JPH05302329A - Earth-retaining support for digged trench with pipe crossing it and earth-retaining construction method - Google Patents

Earth-retaining support for digged trench with pipe crossing it and earth-retaining construction method

Info

Publication number
JPH05302329A
JPH05302329A JP15402692A JP15402692A JPH05302329A JP H05302329 A JPH05302329 A JP H05302329A JP 15402692 A JP15402692 A JP 15402692A JP 15402692 A JP15402692 A JP 15402692A JP H05302329 A JPH05302329 A JP H05302329A
Authority
JP
Japan
Prior art keywords
earth
retaining
earth retaining
bellows
pair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP15402692A
Other languages
Japanese (ja)
Other versions
JPH0751788B2 (en
Inventor
Kenichi Fukumori
謙一 福森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIPPON SPEED SHORE
NIPPON SUPIIDE SHIYOA KK
Original Assignee
NIPPON SPEED SHORE
NIPPON SUPIIDE SHIYOA KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIPPON SPEED SHORE, NIPPON SUPIIDE SHIYOA KK filed Critical NIPPON SPEED SHORE
Priority to JP15402692A priority Critical patent/JPH0751788B2/en
Publication of JPH05302329A publication Critical patent/JPH05302329A/en
Publication of JPH0751788B2 publication Critical patent/JPH0751788B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

PURPOSE:To heighten the safety of the title method, by a method wherein an earth-retaining support consisting of both a pair of sales and struts is provided, earth-retaining structures are formed by placing sheet piles along ground walls except a place where a pipe is laid, the ground between the earth-retaining structures are excavated downward and the sheet piles are depressed. CONSTITUTION:An earth-retaining support is formed by connecting a pair of walls 3, each side view of which is in the shape of a letter U laid, with struts 4. After that, the support is placed in a trench and sheet piles 1 are, one by one, placed along ground walls except a place where a crossing pipe 8 established is laid and thus earth-retaining structures 2 are formed. After that, the ground between the earth-retaining structures 2 is excavated downward and sheet piles 1 are progressively depressed.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、横断管を有する掘削溝
の土留支保工及び土留工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an earth retaining method and an earth retaining method for an excavation groove having a cross pipe.

【0002】[0002]

【従来の技術】従来、溝掘削用の土留支保工として、シ
ーティングプレートと呼ばれる横長の土留壁(矢板)と
伸縮可能な2本以上の切りばりとが組み合わされたユニ
ットで構成されるものがある。
2. Description of the Related Art Conventionally, as an earth retaining structure for excavation of a trench, there is one which is composed of a unit in which a horizontally long earth retaining wall (sheet pile) called a seating plate and two or more expandable cutouts are combined. ..

【0003】この土留支保工を用いる土留工法では、予
掘した溝内にユニットを入れ、ユニット内を掘削しなが
らユニットが押し込まれる。掘削深さが深い場合には、
必要ユニットを積み重ねて掘削しながらユニットを押し
込む、という手順が繰り返される。
In the earth retaining method using the earth retaining support, the unit is put in the pre-drilled groove and the unit is pushed while excavating the inside of the unit. If the drilling depth is deep,
The procedure of stacking required units and pushing the units while excavating is repeated.

【0004】また、この土留支保工の撤去は、最下段の
ユニットの切りばりを短縮して幅を狭め、その上方に積
み重ねられたユニットのあいだから引き上げる方法と、
全てのユニットを連結したまま、最上段のユニットにワ
イヤーロープを掛けて全ユニットを一括して抜き上げる
方法とがある。
Further, the removal of the earth retaining bar work is performed by shortening the cut-off of the lowermost unit to narrow the width, and by pulling it up between the units stacked above it.
There is a method in which all the units are connected and a wire rope is hung on the uppermost unit to pull out all the units at once.

【0005】掘削溝の埋め戻しの方法は、これに対応し
て、下側のユニットを引き上げるごとにその深さまで埋
め戻す方法と、全てのユニットを引き抜いてから埋め戻
しをする方法とがあり、更にこの他に、埋め戻しをして
から全てのユニットを一括して引き抜く方法がある。
Corresponding to this, there are two methods of backfilling the excavation trench: a method of backfilling to the depth each time the lower unit is pulled up, and a method of backfilling after pulling out all the units. In addition to this, there is a method in which all units are collectively pulled out after backfilling.

【0006】また、他の従来の溝掘削用の土留支保工と
して、切りばりで連結されたガイドポスト(レール)
と、これに填め込まれるパネルとで構成されるものがあ
る。
[0006] Further, as another conventional earth retaining structure for excavating a trench, guide posts (rails) connected by cut-outs are used.
And a panel that fits into this.

【0007】この土留支保工を用いる土留工法では、ガ
イドポスト(レール)を適当な間隔を置いて土中に建て
込み、これにパネルを填め込んでからパネルの間を掘削
しながらガイドポスト及びパネルが押し込まれる。
In this earth retaining method using earth retaining supports, guide posts (rails) are built in the soil at appropriate intervals, the panels are fitted into the soil, and the guide posts and the panels are excavated between the panels. Is pushed.

【0008】また、この土留支保工を撤去する方法とし
ては、最下段のパネルにワイヤーロープ等を掛けてその
上側に積み重ねられたパネルを一括して抜き上げ、この
後、必要に応じてガイドポストが引き抜かれる。なお、
パネルと同時にガイドポストを引き抜く場合もある。掘
削溝の埋め戻しは、パネルの抜き上げと並行して、また
はパネルを引き上げた後に行われる。
As a method for removing the earth retaining bar work, a wire rope or the like is hung on the lowermost panel, and the panels stacked on the upper side of the panel are collectively pulled out, and then, if necessary, the guide posts. Is pulled out. In addition,
The guide post may be pulled out at the same time as the panel. The backfilling of the trench is performed in parallel with the pulling up of the panel or after the pulling up of the panel.

【0009】[0009]

【発明が解決しようとする課題】ユニット式の従来例に
よれば、シーティングプーレトの長さが約3mと長いた
め、既設の配管が横断する溝の土留をするためには、掘
削溝の長さ約3m程度にもわたって特別の土留支保工を
施工する必要がある。
According to the unit type conventional example, since the length of the seating pool is as long as about 3 m, the length of the excavation groove must be long in order to retain the groove crossed by the existing pipe. It is necessary to construct a special earth retaining structure for about 3 m.

【0010】また、上記シーティングプレートの大きさ
は長さ約3m、高さ1.0〜2.4mであり、その重量
は、例えば最大寸法のもので約565kg程度である。
また、切りばりの重量は、例えば長さ1.6〜2.0m
程度のもので約80kg程度であるので、ユニット全体
の重量は最大寸法のものでは約725kg以上にもな
る。
The size of the above-mentioned sheeting plate is about 3 m in length and 1.0 to 2.4 m in height, and its weight is, for example, about 565 kg in maximum size.
Further, the weight of the cut edge is, for example, 1.6 to 2.0 m in length.
Since the weight of the unit is about 80 kg, the total weight of the unit is about 725 kg or more.

