Corridor structure

Info

Publication number
JPH0637124Y2
JPH0637124Y2 JP11925190U JP11925190U JPH0637124Y2 JP H0637124 Y2 JPH0637124 Y2 JP H0637124Y2 JP 11925190 U JP11925190 U JP 11925190U JP 11925190 U JP11925190 U JP 11925190U JP H0637124 Y2 JPH0637124 Y2 JP H0637124Y2
Authority
JP
Japan
Prior art keywords
corridor
floor
pair
brace
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP11925190U
Other languages
Japanese (ja)
Other versions
JPH0475002U (en
Inventor
豊久 三宅
Original Assignee
ナショナル住宅産業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ナショナル住宅産業株式会社 filed Critical ナショナル住宅産業株式会社
Priority to JP11925190U priority Critical patent/JPH0637124Y2/en
Publication of JPH0475002U publication Critical patent/JPH0475002U/ja
Application granted granted Critical
Publication of JPH0637124Y2 publication Critical patent/JPH0637124Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Floor Finish (AREA)
  • Joining Of Building Structures In Genera (AREA)

Description

【考案の詳細な説明】 〔産業上の利用分野〕 この考案は、集合住宅の2階外廊下等における廊下構造
に関するものである。
[Detailed Description of the Invention] [Industrial Application Field] The present invention relates to a corridor structure in an outer corridor or the like on the second floor of an apartment house.

〔従来の技術〕[Conventional technology]

従来、集合住宅の2階外廊下は、廊下の幅方向に渡って
複数本の床受梁を渡し、これら床受梁にて並設した複数
枚の床パネルを支持してなり、床パネルの下面にはあら
かじめ補強用のブレースを配設しておく。
Conventionally, an outer corridor on the second floor of an apartment house has a plurality of floor beams across the width of the corridor and supports a plurality of floor panels arranged in parallel by these floor beams. Reinforcing braces are placed on the lower surface in advance.

〔考案が解決しようとする課題〕[Problems to be solved by the device]

従来の外廊下の場合、隣接する一対の床パネルの隣接側
端部は、一本の床受梁に載置してあり、床パネルの支持
面積が小さく、支持が不安定であった。さらに、ブレー
スの取付けは、床受梁の固定とは別に、ブレース取付用
の接合金物にて行っており、部品点数が多くなるという
問題があった。
In the case of a conventional corridor, the adjacent side ends of a pair of floor panels adjacent to each other are placed on a single floor beam, and the floor panel has a small support area, resulting in unstable support. Furthermore, the brace is attached by using a metal fitting for attaching the brace in addition to the fixing of the floor beam, which causes a problem of increasing the number of parts.

したがって、この考案の目的は、廊下床パネルの支持が
安定し、かつ部品点数の削減が図れる廊下構造を提供す
ることである。
Therefore, an object of this invention is to provide a corridor structure in which the support of the corridor floor panel is stable and the number of parts can be reduced.

〔課題を解決するための手段〕[Means for Solving the Problems]

この考案の廊下構造は、廊下の側方に立設した柱と、こ
の柱の廊下側の側面に固定したウェブ片とこのウェブ片
の両端に廊下の中央方向に突出して設けた一対のフラン
ジ片とからなるコ字形部とこのコ字形部の下端に接合し
ブレース取付孔を有した水平部とからなる床受材取付部
材と、前記一対のフランジ片に固定して廊下の幅方向に
渡って設けた一対の廊下床受梁と、前記ブレース取付孔
に固定して廊下に水平配置したブレースと、隣接側端部
近傍をそれぞれ前記一対の廊下床受梁に載置した一対の
廊下床パネルとを備えたものである。
The corridor structure of the present invention comprises a pillar standing on the side of the corridor, a web piece fixed to the side surface of the pillar on the corridor side, and a pair of flange pieces provided at both ends of the web piece so as to project toward the center of the corridor. A floor support mounting member consisting of a U-shaped part consisting of and a horizontal part joined to the lower end of the U-shaped part and having a brace mounting hole, and fixed to the pair of flange pieces and extending across the width of the corridor. A pair of corridor floor beams provided, a brace fixed in the brace mounting hole and horizontally arranged in the corridor, and a pair of corridor floor panels mounted on the pair of corridor floor beams in the vicinity of adjacent side ends, respectively. It is equipped with.

〔作用〕[Action]

この考案の廊下構造によると、床受材取付部材に一対の
廊下床受梁を固定し、これら一対の廊下床受梁にそれぞ
れ隣接する一対の廊下床パネルの端部近傍をを載置した
ので、各廊下床パネルの支持が確実に行える。また、廊
下床受梁を固定する床受材取付部材に、ブレース取付孔
を有した水平部を一体に形成したので、部品点数の削減
が図れる。
According to the corridor structure of the present invention, the pair of corridor floor beams are fixed to the floor support member mounting member, and the ends of the pair of corridor floor panels adjacent to the pair of corridor floor beams are placed. , The corridor floor panels can be reliably supported. Further, since the floor support material mounting member for fixing the corridor floor support beam is integrally formed with the horizontal portion having the brace mounting hole, the number of parts can be reduced.

