JPH05280099A JP7997192A JP7997192A JPH05280099A JP H05280099 A JPH05280099 A JP H05280099A JP 7997192 A JP7997192 A JP 7997192A JP 7997192 A JP7997192 A JP 7997192A JP H05280099 A JPH05280099 A JP H05280099A
Authority
JP
Japan
Prior art keywords
pillar
column
joining part
pillars
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP7997192A
Other languages
Japanese (ja)
Inventor
Kazuhiro Uchida
和弘 内田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP7997192A priority Critical patent/JPH05280099A/en
Publication of JPH05280099A publication Critical patent/JPH05280099A/en
Pending legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

PURPOSE:To prevent local bearing breakage by respectively arranging reinforcing iron plates on the lower face of an upper story pillar and the upper face of a lower story pillar which are in contact with the upper and lower flange faces of a steel framed beam in the joining part of pillar and beam. CONSTITUTION:The joining part of pillar and beam B' of a steel framed beam B is provided on the reinforcing iron plate 2 of the precast RC pillar A of a lower story, a formwork is assembled by surrounding the joining part B' with hoop reinforcement 5, and concrete of the joining part B' is placed together with slab concrete. Next, the precast RC pillar A1 of an upper story is built on, a reinforcing iron plate 1 is integratedly fitted to the lower face, the pillar main reinforcement 3 of the pillar A2 is inserted into a splice sleeve 4 and mortar is filled, and hence the main reinforcement 3 of the pillars A1, A2 of the upper and lower stories are connected together. Against the force applied on the joining part B', the average force is transmitted from the beam B to the pillars A1, A2 through the iron plates 1, 2. Hereby, local bearing breakage at the pillars A1, A2 can be prevented.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は鉄筋コンクリート柱(以
下RC柱と称する)と鉄骨梁(以下S梁と称する)とよ
りなる柱梁の接合部の補強構造に係るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a reinforcing structure of a joint portion of a column beam composed of a reinforced concrete column (hereinafter referred to as RC column) and a steel frame beam (hereinafter referred to as S beam).

【0002】[0002]

【従来の技術】RC柱とS梁とよりなる複合構造におい
て特別な補強を施さない柱,梁接合部は図4及び図5に
示すように、RC柱aにS梁bが貫通したような構造と
なる。
2. Description of the Related Art In a composite structure consisting of RC columns and S beams, columns and beam joints which are not specially reinforced are as shown in FIG. 4 and FIG. It becomes a structure.

【0003】[0003]

【発明が解決しようとする課題】このようにRC柱aに
S梁bが貫通したような従来の柱,梁接合部において
は、梁幅が柱幅よりも小さいため、S梁bのフランジ部
分と上下各RC柱aの端部の一部分だけが接触し、局部
的に支圧破壊を生じることがある。図4及び図5におい
てdは柱端部の開口部、eは柱端部の圧壊部である、な
おQは柱剪断力、Mは柱曲げモーメント、Q′は梁剪断
力、M′は梁曲げモーメントである。更にcは柱主筋で
ある。
In the conventional column-beam joint in which the S beam b penetrates the RC column a as described above, since the beam width is smaller than the column width, the flange portion of the S beam b is And only a part of the end of each of the upper and lower RC columns a may come into contact with each other, which may locally cause bearing failure. 4 and 5, d is the opening at the end of the column, e is the crushing portion at the end of the column, Q is the column shearing force, M is the column bending moment, Q'is the beam shearing force, and M'is the beam. Bending moment. Further, c is the main pillar muscle.

【0004】本発明は前記従来技術の有する問題点に鑑
みて提案されたもので、その目的とする処は、前記RC
柱とS梁との接合部において、RC柱における局部支圧
破壊が回避されるRC柱とS梁との接合部の補強構造を
提供する点にある。
The present invention has been proposed in view of the above problems of the prior art, and the object of the present invention is to provide the RC
The point is to provide a reinforcing structure for the joint between the RC column and the S-beam that avoids local bearing failure in the RC column at the joint between the column and the S-beam.

【0005】[0005]

【課題を解決するための手段】前記の目的を達成するた
め、本発明に係るRC柱とS梁の接合部の補強構造は、
鉄筋コンクリート柱と鉄骨梁よりなる建築物の柱梁接合
部において、同柱梁接合部内における鉄骨梁の上下フラ
ンジ面に接する上階柱の下面及び下階柱の上面に夫々補
強用鉄板を配設して構成されている。
In order to achieve the above-mentioned object, a reinforcing structure for a joint between an RC column and an S-beam according to the present invention comprises:
In a beam-column joint of a building consisting of reinforced concrete columns and steel beams, reinforcing iron plates are placed on the lower surface of the upper floor column and the upper surface of the lower floor column that contact the upper and lower flange surfaces of the steel beam in the beam-column joint, respectively. Is configured.