【0011】このため、ユニットを立て込む時にクレー
ン等を用いる必要があり、例えば市街地等の余剰地が少
ない現場には不向きである。
For this reason, it is necessary to use a crane or the like when the unit is set up, which is not suitable for a site where there is little surplus land such as an urban area.

【0012】更に、シーティングプレートと切りばりと
が連結されているので、その平面積が大きくなり、広大
な保管場所が必要になり、例えば市街地等の余剰地が少
ない現場には一層不向きになる。
Further, since the seating plate and the cut-off are connected, the flat area becomes large and a vast storage space is required, which is more unsuitable for a site where there is little surplus land such as an urban area.

【0013】加えて、ユニットの撤去に際して、最下段
のユニットから一挙に抜き上げる場合には、外部から相
当の土圧を受けている状態で3m以上の長さのユニット
を抜き上げることになり、通常の重量物の揚上作業に比
べても安全性を確保する上で不利になる。
In addition, when removing the unit from the lowest unit at a time, the unit with a length of 3 m or more is pulled out while receiving a considerable earth pressure from the outside. It is disadvantageous in terms of ensuring safety, even compared to normal lifting work of heavy objects.

【0014】特に、溝内に土砂を埋め戻し、バイブロコ
ンパクタ、ランマー等の締固機を用いて埋め戻し砂を締
め固めた後にユニットを土中から抜き上げる場合には、
外側からの土圧の他に埋め戻し砂の摩擦も受けることに
なり、安全性を確保する上で一層不利になる。
In particular, when the unit is pulled back from the soil after the soil is backfilled in the groove and the backfilled sand is compacted by using a compactor such as a vibro compactor or a rammer.
In addition to the earth pressure from the outside, it is also subject to the friction of backfilled sand, which is a further disadvantage in ensuring safety.

【0015】また、上記他の従来例においても、パネル
の長さは3m程度であり、既設の配管が横断する溝の土
留をするためには、掘削溝の長さ約3m程度にもわたっ
て特別の土留支保工を施工する必要がある。
Also, in the other conventional examples, the length of the panel is about 3 m, and in order to retain the earth in the groove traversed by the existing pipe, the length of the excavation groove is about 3 m. It is necessary to construct a special earth retaining structure.

【0016】また、ガイドポストに差し込まれるパネル
の大きさ及び重量は、上記のシーティングプレートと同
様であり、ガイドポストの長さは、約3.7m、その重
量は400kgである。
The size and weight of the panel inserted into the guide post are the same as those of the above-mentioned sheeting plate, the length of the guide post is about 3.7 m, and the weight thereof is 400 kg.

【0017】したがって、上記他の従来例においても、
パネルやガイドポストの重量が大きいため、これらを建
て込む場合にクレーン等を用いなければならず、例えば
市街地等の余剰地が少ない現場には不向きである。
Therefore, also in the other conventional examples described above,
Since the weight of the panels and guide posts is large, a crane or the like must be used when building them, which is unsuitable for sites with little surplus land such as urban areas.

【0018】更に、パネルの撤去に際して、最下段のパ
ネルから一挙に抜き上げる場合には、外部から相当の土
圧を受けている状態で3m以上の長さのユニットを抜き
上げることになり、通常の重量物の揚上作業に比べても
安全性を確保する上で不利になる。
Further, when removing the panel from the bottom panel at a time, it is necessary to pull out a unit having a length of 3 m or more while receiving a considerable earth pressure from the outside. It is disadvantageous in terms of ensuring safety, even when compared to lifting heavy objects.

【0019】特に、溝内に土砂を埋め戻し、バイブロコ
ンパクタ、ランマー等の締固機を用いて埋め戻し砂を締
め固めた後にパネルを土中から抜き上げる場合には、外
側からの土圧の他に埋め戻し砂の摩擦も受けることにな
り、安全性を確保する上で一層不利になる。
Especially, when the panel is pulled out from the soil after the soil is backfilled in the groove and the backfilled sand is compacted by using a compactor such as a vibro compactor or a rammer, the earth pressure from the outside is reduced. In addition, the backfill sand will also be rubbed, which is a further disadvantage in ensuring safety.

【0020】本発明は、上記の事情を鑑みてなされたも
のであり、横断管を有する掘削溝の土留に適するととも
に、撤去時の安全性を高めることができるようにした、
横断管を有する掘削溝の土留支保工及び土留工法を提供
することを目的とする。
The present invention has been made in view of the above circumstances, and is suitable for retaining soil in an excavation groove having a cross pipe, and it is possible to enhance safety at the time of removal.
An object of the present invention is to provide a retaining method and retaining method for an excavation trench having a cross pipe.

【0021】[0021]

【課題を解決するための手段】本発明に係る土留支保工
は、上記の目的を達成するため、少なくとも1箇所どう
しが連結されるとともに、少なくとも一方の端部どうし
の間に解放空間が設けられた上下1対の部材を有する1
対の腹起こしと、1対の腹起こしの間に配置される複数
の切りばりとを備えることを特徴とする。
In order to achieve the above-mentioned object, the earth retaining structure according to the present invention is such that at least one place is connected and a release space is provided between at least one ends. 1 with a pair of upper and lower members
It is characterized in that it comprises a pair of uprisings and a plurality of cutouts arranged between the pair of uprisings.

【0022】また、本発明に係る土留工法は、予掘され
た溝内の所定の高さに請求項1、2または3に記載の1
対の腹起こしを配置し、両腹起こしを切りばりで連結し
た後、横断管の配管箇所を除いて地山壁に沿って矢板を
順次建て込んで土留壁を形成し、土留壁の間を掘り下げ
るとともに矢板を順次押し込め、横断管の上側と下側に
板状の特別の土留壁を設置することを特徴とする。
Further, the earth retaining method according to the present invention is characterized in that a predetermined height is set in the pre-drilled groove according to claim 1, 2 or 3.
After arranging a pair of bellows and connecting both bellows with a cut-out, the sheet piles are formed by sequentially building sheet piles along the ground wall excluding the pipe section of the cross pipe to form the soil retaining wall. It is characterized by digging down and pushing the sheet piles in order, and installing special earth retaining walls in the shape of plates above and below the cross pipe.

【0023】本発明の矢板は、特に限定されず、木矢
板、鋼矢板(シートパイル)、軽量鋼矢板(トレンチシ
ート)等の一般に矢板と呼ばれるものを使用すればよ
い。
The sheet pile of the present invention is not particularly limited, and wood sheet piles, steel sheet piles (sheet piles), lightweight steel sheet piles (trench sheets) and the like commonly used may be used.

