JPH07317264A - Structure and method for attaching handrail - Google Patents

Structure and method for attaching handrail

Info

Publication number
JPH07317264A
JPH07317264A JP26873794A JP26873794A JPH07317264A JP H07317264 A JPH07317264 A JP H07317264A JP 26873794 A JP26873794 A JP 26873794A JP 26873794 A JP26873794 A JP 26873794A JP H07317264 A JPH07317264 A JP H07317264A
Authority
JP
Japan
Prior art keywords
wall
wall material
handrail
mounting
attached
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP26873794A
Other languages
Japanese (ja)
Other versions
JP3022737B2 (en
Inventor
Chozaburo Matsumoto
長三郎 松本
Hideo Aki
秀男 安芸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP26873794A priority Critical patent/JP3022737B2/en
Publication of JPH07317264A publication Critical patent/JPH07317264A/en
Application granted granted Critical
Publication of JP3022737B2 publication Critical patent/JP3022737B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

PURPOSE:To prevent external appearances from being spoiled extremely with a furring reinforcing material kept from becoming obstructive by a method wherein the furring reinforcing material is provided between a first walling material and a second walling material, and a bracket receiving seat on the surface of the first walling material and the furring reinforcing material are fixed, with the first walling material put in between. CONSTITUTION:An attaching hole 5 is bored to a position whereto a handrail is installed to a first walling material 1. A cylindrical body 3, with adhesives applied to both ends 31 thereof, is inserted, being folded up, through the attaching hole 5 to a space between the first walling material 1 and a second walling material 2, and after that the cylindrical body is unfolded to its original size and stuck to the walling materials. Then, reactive setting resin is injected into the cylindrical body 3, and thereby furring reinforcing material 4 is formed. A screw 7 is inserted through a through hole 61 and the attaching hole 5 and screwed down into the furring reinforcing material 4, and the first walling material 1 is fixed form both sides with a bracket receiving seat 6 and the furring reinforcing material 4. Then, a bracket cover 10 of a handrail 9 is made to contact with the bracket receiving seat 6 and fixed to the furring reinforcing material 4 with the screw 7. Thereby, the external apperances are not spoiled while the furring reinforcing material is kept from becoming obstructive.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、手摺取付構造及び手摺
取付工法に関する。特に一般の既設居室の壁、既設廊下
の壁並びに小部屋の中に浴室ユニットを取り付けた既設
の浴室ユニットの壁等に、手摺を取り付ける際に好適な
手摺取付構造及び手摺取付工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a handrail mounting structure and a handrail mounting method. In particular, the present invention relates to a handrail mounting structure and a handrail mounting method suitable for mounting a handrail on a wall of a general existing living room, a wall of an existing corridor, or a wall of an existing bathroom unit in which a bathroom unit is mounted in a small room.

【0002】[0002]

【従来の技術】従来、浴室は小部屋の中に浴槽を据え付
け浴室床や壁等を設けていたが、最近では、実公平1ー
16474号公報に記載されているように浴槽、浴室
床、壁等からなる浴室ユニットを工場で製造し、これを
施工現場に運搬し、小部屋の中にこの浴室ユニットを組
み立てて、据えつけることが現物施工が少なく工期が短
いことから広く行われている。ところが、近年、高齢者
が増え、高齢者用に住宅内の各設備を改修することが多
くなっている。浴室を改修する時には、滑りやすいか
ら、高齢者の安全のため、側壁面に手摺を取り付けるこ
とがよくある。この浴室ユニットに手摺を取り付ける手
摺取付工法は、新規に浴室ユニットを取り付ける場合に
は、浴室ユニットを取り付ける前に、浴室ユニットの側
壁面の手摺取付予定位置の裏面に合板、木片又は鉄材等
の取付部材を接合して壁を補強し、浴室ユニットの側壁
面の上から、この取付部材に手摺を取り付けていた。一
方、既設の場合には、手摺取付位置の壁の裏面に取付部
材を接合することができないから、実際上、手摺の取付
は困難であった。止むなく、手摺を取り付ける場合は、
浴室ユニットの壁の表面の手摺取付予定位置に補強材を
貼りつけ、手摺を取り付けていた。
2. Description of the Related Art Conventionally, in a bathroom, a bathtub is installed in a small room to provide a bathroom floor, a wall, etc., but recently, as described in Japanese Utility Model Publication No. 1-16474, a bathtub, a bathroom floor, and a wall are provided. It is widely practiced to manufacture a bathroom unit consisting of etc. at a factory, transport it to the construction site, assemble this bathroom unit in a small room, and install it in the actual construction because the construction period is short and the construction period is short. However, in recent years, the number of elderly people has increased, and it has become more frequent to refurbish each facility in the house for the elderly people. When renovating a bathroom, it is often slippery, so handrails are often attached to the sidewalls for the safety of the elderly. When installing a new bathroom unit, the handrail installation method for attaching handrails to this bathroom unit is to attach plywood, wood chips, iron material, etc. to the back surface of the bathroom unit side wall installation scheduled position before installing the bathroom unit. The members were joined to reinforce the wall, and the handrail was attached to the attachment member from the side wall surface of the bathroom unit. On the other hand, in the existing case, since it is not possible to join the attachment member to the back surface of the wall at the handrail attachment position, it was actually difficult to attach the handrail. If you want to install the handrail without stopping,
The handrail was attached by attaching a reinforcing material to the position where the handrail was to be attached on the surface of the wall of the bathroom unit.

【0003】[0003]

【発明が解決しようとする課題】ところが、前述の如
き、浴室ユニットの壁の表面に補強材を貼りつけ、手摺
を取り付ける工法では、壁の表面に補強材が見えて浴室
ユニットの外観を著しく損ねると同時に、補強材が表面
から突出しているので、邪魔になるという問題がある。
このように既設の壁に手摺を設けることは、浴室ユニッ
トだけに限らず、その他の場合、例えば、既設の便所等
に手摺を取り付ける場合にも同様な問題が生ずる。
However, as described above, in the method of attaching the reinforcing material to the surface of the wall of the bathroom unit and attaching the handrail, the reinforcing material is visible on the surface of the wall and the appearance of the bathroom unit is significantly impaired. At the same time, the reinforcing material projects from the surface, which causes an obstacle.
Providing the handrail to the existing wall in this manner is not limited to the bathroom unit, and in other cases, for example, when the handrail is attached to the existing toilet or the like, the same problem occurs.

【0004】そこで、本発明の目的は、浴室ユニット等
の既設の壁に手摺を設ける場合に、外観を著しく損なわ
ず、更に、補強材が邪魔にならない手摺取付構造及び手
摺取付工法を提供する事である。
Therefore, an object of the present invention is to provide a handrail mounting structure and a handrail mounting construction method in which a handrail is not significantly impaired when a handrail is provided on an existing wall such as a bathroom unit and the reinforcing material does not disturb the handrail. Is.

