JPH0774075B2 - Remodeling of elevator - Google Patents

Remodeling of elevator

Info

Publication number
JPH0774075B2
JPH0774075B2 JP21719186A JP21719186A JPH0774075B2 JP H0774075 B2 JPH0774075 B2 JP H0774075B2 JP 21719186 A JP21719186 A JP 21719186A JP 21719186 A JP21719186 A JP 21719186A JP H0774075 B2 JPH0774075 B2 JP H0774075B2
Authority
JP
Japan
Prior art keywords
temporary
car
elevator
existing
hoisting machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP21719186A
Other languages
Japanese (ja)
Other versions
JPS6374883A (en
Inventor
昭一 大迫
Original Assignee
株式会社日立ビルシステムサービス
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社日立ビルシステムサービス filed Critical 株式会社日立ビルシステムサービス
Priority to JP21719186A priority Critical patent/JPH0774075B2/en
Publication of JPS6374883A publication Critical patent/JPS6374883A/en
Publication of JPH0774075B2 publication Critical patent/JPH0774075B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は、既設エレベータを改造して新規のエレベー
タにするエレベータの改造方法に関する。
Description: TECHNICAL FIELD The present invention relates to a method for modifying an elevator by modifying an existing elevator into a new elevator.

〔従来の技術〕[Conventional technology]

エレベータはビル内の移動手段として重要視され、5階
建以上のビル全てに取付けられている。このエレベータ
が長年稼動している間に、乗かごに傷みを生じたり、性
能の低下やデザインの陳腐化を来たしたり、あるいは新
しいニーズ、例えばスピードの向上や省エネ化への対応
が求められる等の理由によりエレベータの改造が行なわ
れることがある。従来、この改造を実施するために、エ
レベータをある期間、例えば1ケ月位完全に止めて、こ
の期間に既設の乗かご、巻上機、出入口の部品等を撤去
した後、新設の乗かご、巻上機、出入口部品等の組立て
を行なつていた。
Elevators are regarded as important means of transportation within buildings, and are installed in all buildings with five or more floors. While this elevator has been in operation for many years, the car may be damaged, its performance may deteriorate, its design may become obsolete, or new needs such as speed improvement and energy saving may be required. The elevator may be modified for some reason. Conventionally, in order to carry out this remodeling, the elevator was completely stopped for a period of one month, for example, and the existing car, hoisting machine, doorway parts, etc. were removed during this period, and then the new car, They were assembling hoisting machines and doorway parts.

この方法は、エレベータが2台以上併設されているビル
では、1台づつ交互に休止させ改造が実施できるためそ
れ程問題がないが、小規模ビルのように1台だけのエレ
ベータの場合、長い期間に亘つて休止することになり、
利用者に対し多大の迷惑を掛けるという問題があつた。
This method is not so problematic in a building that has two or more elevators side by side, because it can be paused one by one and remodeled, but in the case of only one elevator like a small building, it will take a long time. I will sleep for
There has been a problem of causing a great deal of trouble to users.

このため、近時、土、日曜日の休日だけを利用し、部分
的に改造を行なうというものが提案されているが、土、
日曜日が休日となる事務所ビル等には適用できても、ア
パート等の休日のないビルには適用できないという問題
があつた。また、土、日曜日の休日作業には作業者の確
保が難しいという問題もあつた。
For this reason, recently, it has been proposed to use only Saturday and Sunday holidays and partially remodel it.
Although it can be applied to office buildings where Sunday is a holiday, it cannot be applied to buildings without holidays such as apartments. There was also a problem that it was difficult to secure workers for work on Saturdays and Sundays.