【0024】本発明の腹起こしは、少なくとも1箇所ど
うしが連結されるとともに、少なくとも一方の端部どう
しの間に解放空間が設けられた上下一対の部材を有する
形状に形成される。このような形状としては、例えば側
面視において、コ字形、⊃字形、>字形、エ字形、X字
形、はしご形等が代表的である。
The abdomen riser of the present invention is formed in a shape having a pair of upper and lower members in which at least one place is connected and a release space is provided between at least one end portions. Typical examples of such shapes are U-shape, ⊃-shape,> shape, E-shape, X-shape, and ladder shape in a side view.

【0025】また、本発明の腹起こしは、互いに接合さ
れた複数本の、あるいは、曲成された1本の部材で構成
され、部材としては、一般に腹起こしの部材として使用
されるH型鋼、角パイプ、アングル等の型鋼、軽量型
鋼、あるいは口、日、目等の断面形状を有するアルミ押
出型材が用いられる。
The bellows of the present invention is composed of a plurality of members joined to each other or one bent member, and the member is an H-shaped steel generally used as a bellows member. Shaped steels such as square pipes and angles, lightweight shaped steels, or aluminum extruded shape materials having cross-sectional shapes such as mouth, sun, and eyes are used.

【0026】更に、本発明の腹起こしは、その長さ及び
高さが固定されたものでもよく、その長さと高さとの一
方または両方を伸縮できるようにしたものでもよい。
Further, the abdomen of the present invention may have a fixed length and height, or may have one or both of its length and height capable of expanding and contracting.

【0027】本発明の切りばりは、一般に切りばりとし
て使用されるものを用いればよく、その長さが固定され
たものでも、伸縮できるようにしたものでもよい。
The cut beam of the present invention may be one generally used as a cut beam, and may have a fixed length or a stretchable one.

【0028】本発明の切りばりと腹起こしとの連結構造
は、特に限定されないが、分解可能であってもよく、分
解不能であってもよい。また、腹起こしと切りばりとを
これらの位置関係を調節ないし調整可能に連結させるよ
うに構成することはなんら妨げない。
The connection structure between the cut-off and the abdomen wake of the present invention is not particularly limited, but may be disassembled or may not be disassembled. Further, there is no obstacle to constructing the abdomen upset and the cut-out joint so as to adjust or adjust their positional relationship.

【0029】本発明の切りばりの本数及びその配置は、
外側からの土圧、腹起こしの形状、強度等を考慮して各
切りばりができるだけ均等に土圧を分担するように決定
すればよく、例えば、互いに対向する上部材の中央部ど
うしを連結する切りばりと、下部材の中央部どうしを連
結する切りばりとの2本の切りばりで両腹起こしを連結
することも可能である。また、例えば互いに対向する腹
起こしの両端どうしと中間との3箇所を3本の切りばり
で連結するようにしてもよい。
The number of cuts and the arrangement thereof according to the present invention are as follows.
It may be determined in consideration of the earth pressure from the outside, the shape of the belly-up, the strength, etc. so that the respective cuts share the earth pressure as evenly as possible, for example, connecting the central portions of the upper members facing each other. It is also possible to connect both flank risers with two cutouts, a cutout and a cutout that connects the central portions of the lower members. In addition, for example, three positions, that is, both ends of the abdomen wake up facing each other and the middle may be connected by three cuts.

【0030】本発明の土留工法において、溝の予掘は例
えばバックホー等の土木作業機を用いて公知の方法で行
えばよい。
In the earth retaining method of the present invention, pre-digging of the groove may be performed by a known method using a civil engineering machine such as a backhoe.

【0031】本発明の土留工法においては、土留支保工
を予掘溝内に設置する方法としては、腹起こしと切りば
りとを分解して予掘溝に搬入して設置する方法と、予め
腹起こしと切りばりとを連結してから予掘溝に搬入して
設置する方法とがある。
In the earth retaining method of the present invention, the method of installing the earth retaining shoring in the pre-grooving is to disassemble the abdomen uplifting and the cut-out and carry it into the pre-digging groove, and to install it beforehand. There is a method in which the raising and the cut-off are connected and then carried into the pre-ditch and installed.

【0032】腹起こしと切りばりとを分解して予掘溝に
搬入して設置する方法としては、予掘溝内で腹起こしと
切りばりとを連結してから、土留支保工を所定の高さに
保持する方法と、先に腹起こしを所定の高さに保持して
から切りばりを連結する方法と、先に切りばりを所定の
高さに保持してから腹起こしを切りばりに連結する方法
とが考えられる。
As a method for disassembling the abdominal waving and the cut-out and carrying them into the pre-digging groove and installing them, after connecting the abdomen-raising and the cut-out in the pre-ditching groove, the earth retaining bar work is performed at a predetermined height. Holding the bellows at a predetermined height before connecting the cutouts, and holding the cutouts at a predetermined height before connecting the bellows to the cutouts It is possible to do this.

【0033】土留支保工、あるいは、その腹起こしは、
横断管を跨ぐようにして差し込めばよく、例えば、互い
に他方との間に適当な間隔が置かれた側(以下、開放側
という)の端部を下側に向けたり、斜め下側に向けた
り、横に向けたり、場合によっては斜め上や上に向けた
りして差し込めばよい。
The earth retaining support work, or its abdomen,
It may be inserted so as to straddle the crossing pipe. For example, the end of the side with an appropriate space between each other (hereinafter referred to as the open side) may face downward or diagonally downward. , It may be inserted sideways, or diagonally upward or upward depending on the case.

【0034】本発明の土留工法において、両土留壁は、
既設配管が横断する箇所の下側だけは矢板を打ち込めな
いので、特別の土留壁を用いる必要がある。もっとも、
横断管の上側にも特別の土留壁用いることは妨げない。
In the earth retaining method of the present invention, both earth retaining walls are
Since it is not possible to drive the sheet pile only below the point where the existing pipe crosses, it is necessary to use a special retaining wall. However,
It does not prevent the use of a special retaining wall on the upper side of the cross pipe.

【0035】なお、差し込まれた腹起こしは、特に限定
はされないが、最終的には上下の部材が水平になるよう
に配置される。また、土留壁の間に配置された腹起こし
は、切りばりによって土留壁に押し付けられるまで、適
当な吊持装置または支柱によって所定の高さに保持され
る。
Although the inserted abdomen is not particularly limited, the upper and lower members are finally arranged horizontally. Also, the abdomen located between the retaining walls is held at a predetermined height by a suitable lifting device or stanchion until it is pressed against the retaining walls by the cut-outs.

