JPH0745777B2 - Method and apparatus for climbing lotus stand for lift - Google Patents
Method and apparatus for climbing lotus stand for liftInfo
- Publication number
- JPH0745777B2 JPH0745777B2 JP25647986A JP25647986A JPH0745777B2 JP H0745777 B2 JPH0745777 B2 JP H0745777B2 JP 25647986 A JP25647986 A JP 25647986A JP 25647986 A JP25647986 A JP 25647986A JP H0745777 B2 JPH0745777 B2 JP H0745777B2
- Authority
- JP
- Japan
- Prior art keywords
- climbing
- lotus
- lotus stand
- rail
- stand
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Movable Scaffolding (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
【発明の詳細な説明】 〔産業上の利用分野〕 本発明はリフトの蓮台(蓮台ともいう)の昇降方法とそ
のために使用する装置に関し、とくに、建設工事におい
て、その進行、変化に伴ってリフトの蓮台を自昇降式に
昇降させる方法と装置とに関する。Description: TECHNICAL FIELD The present invention relates to a method for raising and lowering a lotus stand (also called lotus stand) of a lift and an apparatus used therefor, and particularly, in a construction work, the lift is accompanied by its progress and change. The present invention relates to a method and apparatus for raising and lowering a lotus stand in a self-elevating manner.
建築物に昇降路を設け、その最上部に蓮台を設置し、昇
降路内に一対の垂直レールを設けてこのレールに沿って
ケージを設置して昇降させるエレベータは公知であり、
ケージに代えて人荷用の荷台を設置したものは、建設工
事用等の昇降機としてリフトと呼ばれている。このリフ
トは建築物の工事の進行に伴って順次に揚程を延長させ
る必要があり、荷台とそのカウンタウエイトとそれらと
駆動電動機との間に巻回された巻上げワイヤの関係をそ
のままにして、建築物の上部に設置する蓮台を順次に高
所に移動させ、巻上げワイヤの繰り出しだけで実施でき
る。この移動には(1)別途の揚重機を用いる方法、
(2)新規の高所よりさらに上方に支持架構を設け、チ
ェーンブロックまたは滑車とウインチを使用する方法、
(3)蓮台上に駆動機を設け、昇降路内に別個に設けた
昇降レールに沿って自昇させる方法、(4)昇降路を独
立のマストで形成し、ウインチによってマストに沿って
吊り上げる方法などが採用されている。An elevator is known in which a hoistway is provided in a building, a lotus stand is installed on the top of the hoistway, a pair of vertical rails is provided in the hoistway, and a cage is installed along the rails to ascend and descend.
The one in which a luggage carrier is installed instead of the cage is called a lift as an elevator for construction work. It is necessary to sequentially increase the lift of the lift as the construction work of the building progresses, and the relationship between the cargo bed, its counterweight, and the hoisting wire wound between them and the drive motor remains unchanged. It can be carried out by simply moving the lotus stand installed on top of the object to a higher place and unwinding the winding wire. For this movement, (1) using a separate lifting machine,
(2) A method of using a chain block or pulley and a winch by providing a support frame above the new height.
(3) A method in which a driving machine is provided on the lotus stand and the self-elevation is performed along the lifting rails separately provided in the hoistway, (4) A method in which the hoistway is formed by an independent mast and hoisted along the mast. Have been adopted.
建築物は鉄筋コンクリート造であってもよいがリフトの
設置が有効な中、高層建築物にあっては昇降路は本設の
鉄骨架構内に設けられ、蓮台はその上部に設置される。The building may be made of reinforced concrete, but the installation of a lift is effective, and for high-rise buildings, the hoistway is installed in the main steel frame structure, and lotus stand is installed above it.