これらの問題を解決する方法として、既設の昇降路の上
層階に、仮設の巻上機を備えた仮設機械室を設け、この
仮設巻上機によつて既設又は仮設の乗かごを昇降させて
サービスさせ、このサービス期間に新設の巻上機や乗か
ごを組立てるというものが提案されている。この方法で
あれば、仮設巻上機と乗かごの据付け、又、これらの撤
去時等の限られた期間のみエレベータを休止すればよ
く、利用者への迷惑を掛ける期間を短縮できるという効
果がある。
As a method of solving these problems, a temporary machine room equipped with a temporary hoisting machine is provided on the upper floor of the existing hoistway, and the temporary or hoisting car is used to lift or lower the existing or temporary car. Proposals have been made to allow service and assemble a new hoisting machine or car during this service period. With this method, the temporary hoisting machine and the car can be installed, and the elevator can be stopped only for a limited period such as when removing these, and the effect of reducing the period of inconvenience to the user can be achieved. is there.

なお、この種の改造方法として関連するものには、例え
ば、特開昭61−64686号、特開昭61−64687号等が挙げら
れる。
Note that, as a method related to this kind of remodeling, for example, JP-A-61-64686 and JP-A-61-64687 can be cited.

〔発明が解決しようとする問題点〕[Problems to be solved by the invention]

上記提案されたものでは、昇降路の最上階に近い階床に
仮設の巻上機などからなる仮設機械室を設置する作業が
必要であつた。従つて、小規模ビル等の場合、その搬
入、搬出に多大の労力を要するばかりか、狭い場所での
作業のため作業性や安全性の面でも問題があつた。
In the above-mentioned proposal, it is necessary to install a temporary machine room including a temporary hoisting machine on the floor near the top floor of the hoistway. Therefore, in the case of a small building or the like, not only a great deal of labor is required for loading and unloading it, but there is also a problem in terms of workability and safety due to work in a narrow space.

本発明の目的は、昇降路最上部での仮設機械室の設置、
撤去作業を廃し、この作業に伴う作業性や安全性の改善
を図ることにある。
The purpose of the present invention is to install a temporary machine room at the top of the hoistway,
It is to eliminate the removal work and improve workability and safety associated with this work.

〔問題点を解決するための手段〕[Means for solving problems]

上記目的は、既設エレベータの少なくとも最上階を除く
昇降路上部に、滑車を枢着した仮設機械台を設け、この
機械台の滑車に、仮設乗かごに連結された主ロープを巻
掛け、一方、前記昇降路下部に、ロープの他端を巻取
り、巻戻す仮設巻上機を設け、しかる後この仮設巻上機
によつて前記仮設乗かごを昇降させサービスさせ、この
サービス期間中に既設エレベータの巻上機を新設の巻上
機に変更すると共に、前記仮設機械台上部で新設の乗か
ごの組立てを行ない、この後、仮設の機械台、巻上機、
乗かごを取除くことにより、達成される。
The purpose of the above is to provide a temporary machine base pivotally attached to a pulley on the upper part of the hoistway except at least the uppermost floor of the existing elevator, and to wind the main rope connected to the temporary car on the pulley of this machine base, while A temporary hoisting machine for winding and rewinding the other end of the rope is provided at the lower part of the hoistway, and then the temporary car is hoisted and serviced by the temporary hoisting machine, and the existing elevator is operated during this service period. The hoisting machine is changed to a new hoisting machine, and a new car is assembled on the upper part of the temporary machine base. After that, the temporary machine base, the hoisting machine,
Achieved by removing the car.

〔作用〕[Action]

昇降路下部に仮設巻上機を設け、この巻上機によつて仮
設乗かごが運転され、改造作業中のサービスを行なう。
A temporary hoisting machine is provided at the bottom of the hoistway, and the hoisting machine operates the temporary car to provide services during the remodeling work.

したがつて、改造が長引いても利用者にそれ程の問題を
生じさせないばかりか、仮設巻上機が昇降路下部に取付
けられるため、この搬入、搬出が容易であるばかりか、
作業性や安全性の向上を図ることができる。
Therefore, even if the modification is prolonged, not only does the user not have such a problem, but since the temporary hoisting machine is attached to the lower part of the hoistway, it is not only easy to carry in and carry out,
Workability and safety can be improved.