【0005】[0005]

【問題点を解決するための手段】本発明は上記の目的を
達成するためになされたもので、請求項1に記載の本発
明の手摺取付構造は、第一壁材と第二壁材とが一定間隔
をおいて設けられた壁の第一壁材の表面に手摺が取り付
けられた手摺取付構造であって、第一壁材と第二壁材と
の間に、固化した反応性硬化型樹脂又はモルタルからな
る下地補強材が設けられ、第一壁材の表面にブラケット
受座が設けられ、このブラケット受座と下地補強材とが
第一壁材を挟んでネジで止着され、ブラケット受座に手
摺が取り付けられているものである。
The present invention has been made to achieve the above object, and the handrail mounting structure of the present invention according to claim 1 has a first wall member and a second wall member. Is a handrail mounting structure in which a handrail is attached to the surface of the first wall material of the wall provided at a constant interval, and the reactive hardening type solidified between the first wall material and the second wall material. A base reinforcing material made of resin or mortar is provided, a bracket seat is provided on the surface of the first wall material, and the bracket seat and the base reinforcing material are fixed by screws with the first wall material sandwiched therebetween, and the bracket A handrail is attached to the seat.

【0006】請求項2に記載の本発明は、請求項1の手
摺取付構造を得るための好ましい手摺取付工法であり、
第一壁材と第二壁材とが一定間隔をおいて設けられた壁
の第一壁材の表面に手摺を取り付ける手摺取付工法であ
って、第一壁材に取付孔を穿孔して設け、この取付孔よ
り第一壁材と第二壁材との間に、柔軟な材質からなる筒
状体又は断面U字状の取付部材を変形させて挿入し、こ
の取付部材を第一壁材と第二壁材との間に差し渡し、こ
の両端部を夫々第一壁材と第二壁材に接着した後、この
取付部材の中に反応性硬化型樹脂又はモルタルを注入し
て固化させ、取付孔より大きな下地補強材を形成させ、
ブラケット受座を第一壁材の表面に当接させ、このブラ
ケット受座の上から前記下地補強材にネジを螺入してブ
ラケット受座を第一壁材に取り付け、このブラケット受
座に手摺を取り付けるものである。
The present invention according to claim 2 is a preferred handrail mounting method for obtaining the handrail mounting structure according to claim 1,
A handrail mounting method for mounting a handrail on a surface of a first wall material of a wall in which a first wall material and a second wall material are provided with a constant space, and a mounting hole is provided by drilling a mounting hole in the first wall material. , A tubular member made of a flexible material or a mounting member having a U-shaped cross section is deformed and inserted between the first wall member and the second wall member through the mounting hole, and the mounting member is attached to the first wall member. Between the second wall material and the second wall material, and after adhering both ends to the first wall material and the second wall material, respectively, a reactive curable resin or mortar is injected into the mounting member to solidify, Form a base reinforcement larger than the mounting hole,
The bracket seat is brought into contact with the surface of the first wall material, and the bracket seat is attached to the first wall material by screwing a screw into the base reinforcing material from above the bracket seat, and the handrail is attached to the bracket seat. Is to be attached.

【0007】請求項3に記載の本発明の手摺取付構造
は、第一壁材と第二壁材とが一定間隔をおいて設けられ
た壁の第一壁材の表面に手摺が取り付けられた手摺取付
構造であって、第一壁材に取付孔が設けられ、この取付
孔の中に取付部材が挿入され、この取付部材の先端と第
二壁材内面とが、又、この取付孔の縁端面と取付部材の
周側面とが、夫々接着されて取り付けられ、この取付部
材の第一壁材側端面に化粧板を介してブラケット受座が
取り付けられ、このブラケット受座に手摺が取り付けら
れているものである。
In the handrail mounting structure of the present invention as set forth in claim 3, the handrail is mounted on the surface of the first wall material of the wall in which the first wall material and the second wall material are provided at a constant interval. In the handrail mounting structure, a mounting hole is provided in the first wall member, the mounting member is inserted into the mounting hole, and the tip of the mounting member and the inner surface of the second wall member are The edge surface and the peripheral side surface of the mounting member are attached by being adhered to each other, the bracket seat is attached to the end surface of the mounting member on the first wall material side through the decorative plate, and the handrail is attached to the bracket seat. It is what

【0008】請求項4に記載の本発明は、請求項3の手
摺取付構造を得るための好ましい手摺取付工法であり、
第一壁材と第二壁材とが一定間隔をおいて設けられた壁
の第一壁材の表面に手摺を取り付ける手摺取付工法であ
って、第一壁材に取付孔を穿孔して設け、この取付孔よ
り第一壁材と第二壁材との間に取付部材を挿入し、取付
部材の先端を第二壁材内面に、又、取付部材の周側面を
第一壁材の取付孔の縁端面に、夫々接着し、この取付部
材の第一壁材側端面を化粧板で覆い、この化粧板にブラ
ケット受座を当接し、ブラケット受座の上から取付部材
にネジを螺入してブラケット受座を取付部材に取り付
け、このブラケット受座に手摺を取り付けるものであ
る。
The present invention according to claim 4 is a preferred handrail mounting method for obtaining the handrail mounting structure according to claim 3.
A handrail mounting method for mounting a handrail on a surface of a first wall material of a wall in which a first wall material and a second wall material are provided with a constant space, and a mounting hole is provided by drilling a mounting hole in the first wall material. The mounting member is inserted between the first wall member and the second wall member through the mounting hole, the tip of the mounting member is mounted on the inner surface of the second wall member, and the peripheral side surface of the mounting member is mounted on the first wall member. Adhere to the edge surfaces of the holes respectively, cover the end surface of the mounting member on the first wall material side with a decorative plate, abut the bracket seat on this decorative plate, and screw the screw into the mounting member from above the bracket seat. Then, the bracket seat is attached to the mounting member, and the handrail is attached to the bracket seat.

【0009】本発明において、第一壁材とは手摺を取り
付ける壁材であり、第二壁材とはこの第一壁材の裏側に
一定間隔をおいて設けられた壁材である。例えば、居室
の場合には、第一壁材は居室の壁であり、第二壁材は居
室の隣の廊下や居室等の壁である。又、廊下の場合に
は、第一壁材は廊下の壁であり、第二壁材は隣の居室等
の壁である。又、浴室ユニットを取り付けた小部屋の場
合には、第一壁材は浴室ユニットの壁であり、第二壁材
は小部屋の壁である。
In the present invention, the first wall material is a wall material to which the handrail is attached, and the second wall material is a wall material provided on the back side of the first wall material at a constant interval. For example, in the case of a living room, the first wall material is the wall of the living room, and the second wall material is the wall of the corridor or the living room next to the living room. Further, in the case of a corridor, the first wall material is the wall of the corridor, and the second wall material is the wall of the next room or the like. Further, in the case of a small room to which the bathroom unit is attached, the first wall material is the wall of the bathroom unit and the second wall material is the wall of the small room.

【0010】[0010]

【作用】請求項1の発明においては、第一壁材と第二壁
材との間に、固化した反応性硬化型樹脂又はモルタルか
らなる下地補強材が設けられ、この下地補強材に第一壁
材を挟んでブラケット受座がネジで取り付けられている
から、ブラケット受座は第一壁材に強固に取り付けられ
る。しかも、このブラケット受座に手摺が取り付けられ
ているから、手摺が第一壁材に強固に取り付けられる。
According to the first aspect of the present invention, the base reinforcing material made of the solidified reactive curable resin or mortar is provided between the first wall material and the second wall material. Since the bracket seats are attached with screws with the wall material sandwiched therebetween, the bracket seats are firmly attached to the first wall material. Moreover, since the handrail is attached to the bracket seat, the handrail is firmly attached to the first wall member.

