower adjustment piece 12 when the alignment of the upper and lower adjustment pieces 11 and 12 is completed during horizontal adjustment by the upper and lower adjustment pieces 11 and 12. It will be. On the other hand, the positioning projection 18 is for connecting both adjustment pieces 11 and 12 by screwing a screw 19 which is a positioning stopper from the positioning projection 18 after positioning the both adjustment pieces 11 and 12. Is.
【0043】前記上部調整ピース11の裏面には、図4
に示すように、外周部を残して(換言すれば、外周部を
平行面12bとして)中央部を矩形状にくり抜くことに
より形成された凹部34が形成されている。なお、本実
施例の場合、前記凹部34における位置決め用突部18
側は開放されている。On the back surface of the upper adjusting piece 11, as shown in FIG.
As shown in FIG. 5, a recess 34 is formed by hollowing out the central portion into a rectangular shape while leaving the outer peripheral portion (in other words, the outer peripheral portion as the parallel surface 12b). In the case of the present embodiment, the positioning projection 18 in the recess 34 is
The side is open.
【0044】一方、前記下部調整ピース12の裏面に
は、図5に示すように、外周部を残して(換言すれば、
外周部を平行面12bとして)中央部を矩形状にくり抜
くことにより形成された凹部30が形成されている。該
凹部30の存在によりスラブ2の表面が平坦でない場合
にも平行面12bによる当接状態を良好に確保できるこ
ととなっている。また、前記両調整ピース11,12の
裏面に形成された凹部34,30により肉厚の平均化が
得られることとなり、コンクリートピン8の打ち込み時
のひび割れが防止できる。On the other hand, on the back surface of the lower adjusting piece 12, as shown in FIG. 5, the outer peripheral portion is left (in other words,
A concave portion 30 is formed by hollowing out the central portion into a rectangular shape (with the outer peripheral portion serving as the parallel surface 12b). Due to the presence of the recess 30, even if the surface of the slab 2 is not flat, the contact state by the parallel surface 12b can be well ensured. Further, since the recesses 34 and 30 formed on the back surfaces of both the adjusting pieces 11 and 12 can obtain an average wall thickness, it is possible to prevent cracking when the concrete pin 8 is driven.
【0045】さらに、前記下部調整ピース12における
スライド方向両端の中央部には、下部調整ピース12の
センターを出すためのセンター位置決め31,32が設
けられている。符号33は前記凹部30からの空気を抜
くための空気抜き溝である。Further, at the central portions of both ends of the lower adjusting piece 12 in the sliding direction, center positioning 31, 32 for setting the center of the lower adjusting piece 12 is provided. Reference numeral 33 is an air vent groove for venting air from the recess 30.
【0046】上記のように構成したことにより、上下調
整ピース11,12を互いにスライドさせる際におい
て、凸条15,15と凹溝16,16との嵌合スライド
によりスライド方向と直交する方向への位置ずれが防止
でき、上下調整ピース11,12による下地材3の水平
調整が円滑且つ迅速に行えるとともに、前記マーク基準
端17,17による位置決めおよび位置決め用突部18
による上下調整ピース11,12の位置決め結合により
下地材3の水平調整が極めて容易となる。With the above construction, when the vertical adjustment pieces 11 and 12 are slid on each other, the projections 15 and 15 and the recessed grooves 16 and 16 are fitted and slid to each other in a direction orthogonal to the sliding direction. The positional deviation can be prevented, the horizontal adjustment of the base material 3 can be smoothly and quickly performed by the vertical adjustment pieces 11, 12, and the positioning and the positioning projections 18 by the mark reference ends 17, 17 can be performed.
The horizontal adjustment of the base material 3 becomes extremely easy by the positioning connection of the vertical adjustment pieces 11 and 12 by.
【0047】次に、本実施例にかかる下地構造の組立手
順を説明する。Next, a procedure for assembling the base structure according to this embodiment will be described.
【0048】まず、スラブ2の上に複数の下地材3を所
定間隔で平行に配置して、端面開口9および切欠穴7か
ら釘打ち銃を用いてコンクリートピン8により下地材3
をスラブ2上に固定するのであるが、その際、下地材3
は、上下調整ピース11,12を用いて、以下の手順に
より予め水平調整される。First, a plurality of base materials 3 are arranged on the slab 2 in parallel at a predetermined interval, and the base material 3 is made from the end face opening 9 and the notch hole 7 with a concrete pin 8 using a nailing gun.
Is fixed on the slab 2, but at this time, the base material 3
Is adjusted in advance by the following procedure using the vertical adjustment pieces 11 and 12.
【0049】上記水平調整は、図6に示す手順で行われ
る。The above-mentioned horizontal adjustment is performed by the procedure shown in FIG.
【0050】まず、図6(イ)に示すように、下地材3
における端面開口9,9の近傍および切欠穴7の下方と
スラブ2との間に下部調整ピース12,12・・を予め
ノリ付けあるいは接着等により固定し、該下地材3の両
端に位置する各下部調整ピース12の凹溝16,16に
対して上部調整ピース11の凸条15,15を嵌合させ
つつ、上部調整ピース11をスライドさせて、下地材3
とスラブ2との間の隙間を埋めるとともに下地材3の水
平調整を行う。そして、下地材3の水平調整が終わる
と、各上部調整ピース11のマーク基準端17,17を
基準として下部調整ピース12のテーパ面12aに位置
決め基準マークを記す。この時、金属製押さえ板13お
よび緩衝板14はセットとして定められた個所にノリ付
けあるいは接着等により固定される。First, as shown in FIG. 6A, the base material 3
Are fixed to the slab 2 in the vicinity of the end face openings 9 and 9 and between the cutout hole 7 and the slab 2 in advance by gluing or adhering, and are positioned at both ends of the base material 3. The upper adjusting piece 11 is slid to fit the ridges 15 and 15 of the upper adjusting piece 11 into the concave grooves 16 and 16 of the lower adjusting piece 12, and the base material 3
And the slab 2 are filled in and the horizontal adjustment of the base material 3 is performed. Then, when the horizontal adjustment of the base material 3 is completed, a positioning reference mark is marked on the tapered surface 12a of the lower adjustment piece 12 with the mark reference ends 17, 17 of each upper adjustment piece 11 as references. At this time, the metal pressing plate 13 and the cushioning plate 14 are fixed to the places defined as a set by lapping or bonding.