【0036】本発明の土留支保工の撤去工法は、特に限
定されず、例えば、埋め戻しと埋め戻し砂の締め固めと
をしながら腹起こしの下端まで埋め戻したら矢板を1枚
ずつ引き抜いた後、腹起こし及び切りばりを撤去する。
ここで、腹起こし及び切りばりの撤去はこれらを設置し
た手順と逆の手順で行えばよい。
The method of removing the earth retaining bar work of the present invention is not particularly limited. For example, after backfilling and compaction of the backfilling sand and backfilling to the lower end of the abdomen, after pulling out the sheet piles one by one. , Remove belly and cut.
Here, the abdomen upset and the removal of the cut may be performed in the reverse order of the procedure in which these are installed.

【0037】[0037]

【作 用】本発明においては、腹起こしが、少なくとも
一方の端部どうしの間に開放空間が設けられた上下1対
の部材を有しているので、横断管が開放空間から上下1
対の部材の間に位置するように腹起こしを差し込むよう
にして予掘溝内に鉢起こしを配置することができる。
[Operation] In the present invention, since the abdomen has a pair of upper and lower members in which an open space is provided between at least one of the ends, the crossing pipe is positioned above and below the open space.
The pot raising can be arranged in the pre-ditch by inserting the bellows so as to be located between the pair of members.

【0038】これにより、横断管に触れることなく、横
断管の上下両側に腹起こしを設置することができ、横断
管の近傍の上下両側で土留壁を確実に受け止めさせるこ
とができる。
With this, the bellows can be installed on the upper and lower sides of the crossing pipe without touching the crossing pipe, and the soil retaining wall can be reliably received on the upper and lower sides near the crossing pipe.

【0039】しかも、横断管の近傍の上下両側に同時に
腹起こしを設置できるので、土留支保工の設置が簡単に
なる。
Moreover, since the bellows can be installed at the same time on both upper and lower sides in the vicinity of the cross pipe, the installation of the earth retaining bar work is simplified.

【0040】また、腹起こしの撤去に際しては、その設
置と逆の手順で腹起こしを既設配管に接触させることな
く簡単に腹起こしを撤去することができる。
When removing the abdomen, it is possible to easily remove the abdomen by contacting the existing pipe in the reverse order of its installation.

【0041】本発明においては、土留壁が縦長の複数の
矢板で構成されるので、その1枚当たりの重量が小さく
なる。例えば既製品のトレンチシートを用いる場合、高
さを2.4mとすれば、1枚当たりの重量は約25kg
であり、従来例のシーティングプレートやパネルの約4
0分の1程度に軽くできる。
In the present invention, since the earth retaining wall is composed of a plurality of vertically long sheet piles, the weight per sheet is small. For example, when using an off-the-shelf trench sheet, if the height is 2.4 m, the weight per sheet is about 25 kg.
Which is about 4 times that of the conventional seating plates and panels.
It can be made as light as 1/0.

【0042】また、引抜き時の摩擦力は、幅250mm
の矢板の場合、片面で従来例のシーティングプレートや
パネルの約12分の1程度、両面では約24分の1程度
まで減少させることができ、幅333mmの矢板でも片
面で約9分の1程度、両面では18分の1程度まで減少
させることができる。
The frictional force at the time of drawing is 250 mm in width.
In the case of the sheet pile of No. 1, it can be reduced to about 1/12 of the sheeting plate and panel of the conventional example on one side, and to about 1 / 24th on both sides. , Both sides can be reduced to about 1/18.

【0043】[0043]

【実施例】本発明の一実施例に係る土留支保工及びこれ
を用いる土留工法を図面に基づき具体的に説明すれば、
以下の通りである。
EXAMPLE A soil retaining method and an earth retaining method using the same according to an embodiment of the present invention will be specifically described with reference to the drawings.
It is as follows.

【0044】図1の斜視図に示すように、本発明の一実
施例に係る土留支保工は、多数の縦長の矢板1からなる
1対の土留壁2を受け止めるために、側面視においてコ
字形に形成された1対の腹起こし3と、腹起こし3の上
下1対の部材3aの各端部どうしを連結する4本の切り
ばり4とを備える。
As shown in the perspective view of FIG. 1, the earth retaining bar shovel according to one embodiment of the present invention has a U-shape in a side view in order to receive a pair of earth retaining walls 2 composed of a plurality of vertically long sheet piles 1. And a pair of cut-outs 4 that connect the ends of the pair of upper and lower members 3a of the riser 3 to each other.

【0045】上記矢板1の形状、大きさ及び素材は、掘
削される溝の深さ、土圧等を考慮して決定すればよく、
この実施例では市販されている有効幅250mm、厚さ
4mm、断面形状の高さ35mmのLSP−1型トレン
チシートを用いている。
The shape, size and material of the sheet pile 1 may be determined in consideration of the depth of the trench to be excavated, earth pressure, etc.
In this embodiment, a commercially available LSP-1 type trench sheet having an effective width of 250 mm, a thickness of 4 mm and a cross-sectional shape of height 35 mm is used.

【0046】腹起こし3の側面形状は少なくとも一方の
端部どうしの間に開放空間が設けられた上下1対の部材
を有する形状であればよく、例えば側面視において、コ
字形、⊃字形、>字形、エ字形、X字形、はしご形に形
成することができる。
The side shape of the belly-up 3 may be any shape as long as it has a pair of upper and lower members with an open space provided between at least one of the ends. For example, in a side view, a U shape, a ⊃ shape, It can be formed in a V shape, an E shape, an X shape, or a ladder shape.

【0047】この実施例では、腹起こし3を部材の裁断
と溶接とによって簡単に、かつ、安価に形成できるよう
にするため、上下1対の直線状の部材3aの各一端部ど
うしを連結部材3bを介して溶接して、側面視がコ字形
になるようにした腹起こし3が用いられる。
In this embodiment, in order to make it possible to easily and inexpensively form the belly-up 3 by cutting and welding the members, one end of each of the pair of upper and lower linear members 3a is connected to each other. An abdomen wake 3 that is welded through 3b so that the side view has a U-shape is used.

【0048】腹起こし3の大きさ及び素材は、掘削され
る溝を横断する既設配管の外径、受け止める土留壁2の
面積およびこれが受ける土圧等を考慮して決定すればよ
く、ここでは、それぞれ市販の100mm×100mm
の角パイプ状の軽量型鋼からなる長さ約3mの上下の各
部材3aと、これらの一端部どうしを連結する長さ約
1.5〜2mの連結部材3bとを用いている。
The size and material of the bellows 3 may be determined in consideration of the outer diameter of the existing pipe crossing the trench to be excavated, the area of the earth retaining wall 2 to be received, the earth pressure received by the earth retaining wall 2, etc. Commercially available 100 mm x 100 mm
Each of the upper and lower members 3a having a length of about 3 m and made of square pipe-shaped lightweight steel and a connecting member 3b having a length of about 1.5 to 2 m for connecting one end of these members to each other are used.

