JPH06214973A - Energy infrastructure plan supporting system - Google Patents

Energy infrastructure plan supporting system

Info

Publication number
JPH06214973A
JPH06214973A JP23035091A JP23035091A JPH06214973A JP H06214973 A JPH06214973 A JP H06214973A JP 23035091 A JP23035091 A JP 23035091A JP 23035091 A JP23035091 A JP 23035091A JP H06214973 A JPH06214973 A JP H06214973A
Authority
JP
Japan
Prior art keywords
energy
system
calculation
planning
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP23035091A
Other languages
Japanese (ja)
Inventor
Takashi Fukumura
Toshimasa Itaya
Masaharu Kanejima
Hisato Tadokoro
Jun Uchida
Akira Yashio
彰 八塩
純 内田
敏正 板谷
久人 田所
貴司 福村
正治 金島
Original Assignee
Shimizu Corp
清水建設株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp, 清水建設株式会社 filed Critical Shimizu Corp
Priority to JP23035091A priority Critical patent/JPH06214973A/en
Publication of JPH06214973A publication Critical patent/JPH06214973A/en
Application status is Pending legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2219/00Indexing scheme relating to application aspects of data processing equipment or methods
    • G06F2219/10Environmental application, e.g. waste reduction, pollution control, compliance with environmental legislation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • Y02P90/82Energy audits or management systems therefor

Abstract

PURPOSE:To attain the total evaluation of local energy infrastructure by simply simulation-evaluating an energy quantity and a material quantity supplied and discharged in a planning region and waste heat recovery and recycle in the region. CONSTITUTION:This system is provided with map information 2 of layer structure, which is divided by each piece of information, a planning condition input means 1 for inputting region planning conditions, such as the region, a zone, an area, buildings, etc., on a map by displaying the map information, unit requirement data 4 for calculating an energy demand quantity in the planning region and the available quantity of city exhaust heat in the region to be utilized and a demand quantity calculating means 3 for calculating the energy demand quantity, a garbage generated quantity, etc., by each system based on unit requirement data and the planning condition. Besides, the system is also provided with calculation data 5 such as the energy demand quantity in the planned region, etc., master data 7 and 9 for an equipment used in an energy providing system in the planned region and simulation calculation, a system input means 6 for inputting the specification, the operating method, etc., for the system and a calculation means 8 for executing simulation by calculation.

Description

【発明の詳細な説明】 DETAILED DESCRIPTION OF THE INVENTION

【0001】 [0001]

【産業上の利用分野】本発明は、開発計画地域のエネルギー量や物質量、廃熱利用、リサイクルをシミュレーション評価するエネルギーインフラ計画支援システムに関する。 The present invention relates to the amount of energy and the amount of substance of the development plan area, waste heat utilization, on energy infrastructure planning support system to simulate evaluate the recycling.

【0002】 [0002]

【従来の技術】図6はエネルギーインフラ施設の評価概念図である。 Description of the Prior Art FIG. 6 is an evaluation conceptual view of energy infrastructure facilities.

【0003】電力需要の増加傾向は依然として続いている一方、電力供給量の動向は原子力発電の安全性の問題等から新設が頭打ちとなり、近年では夏期の電力需要ピーク時には電力需給が逼迫した状況を呈している。 [0003] While the trend of increasing power demand is still followed, trends in the power supply amount is made new from the like of the safety of nuclear power generation problem is leveled off, a situation in which the power supply and demand was tight at the time of summer power demand peak in recent years and exhibits.

【0004】また、都市の過密化に伴って、都市における水、電力、熱、ガス、ゴミ等の需要は膨大になり、いまやエネルギー問題、環境問題は、都市における非常に大きな問題になっている。 [0004] In addition, due to the overcrowding of the city, water in the city, electricity, heat, gas, demand of dust and the like will be enormous, now energy issues, environmental issues, has become a very big problem in the city .

【0005】かかる状況にあって、大規模都市開発を行う際の都市におけるエネルギー供給用インフラストラクチャー計画では、地域冷暖房の採用、エネルギー有効利用、環境インパクト、経済性等を考慮した適性な施設計画を行う必要性が特に大きくなっている。 [0005] According to such a situation, in the energy supply for the infrastructure plan in the city at the time of performing a large-scale urban development, the adoption of district heating and cooling, effective use of energy, environment impact, the suitability of facilities planning that takes into account the economy, etc. need to perform has become particularly large.

【0006】その中でも、特に、図6に示すように開発計画区域から排出されるエネルギー(廃熱)や物質(ごみ、下水、雨水、排ガス等)の持つ未利用エネマギーを活用し、開発計画区域へ供給されるエネルギー量や排出されるエネルギー量及び物質量を最少にし、かつ環境への影響を抑えるため、エネルギーインフラストラクチャーのクローズド化が要望されている。 [0006] Among them, in particular, by utilizing the energy discharged from the development planning area as shown in FIG. 6 (waste heat) and matter (dust, sewage, rainwater, waste gas, etc.) the unused Enemagi with the development planning area the amount of energy and materials amount is the amount of energy and emission is supplied to the minimum, and to suppress the influence on the environment, energy infrastructure closed system is desired.

【0007】 [0007]

【発明が解決しようとする課題】しかしながら、従来は、大規模都市開発を行う際に、開発計画区域へ供給されるエネルギー量や排出されるエネルギー量、物質量等について一応の計算は行っているが、それぞれについて手計算で行っているため、システマチックに総合的な分析、評価を行うには手間がかかりすぎるだけでなく、手計算に委ねるにはその内容が複雑になり、総合的な分析、評価を行うことは現実的に難しかった。 [SUMMARY OF THE INVENTION However, conventionally, when performing a large urban development, development planning energy supplied to the zone and discharged by the amount of energy, and done once calculations for amount of substance, etc. but, because it is done by hand calculation for each, comprehensive analysis systematically, evaluation not only takes too much effort to do, is to entrust to hand calculation becomes complicated its contents, comprehensive analysis , it was realistically difficult to evaluate.