【0051】ついで、図6(ロ)に示すように、下地材
3の両端に位置する上下調整ピース11,12を、前記
マーク基準端17,17と位置決め基準マークとを位置
合わせしつつ、位置決め用突部18からねじ込まれたビ
ス19により結合し、その後端面開口9から釘打ち銃を
用いてコンクリートピン8を金属製押さえ板13上から
打ち込んで、下地材3を調整ピース11,12とともに
スラブ2上に共縫い結合する。この時、上下両調整ピー
ス11,12がビス19により結合されているため、釘
打ち銃による衝撃が加わっても、両調整ピース11,1
2はスライド方向に位置ズレすることはなく、水平調整
に狂いが生じない。Next, as shown in FIG. 6B, the vertical adjustment pieces 11 and 12 located at both ends of the base material 3 are positioned while aligning the mark reference ends 17 and 17 with the positioning reference mark. They are joined by screws 19 screwed from the projecting portion 18, and the concrete pin 8 is driven from the rear end face opening 9 using a nailing gun from above the metal pressing plate 13 to slab the base material 3 together with the adjusting pieces 11 and 12. Co-sew on top of 2. At this time, since the upper and lower adjusting pieces 11 and 12 are coupled by the screw 19, even if an impact from a nailing gun is applied, the adjusting pieces 11 and 1 are adjusted.
2 does not shift in the sliding direction, and horizontal adjustment does not occur.
【0052】上記のようにして、下地材3の水平調整が
できると、図6(ハ)に示すように、下地材3における
切欠穴7の下方部と下部調整ピース12,12・・との
間にできる各隙間を埋めるように、各下部調整ピース1
2の凹溝16,16に凸条15,15を嵌合させつつ上
部調整ピース11をスライドさせて、マーク基準端1
7,17による位置決め基準マーク記入を行う。When the base material 3 can be horizontally adjusted as described above, as shown in FIG. 6C, the lower part of the cutout hole 7 in the base material 3 and the lower adjusting pieces 12, 12 ,. Each lower adjustment piece 1 so as to fill each gap created between
The upper adjustment piece 11 is slid while fitting the ridges 15 and 15 into the concave grooves 16 and 16 of the second reference mark 1
Fill in the positioning reference marks by 7 and 17.
【0053】ついで、図6(ニ)に示すように、切欠穴
7の下方に位置する上下調整ピース11,12を前述し
たと同様にして位置決め結合し、その後切欠穴7からク
ギ打ち銃を用いてコンクリートピン8を前記金属製押さ
え板10上から打ち込んで下地材3を上下調整ピース1
1,12とともにスラブ2上に共縫い結合する。Next, as shown in FIG. 6D, the vertical adjustment pieces 11 and 12 located below the cutout hole 7 are positioned and joined in the same manner as described above, and then a nail gun is used from the cutout hole 7. The concrete pin 8 from above the metal pressing plate 10 and the base material 3 is adjusted vertically.
Together with 1 and 12, they are sewn together on the slab 2.
【0054】上記手順において、コンクリートピン8の
頭部8aに加わる打撃力により金属製押さえ板13が下
地材3の下面3bを押さえ込むとともに、緩衝板14に
圧縮力が作用するが、結合後において緩衝板14からの
反力がコンクリートピン頭部8aに作用することとな
り、コンクリートピン8による結合力が増大されること
となる。しかも、本実施例の場合、上下調整ピース1
1,12のスライド方向両側端部に凸条15,15およ
び凹条16,16を形成するとともに、凹部34,30
の形成によって肉厚の平均化が得られるようにしている
ため、コンクリートピン8の打ち込み時における衝撃力
により上部調整ピース11にひび割れ等が生じることは
ない。In the above procedure, the metal pressing plate 13 presses the lower surface 3b of the base material 3 by the impact force applied to the head 8a of the concrete pin 8 and the compressing force acts on the buffer plate 14, but the buffer plate 14 is buffered after the connection. The reaction force from the plate 14 acts on the concrete pin head 8a, so that the coupling force by the concrete pin 8 is increased. Moreover, in the case of this embodiment, the vertical adjustment piece 1
The ridges 15 and 15 and the ridges 16 and 16 are formed at both end portions in the sliding direction of the ridges 1 and 12, and the recesses 34 and 30
Since the averaging of the wall thickness is achieved by forming the, the upper adjusting piece 11 will not be cracked by the impact force when the concrete pin 8 is driven.
【0055】前記上下調整ピース11,12による高さ
調整範囲は、図7(イ)に示すように両調整ピース1
1,12がスライド方向全長に亙って重合した状態(即
ち、位置決め用突部18の先端が下部調整ピース12の
スライド方向端部と一致した状態)の高さTmaxと、
図7(ロ)に示すように上部調整ピース11におけるマ
ーク基準端17が下地材3の側面3dと一致した状態の
高さTminとの範囲とされる。As shown in FIG. 7A, the height adjustment range of the upper and lower adjustment pieces 11 and 12 is as shown in FIG.
The height Tmax in a state where 1, 12 are superposed over the entire length in the sliding direction (that is, a state in which the tip of the positioning projection 18 coincides with the end of the lower adjustment piece 12 in the sliding direction),
As shown in FIG. 7B, the height Tmin is a range in which the mark reference end 17 of the upper adjustment piece 11 is aligned with the side surface 3d of the base material 3.
【0056】なお、図8に示すように、下地材3として
高さHの低いものが使用された場合には、端面開口9か
らの釘打ち銃の挿入が困難なため、下地材3の床材側端
面(即ち、上面3a)の長手方向端部に作業用の穴とし
て端部が開放した切欠穴7を形成しておき、該切欠穴7
からの釘打ち銃の挿入によりコンクリートピン8の打ち
込みを行えばよい。As shown in FIG. 8, when a base material 3 having a low height H is used, it is difficult to insert a nailing gun from the end face opening 9, so that the floor of the base material 3 is difficult to insert. A notched hole 7 having an open end is formed as a working hole at the end in the longitudinal direction of the end face on the material side (that is, the upper surface 3a).
