JPH05280149A - Precast reinforced concrete pole - Google Patents

Precast reinforced concrete pole

Info

Publication number
JPH05280149A
JPH05280149A JP10235192A JP10235192A JPH05280149A JP H05280149 A JPH05280149 A JP H05280149A JP 10235192 A JP10235192 A JP 10235192A JP 10235192 A JP10235192 A JP 10235192A JP H05280149 A JPH05280149 A JP H05280149A
Authority
JP
Japan
Prior art keywords
column
reinforced concrete
main
precast reinforced
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP10235192A
Other languages
Japanese (ja)
Inventor
Yuji Tanaka
雄二 田中
Teruaki Yamaguchi
輝彰 山口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KABUKI KENSETSU KK
Original Assignee
KABUKI KENSETSU KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KABUKI KENSETSU KK filed Critical KABUKI KENSETSU KK
Priority to JP10235192A priority Critical patent/JPH05280149A/en
Publication of JPH05280149A publication Critical patent/JPH05280149A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To save lobor, and to reduce cost by facilitating conveyance and disposal while obtaining the arrangement of a pole main reinforcement and the degree of freedom of execution and improving joint performance, execution performance, efficiency and reliability. CONSTITUTION:A plurality of sheathed pipes 4 for pole main reinforce-ments are penetrated vertically and buried to a solid-shaped precast concrete main body section 1, into which a plurality of hoops 3a, b, c are buried, at peripheral intervals. Splicing bars 5 are positioned along and mounted at the central sections of the sheathed pipes 4, and constituted in the intermediate-stage lap joint sections 4, 5 of the pole main reinforcements 9a, b.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、鉄筋コンクリート造ラ
ーメン構造物におけるプレキャスト鉄筋コンクリート柱
材に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a precast reinforced concrete column material for a reinforced concrete rigid frame structure.

【0002】[0002]

【従来の技術】鉄筋コンクリート造ラーメン構造物の構
築においては、工場等で予め鉄筋を組み立て、その組立
鉄筋を施工現場に搬入して配筋する先組み工法が開発さ
れ、最近は、工場等で予め製造した単材のプレキャスト
鉄筋コンクリート柱材、さらに同梁材、同床材、同壁材
等を施工現場に搬入して配設し、各接合部にコンクリー
トを打設して一体的な構造体(躯体)として構築する工
法が開発、普及されており、型枠の節減や、工程の簡素
化、能率の向上、工期の短縮とともに施工精度等が高め
られている。
2. Description of the Related Art In the construction of reinforced concrete ramen structures, a pre-assembled construction method has been developed in which steel bars are assembled in advance in factories, etc., and the assembled steel bars are delivered to the construction site and arranged. The manufactured single-piece precast reinforced concrete pillar material, the same beam material, the same floor material, the same wall material, etc. are brought into the construction site and placed, and concrete is placed at each joint to form an integrated structure ( The method of constructing as a structure has been developed and popularized, and the construction accuracy has been improved as well as the saving of formwork, the simplification of the process, the improvement of efficiency, the shortening of the construction period.

【0003】また、従来のプレキャスト鉄筋コンクリー
ト柱材は、中実状のプレキャストコンクリート(PC)
主体部に多数の帯筋(剪断補強筋)、複数の柱主筋を埋
設するとともに、その柱主筋の下部に嵌合させて複数の
鋼管継手を配設し、柱頭部から短く突出した柱主筋の上
部を前記の鋼管継手に嵌合して、前記主体部の下部内に
鋼管継手部を構成する構造になつている。
The conventional precast reinforced concrete pillars are solid precast concrete (PC).
A large number of strip reinforcements (shear reinforcement reinforcements) and multiple column main reinforcements are embedded in the main body part, and multiple steel pipe joints are placed in the lower part of the column main reinforcements. The upper part is fitted to the steel pipe joint to form a steel pipe joint part in the lower part of the main body part.