【0011】請求項2の発明においては、筒状又は断面
U字状の取付部材は柔軟な材質からできているため、取
付部材を折り畳んで変形させることにより、第一壁材に
穿孔された取付孔より第一壁材と第二壁材との間に挿入
することができる。従って、第一壁材に穿孔する取付孔
は、取付部材である筒状体の径、又は、U字状帯体の幅
と高さと同じ大きさの孔でなく、小さい孔とすることが
できる。このように取付孔を小さくすることができるか
ら、外観上、あまり目立たず意匠的美観もよい。更に、
このようにして、取付孔より第一壁材と第二壁材との間
に挿入した取付部材の中に反応性硬化型樹脂又はモルタ
ルを注入して固化させることによって、容易に、取付孔
より大きい下地補強材を形成することができる。その結
果、この下地補強材は第一壁材の取付孔から抜け出るこ
とがない。この第一壁材の表面にブラケット受座を当接
させ、ブラケット受座の上から下地補強材にネジを螺入
してブラケット受座を取り付けると、ブラケット受座が
強固に第一壁材に取り付けられる。そして、このブラケ
ット受座に手摺を取り付けると、手摺を壁に強固に取り
付けることができる。
According to the second aspect of the invention, since the tubular or U-shaped mounting member is made of a flexible material, the mounting member is perforated in the first wall member by folding and deforming the mounting member. The hole can be inserted between the first wall material and the second wall material. Therefore, the mounting hole formed in the first wall member can be a small hole instead of the same size as the diameter of the cylindrical body as the mounting member or the width and height of the U-shaped band. . Since the mounting hole can be made small in this way, the appearance is not very noticeable and the aesthetic appearance is good. Furthermore,
In this way, by injecting the reactive curable resin or mortar into the mounting member inserted between the first wall material and the second wall material through the mounting hole and solidifying the resin, the mounting hole can be easily removed from the mounting hole. A large base reinforcing material can be formed. As a result, the base reinforcing material does not come out of the mounting hole of the first wall material. When the bracket seat is brought into contact with the surface of this first wall material and the bracket seat is attached by screwing a screw into the base reinforcing material from above the bracket seat, the bracket seat is firmly attached to the first wall material. It is attached. When the handrail is attached to the bracket seat, the handrail can be firmly attached to the wall.

【0012】請求項3の発明においては、第一壁材に設
けられた取付孔の中に取付部材が挿入され、この取付部
材の先端と第二壁材内面とが、又、取付孔の縁端部と取
付部材の周側面とが、夫々接着されて取り付けられてい
るので、取付部材は抜けることがない。そして、この取
付部材に手摺が取り付けられているから、この第一壁材
と第二壁材と取付部材からなる手摺取付構造は、手摺が
強固に取り付けられ、手摺保持に必要な荷重及びモーメ
ントに十分耐えることができる。
According to the third aspect of the present invention, the mounting member is inserted into the mounting hole provided in the first wall member, and the tip of the mounting member and the inner surface of the second wall member are arranged at the edge of the mounting hole. Since the end portion and the peripheral side surface of the mounting member are bonded and mounted, the mounting member does not come off. Since the handrail is attached to the attachment member, the handrail attachment structure including the first wall material, the second wall material, and the attachment member is firmly attached to the handrail, and the load and moment required for holding the handrail are increased. Can withstand enough.

【0013】請求項4の発明においては、第一壁材に穿
孔された取付孔より、第一壁材と第二壁材との間に取付
部材を挿入し、取付部材の先端を第二壁材内面に、又、
取付部材の周側面を第一壁材の取付孔の縁端面に、夫々
接着するから、第一壁材と第二壁材とが取付部材を介し
て接合される。更に、取付部材は第一壁材の取付孔から
は抜けることなく、強固に、第一壁材及び第二壁材に取
り付けられる。この取付部材にブラケット受座を取り付
けるから、ブラケット受座を強固に壁に取り付けること
ができる。そして、このブラケット受座に手摺を取り付
けるから、手摺が強固に壁に取り付けられる。従って、
従来のように表面に補強材を設ける必要がなく、補強材
が邪魔になることもない。又、この取付部材の第一壁材
側端面を化粧板で覆い、この化粧板にブラケット受座を
当接し取付部材に取り付けているので、第一壁材側から
取付部材は見えず、浴室ユニットの外観を著しく損ねる
ことはない。
In the invention of claim 4, the mounting member is inserted between the first wall member and the second wall member through the mounting hole formed in the first wall member, and the tip of the mounting member is attached to the second wall member. On the inner surface of the material,
Since the peripheral side surface of the mounting member is bonded to the edge surface of the mounting hole of the first wall member, the first wall member and the second wall member are joined via the mounting member. Further, the attachment member is firmly attached to the first wall material and the second wall material without coming off from the attachment hole of the first wall material. Since the bracket seat is attached to this mounting member, the bracket seat can be firmly attached to the wall. Then, since the handrail is attached to the bracket seat, the handrail is firmly attached to the wall. Therefore,
Unlike the conventional case, it is not necessary to provide a reinforcing material on the surface, and the reinforcing material does not interfere. Further, since the end face of the mounting member on the first wall material side is covered with the decorative plate, and the bracket seat is attached to the decorative plate so as to be mounted on the mounting member, the mounting member cannot be seen from the first wall member side, and the bathroom unit Does not significantly impair the appearance.

【0014】[0014]

【実施例】以下,本発明の実施例を図面により説明す
る。図1〜図4は本発明を浴室ユニットに応用した一実
施例を示すもので、図1はブラケット受座を取り付けた
状態を示す断面図、図2はスクリュウネジを螺入して、
ブラケット受座等を下地補強材に取り付ける状態を示す
説明図、図3は手摺をブラケット受座に取り付ける状態
を示す説明図、図4は浴室ユニットの壁面に手摺を取り
付けた状態を示す説明図である。
Embodiments of the present invention will be described below with reference to the drawings. 1 to 4 show an embodiment in which the present invention is applied to a bathroom unit. FIG. 1 is a sectional view showing a state in which a bracket seat is attached, and FIG.
FIG. 4 is an explanatory view showing a state in which a bracket seat and the like are attached to a base reinforcing material, FIG. 3 is an explanatory view showing a state in which a handrail is attached to the bracket seat, and FIG. is there.

