JPH05120294A - Allocation device - Google Patents

Allocation device

Info

Publication number
JPH05120294A
JPH05120294A JP27759291A JP27759291A JPH05120294A JP H05120294 A JPH05120294 A JP H05120294A JP 27759291 A JP27759291 A JP 27759291A JP 27759291 A JP27759291 A JP 27759291A JP H05120294 A JPH05120294 A JP H05120294A
Authority
JP
Japan
Prior art keywords
constraint
time
work
database
stored
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP27759291A
Other languages
Japanese (ja)
Inventor
Akira Ishii
暁 石井
Tsutomu Owa
勤 大輪
Tetsuya Abe
哲也 阿部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP27759291A priority Critical patent/JPH05120294A/en
Publication of JPH05120294A publication Critical patent/JPH05120294A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PURPOSE:To easily perform superior allocation setting matching a resource by setting detailed restriction conditions corresponding to the degree of restrictions in conformity with circumstances that the resource requires. CONSTITUTION:This device is equipped with a job data base 11 wherein jobs having at least attributes of departure time and arrival time are stored and held, a resource data base 12 wherein plural resources are stored and held, a restriction data base 13 wherein restriction conditions of plural levels at the time of allocating the jobs to the resources are stored and held, an inference part 14 which takes the jobs out of the job data base 11 in time order and allocates them to the resources held in the resource data base 12 according to the restriction conditions of the different levels held in the restriction data base 13, and a man-machine interface 15 which rewrites and alters the contents of the restriction conditions held in the restriction data base 13.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、複数のジョブと複数の
リソースとの間の組合わせを効果的に割当て決定する割
当て装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an allocation device for effectively allocating a combination of a plurality of jobs and a plurality of resources.

【0002】[0002]

【従来の技術】従来より、複数のジョブと複数のリソー
スとの間の組合わせを、種々の制約条件の下で割当て決
定することが多く行われてきた。例えば、種々の業務
(ジョブ)に対する作業者の割当てを、労働条件や作業
能力(制約条件)に従ってそれぞれ割当て決定すること
が行なわれる。
2. Description of the Related Art Conventionally, a combination of a plurality of jobs and a plurality of resources has often been assigned and determined under various constraint conditions. For example, the assignment of workers to various jobs is determined according to working conditions and work capabilities (constraints).

【0003】このような割当て決定は、従来、専ら人手
に頼って行なわれているが、上記ジョブとリソースとが
それぞれ大量になるに従って人手による割当て決定が困
難化する。また、割当て決定を進める過程で、例えばあ
るジョブに割当て得るリソースが既に他のジョブに割当
て決定されている結果、そのジョブに割当てリソースが
なくなる等の矛盾が生じ易く、割当て決定処理の行き詰
まりが生じることも多々ある。そして、この場合には、
その割当て決定手続きをやり直す必要がある。このた
め、ジョブとリソースとの割当て決定に多大な時間を必
要とすることが否めなかった。
Conventionally, such an allocation decision is made solely by manpower, but as the number of jobs and resources becomes large, it becomes difficult to manually make an allocation decision. In addition, in the process of advancing the allocation decision, for example, a resource that can be allocated to a job has already been allocated to another job, and as a result, a contradiction such as the allocation of resources to that job is likely to occur, resulting in a deadlock in the allocation decision process. There are many things. And in this case,
The allocation decision procedure needs to be redone. For this reason, it cannot be denied that it takes a lot of time to determine the allocation of jobs and resources.

【0004】そこで最近では、この種の割当て決定を計
算機を用いて処理することが考えられている。この計算
機による処理は、基本的に複数のジョブの中から1つの
ジョブを取出し、取出されたジョブに割当て可能なリソ
ースを、複数のリソースの中から順に取出されるリソー
スについてその割当て制約条件等をチェックして求め
る。このチェックは、具体的には割当ての制約条件をチ
ェックした後、さらにその動的条件をチェックすること
によって行なわれる。そして、割当て制約条件等を満た
すリソースの中から、例えば最初に見出だされたリソー
スを上記ジョブに割当て決定し、ジョブに対して割当て
決定し得るリソースが見出だされない場合はその割当て
変更を行なう。このような処理手続きを、割当て決定さ
れたジョブ及びリソースを除去しながら繰返すことによ
って割当て決定が実行されるものである。
Therefore, recently, it has been considered to process this kind of allocation decision using a computer. The processing by this computer basically takes one job out of a plurality of jobs, assigns resources that can be assigned to the fetched job, and assigns allocation conditions to resources that are sequentially taken out of the plurality of resources. Check and ask. Specifically, this check is performed by checking the constraint condition of the allocation and then further checking the dynamic condition thereof. Then, of the resources that satisfy the allocation constraint conditions, for example, the resource found first is assigned to the job, and if no resource that can be assigned to the job is found, the assignment change is performed. To do. The allocation decision is executed by repeating such a processing procedure while removing the jobs and resources for which the allocation decision has been made.

【0005】ところがこのような処理手続きにあって
は、ジョブ及びリソースの数の増大に伴って割当て決定
が非常に難しくなり、処理を実行させるためのプログラ
ムの作成も困難となる。
However, in such a processing procedure, it becomes very difficult to determine allocation as the number of jobs and resources increases, and it becomes difficult to create a program for executing the processing.

【0006】そこで、ジョブの集合を格納するジョブデ
ータベース、リソースの集合を格納するリソースデータ
ベース及び各種制約を格納する制約データベースをそれ
ぞれ分離独立して設け、割当て決定を行なう推論部がジ
ョブデータベースからジョブを1つずつ取出し、制約デ
ータベースに格納されている制約を満たすようにリソー
スデータベースに格納されるリソースに割当てる方式が
考えられている。
Therefore, a job database for storing a set of jobs, a resource database for storing a set of resources, and a constraint database for storing various constraints are provided separately from each other, and an inference unit for determining allocation assigns jobs from the job database. A method is considered in which the resources are extracted one by one and assigned to the resources stored in the resource database so as to satisfy the constraints stored in the constraint database.