〔実施例〕〔Example〕

この考案の一実施例を第1図および第2図に基づいて説
明する。
An embodiment of the present invention will be described with reference to FIGS. 1 and 2.

第2図は、集合住宅の2階外廊下部分の平面図を示して
いる。図において、10は外廊下、11は踊場、12は階段で
ある。13は建物本体の外壁に沿って立設した本体柱であ
り、本体柱13,13間にラチス梁14が架設してある。ま
た、屋外側には廊下柱15が立設されており、廊下柱15,1
5間には廊下梁16が架設してある。ラチス梁14と廊下梁1
6との間には廊下床受梁17が架設してある。さらに、34
は廊下梁、35はラチス梁、18は廊下床受梁、19,24は踊
場梁、20は階段取付梁、21は階段側桁、22は階段踏板受
である。
FIG. 2 shows a plan view of the outer corridor on the second floor of the apartment house. In the figure, 10 is an outer corridor, 11 is a landing, and 12 is a staircase. Reference numeral 13 is a main body pillar standing along the outer wall of the building main body, and a lattice beam 14 is installed between the main body pillars 13 and 13. In addition, a corridor pillar 15 is erected on the outdoor side.
A corridor beam 16 is installed between the five. Lattice beams 14 and corridor beams 1
A corridor floor beam 17 is installed between 6 and 6. In addition, 34
Is a corridor beam, 35 is a lattice beam, 18 is a corridor floor beam, 19 and 24 are landing beams, 20 is a stair mounting beam, 21 is a stair-side girder, and 22 is a stair tread.

第2図のA部分の平面図を第1図(A)、B−B断面図
を(B)、C−C断面図を(C)に示す。第1図におい
て、23は床受材取付部材であり、コ字形部25と、コ字形
部25の下端に固着した水平部26とから成る。コ字形部25
のウェブ片27は本体柱13の廊下側面にボルト・ナット28
にて固定し、また両フランジ片29,29には廊下床受梁17
がボルト・ナット30にて固定してある。さらに、水平部
26の両端には一対のブレース取付孔31,31が形成されて
おり、ブレース取付孔31には、廊下の対角線上に水平に
延びるブレース32(第2図)が接続される。そして、床
受材取付部材23に固定した廊下床受梁17,17に、各々廊
下床パネル33,33の端部近傍を載置して、隣接する一対
の廊下床パネル33,33を廊下床受梁17等に接合する。
A plan view of a portion A in FIG. 2 is shown in FIG. 1 (A), a BB sectional view is shown in (B), and a CC sectional view is shown in (C). In FIG. 1, reference numeral 23 denotes a floor support mounting member, which comprises a U-shaped portion 25 and a horizontal portion 26 fixed to the lower end of the U-shaped portion 25. U-shaped part 25
The web pieces 27 of the bolts and nuts 28 are
Fixed on both sides, and on both flange pieces 29, 29 the corridor floor beam 17
Are fixed with bolts and nuts 30. Furthermore, the horizontal part
A pair of brace mounting holes 31 and 31 are formed at both ends of 26, and a brace 32 (FIG. 2) horizontally extending on a diagonal line of the corridor is connected to the brace mounting hole 31. Then, on the corridor floor beams 17 and 17 fixed to the floor support mounting member 23, the vicinity of the end portions of the corridor floor panels 33 and 33 are placed, respectively, and a pair of adjacent corridor floor panels 33 and 33 is installed. Joined to the beam 17, etc.

このように構成された廊下構造によると、隣接する一対
の廊下床パネル33,33は、端部近傍をそれぞれ別々の廊
下床受梁17,17に載置して設けられており、廊下床パネ
ル33,33が多少ずれても廊下床受梁17,17から落下せず、
支持が安定する。
According to the corridor structure configured in this way, the pair of adjacent corridor floor panels 33, 33 are provided with the vicinity of the ends placed on separate corridor floor receiving beams 17, 17, respectively. Even if 33,33 is slightly displaced, it does not fall from the corridor floor beams 17,17,
Support is stable.

また、廊下床受梁17を固定する床受材取付部材23に、ブ
レース取付孔31を有した水平部26を一対に形成したの
で、従来のようにブレース取付用の新たな金物が不要で
あり、部品点数の削減が図れる。
In addition, since the floor support material mounting member 23 for fixing the corridor floor support beam 17 is formed with a pair of horizontal portions 26 having the brace mounting holes 31, there is no need for a new hardware for mounting the brace unlike the conventional case. The number of parts can be reduced.

〔考案の効果〕[Effect of device]

この考案の廊下構造によると、床受材取付部材に一対の
廊下床受梁を固定し、これら一対の廊下床受梁にそれぞ
れ隣接する一対の廊下床パネルの端部近傍をを載置した
ので、各廊下床パネルの支持が確実に行える。また、廊
下床受梁を固定する床受材取付部材に、ブレース取付孔
を有した水平部を一体に形成したので、部品点数の削減
が図れるという効果が得られる。
According to the corridor structure of the present invention, the pair of corridor floor beams are fixed to the floor support member mounting member, and the ends of the pair of corridor floor panels adjacent to the pair of corridor floor beams are placed. , The corridor floor panels can be reliably supported. Further, since the horizontal portion having the brace attachment hole is integrally formed with the floor support attachment member for fixing the corridor floor support beam, the number of parts can be reduced.

【図面の簡単な説明】[Brief description of drawings]

第1図(A),(B),(C)はこの考案の一実施例の
平面図,断面図,断面図、第2図はその集合住宅におけ
る外廊下の平面図である。 13……本体柱、17……廊下床受梁、23……床受材取付部
材、25……コ字形部、26……水平部、27……ウェブ片、
29……フランジ片、31……ブレース取付孔、32……ブレ
ース、33……廊下床パネル
1 (A), (B) and (C) are a plan view, a sectional view and a sectional view of an embodiment of the present invention, and FIG. 2 is a plan view of an outer corridor in the apartment house. 13 …… Main body pillar, 17 …… Corridor floor beam, 23 …… Floor support material mounting member, 25 …… U-shaped part, 26 …… Horizontal part, 27 …… Web piece,
29 …… Flange piece, 31 …… Brace mounting hole, 32 …… Brace, 33 …… Corridor floor panel

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】廊下の側方に立設した柱と、この柱の廊下
側の側面に固定したウェブ片とこのウェブ片の両端に廊
下の中央方向に突出して設けた一対のフランジ片とから
なるコ字形部とこのコ字形部の下端に接合しブレース取
付孔を有した水平部とからなる床受材取付部材と、前記
一対のフランジ片に固定して廊下の幅方向に渡って設け
た一対の廊下床受梁と、前記ブレース取付孔に固定して
廊下に水平配置したブレースと、隣接側端部近傍をそれ
ぞれ前記一対の廊下床受梁に載置した一対の廊下床パネ
ルとを備えた廊下構造。
1. A pillar standing upright on a side of a corridor, a web piece fixed to a side surface of the pillar on the corridor side, and a pair of flange pieces provided at both ends of the web piece so as to project toward the center of the corridor. And a floor supporting material mounting member consisting of a U-shaped part and a horizontal part joined to the lower end of the U-shaped part and having a brace mounting hole, and fixed to the pair of flange pieces and provided across the width of the corridor. A pair of corridor floor beams, a brace fixed in the brace mounting holes and horizontally arranged in the corridor, and a pair of corridor floor panels mounted on the pair of corridor floor beams in the vicinity of adjacent side ends. Corridor structure.
JP11925190U 1990-11-13 1990-11-13 Corridor structure Expired - Lifetime JPH0637124Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11925190U JPH0637124Y2 (en) 1990-11-13 1990-11-13 Corridor structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11925190U JPH0637124Y2 (en) 1990-11-13 1990-11-13 Corridor structure

Publications (2)

Publication Number Publication Date
JPH0475002U JPH0475002U (en) 1992-06-30
JPH0637124Y2 true JPH0637124Y2 (en) 1994-09-28

Family

ID=31867219

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11925190U Expired - Lifetime JPH0637124Y2 (en) 1990-11-13 1990-11-13 Corridor structure

Country Status (1)

Country Link
JP (1) JPH0637124Y2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021031890A (en) * 2019-08-20 2021-03-01 新東化成株式会社 Support member to support treadboard member, catwalk, stair landing, catwalk installation method, and stair landing installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021031890A (en) * 2019-08-20 2021-03-01 新東化成株式会社 Support member to support treadboard member, catwalk, stair landing, catwalk installation method, and stair landing installation method

Also Published As

Publication number Publication date
JPH0475002U (en) 1992-06-30

Similar Documents

Publication Publication Date Title
JPH0637124Y2 (en) Corridor structure
JPH0637126Y2 (en) Corridor structure
JPH0637125Y2 (en) Corridor structure
JPH0516330Y2 (en)
JP2829258B2 (en) Mounting structure for decorative panels
JPH06180052A (en) Landing structure of stairway
JP2565042Y2 (en) Stair railing support structure
JPH0340972Y2 (en)
JPH0711229Y2 (en) Stair stop structure
JPH0752241Y2 (en) Balcony support structure
JPS6217527Y2 (en)
JP2957959B2 (en) Horizontal brace mounting structure
JP3712611B2 (en) balcony
JPS587843Y2 (en) balcony
JPS6237882Y2 (en)
JPH0441746B2 (en)
JP2597479Y2 (en) Mounting structure of the gabled roof panel
JPH0523692Y2 (en)
JPH0727305Y2 (en) Prefabricated wall panel upper connection structure
JPH0443524Y2 (en)
JPH0334429Y2 (en)
JPH076248Y2 (en) Balcony assembly structure
JPS6132236Y2 (en)
JPS6311203Y2 (en)
JPH0334428Y2 (en)