【0015】図1〜図4において、1は浴室ユニットの
壁からなる第一壁材である。この第一壁材1は内側が塩
化ビニル樹脂被覆鋼板11で外側が石膏ボード12で出
来ている。尚、この第一壁材は通常浴室ユニットの壁に
使われる材質、例えば、内側が塩化ビニル樹脂被覆鋼板
11の替わりにタイルにしてもよい。又、外側の石膏ボ
ード12の替わりに硅酸カルシウム板にしてもよい。更
に、内側と外側合わせてアルミ板、又は、繊維強化樹脂
(FRP)板でもよい。2は小部屋の壁からなる第二壁
材である。この第二壁材2は鉄製桟材21の屋内側に木
板22が取り付けられ屋外側にコンクリート板23とか
らなる。尚、この第二壁材は通常浴室ユニットの壁に使
われる材質、例えば、鉄製桟材21の替わりに木製桟材
でも、又 コンクリート板23の替わりにセメントボー
ドでもよい。3は柔軟な材質(例えば軟質塩化ビニル樹
脂)からなる断面円形の筒状体であり、この筒状体3の
両端部31、31が、夫々、第一壁材1と第二壁材2に
接着されている。この実施例では、柔軟な材質からなる
筒状体3を使用しているが、この筒状体3に替えて断面
U字状帯体を使用してもよい。4は固化した反応性硬化
型樹脂(例えばエポキシ樹脂、不飽和ポリエステル樹
脂、フェノール樹脂、尿素樹脂等、あるいはこれらの樹
脂にガラス繊維や充填材を添加したもの)から形成され
た円柱状の下地補強材であり、この下地補強材4は第一
壁材1と第二壁材2の間に挿入して配置された筒状体3
の中に充填されて設けられている。尚、この反応性硬化
型樹脂の替わりにモルタルを使用してもよい。5は第一
壁材1に穿孔された円形の取付孔であり、この取付孔5
の孔径は前記下地補強材4の外径の1/3程度の大きさ
となされている。6はブラケット受座であり、このブラ
ケット受座6は中心に通孔61が設けられ、外周面にネ
ジ62が設けられている円盤状のものである。このブラ
ケット受座6は、通孔61及び第一壁材1の取付孔5に
通されたスクリュウネジ7で下地補強材4に取り付けら
れている。9は手摺で、10はブラケットカバーであ
る。ブラケットカバー10は手摺9の先端に回転自在に
係止されている。又、このブラケットカバー10の内周
面には、前記ブラケット受座6のネジ62に螺合するネ
ジが設けられている。従って、手摺9の先端部に設けら
れたブラケットカバー10をブラケット受座6に螺入し
て取り付けることにより、手摺9を第一壁材1に取り付
けることができるようになっている。
1 to 4, reference numeral 1 is a first wall member composed of a wall of a bathroom unit. The first wall member 1 is made of vinyl chloride resin-coated steel plate 11 on the inside and gypsum board 12 on the outside. The first wall material may be a material that is usually used for the wall of the bathroom unit, for example, a tile instead of the vinyl chloride resin-coated steel plate 11 on the inside. Further, a calcium silicate plate may be used instead of the outer plaster board 12. Further, an aluminum plate or a fiber reinforced resin (FRP) plate may be used in combination with the inside and the outside. Reference numeral 2 is a second wall material composed of the wall of the small room. The second wall member 2 includes a wooden board 22 attached to the indoor side of the iron crosspiece 21 and a concrete board 23 on the outdoor side. The second wall material may be a material normally used for the wall of the bathroom unit, for example, a wooden beam instead of the iron beam 21, or a cement board instead of the concrete plate 23. 3 is a tubular body made of a flexible material (for example, soft vinyl chloride resin) and having a circular cross section. Both end portions 31, 31 of the tubular body 3 are formed on the first wall material 1 and the second wall material 2, respectively. It is glued. In this embodiment, the tubular body 3 made of a flexible material is used, but the tubular body 3 may be replaced by a band body having a U-shaped cross section. 4 is a cylindrical base reinforcement made of solidified reactive curable resin (for example, epoxy resin, unsaturated polyester resin, phenol resin, urea resin, etc., or glass resin or filler added to these resins) The base reinforcement material 4 is a material, and the tubular body 3 is inserted and arranged between the first wall material 1 and the second wall material 2.
It is filled and provided inside. Incidentally, mortar may be used instead of the reactive curable resin. Reference numeral 5 denotes a circular mounting hole drilled in the first wall member 1.
The hole diameter is about 1/3 of the outer diameter of the base reinforcing material 4. Reference numeral 6 denotes a bracket seat, which is a disk-shaped member having a through hole 61 in the center and a screw 62 on the outer peripheral surface. The bracket seat 6 is attached to the base reinforcing member 4 by a screw screw 7 which is passed through the through hole 61 and the attaching hole 5 of the first wall member 1. Reference numeral 9 is a handrail, and 10 is a bracket cover. The bracket cover 10 is rotatably locked to the tip of the handrail 9. Further, the inner peripheral surface of the bracket cover 10 is provided with a screw to be screwed into the screw 62 of the bracket seat 6. Therefore, the handrail 9 can be attached to the first wall member 1 by screwing the bracket cover 10 provided at the tip of the handrail 9 into the bracket seat 6 to attach it.

【0016】次に、上記図1〜図4の実施例の手摺取付
方法を説明する。先ず、第一壁材1の手摺取付予定位置
に取付孔5を穿孔する。次に、この取付孔5より第一壁
材1と第二壁材2の間に、柔軟な材質からなる筒状体3
の両端31、31に接着剤を付け、折り畳んで変形させ
て挿入する。挿入後、筒状体3を元の大きさに拡げて、
筒状体3の両端31、31を、夫々、第一壁材1と第二
壁材2に接着する。
Next, the handrail mounting method of the embodiment shown in FIGS. 1 to 4 will be described. First, the mounting hole 5 is drilled at the planned handrail mounting position of the first wall member 1. Next, the tubular body 3 made of a flexible material is provided between the first wall material 1 and the second wall material 2 through the mounting hole 5.
An adhesive agent is attached to both ends 31, 31, and the sheet is folded, deformed, and inserted. After insertion, expand the tubular body 3 to its original size,
Both ends 31, 31 of the tubular body 3 are adhered to the first wall material 1 and the second wall material 2, respectively.

【0017】次に、筒状体3の中に、反応性硬化型樹脂
(例えばエポキシ樹脂)を注入し固化させて下地補強材
4を作る。次に、図2に示す如く、スクリュウネジ7を
ブラケット受座6の通孔61と取付孔5に通し下地補強
材4に螺入する。すると、ブラケット受座6と下地補強
材4とが第一壁材1を挟んで固定される。次に、図3に
示す如く、手摺9の先端に回転自在に係止されているブ
ラケットカバー10をブラケット受座6に当接し、ブラ
ケットカバー10を回転させて、ブラケットカバー10
のネジをブラケット受座6のネジ62に螺入し、図4に
示すように、手摺9を第一壁材1に取り付ける。このよ
うにすると、下地補強材4は第一壁材1の取付孔5から
抜けず、強固に第一壁材1に取り付けられる。更に、第
一壁材1の表面にブラケット受座6を当接させ、ブラケ
ット受座6を下地補強材4にスクリュウネジ7でしっか
りと留めているので、ブラケット受座6も強固に下地補
強材4に取り付けられ、さらに、第一壁材1にもブラケ
ット受座6は強固に取り付けられる。このブラケット受
座6にブラケットカバー10を介して手摺9を取り付け
ると、手摺9が第一壁材1に強固に取り付けられること
になる。
Next, a reactive curable resin (eg, epoxy resin) is injected into the cylindrical body 3 and solidified to form the base reinforcing material 4. Next, as shown in FIG. 2, the screw screw 7 is passed through the through hole 61 of the bracket seat 6 and the mounting hole 5 and screwed into the base reinforcing member 4. Then, the bracket seat 6 and the base reinforcing member 4 are fixed with the first wall member 1 interposed therebetween. Next, as shown in FIG. 3, the bracket cover 10 rotatably locked to the tip of the handrail 9 is brought into contact with the bracket seat 6, and the bracket cover 10 is rotated to move the bracket cover 10
4 is screwed into the screw 62 of the bracket seat 6, and the handrail 9 is attached to the first wall member 1 as shown in FIG. By doing so, the base reinforcing material 4 is firmly attached to the first wall material 1 without coming off from the attachment hole 5 of the first wall material 1. Further, since the bracket seat 6 is brought into contact with the surface of the first wall member 1 and the bracket seat 6 is firmly fixed to the base reinforcing member 4 by the screw screw 7, the bracket seat 6 is also firmly fixed. 4, and the bracket seat 6 is also firmly attached to the first wall member 1. When the handrail 9 is attached to the bracket seat 6 via the bracket cover 10, the handrail 9 is firmly attached to the first wall member 1.