【0007】しかしながら上記のようにジョブデータベ
ース、リソースデータベース及び制約データベースを分
離させ、これらデータベースの内容に基づいて推論部が
順次割当て決定する方式では、ただ単に制約データベー
スに格納された禁止要項等の絶対的な制約条件等のみに
よって割当て決定を行なうため、必ずしも優れた割当て
決定が得られるとは限らず、例えばジョブが作業でリソ
ースが作業者であるとすると、作業者にとって甚だ作業
がしづらいような割当て決定がなされることもあり得
る。
However, in the method in which the job database, the resource database and the constraint database are separated as described above, and the inference unit sequentially determines allocation based on the contents of these databases, the absolute requirements such as prohibition points stored in the constraint database are simply used. Since an allocation decision is made only based on operational constraints, it is not always possible to obtain an excellent allocation decision. For example, if a job is a work and the resource is a worker, it is difficult for the worker to do a heavy job. It is possible that an allocation decision may be made.

【0008】[0008]

【発明が解決しようとする課題】このように従来にあっ
ては、割当て決定の基準となる制約条件として禁止要項
等の絶対的なもののみを使用して割当て決定を行ってい
たため、不可ではないがリソースにとってはあまり具合
のよくない割当て決定がなされてしまう可能性がある。
As described above, in the prior art, since the allocation decision is made by using only the absolute conditions such as the forbidden requirement as the constraint condition which becomes the reference of the allocation decision, it is not impossible. May result in a resource allocation decision that is not very well-suited to the resource.

【0009】本発明は上記のような実情に鑑みてなされ
たもので、その目的とするところは、リソースの要求す
る事情に即してより詳細な制約条件を設定し、リソース
に適した優れた割当て決定を容易に行なうことが可能な
割当て装置を提供することにある。
The present invention has been made in view of the above circumstances, and an object of the present invention is to set more detailed constraint conditions in accordance with the circumstances required by a resource and to provide an excellent resource suitable for the resource. An object of the present invention is to provide an assigning device capable of easily making an assignment decision.

【0010】[0010]

【課題を解決するための手段】すなわち本発明は、少な
くとも出発時刻及び到着時刻の属性を有するジョブを複
数記憶保存するジョブデータベースと、リソースを複数
記憶保存するリソースデータベースと、ジョブをリソー
スに割当てる際の複数レベルの制約条件を記憶保存する
制約データベースと、上記ジョブデータベースに保存さ
れるジョブをその時刻順に取出して上記制約データベー
スに保存される複数レベルの制約条件に従い、上記リソ
ースデータベースに保存されるリソースに割当てる推論
部と、上記制約データベースに保存される制約条件の内
容を書換変更するマンマシンインタフェースとを備える
ようにしたものである。
That is, according to the present invention, a job database for storing and storing a plurality of jobs having at least attributes of departure time and arrival time, a resource database for storing and storing a plurality of resources, and a method for assigning jobs to resources A constraint database that stores and saves a plurality of levels of constraint conditions, and a resource that is saved in the resource database in accordance with the multi-level constraint conditions that are stored in the job database by extracting the jobs saved in the job database in chronological order. And a man-machine interface for rewriting and changing the contents of the constraint conditions stored in the constraint database.

【0011】[0011]

【作用】上記のような構成としたことにより、リソース
の要求する事情に即してより詳細な制約条件をその制約
の度合いに応じて設定し、リソースに適した優れた割当
て決定を容易に行なうことができる。
With the above configuration, more detailed constraint conditions are set according to the circumstances required by the resource according to the degree of the constraint, and an excellent allocation decision suitable for the resource can be easily made. be able to.

【0012】[0012]

【実施例】以下図面を参照して本発明の一実施例を説明
する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings.

【0013】図1はその基本構成を示すものであり、11
がジョブを複数格納したジョブデータベース、12がリソ
ースを複数格納したリソースデータベース、13が複数レ
ベルの制約条件を格納した制約データベース、14が上記
制約データベース13に格納される制約条件に従ってジョ
ブデータベース11に格納されるジョブをリソースデータ
ベース12に格納されるリソースに割当て決定する推定
部、15は利用者がジョブデータベース11、リソースデー
タベース12及び制約データベース13に格納されている各
データの書換変更等を行なうためのマンマシンインタフ
ェースである。
FIG. 1 shows the basic structure thereof.
Is a job database that stores multiple jobs, 12 is a resource database that stores multiple resources, 13 is a constraint database that stores multiple levels of constraint conditions, and 14 is stored in the job database 11 according to the constraint conditions stored in the constraint database 13 above. An estimating unit for allocating and determining the jobs to be stored in the resources stored in the resource database 12, 15 for the user to rewrite each data stored in the job database 11, the resource database 12 and the constraint database 13 It is a man-machine interface.

【0014】上記のような構成にあって、例えば路線バ
スの運行をジョブとし、これを仕業と呼ばれる仮想的な
乗務員をリソースとして割当てる場合の動作について説
明する。
In the above configuration, for example, operation of a route bus operation as a job and a virtual crew member called work as a resource will be described as an operation.

【0015】図2はジョブデータベース11に格納される
ジョブとしての運行の一部を例示するものであり、図示
する如く「出発時刻」「出発場所」「到着時刻」及び
「到着場所」の計4つの属性を有するデータをもって1
つの運行とする。ここでは、各運行ともに出発場所の
「東京」と到着場所の「東京」とで等しい往復の運行で
あり、1往復の平均ハンドル時間(運転している時間)
が50分であることを示している。このような運行に対
して、図3〜図6に示すような種々の制約条件を制約デ
ータベース13に格納するものとする。
FIG. 2 exemplifies a part of the operation as a job stored in the job database 11. As shown in the figure, there are a total of 4 "departure time", "departure place", "arrival time" and "arrival place". 1 with data having one attribute
It will be one operation. Here, each operation is the same round-trip operation between the departure place "Tokyo" and the arrival place "Tokyo", and the average handle time per round trip (driving time)
Indicates that it is 50 minutes. Various constraint conditions as shown in FIGS. 3 to 6 for such operation are stored in the constraint database 13.

【0016】図3は各仕業の種類毎に就業規則のように
して課せられる制約を例示するものである。同図に示す
如く一般にバス会社においては仕業を「午前」「午後」
「日勤」「中休」「午前増務」及び「午後増務」の6種
類とし、各始業に対して「拘束時間」「ハンドル時間」
「実働時間」等の項目をそれぞれ制約として課すもので
ある。以下、これら個々の各項目について自明なものは
除いて説明する。
FIG. 3 exemplifies restrictions imposed as work rules for each type of work. As shown in the figure, the bus companies generally do the work "am" and "pm".
There are 6 types of "day shift,""midnight,""morningincrease," and "afternoon increase," and "constraint time" and "handle time" for each start of work.
Items such as "actual work hours" are imposed as constraints. Hereinafter, each of these individual items will be described, except for those that are obvious.

【0017】「拘束時間」はその仕業によって乗務員が
拘束される時間幅を示し、「ハンドル時間」は上記「拘
束時間」中の実際にバスを運転している時間を示す。ま
た、「実働時間」は上記「拘束時間」中の「ハンドル時
間」「準備時間」「整理時間」及びバスが終点で止まっ
ている時間の一部等を加えた時間を示す。「準備時間」
「整理時間」はそれぞれ乗務員が出勤所定からバスの運
転を開始するまでの時間、バスの運転を終了してから退
勤するまでの時間を示し、点呼、点検、清掃等に費やす
時間である。
The "restriction time" indicates the time width during which the crew member is restricted by the work, and the "handle time" indicates the time during which the bus is actually driven during the "restriction time". Further, the "actual work time" indicates the time obtained by adding the "handle time", "preparation time", "arrangement time" in the "restraint time" and a part of the time when the bus stops at the end point. "Preparation time"
The “rearrangement time” indicates the time from the predetermined attendance to the start of bus operation and the time from the end of bus operation to the departure of the crew members, and is the time spent for roll call, inspection, cleaning, etc.

【0018】「休憩回数」「休憩時間(種別毎)」「休
憩順目安」は、各仕業でとるべき休憩の回数と種別毎の
時間等を示す。通常、休憩は「増務」のような短い仕業
では不要であり、「午前」「午後」のように中程度の長
さの仕業では「1」回だけ食事のためにとれば良いもの
とする。また、「日勤」のように長い仕業では、休憩の
とりかたは複雑となり、30分以上の休憩及び60分以
上の「2」回の休憩を任意の順でとる必要があるものと
する。「休憩時刻目安(種別毎)」は、各休憩をとる時
間帯の目安を示すもので、あくまでも「目安」であるの
で他の項目ほど制約としての度合いは高くないものとす
る。
The "number of breaks", "break time (for each type)", and "rest order guide" indicate the number of breaks to be taken in each work and the time for each type. Usually, breaks are not necessary for short work such as "increased work", and for medium length work such as "am" and "pm", "1" should be taken for meals only. .. Further, in a long work such as "day shift", the method of taking a break becomes complicated, and it is necessary to take a break of 30 minutes or more and "2" breaks of 60 minutes or more in any order. The “rest time standard (for each type)” indicates the standard of the time zone for each break, and is only a “standard”, so the degree of restriction is not so high as other items.

【0019】「最大連続ハンドル時間」はこの時間を超
えて連続運転してはならない限度を示し、「連続ハンド
ル中断時間」はこの時間を超えて後述する「連続ハンド
ル中断場所」に運転せずに止まっている場合に、上記連
続運転の時間のカウントを中断する時間を示す。
The "maximum continuous steering wheel time" indicates the limit of continuous operation beyond this time, and the "continuous steering wheel suspension time" exceeds this time without driving to the "continuous steering wheel suspension place" described later. When stopped, it indicates the time for interrupting the counting of the continuous operation time.

【0020】「出庫休憩間間隔目安」「休憩間間隔目
安」「休憩入庫間間隔目安」は、それぞれ運転開始から
初めの休憩までの時間、休憩と休憩との間の時間、最後
の休憩から運転終了までの時間の「目安」を示すもの
で、あくまで「目安」となる制約項目であり、他の項目
ほど制約としてのレベルは高くないものとする。「リソ
ース数」はその種類の仕業をいくつ用いてよいかを示
し、その名称が「リソース名称」となる。上記のように
制約条件として、必ず厳守しなければならない項目と、
「目安」と付したやや制約としての度合いの低い項目と
を併せて用いる。
"Outgoing break interval interval guideline", "Break interval interval guideline" and "Break entrance interval interval guideline" are respectively the time from the start of operation to the first break, the time between breaks, and the last break to drive. It indicates a "reference" of the time until the end, and it is a constraint item that is merely a "reference", and the level of constraint is not so high as other items. The “number of resources” indicates how many jobs of that type may be used, and the name is the “resource name”. As mentioned above, as a constraint condition, items that must be strictly adhered to,
The items with a little low degree of restriction, which are attached with "reference", are used together.

【0021】図4は、ある仕業を終了してから別の仕業
が開始されるまでの時間の制約条件を例示する図であ
る。例えば、「午前」と「午後」の仕業は1台のバスを
連続して用いるので、その間に「10分以上」の時間が
必要なことが示されている。これは、具体的には、「午
前」の仕業の1つのリソースについて「午後」の仕業の
1つのリソースが対応し、その間に最低「10分」の時
間が必要であることを示す。このように「午前」の仕業
のリソースのすべてについて、「午後」の仕業のリソー
スが原則として対応するようになり、「午前」と「午
後」の仕業のリソースの数が異なる場合には、その多い
分に関しては対応付けが不要となる。
FIG. 4 is a diagram exemplifying a constraint condition of time from the end of one work to the start of another work. For example, it is shown that the work of "am" and "pm" uses one bus in succession, so that "10 minutes or more" is required between them. Specifically, this indicates that one resource of the "afternoon" job corresponds to one resource of the "am" job, and at least "10 minutes" is required in the meantime. In this way, as a general rule, the resources for the "afternoon" jobs will correspond to all the resources for the "am" jobs, and if the number of the resources for the "am" and "afternoon" jobs differs, Correspondence becomes unnecessary for a large amount.

【0022】また、「午後増務」の仕業は、実際には
「午前」の仕業の残業として運用されるので、その間に
「120分〜180分」の間隔が必要なことが表わされ
ており、「午前増務」の仕業と「午後」の仕業の間も同
様となる。
Further, since the "afternoon increase work" work is actually operated as an overtime work of the "am" work, it is indicated that an interval of "120 to 180 minutes" is required between them. The same is true between the “morning increase” work and the “pm” work.

【0023】図5は、必ずしも就業規則にあるわけでは
ないが、就業規則に関係するノウハウの一種を制約条件
として例示するものである。すなわち、仕業の型の拘束
時刻の制約及び一部その会社独自の習慣により、どの型
から出庫するか、また、入庫するかを示したものであ
る。また、別の制約条件として、図6に例示するような
バスの路線に関する種々項目があるので、各項目につい
て以下に説明する。
FIG. 5 exemplifies a kind of know-how related to work rules as a constraint condition, although not necessarily in work rules. That is, it indicates from which type the goods are to be delivered and the goods are to be received, depending on the restriction of the restraint time of the type of work and some customs unique to the company. Further, as another constraint condition, there are various items regarding bus routes as illustrated in FIG. 6, and each item will be described below.

【0024】「停留所」はバスを停車させる停留所名す
べてを示し、「車庫」は上記停留所中、仕業の開始及び
終了の位置を示している。「休憩場所」は上記図3で述
べた種別の「休憩時間」及び「休憩時刻目安」に対応す
る休憩をとることができる停留所名を示し、「連続ハン
ドル中断場所」は上記図3で述べた「連続ハンドル中断
時間」以上の間運転せずに止まっていれば連続ハンドル
時間が中断される場所を示している。
The "stop" indicates all the names of the stops that stop the bus, and the "garage" indicates the start and end positions of the work in the above stop. The "rest place" indicates the name of a stop that can take a break corresponding to the "rest time" and "rest time guideline" of the type described in Fig. 3 above, and the "continuous handle suspension place" is described in Fig. 3 above. This indicates the place where the continuous steering wheel time is interrupted if the vehicle is stopped without driving for more than the "continuous steering wheel suspension time".

【0025】次いで、上記のような各種制約条件が制約
データベース13に格納された状態でジョブデータベース
11に格納されたジョブとしての「運行1」〜「運行6」
をリソースデータベース12に格納されるリソースとして
の2つの仕業「仕業1」「仕業2」に割当て決定する際
の推定部14の処理内容を図7により説明する。
Next, the job database is stored with the various constraint conditions as described above stored in the constraint database 13.
"Run 1" to "Run 6" as jobs stored in 11
The processing contents of the estimation unit 14 when allocating and allocating two jobs "work 1" and "work 2" as resources stored in the resource database 12 will be described with reference to FIG.

【0026】すなわち、まずジョブデータベース11に格
納されているジョブとしての運行のデータを推定部14が
時刻の早い順に取出し(ステップA1 )、取出した運行
が一日の始めの運行であるかを否かを判断する(ステッ
プA2 )。これは、図9に示すような「知識1・始めの
運行についての知識」に対応して実行処理されるもの
で、知識の内容で「始めの運行は仕業1に割当てる。」
としているので、取出した運行がもし始めの運行である
「運行1」であると判断すれば、そのままこの「運行
1」をリソースとして始めの「仕業1」に割当てる(ス
テップA3 )。
That is, first, the estimation unit 14 retrieves the operation data as a job stored in the job database 11 in order of the earliest time (step A1), and determines whether the retrieved operation is the first operation of the day. It is determined (step A2). This is executed corresponding to "Knowledge 1 / Knowledge about the first operation" as shown in FIG. 9, and the content of the knowledge "The first operation is assigned to the job 1".
Therefore, if it is determined that the taken-out operation is the first operation "Operation 1", this "Operation 1" is directly assigned to the first "Work 1" as a resource (step A3).

【0027】図8はこの割当て処理の詳細を示すもの
で、処理当初にはその割当てが制約データベース13に格
納される上記図3乃至図6に示した制約を満たすか否か
判断する(ステップB1 )。満たすと判断すると、その
指示通りにここでは「運行1」を「仕業1」に割当て
(ステップB6 )、以上でこの割当て処理を終える。
FIG. 8 shows the details of the allocation process. At the beginning of the process, it is judged whether or not the allocation satisfies the constraints shown in FIGS. 3 to 6 stored in the constraint database 13 (step B1). ). If it is determined that the condition is satisfied, "operation 1" is assigned to "work 1" here as instructed (step B6), and the assignment process is completed.

【0028】「運行1」の割当てを終えた時点で図7で
は次にまだ割当てを行なっていない運行があるか否かを
判断し(ステップA11)、あると判断すると再び上記ス
テップA1 からの処理を繰返す。
At the time when the allocation of "operation 1" is completed, it is judged in FIG. 7 whether there is a next operation that has not been allocated yet (step A11). Repeat.

【0029】時刻の早い順に「運行2」をジョブデータ
ベース11より取出し(ステップA1)、この「運行2」
が一日の始めの運行ではないと判断する(ステップA2
)と、推定部14は次にこれまでの割当ての結果、一方
の「仕業1」にのみ運行が割当てられているか否かを判
断する(ステップA4 )。「仕業1」にのみ割当てられ
ていると判断すると推定部14は、次に取出した「運行
2」をもし「仕業1」に割当てない場合に上記図3の
「出庫休憩間間隔」の制約項目を満たすか否か判断する
(ステップA5 )。ここでは「出庫休憩間間隔」の制約
項目を満たさないこととなるので、この「運行2」を
「仕業1」に割当てる(ステップA9 )。
"Run 2" is retrieved from the job database 11 in the order of earliest time (step A1).
Is not the first operation of the day (Step A2
), The estimation unit 14 then determines whether or not the operation is assigned to only one "work 1" as a result of the assignment so far (step A4). When it is determined that only the "work 1" is allocated, the estimation unit 14 restricts the "interval between breaks" in Fig. 3 when the next operation "operation 2" is not allocated to the "work 1". It is determined whether or not the condition is satisfied (step A5). Here, since the constraint item of "interval between leaving breaks" is not satisfied, this "operation 2" is assigned to "work 1" (step A9).

【0030】これは、図9に示すような「知識2・一方
の仕業にのみ運行が割当てられた場合の知識」に対応し
て実行処理されるもので、知識の内容で「既に割当てを
受けた仕業に割当てないと出庫休憩間間隔の制約を満た
さない場合、それに割当てる。割当てなくとも制約を満
たす場合は、まだ割当てを受けていない仕業に割当て
る。」としているので、この「運行2」を「仕業2」に
割当ると「仕業1」が出庫から休憩までの時間が50分
となってしまい、上記「出庫休憩間間隔目安」の制約を
満たさないこととなるために、「運行2」を「仕業1」
に割当てるものである。
This is executed in response to "Knowledge 2, knowledge when operation is assigned to only one job" as shown in FIG. If it does not meet the constraint of the interval between shipping breaks unless it is assigned to another job, it is assigned to it. If it does not, it is assigned to an operation that has not been assigned yet. If it is assigned to "work 2", the time from "work 1" to the break will be 50 minutes, and the constraint of the "interval between breaks between shipping breaks" will not be satisfied, so "run 2""Work1"
To be assigned to.

【0031】この割当て処理に関して、再び図8におい
て、処理当初にはその割当てが制約データベース13に格
納される上記図3乃至図6に示した制約を満たすか否か
判断する(ステップB1 )。満たすと判断すると、その
指示通りにここでは「運行2」を「仕業1」に割当て
(ステップB6 )、以上でこの割当て処理を終える。
Regarding this allocation processing, referring again to FIG. 8, it is judged at the beginning of the processing whether or not the allocation satisfies the constraints shown in FIGS. 3 to 6 stored in the constraint database 13 (step B1). When it is judged that the condition is satisfied, "operation 2" is assigned to "work 1" here as instructed (step B6), and the assignment process is completed.

【0032】「運行2」の割当てを終えた時点で図7で
は次にまだ割当てを行なっていない運行があると判断し
(ステップA11)、再び上記ステップA1 からの処理を
繰返す。
At the time when the allocation of "operation 2" is completed, it is judged in FIG. 7 that there is an operation which is not yet allocated (step A11), and the processing from step A1 is repeated again.

【0033】次いで推定部14が「運行3」をジョブデー
タベース11より取出し(ステップA1 )、ステップA2
を介してこの「運行3」をもし「仕業1」に割当てない
場合に上記図3の「出庫休憩間間隔目安」の制約項目を
満たすと判断し、(ステップA5 )、次にこの「運行
3」を「仕業2」に割当てる(ステップA6 )。
Next, the estimation unit 14 retrieves "operation 3" from the job database 11 (step A1), and step A2
If this "Run 3" is not assigned to "Work 1" through the above, it is judged that the constraint items of "Guideline between leaving break intervals" in Fig. 3 above are satisfied (step A5), and then this "Run 3". Is assigned to "work 2" (step A6).

【0034】これは、上記と同じく「知識2・一方の仕
業にのみ運行が割当てられた場合の知識」に対応して実
行処理されるもので、「運行3」を「仕業1」に割当て
なくとも「出庫休憩間間隔目安」の制約を満たす場合
は、まだ割当てを受けていない「仕業2」に割当てるよ
うにしたものである。
This is executed in response to "Knowledge 2, knowledge when operation is assigned to only one job", as described above. "Run 3" is not assigned to "Job 1". In both cases, if the constraint of "interval between delivery breaks" is satisfied, it is assigned to "work 2" that has not been assigned yet.

【0035】「運行3」の割当てを終えた時点で図7で
は次にまだ割当てを行なっていない運行があると判断し
(ステップA11)、再び上記ステップA1 からの処理を
繰返す。
At the time when the allocation of "operation 3" is completed, it is determined in FIG. 7 that there is an operation that has not been allocated yet (step A11), and the processing from step A1 is repeated again.

【0036】次いで推定部14は「運行4」をジョブデー
タベース11より取出し(ステップA1 )、ステップA2
,A4 を介して休憩を取れている仕業があるか否か判
断する(ステップA7 )。ここでは「運行3」に相当す
る時刻に「仕業1」が休憩をとれているため、この「運
行4」を「仕業1」に割当てる(ステップA10)。
Next, the estimation unit 14 retrieves "operation 4" from the job database 11 (step A1), and step A2
, A4 to determine whether there is a work taking a break (step A7). Since "work 1" is taking a break at the time corresponding to "run 3", this "run 4" is assigned to "work 1" (step A10).

【0037】これは、図9に示すような「知識3・両方
の仕業に運行が割当てられている場合の知識」に対応し
て実行処理されるもので、知識の内容で「どちらかが休
憩をとれていればそれに割当てる。」としているので、
ここでは「仕業1」が休憩がとれているため、この「運
行4」を「仕業1」に割当てるようにしたものである。
This is executed corresponding to "Knowledge 3, knowledge when operation is assigned to both jobs" as shown in FIG. If so, assign it to it. ”
Since "work 1" has a break here, this "operation 4" is assigned to "work 1".

【0038】この割当て処理に際して、再び図8におい
て、処理当初にはその割当てが制約データベース13に格
納される上記図3乃至図6に示した制約を満たすか否か
判断する(ステップB1 )。満たすと判断すると、その
指示通りにここでは「運行4」を「仕業1」に割当て
(ステップB6 )、以上でこの割当て処理を終える。
In this allocation process, again in FIG. 8, it is judged whether the allocation satisfies the constraints shown in FIGS. 3 to 6 stored in the constraint database 13 at the beginning of the process (step B1). When it is judged that the condition is satisfied, "operation 4" is assigned to "work 1" here as instructed (step B6), and the assignment process is completed.

【0039】「運行4」の割当てを終えた時点で図7で
は次にまだ割当てを行なっていない運行があると判断し
(ステップA11)、再び上記ステップA1 からの処理を
繰返す。
At the time when the allocation of "operation 4" is completed, it is determined in FIG. 7 that there is an operation that has not been allocated yet (step A11), and the processing from step A1 is repeated again.

【0040】次いで推定部14が「運行5」をジョブデー
タベース11より取出し(ステップA1 )、ステップA2
,ステップA4 を介して休憩をとれている仕業がある
と判断すると(ステップA7 )、この「運行5」を「仕
業1」に割当てる(ステップA10)。
Next, the estimation unit 14 retrieves "operation 5" from the job database 11 (step A1), and step A2
If it is determined that there is a work that can take a break through step A4 (step A7), this "operation 5" is assigned to "work 1" (step A10).

【0041】この割当て処理に際して、再び図8におい
て、処理当初にはその割当てが制約データベース13に格
納される上記図3乃至図6に示した制約を満たすか否か
判断する(ステップB1 )。ここでは、図3の「拘束時
間」の制約に反するものと判断し、図9に示すような
「知識4・共通の知識」に対応してその内容「割当てに
より制約に反する場合は割当てない。」としてこの「運
行5」を他の割当てである「仕業2」に割当てた場合に
制約を満たすか否か判断する(ステップB2 )。この場
合、「出庫休憩間間隔目安」の項目で再び制約を満たし
てはいないと判断し、次に上記ステップA10での指示に
よる「運行5」を「仕業1」に割当てた場合に満たさな
い制約項目が制約条件としての度合いの低い「目安」の
みであるか否か判断する(ステップB3 )。ここで指示
通りの割当てにより満たさない制約項目は上記ステップ
B1 で判断したように「拘束時間」の項目であり、「目
安」ではないので、つぎに他の割当て、すなわちこの
「運行5」を「仕業2」に割当てた場合には満たさない
制約項目が制約条件としての度合いの低い「目安」のみ
であるか否か判断する(ステップB4 )。この場合、満
たしていない制約項目が「出庫休憩間間隔目安」であ
り、「目安」のみであることとなるので、次に上記ステ
ップA10での指示とは異なる「仕業2」に「運行5」を
割当てることとし(ステップB9)、以上でこの処理を
終了する。
In this allocation process, again in FIG. 8, it is judged whether the allocation satisfies the constraints shown in FIGS. 3 to 6 stored in the constraint database 13 at the beginning of the process (step B1). Here, it is judged that the constraint of the "constraint time" in FIG. 3 is violated, and the contents "corresponding to the knowledge 4 / common knowledge" as shown in FIG. It is determined whether or not the constraint is satisfied when this "run 5" is assigned to another assignment "work 2" (step B2). In this case, it is judged that the constraint is not satisfied again in the item “interval between leaving breaks”, and the constraint that is not satisfied when the “operation 5” according to the instruction in step A10 above is assigned to “work 1” It is judged whether or not the item is only a "standard" having a low degree as a constraint condition (step B3). Here, the constraint items that are not satisfied by the assignment as instructed are the items of "constraint time" as judged in step B1 above, and are not "reference", so another assignment, that is, "Run 5" When it is assigned to "work 2", it is judged whether or not the constraint items that are not satisfied are only "standards" having a low degree of constraint condition (step B4). In this case, the constraint items that are not satisfied are the “intervals between leaving breaks” and only the “reference”. Therefore, different from the instruction in step A10, “operation 2” is set to “operation 5”. Is assigned (step B9), and the process is completed.

【0042】「運行5」の割当てを終えた時点で図7で
は次にまだ割当てを行なっていない運行があると判断し
(ステップA11)、再び上記ステップA1 からの処理を
繰返す。
At the time when the allocation of "operation 5" is completed, it is determined in FIG. 7 that there is an operation that is not yet allocated (step A11), and the processing from step A1 is repeated again.

【0043】次いで推定部14が「運行6」をジョブデー
タベース11より取出し(ステップA1 )、ステップA2
,ステップA4 を介して休憩をとれている仕業がある
と判断すると(ステップA7 )、この「運行6」を「仕
業1」に割当てる(ステップA10)。
Next, the estimation unit 14 retrieves "operation 6" from the job database 11 (step A1), and step A2
When it is judged that there is a work that can take a break through step A4 (step A7), this "operation 6" is assigned to "work 1" (step A10).

【0044】この割当て処理に際して、再び図8におい
て、処理当初にはその割当てが制約データベース13に格
納される上記図3乃至図6に示した制約を満たすか否か
判断する(ステップB1 )。ここでは、再び図3の「拘
束時間」の制約に反するものと判断し、次に他の割当
て、すなわちこの「運行6」を「仕業2」に割当てた場
合には制約を満たすか否か判断する(ステップB2 )。
この場合、この「運行6」に関しては制約を満たしてい
ると判断し、次に上記ステップA10での指示とは異なる
「仕業2」に「運行6」を割当てることとし(ステップ
B7 )、以上でこの処理を終了する。
In this allocation process, again in FIG. 8, it is judged whether the allocation satisfies the constraints shown in FIGS. 3 to 6 stored in the constraint database 13 at the beginning of the process (step B1). Here, it is determined again that the constraint of the “restricted time” in FIG. 3 is violated, and next, when another assignment, that is, this “operation 6” is assigned to “work 2”, it is determined whether the constraint is satisfied. (Step B2).
In this case, it is determined that the constraint is satisfied for "Run 6", and then "Run 6" is assigned to "Work 2" different from the instruction in Step A10 (Step B7). This process ends.

【0045】こうして「運行6」の割当てを終えた時点
で図7ではもう割当てを行なっていない運行はないと判
断し(ステップA11)、以上でこの割当て処理をすべて
終了する。
In this way, at the time when the allocation of the "operation 6" is completed, it is judged that there is no operation which is not allocated in FIG. 7 (step A11), and the allocation processing is completed.

【0046】上記のような割当て処理を行なった結果、
図12に示すように「仕業1」は「運行1」「運行2」
及び「運行4」、「仕業2」は「運行3」「運行5」及
び「運行6」というように最終的に割当て決定されるこ
ととなる。この場合、図13に上記割当てによる時間の
流れを示すように、「仕業1」は「休憩入庫間間隔目
安」の制約項目で、また、「仕業2」は上述した如く
「出庫休憩間間隔目安」の制約項目でそれぞれ制約を満
たしていないこととなる。しかしながら、これらの満た
していない制約項目はいずれも制約条件としての度合い
の低い「目安」のみであり、制約条件としての度合いの
高い「拘束時間」等の項目は満たしているので、結果的
には優れた割当て決定と考えることができる。
As a result of performing the allocation process as described above,
As shown in FIG. 12, "work 1" is "run 1""run2"
Finally, "operation 4" and "operation 2" are finally assigned and decided as "operation 3", "operation 5" and "operation 6". In this case, as shown in the time flow of the above allocation in FIG. 13, "work 1" is a constraint item of "interval between breaks and receipt intervals", and "work 2" is "standard of interval between leaving and taking breaks as described above. It means that each constraint item does not satisfy the constraint. However, all of the constraint items that do not meet are only the “standard”, which has a low degree as a constraint condition, and the items such as “constraint time”, which has a high degree of constraint condition, are satisfied. It can be considered a good allocation decision.

【0047】なお、上記図9で示した「知識2・一方の
仕業にのみ運行が割当てられた場合の知識」の内容を図
10に示す如く「既に割当てを受けた仕業に休憩をとら
せることが可能であれば、まだ割当てを受けていない仕
業に割当てる。」というようにマンマシンインタフェー
ス15によって書換変更することもできる。書換変更によ
って最終的に得られる割当て決定は図14(a),
(b)に示すいずれかのようになる。この場合、「仕業
1」が早めに休憩をとることとなり、「仕業2」は「運
行3」「運行4」に該当する時間だけの長い休憩となっ
てしまう(図14(a))か、あるいは「仕業1」「仕
業2」ともに2回ずつ休憩をとらなければならなくなる
(図14(b))ため、あまり優れた割当て決定とは言
えない。
The contents of "Knowledge 2, knowledge when operation is assigned to only one job" shown in FIG. 9 are as shown in FIG. 10 "Take breaks to jobs already assigned." If it is possible, it can be rewritten by the man-machine interface 15 such as "assign to a job that has not been assigned yet." The allocation decision finally obtained by the rewriting change is shown in FIG.
It becomes either one shown in (b). In this case, "work 1" will take an early break, and "work 2" will be a long break corresponding to "run 3" and "run 4" (Fig. 14 (a)). Alternatively, both "work 1" and "work 2" have to take a break twice (Fig. 14 (b)), so it cannot be said that the allocation decision is excellent.

【0048】同様に、上記図9で示した「知識2・一方
の仕業にのみ運行が割当てられた場合の知識」の内容を
図11に示す如く「既に割当てを受けた仕業に割当てが
可能であれば、それに割当てる。それが不可能であれ
ば、まだ割当てを受けていない仕業に割当てる。」とい
うようにマンマシンインタフェース15によって書換変更
すると、最終的に得られる割当て決定は図15に示すよ
うになる。この場合、「仕業1」が「運行1」〜「運行
3」に、「仕業2」が「運行4」〜「運行6」に連続し
て割当てられることとなり、「仕業2」の出庫が遅れる
ため、やはりあまり優れた割当て決定とは言えない。
Similarly, the contents of "Knowledge 2, knowledge when operation is assigned to only one job" shown in FIG. 9 are as shown in FIG. If it is impossible, it is assigned to it. If it is not possible, it is assigned to a job that has not been assigned yet. "When the rewriting is performed by the man-machine interface 15, the finally obtained assignment decision is as shown in FIG. become. In this case, "work 1" is continuously assigned to "run 1" to "run 3" and "work 2" is sequentially assigned to "run 4" to "run 6", and the delivery of "work 2" is delayed. Therefore, it is still not a very good allocation decision.

【0049】また、上記図11に示した「知識2」の内
容を用いて、「勤務開始時刻」の制約項目を図3に示す
「05:00以降」から「05:00以降07:30以
前」と書換変更した場合には、「運行3」を「仕業1」
に割当てようとすると「仕業2」の「勤務開始時刻」の
制約条件が満たされないため、この「運行3」を「仕業
2」に割当てられることとなり、上記図12、図13に
示したのと同様の結果が得られる。ただし、この場合は
「運行2」のやり直しは考えないものとする。
Further, by using the contents of "knowledge 2" shown in FIG. 11, the constraint items of "work start time" are shown in FIG. 3 from "05:00 or later" to "05:00 or later and before 07:30." If you rewrite it as ",""operation3" is changed to "work 1"
However, since the constraint condition of “work start time” of “work 2” is not satisfied, this “operation 3” can be assigned to “work 2”, as shown in FIGS. 12 and 13 above. Similar results are obtained. However, in this case, it is not considered to re-execute "Run 2".

【0050】以上の説明はいずれも朝早い運行から時刻
の順に割当てる例を示したが、反対に運行の時刻を遡っ
て夜遅くから順に割当てるようにしても同様の結果が得
られる。また、休憩を複数回とるようにしたい場合は、
休憩間隔についても同様の処理を行なうことができる。
Although the above explanations show examples of allocating in order from early morning operation to time, on the contrary, the same result can be obtained by allocating operation time backward and allocating sequentially from late night. Also, if you want to take multiple breaks,
Similar processing can be performed for the break intervals.

【0051】[0051]

【発明の効果】以上詳記した如く本発明によれば、少な
くとも出発時刻及び到着時刻の属性を有するジョブを複
数記憶保存するジョブデータベースと、リソースを複数
記憶保存するリソースデータベースと、ジョブをリソー
スに割当てる際の複数レベルの制約条件を記憶保存する
制約データベースと、上記ジョブデータベースに保存さ
れるジョブをその時刻順に取出して上記制約データベー
スに保存される複数レベルの制約条件に従い、上記リソ
ースデータベースに保存されるリソースに割当てる推論
部と、上記制約データベースに保存される制約条件の内
容を書換変更するマンマシンインタフェースとを備える
ようにしたので、リソースの要求する事情に即してより
詳細な制約条件をその制約の度合いに応じて設定し、リ
ソースに適した優れた割当て決定を容易に行なうことが
可能な割当て装置を提供することができる。
As described above in detail, according to the present invention, a job database storing and storing a plurality of jobs having at least the departure time and arrival time attributes, a resource database storing and storing a plurality of resources, and a job as a resource. A constraint database that stores and saves multiple levels of constraint conditions at the time of allocation, and jobs that are saved in the job database are retrieved in the order of time and saved in the resource database according to the multiple levels of constraint conditions that are saved in the constraint database. The inference unit assigned to the resource and the man-machine interface that rewrites and changes the content of the constraint condition stored in the constraint database are provided, so that more detailed constraint conditions can be set according to the circumstances required by the resource. Set according to the degree of constraint, The assignment decision may provide assignments apparatus capable of easily performing.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例に係る構成を示すブロック
図。
FIG. 1 is a block diagram showing a configuration according to an embodiment of the present invention.

【図2】図1のジョブデータベースに格納されるジョブ
の一部を例示する図。
FIG. 2 is a diagram illustrating a part of jobs stored in a job database shown in FIG.

【図3】図1の制約データベースに格納される制約条件
を例示する図。
FIG. 3 is a diagram showing an example of constraint conditions stored in a constraint database shown in FIG.

【図4】図1の制約データベースに格納される制約条件
を例示する図。
FIG. 4 is a view exemplifying constraint conditions stored in a constraint database of FIG.

【図5】図1の制約データベースに格納される制約条件
を例示する図。
5 is a diagram exemplifying constraint conditions stored in the constraint database of FIG. 1. FIG.

【図6】図1の制約データベースに格納される制約条件
を例示する図。
FIG. 6 is a diagram showing an example of constraint conditions stored in the constraint database of FIG.

【図7】図1の推定部による割当て決定の処理内容を示
すフローチャート。
7 is a flowchart showing the processing contents of allocation determination by the estimation unit in FIG.

【図8】図7の割当て処理のサブルーチンを示すフロー
チャート。
8 is a flowchart showing a subroutine of allocation processing of FIG.

【図9】推定部のアルゴリズムの基準となる知識を例示
する図。
FIG. 9 is a diagram exemplifying knowledge as a reference of an algorithm of an estimation unit.

【図10】図9の知識の他の例を示す図。FIG. 10 is a diagram showing another example of the knowledge of FIG.

【図11】図9の知識の他の例を示す図。FIG. 11 is a diagram showing another example of the knowledge of FIG. 9.

【図12】図7の処理によって得られる割当て結果を示
す図。
12 is a diagram showing an allocation result obtained by the processing of FIG.

【図13】図7の処理によって得られる割当て結果を示
す図。
13 is a diagram showing an allocation result obtained by the processing of FIG.

【図14】割当て結果の他の例を示す図。FIG. 14 is a diagram showing another example of the allocation result.

【図15】割当て結果の他の例を示す図。FIG. 15 is a diagram showing another example of the allocation result.

【符号の説明】[Explanation of symbols]

11…ジョブデータベース、12…リソースデータベース、
13…制約データベース、14…推定部、15…マンマシンイ
ンタフェース。
11 ... Job database, 12 ... Resource database,
13 ... Constraint database, 14 ... Estimator, 15 ... Man-machine interface.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 少なくとも出発時刻及び到着時刻の属性
を有するジョブを複数記憶保存するジョブデータベース
部と、 リソースを複数記憶保存するリソースデータベース部
と、 ジョブをリソースに割当てる際の複数レベルの制約条件
を記憶保存する制約データベース部と、 上記ジョブデータベース部に保存されるジョブをその時
刻順に取出して上記制約データベース部に保存される複
数レベルの制約条件に従い、上記リソースデータベース
部に保存されるリソースに割当てる推論部と、 上記制約データベース部に保存される制約条件の内容を
書換変更する変更部とを具備したことを特徴とする割当
て装置。
1. A job database section for storing and storing a plurality of jobs having attributes of at least a departure time and an arrival time, a resource database section for storing and storing a plurality of resources, and constraint conditions for assigning jobs to resources at a plurality of levels. Constraint database part to be stored and stored, and jobs to be stored in the job database part are extracted in chronological order and assigned to the resources stored in the resource database part according to the multi-level constraint conditions stored in the constraint database part. And an altering unit for rewriting and altering the contents of the constraint conditions stored in the constraint database unit.
JP27759291A 1991-10-24 1991-10-24 Allocation device Pending JPH05120294A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP27759291A JPH05120294A (en) 1991-10-24 1991-10-24 Allocation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP27759291A JPH05120294A (en) 1991-10-24 1991-10-24 Allocation device

Publications (1)

Publication Number Publication Date
JPH05120294A true JPH05120294A (en) 1993-05-18

Family

ID=17585603

Family Applications (1)

Application Number Title Priority Date Filing Date
JP27759291A Pending JPH05120294A (en) 1991-10-24 1991-10-24 Allocation device

Country Status (1)

Country Link
JP (1) JPH05120294A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0657809A1 (en) * 1993-12-13 1995-06-14 International Business Machines Corporation Input/output objects in operating system kernel
JP2019175209A (en) * 2018-03-29 2019-10-10 株式会社デンソー Vehicle remote support system and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0657809A1 (en) * 1993-12-13 1995-06-14 International Business Machines Corporation Input/output objects in operating system kernel
US5794035A (en) * 1993-12-13 1998-08-11 International Business Machines Corporation Device driver and input/output hardware research manager
JP2019175209A (en) * 2018-03-29 2019-10-10 株式会社デンソー Vehicle remote support system and method

Similar Documents

Publication Publication Date Title
US7502747B1 (en) Automated job scheduling based on resource availability
JP5113119B2 (en) Computer-executable workflow control system
US5848395A (en) Appointment booking and scheduling system
US5343387A (en) Cyclic maintenance work schedule table preparation system
Kress et al. A worker constrained flexible job shop scheduling problem with sequence-dependent setup times
US6981003B2 (en) Method and system for master planning priority assignment
JPH064516A (en) Assignment decision support system
JPH05120294A (en) Allocation device
JP2007213141A (en) Personnel distribution system, personnel distribution method, personnel distribution program, and recording medium with the program recorded thereon
Loerch et al. An approach to production planning and scheduling in cyclically scheduled manufacturing systems
Liu Scheduling via reinforcement
JPH07219920A (en) Processing method and device for solving optimization problem
JPH0652182A (en) Assigning device
JPH0652181A (en) Allocation device
JPH0635721A (en) Assigning device
JPH1086044A (en) Worker's discretion utilization schedule planning method and device therefor
JP2731079B2 (en) Schedule creation device
JP3114149B2 (en) Schedule automatic creation processing method
JP2000040099A (en) Device and method for preparing schedule, selecting method for job and recording medium recording software of schedule preparation
JPH06250851A (en) Allocating device
JPH0635720A (en) Assigning device
JPH04348856A (en) Work starting order deciding system
JPS63163669A (en) Deciding system for assignment
JP2005259067A (en) Job management device and job allocation program
JP2747130B2 (en) Schedule automatic creation processing method