【0004】[0004]

【発明が解決しようとする課題】従来のプレキャスト鉄
筋コンクリート柱材は、前記のようにそのプレキャスト
コンクリート主体部に柱主筋が埋設されその一部が突出
されて、主筋の配筋、施工の自由度がなく搬送、配設等
の支障となる。また、前記主体部の下部内に埋設されて
いる鋼管継手に、床上より突出した短い柱主筋の突出部
を挿入してグラウト材を注入し、比較的に応力の大きい
柱材の下端部で柱主筋の上下部を突合わせて接続する継
手機構になつているため、鋼管継手内の主筋上端部の挿
入位置の精度が要求されるなど、施工能率、構造耐力に
対する信頼性等に問題点がある。
In the conventional precast reinforced concrete column material, as described above, the main reinforcement of the column is embedded in the main body of the precast concrete and a part of the main reinforcement is projected, so that the reinforcement of the main reinforcement and the degree of freedom of construction are reduced. Without this, it will be an obstacle to transportation and arrangement. Further, the steel pipe joint embedded in the lower portion of the main body portion, the protrusion of a short column main bar protruding from the floor is inserted to inject grout material, and the column at the lower end of the column material with relatively large stress Since it is a joint mechanism that connects the upper and lower parts of the main bar by abutting, there is a problem in construction efficiency, reliability of structural strength, etc., such as the accuracy of the insertion position of the upper end of the main bar in the steel pipe joint is required. ..

【0005】本発明は、上記のような課題に対処するた
めに開発されたものであつて、その目的とする処は、搬
送、配設を容易にするとともに、柱主筋の配筋、施工の
自由度を有し、継手性能、施工性能、能率及び信頼性を
向上して、省力化、コスト節減を可能としたプレキャス
ト鉄筋コンクリート柱材を提供するにある。
The present invention was developed in order to address the above-mentioned problems, and the object of the present invention is to facilitate transportation and arrangement, and also to arrange the main bar of the column and the construction. It is intended to provide a precast reinforced concrete column material which has flexibility and improves joint performance, construction performance, efficiency and reliability, and which enables labor saving and cost reduction.

【0006】[0006]

【課題を解決するための手段】本発明は、多数の帯筋が
埋設されている中実状のプレキャストコンクリート主体
部に、複数本の柱主筋用シース管を周間隔を置き縦に貫
通させて埋設し、同シース管の中央部に添筋を沿設して
柱主筋の中段重ね継手部に構成したプレキャスト鉄筋コ
ンクリート柱材とし、搬送、配設とともに柱主筋の施
工、調整を容易とし、施工能率、精度等の信頼性等を高
めている。
According to the present invention, a plurality of sheath pipes for column main bars are vertically penetrated and embedded in a solid precast concrete main body in which a large number of stirrups are buried. As a precast reinforced concrete column material that was constructed in the middle lap joint part of the column main bar by arranging the reinforcement bar in the center of the sheath tube, it facilitates the construction and adjustment of the column main bar along with the transportation and installation, and the construction efficiency, Improves reliability such as accuracy.

【0007】[0007]

【作用】該プレキャスト鉄筋コンクリート柱材を、床上
の各柱主筋の突出部に上方からシース合せしてその各シ
ース管内に挿入して建て込み、梁、床材の配設後、柱主
筋を各シース管の上部から挿入して前記柱主筋の突出部
上に突き合わせ、グラウトを各シース管内に下部より注
入して、各シース管と沿設されている添筋により、比較
的に応力の小さい柱中段部で柱主筋が容易に高精度で強
力に接続され、また、柱主筋が埋設されてなく容易に搬
送して所望位置に配設されるとともに、主筋の配筋、施
工調整が自在に行われ、柱が容易に所望強度に高精度で
施工される。
[Operation] The precast reinforced concrete column material is sheathed from above to the projecting portion of each column main bar on the floor, inserted into each sheath tube and built in, and after the beams and floor materials are arranged, the column main bar is sheathed. Inserted from the upper part of the tube and abutted on the protruding part of the column main bar, grout is injected into each sheath tube from the lower part, and the column middle stage with relatively small stress is added by the reinforcement bar arranged along each sheath tube. The column main bars are easily and accurately and strongly connected to each other, and the column main bars are not buried and can be easily transported and placed at a desired position, and the main bars can be arranged and adjusted freely. , Pillars can be easily constructed to desired strength with high precision.