【0049】1対の腹起こし3を連結する切りばり4
は、腹起こし3が土留壁2を介して受ける土圧を平均的
に分担できるように配置されておればよく、例えば、予
掘溝の両側に対向配置される上部材3aの中央部どうし
を連結する1本の切りばり4と、予掘溝の両側に対向配
置される下部材3aの中央部どうしを連結する1本の切
りばり4との合計2本の切りばり4を設けるようにして
もよい。
A cutout 4 for connecting a pair of abdominal risers 3
May be arranged so that the abdominal waving 3 can evenly share the earth pressure received through the earth retaining wall 2. For example, the central portions of the upper members 3a that are arranged to face each other on both sides of the pre-digging groove are A total of two cutting beams 4 are provided, one connecting cutting beam 4 and one cutting beam 4 connecting the central portions of the lower members 3a that are arranged to face each other on both sides of the pre-digging groove. Good.

【0050】ここでは、1本の切りばり4が分担する土
圧を軽減するとともに、腹起こし3を安定よく支持でき
るようにするため、予掘溝の両側に対向配置される上下
各部材3aの各端部どうしを連結する4本の切りばり4
を用いている。
Here, in order to reduce the earth pressure shared by one cut beam 4 and to stably support the bellows 3, the upper and lower members 3a, which are arranged opposite to each other on both sides of the pre-groove, are provided. 4 rivets 4 connecting each end
Is used.

【0051】すなわち、上下の各部材3aの両端部に
は、それぞれ他方に直角に突出する連結用ブラケット3
cが溶接され、1対の腹起こし3の互いに対向するブラ
ケット3cの間にそれぞれ長さが一定の切りばり4がボ
ルト止めされる。
That is, at both ends of each of the upper and lower members 3a, the connecting brackets 3 projecting at right angles to the other.
c is welded to each other, and the burrs 4 having a constant length are bolted between the brackets 3c of the pair of uprisings 3 facing each other.

【0052】ここでは、各ブラケット3cには、その突
出方向に長い長孔3dが形成され、両側の腹起こし3の
間隔を調整して切りばり4の端部とその長孔3dとに挿
通された連結用のボルトが螺締される。
Here, each bracket 3c is formed with a long hole 3d which is long in the projecting direction, and the gap between the bellows 3 on both sides is adjusted so that the bracket 3c is inserted through the end of the cut-out 4 and the long hole 3d. The connecting bolt is screwed.

【0053】この土留支保工を用いる本発明の一実施例
に係る土留工法においては、まず、溝が例えばバックホ
ー等の土木作業機を用いて公知の方法で予掘され、この
予掘溝内の横断管8が在る箇所に1対の腹起こし3と4
本の切りばり4とからなる土留支保工が設置される。
In the earth retaining method according to an embodiment of the present invention using the earth retaining structure, first, the groove is pre-digged by a known method using a civil engineering machine such as a backhoe, and the inside of the pre-digging groove is A pair of abdomens 3 and 4 where the crossing tube 8 is located
Soil retaining works consisting of a bookcut 4 will be installed.

【0054】土留支保工を予掘溝内に設置する方法とし
ては、腹起こし3と切りばり4とを分解して予掘溝に搬
入して設置する方法と、予め腹起こし3と切りばり4と
を連結してから予掘溝に搬入して設置する方法とがあ
る。
As a method of installing the earth retaining bar work in the pre-digging groove, a method of disassembling the bellows erection 3 and the cutting burrs 4 and carrying them into the pre-digging groove and setting them, and a method of preliminarily raising the belly 3 and the burrs There is a method of connecting the and and then bringing them into the pre-ditch and installing them.

【0055】また、腹起こし3と切りばり4とを分解し
て予掘溝に搬入して設置する方法としては、予掘溝内で
腹起こし3と切りばり4とを連結してから、土留支保工
を所定の高さに保持する方法と、先に腹起こし3を所定
の高さに保持してから切りばり4を連結する方法と、先
に切りばり4を所定の高さに保持してから腹起こし3を
切りばり4に連結する方法とが考えられる。
As a method for disassembling the bellows 3 and the burrs 4 and bringing them into the pre-digging groove and installing them, after connecting the belly-raising 3 and the burrs 4 in the pre-digging groove, the soil retention is carried out. A method of holding the supporting work at a predetermined height, a method of first holding the bellows 3 at a predetermined height and then connecting the cutouts 4, and a method of holding the cutouts 4 at a predetermined height first. It is conceivable that the abdomen 3 is connected to the cut-out 4 after the start.

【0056】この実施例では、1対の腹起こし3の重量
は約35〜40kg程度であり、各切りばり4の重量は
約7〜9kg程度であるので、腹起こし3と切りばり4
とを分解してあれば、土工が2〜3人掛りで腹起こし3
を1本ずつ地山壁の間に挿入し、例えば図2(a)の側
面図及び図2(b)の正面図に示すように、鎖6によっ
て吊り下げたり、図3(a)の側面図及び図3(b)の
正面図に示すように、支柱7で支持させたりして所定の
高さに保持し、両方の腹起こし3を地山壁の間に挿入し
た後、切りばり4で連結する方法が採用された。
In this embodiment, the weight of the pair of abdomens 3 is about 35-40 kg, and the weight of each cut-off 4 is about 7-9 kg.
If and are disassembled, the earthworker will get angry with 2-3 people.
Insert one by one between the ground walls and, for example, as shown in the side view of FIG. 2 (a) and the front view of FIG. 2 (b), suspend by a chain 6 or the side of FIG. 3 (a). As shown in the drawing and the front view of FIG. 3 (b), the pillars 7 are supported at a predetermined height by supporting them, and both the bellows 3 are inserted between the ground walls, and then the cutout 4 is formed. The method of connecting with was adopted.

【0057】各腹起こし3は、横断管8を跨ぐようにし
て差し込めばよく、例えば、互いに他方との間に適当な
間隔が置かれた側(以下、開放側という)の端部を下側
に向けたり、斜め下側に向けたり、横に向けたり、場合
によっては斜め上や上に向けたりして差し込めばよい。
Each of the abdominal risers 3 may be inserted so as to straddle the crossing tube 8, and for example, the end on the side (hereinafter referred to as the open side) at which an appropriate space is provided between the other is lower side. To the bottom, to the bottom diagonally, to the side, depending on the case diagonally upward or upward.

【0058】腹起こし3の挿入に際して重要なことは、
腹起こし3の開放側の端部が掘削溝を横断する既設配管
8を跨ぐようにして腹起こし3を差しこむことである。
このため、例えば図4(a)ないし図4(d)に示すよ
うに、腹起こし3の開放側の端部を下側に向けたり、斜
め下側に向けたり、横に向けたり、場合によっては斜め
上に向けたりして差し込めばよい。
What is important when inserting the belly up 3
This is to insert the bellows 3 so that the open-side end of the bellows 3 straddles the existing pipe 8 that crosses the excavation groove.
Therefore, as shown in, for example, FIGS. 4A to 4D, the open end of the abdomen 3 may be directed downward, obliquely downward, or laterally. You can insert it by pointing it diagonally upward.

