JPH07123552A - Grounding equipment - Google Patents
Grounding equipmentInfo
- Publication number
- JPH07123552A JPH07123552A JP28453093A JP28453093A JPH07123552A JP H07123552 A JPH07123552 A JP H07123552A JP 28453093 A JP28453093 A JP 28453093A JP 28453093 A JP28453093 A JP 28453093A JP H07123552 A JPH07123552 A JP H07123552A
- Authority
- JP
- Japan
- Prior art keywords
- arm
- metal fitting
- power transmission
- receiving
- receiving metal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000002184 metal Substances 0.000 claims abstract description 78
- 230000005540 biological transmission Effects 0.000 claims abstract description 40
- 229910000831 Steel Inorganic materials 0.000 description 5
- 239000010959 steel Substances 0.000 description 5
- 239000012212 insulator Substances 0.000 description 3
- 230000002093 peripheral effect Effects 0.000 description 3
- 238000007689 inspection Methods 0.000 description 2
Landscapes
- Electric Cable Installation (AREA)
Abstract
(57)【要約】
【目的】 操作棒2の上端に受け金具6を設け、受け金
具6にアーム10を取り付け、アーム10を下向きに揺
動させ、アークホーン1、送電線などの送電部品をアー
ム10と受け金具6間に挟み、締め付けるようにした接
地器具において、送電部品がアーム10と受け金具6間
から抜けないようにする。
【構成】 抜け止め金具11がアーム10の下方に配置
され、受け金具6に揺動可能に取り付けられ、操作機構
3,16,17によってアーム10および抜け止め金具
11が操作され、アーム10が下向きに揺動すると同時
に、抜け止め金具11が上向きに揺動し、アークホーン
1、送電線などの送電部品がアーム10と受け金具6間
に挟まれたとき、送電部品の下方において、抜け止め金
具11によってアーム10と受け金具6間が閉じられ、
送電部品がアーム10と受け金具6から抜けるおそれは
ない。
(57) [Abstract] [Purpose] The receiving metal fitting 6 is provided on the upper end of the operating rod 2, the arm 10 is attached to the receiving metal fitting 6, and the arm 10 is swung downward, so that the power transmitting parts such as the arc horn 1 and the power transmission line are attached. In the grounding device which is sandwiched between the arm 10 and the receiving bracket 6 and tightened, the power transmission component is prevented from coming off between the arm 10 and the receiving bracket 6. [Structure] A retaining metal fitting 11 is arranged below the arm 10, is swingably attached to a receiving metal fitting 6, and the operating mechanism 3, 16, 17 operates the arm 10 and the retaining metal fitting 11 so that the arm 10 faces downward. When the power transmission parts such as the arc horn 1 and the power transmission line are sandwiched between the arm 10 and the receiving metal part 6 at the same time when the power transmission parts such as the arc horn 1 and the power transmission line are swung upward, The space between the arm 10 and the bracket 6 is closed by 11,
There is no possibility that the power transmission component will come off from the arm 10 and the receiving member 6.
Description
【0001】[0001]
【産業上の利用分野】この発明は、アークホーン、送電
線などの送電部品に係合させ、送電線に誘起される誘導
電流を逃がす接地器具に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a grounding device that engages with a power transmission component such as an arc horn or a power transmission line to release an induced current induced in the power transmission line.