【0006】[0006]

【作用】本発明に係るRC柱とS梁の接合部の補強構造
は前記したように構成されているので、前記接合部に作
用する力に対してS梁がRC柱の上面及び下面に配設さ
れた補強用鉄板を介して柱に力を伝達するので、前記R
C柱には平均的に力が伝達されるようになる。
Since the reinforcing structure for the joint between the RC column and the S-beam according to the present invention is constructed as described above, the S-beam is arranged on the upper and lower surfaces of the RC column against the force acting on the joint. Since the force is transmitted to the column via the reinforcing iron plate provided,
The force is transmitted to the C pillars on average.

【0007】[0007]

【実施例】以下本発明を図示の実施例について説明す
る。A1 ,A2 は工場等で製作された上階のプレキャス
トRC柱及び下階のプレキャストRC柱で、上階のRC
柱A1 の下面及び下階のRC柱A2 の上面には夫々補強
用鉄板1,2が一体に取付けられている。下階のRC柱
2 の柱主筋3は柱梁接合部を貫通して上階のRC柱A
1 の柱主筋3の下端に固定されたスプライススリーブ4
に挿入、接合されるように構成されている。
The present invention will be described below with reference to the illustrated embodiments. A 1 and A 2 are precast RC pillars on the upper floor and precast RC pillars on the lower floor, which are manufactured in factories.
Reinforcing iron plates 1 and 2 are integrally attached to the lower surface of the pillar A 1 and the upper surface of the RC pillar A 2 on the lower floor, respectively. The RC main column 3 of the RC column A 2 on the lower floor penetrates the beam-column joint, and the RC column A on the upper floor
Splice sleeve 4 fixed to the lower end of one of the pillars main reinforcement 3
It is configured to be inserted and joined to.

【0008】BはH型鋼製梁で同梁の直交する柱梁接合
部B′においてフープ筋5が同部を囲繞して取付けられ
ている。而して施工に際して柱梁接合部においては、下
階のRC柱A1 の補強用鉄板2上にRC梁Bの柱梁接合
部B′を設置し、柱梁接合部まわりに型枠を組立て、柱
梁接合部のコンクリートをスラブコンクリートとともに
打設する。
Reference numeral B is an H-shaped steel beam, and a hoop streak 5 is attached to the beam-column joint portion B'of the beam which surrounds the beam portion. At the time of construction, at the beam-column joint, the beam-column joint B'of the RC beam B is installed on the reinforcing iron plate 2 of the RC column A 1 on the lower floor, and the formwork is assembled around the beam-column joint. , Concrete of beam-column joints is placed together with slab concrete.

【0009】次いでその上に上階のRC柱A1 を建込
み、スプライススリーブ4に下階のRC柱A2 の柱主筋
3を挿入してモルタルを充填して、上下階のRC柱
1 ,A2の柱主筋3を接続する。図示の実施例は前記
したように構成されているので、S梁Bが前記補強用鉄
板1,2を介して前記RC柱A1 ,A2 に力を伝達する
ので、同柱には平均的に力が伝達される。
Next, an RC column A 1 on the upper floor is erected on the RC column A 1 on the upper and lower floors by inserting the column main bar 3 of the RC column A 2 on the lower floor into the splice sleeve 4 and filling the mortar. , A 2 of the column main bar 3 is connected. Since the illustrated embodiment is configured as described above, since the S beam B transmits the force to the RC columns A 1 and A 2 via the reinforcing iron plates 1 and 2, the S column B is averagely distributed to the RC columns A 1 and A 2. Force is transmitted to.

【0010】なお図中6は局部支圧部分である。Reference numeral 6 in the drawing denotes a local pressure bearing portion.

【0011】[0011]

【発明の効果】本発明によれば前記したように、RC柱
とS梁とよりなる柱梁接合部において、同接合部内にお
ける鉄骨梁の上下フランジ面に接する上階柱の下面及び
下階柱の上面に夫々補強用鉄板を配設した簡単な構造に
よって、柱には平均的に力が流れることによって局部支
圧破壊の回避が可能となる。
As described above, according to the present invention, in the beam-column joint composed of the RC column and the S-beam, the lower surface of the upper floor column and the lower floor column which are in contact with the upper and lower flange surfaces of the steel beam in the joint portion. With a simple structure in which reinforcing iron plates are arranged on the upper surface of each of the columns, it is possible to avoid local bearing failure due to an average force flowing through the columns.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係る鉄筋コンクリート柱と鉄骨梁の接
合部の補強構造の一実施例を示す縦断面図である。
FIG. 1 is a longitudinal sectional view showing an example of a reinforcing structure for a joint portion between a reinforced concrete column and a steel frame beam according to the present invention.

【図2】図1の矢視イ−イ図である。FIG. 2 is an arrow view of FIG.