従来のリフトにおいて、蓮台を上方に移動させるに際し
て、(1)の方法では工事用に設置されるタワークレー
ンなどを使用するが、この作動のために昇降路の上方に
開口を維持する必要があり、雨養生が必要となり、屋上
の完成が残り、屋上防水工事が遅れる。また、リフト全
体の解体撤去までに大型揚重機としての損料が余分にか
る。(2)の方法では、蓮台の吊上げ反力を得るため
に、本設鉄骨に支持させる別個の仮設梁が必要であり、
チェーンブロックまたはウインチの能力に規制されて、
荷台を分割する必要があり、時間と労力がかかるから、
主として解体時にしか採用できず、しかも蓮台の機枠を
避けて、一旦横移動をさせてから吊り降ろさなければな
らない。(3)の方法では、昇降レールを昇降路内の全
揚程用に設置する必要があり、しかもこのレールに設け
るラックと駆動機のピニオンとの噛み合いに精度を確保
する必要があって、電動モータを使用する簡便さの利点
が損われる。(4)の方法では、本設の鉄骨架構を利用
する利点が失われ、自立可能の1対のマストを必要と
し、蓮台が軽量でなければならない。また、(1)、
(3)の場合の蓮台の重量については、蓮台自体が鉄骨
架構間に架け渡されているため重量が大きく、(1)で
はクレーンの能力によって設置位置に制限を受け、従っ
て現場内の動線も影響される。また(3)ではトラクシ
ョン方式によるワイヤ掛けの関係上、蓮台はカウンタウ
エイトあるいは荷台と一体で上昇させるため、駆動モー
タの能力が大きくなければならないか、または架構体に
一部の重量を預けるなどの複雑な工程を要する、などの
欠点がある。In the conventional lift, when moving the lotus stand upward, the method (1) uses a tower crane or the like installed for construction, but it is necessary to maintain the opening above the hoistway for this operation. , Rain curing is required, and the rooftop construction remains, delaying rooftop waterproofing work. In addition, the dismantling of the entire lift will result in extra damage as a large lifting machine. The method (2) requires a separate temporary beam to be supported by the main steel frame in order to obtain the lifting reaction force of the lotus stand.
Regulated by the ability of chain block or winch,
Since it is necessary to divide the loading platform, it takes time and labor,
It can be mainly used only when dismantling, and it must be laterally moved and then hung while avoiding the lotus stand machine frame. In the method (3), it is necessary to install the lifting rail for the entire lift in the hoistway, and moreover, it is necessary to ensure the accuracy of the engagement between the rack provided on this rail and the pinion of the drive machine, and The convenience advantage of using is compromised. The method (4) loses the advantage of utilizing the steel frame structure, requires a pair of masts that can stand on its own, and the lotus stand must be lightweight. Also, (1),
The weight of the lotus stand in case of (3) is large because the lotus stand itself is hung between the steel frames, and in (1), the installation position is restricted by the capacity of the crane, and therefore the movement line in the site. Is also affected. Further, in (3), because the lotus stand is lifted together with the counterweight or the cargo stand due to the wire hanging by the traction system, the capacity of the drive motor must be large, or part of the weight must be stored in the frame structure. There are drawbacks such as requiring complicated steps.
本発明は上述したような従来技術の現状に対して、それ
らの欠点を排除するためにとくに開発されたものであっ
て、通常の構成になるリフトに蓮台のクライミング装置
を設置し、このクライミング装置を作動させて蓮台を尺
取虫式に昇降させることを要旨としており、第2の発明
として、そのようなクライミング方法を実施するための
装置を提供している。そしてそのクライミング装置は、
荷台の昇降路の上方において架構体に支持されるクライ
ミング支持梁と、この梁から懸垂して支持されるクライ
ミング・レールと、蓮台と荷台フレームとを連結する伸
縮機構と、蓮台と荷台フレームとを個別にクライミング
・レールに係着、解離する係脱手段とからなることを特
徴としている。The present invention was developed especially in order to eliminate the drawbacks of the conventional technology as described above, and a lotus stand climbing device is installed in a lift having a normal structure. The gist of the invention is to move the lotus stand up and down in a shingling manner, and as a second invention, an apparatus for carrying out such a climbing method is provided. And that climbing device
A climbing support beam supported by the frame structure above the hoistway of the loading platform, a climbing rail suspended from the beam, and a telescopic mechanism connecting the lotus platform and the loading platform frame, and the lotus platform and the loading platform frame. It is characterized by comprising engaging and disengaging means for engaging and disengaging the climbing rail individually.
このクライミング装置の作動により、蓮台は自称するク
ライミング・レールに反力をとり、逆の反力をとってレ
ールを移動させながら順次に昇降移動が可能であり、本
発明の目的を達成する。Due to the operation of the climbing device, the lotus stand receives a reaction force on the self-claimed climbing rail, and it is possible to move up and down sequentially while moving the rail with the opposite reaction force, thus achieving the object of the present invention.
本発明のリフト用蓮台のクライミング方法を実施するた
めの装置を第1図ないし第3図に示す実施例に基づいて
詳細に説明する。第1図は本発明の対象となるリフトの
正面図、第2図はその側面図、第3図は蓮台を主とする
平面図であって、図中の1は建築物の鉄骨架構体であ
り、その柱、梁が形成する架構体の内部に荷台2の昇降
路3を形成している。4は上記架構体1の梁に支持さ
れ、垂直に固定された1対のガイドレールであり、荷台
2は両端から門型に立上げた枠体21によって荷台フレー
ム5を形成し、上下のローラ22によってガイドレール4
に沿って昇降自在である。An apparatus for carrying out the method of climbing a lotus stand for a lift according to the present invention will be described in detail with reference to an embodiment shown in FIGS. 1 to 3. FIG. 1 is a front view of a lift which is the object of the present invention, FIG. 2 is a side view thereof, and FIG. 3 is a plan view mainly of lotus stand, in which 1 is a steel frame structure of a building. The hoistway 3 of the cargo bed 2 is formed inside the frame structure formed by the columns and beams. Reference numeral 4 denotes a pair of guide rails supported vertically by the beams of the frame structure 1 and fixed vertically, and the loading platform 2 forms a loading platform frame 5 by a frame body 21 that is erected from both ends and has upper and lower rollers. 22 by guide rail 4
You can move up and down along.