〔実施例〕〔Example〕

以下、本発明の一実施例を第1図により説明する。第1
図において、1は昇降路で、この昇降路1の上部には機
械室2が形成され、機械台4を介して巻上機3、そらせ
車5、および巻上機3を制御する制御盤6が設けられて
いる。7は昇降路1に立設されたつり合いおもり用ガイ
ドレール、8は乗かご用ガイドレール、9は乗場敷居、
10は乗場の戸、11は三方枠、12は昇降路最上部13で組立
てられている新設のかごである。14は一端が8階の床15
に置かれ、他端が昇降路1の正面壁に当接された仮設の
機械台、16はこの仮設の機械台14に枢着された滑車、17
は仮設の機械台14を固定しているブラケツトである。既
設の乗かご18とつり合いおもり19は、滑車16に巻掛けら
れた仮設用の主ロープ20により吊られており、この既設
の乗かご18でサービスするために、昇降路最下部21に設
置された仮設の巻上機22の巻胴23とつり合いおもり19を
第2のロープ24により連結している。25は前記仮設の巻
上機22を制御する仮設の制御盤である。
An embodiment of the present invention will be described below with reference to FIG. First
In the figure, 1 is a hoistway, and a machine room 2 is formed in the upper part of the hoistway 1, and a hoisting machine 3, a deflector 5 and a control panel 6 for controlling the hoisting machine 3 via a machine base 4. Is provided. 7 is a guide rail for counterweights standing upright in the hoistway 1, 8 is a car guide rail, 9 is a landing threshold,
10 is a landing door, 11 is a three-way frame, and 12 is a new car assembled at the top 13 of the hoistway. 14 is the floor 15 on the 8th floor
, A temporary machine base, the other end of which is abutted against the front wall of the hoistway 1, 16 is a pulley pivotally attached to the temporary machine base 14, 17
Is a bracket that fixes the temporary machine base 14. An existing car 18 and a counterweight 19 are hung by a temporary main rope 20 that is wound around a pulley 16, and are installed at the bottom 21 of the hoistway to be serviced by the existing car 18. Also, the counterweight 23 and the counterweight 19 of the temporary hoisting machine 22 are connected by a second rope 24. Reference numeral 25 is a temporary control panel for controlling the temporary hoisting machine 22.

しかして今、本発明の改造方法について説明する。エレ
ベータ改造前は、周知のように既設の乗かご18とつり合
いおもり19は、巻上機3に取付けられたシーブとそらせ
車5に巻掛けられた既設の主ロープ(図示せず)で吊ら
れている。まず、既設の乗かご18を最上階である9階ま
で上昇させ、次いで機械室2に取付けたチエーンブロツ
ク(図示せず)により既設の乗かご18を9階階床より少
し上の位置まで吊上げ、つり合いおもり19を下げて緩衝
器(図示せず)で支持させてから、既設の主ロープを取
外す。次に、チエーンブロツクを操作して、既設の乗か
ご18を下げて6階階床より少し上の位置で保持する。そ
して、滑車16の枢着した仮設の機械台14を、一端を8階
の床15に、他端を昇降路1の正面壁にブラケツト17を介
して固定する。その後、仮設の主ロープ20を滑車16に巻
掛け、既設の乗かご18とつり合いおもり19とを連結す
る。このつり合いおもり19は、既設乗かご18の重量より
軽くなるよう調節する。また、新設の乗かご12を組立て
るための作業床を仮設の機械台14に取付ける。次に、巻
胴23の取付けられた仮設の巻上機22と仮設の制御盤25を
1階より昇降路最下部21に搬入し、設置した後、つり合
いおもり19に連結した第2のロープ24の片端を巻胴23に
連結する。さらに、既設の乗かご18から吊るされた通信
用ケーブル、各階床の呼び釦や位置表示灯のケーブル等
(いずれも図示せず)を仮設の制御盤25に接続し、仮設
エレベータの準備が完了する。
Now, the modification method of the present invention will be described. Before the elevator is remodeled, as is well known, the existing car 18 and the counterweight 19 are hung by the sheave attached to the hoisting machine 3 and the existing main rope (not shown) wound around the deflecting vehicle 5. ing. First, the existing car 18 is lifted to the top floor, the 9th floor, and then the chain car (not shown) attached to the machine room 2 lifts the existing car 18 to a position slightly above the 9th floor. , Lower the counterweight 19 and support it with a shock absorber (not shown), and then remove the existing main rope. Next, operate the chain block to lower the existing car 18 and hold it at a position slightly above the sixth floor. Then, the temporary mechanical base 14 to which the pulley 16 is pivotally attached is fixed to the floor 15 on the eighth floor at one end and to the front wall of the hoistway 1 at the other end via a bracket 17. After that, the temporary main rope 20 is wound around the pulley 16, and the existing car 18 and the counterweight 19 are connected. The counterweight 19 is adjusted to be lighter than the weight of the existing car 18. Further, a work floor for assembling the new cage 12 is attached to the temporary machine base 14. Next, the temporary hoisting machine 22 to which the winding drum 23 is attached and the temporary control board 25 are carried into the hoistway lowermost portion 21 from the first floor and installed, and then the second rope 24 connected to the counterweight 19 One end of is connected to the winding drum 23. In addition, the communication cable hung from the existing car 18 and the call buttons and position indicator cables on each floor (not shown) are connected to the temporary control panel 25 to complete the preparation of the temporary elevator. To do.