The concrete pin 8 may be driven in by inserting a nailing gun from above.
【0057】上記したように、本実施例の下地構造で
は、一対の調整ピース11,12の重合度により、下地
材3の水平調整が極めて容易に得られ、しかも凸条15
と凹溝16との嵌合スライド作用によりスライド操作時
の位置ズレ防止も行えるため、極めて少ない部品点数
で、容易かつ迅速な水平調整が達成できるのである。As described above, in the base structure of the present embodiment, horizontal adjustment of the base material 3 can be extremely easily obtained by the degree of polymerization of the pair of adjusting pieces 11 and 12, and the ridges 15 can be obtained.
Since the displacement of the sliding operation can be prevented by the fitting sliding action of the groove 16 and the groove 16, the horizontal adjustment can be easily and quickly achieved with an extremely small number of parts.
【0058】また、上記のようにして得られた下地構造
は、極めて簡単な構成および作業により完成できるとと
もに、堅牢且つ低コストなものとなる。しかも特殊な技
術を有しない作業者(例えば、大工)でも簡単に工事で
きるとともに、低床化も容易に達成できる。しかも、特
殊な床構造ものだけでなく、一般住宅用等にも採用可能
な汎用性を有している。Further, the base structure obtained as described above can be completed by an extremely simple structure and work, and is robust and low in cost. In addition, even a worker (for example, a carpenter) who does not have a special technique can easily perform the construction, and the floor can be easily reduced. Moreover, it has versatility that it can be used not only for special floor structures but also for general housing.
【0059】また、金属製の下地材3を用いているの
で、シロアリ対策としても極めて有用である。Since the metal base material 3 is used, it is extremely useful as a measure against termites.
【0060】しかも、床下において下地材3,3・・相
互間に多くの空間が保持されることとなるため、付随工
事(例えば、断熱材の敷設、水道工事の配管、電気工事
の配線、床暖房の設置等)も極めて簡単に行える。Moreover, since a large amount of space is maintained between the base materials 3, 3, ... Under the floor, ancillary work (for example, laying heat insulating material, plumbing for waterworks, wiring for electrical work, flooring, etc.) Installation of heating, etc.) is extremely easy.
【0061】なお、下地材3は金属板を四角筒状に折曲
して得られるものなので、各種断面寸法のものが容易に
得られ、床下地構造の高さに応じてこれらを選定すれ
ば、床下高さの異なるものにも容易に対応できる。Since the base material 3 is obtained by bending a metal plate into a rectangular tube shape, various sectional dimensions can be easily obtained, and if these are selected according to the height of the floor base structure. Also, it is possible to easily deal with different heights under the floor.
【0062】実施例2 図9および図10には、本願発明の実施例2にかかる建
造物用下地構造が示されている。Embodiment 2 FIGS. 9 and 10 show a building base structure according to Embodiment 2 of the present invention.
【0063】本実施例の場合、実施例1の下地構造(即
ち、図1および図2に示す床下地構造)において、床材
1と下地材3との間には、該下地材3と直交する複数の
根太20が所定間隔で介設されている。該根太20は、
下地材3,3・・相互の強度を補強する作用を有してお
り、実施例1における下地材3と同様な構成の中空な金
属製四角筒とされているが、下地材3よりサイズの小さ
なものとされている。該根太20の場合、上面20a側
から固定具として作用するドライウォールスクリュー2
1により下地材3に結合されるため、コーナ型接続部4
を下方側に位置させるとともに、根太20の上面20a
には、ドライウォールスクリュー21の頭部21aを収
容し得る深さの凹溝22が長手方向に連続して形成され
ている。このようにしたことにより、ドライウォールス
クリュー21の頭部21aが、根太上面20aから露出
しないこととなり、床材1を根太上面20aに張設する
際の支障とならない。符号23は根太20と下地材3と
の間に介設される硬質合成ゴム製の緩衝板、24は根太
20の両側面に形成された補強用のビードである。本実
施例の場合、根太20が存在する分だけ床下高さが高く
なるが、下地材3として高さの低いものを採用すれば問
題はない。その他の構成および作用効果は実施例1と同
様なので重複を避けて説明を省略する。In the case of this embodiment, in the base structure of the first embodiment (that is, the floor base structure shown in FIGS. 1 and 2), the floor material 1 and the base material 3 are orthogonal to each other between the base material 3 and the base material 3. A plurality of joists 20 are provided at predetermined intervals. The joist 20 is
The base materials 3, 3 ... Have a function to reinforce each other, and are formed as hollow metal rectangular cylinders having the same configuration as the base material 3 in Example 1, but the size of the base material 3 is smaller than that of the base material 3. It is supposed to be small. In the case of the joist 20, the dry wall screw 2 that acts as a fixture from the upper surface 20a side
Since it is bonded to the base material 3 by 1, the corner type connecting portion 4
Is located on the lower side and the upper surface 20a of the joist 20 is
A groove 22 having a depth capable of accommodating the head portion 21a of the dry wall screw 21 is formed continuously in the longitudinal direction. By doing so, the head portion 21a of the drywall screw 21 is not exposed from the joist upper surface 20a, and there is no obstacle when the floor material 1 is stretched on the joist upper surface 20a. Reference numeral 23 is a buffer plate made of hard synthetic rubber interposed between the joist 20 and the base material 3, and 24 is a reinforcing bead formed on both side surfaces of the joist 20. In the case of the present embodiment, the underfloor height is increased by the presence of the joists 20, but there is no problem if the base material 3 having a low height is used. Other configurations, functions and effects are the same as those of the first embodiment, and the description will be omitted to avoid duplication.
【0064】実施例3 図11には、本願発明の実施例3にかかる建造物用下地
構造が示されている。Embodiment 3 FIG. 11 shows a structure for a building underlayer according to Embodiment 3 of the present invention.