【0002】[0002]
【従来技術とその問題点】鉄塔に装架されている送電線
については、送電線および付属部品を点検または電気工
事するとき、誘導電流が送電線に誘起されるという問題
がある。したがって、一般に、接地器具によって送電線
の誘導電流を逃がし、その状態で送電線および付属部品
を点検または電気工事しているのは周知のとおりであ
る。普通、鉄塔上において、がいしによって送電線が絶
縁把持され、そのがいしにアークホーンが設けられてお
り、接地器具はアースフックと呼ばれているところのも
ので、アース線を有し、アークホーンに係合させること
ができる。したがって、接地器具をアークホーンに係合
させ、誘導電流をアース線に通し、地上に逃がすことが
できる。2. Description of the Related Art Regarding a power transmission line mounted on a steel tower, there is a problem that an induced current is induced in the power transmission line when the power transmission line and its accessories are inspected or electrical work is performed. Therefore, it is well known that, in general, the grounding device allows the induced current of the power transmission line to escape, and in that state the power transmission line and its accessories are inspected or electrical work is performed. Normally, on a steel tower, an insulator is used to insulate the transmission line, and an arc horn is provided on the insulator.The grounding device is what is called an earth hook. Can be engaged. Therefore, the grounding device can be engaged with the arc horn, and the induced current can be passed through the ground wire to escape to the ground.
【0003】ところで、この接地器具において、作業者
の安全を図るには、点検または電気工事の間、接地器具
がアークホーンから外れないようにする必要がある。こ
のため、従来の接地器具では、その操作棒の上端に受け
金具を設け、受け金具にアームを取り付け、アームを下
向きに揺動させ、アークホーンをアームと受け金具間に
挟み、締め付けていた。しかしながら、アークホーンを
アームと受け金具間に締め付けても、それで万全である
とは限らない。アークホーンがアームと受け金具間から
抜け、接地器具がアークホーンから外れることも考えら
れ、万一、接地器具がアークホーンから外れると、誘導
電流によって感電事故が発生するおそれがある。したが
って、アークホーンがアームと受け金具間から抜けない
ようにし、その安全性を高めることが要望されている。By the way, in order to ensure the safety of the worker with this grounding tool, it is necessary to prevent the grounding tool from coming off the arc horn during inspection or electrical work. Therefore, in the conventional grounding tool, a receiving metal fitting is provided on the upper end of the operating rod, an arm is attached to the receiving metal fitting, the arm is swung downward, and the arc horn is clamped between the arm and the receiving metal fitting. However, even if the arc horn is clamped between the arm and the metal fitting, this is not always the case. It is conceivable that the arc horn may come off between the arm and the metal fitting and the grounding device may come off the arc horn. If the grounding device comes off the arc horn, an induced current may cause an electric shock accident. Therefore, it is required to prevent the arc horn from coming off from between the arm and the receiving metal fitting and to enhance its safety.
【0004】なお、アークホーンに限らず、送電線また
はその他の送電部品がアームと受け金具間に挟まれ、締
め付けられることもある。これによって送電線の誘導電
流を逃がすこともできる。Not only the arc horn but also a power transmission line or other power transmission parts may be clamped by being sandwiched between the arm and the metal fitting. This also allows the induced current in the power transmission line to escape.
【0005】[0005]
【発明の目的】この発明は、操作棒の上端に受け金具を
設け、受け金具にアームを取り付け、アームを下向きに
揺動させ、アークホーン、送電線などの送電部品をアー
ムと受け金具間に挟み、締め付けるようにした接地器具
において、送電部品がアームと受け金具間から抜けない
ようにすることを目的としてなされたものである。SUMMARY OF THE INVENTION An object of the present invention is to provide a receiving metal fitting on the upper end of an operating rod, attach an arm to the receiving metal fitting, and swing the arm downward so that a power transmission component such as an arc horn or a power transmission line is provided between the arm and the metal fitting. The purpose is to prevent the power transmission component from coming off between the arm and the receiving metal fitting in the grounding device that is sandwiched and tightened.