これにより、上記仮設エレベータによるサービスと並行
して改造作業が実施される。すなわち、機械室2におい
て、仮設エレベータの運転に関係なく、機械台4、巻上
機3、そらせ車5、制御盤6を既設より新設のものに改
造できる。一方、新設の乗かご12については、仮設の機
械台14に取付けられた作業床に作業者が乗つて組立作業
を行なう。なお、仮設エレベータの直上で改造作業がな
されるが、仕切床を兼ねた作業床により工具等の落下事
故を防止する。
As a result, the remodeling work is performed in parallel with the service provided by the temporary elevator. That is, in the machine room 2, the machine base 4, the hoisting machine 3, the deflector 5 and the control panel 6 can be modified from existing ones to new ones regardless of the operation of the temporary elevator. On the other hand, for the newly installed car 12, an operator rides on a work floor attached to a temporary machine base 14 to perform an assembly work. Although the remodeling work will be performed directly above the temporary elevator, the work floor that also serves as the partition floor will prevent accidents such as dropping tools.

このようにして機械室2内の改造及び新設の乗かご12の
組立てが完了したならば、既設乗かご18を7階で停止さ
せ、機械室2に取付けたチエーンブロツクにより7階階
床より少し上の位置まで吊上げて保持する。この時、つ
り合いおもり19は緩衝器(図示せず)により支持され
る。この状態で、仮設の主ロープ20、作業床、滑車16、
仮設の機械台14等を取外す。その後、チエーンブロツク
を操作して、既設の乗かご18を1階まで吊下げて取外
し、仮設の巻上機22、制御盤25も取外す。
When the remodeling in the machine room 2 and the assembly of the new car 12 are completed in this way, the existing car 18 is stopped on the 7th floor, and the chain block attached to the machine room 2 makes it a little less than the 7th floor. Lift and hold to the upper position. At this time, the counterweight 19 is supported by a shock absorber (not shown). In this state, the temporary main rope 20, work floor, pulley 16,
Remove the temporary machine base 14 etc. After that, the chain block is operated to suspend the existing car 18 to the first floor and remove it, and also remove the temporary hoisting machine 22 and control panel 25.