【0008】本発明は、上記の課題を解決するものであって、簡易的に計画区域において供給、排出されるエネルギー量や物質量及び区域内での廃熱利用、リサイクルのシミュレーション評価ができ、地域エネルギーインフラストラクチャーの総合評価を行うことができるエネルギーインフラ計画支援システムを提供することを目的とするものである。 [0008] The present invention has been made to solve the above problems, the supply in the simple manner planning area, energy and material weight and use of waste heat in the area to be discharged, can be simulated evaluation of recycling, it is an object of the present invention to provide an energy infrastructure plan supporting system that can perform a comprehensive evaluation of the regional energy infrastructure.

【0009】 [0009]

【課題を解決するための手段】そのために本発明は、開発計画地域のエネルギー量や物質量、廃熱利用、リサイクルをシミュレーション評価するエネルギーインフラ計画支援システムであって、情報毎に分割されたレイヤー構造の地図情報、該地図情報を表示して地図上で地域やゾーン、面積、建物等の地域計画条件を入力する計画条件入力手段、計画地域のエネルギー需要量や活用する域内の都市廃熱の賦存量を算定するための原単位データ、 Means for Solving the Problems] The present invention For this purpose, the amount of energy and materials of the development plan area, the waste heat utilization, an energy infrastructure planning support system for simulation experiments recycled, is divided for each information layer map information of the structure, 該地 diagram information to display the regional and zone in on the map, area, such as building plans condition input means for inputting the regional planning conditions, planning of the region's urban waste heat energy demand and utilization of regional original unit data in order to calculate the endowment,
及び該原単位データと計画条件に基づいて各系統毎にエネルギー需要量やゴミ発生量等を算定する需要量算定手段を備えたことを特徴とし、原単位データでは、代表的な都市や建物用途、都市廃熱により類別をし、需要量算定手段は、年間月別の量、月・日、時刻別変動、ピークの情報を算定することを特徴とする。 And characterized by including a demand calculating means for calculating the energy demand and dust generation amount or the like for each line on the basis of the raw unit data and planning conditions, the intensity data, typical urban and building applications , the classification by urban waste heat, demand amount calculation means, the amount of annual monthly, month, day, time-specific variation, characterized in that to calculate the information of the peak.

【0010】また、計画地域内のエネルギー需要量や都市廃熱の賦存量の算定データ、計画地域のエネルギー供給システムで使用する機器やシミュレーション計算のためのマスターデータ、計画地域のエネルギー供給システムの仕様、運転方法等を入力するシステム入力手段、及びエネルギー供給システムの計算によるシミュレーションを行う計算手段を備えたことを特徴とし、計算手段は、エネルギー評価情報として少なくとも未利用エネルギーの活用量のシミュレーションや、経済性評価、環境影響度のシミュレーションを行うことを特徴とするものである。 [0010] In addition, energy demand and urban waste heat of the endowment amount of calculation data in the plan area, master data for equipment and simulation calculations to be used in the energy supply system of the planning area, planning specifications of the energy supply system of regional , and further comprising a calculation means for performing system input means for inputting the operation method or the like, and the simulation by calculation of the energy supply system, computing means, and a simulation of at least unused energy utilization amount as an energy evaluation information, economic evaluation, is characterized in that to simulate the environmental impact.

【0011】 [0011]

【作用】本発明のエネルギーインフラ計画支援システムでは、地図情報を持つのでそれを表示した地図上で計画条件の入力を簡単に行うことができ、原単位データを持つので計画条件の入力で需要量算定手段によるエネルギー需要量やゴミ発生量等の算定を自動的に行うことができる。 In the energy infrastructure planning support system of the present invention, because it has a map information can do it the easy input of display the map on the plan conditions, demand at the input of the planning conditions because it has the original unit data the calculation of such energy demand and waste generation amount by calculating means can be performed automatically. 同様に、マスターデータを持つので、システム入力手段から計画地域のエネルギー供給システムの仕様、 Similarly, because it has the master data, specifications of the energy supply system of the planning area from the system input means,
運転方法等を入力すると、計算手段で所定のシミュレーションを行って、エネルギー評価や経済性評価、環境影響度等の情報を得ることができる。 If you enter operation method or the like, by performing predetermined simulation calculation means, the energy assessment and economic evaluation, it is possible to obtain information of the environmental impact and the like.

【0012】 [0012]

【実施例】以下、本発明の実施例を図面を参照しつつ説明する。 EXAMPLES Hereinafter, with reference to the drawings an embodiment of the present invention. 図1は本発明のエネルギーインフラ計画支援システムの1実施例を示す図、図2は地図情報のレイヤー構造の例を示す図、図3は入出力画面の例を示す図である。 1 is a diagram showing an embodiment of an energy infrastructure planning support system of the present invention, FIG 2 is a diagram showing an example of the layer structure of the map information, FIG. 3 is a diagram showing an example of the input and output screens.

【0013】図1において、1は計画条件入力部、2は地図情報データ、3は需要量算定部、4は需要量マスターデータ、5は算定需要量データ、6は施設情報設定部、7は機器マスターデータ、8は評価計算部、9は計算用マスターデータ、10は評価計算データを示す。 [0013] In FIG. 1, 1 is plan condition input section, 2 is the map information data, 3 demand calculation unit, the demand master data 4, the calculated demand data 5, 6 facility information setting unit, the 7 equipment master data, 8 evaluation calculation unit, 9 calculated master data, 10 denotes an evaluation calculation data.

【0014】地図情報データ2は、開発対象となる地域の地図画像情報を図2に示すようにDHC(地域熱供給)や都市排熱、道路情報、建物情報等に分けたレイヤー(層)構造でもつデータを格納したものであり、計画条件入力部1は、地図情報データ2から計画対象地域の地図情報を読み出して必要な各レイヤーを重ね表示し、 [0014] Map data 2, DHC the map image information of the region to be developed as shown in FIG. 2 (district heating) and urban waste heat, road information, divided into a building information, etc. Layer (layer) structure Demotsu is obtained by storing the data, plan condition input unit 1 displays overlapped each layer required reads map information of plan target area from the map information data 2,
さらにその上に例えば図3(イ)に示すように計画建物や地域配管、熱源水管等のレイヤーを挿入して表示することによって、計画条件を入力するものである。 Further thereon plan building or local piping, for example, as shown in FIG. 3 (b), by displaying insert a layer of the heat source water tubes and the like, and inputs the plan conditions. 例えば地域計画条件の入力情報としては、地域、ゾーン別敷地面積、ゾーン延べ床面積、ゾーン建物用途別比率等があり、その入力画面の例を示したのが図3(ロ)である。 For example, as the input information regional planning conditions, there is a region, zone-specific site area, zone floor area, zone buildings by usage ratios, etc., of an example of the input screen is shown in FIG. 3 (b).
また、計画条件入力部1では、入力情報に基づき面積や配管延長等の計算も行う。 Moreover, the planning condition input unit 1, also the calculation of the area and tubing extension, etc. on the basis of the input information carried.

【0015】需要量マスターデータ4は、エネルギー需要量や都市廃熱賦存量等の計算に用いるための地域、建物用途毎の床面積当たりの原単位等のデータを格納したものである。 The demand master data 4 is an area for use in the calculation of such energy demand and urban waste heat endowment, data such as intensity per floor area per building applications stored. 建物用途別原単位マスターデータは、例えばオフィス(一般、インテリジェント等)、工場、店舗、ホテル、病院(総合病院、医院等)、学校(小、 Building applications Betsuhara unit master data is, for example, the office (generally, intelligent, etc.), factories, shops, hotels, hospitals (general hospitals, clinics, etc.), school (small,
中、高、大、専等)のように規模や質でも細分され、エネルギー要素(冷暖房給湯熱需要、給排水、電力、ガス、ゴミ等)、建物用途、都市廃熱等のデータを有する。 In has high, large, subdivided in size and quality as 専等), energy element (cooling and heating hot water supply heat demand, plumbing, electricity, gas, dust, etc.), building applications, data such as city waste heat. また、地域別では、大規模都市開発の対象となる大都市で分類され、或いは気候の異なる関東、近畿等の地域ブロックで分類される。 Also, By region, are classified in large cities as a target of large-scale urban development, or climate of different Kanto, it is classified at the regional block of Kinki and the like.

【0016】例えば月別熱負荷係数(温熱)であれば、 [0016] For example, if the monthly heat load factor (thermal), のように暖房負荷施設別月別負荷係数を格納している。 That contains the heating load facility by month load factor and so on.

【0017】需要量計算部3は、計画条件入力部1で入力し設定された地域、ゾーン別敷地面積、ゾーン延べ床面積、ゾーン建物用途別比率等と需要量マスターデータ4の原単位等から水系統(雨水、給排水、中水)や、熱系統(冷暖房、給湯、蒸気、熱源水利用都市廃熱、直接熱利用都市廃熱)、電力系統(一般動力、照明、空調搬送)、ガス系統(一般、厨房)、ゴミ系統(発生量、発生熱量)、情報系統(電話回線数)等の需要量を算定するものである。 [0017] The demand amount calculation unit 3, planning conditions and input by the input unit 1 has been set regional, zone-specific site area, zone total floor area, from the original unit, etc. of the zone building application-specific ratios, etc. and demand master data 4 water system (rainwater, water supply and drainage, recycled water) and heat system (air conditioning, hot water, steam, heat source water utilized urban waste heat, direct heat utilization urban waste heat), power system (general power, lighting, air conditioning transport), gas system (generally, kitchen), dust strain (amount of generated heat generation amount), is to calculate the demand for such information systems (number telephone line).

【0018】算定需要量データ5は、需要量計算部3で計算されたエネルギー需要量、熱需要量、ピーク需要量、年間需要量、月別変動、日・時刻別変動のデータ、 [0018] The calculation demand data 5, demand amount calculation unit 3 in the calculated energy demand, heat demand, peak demand, annual demand, monthly fluctuations, day and time by fluctuations in the data,
さらには、年間月別廃熱賦存量、ピーク廃熱賦存量、年間月別流量・温度変動等の都市廃熱データ、ゴミ排出量、上下水流量等のデータを格納したものである。 Further, annual monthly waste heat endowment, peak waste heat endowment, annual monthly rate and temperature fluctuation of the urban waste heat data, dust emissions, is obtained by storing the data of the upper and lower water flow rate and the like. 例えば図3(ハ)は都市排熱検討用の画面出力例であり、都市排熱と冷暖房需要量の比較検討を月と時間軸を平面にした高さ方向にそれぞれの大きさを表示する3次元グラフを利用して出力している。 For example, FIG. 3 (c) is a screen example of output for urban waste heat study, 3 for displaying the respective sizes of the comparative study of urban waste heat and cooling and heating demand month and time axis in the height direction that the plane and outputs by using the dimension graph. 同様に、ゾーン別負荷パタン検討、地域全体負荷パタン検討用として、ゾーン別の負荷変動や、地域全体の負荷変動も時刻別ー月別の3次元グラフで視覚化される。 Similarly, by Zone load patterns studied, for the entire region loading pattern study, another or load change zones, it is visualized in three-dimensional graph of even hourly over monthly load fluctuation of the entire region. また、図3(ニ)はエネルギー需要量分布検討用の画面出力例であり、エネルギー需要量の地域分布を把握することができるように、各地域毎に水、熱、電力、ガス、ゴミ、都市排熱について分布を3次元グラフを利用して出力している。 Further, FIG. 3 (d) is a screen example of output for the energy demand distribution study, so it is possible to grasp the regional distribution of the energy demand, water for each region, heat, electricity, gas, waste, for urban waste heat outputs using a 3-dimensional graph distribution.

【0019】機器マスターデータ7は、熱供給方式や各種熱源機器種別、エネルギー搬送経路、都市廃熱利用優先順位、システム運転制御方法、使用エネルギー等のシステム仕様を入力するためのメニューや各機器の仕様データを格納したものであり、例えば搬送系統用データは、以下のようなものである。 The device master data 7, the heat supply system and various heat source device type, energy transport path, urban waste heat utilization priority, the system operation control method, menus and the devices for inputting system specifications using Energy is obtained by storing specification data, for example data transport system is as follows.

【0020】 [0020] 施設情報設定部6は、ゴミ処理施設やコジェネ施設、都市排熱搬送施設、DHC搬送施設、DHCプラントに関する情報を入力するものである。 Facility information setting unit 6 is used to input waste treatment facilities and cogeneration facilities, city waste heat transport facilities, DHC transport facilities, information about DHC plant. 図3(ホ)は熱源機器選択画面の例を示したものであり、熱源機器の容量、種類、運転順位や未利用エネルギーの利用方法、蓄熱槽の運転方法等について入力するものである。 Figure 3 (e) shows an example of the heat source device selection screen, the heat source equipment capacity, the type, method of use of the operating position or untapped energy, and inputs the operation method, etc. of the heat storage tank. また、同(へ)は部分負荷特性設定画面の例を示したものであり、この画面により部分負荷特性や温度特性等を確認、 Further, the (the) shows an example of a partial load characteristic setting screen, confirm the partial load characteristics and temperature characteristics, etc. This screen
修正することができる。 It can be modified.

【0021】計算用マスターデータ9は、エネルギー計算、環境影響度計算、ランニングコスト計算、イニシャルコスト計算のためのデータを格納するものであり、例えば環境影響度計算用データを示すと以下のようなものである。 The calculated master data 9, energy calculation, environmental impact calculation, running cost calculation, which stores the data for the initial cost calculation, for example, the following to show the environmental impact calculation data it is intended.

【0022】 [0022] 評価計算部8は、計算用マスターデータ9のデータに基づいて施設情報設定部6で得られたデータを用いて年間月別の代表日計算による年間シミュレーションを行い、 Evaluation calculation unit 8 performs an annual simulation according to a representative date calculation of the annual monthly by using the data obtained by the facility information setting section 6 on the basis of the data of the calculation for the master data 9,
エネルギー評価、環境影響度評価、経済性評価を行うものである。 Energy assessment, environmental impact assessment, is to perform the economic evaluation. エネルギー評価データとして、年間、月別の電力、ガス消費量、1次換算エネルギー消費量、総合効率(1次、2次換算)、エネルギー消費量内訳(熱源機器、搬送機器、発電機器、補機等)、未利用エネルギー活用量等を求め、環境影響度データとして、廃熱、CO As energy assessment data, annual, monthly electricity, gas consumption, primary converted energy consumption, the overall efficiency (primary, secondary conversion), energy consumption Breakdown (heat source device, the transport device, power generation equipment, auxiliary equipment, etc. ), obtains the unused energy utilization amount, etc., as environmental impact data, waste heat, CO
2 、NO x 、SO x等を求め、経済性評価データとして、ランニングコスト、イニシャルコストを求め、さらには年間機器稼働時間を求める。 2, NO x, determine the SO x and the like, as economic evaluation data, running costs, determined initial cost, further obtains the annual equipment uptime.

【0023】評価計算データ10は、評価計算部8で求めたデータを格納するものであり、計画地域のエネルギー需要量や廃熱賦存量をもとに、地域へのエネルギー供給施設の想定を行い、年間にわたってエネルギー評価や経済性評価或いは環境への影響度について評価を行うためのデータである。 [0023] The evaluation calculation data 10 is to store the data obtained in the evaluation calculation unit 8, on the basis of the energy demand and waste heat endowment of the plan area, make assumptions of energy supply facilities to local it is a data for evaluating the energy assessment and the degree of influence on the economic evaluation or environment over, years. 図3(と)は環境影響度について出力されたデータを基に比較対象システムと併せた出力を作成した環境評価画面の例であり、図3(チ)はシステムの運転状況を把握するための画面として、時刻物の詳細データを出力した例を示す図である。 Figure 3 (a) is an example of an environment evaluation screen that created the output in conjunction with comparative systems on the basis of the output data for the environmental impact, FIG. 3 (h) is to grasp the operating conditions of the system as the screen is a diagram showing an example of outputting the detailed data of the time thereof. その他、年間合計エネルギー消費量や総合効率等について、検討システムについての計算条件の一覧等も画面出力される。 Others, for the total annual energy consumption and overall efficiency, and the like, a list or the like of the calculation conditions for the examination system is also screen output.

【0024】上記のように算定需要量データ5を求めるまでのフェーズ1では、地図情報を利用して計画条件を簡易に入力し、熱、電気、ガス、水、ゴミ等の需要量について幅広く算定することができる。 [0024] In phase 1 to obtain the calculated demand data 5 as described above, enter the planned conditions by using the map information in a simple, widely calculating heat, electricity, gas, water, the demand for such waste can do. そして、その結果は、3次元グラフ等に表示することによって資格的にプレゼンテーションを行うことができる。 And thus it can perform the qualification to presentation by displaying the three-dimensional graph or the like. そして、評価計算データ10を求めるまでのフェーズ2では、未利用エネルギーを利用した場合の地域冷暖房の運転シミュレーションができ、熱源機器については、自由に機器容量や台数或いはコンプレッサ等の機器特性を設定することができる。 Then, in phase 2 to obtain the evaluation calculation data 10, the operation simulation of DHC in the case of utilizing the unused energy can, for heat source device, free to set the device characteristics such as equipment capacity and number or compressor be able to. さらには、蓄熱槽について、水蓄熱以外(氷、 In addition, the heat storage tank, other than water thermal storage (ice,
PCM等)の設定も行うことができ、運転に伴う排出物質の環境への影響度(NO x 、SO x 、CO 2排出量、 Setting of the PCM, etc.) can be performed, the degree of influence on the emissions associated with operating environment (NO x, SO x, CO 2 emissions,
放熱量)も評価できる。 Heat radiation amount) can also be evaluated.

【0025】図4は本発明のエネルギーインフラ計画支援システムのシミュレーションフローを示す図、図5は対象施設のモデル化の例を示す図、図6は優先順位による熱源機器運転のモデル化の例を示す図、図7はエネルギー計算マスターフローを示す図である。 [0025] Figure 4 shows a simulation flow of energy infrastructure planning support system of the present invention FIG, FIG 5 is a diagram showing an example of the modeling of the target facility, Figure 6 an example of a model of the heat source device operating according to the priority shows, FIG. 7 is a diagram showing an energy calculation master flow.

【0026】上記のように本発明のエネルギーインフラ計画支援システムは、フェーズ1とフェーズ2に分けることができ、そのシミュレーションフローを示したのが図4である。 The energy infrastructure planning support system of the present invention as described above, can be divided into Phase 1 and Phase 2, it is 4 to that shown the simulation flow.

【0027】図4に示すようにフェーズ1では、まず、 [0027] In phase 1, as shown in FIG. 4, first,
計画地域の地図情報を読み込んで敷地面積や建物面積、 Site area and building area by reading the map information of the plan area,
用途別面積比率等の計画条件、建物構成の入力を行い、 Planning conditions such as by application area ratio, the input of the building configuration is performed,
需要量算定プログラムで、水系統、熱系統、電力系統、 Demand Calculation program, water systems, thermal systems, power system,
ガス系統、ゴミ系統、情報系統の需要量又は発生量を順次算定し、それをエネルギー需要量、熱需要量、ピーク需要量、年間需要量、月別変動、日・時刻別変動、年間月別廃熱賦存量、ピーク、廃熱賦存量、ゴミ排出量、上下水流量等を表や3次元グラフ等に編集して出力する。 Gas system, sequentially calculate the demand amount or the amount of generated waste system, information system, it energy demand, heat demand, peak demand, annual demand, monthly fluctuations, day and time another change, annual monthly waste heat endowment, peak, waste heat endowment, dust emissions, and outputs a vertical water flow rate, etc. to edit the table or 3-dimensional graph or the like.

【0028】そして、フェーズ2では、図5に示すようにエネルギーの供給形態をモデル化し、フェーズ1の出力情報に加えてゴミ処理施設、コジェネ施設、都市廃熱搬送施設、DHC搬送施設、DHCプラント等のシステム入力を行う。 [0028] Then, in phase 2, models the supply form of energy, as shown in FIG. 5, waste treatment facilities in addition to the output information of the phase 1, cogeneration facilities, city waste heat transport facilities, DHC transport facilities, DHC plant perform the system input and the like. ゴミ処理施設に関する情報には、地域外ゴミ流入量や焼却炉容量、熱回収方式、発電方式等があり、コジェネ施設に関する情報には、原動機方式や、使用燃料、発電機器容量、設置台数等がある。 The information about the waste treatment facilities, areas outside dust inflow or incinerator capacity, the heat recovery system, there is the power generation system, etc., the information about the cogeneration facility, and prime mover systems, fuel used, power generation equipment capacity, the number of installed units etc. is there. 都市排熱搬送施設に関する情報には、都市排熱配管ルート、熱媒種類、配管材料、工事方式等があり、DHC搬送施設に関する情報には、DHC配管ルート、熱媒種類、配管材料、工事方式等がある。 The information about the city waste heat transport facilities, urban waste heat pipe route, heating medium type, piping materials, there is construction method or the like, the information about the DHC transport facilities, DHC piping route, heating medium type, piping materials, construction methods and the like. そして、DHCプラントに関する情報には、供給ゾーン、熱供給方式、都市排熱利用方法、2次ポンプ容量、都市排熱搬送ポンプ、蓄熱槽種類、蓄熱容量、蓄熱槽運転方法、熱源機器種類、熱源機器容量、台数、運転優先順位、機器特性、想定エネルギー供給会社(電力、ガス、水道)等がある。 Then, the information about the DHC plant, feed zone, the heat supply system, urban waste heat utilization method, secondary pump capacity, urban waste heat transport pumps, thermal storage tank type, heat storage capacity, storage tank operation method, the heat source equipment type, the heat source equipment capacity, number, operational priorities, device characteristics, there is assumed energy companies (electricity, gas, water) or the like. したがって、ここでは、システム構成、機器容量や台数、運転制御方式は自由に設定できる。 Accordingly, here, the system configuration, equipment capacity and number, the operation control method can be set freely.

【0029】システム入力がなされると、次にエネルギー計算、環境影響度計算、ランニングコスト計算、イニシャルコスト計算を順次行う。 [0029] If the system input is made, then the energy calculation, environmental impact calculation, running cost calculation, sequentially performs initial cost calculation. 例えば熱源機器の計算にあたっては、機種の特性や部分負荷や熱源となる未利用エネルギーの温度変化による運転変動も考慮できるように運転特性に関するデータがマスターデータに用意される。 For example when the calculation of the heat source device, the data relating to the operating characteristics so that it can be considered also operating fluctuations due to temperature changes of the unused energy to be the model characteristics and partial load and heat source is provided in the master data. また、任意のパターの熱源機器運転を再現できるよう、例えば未利用エネルギーの活用や蓄熱槽の利用は、 Also, to be able to reproduce the heat source device operating any putter, for example, the use of leverage or thermal storage tank unused energy,
図6に示すように各季節毎に熱源機器との優先順位を設定し、熱負荷に対応させる。 Set the priority of the heat source device to each seasonal 6, to correspond to the heat load. 図6において、I(t)はt時における負荷、Iiはi番目の機器の負荷、Eiはi番目の機器の入力量、Piはi番目の機器の定格出力、Riはi番目の機器の負荷率、TGは熱源温度、T 6, the load at the time of I (t) is t, Ii is the i-th load equipment, Ei input of i-th equipment, Pi is the i-th rated output of the device, Ri is the i-th equipment load factor, TG is the heat source temperature, T
Oは機器出口温度、f関数は部分負荷率と熱源温度と機器出口温度によりCOPを補正し入力エネルギー量を算出する関数である。 O is a function that calculates the input energy amount correction the COP and the device outlet temperature, f function partial load factor and the heat source temperature and the device outlet temperature.

【0030】熱源機器の運転では、t時における負荷I [0030] In the operation of the heat source equipment, load at the time of t I
(t)を図6に示すように設定された優先順位で1番目の機器(例:コジェネ排熱)からその定格出力より大きければ負荷率R1を1にして熱負荷に対応させ、順次残りの負荷を下位の機器に対応させる。 (T) of 1st set priorities as shown in Figure 6 device: the load factor R1 is greater than its rated output from (eg cogeneration exhaust heat) to 1 to correspond to the heat load, sequential remaining adapt the load to the lower of the equipment.

【0031】次にエネルギー計算について説明する。 [0031] Next, energy calculation will be described. エネルギー計算は、通常の熱源システムの場合であれば、 Energy calculation, in the case of normal heat source system,
図7(イ)に示すように、まず、優先順位順に熱源機器の計算を行い、次に機器別にエネルギー消費量を積算して、後処理・集計を行う。 As shown in FIG. 7 (b), we first compute the heat source device in priority order, then by integrating the energy consumption for each device, it performs post-processing and tallying. これを時刻、日(平日、休日)、月毎に行う。 This time, day (weekdays, holidays), carried out on a monthly basis.

【0032】エネルギー消費量積算では、 COP=基準 COP×部分負荷 COP率×熱源温度 COP率× [0032] In the energy-consumption cumulative is, COP = reference COP × partial load COP factor × heat source temperature COP ratio ×
出口温度 COP率 により効率COPを計算し、 必要エネルギー量=負荷(各機器出力)/COP により利用する機器毎にエネルギー消費量を求めて積算する。 Efficiency COP calculated by the outlet temperature COP ratio, integrating seeking energy consumption amount for each device to be utilized by the required energy amount = load (each device output) / COP. なお、基準 COPは、システム入力時に各機器にて設定し、部分負荷 COP率は、時間毎の各機器の部分負荷(出力/定格能力)により算出し、熱源温度 COP率は、 The reference COP is set in each device when the system input, part load COP ratio is calculated by the partial load of the respective devices for every time (output / rated capacity), the heat source temperature COP ratio,
各機器の熱源の時間別温度変化(フェーズ1)より算出し、出口温度 COP率は、各システムにて設定するものである。 Calculated from hourly temperature changes of the respective devices of the heat source (Phase 1), the outlet temperature COP ratio is to set for each system. また、熱源温度 COP率の算出では、フェーズ1の中で算出した外気温度や未利用エネルギーとしての河川水温度、海水温度等のデータが適用される。 Further, in the calculation of the heat source temperature COP ratio, river water temperature as the outside air temperature or unused energy calculated in phase 1, the data of the sea water temperature or the like is applied.

【0033】コジェネ利用システムの場合には、図7 [0033] In the case of cogeneration use the system, as shown in FIG. 7
(ロ)に示すように、まず、コジェネ排熱量を仮に設定した後、(イ)と同様の処理を行う。 As shown in (b), first, after tentatively setting the cogeneration waste heat, the same processing as (A). その結果、コジェネ利用分だけ熱源の出力を減らすことができ、結果として消費電力が低減されるので、コジェネからの排熱量が当初の仮設定等より少なくなる。 As a result, it is possible to reduce the output of the heat source by cogeneration utilization amount, because the power consumption is reduced as a result, waste heat from cogeneration is less than initial tentative setting like. そこで、これをフィードバックして同様の処理を繰り返し、後処理・集計を行う。 Therefore, the same process is repeated by feeding back this performs post-processing and tallying.

【0034】また、蓄熱槽利用システムの場合には、蓄熱槽を利用することによって夜蓄熱したものを日中のピーク時等に消費するので、この場合の負荷変動を計算した後、(イ)と同様の処理を行い、後処理・集計を行う。 Further, in the case of the heat storage tank utilization system, since the consumed peak like in the daytime to those heat storage night by utilizing thermal storage tank, after calculating the load variation of this case, (i) It was treated in the same manner as, performs post-processing and tallying.

【0035】なお、本発明は、上記の実施例に限定されるものではなく、種々の変形が可能である。 [0035] The present invention is not limited to the above embodiments, and various modifications are possible. 例えば上記の実施例では、地図情報をデータベースとして備えるシステムであるが、このような地図情報は、CADにより作成したものに限らず、市販の地図情報を利用することができることはいうまでもない。 For example, in the above embodiment, although a system including the map information as a database, such map information is not limited to those created by CAD, it is of course possible to utilize a commercially available map information.

【0036】 [0036]

【発明の効果】以上に説明したように、本発明によれば、計画条件を入力すると、その計画地域内のエネルギー需要量や都市廃熱賦存量が算定され、さらにエネルギー供給システムの各施設を入力すると、エネルギー評価、経済性評価、環境影響度に関する情報が得られるので、開発計画区域へ供給されるエネルギー量や排出されるエネルギー量(廃熱)及び物質量(ゴミ、下水、排ガス等)を最小にし、且つ環境への影響を押さえるエネルギーインフラストラクチャーのクローズド化の検討を簡便に行うことができる。 As described above, according to the present invention, according to the present invention, by entering the plan conditions, it is calculated energy demand and urban waste heat endowment in the plan area, the more the property energy supply system If you type, energy assessment, economic evaluation, information about the environmental impact can be obtained, the amount of energy amount of energy and emission is supplied to the development plan area (waste heat) and amount of substance (trash, sewage, gas, etc.) It was brought to a minimum, and it is possible to easily carry out the examination of the closed system of energy infrastructure used to suppress the effects of the environment.

【図面の簡単な説明】 BRIEF DESCRIPTION OF THE DRAWINGS

【図1】 本発明のエネルギーインフラ計画支援システムの1実施例を示す図である。 1 is a diagram showing an embodiment of an energy infrastructure planning support system of the present invention.

【図2】 地図情報のレイヤー構造の例を示す図である。 2 is a diagram showing an example of the layer structure of the map information.

【図3】 入出力画面の例を示す図である。 3 is a diagram showing an example of the input and output screens.

【図4】 本発明のエネルギーインフラ計画支援システムのシミュレーションフローを示す図である。 4 is a diagram showing a simulation flow of energy infrastructure planning support system of the present invention.

【図5】 対象施設のモデル化の例を示す図である。 5 is a diagram showing an example of a model of the target facility.

【図6】 優先順位による熱源機器運転のモデル化の例を示す図である。 6 is a diagram showing an example of a modeling of the heat source equipment operation by priority.

【図7】 エネルギー計算マスターフローを示す図である。 7 is a diagram showing an energy calculation master flow.

【図8】 エネルギーインフラ施設の評価概念図である。 [8] is an evaluation conceptual view of energy infrastructure facilities.

【符号の説明】 DESCRIPTION OF SYMBOLS

1…計画条件入力部、2…地図情報データ、3…需要量算定部、4…需要量マスターデータ、5…算定需要量データ、6…施設情報設定部、7…機器マスターデータ、 1 ... Planning condition input unit, 2 ... map information data, 3 ... demand calculation unit, 4 ... demand master data, 5 ... calculated demand data, 6 ... facility information setting unit, 7 ... equipment master data,
8…評価計算部、9…計算用マスターデータ、10…評価計算データ 8 ... evaluation calculation unit, 9 ... calculation for master data, 10 ... evaluation calculation data

───────────────────────────────────────────────────── ────────────────────────────────────────────────── ───

【手続補正書】 [Procedure amendment]

【提出日】平成4年12月9日 [Filing date] 1992 December 9

【手続補正1】 [Amendment 1]

【補正対象書類名】明細書 [Correction target document name] specification

【補正対象項目名】図面の簡単な説明 A brief description of the correction target item name] drawings

【補正方法】変更 [Correction method] change

【補正内容】 [Correction contents]

【図面の簡単な説明】 BRIEF DESCRIPTION OF THE DRAWINGS

【図1】 本発明のエネルギーインフラ計画支援システムの1実施例を示す図である。 1 is a diagram showing an embodiment of an energy infrastructure planning support system of the present invention.

【図2】 地図情報のレイヤー構造の例を示す図である。 2 is a diagram showing an example of the layer structure of the map information.

【図3イ】 入出力画面の例を示す図である。 Figure 3 b is a diagram showing an example of the input and output screens.

【図3ロ】 入出力画面の例を示す図である。 Figure 3 (b) is a diagram showing an example of the input and output screens.

【図3ハ】 入出力画面の例を示す図である。 FIG. 3 (c) is a diagram showing an example of input and output screen.

【図3ニ】 入出力画面の例を示す図である。 FIG. 3 (d) is a diagram showing an example of input and output screen.

【図3ホ】 入出力画面の例を示す図である。 Figure 3 E is a diagram showing an example of the input and output screens.

【図3ヘ】 入出力画面の例を示す図である。 Figure 3 f shows an example of the input and output screens.

【図3ト】 入出力画面の例を示す図である。 FIG. 3 door is a diagram showing an example of input and output screen.

【図3チ】 入出力画面の例を示す図である。 Figure 3 Ji is a diagram illustrating an example of the input and output screens.

【図4】 本発明のエネルギーインフラ計画支援システムのシミュレーションフローを示す図である。 4 is a diagram showing a simulation flow of energy infrastructure planning support system of the present invention.

【図5】 対象施設のモデル化の例を示す図である。 5 is a diagram showing an example of a model of the target facility.

【図6】 優先順位による熱源機器運転のモデル化の例を示す図である。 6 is a diagram showing an example of a modeling of the heat source equipment operation by priority.

【図7】 エネルギー計算マスターフローを示す図である。 7 is a diagram showing an energy calculation master flow.

【図8】 エネルギーインフラ施設の評価概念図である。 [8] is an evaluation conceptual view of energy infrastructure facilities.

【符号の説明】 1…計画条件入力部、2…地図情報データ、3…需要量算定部、4…需要量マスターデータ、5…算定需要量データ、6…施設情報設定部、7…機器マスターデータ、 DESCRIPTION OF SYMBOLS 1 ... plan condition input unit, 2 ... map information data, 3 ... demand amount calculation unit, 4 ... demand master data, 5 ... calculated demand data, 6 ... facility information setting unit, 7 ... equipment master data,
8…評価計算部、9…計算用マスターデータ、10…評価計算データ 8 ... evaluation calculation unit, 9 ... calculation for master data, 10 ... evaluation calculation data

【手続補正2】 [Amendment 2]

【補正対象書類名】図面 [Correction target document name] drawings

【補正対象項目名】全図 [Correction target item name] all the drawings

【補正方法】変更 [Correction method] change

【補正内容】 [Correction contents]

【図1】 [Figure 1]

【図2】 [Figure 2]

【図3イ】 FIG. 3 b]

【図3ロ】 FIG. 3 (b)]

【図3ハ】 FIG. 3 (c)]

【図3ト】 FIG. 3 door]

【図3チ】 FIG. 3 inch]

【図3ニ】 FIG. 3 d]

【図3ホ】 FIG. 3 e]

【図3ヘ】 FIG. 3 f]

【図5】 [Figure 5]

【図4】 [Figure 4]

【図6】 [Figure 6]

【図8】 [Figure 8]

【図7】 [7]

───────────────────────────────────────────────────── フロントページの続き (72)発明者 福村 貴司 東京都港区芝浦一丁目2番3号清水建設株 式会社内 (72)発明者 八塩 彰 東京都港区芝浦一丁目2番3号清水建設株 式会社内 (72)発明者 板谷 敏正 東京都港区芝浦一丁目2番3号清水建設株 式会社内 ────────────────────────────────────────────────── ─── of the front page continued (72) inventor Takashi Fukumura Shibaura, Minato-ku, Tokyo-chome No. 2 No. 3 Shimizu shares in the company (72) inventor Yashio Tokyo Shimizu, Minato-ku, Shibaura No. chome 2 No. 3 Akira construction shares in the company (72) inventor Toshimasa Itaya Shibaura, Minato-ku, Tokyo-chome No. 2 No. 3 Shimizu shares in the company

Claims (6)

    【特許請求の範囲】 [The claims]
  1. 【請求項1】 開発計画地域のエネルギー量や物質量、 [Claim 1] amount of energy and the amount of substance of the development plan area,
    廃熱利用、リサイクルをシミュレーション評価するエネルギーインフラ計画支援システムであって、情報毎に分割されたレイヤー構造の地図情報、該地図情報を表示して地図上で地域やゾーン、面積、建物等の地域計画条件を入力する計画条件入力手段、計画地域のエネルギー需要量や活用する域内の都市廃熱の賦存量を算定するための原単位データ、及び該原単位データと計画条件に基づいて各系統毎にエネルギー需要量やゴミ発生量等を算定する需要量算定手段を備えたことを特徴とするエネルギーインフラ計画支援システム。 Waste heat utilization, an energy infrastructure plan supporting system to simulate evaluate the recycling, map information of the divided layer structure for each information, regional and zone in on the map to display the 該地 diagram information, area, areas such as buildings planning condition input means for inputting a plan conditions, intensity data for calculating the endowments of regional urban waste heat energy demand and utilization of plan area, and each system each based on the raw unit data and planning conditions energy infrastructure planning support system characterized by comprising a demand calculating means for calculating the energy demand and dust generation amount or the like.
  2. 【請求項2】 原単位データでは、代表的な都市や建物用途、都市廃熱により類別をしていることを特徴とする請求項1記載のエネルギーインフラ計画支援システム。 Wherein the intensity data, typical urban and building applications, energy infrastructure planning support system according to claim 1, characterized in that the classification by urban waste heat.
  3. 【請求項3】 需要量算定手段は、年間月別の量、月・ 3. A demand amount calculation means, the amount of annual monthly, month,
    日、時刻別変動、ピークの情報を算定することを特徴とする請求項1記載のエネルギーインフラ計画支援システム。 Day, hourly change, energy infrastructure planning support system according to claim 1, wherein the calculating the information of the peak.
  4. 【請求項4】 開発計画地域のエネルギー量や物質量、 4. The amount of energy and the amount of substance of the development plan area,
    廃熱利用、リサイクルをシミュレーション評価するエネルギーインフラ計画支援システムであって、計画地域内のエネルギー需要量や都市廃熱の賦存量の算定データ、 Waste heat utilization, an energy infrastructure plan supporting system to simulate evaluate the recycling, plan energy demand and urban waste heat of the endowment amount of calculation data in the region,
    計画地域のエネルギー供給システムで使用する機器やシミュレーション計算のためのマスターデータ、計画地域のエネルギー供給システムの仕様、運転方法等を入力するシステム入力手段、及びエネルギー供給システムの計算によるシミュレーションを行う計算手段を備えたことを特徴とするエネルギーインフラ計画支援システム。 Master data for devices and simulation calculations used in the energy supply system of the planned area, the specifications of the energy supply system planning area, system input means for inputting the operation method or the like, and calculating means for performing a simulation by calculation of the energy supply system energy infrastructure planning support system, characterized in that with.
  5. 【請求項5】 計算手段は、エネルギー評価情報として少なくとも未利用エネルギーの活用量のシミュレーションを行うことを特徴とする請求項4記載のエネルギーインフラ計画支援システム。 5. The computing means energy infrastructure planning support system according to claim 4, characterized in that to simulate use of at least unused energy as an energy evaluation information.
  6. 【請求項6】 計算手段は、経済性評価、環境影響度のシミュレーションを行うことを特徴とする請求項4記載のエネルギーインフラ計画支援システム。 Wherein the calculating means, energy infrastructure planning support system according to claim 4 wherein the economic evaluation, and performing a simulation of environmental impact.
JP23035091A 1991-09-10 1991-09-10 Energy infrastructure plan supporting system Pending JPH06214973A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23035091A JPH06214973A (en) 1991-09-10 1991-09-10 Energy infrastructure plan supporting system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP23035091A JPH06214973A (en) 1991-09-10 1991-09-10 Energy infrastructure plan supporting system
GB9218275A GB2259591A (en) 1991-09-10 1992-08-27 Energy infrastructure analysis system

Publications (1)

Publication Number Publication Date
JPH06214973A true JPH06214973A (en) 1994-08-05

Family

ID=16906481

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23035091A Pending JPH06214973A (en) 1991-09-10 1991-09-10 Energy infrastructure plan supporting system

Country Status (2)

Country Link
JP (1) JPH06214973A (en)
GB (1) GB2259591A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19623292A1 (en) * 1995-11-21 1997-05-28 Lg Electronics Inc Liquid crystal display device and process for their preparation
JP2006292329A (en) * 2005-04-14 2006-10-26 Mitsubishi Heavy Ind Ltd Heat source system, and control device and control method thereof
JP2006313049A (en) * 2005-05-09 2006-11-16 Ebara Corp Waste heat utilizing system and its operating method
US9898862B2 (en) 2011-03-16 2018-02-20 Oldcastle Buildingenvelope, Inc. System and method for modeling buildings and building products

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2785425B1 (en) * 1998-11-02 2001-01-05 Suez Lyonnaise Des Eaux Sludge Management Method of water purification stations Holding for their spreaders

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19623292A1 (en) * 1995-11-21 1997-05-28 Lg Electronics Inc Liquid crystal display device and process for their preparation
DE19623292C2 (en) * 1995-11-21 1999-06-02 Lg Electronics Inc Liquid crystal display device and process for their preparation
JP2006292329A (en) * 2005-04-14 2006-10-26 Mitsubishi Heavy Ind Ltd Heat source system, and control device and control method thereof
JP2006313049A (en) * 2005-05-09 2006-11-16 Ebara Corp Waste heat utilizing system and its operating method
US9898862B2 (en) 2011-03-16 2018-02-20 Oldcastle Buildingenvelope, Inc. System and method for modeling buildings and building products

Also Published As

Publication number Publication date
GB2259591A (en) 1993-03-17
GB9218275D0 (en) 1992-10-14

Similar Documents

Publication Publication Date Title
Smith Investment and Production: A Study in the Theory of the Capital-using Enterprise
Fumo et al. Emission operational strategy for combined cooling, heating, and power systems
Girardin et al. EnerGis: A geographical information based system for the evaluation of integrated energy conversion systems in urban areas
Fragaki et al. Exploration of economical sizing of gas engine and thermal store for combined heat and power plants in the UK
Cho et al. Cost-optimized real-time operation of CHP systems
Mehleri et al. A mathematical programming approach for optimal design of distributed energy systems at the neighbourhood level
Cohen et al. Optimization-based methods for operations scheduling
Pless et al. Net-zero energy buildings: A classification system based on renewable energy supply options
Ghafghazi et al. A multicriteria approach to evaluate district heating system options
De Boeck et al. Improving the energy performance of residential buildings: A literature review
Ren et al. A MILP model for integrated plan and evaluation of distributed energy systems
Krarti Energy audit of building systems: an engineering approach
Mehleri et al. Optimal design and operation of distributed energy systems: Application to Greek residential sector
Donovan et al. Institutional and ad hoc DSS and their effective use
Byrne et al. Evaluating the potential of small-scale renewable energy options to meet rural livelihoods needs: A GIS-and lifecycle cost-based assessment of Western China's options
Heiple et al. Using building energy simulation and geospatial modeling techniques to determine high resolution building sector energy consumption profiles
Balocco et al. Using exergy to analyze the sustainability of an urban area
Giatrakos et al. Sustainable power planning for the island of Crete
Huang et al. Trash-flow allocation: planning under uncertainty
Barlishen et al. Development of a decision support system for municipal solid waste management systems planning
Hartkopf et al. Global relevance of total building performance
Chen et al. Automatic generation and simulation of urban building energy models based on city datasets for city-scale building retrofit analysis
Sharan et al. Integrated generation and transmission expansion planning including power and fuel transportation constraints
Hong et al. A review on sustainable construction management strategies for monitoring, diagnosing, and retrofitting the building’s dynamic energy performance: Focused on the operation and maintenance phase
Henze Energy and cost minimal control of active and passive building thermal storage inventory