【0059】この後、切りばり4を組付ける。ここで、
上下の各部材3aの両端部に設けたブラケット3cには
長孔3dが形成され、この長孔3dと切りばり4の端部
とに挿通された連結用のボルトを螺締することにより腹
起こし3と切りばり4とが連結されるようにしてあるの
で、腹起こし3と切りばり4との相対位置を調整し、腹
起こし3の間隔を所定の寸法を調整しておく。
After that, the cut-out 4 is assembled. here,
Brackets 3c provided at both ends of each of the upper and lower members 3a are provided with long holes 3d, and the long holes 3d and the ends of the notches 4 are screwed together to raise the belly. Since 3 and the cut-out 4 are connected, the relative position between the belly-up 3 and the cut-out 4 is adjusted, and the interval between the belly-up 3 is adjusted to a predetermined size.

【0060】この後、腹起こし3と地山壁との間に矢板
1を順に建て込み、土留壁2を形成する。但し、横断管
8の下方には矢板1を建て込むことができないので、横
断管8の下側には例えばベニヤ板、コンパネ等の特別の
土留壁5が建て込まれる。
After this, the sheet pile 1 is built in order between the abdominal rise 3 and the ground wall to form the retaining wall 2. However, since the sheet pile 1 cannot be built below the cross pipe 8, a special retaining wall 5 such as a plywood or control panel is built below the cross pipe 8.

【0061】横断管8の上側は矢板1を建て込むことが
可能であるが、この実施例では、誤って矢板1が横断管
8を突き破ることを防止するため、横断管8の上側にも
例えばベニヤ板、コンパネ等の特別の土留壁5を立て込
んでいる。
It is possible to build the sheet pile 1 on the upper side of the cross pipe 8, but in this embodiment, in order to prevent the sheet pile 1 from piercing the cross pipe 8 by mistake, for example, on the upper side of the cross pipe 8 as well. A special retaining wall 5 such as plywood and control panel is set up.

【0062】この土留支保工の撤去は、溝を埋め戻しな
がら行う。すなわち、腹起こし3の下方に埋め戻し砂を
入れ、締め固めた後、矢板1を順次抜き取り、腹起こし
3及び切りばり4を設置時と逆の手順で撤去し、更に埋
め戻し砂の投入と締め固めとを適当回繰り返して掘削溝
を埋め戻す。
Removal of the earth retaining bar work is performed while backfilling the groove. That is, after putting backfill sand below the bellows 3 and compacting it, the sheet pile 1 is sequentially withdrawn, and the bellows 3 and the cutouts 4 are removed in the reverse order of the installation, and further backfill sand is added. The compaction is repeated a proper number of times to backfill the trench.

【0063】この矢板1は1枚当たりの重量は従来例の
シーティングプレートやパネルの約40分の1程度に軽
くでき、また、引抜き時の摩擦力は、片面で従来例のシ
ーティングプレートやパネルの約12分の1程度、両面
では約24分の1程度まで減少する。
The sheet pile 1 can be lightened to about 1/40 of the weight of the sheeting plate and panel of the conventional example, and the frictional force at the time of pulling out is one side of the sheeting plate and panel of the conventional example. It is reduced to about 1/12 and to about 1/24 for both sides.

【0064】したがって、この矢板1を引き抜く力はユ
ニットやパネルを引き抜く従来例に比べて格段に小さく
て済み、また、引き抜かれた矢板1の重量も従来のユニ
ットやパネルに比べると格段に軽量であるので、引抜き
作業時の安全性を高めることができる。
Therefore, the force for pulling out the sheet pile 1 is much smaller than that of the conventional example for pulling out the unit or panel, and the weight of the pulled sheet pile 1 is much lighter than that of the conventional unit or panel. Therefore, it is possible to enhance the safety during the drawing work.

【0065】特に、土留壁2の高さが2.4mを超える
場合には、従来例ではユニットやパネルを積み重ねる必
要があり、撤去時には埋め戻しの前に最下段のユニット
やパネルに引上げ用のワイヤーロープを連結しておく必
要があるのに対して、例えば市販のトレンチシートやシ
ートパイルは、パネルのように全土留壁を一挙に引き抜
くのではなく、矢板1を1枚ずつ引き抜くので、撤去作
業の作業性を高めることができる。
In particular, when the height of the retaining wall 2 exceeds 2.4 m, it is necessary to stack the units and panels in the conventional example, and at the time of removal, it is necessary to pull up the units and panels at the lowest stage before backfilling. While it is necessary to connect wire ropes, for example, commercially available trench sheets and sheet piles are removed because the sheet piles 1 are pulled out one by one instead of pulling out all the retaining walls at once like panels. Workability can be improved.

【0066】上記の一実施例においては、腹起こし3と
切りばり4とを分解して予掘溝に搬入しているが、腹起
こし3と切りばり4とを予め組み立てたものの重量は約
63〜71kg程度であるので、土工が4人掛りでこの
組立品を土留壁2の間に挿入することが可能である。も
ちろん、土工の人数を少なくするためチェーンブロック
等を用いたり、バックホーで吊りながら設置することは
妨げげない。
In the above-described embodiment, the bellows raising member 3 and the cut-off beam 4 are disassembled and carried into the pre-digging groove, but the weight of the pre-assembled belly-raising member 3 and the cut-off beam 4 is about 63. Since the weight is about 71 kg, it is possible to insert this assembly between the earth retaining walls 2 by four earthworks. Of course, it is possible to use a chain block or the like to reduce the number of earthworkers, or to hang it on a backhoe and install it.

【0067】また、上記の実施例では、腹起こし3が側
面視においてコ字形に形成されているが、腹起こし3の
形状は、少なくとも1箇所どうしが連結されるととも
に、少なくとも一方の端部どうしの間に開放空間が設け
られた上下1対の部材を有する形状であればよく、例え
ば側面視において⊃字形、>字形等、エ字形、X字形、
あるいは、はしご形等に形成してもい。
In addition, in the above-mentioned embodiment, the abdomen uprising 3 is formed in a U-shape in a side view, but the shape of the abdomen uprising 3 is such that at least one place is connected and at least one end portion is connected. Any shape may be used as long as it has a pair of upper and lower members with an open space provided between them. For example, when viewed from the side, ⊃ shape,> shape, etc., E shape, X shape,
Alternatively, it may be formed into a ladder shape or the like.