【0006】[0006]
【発明の構成】この発明によれば、抜け止め金具がアー
ムの下方に配置され、受け金具に揺動可能に取り付けら
れ、操作機構によってアームおよび抜け止め金具が操作
され、アームが下向きに揺動すると同時に、抜け止め金
具が上向きに揺動する。したがって、アークホーン、送
電線などの送電部品がアームと受け金具間に挟まれたと
き、送電部品の下方において、抜け止め金具によってア
ームと受け金具間が閉じられ、送電部品がアームと受け
金具から抜けるおそれはない。According to the present invention, the retaining metal is arranged below the arm, is swingably attached to the receiving metal, and the operating mechanism operates the arm and the retaining metal to swing the arm downward. At the same time, the retaining bracket swings upward. Therefore, when a power transmission component such as an arc horn or a power transmission line is sandwiched between the arm and the metal fitting, the retaining metal fitting closes the space between the arm and the metal fitting below the power transmission component, and the power transmission component is separated from the arm and the metal fitting. There is no danger of falling out.
【0007】[0007]
【実施例の説明】以下、この発明の実施例を説明する。Description of Embodiments Embodiments of the present invention will be described below.
【0008】図1において、これは鉄塔上で送電線を絶
縁把持するがいしのアークホーン1に係合させる接地器
具であり、アースフックと呼ばれているところのもの
で、一定長さの操作棒2を有する。図3に示すように、
操作棒2はねじ棒3と組み合わされており、操作棒2の
上端において、ジョイント4によって操作棒2とねじ棒
3が連結され、スプリング5が操作棒2とねじ棒3間に
設けられており、ねじ棒3は傾かないよう弾性支持され
ている。In FIG. 1, this is a grounding tool for engaging an arc horn 1 of an insulator for insulating and gripping a power transmission line on a steel tower, which is called a grounding hook, and has an operating rod of a certain length. Have two. As shown in FIG.
The operating rod 2 is combined with the screw rod 3, the operating rod 2 and the screw rod 3 are connected by a joint 4 at the upper end of the operating rod 2, and the spring 5 is provided between the operating rod 2 and the screw rod 3. The screw rod 3 is elastically supported so as not to tilt.
【0009】さらに、操作棒2の上端に受け金具6が設
けられている。受け金具6は金属板を湾曲させたもの
で、U字状の断面形状であり、一対の開口縁7を有し、
開口縁7は間隔を置いて対向する。さらに、操作棒2の
上端において、そのねじ棒3が受け金具6内に挿入され
ており、ねじ棒3に外周溝8が形成され、ボルト9が受
け金具6に取り付けられ、外周溝8に係合し、これによ
って受け金具6とねじ棒3が連結されている。したがっ
て、受け金具6内において、ボルト9および外周溝8に
よってねじ棒3が案内され、ねじ棒3はその軸心のまわ
りを回転することができる。Further, a receiving fitting 6 is provided on the upper end of the operating rod 2. The bracket 6 is a curved metal plate, has a U-shaped cross section, and has a pair of opening edges 7.
The opening edges 7 are opposed to each other with a space. Further, at the upper end of the operating rod 2, the screw rod 3 is inserted into the receiving metal fitting 6, the outer peripheral groove 8 is formed in the screw rod 3, the bolt 9 is attached to the receiving metal fitting 6, and the outer peripheral groove 8 is engaged. The receiving fitting 6 and the screw rod 3 are connected by this. Therefore, the threaded rod 3 is guided by the bolt 9 and the outer peripheral groove 8 in the receiving fitting 6, and the threaded rod 3 can rotate around its axis.