【0018】次に、図5〜図6の本発明の他の実施例に
ついて説明する。図5は手摺取付構造を示す断面図、図
6はスクリュウネジを螺入して、ブラケット受座等を下
地補強材に取り付ける状態を示す説明図である。図にお
いて、1aは浴室ユニットの壁からなる第一壁材であ
る。この第一壁材1aは内側が塩化ビニル樹脂被覆鋼板
11aで外側が石膏ボード12aで出来ている。尚、こ
の第一壁材1aは通常浴室ユニットの壁に使われる材
質、例えば、内側が塩化ビニル樹脂被覆鋼板11aの替
わりにタイルにしても、又、外側の石膏ボード12aの
替わりに硅酸カルシウム板にしてもよい。更に、内側と
外側合わせてアルミ板、又は、繊維強化樹脂(FRP)
板にしてもよい。2aは小部屋の壁からなる第二壁材で
ある。この第二壁材2aは、鉄製桟材21aの屋内側に
木板22aが、又、屋外側にコンクリート板23aが設
けられている。尚、この第二壁材2aは通常浴室ユニッ
トの壁に使われる材質、例えば、鉄製桟材21aの替わ
りに木製桟材でも、又 コンクリート板23aの替わり
にセメントボードでもよい。4aは円筒状の取付部材で
あり、第一壁材1aと第二壁材2aの間に設けられてい
る。具体的には、この取付部材4aは外径75mm、肉厚
5.5mmの硬質塩化ビニル樹脂製の短管であり、この短
管の両端部の内側には、木製の蓋体41a、42aが接
着されて固着されている。蓋体41aは外径63mm、長
さ70mmで、又、蓋体42aは外径63mm、長さ10mm
である。図より明らかなように、蓋体41aのほぼ中心
には、後述のスクリュウネジ7aより小さい径のネジ孔
45aが設けられている。5aは第一壁材1aに穿孔さ
れた取付孔であり、この取付孔5aは取付部材4aの外
径とほぼ同じ大きさの孔である。6aはブラケット受座
であり、このブラケット受座6aは中心に通孔61aが
設けられ、外周面にネジ62aが設けられている円盤状
のものである。8は円盤状の化粧板であり、その中心に
は通孔81aが設けられており、取付部材4aの第一壁
材側端面を覆うように取り付けられている。これらのブ
ラケット受座6aと化粧板8は、それぞれの通孔61a
及び通孔81aに通されたスクリュウネジ7aで取付部
材4aに取り付けられている。9aは手摺で、10aは
ブラケットカバーである。ブラケットカバー10aは手
摺9aの先端に回転自在に係止されて、このブラケット
カバー10aの内周面には、前記ブラケット受座6aの
ネジ62aに螺合するネジが設けられている。従って、
手摺9aの先端部に設けられたブラケットカバー10a
をブラケット受座6aに螺入して取り付けることによ
り、手摺9aを第一壁材1aに取り付けることができる
ようになっている。
Next, another embodiment of the present invention shown in FIGS. 5 to 6 will be described. FIG. 5 is a cross-sectional view showing a handrail mounting structure, and FIG. 6 is an explanatory view showing a state where a bracket screw and the like are mounted on a base reinforcing member by screwing in a screw. In the figure, 1a is a first wall member composed of a wall of the bathroom unit. The first wall member 1a is made of vinyl chloride resin-coated steel plate 11a on the inside and gypsum board 12a on the outside. The first wall material 1a is a material normally used for walls of bathroom units, for example, a tile is used instead of the vinyl chloride resin-coated steel plate 11a on the inside, and calcium silicate is used instead of the gypsum board 12a on the outside. It may be a plate. Furthermore, aluminum plate or fiber reinforced resin (FRP) is used to match the inside and outside
It may be a plate. 2a is a second wall material composed of the wall of the small room. The second wall member 2a is provided with a wooden board 22a on the indoor side of the iron crosspiece 21a and a concrete board 23a on the outdoor side. The second wall member 2a may be a material normally used for the wall of the bathroom unit, for example, a wooden beam instead of the iron beam 21a, or a cement board instead of the concrete plate 23a. 4a is a cylindrical mounting member, and is provided between the first wall member 1a and the second wall member 2a. Specifically, the mounting member 4a is a short pipe made of a hard vinyl chloride resin having an outer diameter of 75 mm and a wall thickness of 5.5 mm, and wooden lids 41a and 42a are provided inside both ends of the short pipe. Adhered and fixed. The lid 41a has an outer diameter of 63 mm and a length of 70 mm, and the lid 42a has an outer diameter of 63 mm and a length of 10 mm.
Is. As is clear from the figure, a screw hole 45a having a diameter smaller than that of a screw screw 7a described later is provided substantially at the center of the lid 41a. Reference numeral 5a is a mounting hole formed in the first wall member 1a, and the mounting hole 5a is a hole having substantially the same size as the outer diameter of the mounting member 4a. Reference numeral 6a denotes a bracket seat, which is a disk-shaped member having a through hole 61a at the center and a screw 62a on the outer peripheral surface. Reference numeral 8 denotes a disk-shaped decorative plate, which is provided with a through hole 81a at its center and is attached so as to cover the end surface of the attachment member 4a on the first wall material side. These bracket seats 6a and the decorative plate 8 are provided with respective through holes 61a.
Also, it is attached to the attachment member 4a by a screw screw 7a which is passed through the through hole 81a. 9a is a handrail and 10a is a bracket cover. The bracket cover 10a is rotatably locked to the tip of the handrail 9a, and a screw that is screwed into the screw 62a of the bracket seat 6a is provided on the inner peripheral surface of the bracket cover 10a. Therefore,
Bracket cover 10a provided at the tip of the handrail 9a
The handrail 9a can be attached to the first wall member 1a by screwing and attaching it to the bracket seat 6a.