次に、6は蓮台であって、床61の下方に長手方向に設け
た2対のアウトリガー62を有して、架構体1の梁の上面
に支持する水平に突出する姿勢と、架構体1から遊離す
る退去の姿勢とによって昇降路3内で昇降移動が可能で
ある。7は荷台フレーム5に対して設けられるカウンタ
エイトであり、複数のシーブ71を有し、蓮台6上に基端
を固定した上げワイヤ8を蓮台上の多数のシーブ63、荷
台フレーム5に設けた複数のシーブ51などを経て掛け回
してあり、この間に図示しない駆動モータを装備して荷
台2と釣合わせて昇降運転させる。以上の構成は従来形
式のリフトについて共通であり、カウンタウエイト7を
設けないものを含めて公知の構成として十分理解され
る。Next, 6 is a lotus stand, which has two pairs of outriggers 62 provided in the longitudinal direction below the floor 61 and has a horizontally projecting posture for supporting the upper surface of the beam of the frame structure 1 and the frame structure 1. It is possible to move up and down in the hoistway 3 depending on the withdrawal posture released from the. Reference numeral 7 is a counter-eight provided to the carrier frame 5, and a plurality of sheaves 71 are provided, and a raising wire 8 having a fixed base end on the lotus stand 6 is provided on a large number of sheaves 63 on the lotus stand and the carrier frame 5. It is hung around a plurality of sheaves 51 and the like, and a drive motor (not shown) is installed between the sheaves 51 and the sheaves 51 are balanced so as to move up and down. The above structure is common to conventional lifts, and is well understood as a known structure including a structure in which the counterweight 7 is not provided.
本発明では、上記のような揚重施設としてのリフトに、
蓮台用のクライミング装置10を付加してある。クライミ
ング装置10は、クライミング支持梁11と、クライミング
・レール12と、伸縮機構13と、係脱手段14とからなって
いる。クライミング支持梁11は蓮台6に平行に、蓮台6
の幅より広い間隔を設けて蓮台6の上方で架構体1に支
持させた2本の梁で、両端部に立設した門型の架構体15
によって間隔を定め、両支持梁11を保持させるようにな
っている。この支持梁11は鉄骨造で組立て、両端部にア
ウトリガー16を装備し、蓮台6のアウトリガー62と同様
に支持梁11を架構体1の梁上に支持し、または移動自在
にさせる。この支持梁11の両端部にはクライミング・レ
ール12の上端を固着し、垂直に懸垂させ、その接合部に
は振れ止めのブラケット17を設ける。このレール12は水
平断面を角形とした柱状体とするのがよく、昇降路3の
内方に面する面と外面とにわたって、上下に定間隔(通
常30cm)をおいて多数の貫通孔18を設ける。蓮台6の両
端にはガイドレール4に沿うガイドローラ64を設け、蓮
台6の昇降を案内させる。In the present invention, the lift as a lifting facility as described above,
A climbing device 10 for lotus stand is added. The climbing device 10 includes a climbing support beam 11, a climbing rail 12, a telescopic mechanism 13, and engaging / disengaging means 14. The climbing support beam 11 is parallel to the lotus stand 6 and
2 beams supported by the frame structure 1 above the lotus stand 6 with a spacing wider than the width of the gate-shaped frame structure 15 erected at both ends.
The support beams 11 are held by a space defined by. The support beam 11 is assembled by a steel frame and equipped with outriggers 16 at both ends thereof, and like the outriggers 62 of the lotus stand 6, the support beam 11 is supported on the beam of the frame structure 1 or is movable. An upper end of a climbing rail 12 is fixed to both ends of the support beam 11 and is vertically suspended, and a steadying bracket 17 is provided at a joint portion thereof. The rail 12 is preferably a columnar body having a rectangular horizontal cross section, and a large number of through holes 18 are vertically provided at regular intervals (usually 30 cm) over the inward facing surface and the outer surface of the hoistway 3. Set up. Guide rollers 64 along the guide rails 4 are provided at both ends of the lotus stand 6 to guide the lotus stand 6 up and down.