【0010】さらに、受け金具6にアーム10が取り付
けられ、抜け止め金具11がアーム10の下方に配置さ
れ、受け金具6に取り付けられている。アーム10と受
け金具6については、受け金具6の開口縁7において、
アーム10の一端が受け金具6内に挿入され、ボルト1
2によってアーム10と受け金具6が連結されており、
アーム10はボルト12のまわりを揺動することができ
る。抜け止め金具11についても、受け金具6の開口縁
7において、抜け止め金具11の一端が受け金具6内に
挿入され、ボルト13によって抜け止め金具11と受け
金具6が連結されており、抜け止め金具11はボルト1
3のまわりを揺動することができる。さらに、ボルト1
3のまわりにスプリング14が設けられ、その一端が受
け金具6に係合し、他端が抜け止め金具11に係合して
おり、抜け止め金具11は図1の反時計方向に弾性付勢
されている。なお、図2に示すように、アーム10は2
又のもので、一対の分岐端15を有し、抜け止め金具1
1は各分岐端15間に位置している。Further, the arm 10 is attached to the receiving metal 6, and the retaining metal 11 is disposed below the arm 10 and attached to the receiving metal 6. Regarding the arm 10 and the receiving bracket 6, at the opening edge 7 of the receiving bracket 6,
One end of the arm 10 is inserted into the bracket 6 and the bolt 1
The arm 10 and the receiving metal 6 are connected by 2,
The arm 10 can swing around the bolt 12. With respect to the retaining metal member 11, one end of the retaining metal member 11 is inserted into the receiving metal member 6 at the opening edge 7 of the receiving metal member 6, and the retaining metal member 11 and the receiving metal member 6 are connected by the bolt 13 to prevent the retaining metal member 11. Metal fitting 11 is bolt 1
3 can be swung around. In addition, bolt 1
3, a spring 14 is provided around one end of the spring 14, one end of which is engaged with the receiving metal fitting 6, and the other end of which is engaged with the retaining metal fitting 11. The retaining metal fitting 11 is elastically biased counterclockwise in FIG. Has been done. In addition, as shown in FIG.
It also has a pair of branch ends 15 and is a retaining metal fitting 1
1 is located between each branch end 15.
【0011】さらに、アーム10および抜け止め金具1
1の操作機構としてターンバックルが使用され、ねじ棒
3に右ねじおよび左ねじ部分が形成され、受け金具6内
において、上側および下側ナット部材16,17が右ね
じおよび左ねじ部分にねじ合わされている。上側ナット
部材16はアーム10を揺動させるためのものであり、
下側ナット部材17は抜け止め金具11を揺動させるた
めのものである。アーム10と上側ナット部材16につ
いては、上側ナット部材16の上端において、その左右
両側に一対の係合溝18が形成され、アーム10の一端
に一対の突起19が形成され、各突起19が各係合溝1
8に挿入されている。抜け止め金具11と下側ナット部
材17については、抜け止め金具11の一端に一定長さ
の端面20が形成されており、後述するように、抜け止
め金具11の端面20が下側ナット部材17の下面21
および側面22に係合する。Further, the arm 10 and the retaining metal fitting 1
A turnbuckle is used as the operation mechanism of 1, the right and left threaded portions are formed on the threaded rod 3, and the upper and lower nut members 16 and 17 are screwed into the right and left threaded portions in the receiving metal fitting 6. ing. The upper nut member 16 is for swinging the arm 10,
The lower nut member 17 is for swinging the retaining fitting 11. Regarding the arm 10 and the upper nut member 16, at the upper end of the upper nut member 16, a pair of engaging grooves 18 are formed on both left and right sides thereof, a pair of protrusions 19 are formed at one end of the arm 10, and each protrusion 19 is Engagement groove 1
It is inserted in 8. With respect to the retaining metal fitting 11 and the lower nut member 17, an end surface 20 of a constant length is formed at one end of the retaining metal fitting 11, and as will be described later, the end surface 20 of the retaining metal fitting 11 has the lower nut member 17. Lower surface 21
And engage the side surface 22.
【0012】また、この接地器具は送電線に誘起される
誘導電流を逃がすアース線(図示せず)を有し、アース
線は受け金具6に取り付けられ、接続される。Further, this grounding device has a ground wire (not shown) for escaping the induced current induced in the power transmission line, and the ground wire is attached to and connected to the receiving metal fitting 6.
【0013】したがって、この接地器具において、鉄塔
の電線を電気工事するとき、操作棒2を一方向に回転さ
せると、ねじ棒3が操作棒2と一体的に回転し、そのね
じ送り作用によって上側ナット部材16が下降する。し
たがって、上側ナット部材16の係合溝18によってア
ーム10の突起19が引き下げられ、ボルト12のまわ
りにおいて、アーム10が上向きに揺動する。これと同
時に、ねじ棒3のねじ送り作用によって下側ナット部材
17が上昇し、それにともない、ボルト13のまわりに
おいて、抜け止め金具11が下向きに揺動し、その端面
20が下側ナット部材17の下面21に係合する。さら
に、スプリング14が抜け止め金具11に作用し、抜け
止め金具11は下側ナット部材17の下面21に係合し
た状態に保たれる。したがって、鉄塔付近において、操
作棒2によって受け金具6を移動させ、受け金具6をア
ークホーン1に係合させ、アークホーン1をアーム10
と受け金具6間に位置させることができる。Therefore, in this grounding device, when the electric wire of the steel tower is electrically constructed, when the operating rod 2 is rotated in one direction, the screw rod 3 rotates integrally with the operating rod 2, and the screw feeding action causes the screw rod 3 to move upward. The nut member 16 descends. Therefore, the protrusion 19 of the arm 10 is pulled down by the engagement groove 18 of the upper nut member 16, and the arm 10 swings upward around the bolt 12. At the same time, the lower nut member 17 is raised by the screw feeding action of the screw rod 3, and accordingly, the retaining metal fitting 11 swings downward around the bolt 13, and the end face 20 of the retaining metal fitting 11 swings downward. Engage the lower surface 21 of the. Further, the spring 14 acts on the retaining metal 11, and the retaining metal 11 is kept in engagement with the lower surface 21 of the lower nut member 17. Therefore, in the vicinity of the steel tower, the receiving metal fitting 6 is moved by the operating rod 2, the receiving metal fitting 6 is engaged with the arc horn 1, and the arc horn 1 is moved to the arm 10.
And the metal fitting 6 can be positioned.
【0014】その後、操作棒2を逆方向に回転させる
と、ねじ棒3が操作棒2と一体的に回転し、そのねじ送
り作用によって上側ナット部材16が上昇し、その係合
溝18によってアーム10の突起19が押し上げられ
る。したがって、ボルト12のまわりにおいて、アーム
10が下向きに揺動し、アークホーン1がアーム10と
受け金具6間に挟まれ、締め付けられる。これと同時
に、ねじ棒3のねじ送り作用によって下側ナット部材1
7が下降し、その下面21によって抜け止め金具11の
端面20が押し下げられる。したがって、ボルト13の
まわりにおいて、抜け止め金具11が上向きに揺動し、
アークホーン1がアーム10と受け金具6間に挟まれた
とき、アークホーン1の下方において、抜け止め金具1
1によってアーム10と受け金具6間が閉じられ、抜け
止め金具11はアーム10の分岐端15間に挿入され
る。なお、抜け止め金具11が上向きに揺動すると、そ
の端面20が下側ナット部材17の側面22に係合し、
その後、下側ナット部材17が下降しても、抜け止め金
具11はそれ以上揺動しない。Thereafter, when the operating rod 2 is rotated in the opposite direction, the screw rod 3 rotates integrally with the operating rod 2, and the upper nut member 16 is raised by the screw feeding action thereof, and the engaging groove 18 causes the arm to move. The protrusion 19 of 10 is pushed up. Therefore, the arm 10 swings downward around the bolt 12, and the arc horn 1 is sandwiched between the arm 10 and the receiving metal fitting 6 and tightened. At the same time, by the screw feeding action of the screw rod 3, the lower nut member 1
7, the lower surface 21 pushes down the end surface 20 of the retaining metal fitting 11. Therefore, the retaining fitting 11 swings upward around the bolt 13,
When the arc horn 1 is sandwiched between the arm 10 and the receiving metal fitting 6, the retaining metal fitting 1 is provided below the arc horn 1.
The arm 10 and the receiving metal fitting 6 are closed by 1, and the retaining metal fitting 11 is inserted between the branch ends 15 of the arm 10. When the retaining metal fitting 11 swings upward, its end surface 20 engages with the side surface 22 of the lower nut member 17,
After that, even if the lower nut member 17 descends, the retaining fitting 11 does not swing any further.
【0015】したがって、送電線の誘導電流を受け金具
6およびアース線に通し、地上に逃がすことができ、そ
の状態で送電線および付属部品を点検または電気工事す
ることができる。しかも、この接地器具の場合、アーク
ホーン1がアーム10と受け金具6間に挟まれ、締め付
けられるだけではなく、アークホーン1の下方におい
て、抜け止め金具11によってアーム10と受け金具6
間が閉じられ、点検または電気工事の間、アークホーン
1がアーム10と受け金具6間から抜けるおそれはな
い。したがって、接地器具がアークホーン1から外れ
ず、安全である。Therefore, the induced current of the power transmission line can be passed through the metal fitting 6 and the ground wire and allowed to escape to the ground, and in that state, the power transmission line and accessory parts can be inspected or electrically constructed. Moreover, in the case of this grounding device, the arc horn 1 is not only sandwiched between the arm 10 and the receiving metal fitting 6 and tightened, but also the arm 10 and the receiving metal fitting 6 are provided below the arc horn 1 by the retaining metal fitting 11.
The space is closed, and there is no possibility that the arc horn 1 will come off between the arm 10 and the bracket 6 during inspection or electrical work. Therefore, the grounding tool does not come off from the arc horn 1 and is safe.
【0016】なお、アークホーン1に限らず、送電線を
アーム10と受け金具6間に挟み、締め付け、これによ
って送電線の誘導電流を逃がすこともできる。その他の
送電部品をアーム10と受け金具6間に挟み、締め付け
ることもできる。Not only the arc horn 1, but also a transmission line can be sandwiched between the arm 10 and the receiving metal 6 and tightened to release the induced current of the transmission line. It is also possible to clamp other power transmission parts by sandwiching them between the arm 10 and the receiving metal fitting 6.
【0017】[0017]
【発明の効果】以上説明したように、この発明によれ
ば、アークホーン1、送電線などの送電部品がアーム1
0と受け金具6間に挟まれたとき、送電部品の下方にお
いて、抜け止め金具11によってアーム10と受け金具
6間が閉じられ、送電部品がアーム10と受け金具6間
から抜けるおそれはない。したがって、接地器具が送電
部品から外れず、安全であり、所期の目的を達成するこ
とができるものである。As described above, according to the present invention, the power transmission parts such as the arc horn 1 and the power transmission line are connected to the arm 1.
When sandwiched between 0 and the receiving fitting 6, the retaining fitting 11 closes the arm 10 and the receiving fitting 6 below the power transmitting component, and there is no possibility that the power transmitting component will come off between the arm 10 and the receiving fixture 6. Therefore, the grounding device does not come off from the power transmission component, is safe, and can achieve the intended purpose.
【図1】この発明の実施例を示す側面図である。FIG. 1 is a side view showing an embodiment of the present invention.
【図2】図1の接地器具の正面図である。FIG. 2 is a front view of the grounding device of FIG.
【図3】図1の操作棒とねじ棒の関係を示す側面図であ
る。FIG. 3 is a side view showing the relationship between the operation rod and the screw rod of FIG.
1 アークホーン 2 操作棒 3 ねじ棒 6 受け金具 10 アーム 11 抜け止め金具 16 上側ナット部材 17 下側ナット部材 1 arc horn 2 operation rod 3 screw rod 6 receiving metal fitting 10 arm 11 retaining metal fitting 16 upper nut member 17 lower nut member
───────────────────────────────────────────────────── フロントページの続き (72)発明者 中川和彦 愛知県名古屋市港区千年3−1−32 株式 会社トーエネック本店別館内 (72)発明者 砂崎道夫 京都府京都市山科区四ノ宮岩久保町11番地 株式会社砂崎製作所内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Kazuhiko Nakagawa Inventor, Kazuhiko Nakagawa 3-1-32, Millennial, Minato-ku, Aichi Prefecture Toeneck Co., Ltd.Annex (72) Inventor Michio Sunasaki Ishinokubo, Ishinokubo, Yamashina-ku, Kyoto-shi, Kyoto 11 Address: Sunazaki Manufacturing Co., Ltd.
Claims (1)
け金具にアームを取り付け、前記アームを下向きに揺動
させ、アークホーン、送電線などの送電部品を前記アー
ムと前記受け金具間に挟み、締め付けるようにした接地
器具において、 前記アームの下方に配置され、前記受け金具に揺動可能
に取り付けられた抜け止め金具と、 前記アームを下向きに揺動させると同時に、前記抜け止
め金具を上向きに揺動させる操作機構とを備え、 前記送電部品が前記アームと前記受け金具間に挟まれた
とき、前記送電部品の下方において、前記抜け止め金具
によって前記アームと前記受け金具間が閉じられ、前記
送電部品が前記アームと前記受け金具間から抜けないよ
うにしたことを特徴とする接地器具。1. A receiving metal fitting is provided on an upper end of an operating rod, an arm is attached to the receiving metal fitting, the arm is swung downward, and a power transmitting component such as an arc horn or a power transmission line is provided between the arm and the receiving metal fitting. In a grounding device that is sandwiched and tightened, a retaining member that is disposed below the arm and is swingably attached to the receiving member, and the arm is pivoted downward, and at the same time, the retaining member is An operating mechanism for swinging upward, and when the power transmission component is sandwiched between the arm and the receiving metal fitting, the arm and the receiving metal fitting are closed below the power transmission component by the retaining metal fitting. A grounding device characterized in that the power transmission component is prevented from coming off between the arm and the receiving metal fitting.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP28453093A JPH07123552A (en) | 1993-10-18 | 1993-10-18 | Grounding equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP28453093A JPH07123552A (en) | 1993-10-18 | 1993-10-18 | Grounding equipment |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH07123552A true JPH07123552A (en) | 1995-05-12 |
Family
ID=17679667
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP28453093A Pending JPH07123552A (en) | 1993-10-18 | 1993-10-18 | Grounding equipment |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH07123552A (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2009077592A (en) * | 2007-09-21 | 2009-04-09 | Sumiden Asahi Industries Ltd | Grounding tool |
| CN102456957A (en) * | 2010-10-28 | 2012-05-16 | 河南省电力公司濮阳供电公司 | Ground wire clamp |
| CN109216964A (en) * | 2018-10-28 | 2019-01-15 | 中国南方电网有限责任公司超高压输电公司南宁局 | Controllable type run-resistant high-voltage electric power circuit grounding wire device |
| CN110768034A (en) * | 2019-11-25 | 2020-02-07 | 广州供电局有限公司 | High-voltage grounding rod |
| CN111585068A (en) * | 2020-05-11 | 2020-08-25 | 国网新疆电力有限公司检修公司 | Ground wire anti-falling device with dual locking function |
| CN113690647A (en) * | 2021-08-31 | 2021-11-23 | 国网河南省电力公司濮阳供电公司 | An anti-loosening type grounding wire self-locking clip hook wire clip and its working method |
| CN114759373A (en) * | 2022-03-21 | 2022-07-15 | 国网河北省电力有限公司保定供电分公司 | Grounding device |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5578720A (en) * | 1978-12-12 | 1980-06-13 | Nisshoku Corp | Disposal of spring water at face of slope |