そして、新設の主ロープ(図示せず)を新設の巻上機3
に取付けられたシーブとそらせ車5に巻掛けて、新設の
乗かご12及びこの乗かご12の重量に見合つた重量に調節
されたつり合いおもり19を吊る。最後に、取外された既
設及び仮設の部品を外部に搬出することにより改造作業
が完了する。
Then, install a new main rope (not shown) on the new hoist 3
The sheave and the deflecting wheel 5 attached to the car are wound around the car, and the newly installed car 12 and the counterweight 19 adjusted to a weight commensurate with the weight of the car 12 are hung. Finally, the remodeling work is completed by carrying out the removed existing and temporary parts to the outside.

上記一実施例によれば、昇降路下部に設けられた仮設巻
上機によつて、既設の乗かごを昇降させることができ
る。このため、昇降路最上部付近では、滑車を有する仮
設の機械台14の取付けだけですみ、最上部付近まで巻上
機を持上げたり、これらを組立て、取外す必要がなく、
作業性や安全性の面で優れたものを提供できる。
According to the above-described embodiment, the existing hoisting car can be moved up and down by the temporary hoisting machine provided in the lower part of the hoistway. Therefore, in the vicinity of the top of the hoistway, it is only necessary to attach the temporary machine base 14 having the pulley, and it is not necessary to lift the hoisting machine to the vicinity of the top, assemble or remove them,
It is possible to provide the one excellent in workability and safety.

なお、上記実施例では、既設乗かごを仮設用の乗かごに
用いたが、この既設乗かごは取外し、仮設専用の乗かご
を組込み利用するようにしても良い。又、既設のつり合
いおもりを用いたが、必要によつては、この既設おもり
を用いず、直接主ロープ20の一端を巻胴23に連結するよ
うにしても良い。
In the above embodiment, the existing car is used as a temporary car, but the existing car may be removed and a temporary car may be incorporated and used. Further, although the existing counterweight is used, if necessary, the one end of the main rope 20 may be directly connected to the winding drum 23 without using the existing weight.

〔発明の効果〕〔The invention's effect〕

本発明によれば、昇降路の最上階付近に、滑車を備えた
仮設機械室、昇降路下部に仮設巻上機を設けるようにし
たため、これらの据付け、撤去作業を、安全に、しかも
効率良く行なうことができる。
According to the present invention, a temporary machine room equipped with a pulley is provided near the top floor of the hoistway, and a temporary hoisting machine is provided at the lower part of the hoistway.Therefore, installation and removal of these can be performed safely and efficiently. Can be done.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明の一実施例になるエレベータの改造方法
を用いて改造作業中の状態を示すエレベータの全体縦断
面図である。 1……昇降路、3……巻上機、12……新設乗かご、13…
…昇降路上部、14……仮設機械台、16……滑車、18……
既設乗かご、19……つり合いおもり、20……仮設主ロー
プ、21……昇降路下部、22……仮設巻上機、23……巻
胴、24……第2のロープ。
FIG. 1 is an overall longitudinal sectional view of an elevator showing a state during a remodeling work using a method for remodeling an elevator according to an embodiment of the present invention. 1 ... Hoistway, 3 ... Hoisting machine, 12 ... New car, 13 ...
… Top of hoistway, 14 …… Temporary machine base, 16 …… Pulley, 18 ……
Existing car, 19 …… Balance weight, 20 …… Temporary main rope, 21 …… Lower part of hoistway, 22 …… Temporary hoisting machine, 23 …… Winding cylinder, 24 …… Second rope.

