JPH0372115A - Method for constructing foundation using workshop ship - Google Patents

Method for constructing foundation using workshop ship

Info

Publication number
JPH0372115A
JPH0372115A JP20673889A JP20673889A JPH0372115A JP H0372115 A JPH0372115 A JP H0372115A JP 20673889 A JP20673889 A JP 20673889A JP 20673889 A JP20673889 A JP 20673889A JP H0372115 A JPH0372115 A JP H0372115A
Authority
JP
Japan
Prior art keywords
workshop
ships
sheet piles
sheet pile
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP20673889A
Other languages
Japanese (ja)
Inventor
Akira Ikebe
池邉 彰
Masatoshi Chiba
千葉 政俊
Yoshiaki Kageyama
景山 義彰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUKADA SALVAGE KENSETSU KK
Mitsubishi Heavy Industries Ltd
Konoike Construction Co Ltd
Original Assignee
FUKADA SALVAGE KENSETSU KK
Mitsubishi Heavy Industries Ltd
Konoike Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUKADA SALVAGE KENSETSU KK, Mitsubishi Heavy Industries Ltd, Konoike Construction Co Ltd filed Critical FUKADA SALVAGE KENSETSU KK
Priority to JP20673889A priority Critical patent/JPH0372115A/en
Publication of JPH0372115A publication Critical patent/JPH0372115A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

PURPOSE:To shorten the construction period of a foundation by annularly connecting a plurality of workshop ships to each other and annularly placing sheet piles in a sea area surrounded by the workshop ships, and connecting the workshop ships and the sheet piles together by means of support metal fittings, and constructing a foundation in a portion surrounded by the sheet piles. CONSTITUTION:A plurality of workshop ships 1 are connected together by connecting metal fittings 6 on a construction site sea surface while being arranged into the shape of a ring and seawater ballast is injected into the ballast tank of settled floating equipment 5 and are settled and seated on a temporary structure supporting ground 7. A series of annularly arranged sheet piles 13 are placed into an inside sea area surrounded by the workshop ships 1 and are connected together by sheet pile reinforcing metal fittings 14. After sea water is discharged from the inner part surrounded by the sheet piles 13, a foundation 16 for constructions is constructed. The sheet piles 13 are then removed and the workshop ships 1 are caused to float up and are also disconnected and separated from each other and removed.

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は例えば海上の橋脚建設工事等に適用される作業
台船による基礎構築方法に関する。
DETAILED DESCRIPTION OF THE INVENTION (Field of Industrial Application) The present invention relates to a foundation construction method using a work barge, which is applied, for example, to offshore bridge pier construction work.

(従来の技術) 従来海上の橋脚建設工事等に適用される基礎構築方法は
海底の支持層が比較的浅い水深(約10rrL)に存在
する場所では次の工法が採られている。
(Prior Art) As for the foundation construction method conventionally applied to offshore bridge pier construction work, etc., the following method has been adopted in places where the support layer on the seabed exists at a relatively shallow water depth (approximately 10 rrL).

即ち第3図及び第4図に示すように建設する橋脚aの周
囲に鋼管矢板又は鋼矢板からなる矢板すを環状に打設し
、該矢板すはその強度を補償させるため内外2重に打設
して内側の矢板bl  同志及び外側の矢板b2同志を
それぞれ矢板補強金物Cで補強すると共に適当箇所で内
側の矢板bl  と外側の矢板b2  とを矢板連結金
物dで連結し、更に、外側の矢板b2 の外側に多数の
支持杭eによう支持される作業台fを建設し、かくて内
側の矢板blで囲1れた部分の排水と、掘削とを行った
後、橋脚aの建設工事を行っている。
That is, as shown in Figures 3 and 4, steel pipe sheet piles or sheet piles made of steel sheet piles are driven in a ring around the pier a to be constructed, and the sheet piles are double hammered inside and outside to compensate for their strength. The inner sheet pile bl and the outer sheet pile b2 are each reinforced with sheet pile reinforcing metal fittings C, and the inner sheet pile bl and outer sheet pile b2 are connected with sheet pile connecting fittings d at appropriate locations. After constructing a work platform f supported by a large number of support piles e on the outside of the sheet pile b2 and draining and excavating the area surrounded by the inner sheet pile bl, the construction work of the pier a begins. It is carried out.

図中gは水面、hは仮設構造物支持地盤、1は常設構造
物支持地盤を示す。
In the figure, g indicates the water surface, h indicates the ground supporting the temporary structure, and 1 indicates the ground supporting the permanent structure.

