JPH0432908B2 - - Google Patents

Info

Publication number
JPH0432908B2
JPH0432908B2 JP2822884A JP2822884A JPH0432908B2 JP H0432908 B2 JPH0432908 B2 JP H0432908B2 JP 2822884 A JP2822884 A JP 2822884A JP 2822884 A JP2822884 A JP 2822884A JP H0432908 B2 JPH0432908 B2 JP H0432908B2
Authority
JP
Japan
Prior art keywords
curing net
scaffold
net
scaffolding
framework
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP2822884A
Other languages
Japanese (ja)
Other versions
JPS60173262A (en
Inventor
Junichi Moritaka
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2822884A priority Critical patent/JPS60173262A/en
Publication of JPS60173262A publication Critical patent/JPS60173262A/en
Publication of JPH0432908B2 publication Critical patent/JPH0432908B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Catching Or Destruction (AREA)
  • Knitting Of Fabric (AREA)
  • Emergency Lowering Means (AREA)
  • Movable Scaffolding (AREA)

Description

【発明の詳細な説明】 この発明は枠組足場の組立または解体の際に作
業に使用している部材や資材などの落下を防止す
る養生網の先行張り工法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for pre-stretching a curing net to prevent falling of members and materials used during assembly or disassembly of a framework scaffold.

枠組足場の組立または解体作業中の墜落防止策
として、足場部材の上段の主枠材に親綱支柱をセ
ツトし、そこに張設した親綱に作業員に取付けた
命綱を係止して作業を行なうようにしている。
As a fall prevention measure during assembly or dismantling work of framed scaffolding, a main rope support is set on the main frame material of the upper stage of the scaffolding members, and the lifeline attached to the worker is secured to the main rope stretched there. I try to do this.

このようなことから、作業員の墜落事故はきわ
めてまれとなつたが、作業に使用する部材や資材
などの落下までをも防止するまでにはいたらず、
落下物による通行人の傷害などが生じ易い。
As a result, falls among workers have become extremely rare, but it has not been possible to prevent the falling of parts and materials used in work.
Passersby are likely to be injured by falling objects.

この部材等の落下防止策として、特開昭56−
108901号に開示されているような保護柵を、枠組
足場の上段に取付けることが、一部にて試みられ
ているが、このような場合には、保護柵の移動に
際して、保護柵の支柱を枠組足場に仮止めした
り、また支柱とは別に吊上げた保護柵を再度支柱
に掛止めしたりしなければならないなど、保護柵
の張設に手間を要するばかりか、保護柵の吊り上
げ前に、作業員が保護手段のない最上段の枠組足
場に乗つて支柱と保護柵とを吊合げなければなら
ず、その吊上げ作業時におけ落下防止までをも考
慮されていないものであつた。
As a measure to prevent this component from falling,
Some attempts have been made to attach a protective fence such as the one disclosed in No. 108901 to the upper level of the framework scaffolding, but in such cases, when moving the protective fence, the posts of the protective fence must be Not only is it time-consuming to set up the protective fence, as it requires temporary fixing to the framework scaffolding, and the need to re-hook the protective fence that has been lifted separately from the posts to the posts. Workers had to climb onto the topmost frame scaffolding, which had no protective means, to hang the support posts and protective fence together, and no consideration was given to preventing falls during the lifting process.

この発明は上記従来の欠点を排除し、足場部材
の組立や解体時は勿論のこと、養生網の張設作業
時においても部材等の落下を防止することができ
る新たな工法を提供しようとするものである。
This invention aims to eliminate the above-mentioned conventional drawbacks and provide a new construction method that can prevent scaffolding members from falling, not only when assembling and dismantling scaffolding members, but also when constructing a protective net. It is something.

またこの発明は、枠組足場の上段に佇設された
支柱の盛替えと、その支柱に吊下げた養生網の下
辺の掛替えとを行うだけで、養生網を枠組足場の
上方または下方に張替えることができる新たな工
法を提供するものである。
In addition, this invention allows the curing net to be stretched above or below the frame scaffold by simply replacing the supports placed on the upper level of the frame scaffold and replacing the lower side of the curing net suspended from the support. This provides a new construction method that allows for

更にまたこの発明は、生命保護のために枠組足
場の上段に佇設される親綱支柱を、養生網の吊下
げ支柱に利用し、その支柱間の親綱とそこに係止
された命綱とにより作業員の安全を確保した上に
て、養生網により部材等の落下を防止し得る新た
な工法を提供するものである。
Furthermore, this invention utilizes the main rope supports placed on the upper stage of the framework scaffold for life protection as the hanging supports of the curing net, and the main ropes between the supports and the life lines latched thereto. This provides a new construction method that can prevent parts from falling using a protective net while ensuring the safety of workers.

上記目的によるこの発明の特徴は、組立または
解体途中の枠組足場の上段に、ブラケツトを上端
部に突設した複数の支柱を、足場部材の主枠材上
部に取付けて所要間隔ごとに佇設し、その支柱の
一部に設けた自在滑車を介して他の各ブラケツト
にわれり案内ロープを緊張及び緩弛自在に掛け設
け、その案内ロープに養生網の上辺を連結すると
ともに、下辺を枠組足場に掛止して、該養生網を
枠組足場の上部外側に張設し、上記支柱の盛替え
と養生網下辺の掛替えとにより、養生網を組立ま
たは解体作業前に枠組足場の上方または下方へ張
設することにあり、これをもつてその目的を達成
しようとするものである。
A feature of the present invention for the above-mentioned purpose is that a plurality of columns having brackets protruding from the upper end are attached to the upper part of the main frame member of the scaffolding member and are placed at required intervals on the upper stage of a framework scaffold that is being assembled or dismantled. A guide rope is attached to each of the other brackets through a flexible pulley installed on a part of the support, so that the upper side of the curing net is connected to the guide rope, and the lower side is attached to the frame scaffolding. The curing net is stretched outside the upper part of the framework scaffold, and by replacing the above-mentioned supports and replacing the lower side of the curing net, the curing net can be placed above or below the framework scaffold before assembly or dismantling work. The aim is to establish a system for the purpose of achieving this goal.

以下この発明を図示の例により詳細に説明す
る。
The present invention will be explained in detail below using illustrated examples.

図中1は枠組足場、2は養生網、3は養生網2
の支柱で、親綱支柱をもつて兼用させてある。
In the figure, 1 is a framework scaffold, 2 is a curing net, and 3 is a curing net 2
The main rope support also serves as a main rope support.

上記枠組足場1は、門型に形成した主枠材11
と、歩み板12及び筋違13などによる通常構造
からなる。
The framework scaffolding 1 has a main frame member 11 formed into a gate shape.
It has a normal structure including footboards 12 and braces 13.

また上記養生網2は、合成繊維をもつて長方形
に編織した目の細かな複数枚の綱地21を、周辺
の補強縁22に貫設した鳩目23と綴紐とにより
綴り合わせた一枚のものからなり、かつ防水加工
が施してある。
The curing net 2 is made of a single piece of fine rope 21 made of synthetic fibers woven into a rectangular shape, sewn together using eyelets 23 penetrating the peripheral reinforcing edges 22 and binding cords. It is made of aluminum and is waterproof.

上記支柱3、第2図以下に明示するように、親
綱掛板32を腹部に設けた柱部材31の下端に、
蝶番33を備えた取付金具34を有し、かつ上端
部に養生網吊下用のブラツト35が突設してあ
る。この支柱3は枠組足場1の上段に所要間隔ご
とに配設され、そのうちの中央に位置する支柱3
のブラケツト35には、第4図に示すように、一
対の自在滑車4,4が制動側を内側にして吊下げ
てあり、案内ロープ5をその自在滑車4,4に余
長部5aを残し挿通して、該案内ロープ5を両側
の支柱3のブラケツト35にわたり緊張及び緩弛
自在に張設してある。
As clearly shown in FIGS. 2 and below, the pillar 3 has a main rope hanging plate 32 attached to the lower end of the pillar member 31 on its abdomen.
It has a mounting bracket 34 with a hinge 33, and a bracket 35 for suspending the curing net is protruded from the upper end. These pillars 3 are arranged at required intervals on the upper stage of the framework scaffolding 1, and the pillar 3 located in the center of them is
As shown in FIG. 4, a pair of swivel pulleys 4, 4 are suspended from the bracket 35 with the braking side facing inside, and the guide rope 5 is attached to the swivel pulleys 4, 4, leaving an extra length 5a. The guide rope 5 is inserted through the guide rope 5 and stretched across the brackets 35 of the support columns 3 on both sides so as to be tensionable and relaxed.

また案内ロープ5には、上記養生網2の上辺
が、鳩目23に嵌挿した環51をもつて連結して
あり、案内ロープ5と共にその上辺を弛ませて、
枠組足場1の最上部のみを、主枠材11の取込み
のために開放することができるようにしてある。
Further, the upper side of the curing net 2 is connected to the guide rope 5 with a ring 51 inserted into the eyelet 23, and the upper side is loosened together with the guide rope 5.
Only the top of the framework scaffold 1 can be opened for the introduction of the main frame material 11.

6は養生網2の下端部24を折返して掛け止め
する金具で、一端は綱地21の下辺の鳩目に掛止
め、他端は主枠材11に掛止めてある。
Reference numeral 6 denotes a metal fitting for folding and latching the lower end portion 24 of the curing net 2. One end is latched to the eyelet on the lower side of the rope 21, and the other end is latched to the main frame material 11.

7は親綱で、上記親綱掛板32に係止した緊張
滑車8をもつて水平に張設してある。
Reference numeral 7 denotes a main rope, which is stretched horizontally with a tension pulley 8 locked to the main rope hanging plate 32.

次に足場組立作業を例にして、養生網の先行張
り工程を第2図及び第3図より順に説明する。
Next, using scaffold assembly work as an example, the pre-stretching process of the curing net will be explained in order with reference to FIGS. 2 and 3.

まず第2図に示すように、最上段Aの足場部材
の組立てが完了したならば、その下段の主枠材1
1の縦枠11aに取付金具34をもつて固定した
支柱3を、最上段Aの主枠材11に盛替える。
First, as shown in Figure 2, once the assembly of the scaffolding members on the top tier A is completed, the main frame member 1
The support column 3 fixed to the vertical frame 11a of No. 1 with the mounting bracket 34 is transferred to the main frame material 11 of the uppermost stage A.

この盛替作業は最上段Aの主枠材11などの組
立てを行した上段Bの足場の上にて行うことがで
き、また盛替作業中に部材などが落しても、その
落下部材は養生網2よりも外側へ落るようなこと
がなく、また養生網2の折返した下端部24によ
り受止めることができる。
This replacement work can be performed on the scaffolding of the upper tier B, where the main frame material 11 of the top tier A has been assembled, and even if parts fall during the replacement work, the fallen parts can be It does not fall to the outside of the net 2, and can be caught by the folded lower end 24 of the curing net 2.

上記支柱3の盛替えに際しては、まず第3図に
示すように、案内ロープ5を弛めて、養生網2の
上辺を、組立てた最上段Aを主枠材11の上部ま
で下げ、支柱盛替え時における養生網2の荷重や
抵抗などを出来るだけ少なくして、作業を容易に
行うことができるようにして置く。
When replacing the pillar 3, first, as shown in FIG. The load and resistance of the curing net 2 at the time of replacement are reduced as much as possible so that the work can be easily performed.

この案内ロープ5緩弛作業は、上記一対の自在
滑車4,4の間にたれ下げた余長部5aを操作し
て自在滑車4,4の制動部材を外し、その制動部
材が再度案内ロープ5に噛み付かないように余長
部5aを張りながら送り出すことにより、きわめ
て容易に行うことができる。
This work of relaxing and loosening the guide rope 5 is performed by removing the braking members of the movable pulleys 4, 4 by operating the extra length 5a hanging between the pair of movable pulleys 4, 4, and then the braking member is re-routed to the guide rope 5. This can be done very easily by stretching the extra length 5a so that it does not get caught.

上記のようにして、養生網2の吊り下しを行つ
たならば、上記蝶番33を開いて取付金具34を
縦枠11aから外し、その取付金具34を再度最
上段Aの主枠材11の縦枠上部に固定して、支柱
3を組立足場1の最上段Aより上方に佇設する。
そして上記案内ロープ5を主枠材11の縦枠上端
に差込んだジヨイントピン9に掛止めて、養生網
上部が風によりあおられないように固定したの
ち、更に上段の足場部材の取込みを行う。この取
込作業は、予め張設した親綱に命綱を掛止めて作
業員の安全を認保したのち行われることは言うま
でもない。
Once the curing net 2 has been suspended as described above, the hinge 33 is opened, the mounting bracket 34 is removed from the vertical frame 11a, and the mounting bracket 34 is attached again to the main frame member 11 of the uppermost stage A. The pillar 3 is fixed to the upper part of the vertical frame and is placed above the top step A of the assembled scaffold 1.
Then, the guide rope 5 is hooked to the joint pin 9 inserted into the upper end of the vertical frame of the main frame member 11, and after the upper part of the curing net is fixed so as not to be blown by the wind, the upper scaffolding members are taken in. Needless to say, this retrieval work is carried out after ensuring the safety of the workers by latching the lifeline to the main rope that has been stretched in advance.

したがつて、組立足場1の最上段Aの上にて取
込作業を行つても墜落などの事故を起すようなこ
とはない。
Therefore, even if the loading work is performed on the top step A of the assembly scaffold 1, accidents such as falls will not occur.

取込作業が完了したならば、養生網2の下端部
24を折返した状態で、上段Bの主枠材11に掛
替え、また案内ロープ5をジヨイントピン9から
外して余長部5aを引張り、該案内ロープ5を緊
張する。
When the loading work is completed, the lower end 24 of the curing net 2 is folded back and replaced with the main frame material 11 of the upper tier B, and the guide rope 5 is removed from the joint pin 9 and the extra length 5a is pulled. Tension the guide rope 5.

この緊張により養生網2の上辺は、各ブラケツ
ト35の下側まで引上げられて、第1図及び第2
図の状態に組立足場1の上2段目から上方に張設
され、またその緊張は自在滑車4,4の制動部材
によつて維持される。
Due to this tension, the upper side of the curing net 2 is pulled up to the bottom of each bracket 35, and as shown in FIGS.
The assembly scaffold 1 is stretched upward from the upper second stage in the state shown in the figure, and the tension is maintained by the braking members of the adjustable pulleys 4, 4.

このようにして、養生網2を組立足場1の上部
外側に張設してから、先に取込んだ足場部材の組
立てを行う。そして組立が完了するごとに、上記
と同様な工程を繰返しすれば、常に組立作業に先
行して、養生網2を張設することができ、その養
生網2をもつて落下事故を未然に防ぐことができ
る。
In this way, the curing net 2 is stretched outside the upper part of the assembled scaffold 1, and then the scaffold members taken in earlier are assembled. By repeating the same process as above each time the assembly is completed, the protection net 2 can be always stretched prior to the assembly work, and the protection net 2 can be used to prevent falling accidents. be able to.

また組立足場1と養生網2との間には、充分な
スペースが確保できるので、養生網2の内側にて
組立足場1への防音板などの取付作業を実施する
ことができる。
Further, since a sufficient space can be secured between the assembled scaffold 1 and the curing net 2, it is possible to carry out work for attaching soundproof boards and the like to the assembled scaffold 1 inside the curing net 2.

なお、解体作業における養生網2の先行張り
は、上記組立作業とは逆に、支柱3を下段の主枠
材11に盛替えて行えばよく、先行張りに付いて
の工程は、組立ての場合と同様であるので、その
説明は省略する。
In addition, the preliminary tensioning of the curing net 2 in the dismantling work can be carried out by replacing the pillars 3 with the lower main frame material 11, contrary to the above-mentioned assembly work, and the process for the preliminary tensioning is the same as in the case of assembly. Since it is the same as that, its explanation will be omitted.

この発明は上述のように、養生網2を組立足場
1の上段に、盛替え自在に佇設した複数の支柱
3,3に吊下し、その支柱3,3の盛替えと養生
網2の下辺の掛替えとをもつて、組立または解体
作業に先行して、養生網2を作業場の外側に張設
するので、その養生網2により作業中の部材等の
落下による事故を確実に防止することができる。
As described above, this invention suspends the curing net 2 from a plurality of pillars 3, 3 which are placed on the upper level of the assembled scaffolding 1 so that the pillars 3, 3 can be rearranged and the curing net 2 can be replaced. With the replacement of the lower side, the curing net 2 is stretched outside the work area prior to assembly or disassembly work, so the curing net 2 reliably prevents accidents caused by falling parts, etc. during work. be able to.

しかも養生網2を、自在滑車4を用いて、緊張
及び緩弛自在に各支柱3のブラケツト35にわた
り張設した案内ロープ5を介して、各支柱3に吊
下し、その案内ロープ5の操作をもつて、養生網
上部の開閉を自由に行えるようにしたため、部材
や資材などの取込みに際して、養生網が傷害とな
るようなこともない。
In addition, the curing net 2 is suspended from each pillar 3 using a flexible pulley 4 via a guide rope 5 stretched across the bracket 35 of each pillar 3 so as to be tensionable and relaxed, and the guide rope 5 is operated. Since the upper part of the curing net can be opened and closed freely, the curing net will not be damaged when taking in parts or materials.

また親綱支柱を支柱に利用して、養生網の張設
ができるので、作業員の墜落防止は親綱により、
部材等の落下は養生網によりそれぞれ分担させる
ことができるので、その安全性は一段と向上し安
心して作業を行うことができる。
In addition, the safety net can be stretched using the main rope support as a support, so the main rope can help prevent workers from falling.
Since the falling of members, etc. can be divided by the protection net, safety is further improved and work can be carried out with peace of mind.

更にまた支柱の盛替えに際して、養生網の上辺
を組立足場に持たせ、養生網による支柱の負担を
軽減できるので、支柱の上げ下げに大きな労力を
要せず、盛替作業を簡単な手段のもとに、きわめ
て容易に行うことができるなどの多くの特長を有
する。
Furthermore, when replacing the pillars, the upper side of the protective net can be placed on the assembly scaffolding to reduce the burden on the pillars due to the protective net, so it does not require a lot of effort to raise and lower the pillars, making the replacement work a simple method. It has many features such as being extremely easy to perform.

【図面の簡単な説明】[Brief explanation of drawings]

図面はこの発明に係る養生網先行張設工法を例
示するもので、第1図は養生網を上部外側に張設
した組立足場の正面図、第2図及び第3図は養生
網の張設工程を示す組立足場上部の側面図、第4
図は自在滑車を設けた支柱の正面図である。 1……組立足場、2……養生網、3……支柱、
4……自在滑車、5……案内ロープ、6……掛け
止金具、7……親綱、11……主枠材。
The drawings illustrate the method for pre-stretching a curing net according to the present invention, and FIG. 1 is a front view of an assembled scaffold with a curing net stretched on the outside of the upper part, and FIGS. Side view of the upper part of the assembled scaffold showing the process, No. 4
The figure is a front view of a column provided with a swivel pulley. 1... Assembled scaffolding, 2... Protection net, 3... Support column,
4...Swivel pulley, 5...Guide rope, 6...Latch fitting, 7...Main rope, 11...Main frame material.

Claims (1)

【特許請求の範囲】 1 組立または解体途中の枠組足場の上段に、ブ
ラケツトを上端部に突設した複数の支柱を、足場
部材の主枠材上部に取付けて所要間隔ごとに佇設
し、その支柱の一部に設けた自在滑車を介して他
の各ブラケツトにわたり案内ロープを緊張及び緩
弛自在に掛け設け、その案内ロープに養生網の上
辺を連結するとともに、下辺を枠組足場に掛止し
て、該養生網を枠組足場の上部外側に張設し、上
記支柱の盛替えと養生網下辺の掛替えとにより、
養生網を組立または解体作業前に枠組足場の上方
または下方へ張設することを特徴とする枠組足場
における養生網先行張設工法。 2 上記支柱は親綱支柱の上端部にブラケツトを
突設したものからなる特許請求の範囲第1項記載
の枠組足場における養生網先行張設工法。
[Scope of Claims] 1. A plurality of columns with brackets protruding from the upper ends are attached to the upper part of the main frame material of the scaffolding members and are placed at required intervals on the upper stage of the framework scaffold that is being assembled or dismantled. A guide rope is tensioned and loosened freely over the other brackets via a flexible pulley provided on a part of the support, and the upper side of the curing net is connected to the guide rope, and the lower side is hooked to the framework scaffolding. Then, the curing net is stretched outside the upper part of the framework scaffold, and by replacing the above-mentioned supports and replacing the bottom side of the curing net,
A method for pre-stretching a curing net in a framed scaffold, characterized by stretching the curing net above or below the framed scaffold before assembly or dismantling work. 2. The method for pre-stretching a curing net in a framework scaffold according to claim 1, wherein the support is comprised of a parent rope support with a bracket protruding from the upper end.
JP2822884A 1984-02-17 1984-02-17 Aged net preceding tensioning construction in framework scaffold Granted JPS60173262A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2822884A JPS60173262A (en) 1984-02-17 1984-02-17 Aged net preceding tensioning construction in framework scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2822884A JPS60173262A (en) 1984-02-17 1984-02-17 Aged net preceding tensioning construction in framework scaffold

Publications (2)

Publication Number Publication Date
JPS60173262A JPS60173262A (en) 1985-09-06
JPH0432908B2 true JPH0432908B2 (en) 1992-06-01

Family

ID=12242740

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2822884A Granted JPS60173262A (en) 1984-02-17 1984-02-17 Aged net preceding tensioning construction in framework scaffold

Country Status (1)

Country Link
JP (1) JPS60173262A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0724531Y2 (en) * 1988-08-12 1995-06-05 積水ハウス株式会社 Protective net support equipment

Also Published As

Publication number Publication date
JPS60173262A (en) 1985-09-06

Similar Documents

Publication Publication Date Title
EP0795068B1 (en) Temporary protective covering system
US5161641A (en) Jointly movable safety net and curtain arrangement for multi-floor buildings under construction
US4856615A (en) Safety net arrangement for multi-floor buildings under construction, and method
RU2400609C2 (en) Complex system of accident prevention support in construction
KR100841240B1 (en) Built-up scaffold for construction field
US4880024A (en) Self-supporting tent
JPH0432908B2 (en)
US11578497B1 (en) Barrier members for a building debris containment system
JP2623072B2 (en) Dome type temporary tent and its assembling method
JP2921403B2 (en) Seat stretching structure
JPH05163833A (en) Erected frame with safety net
CN216197788U (en) Ladder stand
JPH0728321Y2 (en) Construction sheet
JP6749129B2 (en) Flying object protection equipment and opening/closing method of flying object protection equipment
JP7443279B2 (en) A roof frame for curing external framework scaffolding and a rain protection device for external framework scaffolding using a roof frame for curing external framework scaffolding.
JP2620681B2 (en) Temporary roof
KR200493327Y1 (en) Toe plate for hoist
JPH0746135Y2 (en) Protective net device
JP6788282B2 (en) Large tent
JPH08447Y2 (en) Sugomori Tent
JPS60144460A (en) Scaffold apparatus and its installation
JP2562825Y2 (en) Frame scaffolding protection sheet
JP2562525Y2 (en) Elevating frame material for narrow frame scaffolds
JPH0738565Y2 (en) Curing sheet tensioning device
JP3227328B2 (en) Partition structure