【0008】[0008]

【実施例】図1及び図2に本発明のプレキャスト鉄筋コ
ンクリート柱材の各実施例を示す。図中1はプレキャス
トコンクリート(PC)主体部、3a,b,cは帯筋
(剪断補強筋)、4は柱主筋用のシース管、5は添筋、
9a,bは柱主筋であつて、多数の帯筋3a,b,cが
埋設されている中実状のプレキャストコンクリート主体
部1に、複数本の柱主筋9a,b用シース管4を周間隔
を置き縦に貫通させて埋設し、同シース管4の中央部に
添筋5を沿設して柱主筋9a,bの中段重ね継手部4,
5に構成したプレキャスト鉄筋コンクリート柱材10に
なつている。
EXAMPLES FIGS. 1 and 2 show examples of the precast reinforced concrete column material of the present invention. In the figure, 1 is a precast concrete (PC) main body, 3a, b, and c are stirrups (shear reinforcements), 4 is a sheath tube for column main bars, 5 is splint,
9a and 9b are column main reinforcements, and a plurality of sheath pipes 4 for column main reinforcements 9a and b are arranged at circumferential intervals on a solid precast concrete main body 1 in which a large number of strip reinforcements 3a, b and c are embedded. It is vertically inserted and embedded, and a reinforcing bar 5 is provided along the central portion of the sheath tube 4 so that the middle lap joint section 4 of the column main bars 9a and 9b is formed.
It is the precast reinforced concrete pillar material 10 configured in 5.

【0009】前記プレキャスト鉄筋コンクリート柱材1
0は、鉄筋コンクリート造ラーメン構造物において、梁
材、床材、壁材等とともに基本骨組を形づくり、曲げ、
剪断のほかに軸力を受けて耐座屈力も要求され、前記構
造物が比較的に低層の場合は、図2(A)に示すように
プレキャストコンクリート主体部1の横断面積ととも
に、シース管4及び添筋5が減少され、帯筋(剪断補強
筋)は主帯筋3aと副帯筋3bからなり、前記構造物が
比較的に高層の場合は、図2(B)のようにプレキャス
トコンクリート主体部1の横断面積とともに、シース管
4及び添筋5が増設され、それに対応して帯筋は主帯筋
3aと複数の副帯筋3cからなり、あるいは、図2
(C)のように主帯筋3aと複数の副帯筋3b、3cか
らなる帯筋が施されて、所要強度に設定される。本発明
の中段重ね継手部4,5は、図示のようにシース管4の
側部に2〜3本の添筋5を対設するとともに、図3に示
すように柱中央部に適宜長さにわたり配設して構成され
る。
The precast reinforced concrete column material 1
0 is for reinforced concrete ramen structure to form and bend the basic frame with beams, floors, walls, etc.
In addition to shearing, axial force is also required to resist buckling, and when the structure is a relatively low layer, as shown in FIG. 2 (A), the cross-sectional area of the precast concrete main body 1 and the sheath pipe 4 And the reinforcing bar 5 is reduced, and the stirrup (shear reinforcing bar) is composed of the main stirrup 3a and the sub stirrup 3b. When the structure is relatively high, as shown in FIG. Along with the cross-sectional area of the main body portion 1, a sheath tube 4 and a supplementary bar 5 are added, and the stirrups consist of a main stirrup 3a and a plurality of sub stirrups 3c, or FIG.
As shown in (C), a stirrup composed of the main stirrup 3a and the plurality of sub stirrups 3b and 3c is applied to set the required strength. The middle-stage lap joint portions 4 and 5 of the present invention have two to three additional reinforcements 5 arranged opposite to each other on the side of the sheath tube 4 as shown in the figure, and as shown in FIG. It is arranged over.