| JPS6149607A (en) * | 1984-08-11 | 1986-03-11 | 東北電気工事株式会社 | Temporary wiring method and device |
-
1993
- 1993-10-18 JP JP28453093A patent/JPH07123552A/en active Pending
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5578720A (en) * | 1978-12-12 | 1980-06-13 | Nisshoku Corp | Disposal of spring water at face of slope |
| JPS6149607A (en) * | 1984-08-11 | 1986-03-11 | 東北電気工事株式会社 | Temporary wiring method and device |
Cited By (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2009077592A (en) * | 2007-09-21 | 2009-04-09 | Sumiden Asahi Industries Ltd | Grounding tool |
| CN102456957A (en) * | 2010-10-28 | 2012-05-16 | 河南省电力公司濮阳供电公司 | Ground wire clamp |
| CN109216964A (en) * | 2018-10-28 | 2019-01-15 | 中国南方电网有限责任公司超高压输电公司南宁局 | Controllable type run-resistant high-voltage electric power circuit grounding wire device |
| CN109216964B (en) * | 2018-10-28 | 2023-10-17 | 中国南方电网有限责任公司超高压输电公司南宁局 | Controllable anti-drop high-voltage power line grounding wire device |
| CN110768034A (en) * | 2019-11-25 | 2020-02-07 | 广州供电局有限公司 | High-voltage grounding rod |
| CN111585068A (en) * | 2020-05-11 | 2020-08-25 | 国网新疆电力有限公司检修公司 | Ground wire anti-falling device with dual locking function |
| CN111585068B (en) * | 2020-05-11 | 2021-09-07 | 国网新疆电力有限公司检修公司 | A ground wire anti-dropping device with double locking function |
| CN113690647A (en) * | 2021-08-31 | 2021-11-23 | 国网河南省电力公司濮阳供电公司 | An anti-loosening type grounding wire self-locking clip hook wire clip and its working method |
| CN113690647B (en) * | 2021-08-31 | 2024-02-06 | 国网河南省电力公司濮阳供电公司 | Anti-loosening type self-locking clip hook clamp for grounding wire and working method thereof |
| CN114759373A (en) * | 2022-03-21 | 2022-07-15 | 国网河北省电力有限公司保定供电分公司 | Grounding device |
| CN114759373B (en) * | 2022-03-21 | 2025-03-18 | 国网河北省电力有限公司保定供电分公司 | Grounding device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US5427538A (en) | Electrical connecting system | |
| CA2189578C (en) | Hinged electrical connector | |
| US5581051A (en) | Power line isolator | |
| US2775422A (en) | Combination hanger and clamp | |
| US3761865A (en) | Safety device for cables supporting electrical wires | |
| US11817665B2 (en) | Spring loaded ground clamp | |
| JPH07123552A (en) | Grounding equipment | |
| US4097108A (en) | Hot line clamps | |
| US4383668A (en) | Cable clamp | |
| JP2002262421A (en) | Hook for wire grounding | |
| US4814550A (en) | Power line isolating apparatus and method | |
| US5679032A (en) | Strain relief device for clamp assembly | |
| US6899552B1 (en) | Gripping and locking electrical grounding device for single and multiphase electrical equipment | |
| KR102011918B1 (en) | Live wire bypass device for transmission lines | |
| US20020090847A1 (en) | Ground connector | |
| JP3355507B2 (en) | Installation tool for wire clamp type equipment | |
| KR20020021580A (en) | An electric wire fixing apparatus | |
| JP6857901B2 (en) | Strap push-up tool | |
| JP3799460B2 (en) | Divided hardware | |
| JPH05252627A (en) | Terminal clamper for wire insulation protective tube | |
| KR790002015Y1 (en) | Support tool for live wire operations | |
| JPH0746735A (en) | Holding jig for compression | |
| US2438121A (en) | Tool for applying fuse links to fused cutouts | |
| JP2857271B2 (en) | Interphase spacer | |
| KR200214341Y1 (en) | An electric wire fixing apparatus |