(発明が解決しようとする課題) しかしながら、強度面よ身内外2重の打設を必要とする
止水兼土留用矢板の建設及びその矢板の周囲の作業台の
建設等は、その建設・撤去工事が大掛りで工期が長くか
\ると共に、これら機材は腐蝕、損傷などを受けて再利
用できず、材料費も高くつき更に人家が近くにあるとそ
の騒音防止対策が必要とされる等の問題点があった。
(Problem to be solved by the invention) However, in terms of strength, construction of water-stopping and earth-retaining sheet piles that requires double pouring both inside and outside, as well as construction of a workbench around the sheet piles, requires construction and removal. The construction work is large-scale and takes a long time, and the equipment cannot be reused due to corrosion or damage.Material costs are also high.Furthermore, noise prevention measures are required if there are residential areas nearby. There was a problem.

本発明は、か\る現状に鑑み提案されたものであって、
繰返し使用でさる作業船台をもって矢板の環状の一重の
打設によるもその強度を補償させると共に工期の短縮を
図ることを目的とする。
The present invention was proposed in view of the current situation, and
The purpose of the present invention is to compensate for the strength of a work platform that is used repeatedly by driving a circular single layer of sheet piles, and to shorten the construction period.

(課題を解決するための手段) 上記の目的を達成するための本発明の構成を実施例に対
応する第1図及び第2図を用いて説明すると本発明は上
面を作業台(2)とし、内部に沈降・浮上設備(5)を
有する作業台船「1)の複数個をリング状に連結して水
中に沈降着座させ、該作業台船(1)で囲繞される内面
水域に止水兼土留矢板03を環状の一重に打設し、該止
水兼土留矢板α冷と前記作業台船(]、)とを支持金物
ααで連結した後止水兼土留板0??囲繞される内部に
構造物用基礎翰を構築することを特徴とする。
(Means for Solving the Problems) The structure of the present invention for achieving the above object will be explained using FIG. 1 and FIG. 2 corresponding to the embodiment. , a plurality of work barges (1) each having a sinking/floating facility (5) inside are connected in a ring shape and are lowered and seated in water, and water is stopped in the inner water area surrounded by the work barges (1). The water-stopping and earth-retaining sheet piles 03 are driven in a single ring shape, and the water-stopping and earth-retaining sheet piles α are connected to the work barge (], ) with supporting hardware αα, and then the water-stopping and earth-retaining sheet piles 0?? are surrounded. It is characterized by constructing a foundation for the structure inside.

(作用) そして本発明は上記の手段によシ水中に沈降着座する作
業台船(1)のリング状連結によシその内面水域に止水
兼土留矢板0を環状の一重に打設し、該止水兼土留矢板
α3と作業台船(1)とを支持金物(Lりで連結したか
ら止水兼土留矢板0はこれを内外2重に打設しなくても
風波に対してその強度を補償され而も止水兼土留矢板0
で囲繞される内部に構造物用基礎Qf9を構築したもの
であるからその構築作業は作業台船(1)を使用して簡
単に構築でき、構築後の撤去は一重の止水兼土留矢板(
13)の撤去と作業船台(2)の撤去だけですむため撤
去工事が簡単となる。
(Function) The present invention uses the above-mentioned means to install a single ring-shaped water-stopping and earth-retaining sheet pile 0 in the inner surface area of the ring-shaped connection of the work barge (1) that is seated submerged in water. Since the water-stopping and earth-retaining sheet pile α3 and the work barge (1) are connected with supporting metal fittings (L-rips), the water-stopping and earth-retaining sheet pile 0 has good strength against wind and waves without having to double-cast it both inside and outside. However, the water stoppage and retaining sheet pile is 0.
Since the structure foundation Qf9 is constructed inside the structure surrounded by
13) and the work platform (2), the removal work becomes easy.

(実施例) 以下第1図及び第2図に基づいて本発明の一実施例を説
明すると、(1)は作業船台を示し、該作業船台(1)
は上面に作業台(2)を有すると共に内部にバラストタ
フり(3)と該バラストタンク(3)に海水ノミラスト
(4)の注入、排水を行う沈降・浮上設備(5)とを有
し、該作業台船(1)の複数個が、工事海面上でそれぞ
れに設けた連結金物(6)によってリング状に連結し、
該連結状態で、沈降浮上設備(5)によるバラストタン
ク(3)内に海水バラスト(4)を注入することにより
仮設構造物支持地盤(7)上に沈降着座させる。
(Embodiment) An embodiment of the present invention will be described below based on FIGS. 1 and 2. (1) shows a work platform;
has a workbench (2) on the top surface, and has a ballast tuff (3) inside and sinking/floating equipment (5) for injecting and draining seawater Nolast (4) into the ballast tank (3). A plurality of work barges (1) are connected in a ring shape by connecting hardware (6) installed on each one above the construction sea level,
In this connected state, seawater ballast (4) is injected into the ballast tank (3) by the sinking and flotation equipment (5), so that the temporary structure is settled on the support ground (7).

その際地盤(7)上に船台(1)の着座に有害i地盤傾
斜や凹凸がある場合は、あらかじめ海底を掘削して敷砂
(8)を施行して沈降着座を可能になるようにして釦〈
。又作業台船(f)が、その海水バラスト(4)だけの
重量で海底押圧力が得られない場合はグランドアンカー
(9)、PC鋼材帥、PC鋼材導設路aυ及び頭部固定
金物αのからなるアンカーを追加する。
If there is a slope or unevenness on the ground (7) that would be detrimental to the seating of the slipway (1), excavate the seabed in advance and apply sand (8) to make it possible for the platform (1) to sit on the ground. Button
. In addition, if the work barge (f) cannot obtain seabed pressing force due to the weight of its seawater ballast (4), the ground anchor (9), prestressed steel barge, prestressed steel guideway aυ, and head fixing hardware α Add an anchor consisting of.

次いで沈降着座した作業台船(1)の作業台(2)で矢
板打設機を用いて作業台船(1)で囲繞される内面水域
に矢板0を環状の一重に打設し、該矢板0の相互を矢板
補強金物a菊で連結し、更に該矢板補強金物0と作業台
船(1)とを矢板支持金物(L′5にて連結して、打設
された矢板(13を補強し、次いで矢板0で囲繞される
内部の海水の排水作業と、排水後の掘削作業と掘削後の
構造物用基礎α0の構築とを作業台船(1)を使用して
行う。
Next, using a sheet pile driving machine on the work platform (2) of the work barge (1) that has been sunk and seated, sheet piles 0 are driven in a single layer in an annular manner into the inner water area surrounded by the work barge (1). 0 are connected with sheet pile reinforcing hardware a chrysanthemum, and the sheet pile reinforcing hardware 0 and work barge (1) are connected with sheet pile supporting hardware (L'5) to reinforce the driven sheet piles (13). Then, the work barge (1) is used to drain the seawater inside the interior surrounded by the sheet pile 0, excavate the water after draining, and construct the foundation α0 for the structure after the excavation.

工事終了後環状の矢板0国を撤去すると共に作業台船(
1)はこれを沈降浮上設備(5)によシバラストタンク
(3)内の海水バラスト(4)を排水して台船(1)を
浮上させ、台船(1)相互の連結を解除して分離し撤去
する。図中卸は常設構造物支持地盤を示す。
After the construction was completed, the ring-shaped sheet pile 0 country was removed and the work barge (
1) uses the sinking and flotation equipment (5) to drain the seawater ballast (4) in the ballast tank (3), float the barge (1), and release the mutual connection between the barges (1). Separate and remove. The outline in the figure indicates the supporting ground for the permanent structure.

(発明の効果) このように本発明によるときは上面を作業台(2)とし
、内部に沈降浮上設備(5)を有する作業台船(1)の
複数個をリング状に連結して水中に沈降着座させ、該作
業台船(1)で囲繞される内面水域に止水兼土留矢板0
を環状の一重に対設し、該止水兼土留矢板αJと作業台
船(1)とを支持金物(I9で連結した後、止水兼土留
矢板a3で囲繞される内部に構造物用基礎αQを構築さ
せたものであるから止水兼土留矢板0はこれを囲繞する
作業台船(1)に支持されて従来の内外2重構造の矢板
0の打設を廃止できると共に従来の作業台の建設を廃止
して工期の短縮と工費の低減と騒音発生期間の短縮とを
図ることができ、而も作業台船(1)は繰返し使用でき
るため機材の腐蝕損傷を少くして工費を著しく低減でき
る等の効果を有する。
(Effects of the Invention) According to the present invention, a plurality of work platforms (1) each having a work platform (2) on the upper surface and a sinking/floating facility (5) inside are connected in a ring shape and placed underwater. The work barge (1) will be placed in a seated position, and a water stop and earth retaining sheet pile will be installed in the inner water area surrounded by the work barge (1).
After connecting the water stop and earth retaining sheet pile αJ and the work barge (1) with supporting metal fittings (I9), a foundation for the structure is installed inside the area surrounded by the water stop and earth retaining sheet pile a3. Since αQ is constructed, the water-stopping and earth-retaining sheet pile 0 is supported by the work barge (1) that surrounds it, making it possible to eliminate the conventional driving of the sheet pile 0 with a double structure inside and outside, and to replace the conventional work platform. By abolishing the construction of a It has the effect of reducing