【0010】本発明のプレキャスト鉄筋コンクリート柱
材10は、図1に示すように床上の各柱主筋9aの突出
部に上方からシース合せして、その各シース管4に挿入
して建て込まれ、各柱主筋9aの突出部が各シース管4
の中央部まで挿入されて、簡単な支保工で精度良く建て
込まれる。次ぎに梁、床材を配設した後、柱主筋9bを
各シース管4の上部から挿入して各柱主筋9aの上端部
に突き当てグラウト材を好ましくは下方から注入して、
各シース管4とそれに沿設されている複数本の添筋5に
より、比較的に応力の小さい柱中央部、即ち中段部で柱
主筋9a,9bが容易に強力に接続される。また、柱主
筋が埋設されてなく容易に搬送して所望位置に設置さ
れ、柱主筋の選択、その突出部等の調整が自在に行われ
て所望強度に施工されるなど、柱が精度良く能率的に施
工される。
As shown in FIG. 1, the precast reinforced concrete column member 10 of the present invention is fitted with a sheath from above to the protruding portion of each column main bar 9a on the floor, and inserted into each sheath tube 4 to be built therein. The projecting portion of the column main bar 9a is the sheath tube 4
It is inserted up to the central part of and is built with high accuracy by simple support work. Next, after arranging the beam and the floor material, the column main bar 9b is inserted from the upper part of each sheath tube 4 and abutted against the upper end of each column main bar 9a, and the grout material is preferably injected from below,
By the sheath tubes 4 and the plurality of reinforcing bars 5 arranged along the sheath tubes 4, the pillar main bars 9a and 9b are easily and strongly connected at the central portion of the pillar with relatively small stress, that is, the middle step. In addition, the column main bar is not buried and can be easily transported and installed at a desired position, and the column main bar can be selected and its protrusions can be adjusted freely to construct it to the desired strength. Will be constructed.

【0011】[0011]

【発明の効果】本発明は、上述のような構成からなり、
該プレキャスト鉄筋コンクリート柱材は、容易に搬送、
配設されて、床上に突出した柱主筋の上端部に上方から
シース合せしてその各シース管内に挿入して建て込ま
れ、柱主筋を各シース管の上部から挿入し、グラウト材
を各シース管内に注入することにより、各シース管と沿
設されている添筋によつて柱主筋が比較的に応力の小さ
い柱中段部で精度良く強力に接続され、主筋の配筋、施
工が自在に調整されるなど、柱主筋の継手性能、柱の施
工性能、能率及び信頼性が向上され省力化、コスト節減
等の利点を有する。
The present invention has the above-mentioned structure.
The precast reinforced concrete pillar material is easily transported,
The sheath is installed from above into the upper end of the column main bar protruding above the floor and inserted into each sheath tube, and the column main bar is inserted from the upper part of each sheath tube, and the grout material is inserted into each sheath. By injecting into the pipe, the main reinforcement of the column is accurately and strongly connected at the middle step of the column where the stress is comparatively small, by the reinforcements arranged along with each sheath pipe, and the arrangement and the construction of the main reinforcement are free. Adjusted, the joint performance of the column main bar, the construction performance of the column, efficiency and reliability are improved, and there are advantages such as labor saving and cost saving.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例を示す縦断面図(A)と要部
拡大図(B)及び平面図(C)
FIG. 1 is a vertical sectional view (A), an enlarged view of a main part (B) and a plan view (C) showing an embodiment of the present invention.

【図2】本発明の他実施例を示す低層鉄筋コンクリート
造ラーメン構造物の場合と高層鉄筋コンクリート造ラー
メン構造物の場合及び同じく他実施例の各平面図(A)
〜(C)
FIG. 2 is a plan view of a low-rise reinforced concrete rigid-frame structure and a high-rise reinforced concrete rigid-frame structure according to another embodiment of the present invention, and each plan view of the other embodiment (A).
~ (C)

【図3】柱における応力分布図である。FIG. 3 is a stress distribution diagram in a column.