【0068】更に、上記の一実施例では腹起こし3の長
さ及び高さも固定されているが、例えば図5に示すよう
に腹起こし3の高さを伸縮できるように構成したり、図
示はしないが腹起こし3の長さを伸縮できるように構成
することは妨げない。
Further, although the length and height of the abdomen wake 3 are fixed in the above-mentioned embodiment, the height of the abdomen wake 3 can be expanded and contracted as shown in FIG. Although it does not, it does not prevent that the length of the abdomen waving unit 3 can be expanded and contracted.

【0069】すなわち、連結部材3bを上下に2分割
し、これらを中間部材3eに摺動可能に挿入することに
より、両部材3aの間隔を変更可能にするとともに、中
間部材3eに上下に長い長孔3fを形成し、各連結部材
3bに挿通したボルト3gをこれらの長孔3fに摺動可
能に挿通させ、このボルト3gを締め込むことにより、
中間部材3eに上下の連結部材3bを固定できるように
している。
That is, the connecting member 3b is vertically divided into two parts, and these members are slidably inserted into the intermediate member 3e so that the distance between the two members 3a can be changed and the intermediate member 3e can be elongated vertically. A hole 3f is formed, a bolt 3g inserted through each connecting member 3b is slidably inserted through these elongated holes 3f, and the bolt 3g is tightened,
The upper and lower connecting members 3b can be fixed to the intermediate member 3e.

【0070】この場合、1種類の腹おこし3を規模が異
なる複数種類の土留支保工に共通に用いることができる
ようになり、保管すべき腹起こし3の種類を少なくして
資材保管を簡単にできるとともに、保管スペースを狭く
することができる。
In this case, one type of abdominal riser 3 can be commonly used for a plurality of types of earth retaining supports of different scales, and the number of abdominal risers 3 to be stored can be reduced to facilitate material storage. In addition to being able to do so, the storage space can be reduced.

【0071】また、切りばり4の数は、4本に限定され
ず、例えば、上下の各部材3aが連結されている側の端
部の2本に代えて、連結部材3bの中間高さを1本の切
りばり4で連結するように構成してもよく、また、上下
の各部材3aの中間部どうしを連結する2本の切りばり
4を追加するように構成してもよい。
The number of the cut-outs 4 is not limited to four. For example, instead of the two end portions on the side where the upper and lower members 3a are connected, the intermediate height of the connecting member 3b may be changed. It may be configured to be connected by one cut beam 4, or may be configured to add two cut beams 4 for connecting the intermediate portions of the upper and lower members 3a.

【0072】更に、上記の一実施例においては切りばり
4の長さは、固定しているが、例えばスクリュー式ある
いはシリンダー式のジャッキ機構を有する伸縮可能な切
りばり4を用いたり、継軸等を介して連結してその長さ
を変更したりしてもよい。
Further, although the length of the cutting beam 4 is fixed in the above-mentioned embodiment, for example, an expanding and contracting cutting beam 4 having a screw type or cylinder type jack mechanism is used, a joint shaft or the like is used. The length may be changed by connecting via.

【0073】[0073]

【発明の効果】以上説明したように、本発明において
は、少なくとも1箇所どうしが互いに連結されるととも
に、少なくとも一方の端部で互いに他方との間に適当な
間隔が置かれる上下1対の部材を有する腹起こしを用い
るので、横断管を跨ぐようにして差し込むことにより、
横断管を破断することなく同時に横断管の上下に腹起こ
しの部材を配置できる。
As described above, according to the present invention, at least one member is connected to each other, and a pair of upper and lower members are provided so that at least one end portion is appropriately spaced from the other member. Since a belly uplifter with is used, by inserting it so as to straddle the crossing tube,
It is possible to dispose the bellows members above and below the cross tube at the same time without breaking the cross tube.

【0074】また、土留壁として、横断管と交錯する箇
所を除いて矢板を用いることができるので、特別の土留
壁を形成する範囲を横断管と交錯する箇所に狭く限定で
きる上、撤去に際して矢板を引き抜く場合には、従来の
面積の大きいシーティングプレートやパネルに比べて矢
板の幅が狭く、外側からの土圧や埋め戻し砂の締め固め
圧に対する摩擦抵抗が格段に小さくなるとともに、一度
に引き抜く重量も格段に小さくなるので、作業の安全性
が高められる。
Further, since the sheet pile can be used as the retaining wall except for the portion intersecting with the cross pipe, the range of forming the special retaining wall can be narrowly limited to the portion intersecting with the cross pipe, and the sheet pile can be removed at the time of removal. The width of the sheet pile is narrower than conventional seating plates and panels with a large area, and the frictional resistance against soil pressure from the outside and compaction pressure of backfilled sand is significantly reduced, and it is pulled out at once. Since the weight is significantly reduced, work safety is improved.

【0075】更に、土留支保工の重量がシーティングプ
レートと切りばりとからなるユニットやガイドポスト及
びこれに嵌め込まれるパネルに比べると軽量であるの
で、クレーンを用いずに土留支保工や土留壁の建て込み
や撤去ができ、クレーンが入れないような狭い所でも土
留支保工及び土留壁の設置が可能になる。
Furthermore, since the weight of the earth retaining bar work is lighter than the weight of the unit consisting of the sheeting plate and the burrs and the guide post and the panel fitted therein, it is possible to construct the earth retaining bar work and the earth retaining wall without using a crane. It can be installed and removed, and earth retaining works and earth retaining walls can be installed even in a narrow space where a crane cannot be placed.

【0076】加えて、本発明においては、土留支保工が
土留壁を構成する矢板と別体に形成され、しかも、互い
に分解可能な腹起こしと切りばりとで構成しているの
で、これらを分解することにより資材の保管スペースを
狭くすることができる。
In addition, in the present invention, since the earth retaining bar work is formed separately from the sheet pile forming the earth retaining wall, and is composed of the bellows and the cuts which can be disassembled from each other, these are disassembled. By doing so, the material storage space can be narrowed.

【0077】しかも、構成が簡単であり、既設配管が横
断する溝の土留支保工として最適のものが得られる。
Moreover, the structure is simple, and the optimum one can be obtained as the earth retaining support for the groove crossed by the existing pipe.

【0078】本発明において、特に上下方向と長さ方向
との一方または両方に伸縮可能な腹起こしを用いる場合
には、1種類の腹起こしを規模が異なる複数種類の土留
支保工に共通に用いることができ、資材保管が簡単にな
るとともに、保管スペースを一層狭くすることができ
る。
In the present invention, one type of abdomen is commonly used for a plurality of types of earth retaining shovels of different scales, especially when using an abdomen which can expand and contract in one or both of the vertical direction and the length direction. Therefore, the material can be stored easily, and the storage space can be further reduced.