【0019】次に、図5〜図6の他の実施例の手摺取付
方法を説明する。先ず、第一壁材1aの手摺取付予定位
置に取付孔5aを穿孔する。次に、両端部の内側に上記
木製の蓋体41a、42aが取り付けられた硬質塩化ビ
ニル樹脂製短管からなる取付部材4aの蓋体42a側先
端全面及び取付部材4aの反対側の周側面に二液型ウレ
タン接着剤を塗布し、この取付孔5aより第一壁材1a
と第二壁材2aの間に取付部材4aを挿入し、取付部材
4aの先端(蓋体42a側)を第二壁材2aの内面に、
又、取付部材4aの周側面を第一壁材1aの取付孔の周
端面に、夫々接着する。このように、取付部材4aを第
二壁材2aと第一壁材1aに接着することにより、取付
部材4aは強固に固定される。次に、所定時間(例えば
24時間)硬化養生後に、この取付部材4aの第一壁材
1a側端面を化粧板8で覆い、図6に示す如く、ネジ径
8mm、長さ50mmのスクリュウネジ7aをブラケット受
座6aの通孔61aと化粧板8の通孔81aに通し、取
付部材4aの蓋体41aのネジ孔45aに螺入する。す
ると、ブラケット受座6aと化粧板8と取付部材4aと
が第一壁材1aを挟んで固定される。次に、図3に示す
如く、手摺9aの先端に回転自在に係止されているブラ
ケットカバー10aをブラケット受座6aに当接し、ブ
ラケットカバー10aを回転させて、ブラケットカバー
10aのネジをブラケット受座6aのネジ62aに螺入
し、外径28mm、スパン400mmの手摺9aを第一壁材
1aに取り付ける。尚、取付部材4aが手摺9aを支え
るだけ強固に取り付けられているかどうかを確認のた
め、ブラケット受座6aを介して取り付けられた手摺9
aに、水平及び垂直方向に、75kgの荷重を作用させ、
10回の繰り返し静荷重を加えた。第一壁材1a、第二
壁材2a及びその他の部位を調べた結果、全く損傷はみ
られなかった。
Next, a handrail mounting method according to another embodiment of FIGS. 5 to 6 will be described. First, the mounting hole 5a is drilled at the planned handrail mounting position of the first wall member 1a. Next, on the entire front end of the lid 42a side of the mounting member 4a made of a short pipe made of a hard vinyl chloride resin having the wooden lids 41a and 42a mounted inside the both ends and on the peripheral side surface opposite to the mounting member 4a. Apply the two-component urethane adhesive, and from the mounting hole 5a, the first wall material 1a
The mounting member 4a is inserted between the second wall member 2a and the second wall member 2a, and the tip of the mounting member 4a (on the side of the lid 42a) is attached to the inner surface of the second wall member 2a.
The peripheral side surface of the mounting member 4a is bonded to the peripheral end surface of the mounting hole of the first wall member 1a. In this way, the attachment member 4a is firmly fixed by adhering the attachment member 4a to the second wall member 2a and the first wall member 1a. Next, after curing and curing for a predetermined time (for example, 24 hours), the end surface of the mounting member 4a on the side of the first wall 1a is covered with a decorative plate 8, and as shown in FIG. 6, a screw screw 7a having a screw diameter of 8 mm and a length of 50 mm. Through the through hole 61a of the bracket seat 6a and the through hole 81a of the decorative plate 8 and screwed into the screw hole 45a of the lid 41a of the mounting member 4a. Then, the bracket seat 6a, the decorative plate 8, and the mounting member 4a are fixed with the first wall member 1a interposed therebetween. Next, as shown in FIG. 3, the bracket cover 10a rotatably locked to the tip of the handrail 9a is brought into contact with the bracket seat 6a, and the bracket cover 10a is rotated so that the screws of the bracket cover 10a are received. The handrail 9a having an outer diameter of 28 mm and a span of 400 mm is screwed into the screw 62a of the seat 6a and attached to the first wall member 1a. In order to confirm whether the mounting member 4a is firmly attached to support the handrail 9a, the handrail 9 attached via the bracket seat 6a is checked.
A load of 75 kg is applied to a in the horizontal and vertical directions,
Repeated static load was applied 10 times. As a result of examining the first wall material 1a, the second wall material 2a and other parts, no damage was observed.

【0020】以上、本発明の実施例を図面により詳述し
たが、具体的な構成は上記実施例に限定されるものでは
なく、本発明の要旨を逸脱しない範囲における設計変更
等があっても本発明に含まれる。例えば、取付部材4a
の材質は、実施例の硬質塩化ビニル樹脂製短管に限られ
ず、中空の紙管、木管、硬質塩化ビニル樹脂以外の樹脂
製短管や金属管でもよい。又、取付部材4aは、実施例
の中空形状のものに限られず、中実のものでもよい。更
に、筒状体の形状は、円形状の他、角形状でもよい。
The embodiments of the present invention have been described in detail above with reference to the drawings. However, the specific structure is not limited to the above embodiments, and there may be design changes and the like within the scope not departing from the gist of the present invention. Included in the present invention. For example, the mounting member 4a
The material is not limited to the short pipe made of the hard vinyl chloride resin of the embodiment, and may be a hollow paper pipe, a wooden pipe, a short pipe made of a resin other than the hard vinyl chloride resin, or a metal pipe. Further, the mounting member 4a is not limited to the hollow member of the embodiment, but may be a solid member. Further, the shape of the tubular body may be a square shape as well as a circular shape.

【0021】[0021]

【発明の効果】以上説明してきたように,請求項1に記
載の発明では、第一壁材と第二壁材との間に下地補強材
が設けられ、この下地補強材に第一壁材を挟んで、ブラ
ケット受座がネジで取り付けられているから、ブラケッ
ト受座は第一壁材に強固に取り付けられる。又、このブ
ラケット受座に手摺が取り付けられているから、手摺が
第一壁材に強固に取り付けられる。
As described above, according to the first aspect of the invention, the base reinforcing material is provided between the first wall material and the second wall material, and the base reinforcing material is attached to the first wall material. Since the bracket seat is attached with a screw across the bracket seat, the bracket seat is firmly attached to the first wall member. Further, since the handrail is attached to the bracket seat, the handrail is firmly attached to the first wall member.

【0022】請求項2に記載の発明では、第一壁材に穿
孔された取付孔より挿入する筒状又は断面U字状の取付
部材は、柔軟な材質からできているため、この取付部材
を折り畳み、変形させて取付孔より挿入することができ
る。従って、第一壁材に穿孔する取付孔は、筒状体又は
断面U字状帯体の径、又は、U字状帯体の幅と高さより
も小さい孔でよいので、取付後、外観上あまり目立たな
い。
According to the second aspect of the present invention, since the tubular or U-shaped mounting member to be inserted from the mounting hole formed in the first wall member is made of a flexible material, this mounting member is used. It can be folded, deformed and inserted through the mounting hole. Therefore, the mounting hole to be drilled in the first wall member may be smaller than the diameter of the tubular body or the U-shaped band in cross section, or the width and height of the U-shaped band. Not very noticeable.

【0023】更に、取付部材を第一壁材と第二壁材との
間に変形させて挿入した後、変形前の状態に戻して、こ
の取付部材の中に、反応性硬化型樹脂又はモルタルを注
入して固化させることにより取付孔より大き強固な下地
補強材ができる。この下地補強材は取付孔より大きくす
ることができるから、第一壁材に穿孔された取付孔から
抜け出ることがない。又、この下地補強材に第一壁材を
挟んで、ブラケット受座をネジで取り付けると、ブラケ
ット受座が強固に取り付けられる。従って、このブラケ
ット受座に手摺を取り付けることによって、手摺が第一
壁材に強固に取り付けられる。
Further, after the mounting member is deformed and inserted between the first wall member and the second wall member, the mounting member is returned to the state before the deformation, and the reactive hardening resin or mortar is put in the mounting member. By injecting and solidifying, a base reinforcing material that is larger and stronger than the mounting hole can be formed. Since the base reinforcing material can be made larger than the mounting hole, it does not come out of the mounting hole formed in the first wall member. Further, when the bracket wall is attached with screws by sandwiching the first wall member in the base reinforcing material, the bracket wall is firmly attached. Therefore, by attaching the handrail to the bracket seat, the handrail is firmly attached to the first wall member.