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】既設エレベータの乗かごと巻上機とを、新
設の乗かごと巻上機とに改造するものにおいて、前記既
設エレベータの少なくとも最上階を除く昇降路上部に、
滑車を枢着した仮設機械台を設け、この機械台の滑車
に、仮設乗かごに連結された主ロープを巻掛け、一方、
前記昇降路下部に、ロープの他端を巻取り、巻戻す仮設
巻上機を設け、しかる後この仮設巻上機によつて前記仮
設乗かごを昇降させてサービスさせ、このサービス期間
中に前記既設エレベータの巻上機を新設の巻上機に変更
すると共に、前記仮設機械台上部で新設の乗かごの組立
てを行ない、この後、前記仮設機械台、前記仮設巻上
機、前記仮設乗かごを取除くようにしたことを特徴とす
るエレベータの改造方法。
Claim: What is claimed is: 1. A car and a hoisting machine of an existing elevator are converted into a new car and a hoisting machine, wherein the hoistway except at least the uppermost floor of the existing elevator,
A temporary machine base pivotally attached to the pulley is installed, and the main rope connected to the temporary car is wrapped around the pulley of this machine base, while
A temporary hoisting machine for winding and rewinding the other end of the rope is provided at the lower part of the hoistway, and then the temporary hoisting machine is hoisted and serviced by the temporary hoisting machine, and during the service period, The existing elevator hoist is changed to a new hoist, and a new car is assembled at the upper part of the temporary machine base, and then the temporary machine base, the temporary hoist, and the temporary car are assembled. A method of remodeling an elevator, characterized in that the elevator is removed.
【請求項2】前記仮設乗かごは、既設の乗かごであるこ
とを特徴とする特許請求の範囲第(1)項記載のエレベ
ータの改造方法。
2. The elevator remodeling method according to claim 1, wherein the temporary car is an existing car.
【請求項3】前記主ロープの一端を仮設の乗かごに、他
端を既設のつり合いおもりに連結すると共に、このつり
合いおもりの重量を前記仮設乗かごの重量より軽くし、
かつ、前記既設つり合いおもりに、前記仮設巻上機によ
り巻取り、巻戻される第2のロープを連結したことを特
徴とする特許請求の範囲第(1)項記載のエレベータの
改造方法。
3. One of the main ropes is connected to a temporary car and the other end is connected to an existing counterweight, and the weight of the counterweight is made lighter than the weight of the temporary car.
The method for modifying an elevator according to claim (1), characterized in that a second rope that is wound and unwound by the temporary hoisting machine is connected to the existing counterweight.
JP21719186A 1986-09-17 1986-09-17 Remodeling of elevator Expired - Lifetime JPH0774075B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21719186A JPH0774075B2 (en) 1986-09-17 1986-09-17 Remodeling of elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21719186A JPH0774075B2 (en) 1986-09-17 1986-09-17 Remodeling of elevator

Publications (2)

Publication Number Publication Date
JPS6374883A JPS6374883A (en) 1988-04-05
JPH0774075B2 true JPH0774075B2 (en) 1995-08-09

Family

ID=16700282

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21719186A Expired - Lifetime JPH0774075B2 (en) 1986-09-17 1986-09-17 Remodeling of elevator

Country Status (1)

Country Link
JP (1) JPH0774075B2 (en)

Also Published As

Publication number Publication date
JPS6374883A (en) 1988-04-05

Similar Documents

Publication Publication Date Title
JP2000177949A (en) Elevator
JP2000255941A (en) Balance weight for elevator
JP3844944B2 (en) Demolition method of construction elevator
JPH0774075B2 (en) Remodeling of elevator
JPS5935822B2 (en) Construction elevator installation method
JPH0348142Y2 (en)
JPS6374885A (en) Method of remodeling elevator
JPH10316331A (en) Climbing elevator
JP2930911B2 (en) Elevator installation method
JP7517598B2 (en) Elevator and method for extending lift
JP2549726Y2 (en) Construction lift
JP2939064B2 (en) Elevator installation template
JPH0336184A (en) Home elevator
JPH05201648A (en) Installation of elevator
JP2001226056A (en) Elevator device
JPH0234873B2 (en)
JPH057309B2 (en)
JPH09235082A (en) Elevator modification method
JPH02300081A (en) Installation work method for elevator
JPH06156931A (en) Main rope passing method for elevator
JPH11292424A (en) Installation method for small size elevator
JPH0672663A (en) Construction method for linking main rope of elevator
JP2003112875A (en) Structure and method for mounting elevator compensation rope
JPH04116079A (en) Installation method for elevator
JPS63687Y2 (en)