【符号の説明】[Explanation of symbols]

1 プレキャストコンクリート主体部 3a,b,c 帯筋 4 シース管 5 添筋 9a,b 柱主筋 1 Precast concrete main body 3a, b, c Strip reinforcement 4 Sheath pipe 5 Reinforcement 9a, b Column main reinforcement

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 多数の帯筋が埋設されている中実状のプ
レキャストコンクリート主体部に、複数本の柱主筋用シ
ース管を周間隔を置き縦に貫通させて埋設するととも
に、同シース管の中央部に添筋を沿設して柱主筋の中段
重ね継手部に構成したことを特徴とするプレキャスト鉄
筋コンクリート柱材。
1. A plurality of sheath pipes for column main bars are vertically penetrated at a circumferential interval in a solid precast concrete main body in which a large number of stirrups are buried, and a central portion of the sheath pipe. A precast reinforced concrete column material characterized in that it is configured as a middle-stage lap joint part of the column main bar with a reinforcement bar along the section.
JP10235192A 1992-03-30 1992-03-30 Precast reinforced concrete pole Pending JPH05280149A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10235192A JPH05280149A (en) 1992-03-30 1992-03-30 Precast reinforced concrete pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10235192A JPH05280149A (en) 1992-03-30 1992-03-30 Precast reinforced concrete pole

Publications (1)

Publication Number Publication Date
JPH05280149A true JPH05280149A (en) 1993-10-26

Family

ID=14325064

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10235192A Pending JPH05280149A (en) 1992-03-30 1992-03-30 Precast reinforced concrete pole

Country Status (1)

Country Link
JP (1) JPH05280149A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160086857A (en) 2014-12-10 2016-07-20 가부시키가이샤 아루박 Electron beam evaporation source and vacuum deposition apparatus

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0434161A (en) * 1990-05-31 1992-02-05 Kabuki Kensetsu Kk Centrifugally molded hollow pc concrete column and column construction method

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0434161A (en) * 1990-05-31 1992-02-05 Kabuki Kensetsu Kk Centrifugally molded hollow pc concrete column and column construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160086857A (en) 2014-12-10 2016-07-20 가부시키가이샤 아루박 Electron beam evaporation source and vacuum deposition apparatus

Similar Documents

Publication Publication Date Title
JPH0518003A (en) Joining method of steel pipe concrete column and half-precast reinforced concrete column
JP3050136B2 (en) Connection structure between reinforced concrete columns and steel beams with large diameters only in the column reinforcement around the panel zone
JPH05280149A (en) Precast reinforced concrete pole
JPH0726624A (en) Joint method of steel encased reinforced concrete column in precast method
CN112780007A (en) Fully-prefabricated concrete shear wall and construction method thereof
JPH0699963B2 (en) Prestressed RPC method and prestressed PC columns with beams
JPH03132532A (en) Construction method of precast reinforced concrete column and beam
WO2009066829A1 (en) Connector for pre-fabricating the reinforced bar and connecting method using the connector
JP2007154565A (en) Joint structure and construction method of column and beam-less slab
JP2762906B2 (en) RC frame
JP2000073448A (en) Connection method and structure for precast concrete beam and column
JPH06316964A (en) Method for constructing joint of precast reinforced concrete column and beam
JP2984626B2 (en) PC pillar construction method and its PC pillar
JPS6134404Y2 (en)
JPH06306931A (en) Construction of steel frame reinforced concrete structure
JP3039260B2 (en) Building method using PC members
JPH069130Y2 (en) Hollow slubler men structure
JP2701650B2 (en) PC column / beam frame structure and PC column / beam joint members
JPH0447737B2 (en)
JPH07247632A (en) Prestressed, precast concrete beam, and joined structure of same with column
JPH04281947A (en) Precast reinforced concrete post material and precast reinforced concrete walling
JP2575104Y2 (en) Beam-column joint structure of precast concrete structure
JPH0531632B2 (en)
JPH05230935A (en) Precase concrete made beam frame member
JPH02236328A (en) Construction method for super-highrice building