【0024】請求項3に記載の発明では、第一壁材と第
二壁材との間に取付部材が挿入され、この取付部材の先
端が第二壁材に接着され、且つ、取付部材の周側面が第
一壁材に設けられた取付孔の縁端面に接着されているか
ら、取付部材は強固に第一壁材と第二壁材に固定され
る。そして、この取付部材にブラケット受座がネジで取
り付けられているから、ブラケット受座は第一壁材にが
強固に取り付けらている。更に、このブラケット受座に
手摺が取り付けられているから、手摺が第一壁材に強固
に取り付けられる。又、取付部材の第一壁材側端面を化
粧板で覆っているので、浴室ユニットの外観を損ねるこ
とはない。
According to the third aspect of the invention, a mounting member is inserted between the first wall member and the second wall member, the tip of the mounting member is bonded to the second wall member, and the mounting member is Since the peripheral side surface is bonded to the edge surface of the mounting hole provided in the first wall member, the mounting member is firmly fixed to the first wall member and the second wall member. Since the bracket seat is attached to this mounting member with a screw, the bracket seat is firmly attached to the first wall member. Further, since the handrail is attached to the bracket seat, the handrail is firmly attached to the first wall member. Further, since the end surface of the attachment member on the first wall member side is covered with the decorative plate, the appearance of the bathroom unit is not spoiled.

【0025】請求項4の発明では、第一壁材に穿孔され
た取付孔より、第一壁材と第二壁材との間に取付部材を
挿入し、取付部材の先端が第二壁材内面に、又、取付部
材の周側面が第一壁材に設けられた取付孔の縁端面に、
夫々接着されているので、この取付部材は第一壁材に穿
孔された取付孔から抜けない。従って、この取付部材
に、ブラケット受座をネジで取り付けると、ブラケット
受座が強固に取り付けられる。従って、このブラケット
受座に手摺を取り付けることによって、手摺が第一壁材
に強固に取り付けられる。
According to the invention of claim 4, the mounting member is inserted between the first wall member and the second wall member through the mounting hole formed in the first wall member, and the tip of the mounting member is the second wall member. On the inner surface, and the peripheral side surface of the mounting member on the edge surface of the mounting hole provided in the first wall member,
Since they are adhered to each other, this mounting member does not come off from the mounting hole formed in the first wall member. Therefore, when the bracket seat is attached to the mounting member with the screw, the bracket seat is firmly attached. Therefore, by attaching the handrail to the bracket seat, the handrail is firmly attached to the first wall member.

【0026】本発明において、下地補強材並びに取付部
材は、どちらも、第一壁材と第二壁材との間に設けられ
ているため、外観を損なうことがなく、補強材も邪魔に
ならない。
In the present invention, since both the base reinforcing material and the mounting member are provided between the first wall material and the second wall material, the appearance is not spoiled and the reinforcing material does not interfere. .

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明を浴室ユニットに応用した一実施例を示
すもので、ブラケット受座を取り付けた状態を示す断面
図である。
FIG. 1 shows an embodiment in which the present invention is applied to a bathroom unit, and is a cross-sectional view showing a state in which a bracket seat is attached.

【図2】ブラケット受座等を下地補強材に取り付ける状
態を示す説明図である。
FIG. 2 is an explanatory view showing a state where a bracket seat and the like are attached to a base reinforcing material.

【図3】手摺をブラケット受座に取り付ける状態を示す
説明図である。
FIG. 3 is an explanatory view showing a state where a handrail is attached to a bracket seat.

【図4】浴室ユニットの壁面に手摺を取り付けた状態を
示す説明図である。
FIG. 4 is an explanatory view showing a state where handrails are attached to the wall surface of the bathroom unit.

【図5】本発明の他の実施例を示すもので、手摺取付構
造を示す断面図である。
FIG. 5 shows another embodiment of the present invention and is a cross-sectional view showing a handrail mounting structure.

【図6】ブラケット受座等を下地補強材に取り付ける状
態を示す説明図である。
FIG. 6 is an explanatory view showing a state where a bracket seat and the like are attached to a base reinforcing material.

【符号の説明】[Explanation of symbols]

1、1a 第一壁材 2、2a 第二壁材 3 柔軟な材質からなる筒状体 4 下地補強材 4a 取付部材(硬質塩化ビニル樹脂製短
管) 41a、42a 蓋体 5、5a 取付孔 6、6a ブラケット受座 61 通孔 62 ブラケット受座のネジ 7、7a ネジ 9、9a 手摺 10、10a ブラケットカバー
1, 1a First wall material 2, 2a Second wall material 3 Cylindrical body made of flexible material 4 Base reinforcing material 4a Mounting member (short pipe made of hard vinyl chloride resin) 41a, 42a Lid body 5, 5a Mounting hole 6 , 6a Bracket seat 61 Through hole 62 Bracket seat screw 7, 7a Screw 9, 9a Handrail 10, 10a Bracket cover

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 第一壁材と第二壁材とが一定間隔をおい
て設けられた壁の第一壁材の表面に手摺が取り付けられ
た手摺取付構造であって、第一壁材と第二壁材との間
に、固化した反応性硬化型樹脂又はモルタルからなる下
地補強材が設けられ、第一壁材の表面にブラケット受座
が設けられ、このブラケット受座と下地補強材とが第一
壁材を挟んでネジで止着され、ブラケット受座に手摺が
取り付けられていることを特徴とする手摺取付構造。
1. A handrail mounting structure in which a handrail is attached to a surface of a first wall material of a wall in which a first wall material and a second wall material are provided at a constant interval, Between the second wall material, a base reinforcing material made of a solidified reactive curable resin or mortar is provided, and a bracket seat is provided on the surface of the first wall material. The handrail mounting structure is characterized in that the first wall member is fixed to the bracket with screws, and the handrail is attached to the bracket seat.
【請求項2】 第一壁材と第二壁材とが一定間隔をおい
て設けられた壁の第一壁材の表面に手摺を取り付ける手
摺取付工法であって、第一壁材に取付孔を穿孔して設
け、この取付孔より第一壁材と第二壁材との間に、柔軟
な材質からなる筒状又は断面U字状の取付部材を変形さ
せて挿入し、この取付部材を第一壁材と第二壁材との間
に差し渡し、この両端部を夫々第一壁材と第二壁材に接
着した後、この取付部材の中に反応性硬化型樹脂又はモ
ルタルを注入して固化させ、取付孔より大きな下地補強
材を形成させ、ブラケット受座を第一壁材の表面に当接
させ、このブラケット受座の上から前記下地補強材にネ
ジを螺入してブラケット受座を第一壁材に取り付け、こ
のブラケット受座に手摺を取り付けることを特徴とする
手摺取付工法。
2. A handrail mounting method for mounting a handrail on the surface of a first wall material of a wall in which a first wall material and a second wall material are provided with a constant interval, and a mounting hole in the first wall material. Is provided by punching, and a tubular or U-shaped mounting member made of a flexible material is deformed and inserted between the first wall material and the second wall material through the mounting hole. After passing between the first wall material and the second wall material and adhering both ends to the first wall material and the second wall material, respectively, a reactive curable resin or mortar is injected into the mounting member. Solidify to form a base reinforcing material larger than the mounting hole, bring the bracket seat into contact with the surface of the first wall material, and screw a screw into the base reinforcing material from above the bracket seat to receive the bracket support. A handrail installation method characterized in that the seat is attached to the first wall material and the handrail is attached to the bracket seat.
【請求項3】 第一壁材と第二壁材とが一定間隔をおい
て設けられた壁の第一壁材の表面に手摺が取り付けられ
た手摺取付構造であって、第一壁材に取付孔が設けら
れ、この取付孔の中に取付部材が挿入され、この取付部
材の先端と第二壁材内面とが、又、この取付孔の縁端面
と取付部材の周側面とが、夫々接着されて取り付けら
れ、この取付部材の第一壁材側端面に化粧板を介してブ
ラケット受座が取り付けられ、このブラケット受座に手
摺が取り付けられていることを特徴とする手摺取付構
造。
3. A handrail mounting structure in which a handrail is attached to the surface of the first wall material of a wall in which the first wall material and the second wall material are provided with a constant spacing, A mounting hole is provided, and the mounting member is inserted into the mounting hole, the tip of the mounting member and the inner surface of the second wall member, and the edge surface of the mounting hole and the peripheral side surface of the mounting member, respectively. A handrail mounting structure characterized in that it is attached by adhesion, a bracket seat is attached to an end surface of the mounting member on the first wall material side via a decorative plate, and a handrail is attached to the bracket seat.
【請求項4】 第一壁材と第二壁材とが一定間隔をおい
て設けられた壁の第一壁材の表面に手摺を取り付ける手
摺取付工法であって、第一壁材に取付孔を穿孔して設
け、この取付孔より第一壁材と第二壁材との間に取付部
材を挿入し、取付部材の先端を第二壁材内面に、又、取
付部材の周側面を第一壁材の取付孔の縁端面に、夫々接
着し、この取付部材の第一壁材側端面を化粧板で覆い、
この化粧板にブラケット受座を当接し、ブラケット受座
の上から取付部材にネジを螺入してブラケット受座を取
付部材に取り付け、このブラケット受座に手摺を取り付
けることを特徴とする手摺取付工法。
4. A handrail mounting method for mounting a handrail on the surface of the first wall material of a wall in which the first wall material and the second wall material are provided at regular intervals, and a mounting hole in the first wall material. The mounting member is inserted between the first wall material and the second wall material through the mounting hole, the tip of the mounting member is the inner surface of the second wall material, and the peripheral side surface of the mounting member is Adhering to the edge surfaces of the mounting holes of the one wall material, respectively, and covering the end surface of the mounting member on the first wall material side with a decorative plate,
A handrail mounting characterized in that the bracket seat is brought into contact with this decorative plate, a screw is screwed into the mounting member from above the bracket seat to attach the bracket seat to the mounting member, and a handrail is attached to the bracket seat. Construction method.
JP26873794A 1994-03-31 1994-11-01 Handrail mounting structure and handrail mounting method Expired - Fee Related JP3022737B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP26873794A JP3022737B2 (en) 1994-03-31 1994-11-01 Handrail mounting structure and handrail mounting method

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP6265094 1994-03-31
JP6-62650 1994-03-31
JP26873794A JP3022737B2 (en) 1994-03-31 1994-11-01 Handrail mounting structure and handrail mounting method

Publications (2)

Publication Number Publication Date
JPH07317264A true JPH07317264A (en) 1995-12-05
JP3022737B2 JP3022737B2 (en) 2000-03-21

Family

ID=26403696

Family Applications (1)

Application Number Title Priority Date Filing Date
JP26873794A Expired - Fee Related JP3022737B2 (en) 1994-03-31 1994-11-01 Handrail mounting structure and handrail mounting method

Country Status (1)

Country Link
JP (1) JP3022737B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10266509A (en) * 1997-03-28 1998-10-06 Nippon Jutaku Panel Kogyo Kyodo Kumiai Fitting backing of hollow member and forming method thereof
JP2009264051A (en) * 2008-04-28 2009-11-12 Asahi Bondo Kogyo Kk Reinforcement device for outer wall in existing wooden building
WO2010030920A3 (en) * 2008-09-11 2010-05-20 Steve Trump Systems and methods for providing structural support and reinforcement

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10266509A (en) * 1997-03-28 1998-10-06 Nippon Jutaku Panel Kogyo Kyodo Kumiai Fitting backing of hollow member and forming method thereof
JP2009264051A (en) * 2008-04-28 2009-11-12 Asahi Bondo Kogyo Kk Reinforcement device for outer wall in existing wooden building
WO2010030920A3 (en) * 2008-09-11 2010-05-20 Steve Trump Systems and methods for providing structural support and reinforcement

Also Published As

Publication number Publication date
JP3022737B2 (en) 2000-03-21

Similar Documents

Publication Publication Date Title
JP3083723B2 (en) Outdoor structures such as gateposts, gate sleeves, walls, etc. and their production methods
US6510667B1 (en) Wall member and method of construction thereof
JPH08189275A (en) Outdoor structure such as gate pillar, gate wing, fence, etc.
JP4535382B2 (en) Reinforcing structure for perforated plate seams
JPH07317264A (en) Structure and method for attaching handrail
KR100845245B1 (en) Carrying out method of panel for outer wall ornamental
JP4149895B2 (en) Thermal insulation structure and construction method
JP4471502B2 (en) Sound insulation lightweight cellular concrete floor structure
JP3621054B2 (en) Book wall mounting method and mounting bracket for external insulation building with reinforced concrete wall structure
JPH10331385A (en) Execution method for decorative laminated sheet and structure containing decorative laminated sheet
JP2011202449A (en) Earthquake-resistant exterior wall structure and method of constructing earthquake-resistant exterior wall
JPH1046786A (en) Installing structure and installing method of interior trim member
KR200469791Y1 (en) Structure for constructing prefabricated bathroom wall
JP2006274698A (en) Partition wall structure
JP2002089002A (en) Handrail fitting structure and method
JPH11181994A (en) Wall face fixing structure for plate type member
JP4146598B2 (en) Insulation structure of unit building and insulation construction method
JP4062244B2 (en) Partition panel
JP2669036B2 (en) Construction method of vertical hollow panel building materials
JP3054727B2 (en) Method and structure for attaching surface finishing material to cement-based molded plate
JP2001227126A (en) Prefabricated frame structure of stair
JP3268182B2 (en) Insulation method
JP2006193911A (en) Tile wall
JPH10331384A (en) Execution method for decorative laminated sheet and structure containing decorative laminated sheet
JP3024637U (en) Interior and exterior materials for buildings

Legal Events

Date Code Title Description
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080114

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090114

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100114

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100114

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110114

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110114

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120114

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130114

Year of fee payment: 13

LAPS Cancellation because of no payment of annual fees