【0065】本実施例の場合、実施例1と下地材3の形
状が大きく相違している。即ち、本実施例の下地材3
は、スラブ2側が開放され、床材1側よりスラブ2側の
幅を幅狭となしたコ字状断面形状を有し且つスラブ2側
の開放端部に長手方向に連続する固定ピン取付用のフラ
ンジ部25,25を有する金属製部材とされている。そ
して、下地材3の上面3aを床材貼付面とする一方、フ
ランジ部25からコンクリートピン8を打ち込んで、上
下調整ピース11,12とともにスラブ2上に共縫い結
合されることとなっている。本実施例の下地材3の両側
面3c,3dにも補強用のビード10,10・・が形成
されている。なお、緩衝板14はフランジ部25,25
と上部調整ピース11との間に介設されている。このよ
うに構成すると、調整ピース11,12のスライド方向
長さを長くしなくともスライド調整量を確保できるとと
もに、フランジ部25へのコンクリートピン8の打ち込
みにより下地材3の固定が行えるところから、実施例1
における作業用の切欠穴7が不要となり、下地材3の構
成が簡略化される。しかも得られた下地構造は、軽量且
つ堅牢で作業性に優れた低コストなものとなる。その他
の構成および作用効果は実施例1と同様なので重複を避
けて説明を省略する。In the case of this embodiment, the shape of the base material 3 is greatly different from that of the first embodiment. That is, the base material 3 of this embodiment
Has a U-shaped cross-sectional shape in which the slab 2 side is open and the width of the slab 2 side is narrower than the floor material 1 side, and for mounting a fixed pin that is continuous in the longitudinal direction at the open end of the slab 2 side. It is a metal member having the flange portions 25, 25 of. Then, while the upper surface 3a of the base material 3 is used as a floor material adhering surface, the concrete pin 8 is driven in from the flange portion 25 and is jointed together on the slab 2 together with the vertical adjustment pieces 11 and 12. Reinforcing beads 10, 10 ... Are also formed on both side surfaces 3c, 3d of the base material 3 of this embodiment. In addition, the buffer plate 14 includes the flange portions 25, 25.
And the upper adjustment piece 11 are interposed. According to this structure, the slide adjustment amount can be secured without increasing the slide direction length of the adjustment pieces 11 and 12, and the base material 3 can be fixed by driving the concrete pin 8 into the flange portion 25. Example 1
The notch hole 7 for work is unnecessary and the structure of the base material 3 is simplified. Moreover, the obtained underlayer structure is lightweight, robust, and has excellent workability and low cost. Other configurations, functions and effects are the same as those of the first embodiment, and the description will be omitted to avoid duplication.
【0066】実施例4 図12および図13には、本願発明の実施例4にかかる
建造物用下地構造が示されている。Embodiment 4 FIGS. 12 and 13 show a building base structure according to Embodiment 4 of the present invention.
【0067】本実施例の場合、実施例3の下地構造(即
ち、図11に示す床下地構造)において、床材1と下地
材3との間に、該下地材3と直交する複数の根太20
(実施例2に示すものと同じ構成のもの)を所定間隔で
介設している。その他の構成および作用効果について
は、実施例1、実施例2および実施例3において説明し
たものと同様なので重複を避けて説明を省略する。In the case of this embodiment, in the base structure of the third embodiment (that is, the floor base structure shown in FIG. 11), a plurality of joists perpendicular to the base material 3 are provided between the floor material 1 and the base material 3. 20
(The same structure as that of the second embodiment) is interposed at a predetermined interval. Other configurations and operational effects are the same as those described in the first, second, and third embodiments, and the description thereof will be omitted to avoid duplication.
【0068】実施例5 図14には、本願発明の実施例5にかかる建造物用下地
構造が示されている。Fifth Embodiment FIG. 14 shows a building base structure according to a fifth embodiment of the present invention.
【0069】本実施例の場合、実施例1と下地材3の形
状が大きく相違している。即ち、本実施例の下地材3
は、スラブ2側の端面3bに長手方向に連続する開口2
6を有する金属製四角筒とされており、前記開口26の
長手方向口縁に跨がって固定ピン取付用の取付板27が
所定間隔で配設されている。本実施例においては、前記
開口26の両長手口縁には、反スラブ方向(本実施例の
場合、上向き)に延びるリブ28,28が一体に突設さ
れており、該リブ28,28に跨がって前記取付板27
が緩衝材29を介して配設されている。また、前記下地
材3の上面3aには、作業用穴として利用される複数の
切欠穴7が前記取付板27に対応して形成されている。
切欠穴7を作業穴として利用して該切欠穴7と対応する
位置において取付板27を介してコンクリートピン8に
より下地材3とスラブ2とを結合するという極めて簡単
な構成および作業により堅牢な下地構造が得られること
となる。なお、本実施例の下地材3の両側面3c,3d
にも補強用のビード10,10・・が形成されている。
その他の構成および作用効果は実施例1と同様なので重
複を避けて説明を省略する。In the case of this embodiment, the shape of the base material 3 is greatly different from that of the first embodiment. That is, the base material 3 of this embodiment
Is an opening 2 continuous in the longitudinal direction on the end face 3b on the slab 2 side.
It is a metal square tube having 6 and mounting plates 27 for mounting the fixing pins are arranged at predetermined intervals across the rim of the opening 26 in the longitudinal direction. In the present embodiment, ribs 28, 28 extending in the anti-slab direction (upward in the case of the present embodiment) are integrally provided on both longitudinal rims of the opening 26, and the ribs 28, 28 are integrally formed. The mounting plate 27 straddling
Are arranged via a cushioning material 29. Further, a plurality of cutout holes 7 used as working holes are formed in the upper surface 3a of the base material 3 so as to correspond to the mounting plate 27.
A robust base material by a very simple structure and work in which the cutout hole 7 is used as a working hole and the base material 3 and the slab 2 are joined by a concrete pin 8 via a mounting plate 27 at a position corresponding to the cutout hole 7. The structure will be obtained. Both side surfaces 3c and 3d of the base material 3 of this embodiment are
Also, reinforcing beads 10, 10, ... Are formed.
Other configurations, functions and effects are the same as those of the first embodiment, and the description will be omitted to avoid duplication.