【0079】また、本発明において、特に上記切りばり
が伸縮可能な切りばりである場合には、1種類の切りば
りを規模が異なる複数種類の土留支保工に共通に用いる
ことができ、資材保管が簡単になるとともに、保管スペ
ースを一層狭くすることができる。
Further, in the present invention, particularly when the above-mentioned cut is a stretchable cut, one kind of cut can be commonly used for a plurality of types of earth retaining shovels having different scales, and the material can be stored. The storage space can be further reduced while simplifying the storage.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例の斜視図である。FIG. 1 is a perspective view of an embodiment of the present invention.

【図2】本発明の腹起こしの仮支持の要領を示す側面図
および正面図である。
2A and 2B are a side view and a front view showing the procedure of temporary support for abdominal acclimation of the present invention.

【図3】本発明の腹起こしの他の仮支持の要領を示す側
面図および正面図である。
3A and 3B are a side view and a front view showing another gist of temporary support for abdominal recoil according to the present invention.

【図4】本発明の腹起こしの種々の設置要領を示す各側
面図である。
FIG. 4 is a side view showing various ways of setting up the abdomen according to the present invention.

【図5】本発明の他の腹起こしの側面図である。FIG. 5 is a side view of another abdomen upset according to the present invention.

【符号の説明】[Explanation of symbols]

1 トレンチシート 2 土留壁 3 腹起こし 4 切りばり 8 既設配管 1 Trench sheet 2 Soil retaining wall 3 Raising up 4 Cutting beam 8 Existing pipe

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 少なくとも1箇所どうしが連結されると
ともに、少なくとも一方の端部どうしの間に開放空間が
設けられた上下1対の部材を有する1対の腹起こしと、
1対の腹起こしの間に配置される複数の切りばりとを備
えることを特徴とする横断管を有する掘削溝の土留支保
工。
1. A pair of bellows having at least one member connected to each other and having a pair of upper and lower members provided with an open space between at least one end portions,
An earth retaining support for an excavation trench having a cross pipe, comprising a plurality of cut-outs arranged between a pair of bellows.
【請求項2】 上下方向と長さ方向との一方または両方
に伸縮可能な腹起こしを用いる請求項1に記載の横断管
を有する掘削溝の土留支保工。
2. The earth retaining support of the excavation groove having a cross pipe according to claim 1, wherein a bellows foldable in one or both of the vertical direction and the longitudinal direction is used.
【請求項3】 上記切りばりが伸縮可能な切りばりであ
る請求項1または2に記載の横断管を有する掘削溝の土
留支保工。
3. The earth retaining support of an excavation groove having a cross pipe according to claim 1, wherein the sill is a slash that can be expanded and contracted.
【請求項4】 予掘された溝内の所定の高さに請求項
1、2または3に記載の土留支保工を配置した後、横断
管の配管箇所を除いて地山壁に沿って矢板を順次建て込
んで土留壁を形成し、土留壁の間を掘り下げるとともに
矢板を順次押し込め、横断管の下側または上下両側に板
状の特別の土留壁を設置することを特徴とする横断管を
有する掘削溝の土留工法。
4. After arranging the earth retaining bar work according to claim 1, 2 or 3 at a predetermined height in a pre-drilled groove, a sheet pile is formed along the ground wall except for the piping portion of the cross pipe. Are built in order to form a retaining wall, the space between the retaining walls is dug down and the sheet piles are pushed in sequentially, and a plate-shaped special retaining wall is installed below or above and below both sides of the retaining pipe. Soil retaining method for excavation trenches.
JP15402692A 1992-04-27 1992-04-27 Earth retaining frame and excavation method for excavated trenches with cross pipes Expired - Fee Related JPH0751788B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15402692A JPH0751788B2 (en) 1992-04-27 1992-04-27 Earth retaining frame and excavation method for excavated trenches with cross pipes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15402692A JPH0751788B2 (en) 1992-04-27 1992-04-27 Earth retaining frame and excavation method for excavated trenches with cross pipes

Publications (2)

Publication Number Publication Date
JPH05302329A true JPH05302329A (en) 1993-11-16
JPH0751788B2 JPH0751788B2 (en) 1995-06-05

Family

ID=15575287

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15402692A Expired - Fee Related JPH0751788B2 (en) 1992-04-27 1992-04-27 Earth retaining frame and excavation method for excavated trenches with cross pipes

Country Status (1)

Country Link
JP (1) JPH0751788B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002004308A (en) * 2000-06-23 2002-01-09 Taisei Corp Method for constructing underground structure
KR100593297B1 (en) * 2006-04-05 2006-06-28 (주)원건축사사무소 Structure of panel using entrance transport pipe

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002004308A (en) * 2000-06-23 2002-01-09 Taisei Corp Method for constructing underground structure
KR100593297B1 (en) * 2006-04-05 2006-06-28 (주)원건축사사무소 Structure of panel using entrance transport pipe

Also Published As

Publication number Publication date
JPH0751788B2 (en) 1995-06-05

Similar Documents

Publication Publication Date Title
KR100884289B1 (en) Composite type steel temporary construction and construction method thereof
JP5503822B2 (en) Retaining wall and its construction method
KR101793037B1 (en) Construction method of permanent wall with retaining wall combined PHC pile and steel pipe
JP6650257B2 (en) Mountain retaining structure and construction method thereof
US3243963A (en) Method of reinforcing deep excavations
US5158398A (en) Method and apparatus for an excavation support system for trenches
KR20140015019A (en) Arch wall shoring structure
KR20120109418A (en) Inclined earth retaining structure method
KR102490872B1 (en) Reinforced earth retaining wall and construction method using tensile force of steel rod piles
KR102637150B1 (en) Thumb pile using guide bracket and support bracket and construction method for retaining temporary facility using the same
JPH05302329A (en) Earth-retaining support for digged trench with pipe crossing it and earth-retaining construction method
KR20230030532A (en) Thumb pile using guide bracket and ground anchor and construction method of retaining temporary facility using the same
KR20040031451A (en) Prestressed scaffolding method
KR20190002845U (en) Braced wall
KR102150531B1 (en) Retaining wall structure using vertical underground insert and its construction method
JPH06136760A (en) Theathing construction method for excavation groove including transverse pipe and sheathing support
JPH11190024A (en) Earth retaining work
KR102276810B1 (en) Earth retaing structure, earth retaing plate and construction methd using the same
JP3500446B2 (en) Earth retaining method for earth excavation and earth retaining structure
KR100592397B1 (en) storey spacing support ssoldier pile soil retaining wall
JP3228199U (en) Construction structure of earth retaining support
KR102626432B1 (en) Temporary retaining facility using guide bracket and ground anchor for step-by-step support of deep excavation and its construction method
JP2011220009A (en) Erection method of permanent sub-substructural column
JP4889993B2 (en) Construction method of widening shaft
KR101150795B1 (en) The deepened sheet plate and the method of installation of the same

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees