JPH0559775A - Construction method of precast concrete exterior wall - Google Patents

Construction method of precast concrete exterior wall

Info

Publication number
JPH0559775A
JPH0559775A JP22298791A JP22298791A JPH0559775A JP H0559775 A JPH0559775 A JP H0559775A JP 22298791 A JP22298791 A JP 22298791A JP 22298791 A JP22298791 A JP 22298791A JP H0559775 A JPH0559775 A JP H0559775A
Authority
JP
Japan
Prior art keywords
precast concrete
wall
column
concrete
wall plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP22298791A
Other languages
Japanese (ja)
Inventor
Osamu Ichikawa
市川  修
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP22298791A priority Critical patent/JPH0559775A/en
Publication of JPH0559775A publication Critical patent/JPH0559775A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To carry out mounting work of a precast concrete exterior wallboard together with structural steel work simultaneously, to promote execution efficiency and to save man-power. CONSTITUTION:A cut section 1 having an exposed part of an anchor bar 3 is provided to a part brought into contact with a column B of a precase concrete exterior wallboard A and a beam C. The cut section 1 is temporarily fastened to a structural steel column (a) and a structural steel beam (b), a reinforcing bar 8 is arranged among the column (a), the beam (b) and the cut section 1, and column and beam concretes 9 and 10 are placed.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は建築物におけるプレキヤ
ストコンクリート外壁の構築方法に係るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a precast concrete outer wall in a building.

【0002】[0002]

【従来の技術】従来の鉄筋コンクリート構造や、鉄骨鉄
筋コンクリート構造における外壁の構築方法としては、
(イ)耐震壁構造の場合、現場施工が多く、柱、梁躯体
に接して所要の壁厚に補強筋を配筋し、型枠を組立てて
コンクリートを打設し、同打設コンクリートが所定の強
度を発現したのち、型枠を解体する方法、(ロ)外側に
躯体壁の一部を構成し、外面に仕上げを施された薄肉半
プレキヤストコンクリート壁板を外型枠とし、その内側
には補強筋を配筋し、内部型枠を組立て、同型枠と前記
壁板との間にコンクリートを打設し、同打設コンクリー
トと前記壁板とを一体化する方法、(ハ)鉄骨鉄筋コン
クリート構造や鉄骨構造において、カーテンウオール方
式として外面に仕上げしたプレキヤストコンクリート壁
板を躯体に取付ける方法、が一般に行なわれている。
2. Description of the Related Art As conventional methods for constructing an outer wall in a reinforced concrete structure or a steel frame reinforced concrete structure,
(B) In the case of earthquake-resistant wall structures, there are many on-site constructions. Reinforcing bars are arranged to the required wall thickness in contact with pillars and beam frames, formworks are assembled, and concrete is laid. Method to dismantle the formwork after expressing the strength of (b), (b) A part of the building wall is constructed on the outside, and a thin-walled semi-precast concrete wallboard finished on the outer surface is used as the outer formwork, and the inside A method of arranging reinforcing bars on the inner wall, assembling the internal formwork, placing concrete between the formwork and the wall plate, and integrating the placed concrete and the wall plate, (c) steel frame In a reinforced concrete structure or a steel frame structure, a method of attaching a precast concrete wall plate finished on the outer surface to a frame is generally performed as a curtain wall method.

【0003】[0003]

【発明が解決しようとする課題】前記柱、梁、耐震壁等
よりなる躯体構造においては、耐震壁の工業化が難し
く、現場施工による柱、梁、耐震壁の躯体は鉄骨の建て
方、鉄筋の組立、型枠の組立、コンクリートの打設等の
工程を要し、また外面に仕上げを施した薄肉の半プレキ
ヤストコンクリート壁板を外型枠とし、内側に補強筋を
配筋し、内部型枠を組立ててコンクリートを打設し、前
記壁板との一体化を図る構築方法においては、多くの工
程と作業量が必要となり、作業員の確保に難渋する。
In the frame structure composed of the columns, beams, earthquake-resistant walls, etc., it is difficult to industrialize the earthquake-resistant walls, and the frame of the columns, beams, and earthquake-resistant walls constructed on-site is Processes such as assembly, formwork assembly, concrete pouring are required, and a thin semi-precast concrete wallboard with a finish on the outer surface is used as the outer formwork, reinforcing bars are arranged on the inside, and internal molds are used. In the construction method in which the frame is assembled, concrete is poured, and the wall board is integrated, a large number of steps and a large amount of work are required, which makes it difficult to secure workers.

【0004】更にまた、鉄骨鉄筋コンクリート構造や鉄
骨構造におけるカーテンウオール方式は、鉄骨工事、あ
るいはまた鉄骨鉄筋コンクリート工事がある階数まで先
行したのちにカーテンウオールを取付けていくものであ
るが、カーテンウオール取付金物の取付やこれに付随す
る作業が煩雑となり、工程に悪影響を及ぼす。本発明は
前記従来技術の有する問題点に鑑みて提案されたもの
で、その目的とする処は、プレキヤストコンクリート壁
板の取付作業が鉄骨工事と平行して行なわれ、施工性が
向上されるとともに、構造的に信頼性が大であり、工期
の短縮、省力化が図られるプレキヤストコンクリート外
壁の構築方法を提供する点にある。
Furthermore, the curtain wall system for steel-framed reinforced concrete structures and steel-framed structures is one in which the curtain wall is attached after the steel frame work or the steel frame reinforced concrete work is preceded by a certain number of floors. The installation and the work associated therewith becomes complicated, which adversely affects the process. The present invention has been proposed in view of the above problems of the prior art, and an object thereof is to perform work for mounting a precast concrete wall plate in parallel with steel frame work, thereby improving workability. At the same time, it is to provide a method for constructing a precast concrete outer wall that is structurally highly reliable, shortens the construction period, and saves labor.

【0005】[0005]

【課題を解決するための手段】前記の目的を達成するた
め、本発明に係るプレキヤストコンクリート外壁の構築
方法によれば、柱、梁に接する部分に欠損部を設けると
ともに、同欠損部に定着筋の一部を露出させてなる予め
外面仕上げが施されたプレキヤストコンクリート外壁板
における前記欠損部を、鉄骨柱及び鉄骨梁に仮止めし、
同鉄骨柱、梁と前記欠損部に亘って補強筋を配筋して
柱、梁コンクリートを打設するものである。
In order to achieve the above-mentioned object, according to the method of constructing a precast concrete outer wall according to the present invention, a defective portion is provided at a portion in contact with a pillar or a beam and is fixed to the defective portion. The defective portion in the precast concrete outer wall plate, which has been subjected to an external surface finish by exposing a part of the muscles, is temporarily fixed to a steel column and a steel beam,
The reinforcement is arranged across the steel frame column, the beam and the defective portion, and the column and beam concrete are placed.

【0006】請求項2の発明は前記プレキヤストコンク
リート外壁板は、柱間を適宜寸法に分割した幅を有し、
上下階の各床面より上方位置において上下に隣る前記外
壁板を接合金物によって接合するとともに、前記各外壁
板の外周部相互間を防止ガスケットとコーキング材とに
よって封塞するものである。
According to a second aspect of the present invention, the precast concrete outer wall plate has a width obtained by appropriately dividing the space between columns.
The outer wall plates that are vertically adjacent to each other at a position above each floor surface of the upper and lower floors are joined together by a metal joint, and the outer peripheral portions of the outer wall plates are sealed by a preventive gasket and a caulking material.

【0007】[0007]

【作用】本発明によれば前記したように、予め外面仕上
げが施されたプレキヤストコンクリート外壁板における
柱、梁に接する部分に設けられた欠損部を、鉄骨工事と
平行して鉄骨柱及び鉄骨梁に仮止めし、同柱、梁と定着
筋の一部が露出された前記欠損部との間に補強筋を配筋
し、柱、梁各型枠を組立ててコンクリートを打設し、前
記欠損部に露出した定着筋を介して前記外壁板と一体化
された鉄骨、鉄筋コンクリート柱、梁を構築するもので
ある。
According to the present invention, as described above, a defect portion provided in a portion in contact with a column or beam in a precast concrete outer wall plate having an outer surface finished in advance is provided with a steel column and a steel frame in parallel with the steel frame construction. Temporarily fixed to the beam, the same pillar, reinforcing bars are arranged between the beam and the defective portion where a part of the anchoring bar is exposed, and the pillar and beam molds are assembled and concrete is cast. It is intended to construct a steel frame, a reinforced concrete column, and a beam which are integrated with the outer wall plate through a fixing line exposed at the defect.

【0008】請求項2の発明によれば、上下のプレキヤ
ストコンクリート外壁板が各階床の上部において接合板
によって接合され、躯体の変形を吸収し、地震等による
変位にも追従するとともに、上下に隣る前記外壁板の外
周部相互間が防水ガスケットとコーキングとによって封
塞されていることによって、外部からの漏水が防止され
るものである。
According to the invention of claim 2, the upper and lower precast concrete outer wall plates are joined by the joining plates at the upper part of each floor, absorb the deformation of the skeleton, follow the displacement due to an earthquake, etc. Since the outer peripheral portions of the adjacent outer wall plates are sealed by the waterproof gasket and the caulking, water leakage from the outside is prevented.

【0009】[0009]

【実施例】以下本発明を図示の実施例について説明す
る。Aはプレキヤストコンクリート外壁板で、柱、梁に
接する部分に欠損部1を設けるとともに、同欠損部1に
壁主筋2及び定着筋3の一部が露出している。(図5参
照) 而して鉄骨柱a及び鉄骨梁bを建て方して、同柱a及び
梁bに前記外壁板Aの欠損部1を仮止めし、下方のプレ
キヤストコンクリート外壁板1同志は公知の接合金物で
接合し、前記鉄骨柱a及び梁bの外周に柱主筋4及び帯
筋5、梁主筋6及び肋筋7を夫々配筋するとともに、前
記プレキヤストコンクリート外壁板Aの欠損部1と鉄骨
柱a部及び鉄骨梁b部との間に補強筋8を配筋し、柱型
枠及び梁型枠(いずれも図示せず)を組立てて柱コンク
リート9及び梁コンクリート10を打設して鉄骨鉄筋コ
ンクリート構造の柱B、梁Cを構築し、同柱B、梁Cと
プレキヤストコンクリート外壁板Aとを後述のように一
体に接合する。
The present invention will be described below with reference to the illustrated embodiments. Reference numeral A denotes a precast concrete outer wall plate, in which a defective portion 1 is provided in a portion in contact with a column and a beam, and the wall main bar 2 and part of the anchoring bar 3 are exposed in the defective part 1. (See FIG. 5) Then, the steel columns a and the steel beams b are erected, the defective portions 1 of the outer wall plate A are temporarily fixed to the columns a and b, and the lower precast concrete outer wall plates 1 are used together. Is joined with a known joint metal, and column main bars 4 and stirrups 5, beam main bars 6 and ribs 7 are arranged on the outer circumferences of the steel column a and the beam b, respectively, and the precast concrete outer wall board A is missing. Reinforcing bars 8 are arranged between the part 1 and the steel column a part and the steel beam b part, and a column formwork and a beam formwork (neither of which are shown) are assembled to form a column concrete 9 and a beam concrete 10. Then, columns B and beams C having a steel-framed reinforced concrete structure are constructed, and the columns B and beams C and the precast concrete outer wall board A are integrally joined as described later.

【0010】なお前記プレキヤストコンクリート外壁板
Aの大きさは、スパン方向は柱Bを掩覆する幅Wと搬送
に都合のよい幅W′に分割し、また高さは階層高Hとす
るが、上下端縁を各階床N1 、N2 、N3 …より高さh
に位置せしめる。(図1及び図2参照) かくして梁Cに対する接合部に欠損部1を設けて、プレ
キヤストコンクリート外壁板A側の定着筋3はコツター
として、梁C側からの補強筋8をアンカーとして梁コン
クリート10を打設することによって、前記外壁板Aと
鉄骨鉄筋コンクリート構造の梁Cとが一体に接合され
る。(図4参照) 柱部も同様にして前記外壁板Aの柱面に設けた欠損部1
に露出させた補強筋3をコツターとして、柱B側の補強
筋8がアンカーとしてコンクリート9を打設することに
よって、前記外壁板Aが柱Bに接合される。(図3参
照) また上下のプレキヤストコンクリート外壁板Aは簡単な
接合金物11によって接合し、躯体の変形を吸収するよ
うにし、地震等の振動による変位にも追従しうるように
する。
The size of the precast concrete outer wall board A is divided into a width W for covering the column B and a width W ', which is convenient for transportation, in the span direction, and the height is a floor height H. , The upper and lower edges are higher than the floors N 1 , N 2 , N 3 ...
Position it. (Refer to FIG. 1 and FIG. 2) Thus, the defect portion 1 is provided at the joint portion with respect to the beam C, the anchoring bar 3 on the precast concrete outer wall board A side serves as a cotter, and the reinforcing bar 8 from the beam C side serves as an anchor. By placing 10, the outer wall plate A and the beam C having the steel frame reinforced concrete structure are integrally joined. (See FIG. 4) Similarly, the pillar portion also has a defective portion 1 provided on the pillar surface of the outer wall plate A.
The outer wall plate A is joined to the pillar B by using the exposed reinforcing bar 3 as a cotter and placing concrete 9 as the reinforcing bar 8 on the pillar B side as an anchor. (See FIG. 3) The upper and lower precast concrete outer wall boards A are joined by a simple joining hardware 11 so as to absorb the deformation of the skeleton and to be able to follow the displacement due to vibration such as an earthquake.

【0011】なお前記外壁板A間の側面外周部は、相互
の溝部12に防水ガスケット13を装着し、水切り目地
にコーキング14を施す。
In the outer peripheral portion of the side surface between the outer wall plates A, waterproof gaskets 13 are attached to the mutual groove portions 12 and caulks 14 are applied to the drainage joints.

【0012】[0012]

【発明の効果】このように本発明によれば、プレキヤス
トコンクリート外壁板の柱、梁に接する部分に、定着筋
の一部が露出した欠損部を設け、同欠損部を鉄骨柱、鉄
骨梁に仮止めし、同柱、梁と前記欠損部との間に補強筋
を配筋して柱、梁コンクリートを打設することによっ
て、鉄骨建方と平行して前記外壁板を取付けて柱、梁と
接合することによって、鉄骨の建方、柱、梁のコンクリ
ート打設後にプレキヤストコンクリート外壁板を取付け
る従来方法に比して省力化、工期の短縮を図ることがで
き、また外面仕上げが予め施されていることによって、
外部足場が不要となり、工費を低減することができる。
As described above, according to the present invention, the precast concrete outer wall plate is provided with a defective portion in which a part of the anchoring streak is exposed at a portion in contact with the pillar and the beam, and the defective portion is formed into a steel column or a steel beam. Temporarily fixed to the same column, by arranging reinforcing bars between the beam and the defective portion, by placing concrete pillars, beam concrete, by attaching the outer wall plate in parallel with the steel frame, pillars, By joining with the beam, it is possible to save labor and shorten the construction period compared with the conventional method of mounting the precast concrete outer wall plate after the concrete construction of the steel frame, pillars and beams, and the external surface finish in advance. By being given,
No external scaffolding is required, and the construction cost can be reduced.

【0013】請求項2の発明は、プレキヤストコンクリ
ート外壁板の上下が簡単な接合金物で接合されたことに
よって、躯体の変形を吸収し、地震時の変形にも追従で
き、前記外壁板の外周部相互間に設けられた防水ガスケ
ットとコーキング材とによって、外部よりの漏水が防止
される。
According to the second aspect of the present invention, the precast concrete outer wall plate is joined to the upper and lower parts with simple joining metal parts so that the deformation of the skeleton can be absorbed and the deformation at the time of earthquake can be followed, and the outer periphery of the outer wall plate The waterproof gasket and the caulking material provided between the parts prevent water leakage from the outside.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の方法によって構築された外壁面の躯体
とプレキヤストコンクリート外壁とを示す正面図であ
る。
FIG. 1 is a front view showing a skeleton of an outer wall surface and a precast concrete outer wall constructed by the method of the present invention.

【図2】図1の縦断側面図である。2 is a vertical side view of FIG.

【図3】プレキヤストコンクリート外壁板と柱との接合
部を示す横断平面図である。
FIG. 3 is a cross-sectional plan view showing a joint portion between a precast concrete outer wall plate and a column.

【図4】プレキヤストコンクリート外壁板と梁との接合
部を示す縦断面図である。
FIG. 4 is a vertical cross-sectional view showing a joint portion between a precast concrete outer wall plate and a beam.

【図5】プレキヤストコンクリート外壁板の部分斜視図
である。
FIG. 5 is a partial perspective view of a precast concrete outer wall plate.

【符号の説明】[Explanation of symbols]

A プレキヤストコンクリート外壁板 B 柱 C 梁 a 鉄骨柱 b 鉄骨梁 1 欠損部 3 定着筋 8 補強筋 9 柱コンクリート 10 梁コンクリート 11 接合金物 13 防水ガスケット 14 コーキング A Precast concrete outer wall panel B Column C Beam a Steel frame column b Steel beam 1 Defect part 3 Anchoring bar 8 Reinforcing bar 9 Column concrete 10 Beam concrete 11 Joint metal fittings 13 Waterproof gasket 14 Caulking

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 柱、梁に接する部分に欠損部を設けると
ともに、同欠損部に定着筋の一部を露出させてなる予め
外面仕上げが施されたプレキヤストコンクリート外壁板
における前記欠損部を、鉄骨柱及び鉄骨梁に仮止めし、
同鉄骨柱、梁と前記欠損部に亘って補強筋を配筋して
柱、梁コンクリートを打設することを特徴とするプレキ
ヤストコンクリート外壁の構築方法。
1. A defect portion is provided in a portion in contact with a column or a beam, and the defect portion in a precast concrete outer wall plate having a pre-external surface finish formed by exposing a part of anchoring streaks in the defect portion, Temporarily fixed to steel columns and beams,
A method for constructing an outer wall of precast concrete, comprising arranging reinforcing bars across the steel frame column, the beam and the defective portion, and placing the column and beam concrete.
【請求項2】 前記プレキヤストコンクリート外壁板
は、柱間を適宜寸法に分割した幅を有し、上下階の各床
面より上方位置において上下に隣る前記外壁板を接合金
物によって接合するとともに、前記各外壁板の外周部相
互間を防水ガスケットとコーキング材とによって封塞す
る請求項1記載のプレキヤストコンクリート外壁の構築
方法。
2. The precast concrete outer wall plate has a width in which columns are appropriately divided, and the outer wall plates vertically adjacent to each other at a position above each floor surface of the upper and lower floors are joined together by a joining hardware. The method for constructing a precast concrete outer wall according to claim 1, wherein the outer peripheral portions of the outer wall plates are sealed with a waterproof gasket and a caulking material.
JP22298791A 1991-09-03 1991-09-03 Construction method of precast concrete exterior wall Pending JPH0559775A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22298791A JPH0559775A (en) 1991-09-03 1991-09-03 Construction method of precast concrete exterior wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22298791A JPH0559775A (en) 1991-09-03 1991-09-03 Construction method of precast concrete exterior wall

Publications (1)

Publication Number Publication Date
JPH0559775A true JPH0559775A (en) 1993-03-09

Family

ID=16791031

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22298791A Pending JPH0559775A (en) 1991-09-03 1991-09-03 Construction method of precast concrete exterior wall

Country Status (1)

Country Link
JP (1) JPH0559775A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008223370A (en) * 2007-03-14 2008-09-25 Haneda Concrete Industrial Co Ltd Rigidly connecting structure of corner part

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008223370A (en) * 2007-03-14 2008-09-25 Haneda Concrete Industrial Co Ltd Rigidly connecting structure of corner part

Similar Documents

Publication Publication Date Title
JPH0559775A (en) Construction method of precast concrete exterior wall
RU2206673C2 (en) Process of erection of monolithic frames
JPH11166294A (en) Steel frame-contained concrete beam and floor construction method using the concrete beam
JPH1025840A (en) Constructing method for building frame with precast anti-seismic wall
JPH084196A (en) Panel for building
JP2614000B2 (en) Basics of steel frame
JP2797023B2 (en) Construction method of beam
JPH06104993B2 (en) Construction method of steel pipe precast concrete columns
JP2643641B2 (en) Building method using PC members
JP3312945B2 (en) Construction method of concrete structure
JPS6046219B2 (en) Construction method of concrete retaining wall
JPH06299718A (en) Construction of wall, floor in atomic power plant and wall slab thereof
JPH0598653A (en) Steel pipe concrete pillar in underground inverter construction method
JPH03275839A (en) Connection construction of reinforced concrete column and steel beam
JPH0790972A (en) Construction of building and lightweight floor slab
JPH0673785A (en) Steel framed reinforced concrete column and construction of this column and steel skeleton beam
JPS58173239A (en) Slab with beam in pc building
JPH02167937A (en) Connecting work of steel plate-concrete structure
JPH05230873A (en) Construction method of structure
JPH02120441A (en) Precast concrete wall panel and constructing wall therewith
JP2809092B2 (en) Lap joint method of main reinforcement of SRC column
JP2000017727A (en) Skelton constructing method of steel frame and reinforced concrete
JPH0544494B2 (en)
JPH0558112B2 (en)
JPH04140366A (en) Preceding erection method of prefabricated column bar and semi-pc girder in pc construction