JPH05164377A - Operation supporting system for energy facility - Google Patents

Operation supporting system for energy facility

Info

Publication number
JPH05164377A
JPH05164377A JP35178091A JP35178091A JPH05164377A JP H05164377 A JPH05164377 A JP H05164377A JP 35178091 A JP35178091 A JP 35178091A JP 35178091 A JP35178091 A JP 35178091A JP H05164377 A JPH05164377 A JP H05164377A
Authority
JP
Grant status
Application
Patent type
Prior art keywords
energy
operating
operation
setting
facilities
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP35178091A
Other languages
Japanese (ja)
Inventor
Koichi Ito
Kazuyuki Kamimura
Fusachika Miyasaka
Ryoji Takeyama
Shiyuuji Tamura
Junji Yazaki
Ryohei Yokoyama
弘一 伊東
房千加 宮坂
良平 横山
什二 田邑
淳史 矢崎
一幸 神村
良次 竹山
Original Assignee
Koichi Ito
Marunouchi Netsu Kiyoukiyuu Kk
Yamatake Honeywell Co Ltd
丸の内熱供給株式会社
弘一 伊東
山武ハネウエル株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date

Links

Abstract

PURPOSE: To easily and quickly find a new optimum combination, considering the utilizing frequency, balance and the like of various feat source facilities.
CONSTITUTION: An operating condition setting sereen is displayed. The forced operation time band, forced stopping time band and the preferential operating order of boilers B1-Bn, absorption type refrigeranting machines AR1-ARn and turbo type refrigerating machines TR1-TRn are set and/or changed in accordance with the indication of an accumulated operation time, a continuous stopping time and a continuous operation time in the operating condition setting picture. The setting and/or changing conditions 1 are sent into an optimized operation unit 2 and a new optimum combination is outputted to a processing unit 3.
COPYRIGHT: (C)1993,JPO&Japio

Description

【発明の詳細な説明】 DETAILED DESCRIPTION OF THE INVENTION

【0001】 [0001]

【産業上の利用分野】この発明は、各種エネルギー設備、例えば地域冷暖房における各種熱源設備の運転支援システムに関するものである。 BACKGROUND OF THE INVENTION This invention, various types of energy facilities, such as those related to various types of heat source equipment operation support system in district heating and cooling.

【0002】 [0002]

【従来の技術】従来より、例えば地域冷暖房においては、各種熱源設備として、ボイラ,吸収式冷凍機,ターボ式冷凍機等を使用している。 Conventionally, for example in district heating and cooling has various heat source equipment, using the boiler, the absorption chiller, turbo refrigerator or the like. すなわち、暖房需要に対しては、エネルギー源として都市ガスを使用し、ボイラにより作られる蒸気を需要家へ送るものとしている。 That is, for the heating demand, using city gas as an energy source, which shall be sent to the customer the steam produced by the boiler. また、ボイラにより作られる蒸気を吸収式冷凍機に与えて作った冷水や、電力をエネルギー源としてターボ式冷凍機により作った冷水を需要家へ送るものとして、冷房需要に対応している。 Further, as for sending cold water and made giving steam produced in the absorption chiller by boiler, cold water made by the turbo chiller power as an energy source to consumers, which corresponds to the cooling demand. このような地域冷暖房において、運転コストの最少化(運転費用の低減)は、経営を行う面で重要な問題である。 In such a district heating and cooling, minimization of operating costs (reduced operational costs) is a significant problem in terms of performing management. そこで、本出願人は、地域冷暖房における運転コストの最少化を目指して、エネルギー需要量を予測するものとし、少なくともこの予測したエネルギー需要量,各種熱源設備の能力および構成,各種エネルギーコスト(電力料金、ガス料金、水道料金等)に基づき運転コストが最少となる熱源設備の最適組み合わせを導出し、すなわち最適化計算を行い、その導出した最適組み合わせによる予測運転コストを併せて示すことにより、熱源設備の運転を支援するシステムの研究を進めている。 The present applicant, aims to minimize the operating cost of DHC, and predicts the energy demand, at least the predicted energy demand, capacity and configuration of the various heat sources equipment, various energy costs (electricity rate , gas rates, operating costs based on water rates, etc.) to derive an optimum combination of the heat source equipment is minimized, i.e. performs optimization calculation, by showing together the predicted operating costs due to the optimal combination that the derivation, the heat source equipment and advanced systems research to support the operation.

