JPH04166561A - Application of slab piercing hole - Google Patents

Application of slab piercing hole

Info

Publication number
JPH04166561A
JPH04166561A JP29077990A JP29077990A JPH04166561A JP H04166561 A JPH04166561 A JP H04166561A JP 29077990 A JP29077990 A JP 29077990A JP 29077990 A JP29077990 A JP 29077990A JP H04166561 A JPH04166561 A JP H04166561A
Authority
JP
Japan
Prior art keywords
block
slab
frame
hole
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP29077990A
Other languages
Japanese (ja)
Inventor
Naoyuki Ito
直之 伊藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP29077990A priority Critical patent/JPH04166561A/en
Publication of JPH04166561A publication Critical patent/JPH04166561A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To simplify the application and reduce the processes and decrease the construction time, labours and costs, by arranging two architrave-shaped blocks expanding outward and upward so as to hold a temporary column or the like on a slab mold. CONSTITUTION:A square shaped plane block having a pierced hole 7 in the center is divided into two and two blocks 3 on the architrave having upwardly and outwardly expanding shape in the section are arranged on a slab mold 2 so as to hold a temporary column 1. And a slab concrete 4 is placed at the part except the block 3 on the slab mold 2. And next, after the temporary column 1 is removed, a lid block 5 is inserted in the pierced hole 7 from the upper side to hold it by the peripheral protrusions 8 of the block 3. And further, reinforced bars 11 are arranged in the space surrounded by the block 3 and the lid block 5 and repair concrete 12 is placed in the space to finish the repair of the pierced hole 7.

Description

【発明の詳細な説明】 し産業上の利用分野1 本発明は、建築物のスラブを貫通して立設する仮設支柱
等の貫通孔の仕切り型枠及び同貫通孔の補修を、体系的
に施工するようにしたスラブ貫通孔の施工方法に関する
[Detailed Description of the Invention] Industrial Application Field 1 The present invention systematically repairs the partition formwork of a through-hole such as a temporary support that is erected through a slab of a building, and the repair of the through-hole. The present invention relates to a method for constructing a slab through hole.

[従来の技術] 従来、スラブ型枠を貫通して立設する仮設支柱等の貫通
孔の施工方法は、第5図に示すように、仕切り型枠13
が水平方向に敷設されたスラブ型枠2の貫通孔7の周縁
部に、仮設支柱1等を取り囲んで設けられる。
[Prior Art] Conventionally, as shown in FIG.
is provided at the periphery of the through hole 7 of the horizontally laid slab formwork 2, surrounding the temporary support 1 and the like.

この仕切り型枠13は、通常、木製や鋼製の板状型枠が
用いられ、大工等により仮設支柱1等を取り囲む箱抜状
に作成されて貫通孔7が仕切られる。
This partition formwork 13 is usually a plate-like formwork made of wood or steel, and is made by a carpenter or the like in a box-shaped form surrounding the temporary support 1 etc., and the through-hole 7 is partitioned off.

そして、スラブコンクリート4が貫通孔7内に流入しな
いようにスラブ型枠2上に打設される。この際、仕切り
型枠13には図示を省略した複数の挿し筋が貫通して設
けられ、挿し筋の一方はスラブコンクリート4内に埋設
され、他方は貫通孔7内に突出した状態に配置される。
Then, the slab concrete 4 is placed on the slab formwork 2 so as not to flow into the through hole 7. At this time, a plurality of insertion reinforcements (not shown) are provided to penetrate through the partition formwork 13, one of the insertion reinforcements is buried in the slab concrete 4, and the other is arranged so as to protrude into the through hole 7. Ru.

このように施工された後、仮設支柱1等が撤去され、ス
ラブコンクリート4の硬化機解体作業員により仕切り型
枠13が撤去される。そして、貫通孔7の下面に木製や
鋼製の型枠を用いて底蓋が施され、貫通孔7内に鉄筋工
等により補強鉄筋が組まれて補修用コンクリートが打設
される。その後、補修用コンクリートの硬化具合を見計
らって解体作業員により底蓋とスラブ型枠2が取り外さ
れ、貫通孔7の補修を完了していた。
After the construction is completed in this manner, the temporary supports 1 and the like are removed, and the partition formwork 13 is removed by a worker dismantling the slab concrete 4 hardening machine. Then, a bottom cover is applied to the lower surface of the through hole 7 using a formwork made of wood or steel, reinforcing reinforcing bars are set in the through hole 7 by reinforcing steel work, etc., and repair concrete is poured. Thereafter, the bottom cover and the slab formwork 2 were removed by a demolition worker while checking the degree of hardening of the repair concrete, and the repair of the through hole 7 was completed.

[発明が解決しようとする課題] 前記従来の仮設支柱等の貫通孔の施工方法では、後施工
により貫通孔に打設する補修用コンクリートが落下しな
いように、スラブコンクリート内から貫通孔へ挿し筋を
貫通配置させている。そのため仕切り型枠には挿し筋を
貫通させるための貫通孔を設けなければならず、この仕
切り型枠を組み立てたり、解体する作業が結構面倒であ
り、この作業に大工や解体作業員等の熟練工が行なって
も手間がかかった。
[Problems to be Solved by the Invention] In the conventional construction method for through-holes such as temporary supports, it is necessary to insert reinforcing bars into the through-holes from within the slab concrete so that the repair concrete poured into the through-holes during post-construction does not fall. are arranged through the Therefore, it is necessary to provide through holes in the partition formwork to allow the inserts to pass through, and the work of assembling and dismantling the partition formwork is quite troublesome, and this work requires skilled workers such as carpenters and demolition workers. Even if I did it, it was time consuming.

また仮設支柱等の撤去後の貫通孔の補修は、貫通孔の下
面に木製や鋼製型枠で底蓋を取り付ける等施工工程が多
様化して多くなるのに伴い、多数の大工、解体作業員あ
るいは鉄筋工等が必要なうえ日数と手間がかかった。
In addition, repairing through-holes after temporary supports have been removed requires a large number of carpenters and demolition workers, as the construction process has become more diverse, such as attaching a bottom cover to the bottom of the through-hole using wooden or steel formwork. Alternatively, reinforcing steel work, etc. was required, and it took a lot of time and effort.

さらに仕切り型枠の取り外し作業は、スラブコンクリー
トの硬化後に行なわれるため、すぐに補修工事が出来ず
貫通孔は一時開放状態になった。
Furthermore, because the partition formwork was removed after the slab concrete had hardened, repair work could not be carried out immediately, and the through holes were temporarily left open.

そのため、作業員等の落下防止手段として貫通孔に上か
ら蓋をしたり、手摺を設ける等の安全管理対策が必要で
あった。
Therefore, it is necessary to take safety management measures such as covering the through hole from above or providing handrails to prevent workers from falling.

そこで本発明は、スラブ貫通孔の廻りの施工の多様性に
鑑み、施工が簡単で作業工程が少なくてすむスラブ貫通
孔の施工方法を提供することを目的とする。
SUMMARY OF THE INVENTION In view of the variety of construction methods around slab through holes, an object of the present invention is to provide a method for constructing slab through holes that is easy to construct and requires fewer work steps.

[課題を解決するための手段] 上記目的を達成するために、本発明では、建築物のスラ
ブを貫通して立設する仮設支柱等の貫通孔の施工方法に
おいて、予めコンクリート材料を用いて中央に貫通孔を
有する額縁状のブロックを2分割に形成するとともに、
同ブロックを上方に向かって外廓がりに形成し、額縁状
のブロックを仮設支柱等を挟むように組み合わせてスラ
ブ型枠状に配置する。そして、スラブ型枠上の額縁状の
ブロック内を除いた部分にコンクリートを打設する第1
工程と、仮設支柱等の撤去後、上記額縁状のブロックで
仕切られた貫通孔内に蓋ブロックを上方から嵌入して、
額縁状のブロックの周壁部に保持させる第2工程と、額
縁状のブロックと蓋ブロックで囲まれた空所に補強鉄筋
を配置し、同空所に補修用コンクリートを打設する第3
工程とから構成されている。
[Means for Solving the Problems] In order to achieve the above object, the present invention provides a method for constructing a through-hole for a temporary post or the like to be erected through a slab of a building. A frame-shaped block having a through hole is formed into two parts, and
The blocks are formed so as to have an outer edge facing upwards, and the frame-shaped blocks are combined to sandwich temporary supports and the like, and arranged in a slab form. Then, the first step is to pour concrete on the slab formwork except for the inside of the frame-shaped blocks.
After completing the process and removing the temporary supports, etc., insert the lid block from above into the through hole partitioned by the frame-shaped block.
The second step is to hold the frame-shaped block on the peripheral wall, and the third step is to place reinforcing reinforcing bars in the space surrounded by the frame-shaped block and the lid block, and to pour repair concrete into the same space.
It consists of processes.

なお額縁状のブロックの内壁下端に突部を設けるととも
に、その突部に係止される突部を蓋ブロックに設け、さ
らに額縁状の同ブロックの外壁から挿し筋を突出させた
構成にしてもよい。
It should be noted that a structure in which a protrusion is provided at the lower end of the inner wall of the frame-shaped block, a protrusion that is engaged with the protrusion is provided on the lid block, and an insertion line is further protruded from the outer wall of the frame-shaped block is also adopted. good.

このように構成されるスラブ貫通孔の施工方法で使用さ
れる額縁状のブロックと蓋ブロックは、その素材として
プレキャストコンクリート又は繊維補強プレキャストコ
ンクリートにするのが望ましい。
It is preferable that the frame-shaped block and lid block used in the construction method of the slab through-hole constructed in this manner be made of precast concrete or fiber-reinforced precast concrete.

[作用] 上記のスラブ貫通孔の施工方法では、二つの額縁状のブ
ロックをスラブ型枠上に仮設支柱等をはさんで配置させ
るだけで貫通孔の仕切り壁が完成するため工期の短縮が
出来るとともに、取付が容易である。
[Function] In the above-mentioned slab through hole construction method, the construction period can be shortened because the partition wall of the through hole is completed by simply placing two frame-shaped blocks on the slab formwork with temporary supports sandwiched between them. At the same time, it is easy to install.

また額縁状のブロックは挿し筋によりスラブコンクリー
トに保持されるため、スラブコンクリートがクリープや
温度変化に伴い伸縮しても落下することがなく、さらに
スラブコンクリートの一部として一体化されるため、解
体作業も不要である。
In addition, since the picture frame-shaped blocks are held in the slab concrete by insert reinforcement, they will not fall even if the slab concrete expands and contracts due to creep or temperature changes.Furthermore, since the blocks are integrated as part of the slab concrete, they can be dismantled easily. No work is required.

また仮設支柱等の引き抜き直後に蓋ブロックを額縁状の
ブロック内に嵌入して蓋ブロックの周壁部に保持させる
ことができるので、作業員等の落下防止対策が完全であ
るとともに、貫通孔の補修を迅速に終えることができる
In addition, since the lid block can be inserted into the frame-shaped block and held on the peripheral wall of the lid block immediately after pulling out the temporary support, etc., it is possible to completely prevent workers from falling, and also to repair through-holes. can be completed quickly.

[実施例] 本発明の実施例を第1〜4図により説明する。[Example] Embodiments of the present invention will be described with reference to FIGS. 1 to 4.

・ 建造物の構造支持部材として、8w4等の仮設支柱
lが立設される。この仮設支柱lの任意高さにスラブ型
枠2が水平方向に組み立てられ、仮設支柱lの貫通孔周
囲のスラブ型枠2上に、額縁状のブロック3が仮設支柱
lを取り囲むように設置される。その後、スラブ型枠2
上の額縁状のブロック3内を除いた部分にスラブコンク
リート4が打設される。仮設支柱lが撤去された後、落
下防止用として蓋ブロック5が額縁状のブロック3内に
嵌入される。
- Temporary supports such as 8W4 will be erected as structural support members for the building. A slab formwork 2 is assembled horizontally at an arbitrary height of the temporary support l, and a frame-shaped block 3 is installed on the slab formwork 2 around the through hole of the temporary support l so as to surround the temporary support l. Ru. After that, slab formwork 2
Slab concrete 4 is placed in the area excluding the inside of the upper frame-shaped block 3. After the temporary support l is removed, the lid block 5 is fitted into the frame-shaped block 3 to prevent it from falling.

額縁状のブロック3と蓋ブロック5は共にその素材とし
てプレキャストコンクリートが使用され、それぞれ工場
で製作される。額縁状のブロック3は内部に補強用の鉄
筋6を配置し、外形は中央に貫通孔7を有する平面四角
形状のブロックを2分割に形成したものであり、2分割
の各部分は平面コ字状であるとともに、その断面は上方
に向かって外廓がりの平行四辺形状になっている。また
額縁状のブロック3の内壁下端には周状突部8を設けら
れ、さらにこのブロック3の外壁には、棒状の挿し筋9
が突出するようにして一体製作したものである。蓋ブロ
ック5は、断面を略四角形状に形成するとともに、その
上端には額縁状のブロック3の周状突部8に係止可能な
突部lOを設けた。
Both the frame-shaped block 3 and the lid block 5 are made of precast concrete, and are manufactured at a factory. The frame-shaped block 3 has reinforcing reinforcing bars 6 arranged inside, and the block has a rectangular shape with a through hole 7 in the center and is divided into two parts, each of which has a U-shape in plan. It is shaped like a parallelogram, and its cross section is shaped like a parallelogram with the outer edge slanting upward. Further, a circumferential protrusion 8 is provided at the lower end of the inner wall of the frame-shaped block 3, and a rod-shaped insertion line 9 is provided on the outer wall of the block 3.
It is manufactured in one piece so that it protrudes. The lid block 5 has a substantially rectangular cross section, and is provided with a protrusion lO that can be engaged with the circumferential protrusion 8 of the frame-shaped block 3 at its upper end.

なお、上記の額縁状のブロック3と蓋ブロック5は、本
実施例では、その素材としてプレキャストコンクリート
を使用したが、これに限定するものではなく、各種繊維
を混入させた繊維補強プレキャストコンクリート等の耐
火材料を使用してもよい。また額縁状のブロック3の平
面形状も四角形に限るものではな(、分割位置や分割数
を前記のものに限定するものではない。この場合、蓋ブ
ロック5の平面形状は額縁状のブロック3の貫通孔内に
嵌入可能に形成される。
Although precast concrete was used as the material for the frame-shaped block 3 and lid block 5 in this embodiment, the material is not limited to this, and fiber-reinforced precast concrete mixed with various types of fibers may be used. Refractory materials may also be used. In addition, the planar shape of the frame-shaped block 3 is not limited to a rectangular shape (and the division position and number of divisions are not limited to those described above. In this case, the planar shape of the lid block 5 is not limited to the rectangular shape. It is formed so that it can be fitted into the through hole.

次に上記額縁状のブロック3と蓋ブロック5を使用して
行なうスラブ貫通孔の施工方法を体系的に説明する。
Next, a method of constructing a slab through hole using the frame-shaped block 3 and lid block 5 will be systematically explained.

第1工程として第1図に示すように額縁状のブロック3
が仮設支柱lを挟むように平面四角形状に組合わされて
スラブ型枠2上に配置され、貫通孔7が仕切られる。そ
してスラブ型枠2上の額縁状のブロック3内を除いて、
スラブコンクリート4が所定の厚さでスラブ型枠2上に
打設される。
As the first step, as shown in FIG.
are arranged on the slab formwork 2 in a planar rectangular shape so as to sandwich the temporary support l, and the through holes 7 are partitioned. And, except for the inside of the frame-shaped block 3 on the slab formwork 2,
Slab concrete 4 is poured onto slab formwork 2 to a predetermined thickness.

第2工程として第2図に示すように、仮設支柱lの撤去
後直ちに上記蓋ブロック5が額縁状のブロック3の貫通
孔7に上方から嵌入され、蓋ブロック5の突部lOが額
縁状のブロック3の周状突部8に係止されて落下防止が
図られる。
As a second step, as shown in FIG. 2, immediately after the temporary support l is removed, the lid block 5 is fitted from above into the through hole 7 of the frame-shaped block 3, and the protrusion lO of the lid block 5 is inserted into the frame-shaped block 3. It is latched to the circumferential protrusion 8 of the block 3 to prevent it from falling.

第3工程は第3図に示すように、額縁状のブロック3と
蓋ブロック5で囲まれた空所、すなわち蓋ブロック5の
上側に平面格子状の補強鉄筋11を配置し、同空所に補
修用コンクリート12を打設して貫通孔7の補修が完了
する。
In the third step, as shown in FIG. 3, reinforcing reinforcing bars 11 in the form of a planar lattice are placed in the space surrounded by the frame-shaped block 3 and the lid block 5, that is, on the upper side of the lid block 5. Repair concrete 12 is placed to complete the repair of the through hole 7.

なおスラブ型枠2は、スラブコンクリート4の硬化状況
により適時期に撤去される。
Note that the slab formwork 2 is removed at an appropriate time depending on the hardening status of the slab concrete 4.

[発明の効果] 本発明のスラブ貫通孔の施工方法では、現場では電工か
大工等の一種でよく、施工が簡単で施工工程が少な(て
すみ、さらに施工日数と手間及びコストを低減させるこ
とができる。
[Effects of the Invention] The method for constructing through-holes in slabs of the present invention requires only an electrician or carpenter at the site, and the construction is simple and requires fewer construction steps. I can do it.

また仮設支柱等の撤去後直に貫通孔に蓋をすることがで
きるので、落下防止等の安全管理対策が完全であり、其
のための費用がかからない。
Further, since the through hole can be covered immediately after the temporary support etc. is removed, safety management measures such as fall prevention are complete, and there is no cost involved.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明のスラブ貫通孔の施工方法の第1工程を
示す断面図、第2図は上記スラブ貫通孔の施工方法の第
2工程を示す断面図、第3図は上記スラブ貫通孔の施工
方法の第3工程を示す断面図、第4図は上記スラブ貫通
孔の施工方法で使用される額縁状のブロックの斜視図、
第5図は従来のスラブ貫通孔の施工方法を示す断面図で
ある。 2;スラブ型枠     3:額縁状のブロック4;ス
ラブコンクリート 5:蓋ブロック7;貫通孔    
   8:周状突部9;挿し筋       lO;突
FIG. 1 is a sectional view showing the first step of the method for constructing the slab through hole of the present invention, FIG. 2 is a sectional view showing the second step of the method for constructing the slab through hole, and FIG. 3 is a sectional view showing the second step of the method for constructing the slab through hole of the present invention. Fig. 4 is a perspective view of a frame-shaped block used in the above-mentioned slab through-hole construction method;
FIG. 5 is a cross-sectional view showing a conventional method for constructing through-holes in slabs. 2; Slab formwork 3: Frame-shaped block 4; Slab concrete 5: Lid block 7; Through hole
8: Circumferential protrusion 9; insertion bar lO; protrusion

Claims (3)

【特許請求の範囲】[Claims] (1)建築物のスラブを貫通して立設する仮設支柱等の
貫通孔の施工方法において、予めコンクリート材料を用
いて中央部に貫通孔を有する額縁状のブロックを2分割
に形成するとともに、同ブロックを上方に向かって外広
がりに形成し、額縁状のブロックを仮設支柱等を挟むよ
うに組み合わせてスラブ型枠上に配置し、スラブ型枠上
の額縁状のブロック内を除いた部分にコンクリートを打
設する第1工程と、仮設支柱等の撤去後、上記額縁状の
ブロックで仕切られた貫通孔内に蓋ブロックを上方から
嵌入して、額縁状のブロックの周壁部に保持させる第2
工程と、額縁状のブロックと蓋ブロックで囲まれた空所
に補強鉄筋を配置し、同空所に補修用コンクリートを打
設する第3工程とからなることを特徴としたスラブ貫通
孔の施工方法。
(1) In a method for constructing through-holes for temporary supports etc. that are erected through the slab of a building, a frame-shaped block with a through-hole in the center is formed into two parts using concrete material in advance, and The same block is formed to expand outward upwards, and the frame-shaped blocks are placed on the slab formwork with temporary supports sandwiched between them, and the part of the slab formwork excluding the inside of the frame-shaped blocks is After the first step of pouring concrete and the removal of the temporary supports, etc., the lid block is inserted from above into the through hole partitioned by the frame-shaped blocks and held on the peripheral wall of the frame-shaped blocks. 2
and a third step of placing reinforcing reinforcing bars in a space surrounded by a frame-shaped block and a lid block, and pouring repair concrete into the space. Method.
(2)額縁状のブロックの内壁下端に突部を設けるとと
もに、その突部に係止される突部を蓋ブロックに設け、
さらに同ブロックの外壁から挿し筋を突出させた請求項
1に記載のスラブ貫通孔の施工方法。
(2) A protrusion is provided on the lower end of the inner wall of the frame-shaped block, and a protrusion that is engaged with the protrusion is provided on the lid block,
2. The method for constructing a slab through hole according to claim 1, further comprising making the insertion reinforcement protrude from the outer wall of the block.
(3)額縁状のブロックと蓋ブロックを、プレキャスト
コンクリート又は繊維補強プレキャストコンクリート製
としたことを特徴とする請求項1に記載のスラブ貫通孔
の施工方法。
(3) The method for constructing a slab through hole according to claim 1, wherein the frame-shaped block and the lid block are made of precast concrete or fiber-reinforced precast concrete.
JP29077990A 1990-10-30 1990-10-30 Application of slab piercing hole Pending JPH04166561A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP29077990A JPH04166561A (en) 1990-10-30 1990-10-30 Application of slab piercing hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP29077990A JPH04166561A (en) 1990-10-30 1990-10-30 Application of slab piercing hole

Publications (1)

Publication Number Publication Date
JPH04166561A true JPH04166561A (en) 1992-06-12

Family

ID=17760406

Family Applications (1)

Application Number Title Priority Date Filing Date
JP29077990A Pending JPH04166561A (en) 1990-10-30 1990-10-30 Application of slab piercing hole

Country Status (1)

Country Link
JP (1) JPH04166561A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07158268A (en) * 1993-12-13 1995-06-20 Okamoto Ind Inc Molding method of cement product, and air bag body used for this molding method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07158268A (en) * 1993-12-13 1995-06-20 Okamoto Ind Inc Molding method of cement product, and air bag body used for this molding method

Similar Documents

Publication Publication Date Title
WO2000065166A1 (en) Steel-frame structure and method of construction by using the same
EP0392610A2 (en) Wall units for constructing buildings
JPH11229402A (en) Foundation and construction for steel frame structure
JPH04166561A (en) Application of slab piercing hole
JPH1129910A (en) Method for constructing concrete pier
JPH11158813A (en) Concrete pier constructing method
JPH1136229A (en) Construction method for reinforced concrete bridge pier
JPH084196A (en) Panel for building
JP2000356000A (en) Formwork unit construction method
JPH09256515A (en) Precast wall slab and constructing method of building using the wall slab
JPH08302710A (en) Machine base for installation equipment and constructing method thereof
JPH084203A (en) Steel framed reinforcement beam and execution method thereof
JPH0649982A (en) Formwork unit and its construction
JPH11193533A (en) Execution method of foundation part
JPS58204228A (en) Construction of concrete retaining wall
JPH08105059A (en) Concrete strip footing and forming method thereof
JPH03151430A (en) Building method for reinforced concrete beam using beam formwork of precast concrete
JPH1046714A (en) Concrete placing form and concrete using this form
JPH07109112B2 (en) Construction method of watful slab and lower part of watful slab
JPH0144686Y2 (en)
JPH0340182B2 (en)
JPH0416629A (en) Marth form base structuring method thereof
JP2002309590A (en) Mat foundation member made of precast reinforced concrete and method of joining the member to cast-in- place slab
JPH0359224A (en) Constructing method for continuous footing
JPH01226981A (en) Heat-insulating floor formwork and construction of heat-insulating floor therewith