【図3】本発明の補強構造の施工要領を示す斜視図であ
る。
FIG. 3 is a perspective view showing a construction procedure of the reinforcing structure of the present invention.

【図4】従来構造の破壊メカニズムを示す説明図であ
る。
FIG. 4 is an explanatory diagram showing a destruction mechanism of a conventional structure.

【図5】図4の平面図である。FIG. 5 is a plan view of FIG.

【符号の説明】[Explanation of symbols]

1 上階のプレキャストRC柱 A2 下階のプレキャストRC柱 B S梁 1 補強用鉄板 2 補強用鉄板 3 柱主筋 4 スプライススリーブ 5 フープ筋 6 局部支圧部分A 1 Upper floor precast RC column A 2 Lower floor precast RC column B S beam 1 Reinforcing iron plate 2 Reinforcing iron plate 3 Column main bar 4 Splice sleeve 5 Hoop bar 6 Local bearing part

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 鉄筋コンクリート柱と鉄骨梁よりなる建
築物の柱梁接合部において、同柱梁接合部内における鉄
骨梁の上下フランジ面に接する上階柱の下面及び下階柱
の上面に夫々補強用鉄板を配設してなることを特徴とす
る鉄筋コンクリート柱と鉄骨梁の接合部の補強構造。
1. In a beam-column joint of a building composed of a reinforced concrete column and a steel frame beam, for reinforcement on the lower surface of the upper floor column and the upper surface of the lower floor column which contact the upper and lower flange surfaces of the steel beam in the beam-column joint, respectively. A reinforcing structure for a joint between a reinforced concrete column and a steel beam, which is characterized by disposing an iron plate.
JP7997192A 1992-04-01 1992-04-01 Reinforced construction for joint part of reinforced concrete pillar and steel framed beam Pending JPH05280099A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7997192A JPH05280099A (en) 1992-04-01 1992-04-01 Reinforced construction for joint part of reinforced concrete pillar and steel framed beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7997192A JPH05280099A (en) 1992-04-01 1992-04-01 Reinforced construction for joint part of reinforced concrete pillar and steel framed beam

Publications (1)

Publication Number Publication Date
JPH05280099A true JPH05280099A (en) 1993-10-26

Family

ID=13705214

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7997192A Pending JPH05280099A (en) 1992-04-01 1992-04-01 Reinforced construction for joint part of reinforced concrete pillar and steel framed beam

Country Status (1)

Country Link
JP (1) JPH05280099A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07150639A (en) * 1993-11-30 1995-06-13 Kajima Corp Joint structure of reinforced concrete columns and steel beams
JP2018150770A (en) * 2017-03-15 2018-09-27 大成建設株式会社 A column beam structure using a hollow precast concrete column and a building structure including the column beam frame

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07150639A (en) * 1993-11-30 1995-06-13 Kajima Corp Joint structure of reinforced concrete columns and steel beams
JP2018150770A (en) * 2017-03-15 2018-09-27 大成建設株式会社 A column beam structure using a hollow precast concrete column and a building structure including the column beam frame

Similar Documents

Publication Publication Date Title
JP3752999B2 (en) Upper and lower integrated bridge and its construction method
JPH05280099A (en) Reinforced construction for joint part of reinforced concrete pillar and steel framed beam
JP2716508B2 (en) Column and beam joint structure
JPH09273318A (en) Earthquakeproof reinforcing structure for beam-column joint in existing reinforced concrete or steel-concrete composite structure
JPH06212691A (en) Construction method of building
JP3039295B2 (en) Manufacturing method of prefabricated member of mixed structure
JP3516927B2 (en) Seismic reinforcement frame
JPH1150538A (en) Building and its construction method
JP3041433B2 (en) Joint structure between reinforced concrete columns and steel beams
JPS63181816A (en) Constituent material for underground beam
JPH0447737B2 (en)
JP3519331B2 (en) Joint structure between bundle columns and beams of seismic retrofit unit
JPH0366878A (en) Construction method for precast column and beam and precast anti-seismic wall
JP2949650B2 (en) Precast reinforced concrete members
JPH069140Y2 (en) Structure of structure of building
JPH02236328A (en) Construction method for super-highrice building
JPH08232400A (en) Steel-framed concrete composite beam structure
JPH0123614B2 (en)
JP2973009B2 (en) Connection method between synthetic steel beams and steel bars or steel reinforced concrete columns
JPH04353149A (en) Precast reinforced concrete beams and their connection method
JPH02167939A (en) Construction work of precast steel framed, reinforced concrete structure
JPS6335773B2 (en)
JPS6139457B2 (en)
JPH10299260A (en) Seismic retrofitting method for existing buildings using square frame structures
JPH07207781A (en) Joining structure of steel frame, reinforced concrete column and beamless precast concrete bearing wall