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明の方法を実施する装置の平面図、第2図
は第1図のA−A線断面図、第3図は従来の方法を実施
する装置の一部欠截平面図、第4図は第3図のB−B線
断面図である。 (1)・・・作業台船      (2)・・・作業台
(5)・・・沈降浮上設備    Q3I・・・矢板0
!19・・支持金物      αG・・・構造物用基
礎代理 人 弁理士 岡 本 重 文 外1名
FIG. 1 is a plan view of an apparatus for carrying out the method of the present invention, FIG. 2 is a sectional view taken along the line A-A in FIG. 1, and FIG. 3 is a partially cutaway plan view of an apparatus for carrying out the conventional method. FIG. 4 is a sectional view taken along the line B--B in FIG. 3. (1)...Work platform (2)...Work platform (5)...Sinking and flotation equipment Q3I...Sheet pile 0
! 19...Support hardware αG...Structure foundation agent Patent attorney Shige Okamoto 1 extra person

Claims (1)

【特許請求の範囲】[Claims] 上面を作業台とし、内部に沈降、浮上設備を有する作業
台船の複数個をリング状に連結して水中に沈降着座させ
、該作業台船で囲繞される内面水域に止水兼土留矢板を
環状の一重に打設し、該止水兼土留矢板と前記作業台船
とを支持金物で連結した後、止水兼土留矢板で囲繞され
る内部に構造物用基礎を構築することを特徴とする作業
台船による基礎構築方法。
A plurality of work platforms with upper surfaces as work platforms and internal sinking and flotation equipment are connected in a ring shape and are lowered and seated in water, and a water stop and earth retaining sheet pile is installed in the inner water area surrounded by the work platforms. The structure is characterized by constructing a foundation for a structure inside the water-stopping and earth-retaining sheet pile surrounded by the water-stopping and earth-retaining sheet pile after the water-stopping and earth-retaining sheet pile is connected to the work barge using supporting hardware. A foundation construction method using a work barge.
JP20673889A 1989-08-11 1989-08-11 Method for constructing foundation using workshop ship Pending JPH0372115A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20673889A JPH0372115A (en) 1989-08-11 1989-08-11 Method for constructing foundation using workshop ship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20673889A JPH0372115A (en) 1989-08-11 1989-08-11 Method for constructing foundation using workshop ship

Publications (1)

Publication Number Publication Date
JPH0372115A true JPH0372115A (en) 1991-03-27

Family

ID=16528287

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20673889A Pending JPH0372115A (en) 1989-08-11 1989-08-11 Method for constructing foundation using workshop ship

Country Status (1)

Country Link
JP (1) JPH0372115A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009089783A (en) * 2007-10-04 2009-04-30 Akira Yonezu Incense burner ash automatic separator

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009089783A (en) * 2007-10-04 2009-04-30 Akira Yonezu Incense burner ash automatic separator

Similar Documents

Publication Publication Date Title
CN104775446B (en) Barrel pier for fixing water structure and installation and construction method thereof
WO2015135471A1 (en) Hollow cylindrical pier for fixing offshore platform structure to bed and method of installing and constructing same
NO343178B1 (en) Seabed base structure and method for installation of same
JP2001207948A (en) Composite foundation structure for marine installation type wind power generation and its constructing method
JP3145641B2 (en) Jacket structure
JPH09268562A (en) Dry working method and working case employed therefor
JPH0372115A (en) Method for constructing foundation using workshop ship
JP4018288B2 (en) Artificial ground made of box that can pass water and its construction method
JP2817466B2 (en) Work box
JP2004108078A (en) Construction method for underwater shaft, underwater shaft, connection method for shaft and adit, and pit structure
JP3310452B2 (en) Method of constructing continuous wall in water area and guide device for construction
RU2382142C2 (en) Method for formation of closed section of water area bottom with possibility of its drying and system, which realises it
JP2815492B2 (en) How to build an underwater foundation
JP2000319849A (en) Dolphin and dolphin installation method
JPS6340024A (en) Pile-type caisson work
JP2002047665A (en) Installation method for jacket structure
JPH06257163A (en) Droughty pontoon for constructing shallow foundation
JP2001081790A (en) Jacket structural body and construction method of the structure
JPH10121450A (en) Binding engineering method of caison and foundation pile
JP2655322B2 (en) Construction method of revetment structure
JPH0673716A (en) Method of burying sinker, and sinker
CA1288960C (en) Method of installing offshore constructions
JPH0132335B2 (en)
JPS59224726A (en) Pc well work
JPH0835221A (en) Construction of large scale floating structure