蓮台6の両端の下面には第2図に示すように支持梁65を
設け、その両端部を前記クライミング・レールの内面に
臨ませ、その位置に上部ストッパー66を設ける。上部ス
トッパー66はケーシング構造でその内部には支持梁65に
直角方向で、クライミンク・レール12の貫通孔18に向か
って進退伸縮する油圧シリンダ67を設け、その先端のピ
ン68を貫通孔18に係脱させる。As shown in FIG. 2, support beams 65 are provided on the lower surfaces of both ends of the lotus stand 6, both ends thereof are exposed to the inner surface of the climbing rail, and an upper stopper 66 is provided at that position. The upper stopper 66 has a casing structure, in which a hydraulic cylinder 67 that extends and retracts toward the through hole 18 of the climbing rail 12 is provided in a direction perpendicular to the support beam 65, and a pin 68 at its tip is engaged with the through hole 18. Take off.
次に荷台フレーム5の両端には、蓮台6の支持梁65と同
様な支持梁52を設け、その両端に上部ストッパー66と同
様の下部ストッパー53を設ける。これらの上下のストッ
パー66と53にはレール12に沿うローラ54を設け、これら
を係脱手段14と総称する。Next, support beams 52 similar to the support beams 65 of the lot stand 6 are provided at both ends of the carrier frame 5, and lower stoppers 53 similar to the upper stoppers 66 are provided at both ends thereof. These upper and lower stoppers 66 and 53 are provided with rollers 54 along the rail 12, and these are collectively referred to as engagement / disengagement means 14.
支持梁65と支持梁52には、蓮台6のアウトリガー62の直
下の位置に伸縮機構13を設け、その両端を両支持梁に軸
着して、蓮台6と荷台フレーム5とを上下に連結する。
この伸縮機構13は油圧シリンダとして図示されている
が、ジャッキのような他の形式のものでもよい。同様に
前記したピン68の進退機構も電動式としてもよい。The support beam 65 and the support beam 52 are provided with a telescopic mechanism 13 at a position directly below the outrigger 62 of the lotus stand 6, and both ends thereof are pivotally attached to both support beams to vertically connect the lotus stand 6 and the luggage carrier frame 5. .
The telescopic mechanism 13 is shown as a hydraulic cylinder, but may be of another type such as a jack. Similarly, the advance / retreat mechanism of the pin 68 described above may be electrically driven.
図中に示す他の記号19は架構体1へのガイドレール4の
支持部材であり、81は蓮台6上に設けた上げワイヤ8の
余巻ドラムである。第3図の69はカバナ式自動落下防止
装置であって、共に公知のものである。Another symbol 19 shown in the figure is a support member for the guide rail 4 to the frame structure 1, and 81 is an extra winding drum of the raising wire 8 provided on the lotus stand 6. Reference numeral 69 in FIG. 3 denotes a cabana-type automatic fall prevention device, both of which are publicly known.
伸縮機構13、係脱手段14、アウトリガー16のための油圧
系統は、蓮台のアウトリガー62のものと共に図示されて
いないが、蓮台6上に設けるのがよい。The hydraulic system for the extension / contraction mechanism 13, the engaging / disengaging means 14, and the outrigger 16 is not shown together with that of the outrigger 62 of the lotus stand, but is preferably provided on the lotus stand 6.
本発明のクライミング方法と、それを実施するための第
2の発明の装置の作用とを工程に基づいて説明する。The climbing method of the present invention and the operation of the apparatus of the second invention for carrying out the method will be described based on steps.
鉄骨造の架構体1によって昇降路3を形成し、建築物の
既成の全高にわたってガイドレール4を設置し、支持部
材19によって垂直に支持する。次にこのガイドレール4
にローラ64を沿わせて蓮台6を設け、ローラ22によつて
荷台フレーム5を設け、昇降路3の底部に設けられてい
る駆動機とカウンタウエイトと共に巻上げワイヤ8を掛
け回して、荷台2によるリフトを構成する。このとき蓮
台6は昇降路3の上部でアウトリガー62によって固定さ
れており、荷台2はガイドレール4に沿って昇降運転さ
れる。A hoistway 3 is formed by the steel frame structure 1, a guide rail 4 is installed over the existing height of the building, and it is vertically supported by a support member 19. Next, this guide rail 4
The lottery stand 6 is provided along the roller 64, the loading platform frame 5 is provided by the roller 22, and the winding wire 8 is wound around the drive unit and the counterweight provided at the bottom of the hoistway 3 and the loading platform 2 is used. Make up the lift. At this time, the lotus stand 6 is fixed on the upper part of the hoistway 3 by the outriggers 62, and the loading platform 2 is vertically moved along the guide rails 4.
建築工事が進行し、荷台2の揚程が不足してくると、蓮
台6を上方へ移動させる。そのためには基本のリフトの
構成にクライミング装置10を加えて設置する。When the construction work progresses and the lifting height of the loading platform 2 becomes insufficient, the lotus platform 6 is moved upward. For that purpose, the climbing device 10 is added to the basic lift configuration.
まず、蓮台6の上方に架構体1に支持させてクライミン
グ支持梁11を2本、架構体15によって間隔を定めて架設
する。この支持梁11をアウトリガー16によって架構体1
の梁上に支持させ、それらの両端部下面にクライミング
・レール12を4本固着する。このレール12は架構体1の
ほぼ2階分の長さとし、上端をブラケット17で支持梁11
に固着させる。レール12は上下のストッパー66,53のロ
ーラによって安定する。ついで通常の運転方式によっ
て、荷台フレーム5をそのときの昇降路3の最上部まで
吊上げ、ここで蓮台6と荷台フレーム5とをはじめて伸
縮機構13で連結し、このシリンダを短縮した状態で係脱
手段14の上下のピンをクライミング・レール12の貫通孔
に挿入し係着する。これで蓮台6と荷台フレーム5とク
ライミング装置はそれぞれ架構体1に支持されている。First, two climbing support beams 11 supported by the frame structure 1 above the lotus stand 6 are erected at intervals by the frame structure 15. This support beam 11 is attached to the frame structure 1 by the outrigger 16.
The four climbing rails 12 are fixed to the lower surfaces of both ends of the beams. This rail 12 has a length of almost two floors of the frame structure 1, and the upper end of the rail 12 is supported by a bracket 17
Stick to. The rail 12 is stabilized by rollers of upper and lower stoppers 66 and 53. Then, by a normal operation method, the carrier frame 5 is hung up to the top of the hoistway 3 at that time, where the lotus stand 6 and the carrier frame 5 are first connected by the expansion mechanism 13, and the cylinder is disengaged in a shortened state. The upper and lower pins of the means 14 are inserted into the through holes of the climbing rail 12 and fastened. Thus, the lotus stand 6, the carrier frame 5, and the climbing device are supported by the frame structure 1, respectively.
この状態からまずクライミング支持梁11とクライミング
・レール12の上昇を開始する。From this state, first, the climbing support beam 11 and the climbing rail 12 start to rise.
1.支持梁11のアウトリガー16を短縮し、支持梁11とクラ
イミング・レール12とを自由にする。1. Shorten the outriggers 16 of the support beam 11 to free the support beam 11 and the climbing rail 12.
2.下部ストッパー53を操作し、ピン68をレール12の貫通
孔18から抜出して解離する。2. Operate the lower stopper 53 to pull out the pin 68 from the through hole 18 of the rail 12 and disengage it.
3.油圧シリンダ13を伸長し、下部ストッパー53のピン68
を下方の貫通孔18に挿入して係着する。3. Extend the hydraulic cylinder 13 and push the pin 68 of the lower stopper 53.
Is inserted into the lower through hole 18 and fixed.
4.上部ストッパー66を操作してピン68を貫通孔18から解
離し、荷重を下部ストッパー53に支持させる。4. The upper stopper 66 is operated to disengage the pin 68 from the through hole 18, and the lower stopper 53 supports the load.
5.油圧シリンダ13を短縮する。レール12と支持梁11とは
下部ストッパー66と共に上昇する。5. Shorten the hydraulic cylinder 13. The rail 12 and the support beam 11 rise together with the lower stopper 66.
6.上部ストッパー66のピン68を突出させてレール12に係
着し、荷重を支持する。6. The pin 68 of the upper stopper 66 is projected to engage with the rail 12 to support the load.
7.2〜6の工程を繰返し、レール12と支持梁11とは油圧
シリンダ13のストロークに従って尺取虫式に上昇する。The steps of 7.2 to 6 are repeated, and the rail 12 and the support beam 11 are lifted up in accordance with the stroke of the hydraulic cylinder 13.
8.クライミング支持梁11のアウトリガー16を伸長させ、
架構体1の上方の梁上に支持させ、次に蓮台6の上昇を
開始する。8.Extend the outrigger 16 of the climbing support beam 11,
It is supported on the beam above the frame structure 1, and then the lotus stand 6 starts to rise.
9.6の過程の上下のストッパーの支持のもとで、蓮台6
のアウトリガー62を短縮し、ローラ64によって上下移動
可能の状態にする。Under the support of the upper and lower stoppers in the process of 9.6, the lotus stand 6
The outrigger 62 is shortened, and the roller 64 makes it movable up and down.
10.上部ストッパー66をレール12から解離する。10. Disengage the upper stopper 66 from the rail 12.
11.油圧ジャッキ13を伸長し、下部ストッパー53のレー
ル12との係着により、支持梁11に反力をとって蓮台6を
上昇させる。11. The hydraulic jack 13 is extended, and by engaging the lower stopper 53 with the rail 12, a reaction force is applied to the support beam 11 to raise the lotus stand 6.
12.上部ストッパー66をレール12に係着して下部ストッ
パー53をレールから解離し、油圧ジャッキ13を短縮す
る。12. Engage the upper stopper 66 with the rail 12 to disengage the lower stopper 53 from the rail, and shorten the hydraulic jack 13.
13.下部ストッパー53をレール12に係着する。13. Attach the lower stopper 53 to the rail 12.
14.上記10〜13の工程を繰返すと第1図で示す状態とな
る。14. When the above steps 10 to 13 are repeated, the state shown in FIG. 1 is obtained.
15.さらに10,11の工程を加える。15. Add 10 and 11 more steps.
16.蓮台6のアウトリガー62を伸長し、蓮台6の新しい
上方の位置への移動が完了する。16. The outrigger 62 of the lotus stand 6 is extended, and the movement of the lotus stand 6 to the new upper position is completed.
17.油圧ジャッキ13による蓮台6と荷台フレーム5との
連結を解き、通常の荷台の昇降運転に移り、次回のクラ
イミングの実施では前記の工程1に戻る。17. The hydraulic jack 13 releases the connection between the lotus platform 6 and the luggage carrier frame 5, and the normal operation of raising and lowering the luggage carrier is started. In the next climbing, the process returns to the step 1.
上記した工程に従う蓮台6の昇降操作は、クライミング
装置の一環として制御装置を設けることによってより改
善することができる。このための制御装置は、架構体1
の既設床上に設置し、上部、下部のストッパーを含む係
脱手段の係脱操作と、伸縮機構の伸縮操作のための油圧
系統を個別に、順次に制御するように構成し、押ボタン
によって、蓮台の昇降、クライミング支持梁とレールと
の昇降、非常停止などの系統別に行い、また、係脱手段
とクライミング・レールとのピンの係脱には安全系統の
制御も行えるようにする。そして全体的には各操作をプ
ログラムに組み、押ボタンの選定で自動的、かつシステ
ムを組んだ作動を行うようにすることができる。The lifting operation of the lotus stand 6 according to the above-mentioned steps can be further improved by providing a control device as a part of the climbing device. The control device for this is the frame structure 1.
Installed on the existing floor of, the hydraulic system for engaging and disengaging operation of the engaging and disengaging means including the upper and lower stoppers, and the expanding and contracting operation of the expanding and contracting mechanism are individually and sequentially controlled, and by the push button, The system will be used for lifting / lowering the lotus stand, lifting / lowering of the climbing support beam and rail, and emergency stop. Also, the safety system can be controlled for engaging / disengaging the pin between the engaging / disengaging means and the climbing rail. Then, as a whole, each operation can be programmed into a program so that the operation can be performed automatically and systematically by selecting a push button.
クライミング装置10は建設工事の末期まで装備したまま
でよく、蓮台6が下降を必要とするときには、上記の逆
順の工程に従えばよい。またリフトの解体撤去も下降と
同様に実施すればよい。ただし、下降時には、クライミ
ング・レール12の貫通孔18に係着している上下のストッ
パーのピン68には、常に荷重がかかっているため、油圧
シリンダ13には微妙な作動を与えて、ピン68の解除を円
滑にさせる必要があり、この操作も制御事項に加えるこ
とにする。The climbing device 10 may be kept equipped until the end of the construction work, and when the lotus stand 6 needs to be lowered, the above steps may be followed in reverse order. Also, dismantling and removal of the lift may be carried out in the same manner as the lowering. However, at the time of descending, since the upper and lower stopper pins 68 engaged with the through holes 18 of the climbing rail 12 are always loaded, the hydraulic cylinder 13 is given a delicate operation, and the pin 68 It is necessary to smooth the release of the above, and this operation will be added to the control items.
本発明は本設の架構体によって昇降路を形成し、荷台を
昇降させるリフトに、クライミング装置を付加し、これ
を作動させて蓮台を尺取虫式に昇降させるものであるか
ら、通常のリフトの蓮台をそのまま自昇降式に移動可能
にしたものであり、とくに建設工事の進行変化に伴って
昇降を必要とするリフトの蓮台を逐次移動するクライミ
ング方法を完成し、併せてその方法を実施するための装
置を提供するものである。本発明によれば、昇降路内に
複雑に組立てられたリフトにおいて、大型の揚重機のそ
の操作のための上方空間を確保する必要がなく、また昇
降路の全長にわたって昇降レールを設置する必要がな
い。さらにクライミング装置として付加される荷重支持
材は架構体として簡単な振れ止めを有する程度に構成さ
れて、格別な精度を必要としない。The present invention forms a hoistway by the main frame structure, adds a climbing device to the lift that raises and lowers the loading platform, and operates the lotus stand to raise and lower the lotus stand in a scaled manner. Is a self-elevating type that can be moved as it is, and in particular, we have completed a climbing method that sequentially moves the lotus stand of the lift that needs to be raised and lowered as the construction work progresses, and to carry out that method as well. A device is provided. According to the present invention, in a lift that is complicatedly assembled in a hoistway, it is not necessary to secure an upper space for the operation of a large lifting machine, and it is not necessary to install a hoisting rail over the entire length of the hoistway. Absent. Furthermore, the load supporting material added as a climbing device is configured to have a simple steady rest as a frame structure, and does not require special accuracy.
本発明のクライミング方法とそれに使用する装置は大型
のタワークレーンなどを前提としないものであるから、
クレーンに要する費用の削減だけでなく、クレーンの設
置を必要としない現場にもリフトが使用でき、クレーン
の使用予定とも関係なく単独に蓮台の昇降が実施でき、
しかも昇降状況を直接監視しながら操作を行えるから、
施工管理や安全管理にも効果が大きい。Since the climbing method of the present invention and the device used for the climbing method do not assume a large tower crane or the like,
Not only can you reduce the cost required for the crane, but you can also use the lift at the site where you do not need to install the crane, and you can independently lift the lotus stand regardless of the planned use of the crane.
Moreover, since it is possible to operate while directly monitoring the lifting status,
Greatly effective for construction management and safety management.
図面は本発明のクライミング方法を実施するための装置
の実施例を示し、第1図はリフトの正面図、第2図はそ
の側面図、第3図はリフトの蓮台を主とする平面図であ
る。 1…架構体、本設鉄骨、2…荷台、3…昇降路、4…ガ
イドレール、5…荷台フレーム、6…蓮台、7…カウン
タウエイト、8…巻上げワイヤ、10…クライミング装
置、11…クライミング支持梁、12…クライミング・レー
ル、13…伸縮機構、油圧シリンダ、14…係脱手段、16…
アウトリガー、17…ブラケット、18…貫通孔、52,65…
支持梁、53…下部ストッパー、62…アウトリガー、66…
上部ストッパー、67…油圧シリンダ、68…ピンThe drawings show an embodiment of an apparatus for carrying out the climbing method of the present invention. Fig. 1 is a front view of a lift, Fig. 2 is a side view thereof, and Fig. 3 is a plan view mainly of a lotus stand of the lift. is there. DESCRIPTION OF SYMBOLS 1 ... Frame structure, main steel frame, 2 ... Loading platform, 3 ... Hoistway, 4 ... Guide rail, 5 ... Loading platform frame, 6 ... Lotus platform, 7 ... Counterweight, 8 ... Winding wire, 10 ... Climbing device, 11 ... Climbing Support beam, 12 ... Climbing rail, 13 ... Telescopic mechanism, hydraulic cylinder, 14 ... Engaging means, 16 ...
Outrigger, 17 ... Bracket, 18 ... Through hole, 52,65 ...
Support beam, 53 ... Lower stopper, 62 ... Outrigger, 66 ...
Upper stopper, 67 ... Hydraulic cylinder, 68 ... Pin
Claims (3)
たリフトの蓮台を昇降する方法において、このリフトに
は、蓮台の上方において架構体に支持されるクライミン
グ支持梁と、この梁から懸垂して支持されるクライミン
グ・レールと、蓮台と荷台フレームとを連結する伸縮機
構と、蓮台と荷台フレームとを個別にクライミング・レ
ールに係着、解離する係脱手段とを装備し、上記係脱手
段を、蓮台と荷台フレームとについて交互にクライミン
グ・レールに係着、解離するとともに上記伸縮機構を伸
縮し、蓮台を架構体に固定したときには、蓮台に反力を
とってクライミング支持梁とクライミング・レールとを
尺取虫式に昇降させて架構体に固定し、クライミング支
持梁を架構体に固定したときは、クライミング・レール
に反力をとって蓮台を尺取虫式に昇降させて架構体に固
定することを特徴とするリフト用蓮台のクライミング方
法。1. A method for raising and lowering a lotus stand of a lift provided with a carrier frame capable of moving up and down in a hoistway, wherein the lift includes a climbing support beam supported by a frame structure above the lotus stand and suspended from the beam. Equipped with a climbing rail that is supported by the climbing rail, a telescopic mechanism that connects the lotus stand and the luggage carrier frame, and an engagement / disengagement means that separately engages and disengages the lotus stand and the luggage carrier frame with the climbing rail. The means are alternately engaged with and disengaged from the climbing rails for the lotus stand and the cargo frame, and when the lotus stand is fixed to the frame structure by disengagement and disengagement, the lotus stand takes a reaction force to the climbing support beam and the climbing frame. When the rail and the climbing insect are lifted and fixed to the frame structure, and the climbing support beam is fixed to the frame structure, the reaction force is applied to the climbing rail and the lotus Climbing method of lifting Rendai, characterized in that fixed to the rack assembly by lifting the inchworm expression.
たリフトにおいて、このリフトはクライミング装置を装
備しており、このクライミング装置は蓮台の上方におい
て架構体に支持されるクライミング支持梁と、この支持
梁から懸垂して支持されるクライミング・レールと、蓮
台と荷台フレームとを連結する伸縮機構と、蓮台と荷台
フレームとを個別にクライミング・レールに係着、解離
する係脱手段とを包含していることを特徴とするリフト
用蓮台のクライミング装置。2. A lift in which a carrier frame is vertically movable in a hoistway, the lift is equipped with a climbing device, and the climbing device includes a climbing support beam supported by a frame structure above a lotus stand. Includes a climbing rail suspended from this support beam, an expansion / contraction mechanism for connecting the lotus stand and the luggage carrier frame, and an engaging / disengaging means for separately engaging and disengaging the lotus stand and the luggage carrier frame with the climbing rail. A lotus stand climbing device for lifts.
リガーを有し、その伸長時に架構体に支持される特許請
求の範囲第2項に記載のクライミング装置。3. The climbing device according to claim 2, wherein the climbing support beam has an outrigger in a longitudinal direction and is supported by the frame structure when the outrigger is extended.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP25647986A JPH0745777B2 (en) | 1986-10-27 | 1986-10-27 | Method and apparatus for climbing lotus stand for lift |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP25647986A JPH0745777B2 (en) | 1986-10-27 | 1986-10-27 | Method and apparatus for climbing lotus stand for lift |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS63110364A JPS63110364A (en) | 1988-05-14 |
| JPH0745777B2 true JPH0745777B2 (en) | 1995-05-17 |
Family
ID=17293207
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP25647986A Expired - Lifetime JPH0745777B2 (en) | 1986-10-27 | 1986-10-27 | Method and apparatus for climbing lotus stand for lift |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0745777B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114837396A (en) * | 2022-05-12 | 2022-08-02 | 中国建筑第二工程局有限公司 | Telescopic operation platform for light production well and construction method thereof |
| CN117144972A (en) * | 2023-08-17 | 2023-12-01 | 中国一冶集团有限公司 | A kind of in-hole variable distance working platform |
| CN119825114B (en) * | 2025-01-22 | 2026-01-02 | 上海建工一建集团有限公司 | A pneumatic hoisting platform and its hoisting method |
-
1986
- 1986-10-27 JP JP25647986A patent/JPH0745777B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPS63110364A (en) | 1988-05-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH07100582B2 (en) | Elevator work platform and elevator installation method | |
| JP6893188B2 (en) | Demolition system and demolition method of existing structures | |
| WO2024104449A1 (en) | Nuclear island reactor plant construction equipment integration platform and climbing method therefor | |
| JPH08311818A (en) | Climbing type lift-up method for building and its equipment | |
| WO1992021838A1 (en) | Work platform system for multi-storey buildings | |
| US4022330A (en) | Apparatus for mounting building panels | |
| JPH0745777B2 (en) | Method and apparatus for climbing lotus stand for lift | |
| JP3822084B2 (en) | Construction lifting system for high-rise buildings | |
| JP2612974B2 (en) | Mounting method of outer wall PC members | |
| CN215564411U (en) | Sliding construction device for high-rise cylindrical building | |
| JP2001039652A (en) | Self climbing lift | |
| JP3920527B2 (en) | Elevator for construction | |
| JPH05113026A (en) | Temporary scaffold structure | |
| JP3841242B2 (en) | Elevator parking elevating work table and construction method using it | |
| JP5894851B2 (en) | Support mechanism for construction elevator mast, construction elevator, and extension method for construction elevator mast | |
| JPS63110365A (en) | Method and apparatus for rising and falling of lift stand | |
| JPH08312146A (en) | Temporary frame device for construction | |
| JP2612258B2 (en) | Elevator installation construction method | |
| JPH05262475A (en) | Installation method of elevator | |
| JPH05201648A (en) | Installation of elevator | |
| JP2024157825A (en) | Elevator lifting machine and elevator shaft structure | |
| CN120390720A (en) | Construction site equipment with climbing formwork and elevator growing together | |
| HK40124170A (en) | Platform for an elevator system for a building which is under construction | |
| CN112854743A (en) | Sliding construction device for high-rise cylindrical building | |
| SU1705231A1 (en) | Self-hoisting crane |