【0003】 [0003]

【発明が解決しようとする課題】しかしながら、現有の熱源設備の運転支援システムでは、最適化計算を経て導出された熱源設備の最適組み合わせ結果には、各種エネルギー設備の使用頻度やバランス等が考慮されていない。 [SUMMARY OF THE INVENTION However, in the existing heat source equipment operation support system of the optimal combination result of the heat source equipment derived through the optimization calculation, frequency of use and balance of various energy facilities are considered not. 現行では、これを補うべくオペレータが経験と勘に頼って最適組み合わせを修正するものとしているが、運転コスト最少となる新たな最適組み合わせを見つけ出すのは至難の技である。 Currently, although the operator to compensate for this it is assumed to correct the optimal combination rely on experience and intuition, figure out a new optimum combinations of the operating costs minimized is extremely difficult.

【0004】 [0004]

【課題を解決するための手段】本発明はこのような課題を解決するためになされたもので、その第1発明(請求項1に係る発明)は、エネルギー需要量を予測する需要量予測手段と、少なくともこの予測されたエネルギー需要量,各種エネルギー設備の能力および構成,各種エネルギーコストに基づき、運転費用低減を目的としたエネルギー設備の最適組み合わせを導出する最適組合導出手段と、この最適組合導出手段により導出された最適組み合わせによる予測運転費用を表示する運転費用表示手段と、任意のエネルギー設備についてその強制運転時間帯および強制停止時間帯の設定/変更を可能とし、これをエネルギー設備の最適組み合わせの導出に反映させる運転時間帯設定/変更手段とを備えている。 SUMMARY OF THE INVENTION The present invention has been made in order to solve such problems, (the invention according to claim 1) a first invention, demand prediction means for predicting energy demand When at least the predicted energy demand, capacity and configuration of the various energy facilities, based on various energy costs, and optimal union deriving means for deriving the optimal combination of energy equipment for the purpose of operating costs decrease, the optimal union derived and the operating costs display means for displaying the predicted operating costs due to the optimal combination derived, enabling setting / change of the forced operation time zone and suspended time periods for any energy equipment by means, optimal combination of energy facilities this and an operating time zone setting / changing means for reflecting the derivation of. また、その第2発明(請求項2に係る発明)は、第1発明において、 Further, the second invention (the invention according to claim 2), in the first invention,
任意のエネルギー設備についてその優先運転順位の設定/変更を可能とし、これをエネルギー設備の最適組み合わせの導出に反映させる優先順位設定/変更手段と、現時刻に至るまでの各種エネルギー設備の運転状況を表示する運転状況表示手段とを備えている。 For any energy facilities to enable the setting / change of the priority operating order, and priority setting / changing means for reflecting this to derive the optimal combination of energy equipment, the operating conditions of various energy facilities up to the present time and an operating state display means for displaying.

【0005】 [0005]

【作用】したがって、本願の第1発明によれば、各種エネルギー設備の使用頻度やバランス等を考慮して、任意のエネルギー設備についてその強制運転時間帯および強制停止時間帯を設定あるいは変更すれば、これがエネルギー設備の最適組み合わせの導出に反映される。 Therefore, according to the first invention of the present application, taking into account the frequency of use and balance of various energy facilities, setting or changing the forced stopping time period forced operation time zone and that for any energy facilities, This is reflected in the derivation of the optimal combination of energy equipment. また、 Also,
本願の第2発明によれば、各種エネルギー設備の使用頻度やバランス等を考慮して、任意のエネルギー設備についてその優先運転順位を設定あるいは変更すれば、これがエネルギー設備の最適組み合わせの導出に反映される。 According to a second aspect of the present invention, in consideration of the frequency of use and balance of various energy facilities, setting or change the priority operation order for any energy facility, which is reflected in the derivation of the optimal combination of energy facilities that. また、現時刻に至るまでの各種エネルギー設備の運転状況(積算運転時間,連続停止時間,連続運転時間等)の表示が、各種エネルギー設備の使用頻度やバランス等を考慮する際の参考となる。 Further, driving conditions (integrated operating time, continuous stop time, continuous operating time, etc.) of the various energy facilities up to the current time display, the reference when considering use frequency and balance of various energy facilities.

【0006】 [0006]

【実施例】以下、本発明に係るエネルギー設備の運転支援システムを実施例に基づき詳細に説明する。 EXAMPLES Hereinafter, will be described in detail with reference to Examples driving support system of the energy facility according to the present invention.

【0007】図1は地域冷暖房における熱源設備の運転支援システムを示すブロック図である。 [0007] FIG. 1 is a block diagram illustrating a driving support system of the heat source equipment in district heating and cooling.

【0008】同図において、1は供与される実負荷データに基づき現時刻から複数ステップ先までのエネルギーの需要量を予測する需要量予測部、2はこの需要量予測部1にて予測されたエネルギー需要量,各種熱源設備(ボイラB1〜Bn,吸収式冷凍機AR1〜ARn,ターボ式冷凍機TR1〜TRn等)の機能(機器性能特性)および構成,各種エネルギーコスト(電力料金、都市ガス料金、水道料金等),評価関数(ガス,電力,最適)を入力とし、運転費用低減を目的とした熱源設備の最適組み合わせの導出およびその予想運転コストの演算ならびにその予想運転コストに占める都市ガス量,電力量,水道量を計算する最適化計算部、3はこの最適化計算部2での演算結果や需要量予測部1での予測エネルギー需要量,キーボード [0008] In the figure, 1 is demand prediction unit that predicts a demand for energy to a plurality steps ahead from the current time on the basis of the actual load data donor, 2 were predicted by the demand prediction unit 1 energy demand, various heat sources equipment (boilers Bl to Bn, absorption chillers AR1~ARn, turbo chiller TR1~TRn etc.) function (device performance characteristics) and configuration, various energy costs (electricity rates, city gas fee , water rates, etc.), the evaluation function (gas, power, and inputs the optimum), the derivation of the optimal combinations of the heat source equipment for the purpose of operating costs reduction and operation as well as city gas amount occupied in its expected operating costs of its expected operating costs amount of power, the optimization calculation section for calculating a water supply amount, 3 predicted energy demand in the calculation results and demand prediction unit 1 in the optimization calculation section 2, a keyboard を介する指令を入力とし各種の処理を行う処理部である。 And inputs a command via a processing unit that performs various processes.

【0009】次に、各部の機能を交えながら、この運転支援システムの動作について説明する。 [0009] Next, while exchanging the function of each part, the operation of the driving support system.

【0010】需要量予測部1は、現時刻から複数ステップ前までの実負荷データの供与を受けて、現時刻から複数ステップ先までのエネルギーの需要量を予測する。 [0010] demand prediction unit 1 receives the provision of actual load data to a plurality steps before the current time, predicts the demand of energy to a plurality steps ahead from the current time. このエネルギー需要量の予測は、本出願人らが先に提案したARIMAモデルを使用した負荷予測方法(特願平1 Prediction of the energy demand, the load prediction method the applicants have used the ARIMA model previously proposed (Japanese Patent Application No. 1
−180605号)に従い、本実施例においては、キーボード4を介し処理部3を経て与えられる予報最高気温により補正が加えられる。 According No. -180605), in the present embodiment, the correction applied by the forecast maximum temperatures given through the processing unit 3 through the keyboard 4. 需要量予測部1にて予測されたエネルギー需要量は最適化計算部2および処理部3へ与えられる。 Energy demand predicted by the demand prediction unit 1 is supplied to the optimum value calculating unit 2 and the processing section 3.

【0011】最適化計算部2は、需要量予測部1より与えられる予測エネルギー需要量,各種熱源設備の機能および構成,キーボード4を介し処理部3を経て与えられる各種エネルギーコスト並びに評価関数を入力とし、運転費用低減を目的とした熱源設備の最適組み合わせを各予測ステップ毎に、かつ評価関数毎に導出する。 [0011] optimum value calculating unit 2, the amount of predicted energy demand given from demand prediction unit 1, function and arrangement of the various heat sources equipment, input various energy costs and the evaluation function is given through the processing unit 3 through the keyboard 4 and then, the optimal combination of the heat source equipment for the purpose of operating costs reduction for each prediction step, and deriving for each evaluation function. すなわち、本実施例においては、評価関数として「ガス」, That is, in this embodiment, "gas" as the evaluation function,
「電力」,「最適」を与えており、使用エネルギー源として都市ガスを優先した最適運転(ガス優先最適運転) "Power", which gives the "best" optimal operation that prioritizes city gas as used energy source (gas priority optimum operation)
方法をとった場合の熱源設備の最適組み合わせ、電力を優先した最適運転(電力優先最適運転)方法をとった場合の熱源設備の最適組み合わせ、どちらも優先しない運転(最適運転)方法をとった場合の熱源設備の最適組み合わせを、各ステップ毎に導出する。 Optimal combination of heat source equipment when taking method, optimum combinations of the heat source equipment when taking the optimal operating (power priority optimum operation) method giving priority to power, if neither taken a free operation priority (optimal operation) METHOD the optimal combination of the heat source equipment, is derived for each step. また、最適化計算部2は、ガス優先最適運転方法をとった場合の予想運転コスト、電力優先最適運転方法をとった場合の予想運転コスト、最適運転方法をとった場合の予想運転コストを、各ステップ毎に演算する。 Further, optimization calculation unit 2, anticipated operational cost of taking a gas preferentially optimal operating method, anticipated operational cost of taking the power priority optimal operating method, the prospective operating cost of taking optimal operating method, calculating for each step. また、最適化計算部2 Moreover, the optimization calculation section 2
は、上記予想運転コストに占める都市ガス量,電力量, Is city gas amount occupied in the expected operating costs, power amount,
水道量を計算する。 To calculate the water amount.

【0012】なお、本実施例においては、最適化計算部2における最適化計算手法として、混合整数線形計画法(Mixed-Integer LinearProgramming:参考文献:コージェネレーションの最適計画、産業図書(1990)) [0012] In this embodiment, as the optimization calculation method in the optimization calculation section 2, mixed integer linear programming (Mixed-Integer LinearProgramming: References: cogeneration of optimal design, Sangyo Tosho (1990))
を使用している。 I am using.

【0013】この最適化計算部2での演算結果を得て、 [0013] to obtain the result of the operation in the optimization calculation section 2,
処理部3は、運転方法毎の熱源設備の最適組み合わせ状況を台数制御画面として、また運転方法毎の予測運転コストならびにその予想運転コストに占める都市ガス量, Processor 3, as the number control screen an optimum combination condition of the heat source facilities for each operation method, also predicted operating costs per operation method and city gas amount occupied in its expected operating costs,
電力量,水道量を運転比較グラフ画面として表示する。 Electric energy, and displays the water amount as an operation comparison graph screen.

【0014】図2に処理部3の表示する台数制御画面の一例を示す。 [0014] An example of a unit count control screen displayed in the processing unit 3 in FIG. 2. この台数制御画面の表示領域I〜III を見れば、最適運転方法,電力優先最適運転方法,ガス優先最適運転方法のそれぞれについて、黒丸で示されるボイラB,吸収式冷凍機AR,ターボ式冷凍機TRが、各時刻毎(30分毎)の最適組み合わせとされることが分かる。 If you look at the display area I~III the MI control screen, optimal operation method, the power priority optimal operation method, each of the gas preferentially optimal operating method, a boiler B shown by a black circle, the absorption chiller AR, turbo chiller TR is can be seen that the optimum combination of time each (every 30 minutes).

【0015】なお、図2において、各運転方法の最上段時刻に示した最適組み合わせは、現時刻での運転状況を示す。 [0015] In FIG. 2, the optimum combinations shown at the top time of each method of operation, indicating the operating status at the current time. また、この台数制御画面には、最適運転方法,電力優先最適運転方法,ガス優先最適運転方法の他、これら運転方法によらない手動運転を想定し、キーボード4 Further, this number control screen, optimal operation method, the power priority optimal operation method, other gases priority optimal operating method, assuming a manual operation that does not depend on these operating methods, the keyboard 4
を介して手動入力される熱源設備の組み合わせを表示する表示領域IVを設けている。 Is provided a display area IV for displaying a combination of the heat source equipment is manually inputted via the. また、この台数制御画面は、図示上下方向へスクロールすることができる。 Further, the number of control screen can be scrolled in the vertical direction in the figure.

【0016】図3に処理部3の表示する運転比較グラフ画面の一例を示す。 [0016] An example of operation compared graph screen for displaying the processing unit 3 in FIG. この運転比較グラフ画面の表示領域Iを見れば、図示太実線で示す特性により運転コストの実績が分かり、図示細実線で示す特性により最適運転方法をとった場合の予想運転コストが分かり、図示一点鎖線で示す特性により電力優先最適運転方法をとった場合の予想運転コストが分かり、図示二点鎖線で示す特性によりガス優先最適運転方法をとった場合の予想運転コストが分かる。 If you look at the display area I of the operational comparison graph screen, see actual operating costs due to the characteristics shown in the illustrated bold solid line, see anticipated operational cost of taking the best operation method by the characteristics shown in the illustrated thin solid line, shown one point expected operating costs to understand when taken power priority optimum operation method by the characteristics indicated by the chain line, indicating the expected operating cost of taking a gas preferentially optimal operation method by the characteristics shown in the illustrated two-dot chain line. また、その表示領域II,III ,IVを見れば、表示領域Iに示された実績運転コストおよび予想運転コストに占める都市ガス量,電力量,水道量が分かる。 Further, the display area II, III, if you look at the IV, city gas volume occupied in actual operating costs and expected operating costs shown in the display area I, the amount of power, the water quantity can be seen.

【0017】また、処理部3は、図2に示した台数制御画面と併せて、運転状況設定画面を表示する。 Further, the processing unit 3, together with the number control screen shown in FIG. 2, and displays the operation status setting screen. 図3はこの運転状況設定画面の一例であり、ボイラB1〜Bn, Figure 3 is an example of the operating situation setting screen, boilers Bl to Bn,
吸収式冷凍機AR1〜ARn,ターボ式冷凍機TR1〜 Absorption chiller AR1~ARn, turbo chiller TR1~
TRnについてその強制運転時間帯,強制停止時間帯, The forced operation time zone for TRn, forced stop time zone,
自動運転時間帯を表示する表示領域Iと、現時刻に至るまでの積算運転時間を表示する表示領域IIと、現時刻に至るまでの連続停止時間を表示する表示領域III と、現時刻に至るまでの連続運転時間を表示する表示領域IV A display area I for displaying the automatic operation time period, a display area II for displaying the integrated operating time up to the present time, a display area III for displaying a continuous stop time up to the present time, leading to the current time display area IV for displaying the continuous operation time to
と、同能力のボイラB,吸収式冷凍機AR,ターボ式冷凍機TRについてそれらの間での優先運転順位を表示する表示領域Vとを有している。 If has a boiler B of the same capacity, absorption chiller AR, a display area V for displaying the priority operating order between them for turbo chiller TR.

【0018】オペレータは、この運転状況設定画面を参照として、特定の熱源設備の積算運転時間が長すぎないか、連続停止時間や連続運転時間が短すぎないか等、各種熱源設備の使用頻度やバランス等を経験等から考える。 [0018] The operator, by reference to the operating conditions setting screen, not too long integrated operating time of the particular heat source equipment, such as not too short continuous stop time and continuous operation time, Ya frequency of use of various heat sources equipment consider, for example, the balance from experience, etc.. そして、例えば、ボイラB1の使用頻度が高ければ、ボイラB1を休めるために、例えば9時から18時までを強制停止時間帯として設定する。 Then, for example, the higher the frequency of use of the boiler B1, in order to rest the boiler B1, to set the example from 9:00 to 18:00 as the suspended time period. また、同能力の吸収式冷凍機AR1,AR2,AR3の優先順位が「1」,「2」,「3」として定められていた場合、吸収式冷凍機AR1の使用頻度が高ければ、バランスをとるために例えばその優先順位を「2」,「1」,「3」 Moreover, absorption chillers AR1 of the capacity, AR2, AR3 priority is "1", "2", if that has been defined as "3", the higher the frequency of use of the absorption chiller AR1, the balance "2" the priority example to take, "1", "3"
と変更する。 To change the. また、例えばターボ式冷凍機TR1の使用頻度が極端に少なければ、ターボ式冷凍機TR1をたまには動かすものとして、例えば12時から18時までを強制運転時間帯として設定する。 Further, for example, if extremely fewer frequency of use of the turbo chiller TR1, sets the turbo chiller TR1 as sometimes moves, for example, from 12 o'clock to 18 o'clock as a forced operation time zone.

【0019】このようにして各種熱源設備の強制運転時間帯や強制停止時間帯,優先運転順位が設定/変更されると、この設定/変更状況が最適化計算部2に送られ、 [0019] In this way, the various heat sources facilities forced operating hours or suspended time period, if the priority operation order is set / changed, the setting / change status is sent to the optimum value calculating unit 2,
熱源設備の最適組み合わせの導出に反映される。 It is reflected in the derivation of the optimal combination of heat source equipment. すなわち、運転状況設定画面での設定/変更状況を最適化計算部2に送ることにより、最適組み合わせの導出とオペレータの運転ノウハウとが融合され、各種熱源設備の使用頻度やバランス等を考慮した新たな最適組み合わせが素早く導出されるものとなる。 That is, by sending a setting / changing situation in the operating conditions setting screen optimum value calculating unit 2, the derivation of the optimal combination and the operation know-how of the operator are fused, considering use frequency and balance of various heat sources facilities new becomes the optimal combination, such is quickly derived.

【0020】そして、この最適組み合わせの導出に伴い、図2に示した台数制御画面および図3に示した運転比較グラフ画面が速やかに修正され、以降、この台数制御画面に示された最適組み合わせに従って、ボイラB1 [0020] Then, with the derivation of the optimal combination, the operation comparison graph screen shown in FIG volume control screen and shown in FIG. 2 3 are promptly corrected, since, according to the optimum combination shown in the MI control screen , boiler B1
〜Bn,吸収式冷凍機AR1〜ARn,ターボ式冷凍機TR1〜TRnの自動運転が行われるものとなる。 To Bn, absorption chiller AR1~ARn, becomes the automatic operation of the turbo chiller TR1~TRn is performed.

【0021】 [0021]

【発明の効果】以上説明したことから明らかなように本発明によれば、その第1発明によると、各種エネルギー設備の使用頻度やバランス等を考慮して任意のエネルギー設備についてその強制運転時間帯および強制停止時間帯を設定あるいは変更すれば、これがエネルギー設備の最適組み合わせの導出に反映され、最適組み合わせの導出とオペレータの運転ノウハウとが融合されるものとなり、運転コスト最少となる新たな最適組み合わせが難なくかつ素早く見つけ出されるものとなる。 According to apparent the present invention since it has been described above, according to the first invention, various types of energy facilities that force operating time period for any energy facility taking into account the frequency of use and balance, etc. and by setting or changing the forced stop time zone, which is reflected in the derivation of the optimal combination of energy equipment, it is assumed that the derivation of the optimal combination and the operation know-how of the operator is fused, new optimal combinations of the operating costs minimized but the ones without difficulty and are found quickly. また、その第2発明によると、各種エネルギー設備の使用頻度やバランス等を考慮して任意のエネルギー設備についてそのその優先運転順位を設定あるいは変更すれば、これがエネルギー設備の最適組み合わせの導出に反映され、また、 Further, according to the second invention, if various energy facilities used by considering the frequency and balance etc. of setting the its priority operating order for any energy facilities or change, which is reflected in the derivation of the optimal combination of energy facilities ,Also,
現時刻に至るまでの各種エネルギー設備の運転状況(積算運転時間,連続停止時間,連続運転時間等)の表示が各種エネルギー設備の使用頻度やバランス等を考慮する際の参考となり、オペレータの運転ノウハウを有効に活用することができるようになる。 Driving situation (integrated operating time, continuous stop time, continuous operation time, etc.) of various energy facilities up to the present time become a reference for when the display of taking into account the frequency of use and the balance of various energy equipment, operation know-how of the operator it is possible to effectively utilize the.

【図面の簡単な説明】 BRIEF DESCRIPTION OF THE DRAWINGS

【図1】本発明の一実施例を示す地域冷暖房における熱源設備の運転支援システムのブロック図。 Block diagram of a driving support system of the heat source equipment in DHC showing an embodiment of the present invention; FIG.

【図2】この運転支援システムにおいて表示される台数制御画面の一例を示す図。 Figure 2 is a diagram showing an example of installation control screen displayed in the driving support system.

【図3】この運転支援システムにおいて表示される運転比較グラフ画面の一例を示す図。 Figure 3 is a diagram showing an example of operation compared graph screen displayed in the driving support system.

【図4】この運転支援システムにおいて表示される運転状況設定画面の一例を示す図。 4 is a diagram showing an example of a driving situation setting screen displayed in the driving support system.

【符号の説明】 DESCRIPTION OF SYMBOLS

1 需要予測部 2 最適化計算部 3 処理部 4 キーボード B1〜Bn ボイラ AR1〜ARn 吸収式冷凍機 TR1〜TRn ターボ式冷凍機 1 forecast unit 2 optimum value calculating unit 3 processing section 4 keyboard B1~Bn boiler AR1~ARn absorption refrigerator TR1~TRn turbo chiller

───────────────────────────────────────────────────── フロントページの続き (72)発明者 竹山 良次 東京都千代田区丸の内一丁目4番2号 丸 の内熱供給株式会社内 (72)発明者 矢崎 淳史 東京都千代田区丸の内一丁目4番2号 丸 の内熱供給株式会社内 (72)発明者 伊東 弘一 大阪府吹田市山田東4丁目41番4−710号 (72)発明者 横山 良平 大阪府堺市大野芝町23番1−16号 (72)発明者 神村 一幸 東京都渋谷区渋谷二丁目12番19号 山武ハ ネウエル株式会社内 (72)発明者 宮坂 房千加 東京都渋谷区渋谷二丁目12番19号 山武ハ ネウエル株式会社内 ────────────────────────────────────────────────── ─── of the front page continued (72) inventor Ryoji Takeyama Marunouchi, Chiyoda-ku, tokyo chome No. 4 No. 2, the internal heat supply within the Corporation of the round (72) inventor Atsushi Yazaki Marunouchi, Chiyoda-ku, tokyo chome No. 4 the internal heat supply Co., Ltd. of No. 2 round (72) inventor Koichi Ito Suita, Osaka Prefecture Yamadahigashi 4-chome No. 41 No. 4-710 (72) inventor Ryohei Yokoyama Sakai, Osaka Prefecture Onoshiba-cho # 23 1-16 No. (72) inventor Kazuyuki Kamimura Shibuya, Shibuya-ku, Tokyo chome No. 12, No. 19 Yamatake c Neueru within Co., Ltd. (72) inventor Miyasaka BoChika Shibuya, Shibuya-ku, Tokyo chome No. 12, No. 19 Yamatake Ha Neueru Co., Ltd. the inner

Claims (2)

    【特許請求の範囲】 [The claims]
  1. 【請求項1】 エネルギー需要量を予測する需要量予測手段と、少なくとも前記予測されたエネルギー需要量, 1. A and demand prediction means for predicting energy demand, energy demand which is at least the prediction,
    各種エネルギー設備の能力および構成,各種エネルギーコストに基づき、運転費用低減を目的としたエネルギー設備の最適組み合わせを導出する最適組合導出手段と、 この最適組合導出手段により導出された最適組み合わせによる予測運転費用を表示する運転費用表示手段と、 任意のエネルギー設備についてその強制運転時間帯および強制停止時間帯の設定/変更を可能とし、これを前記エネルギー設備の最適組み合わせの導出に反映させる運転時間帯設定/変更手段とを備えたことを特徴とするエネルギー設備の運転支援システム。 Capacity and configuration of the various energy facilities, various based on the energy costs, and optimal union deriving means for deriving the optimal combination of energy equipment for the purpose of operating costs decrease, predicted operating costs due to the optimal combination that is derived by the optimal union deriving means and operating costs display means for displaying the arbitrary energy facilities to enable the setting / change of the forced stopping time period forced operation time zone and that, operating time zone setting to reflect this in the derivation of the optimal combination of the energy facilities / drive assistance system energy equipment, characterized by comprising a changing unit.
  2. 【請求項2】 請求項1において、任意のエネルギー設備についてその優先運転順位の設定/変更を可能とし、 2. The method of claim 1, to enable the setting / change of the priority operating order for any energy facilities,
    これをエネルギー設備の最適組み合わせの導出に反映させる優先順位設定/変更手段と、現時刻に至るまでの各種エネルギー設備の運転状況を表示する運転状況表示手段とを備えたことを特徴とするエネルギー設備の運転支援システム。 Energy plant, characterized in that it comprises a priority setting / changing means for reflecting this to derive the optimal combination of energy facilities, and a driving condition display means for displaying the operation status of the various energy facilities up to the present time operation support system.
JP35178091A 1991-12-16 1991-12-16 Operation supporting system for energy facility Pending JPH05164377A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP35178091A JPH05164377A (en) 1991-12-16 1991-12-16 Operation supporting system for energy facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP35178091A JPH05164377A (en) 1991-12-16 1991-12-16 Operation supporting system for energy facility

Publications (1)

Publication Number Publication Date
JPH05164377A true true JPH05164377A (en) 1993-06-29

Family

ID=18419562

Family Applications (1)

Application Number Title Priority Date Filing Date
JP35178091A Pending JPH05164377A (en) 1991-12-16 1991-12-16 Operation supporting system for energy facility

Country Status (1)

Country Link
JP (1) JPH05164377A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001211696A (en) * 2000-01-26 2001-08-03 Ishikawajima Harima Heavy Ind Co Ltd Method and system for operating cogeneration plant
US7177726B2 (en) 2002-11-18 2007-02-13 Hitachi, Ltd. Operation-assisting system and operation-assisting computer program
WO2008088031A1 (en) * 2007-01-17 2008-07-24 Daikin Industries, Ltd. Air conditioner
JP2012057864A (en) * 2010-09-09 2012-03-22 Yamatake Corp Device and method of controlling feed water temperature
JP2012112649A (en) * 2012-03-19 2012-06-14 Hitachi Plant Technologies Ltd Air conditioning system
WO2014125721A1 (en) * 2013-02-12 2014-08-21 株式会社 東芝 Optimum controller for energy, control method, control program and storage medium for recording control program

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01137145A (en) * 1987-11-24 1989-05-30 Fujitsu Ltd Optimum operation information output processing system for heat source equipment in building

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01137145A (en) * 1987-11-24 1989-05-30 Fujitsu Ltd Optimum operation information output processing system for heat source equipment in building

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001211696A (en) * 2000-01-26 2001-08-03 Ishikawajima Harima Heavy Ind Co Ltd Method and system for operating cogeneration plant
US7177726B2 (en) 2002-11-18 2007-02-13 Hitachi, Ltd. Operation-assisting system and operation-assisting computer program
US7236856B2 (en) 2002-11-18 2007-06-26 Hitachi, Ltd. Operation-assisting system and operation-assisting computer program
WO2008088031A1 (en) * 2007-01-17 2008-07-24 Daikin Industries, Ltd. Air conditioner
JP2012057864A (en) * 2010-09-09 2012-03-22 Yamatake Corp Device and method of controlling feed water temperature
JP2012112649A (en) * 2012-03-19 2012-06-14 Hitachi Plant Technologies Ltd Air conditioning system
WO2014125721A1 (en) * 2013-02-12 2014-08-21 株式会社 東芝 Optimum controller for energy, control method, control program and storage medium for recording control program
JP2014155390A (en) * 2013-02-12 2014-08-25 Toshiba Corp Energy optimum control apparatus, control method, and control program

Similar Documents

Publication Publication Date Title
US7035719B2 (en) Tone generating electronic device with paging module for verification of energy curtailment
Gits Design of maintenance concepts
Sanghvi Economic costs of electricity supply interruptions: US and foreign experience
US5543667A (en) Load control for partially increasing/decreasing power usage
Pang et al. Evaluation of dynamic programming based methods and multiple area representation for thermal unit commitments
Maidment et al. Combined cooling heat and power in supermarkets
US20110046806A1 (en) Systems and methods for estimating the effects of a request to change power usage
US20070006586A1 (en) Serving end use customers with onsite compressed air energy storage systems
Ayoub et al. Optimal thermal generating unit commitment
US4971136A (en) Dual fuel heat pump controller
US7009493B2 (en) Electronic device with paging for energy curtailment and code generation for manual verification of curtailment
US5924486A (en) Environmental condition control and energy management system and method
US8180494B2 (en) System and method for dynamically managing blowers and vents
Tang A single-server M/G/1 queueing system subject to breakdowns—some reliability and queueing problems
Takahashi et al. Reacting JIT ordering systems to the unstable changes in demand
JP2003061245A (en) Operation planning method for cogeneration apparatus
US20100222934A1 (en) System for managing energy at loads
US20100004791A1 (en) Systems and methods for presenting saving opportunities for electronic devices
US20110251731A1 (en) Demand response method and demand response system
JPH11178247A (en) Power consumption management system
JP2007151371A (en) System cooperation-type variation suppressing system and output variation suppression method
JP2012019579A (en) Power management device, power management program and recording medium
US9031703B2 (en) Operation management apparatus, operation management method, and operation management program
JP2003065588A (en) Air conditioning apparatus
JP2009047682A (en) System for informing electricity usage quantity