【0070】実施例6 図15よび図16には、本願発明の実施例6にかかる建
造物用下地構造が示されている。Embodiment 6 FIGS. 15 and 16 show a building base structure according to Embodiment 6 of the present invention.
【0071】本実施例の場合、実施例5の下地構造(即
ち、図14に示す床下地構造)において、床材1と下地
材3との間に、該下地材3と直交する複数の根太20
(実施例2に示すものと同じ構成のもの)を所定間隔で
介設している。その他の構成および作用効果について
は、実施例1、実施例2および実施例5において説明し
たものと同様なので重複を避けて説明を省略する。In the case of this embodiment, in the base structure of the fifth embodiment (that is, the floor base structure shown in FIG. 14), a plurality of joists perpendicular to the base material 3 are provided between the floor material 1 and the base material 3. 20
(The same structure as that of the second embodiment) is interposed at a predetermined interval. Other configurations and operational effects are the same as those described in the first, second, and fifth embodiments, and the description thereof will be omitted to avoid duplication.
【0072】実施例7 図17には、本願発明の実施例7にかかる建造物用下地
構造が示されている。Embodiment 7 FIG. 17 shows a building base structure according to Embodiment 7 of the present invention.
【0073】本実施例の建造物用下地構造は、ふかし壁
用の下地構造であり、内装材である壁用の上貼りボード
1とコンクリート製の壁用のスラブ2との間に、実施例
1に用いられていると同様な構成の下地材3を所定間隔
をおいて平行状態で介設することにより構成されてい
る。本実施例の場合、下地材3に大きな荷重がかかるお
それがないので、緩衝板14およびビード10は省略さ
れる。その他の構成および作用効果は実施例1と同様な
ので重複を避けて説明を省略する。The foundation structure for a building of this embodiment is a foundation structure for puffed walls, and it is used as an interior material between the top-coated board 1 for walls and the concrete slab 2 for walls. The base material 3 having the same structure as that used in No. 1 is arranged in parallel at a predetermined interval. In the case of this embodiment, since there is no possibility that a large load is applied to the base material 3, the buffer plate 14 and the bead 10 are omitted. Other configurations, functions and effects are the same as those of the first embodiment, and the description will be omitted to avoid duplication.
【0074】実施例8 図18には、本願発明の実施例8にかかる建造物用下地
構造が示されている。Embodiment 8 FIG. 18 shows a building base structure according to Embodiment 8 of the present invention.
【0075】本実施例の建造物用下地構造は、ふかし壁
用の下地構造であり、内装材である壁用の上貼りボード
1とコンクリート製の壁用のスラブ2との間に、実施例
3に用いられていると同様な構成の下地材3を所定間隔
をおいて平行状態で介設することにより構成されてい
る。本実施例の場合、下地材3に大きな荷重がかかるお
それがないので、緩衝板14およびビード10は省略さ
れる。その他の構成および作用効果は実施例1および実
施例3と同様なので重複を避けて説明を省略する。The foundation structure for a building of the present embodiment is a foundation structure for puffed walls, and the embodiment is provided between the top-coated board 1 for walls, which is an interior material, and the slab 2 for concrete walls. The base material 3 having the same structure as that used in No. 3 is arranged in parallel at a predetermined interval. In the case of this embodiment, since there is no possibility that a large load is applied to the base material 3, the buffer plate 14 and the bead 10 are omitted. Other configurations, functions and effects are the same as those in the first and third embodiments, and the description thereof will be omitted to avoid duplication.
【0076】実施例9 図19には、本願発明の実施例9にかかる建造物用下地
構造が示されている。Ninth Embodiment FIG. 19 shows a building base structure according to a ninth embodiment of the present invention.
【0077】本実施例の建造物用下地構造は、ふかし壁
用の下地構造であり、内装材である壁用の上貼りボード
1とコンクリート製の壁用のスラブ2との間に、実施例
5に用いられていると同様な構成の下地材3を所定間隔
をおいて平行状態で介設することにより構成されてい
る。本実施例の場合、下地材3に大きな荷重がかかるお
それがないので、ビード10は省略される。その他の構
成および作用効果は実施例1および実施例5と同様なの
で重複を避けて説明を省略する。The foundation structure for a building of the present embodiment is a foundation structure for puffed walls, and is used between the top-coated board 1 for walls, which is an interior material, and the slab 2 for concrete walls. The base material 3 having the same structure as that used in No. 5 is arranged in parallel at a predetermined interval. In the case of this embodiment, the bead 10 is omitted because there is no possibility that a large load is applied to the base material 3. Other configurations and operational effects are the same as those in the first and fifth embodiments, and thus the description thereof will be omitted to avoid duplication.
【0078】実施例10 図20には、本願発明の実施例10にかかる建造物用下
地構造が示されている。Embodiment 10 FIG. 20 shows a building base structure according to Embodiment 10 of the present invention.
【0079】本実施例の建造物用下地構造は、天井用の
下地構造であり、内装材である天井用の上貼りボード1
とコンクリート製の天井用のスラブ2との間に、実施例
1と同様な構成の下地材3を所定間隔をおいて平行状態
で介設することにより構成されている。本実施例の場
合、下地材3に大きな荷重がかかるおそれがないので、
緩衝板14およびビード10は省略される。その他の構
成および作用効果は実施例1と同様なので重複を避けて
説明を省略する。The base structure for a building of the present embodiment is a base structure for a ceiling, which is an interior material, and is a top-coated board 1 for a ceiling.
And a slab 2 for ceiling made of concrete, a base material 3 having the same configuration as that of the first embodiment is interposed in parallel at a predetermined interval. In the case of this embodiment, since there is no possibility that a large load is applied to the base material 3,
The buffer plate 14 and the bead 10 are omitted. Other configurations, functions and effects are the same as those of the first embodiment, and the description will be omitted to avoid duplication.
【0080】実施例11 図21には、本願発明の実施例11にかかる建造物用下
地構造が示されている。Embodiment 11 FIG. 21 shows a building underlayer structure according to Embodiment 11 of the present invention.
【0081】本実施例の建造物用下地構造は、天井用の
下地構造であり、内装材である天井用の上貼りボード1
とコンクリート製の天井用のスラブ2との間に、実施例
3と同様な構成の下地材3を所定間隔をおいて平行状態
で介設することにより構成されている。本実施例の場
合、下地材3に大きな荷重がかかるおそれがないので、
緩衝板14およびビード10は省略される。その他の構
成および作用効果は実施例1および実施例3と同様なの
で重複を避けて説明を省略する。The base structure for a building of this embodiment is a base structure for a ceiling, and is a ceiling-applied board 1 for a ceiling which is an interior material.
And a slab 2 for ceiling made of concrete, a base material 3 having the same structure as that of the third embodiment is interposed in parallel at a predetermined interval. In the case of this embodiment, since there is no possibility that a large load is applied to the base material 3,
The buffer plate 14 and the bead 10 are omitted. Other configurations, functions and effects are the same as those in the first and third embodiments, and the description thereof will be omitted to avoid duplication.
【0082】実施例12 図22には、本願発明の実施例12にかかる建造物用下
地構造が示されている。Embodiment 12 FIG. 22 shows a building underlayer structure according to Embodiment 12 of the present invention.
【0083】本実施例の建造物用下地構造は、天井用の
下地構造であり、内装材である天井用の上貼りボード1
とコンクリート製の天井用のスラブ2との間に、実施例
5と同様な構成の下地材3を所定間隔をおいて平行状態
で介設することにより構成されている。本実施例の場
合、下地材3に大きな荷重がかかるおそれがないので、
ビード10は省略される。その他の構成および作用効果
は実施例1および実施例5と同様なので重複を避けて説
明を省略する。The building base structure of this embodiment is a base structure for a ceiling, and is a top board 1 for a ceiling which is an interior material.
And a slab 2 for ceiling made of concrete, a base material 3 having the same structure as that of the fifth embodiment is interposed in parallel at a predetermined interval. In the case of this embodiment, since there is no possibility that a large load is applied to the base material 3,
The bead 10 is omitted. Other configurations and operational effects are the same as those in the first and fifth embodiments, and thus the description thereof will be omitted to avoid duplication.
【0084】上記各実施例においては、スラブとしてコ
ンクリート製のものが採用され、固定ピンとしてコンク
リートピンが採用されているが、スラブとして発泡コン
クリート製のものを採用する場合には、固定ピンとして
コンクリートビスを採用することもできる。コンクリー
トビスを用いる場合には、上下調整ピース11,12お
よび金属製押さえ板13に予めコンクリートビス挿入用
のビス穴を形成しておく必要がある。In each of the above embodiments, the concrete slab is used and the concrete pin is used as the fixing pin. However, when the slab is made of foam concrete, the concrete pin is used as the fixing pin. You can also use screws. When using concrete screws, it is necessary to previously form screw holes for inserting concrete screws in the vertical adjustment pieces 11 and 12 and the metal pressing plate 13.
【0085】本願発明は、上記各実施例の構成に限定さ
れるものではなく、発明の要旨を逸脱しない範囲におい
て適宜設計変更可能なことは勿論である。The invention of the present application is not limited to the configuration of each of the above-described embodiments, and it goes without saying that the design can be appropriately changed without departing from the gist of the invention.
【図1】本願発明の実施例1にかかる建造物用下地構造
の要部を示す斜視図である。FIG. 1 is a perspective view showing a main part of a building base structure according to a first embodiment of the present invention.
【図2】本願発明の実施例1にかかる建造物用下地構造
の要部を示す断面図である。FIG. 2 is a cross-sectional view showing a main part of a building underlayer structure according to Example 1 of the present invention.
【図3】本願発明の実施例1にかかる建造物用下地構造
において用いられる調整ピースの分解拡大斜視図であ
る。FIG. 3 is an exploded enlarged perspective view of an adjustment piece used in the base structure for a building according to the first embodiment of the present invention.
【図4】本願発明の実施例1にかかる建造物用下地構造
において用いられる上部調整ピースの裏面図である。FIG. 4 is a back view of the upper adjustment piece used in the building base structure according to the first embodiment of the present invention.
【図5】本願発明の実施例1にかかる建造物用下地構造
において用いられる下部調整ピースの裏面図である。FIG. 5 is a back view of the lower adjustment piece used in the building base structure according to the first embodiment of the present invention.
【図6】(イ)〜(ニ)は本願発明の実施例1にかかる
建造物用下地構造の組立手順を示す説明図である。6A to 6D are explanatory views showing an assembling procedure of the building base structure according to the first embodiment of the present invention.
【図7】(イ)は本願発明の実施例1にかかる建造物用
下地構造において用いられる調整ピースの最大調整高さ
が得られる状態を示す図、(ロ)は本願発明の実施例1
にかかる建造物用下地構造において用いられる調整ピー
スの最小調整高さが得られる状態を示す図である。FIG. 7A is a diagram showing a state in which the maximum adjustment height of the adjustment piece used in the foundation structure for a building according to the first embodiment of the present invention is obtained, and FIG. 7B is the first embodiment of the present invention.
It is a figure which shows the state in which the minimum adjustment height of the adjustment piece used in the foundation structure for buildings concerning this is obtained.
【図8】本願発明の実施例1にかかる建造物用下地構造
において下地材として高さの低いものを使用した場合に
おける下地材端部の構造を示す斜視図である。FIG. 8 is a perspective view showing a structure of an end portion of a base material when a base material having a low height is used in the base structure for a building according to the first embodiment of the present invention.
【図9】本願発明の実施例2にかかる建造物用下地構造
の要部を示す断面図である。FIG. 9 is a cross-sectional view showing a main part of a foundation structure for a building according to a second embodiment of the present invention.
【図10】図8のX−X断面図である。10 is a sectional view taken along line XX of FIG.
【図11】本願発明の実施例3にかかる建造物用下地構
造の要部を示す断面図である。FIG. 11 is a cross-sectional view showing a main part of a base structure for a building according to a third embodiment of the present invention.
【図12】本願発明の実施例4にかかる建造物用下地構
造の要部を示す断面図である。FIG. 12 is a cross-sectional view showing a main part of a building base structure according to a fourth embodiment of the present invention.
【図13】図9のXIII−XIII断面図である。13 is a sectional view taken along line XIII-XIII in FIG.
【図14】本願発明の実施例5にかかる建造物用下地構
造の要部を示す断面図である。FIG. 14 is a cross-sectional view showing the main parts of the foundation structure for a building according to Embodiment 5 of the present invention.
【図15】本願発明の実施例6にかかる建造物用下地構
造の要部を示す断面図である。FIG. 15 is a cross-sectional view showing the main parts of a building underlayer structure according to Example 6 of the present invention.
【図16】図12のXVI−XVI断面図である。16 is a sectional view taken along line XVI-XVI of FIG.
【図17】本願発明の実施例7にかかる建造物用下地構
造の要部を示す断面図である。FIG. 17 is a cross-sectional view showing a main part of a base structure for a building according to Embodiment 7 of the present invention.
【図18】本願発明の実施例8にかかる建造物用下地構
造の要部を示す断面図である。FIG. 18 is a cross-sectional view showing the main parts of a building underlayer structure according to Example 8 of the present invention.
【図19】本願発明の実施例9にかかる建造物用下地構
造の要部を示す断面図である。FIG. 19 is a cross-sectional view showing the main parts of a foundation structure for a building according to Embodiment 9 of the present invention.
【図20】本願発明の実施例10にかかる建造物用下地
構造の要部を示す断面図である。FIG. 20 is a cross-sectional view showing the main parts of a building underlayer structure according to Example 10 of the present invention.
【図21】本願発明の実施例11にかかる建造物用下地
構造の要部を示す断面図である。FIG. 21 is a cross-sectional view showing the main parts of a building base structure according to Example 11 of the present invention.
【図22】本願発明の実施例12にかかる建造物用下地
構造の要部を示す断面図である。FIG. 22 is a cross-sectional view showing the main parts of a building base structure according to Embodiment 12 of the present invention.
1は内装材(床材、上貼りボード)、2はスラブ、3は
下地材、3aは内装材端面、3bはスラブ側端面、7は
切欠穴、8は固定ピン(コンクリートピン)、11,1
2は調整ピース、11a,12aはテーパ面、11b,
12bは平行面、15は凸条、16は凹溝、17はマー
ク基準端、18は位置決め用突部、19は位置決め用止
着子(ビス)、25はフランジ部、26は開口、27は
取付板。1 is an interior material (floor material, top board), 2 is a slab, 3 is a base material, 3a is an end surface of an interior material, 3b is an end surface on the slab side, 7 is a notch hole, 8 is a fixing pin (concrete pin), 11, 1
2 is an adjusting piece, 11a and 12a are tapered surfaces, 11b,
12b is a parallel surface, 15 is a ridge, 16 is a groove, 17 is a mark reference end, 18 is a positioning projection, 19 is a positioning fastener (screw), 25 is a flange, 26 is an opening, and 27 is an opening. Mounting plate.
Claims (9)
固定ピン(8)により前記スラブ(2)に対して固定さ
れた金属製の下地材(3)を所定間隔をおいて平行状態
で介設してなる建造物用下地構造であって、前記スラブ
(2)と下地材(3)との間には、前記固定ピン(8)
により共縫いされ且つ前記下地材(3)の長手方向に対
して直交するテーパ面(11a),(12a)で互いに
当接され、それぞれの反テーパ面側が互いに平行な平行
面(11b),(12b)とされている楔状の一対の調
整ピース(11),(12)がスライド可能に介設され
ており、該両調整ピース(11),(12)におけるテ
ーパ面(11a),(12a)には、スライド方向に延
び且つ互いにスライド自在に嵌合し合う凸条(15)お
よび凹溝(16)がそれぞれ形成されていることを特徴
とする建造物用下地構造。1. Between the interior material (1) and the slab (2),
A base structure for a building, comprising a metal base material (3) fixed to the slab (2) by a fixing pin (8) in a parallel state at a predetermined interval. The fixing pin (8) is provided between (2) and the base material (3).
Are sewn together by means of parallel surfaces (11b), (11b), which are abutted against each other by taper surfaces (11a), (12a) orthogonal to the longitudinal direction of the base material (3) and whose anti-taper surface sides are parallel to each other. A pair of wedge-shaped adjustment pieces (11) and (12), which are referred to as 12b), are slidably interposed, and the tapered surfaces (11a) and (12a) of the both adjustment pieces (11) and (12). The base structure for a building, characterized in that a ridge (15) and a groove (16) extending in the sliding direction and slidably fitted to each other are formed in the base.
ち前記下地材(3)側に位置する調整ピース(11)に
おけるスライド方向先端部には、スライド方向と直交す
るように部分的に切除してなるマーク基準端(17)
と、該マーク基準端(17)より突出し且つ前記両調整
ピース(11),(12)を結合する位置決め用止着子
(19)の止着部となる位置決め用突部(18)とが形
成されていることを特徴とする前記請求項1記載の建造
物用下地構造。2. A tip end portion in the sliding direction of the adjustment piece (11) located on the side of the base material (3) of the adjusting pieces (11), (12) is partially provided so as to be orthogonal to the sliding direction. Mark reference end (17)
And a positioning projection (18) projecting from the mark reference end (17) and serving as a fastening portion of a positioning fastener (19) that joins both the adjusting pieces (11) and (12). The groundwork structure for a building according to claim 1, wherein
裏面側には、それらの中央部を刳り貫いてなる凹部(3
4),(30)がそれぞれ形成されていることを特徴と
する前記請求項1および請求項2のいずれか一項記載の
建造物用下地構造。3. The recesses (3) formed by hollowing out the central portions of the rear surfaces of the adjusting pieces (11), (12).
4) and (30) are formed respectively, The foundation structure for buildings according to any one of claims 1 and 2 characterized by the above-mentioned.
筒とされており、その内装材(1)側の端面(3a)に
は、作業用穴として利用される複数の切欠穴(7)が前
記固定ピン(8)の固定位置に対応して形成されている
ことを特徴とする前記請求項1ないし請求項3のいずれ
か一項記載の建造物用下地構造。4. The base material (3) is a hollow metal square tube, and a plurality of cutout holes used as working holes are formed on an end surface (3a) of the interior material (1) side. 4. The base structure for a building according to claim 1, wherein (7) is formed so as to correspond to a fixed position of the fixing pin (8).
開放され、内装材(1)側よりスラブ(2)側の幅を幅
狭となしたコ字状断面形状を有し且つスラブ(2)側の
両端部に長手方向に連続する固定ピン取付用のフランジ
部(25),(25)を有する金属製部材とされている
ことを特徴とする前記請求項1ないし請求項3のいずれ
か一項記載の建造物用下地構造。5. The base material (3) has a U-shaped cross-sectional shape in which the slab (2) side is open and the width of the slab (2) side from the interior material (1) side is narrower. The metal member having flanges (25), (25) for attaching a fixed pin continuous in the longitudinal direction at both ends on the slab (2) side, which is a metal member. The base structure for a building according to any one of 1.
端面(3b)に長手方向に連続する開口(26)を有す
る金属製四角筒とされ、前記開口(26)の長手方向口
縁に跨がって固定ピン取付用の取付板(27)が所定間
隔で配設され且つ前記下地材(3)の内装材(1)側の
端面(3a)には、作業用穴として利用される複数の切
欠穴(7)が前記取付板(27)に対応して形成されて
いることを特徴とする前記請求項1ないし請求項3のい
ずれか一項記載の建造物用下地構造。6. The base material (3) is a metal square tube having an opening (26) continuous in the longitudinal direction at an end face (3b) on the slab (2) side, and the longitudinal direction of the opening (26). Mounting plates (27) for mounting the fixing pins are arranged at predetermined intervals across the rim, and the end surface (3a) on the interior material (1) side of the base material (3) serves as a working hole. A plurality of notch holes (7) to be used are formed corresponding to the mounting plate (27), and the base structure for a building according to any one of claims 1 to 3. .
とを特徴とする前記請求項1ないし請求項6のいずれか
一項記載の建造物用下地構造。7. The base structure for a building according to any one of claims 1 to 6, wherein the slab (2) is for a floor.
とを特徴とする前記請求項1ないし請求項6のいずれか
一項記載の建造物用下地構造。8. The base structure for a building according to claim 1, wherein the slab (2) is for a wall.
ことを特徴とする前記請求項1ないし請求項6のいずれ
か一項記載の建造物用下地構造。9. The base structure for a building according to claim 1, wherein the slab (2) is for a ceiling.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP29638894A JP3527298B2 (en) | 1994-11-30 | 1994-11-30 | Substructure for buildings |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP29638894A JP3527298B2 (en) | 1994-11-30 | 1994-11-30 | Substructure for buildings |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH08151767A true JPH08151767A (en) | 1996-06-11 |
| JP3527298B2 JP3527298B2 (en) | 2004-05-17 |
Family
ID=17832905
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP29638894A Expired - Lifetime JP3527298B2 (en) | 1994-11-30 | 1994-11-30 | Substructure for buildings |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3527298B2 (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2007107380A (en) * | 2006-12-01 | 2007-04-26 | Tsuka Kanamono Kk | Steel hollow material and its manufacturing system |
| KR101469148B1 (en) * | 2013-05-06 | 2014-12-04 | 한국철도기술연구원 | Guideway structure having mounting member and concrete girder with end difference, and constructing method for the same |
| CN113062503A (en) * | 2021-04-23 | 2021-07-02 | 江苏智聚智慧建筑科技有限公司 | Cushion block for assembly type wallboard and assembly method of assembly type wallboard |
-
1994
- 1994-11-30 JP JP29638894A patent/JP3527298B2/en not_active Expired - Lifetime
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2007107380A (en) * | 2006-12-01 | 2007-04-26 | Tsuka Kanamono Kk | Steel hollow material and its manufacturing system |
| KR101469148B1 (en) * | 2013-05-06 | 2014-12-04 | 한국철도기술연구원 | Guideway structure having mounting member and concrete girder with end difference, and constructing method for the same |
| CN113062503A (en) * | 2021-04-23 | 2021-07-02 | 江苏智聚智慧建筑科技有限公司 | Cushion block for assembly type wallboard and assembly method of assembly type wallboard |
Also Published As
| Publication number | Publication date |
|---|---|
| JP3527298B2 (en) | 2004-05-17 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| AU765758B2 (en) | Anchoring biscuit device | |
| US8161702B2 (en) | Expansion-compensating deck fastener | |
| US8287206B2 (en) | Decking system and anchoring device | |
| JP3527298B2 (en) | Substructure for buildings | |
| JP3442510B2 (en) | Floor structure | |
| JP3281437B2 (en) | Exterior corner material mounting structure | |
| JPH05302425A (en) | Building plate material fitting device | |
| JPH0886072A (en) | Backing structure for building | |
| JPH11280238A (en) | Substrate structure for building | |
| JPH11131683A (en) | Composite panel | |
| JPH11210126A (en) | Wall base material | |
| JPH11141103A (en) | Floor substrate structure | |
| JP2003239496A (en) | Fastening fitting for directly laying and vertically laying exterior wall panel, and structure for directly laying, vertically laying and fastening exterior wall panel by using the same | |
| JP3299249B2 (en) | Metal square tube | |
| JPH1025878A (en) | Quadrangular cylinder of metal and backing structure for building | |
| JPH0222430Y2 (en) | ||
| JPS5857590B2 (en) | Neda Oyobi Yukashitajizai no Toritsukesouchi | |
| JP2003003648A (en) | Floor substrate and its execution method | |
| JPH10252146A (en) | Joint metal fittings for building | |
| JP3910055B2 (en) | Elongated floor laying equipment | |
| JP2025130601A (en) | Corner materials and wall structures | |
| JPH05809U (en) | Floor assembly in buildings | |
| JPH09221898A (en) | Wall-side joint supporter and wall-side joint supporting device | |
| JPH11117439A (en) | Structure and method for fixing box-shaped steel building materials | |
| JPH1122087A (en) | Steel structure floor structure and mounting bracket for composite panel, and method of forming floor structure with composite panel |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20040127 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20040219 |
|
| R150 | Certificate of patent (=grant) or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |