JPH03267478A - Manufacturing of bath room unit - Google Patents

Manufacturing of bath room unit

Info

Publication number
JPH03267478A
JPH03267478A JP2063906A JP6390690A JPH03267478A JP H03267478 A JPH03267478 A JP H03267478A JP 2063906 A JP2063906 A JP 2063906A JP 6390690 A JP6390690 A JP 6390690A JP H03267478 A JPH03267478 A JP H03267478A
Authority
JP
Japan
Prior art keywords
pipe
frame
piping
manufacturing
bathroom unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2063906A
Other languages
Japanese (ja)
Other versions
JP2530040B2 (en
Inventor
Kiyoshi Tomiyasu
富安 清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP2063906A priority Critical patent/JP2530040B2/en
Publication of JPH03267478A publication Critical patent/JPH03267478A/en
Application granted granted Critical
Publication of JP2530040B2 publication Critical patent/JP2530040B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bathtubs, Showers, And Their Attachments (AREA)
  • Residential Or Office Buildings (AREA)

Abstract

PURPOSE:To enhance the efficiency of a manufacturing work by mounting pipes for supplying and discharging water, supplying hot water, etc., to a frame of which a bath room is constituted, and mounting a floor pan of which a floor is made to the frame afterward. CONSTITUTION:A supply and drainage pipe and a hot water supply pipe for a bathtub, lavatory, toilet room, etc., are mounted to a frame 16 of which a bath room unit 10 is constituted. After that, a floor pan 20 of which a floor is made is mounted to the frame 16. According to the constitution, the bath room unit 10 can be efficiently manufactured.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、ユニット住宅のバスルームユニットの製造方
法に関する。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a method of manufacturing a bathroom unit for a unit house.

バスルームを形成するものがある。従来より、このよう
なバスルームユニットを製造するにあたっては、バスル
ームユニットの床等の内装を行い、浴槽、便器、洗面シ
ンクおよびからん等の器具を設置した後、このバスルー
ムユニット全体を上方へ持ち上げて、バスルームユニッ
トの床下にもぐり込み、直管やエルボ等の管を接続して
いき、排水、汚水、給水および給湯等の配管していた。
There are things that form the bathroom. Conventionally, when manufacturing such a bathroom unit, the interior of the bathroom unit, such as the floor, has been installed, and fixtures such as the bathtub, toilet bowl, washbasin, and pans have been installed, and then the entire bathroom unit is moved upwards. They lifted it up, crawled under the floor of the bathroom unit, and connected straight pipes and elbow pipes for drainage, sewage, water supply, hot water, etc.

〔発明が解決しようとする課題〕[Problem to be solved by the invention]

しかしながら、前記配管作業は、上向き作業になるうえ
、狭いところに配管を通していく作業となるため、作業
能率が悪いという問題かあった。
However, the above-mentioned piping work requires upward work and also involves passing the pipe through a narrow space, so there is a problem of poor work efficiency.

本発明の目的は、製造作業能率のよいバスルームユニッ
トの製造方法を提供するにある。
An object of the present invention is to provide a method for manufacturing a bathroom unit with high manufacturing efficiency.

〔背景技術〕[Background technology]

近年、予め工場等で製造したユニットを現場で互いに接
合して組立てられるユニット住宅が利用されている。ユ
ニット住宅のユニットの中には、〔課題を解決するため
の手段〕 本発明は、ユニット住宅のバスルームの製造方法であっ
て、バスルームのフレーム側に水用配管を取付けた後、
バスルームユニットの床を構成するフロアパンを前記フ
レームに取付けることを特徴とするものである。
2. Description of the Related Art In recent years, unit housing has been used in which units manufactured in advance in a factory or the like are joined together on site and assembled. [Means for Solving the Problems] The present invention is a method for manufacturing a bathroom for a unit house, in which after installing water piping on the frame side of the bathroom,
The bathroom unit is characterized in that a floor pan constituting the floor of the bathroom unit is attached to the frame.

ここで、水用配管とは、給水、排水および汚水用の配管
だけでなく、給湯用の配管をも含むものである。
Here, the water piping includes not only piping for water supply, drainage, and sewage, but also piping for hot water supply.

〔作 用〕[For production]

このような本発明では、開放された空間で、下向きの配
管取付作業を行うことが可能となる。
According to the present invention, it is possible to perform downward piping installation work in an open space.

〔実施例〕〔Example〕

以下、本発明の一実施例を図面に基づいて説明する。 Hereinafter, one embodiment of the present invention will be described based on the drawings.

第1図および第2図には、本実施例のバスルームユニッ
ト10が示されている。
1 and 2 show a bathroom unit 10 of this embodiment.

バスルームユニット10は、四角筒状の柱11と断面コ
字状の梁12〜15とで形成された六面体状のフレーム
16を有している。このフレーム16の上側の長辺粱1
2の間には、複数の小梁17が掛渡され、下側の長辺粱
14の間には、複数の根太18が掛渡されている。根太
18の上側には、バスルームユニット10の床を構成す
るフロアパン20が配置される。
The bathroom unit 10 has a hexahedral frame 16 formed of a square cylindrical column 11 and beams 12 to 15 each having a U-shaped cross section. The upper long side 1 of this frame 16
A plurality of small beams 17 are spanned between the two, and a plurality of joists 18 are spanned between the lower long sides 14. A floor pan 20 constituting the floor of the bathroom unit 10 is arranged above the joist 18.

フロアパン20の中央には、略円筒状のセンタコア部2
1が設けられている。このセンタコア部21の上部およ
び周囲には、洗面シンク22、からん23、便器24、
洗場25、バスタブ26およびシャワー付きからん27
が設けられている。
At the center of the floor pan 20, a substantially cylindrical center core portion 2 is provided.
1 is provided. Above and around the center core part 21, there is a wash basin 22, a toilet 23, a toilet bowl 24,
Washing area 25, bathtub 26 and shower room 27
is provided.

また、センタコア部21の洗面シンク22側の側面には
、作業員が入ることのできる大きさの点検口28が設け
られ、この点検口28は、着脱可能な箱状の収納ラック
29によって塞がれている。
Furthermore, an inspection opening 28 large enough for a worker to enter is provided on the side surface of the center core section 21 on the washbasin 22 side, and this inspection opening 28 is blocked by a removable box-shaped storage rack 29. It is.

前記洗場25の排水口30には、第4図に示されるよう
に、Sトラップ31の一端が接続され、このトラップ3
1の他端はフロアパン20の下方へ向けられ、他の配管
が接続可能になっている。
As shown in FIG. 4, one end of an S trap 31 is connected to the drain port 30 of the washing area 25.
The other end of the pipe 1 is directed below the floor pan 20, and other pipes can be connected thereto.

この洗場25と同様に、洗面シンク22には、Sトラッ
プ(図示せず)の一端が接続されて排水可能にされ、こ
のSトラップの他端はフロアパン20の下面から下向き
に突出され、他の配管が接続可能になっている。
Similar to this washing area 25, one end of an S trap (not shown) is connected to the wash sink 22 to enable drainage, and the other end of this S trap projects downward from the bottom surface of the floor pan 20. Other piping can be connected.

また、前記バスタブ26には、第6図に示されるように
、L字状の配管32の一端が接続されて排水可能にされ
ている。この配管32の他端側は、バスタブ26の下面
から下向きに延長され、フロアパン20の下面を貫通し
て、その先端が横向き曲げられて、他の配管が接続可能
になっている。
Furthermore, as shown in FIG. 6, one end of an L-shaped pipe 32 is connected to the bathtub 26 to allow drainage. The other end of the piping 32 extends downward from the lower surface of the bathtub 26, passes through the lower surface of the floor pan 20, and its tip is bent laterally so that other piping can be connected.

一方、前記フロアパン20の下には、それぞれ水用配管
である給水配管41、給湯配管42、雑排水配管43お
よび汚水配管44が配置されている。
On the other hand, below the floor pan 20, a water supply pipe 41, a hot water supply pipe 42, a gray water pipe 43, and a waste water pipe 44, which are water pipes, are arranged.

この際、配管41〜43は、前記洗面シンク22、から
ん23.27、洗場25およびバスタブ26に対する接
続部分がセンタコア部21に集中配置されている。
At this time, the connecting portions of the pipes 41 to 43 to the sink 22, the toilet 23, 27, the washing area 25, and the bathtub 26 are centrally arranged in the center core portion 21.

前記配管41〜44の平面配置は、バスルームユニット
lOの下部の平面図である第3図に示されている。
The planar arrangement of the pipes 41 to 44 is shown in FIG. 3, which is a plan view of the lower part of the bathroom unit IO.

第3図において、図中左下には、パイプシャフト33が
設けられ、このパイプシャフト33には、住宅の縦方向
に延長される給水や排水等の配管が集中して配置されて
いる。
In FIG. 3, a pipe shaft 33 is provided at the lower left in the figure, and pipes for water supply, drainage, etc. extending in the vertical direction of the house are arranged in a concentrated manner on this pipe shaft 33.

給水配管41は、略し字状に成形され、前記パイプシャ
フト33の位置からセンタコア部21の所定位置まで延
長され、複数のサドルバンド45Aで根太18に固定さ
れている。また、給水配管41は、センタコア部21内
で二方向に分岐され、一方の枝管41Aか可撓継手46
Aを介してからん23に接続され、他方の枝管41Bが
可撓継手46Bを介してからん27に接続されている。
The water supply pipe 41 is formed into an abbreviated shape, extends from the position of the pipe shaft 33 to a predetermined position of the center core portion 21, and is fixed to the joist 18 with a plurality of saddle bands 45A. Further, the water supply pipe 41 is branched into two directions within the center core portion 21, and one branch pipe 41A is connected to the flexible joint 46.
The other branch pipe 41B is connected to the ring 27 via a flexible joint 46B.

給湯配管42は、給水配管41と同様に、パイプシャフ
ト33の位置からセンタコア部21まで延長され、サド
ルバンド45Bで固定されるとともに、センタコア部2
1内で二方向に分岐されている。このうち、一方の枝管
42Aが可撓継手47Aを介してからん23に接続され
、他方の枝管42Bが可撓継手47Bを介してからん2
7に接続されている。
Like the water supply pipe 41, the hot water supply pipe 42 extends from the position of the pipe shaft 33 to the center core part 21, is fixed with a saddle band 45B, and is attached to the center core part 21.
1 is branched in two directions. Among these, one branch pipe 42A is connected to the karan 23 via a flexible joint 47A, and the other branch pipe 42B is connected to the karan 2 through a flexible joint 47B.
7 is connected.

雑排水配管43は、前記パイプシャフト33の位置から
センタコア部21まで延長され、パイプシャフト33側
が支持部材48を介して根太18に固定されている。ま
た、雑排水配管43のセンタコア部21側は、三つの枝
管43A、 43B、 43Cに分岐され、このうち枝
管43A、 43Cか根太18にサドルバンド49で固
定されている。
The gray water pipe 43 extends from the position of the pipe shaft 33 to the center core portion 21, and the pipe shaft 33 side is fixed to the joist 18 via a support member 48. Further, the center core portion 21 side of the gray water pipe 43 is branched into three branch pipes 43A, 43B, and 43C, and one of these branch pipes 43A, 43C is fixed to the joist 18 with a saddle band 49.

枝管43Aの先端には、第4図に示されるように、前記
洗場25のSトラップ31と嵌合するソケット50が接
続され、枝管43Aの先端とSトラップ31とがワンタ
ッチで接続可能にされている。
As shown in FIG. 4, the tip of the branch pipe 43A is connected to a socket 50 that fits into the S trap 31 of the washing area 25, and the tip of the branch pipe 43A and the S trap 31 can be connected with one touch. It is being done.

枝管43Bには、枝管43Aと同様に、先端にソケット
(図示せず)が接続され、このソケットを介して枝管4
3Bが洗面シンク22のSトラップ(図示せず)にワン
タッチで接続可能にされている。
Like the branch pipe 43A, the branch pipe 43B has a socket (not shown) connected to its tip, and the branch pipe 4 is connected to the branch pipe 43B through this socket.
3B can be connected to the S trap (not shown) of the wash basin 22 with one touch.

枝管43Cの先端には、第6図に示されるように、前記
バスタブ26のL字状の配管32と嵌合するソケット5
1が接続されるとともに、このソケット51の手前にU
トラップ52が接続されている。前記ソケット51によ
り、枝管43Cがバスタブ26の配管32にワンタッチ
で接続可能にされている。
At the tip of the branch pipe 43C, as shown in FIG. 6, there is a socket 5 that fits into the L-shaped pipe 32 of the bathtub 26.
1 is connected, and U is connected in front of this socket 51.
A trap 52 is connected. The socket 51 allows the branch pipe 43C to be connected to the piping 32 of the bathtub 26 with one touch.

汚水配管44は、L字状に形成されるとともに、パイプ
シャフト33の位置から便器24の直下まで延長されて
いる。この汚水配管44のパイプシャフト33側は、前
記雑排水配管43と同じ支持部材48を介して根太18
に固定されている。一方、汚水配管44の便器24側は
、別の支持部材53を介して根太18に固定されている
。また、汚水配管44の便器24側の先端には、第9図
に示されるように、ソケット54が接続されている。こ
のソケット54には、配管44内へのごみ等の侵入防止
用として一方が塞がれた円筒形の鞘管55が着脱自在に
嵌合され、この鞘管55の取外し時に、フランジ56を
有する接続管57が嵌合されるようになっている。この
接続管57を介して便器24が汚水配管44に接続され
る。
The sewage pipe 44 is formed in an L-shape and extends from the position of the pipe shaft 33 to just below the toilet bowl 24. The pipe shaft 33 side of this waste water pipe 44 is connected to the joist 18 via the same support member 48 as the gray water pipe 43.
Fixed. On the other hand, the toilet bowl 24 side of the sewage pipe 44 is fixed to the joist 18 via another support member 53. Further, a socket 54 is connected to the tip of the waste water pipe 44 on the side of the toilet bowl 24, as shown in FIG. A cylindrical sheath pipe 55 with one end closed to prevent dirt from entering the pipe 44 is removably fitted into the socket 54. When the sheath pipe 55 is removed, a flange 56 is attached. A connecting pipe 57 is fitted therein. The toilet bowl 24 is connected to the sewage pipe 44 via this connecting pipe 57.

次に、本実施例のバスルームユニット10の製造手順を
説明する。
Next, the manufacturing procedure of the bathroom unit 10 of this embodiment will be explained.

まず、予め別の製造工程等で、給水配管41、給湯配管
42、雑排水配管43および汚水配管44を組立ててお
き、また、フロアパン20には、センタコア部21を設
けるとともに、洗面シンク22、からん23゜27およ
びバスタブ26を取付けておく。さらに、柱11および
粱12〜15でフレーム16を形成するとともに、小梁
17および根太18をフレーム16に組付けておく。
First, the water supply pipe 41, the hot water supply pipe 42, the gray water pipe 43, and the waste water pipe 44 are assembled in advance in a separate manufacturing process, and the floor pan 20 is provided with the center core part 21, and the washbasin sink 22, Install the curtain 23° 27 and the bathtub 26. Further, a frame 16 is formed by the pillars 11 and the girders 12 to 15, and a small beam 17 and a joist 18 are assembled to the frame 16.

この際、洗場25の排水口30およびバスタブ26にに
それぞれSトラップ31およびL字状の配管32を接続
し、洗面シンク22には、図示しないSトラップを接続
してお(。また、コーキング剤等で、これらの接続部分
に防水処理をしておく。
At this time, an S-trap 31 and an L-shaped pipe 32 are connected to the drain 30 of the washing area 25 and the bathtub 26, respectively, and an S-trap (not shown) is connected to the washbasin sink 22. Apply waterproof treatment to these connecting parts with a disinfectant or the like.

また、前記汚水配管44のソケット54には鞘管55を
嵌合しておく。
Further, a sheath pipe 55 is fitted into the socket 54 of the waste water pipe 44.

次いで、前記フレーム16に組付けておいた根太18に
給水配管41.給湯配管42、雑排水配管43および汚
水配管44を取付ける。
Next, the water supply pipe 41. is attached to the joist 18 assembled to the frame 16. Attach hot water piping 42, gray water piping 43, and sewage piping 44.

この際、雑排水配管43以外の配管41.42.44は
固定部分を全て根太18に固定する。一方、雑排水配管
43は、撓ませて枝管43A、 43B、43Cの先端
部分が移動できるように、支持部材48側のみを根太1
8に固定する。
At this time, all of the fixed parts of the pipes 41, 42, and 44 other than the gray water pipe 43 are fixed to the joists 18. On the other hand, only the support member 48 side of the gray water pipe 43 is attached to one joist so that the tips of the branch pipes 43A, 43B, and 43C can be moved by bending.
Fixed at 8.

次に、配管41〜42が取付けられた根太18の上に前
記フロアパン20を載置し、フレーム16にフロアパン
20を取付ける。
Next, the floor pan 20 is placed on the joist 18 to which the pipes 41 to 42 are attached, and the floor pan 20 is attached to the frame 16.

ここで、枝管43A、 43B、 43Cの先端にSト
ラップ31の下端やL字状の配管32の先端等が衝突す
るのを防ぐために、枝管43A、 43B、 43Cの
先端部分を、第5図および第7図に示されるように、予
め撓ませて横方向に移動させ、この状態でフロアパン2
0を載置する。また、第8図に示されるように、汚水配
管44に嵌合した鞘管55の上端をフロアパン20の上
面から突出させて引き抜けるようにしておく。
Here, in order to prevent the lower end of the S trap 31 or the tip of the L-shaped piping 32 from colliding with the tips of the branch pipes 43A, 43B, 43C, the tips of the branch pipes 43A, 43B, 43C are As shown in the figure and FIG. 7, the floor pan 2 is bent in advance and moved laterally.
Place 0. Further, as shown in FIG. 8, the upper end of the sheath pipe 55 fitted to the waste water pipe 44 is made to protrude from the upper surface of the floor pan 20 so that it can be pulled out.

続いて、点検口28からセンタコア部21内部に上半身
を入れた作業員により、各配管41〜44と洗場25の
排水口30や洗面シンク22等の各器具との接続を行う
とともに、便器24のフロアパン20への取付および汚
水配管44への接続を行う。
Next, a worker who inserted his upper body into the center core section 21 through the inspection opening 28 connected each of the pipes 41 to 44 to each fixture such as the drain 30 of the washing area 25 and the wash basin sink 22, and also connected the toilet 24 is attached to the floor pan 20 and connected to the sewage pipe 44.

すなわち、給水配管41の可撓継手46A、 46Bお
よび給湯配管42の可撓継手47A、 47Bをからん
23.27にそれぞれ接続する。
That is, the flexible joints 46A, 46B of the water supply pipe 41 and the flexible joints 47A, 47B of the hot water supply pipe 42 are connected to the ring 23.27, respectively.

雑排水配管43の枝管43Aと洗場25の排水口30と
の接続は、洗場25のSトラップ31の下端に接着剤を
塗り、第4図および第5図に示されるように、雑排水配
管43の枝管43Aを下方へ一置換ませて、先端のソケ
ット50をSトラップ31の下端に嵌合させて行う。
To connect the branch pipe 43A of the gray water pipe 43 and the drain port 30 of the washing area 25, apply adhesive to the lower end of the S trap 31 of the washing area 25, and connect the gray water pipe 43A to the drain port 30 of the washing area 25, as shown in FIGS. 4 and 5. The branch pipe 43A of the drain pipe 43 is moved downward, and the socket 50 at the tip is fitted into the lower end of the S trap 31.

雑排水配管43の枝管43Bと洗面シンク22との接続
は、枝管43Aと同様に、枝管43Bを下方へ撓ませて
、下端に接着剤を塗ったSトラップに枝管43Bのソケ
ットを嵌合して行う。
To connect the branch pipe 43B of the gray water pipe 43 and the washbasin sink 22, similarly to the branch pipe 43A, bend the branch pipe 43B downward and insert the socket of the branch pipe 43B into an S trap whose lower end is coated with adhesive. This is done by mating.

雑排水配管43の枝管43Cとバスタブ26との接続は
、バスタブ26のL字状配管32の先端に接着剤を塗り
、第6図および第7図に示されるように、枝管43Cを
手前に一置換ませて、先端のソケット51をL字状配管
32の先端に嵌合して行う。
To connect the branch pipe 43C of the gray water pipe 43 and the bathtub 26, apply adhesive to the tip of the L-shaped pipe 32 of the bathtub 26, and as shown in FIGS. 6 and 7, connect the branch pipe 43C to the front. This is done by replacing the socket 51 at the tip with the tip of the L-shaped pipe 32.

また、便器24の取付および汚水配管44への接続は、
第9図および第10図に示されるように、フロアパン2
0の上面から突出させた前記鞘管55を取外し、代わり
に接続管57を取付け、この接続管57のフランジ56
に便器24の底面を当接させ、この状態で便器24をフ
ロアパン20にボルト等で固定して行う。
In addition, the installation of the toilet bowl 24 and the connection to the sewage pipe 44 are as follows:
As shown in FIGS. 9 and 10, the floor pan 2
The sheath pipe 55 protruding from the upper surface of the
The bottom surface of the toilet bowl 24 is brought into contact with the bottom surface of the toilet bowl 24, and in this state, the toilet bowl 24 is fixed to the floor pan 20 with bolts or the like.

雑排水配管43の各枝管43A、 43B、 43Cの
接続完了後に、枝管43A、 43Cをサドルバンド4
9で根太18に固定する。また、センタコア部21内で
の作業完了後、点検口28を収納ラック29で塞ぐ。
After connecting the branch pipes 43A, 43B, and 43C of the gray water piping 43, connect the branch pipes 43A and 43C to the saddle band 4.
Fix it to the joist 18 with 9. Further, after the work inside the center core section 21 is completed, the inspection opening 28 is closed with a storage rack 29.

前述のような実施例によれば、次のような効果がある。According to the embodiment described above, the following effects can be obtained.

すなわち、開放された空間で、下向きに配管41〜44
の取付作業を行うので、バスルームユニット10の製造
作業の能率を向上できる。
In other words, the pipes 41 to 44 are connected downward in an open space.
Since the installation work is performed, the efficiency of the manufacturing work of the bathroom unit 10 can be improved.

また、配管の組立を別の製造工程で行うので、作業かさ
′らに分業化され、このことからも、バスルームユニッ
ト10の製造作業の能率を良いものにできる。
Further, since the assembly of the piping is performed in a separate manufacturing process, the work is divided into different parts, which also improves the efficiency of the manufacturing work of the bathroom unit 10.

さらに、センタコア部21に洗面シンク22、からん2
3.27、洗場25およびバスタブ26に対する配管4
1〜44の接続部分を集中配置したから、接続作業か一
箇所で行え、しかも、接続が容易な可撓継手46A、 
46B、 47A、 47Bおよびソケット50.51
で接続を行うようにしたので、センタコア部21内での
接続作業を最小限にすることができ、作業員の作業負荷
を軽減できる。
Furthermore, the center core part 21 includes a wash basin 22 and a sink 2.
3.27, Piping 4 for washing area 25 and bathtub 26
Since the connection parts 1 to 44 are arranged centrally, the connection work can be done in one place, and the flexible joint 46A is easy to connect.
46B, 47A, 47B and socket 50.51
Since the connection is made in the center core section 21, the connection work within the center core section 21 can be minimized, and the workload of the worker can be reduced.

また、バスルームユニット10を製造するにあたり、こ
のバスルームユニット10を上方へ持ち上げる必要がな
いので、バスルームユニット10の落下等による事故が
発生せず、作業の安全性を向上できる。
Further, when manufacturing the bathroom unit 10, there is no need to lift the bathroom unit 10 upward, so accidents such as falling of the bathroom unit 10 do not occur, and work safety can be improved.

また、点検口28を収納ラック29で塞いだので、点検
口28を目立たなくできるうえ、センタコア部21の内
部空間を有効利用することができる。
Furthermore, since the inspection port 28 is covered with the storage rack 29, the inspection port 28 can be made less noticeable, and the internal space of the center core portion 21 can be effectively utilized.

なお、本発明は前述の実施例に限定されるものではなく
、本発明の目的を達成できる範囲での変形、改良等は本
発明に含まれるものである。
It should be noted that the present invention is not limited to the above-mentioned embodiments, and the present invention includes modifications, improvements, etc. within a range that can achieve the purpose of the present invention.

すなわち、前記実施例では、バスルームユニットlOに
便器24や洗面シンク25が設けられていたが、洗場2
5およびバスタブ26のみが設けられたものでもよく、
要するに、バスルームユニット10には必要に応じて適
宜な設備を設ければよい。
That is, in the embodiment described above, the bathroom unit IO was provided with the toilet bowl 24 and the wash basin sink 25, but the wash area 2
5 and a bathtub 26 may be provided,
In short, the bathroom unit 10 may be provided with appropriate equipment as necessary.

また、バスタブ26内の湯を保温あるいは加熱するため
に、バスタブ26に一対の配管を接続し、別途設けた温
水器等に対しバスタブ26内の湯を循環するようにして
もよい。
Further, in order to keep warm or heat the hot water in the bathtub 26, a pair of pipes may be connected to the bathtub 26, and the hot water in the bathtub 26 may be circulated to a separately provided water heater or the like.

さらに、各ソケット50.51.54は、枝管43A、
 Uトラップ52、汚水配管44等と一体にされていて
もよい。
Furthermore, each socket 50.51.54 has a branch pipe 43A,
It may be integrated with the U-trap 52, the sewage pipe 44, etc.

〔発明の効果〕〔Effect of the invention〕

前述のように、本発明のバスルームユニットの製造方法
によれば、製造作業能率を良くすることかできる。
As described above, according to the bathroom unit manufacturing method of the present invention, manufacturing efficiency can be improved.

【図面の簡単な説明】[Brief explanation of drawings]

第1図および第2図は本発明の一実施例のバスルームユ
ニットを示す分解斜視図および縦断面図、第3図は前記
実施例のバスルームユニットの水用配管の配置を示す平
面図、第4図および第5図は、前記実施例のSトラップ
と雑排水配管との接続の手順を説明する縦断面図および
平面図、第6図および第7図はバスタブと雑排水配管と
の接続の手順を説明する縦断面図および平面図、第8図
ないし第10図は便器の設置および汚水配管への接続の
手順を説明する縦断面図である。 10・・・バスルームユニット、16・・・フレーム、
20・・・フロアパン、41.42.43.44・・・
水用配管である給水配管、給湯配管、雑排水配管、汚水
配管。 1.0・・・バスルームユユッ 16・フレーム 20・・・フロアパン 41〜44・・・水用配管 ト 第4 図 第 図 2 第 図 3C 6 451−
1 and 2 are an exploded perspective view and a vertical sectional view showing a bathroom unit according to an embodiment of the present invention, and FIG. 3 is a plan view showing the arrangement of water pipes of the bathroom unit according to the embodiment, Figures 4 and 5 are longitudinal cross-sectional views and plan views illustrating the procedure for connecting the S-trap and the gray water pipe of the above embodiment, and Figures 6 and 7 are the connections between the bathtub and the gray water pipe. FIGS. 8 to 10 are longitudinal sectional views and plan views illustrating the procedure for installing the toilet bowl and connecting it to the sewage pipes. 10... Bathroom unit, 16... Frame,
20...floor pan, 41.42.43.44...
Water piping: water supply piping, hot water supply piping, gray water piping, and sewage piping. 1.0...Bathroom unit 16/Frame 20...Floor pans 41-44...Water piping Fig. 4 Fig. 2 Fig. 3C 6 451-

Claims (1)

【特許請求の範囲】[Claims] (1)ユニット住宅のバスルームの製造方法であって、
バスルームのフレーム側に水用配管を取付けた後、バス
ルームユニットの床を構成するフロアパンを前記フレー
ムに取付けることを特徴とするバスルームユニットの製
造方法。
(1) A method for manufacturing a bathroom in a unit house, the method comprising:
A method for manufacturing a bathroom unit, which comprises: attaching water piping to the frame side of the bathroom, and then attaching a floor pan constituting the floor of the bathroom unit to the frame.
JP2063906A 1990-03-14 1990-03-14 Bass room unit manufacturing method Expired - Fee Related JP2530040B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2063906A JP2530040B2 (en) 1990-03-14 1990-03-14 Bass room unit manufacturing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2063906A JP2530040B2 (en) 1990-03-14 1990-03-14 Bass room unit manufacturing method

Publications (2)

Publication Number Publication Date
JPH03267478A true JPH03267478A (en) 1991-11-28
JP2530040B2 JP2530040B2 (en) 1996-09-04

Family

ID=13242837

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2063906A Expired - Fee Related JP2530040B2 (en) 1990-03-14 1990-03-14 Bass room unit manufacturing method

Country Status (1)

Country Link
JP (1) JP2530040B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5491934A (en) * 1992-07-24 1996-02-20 Bigelow, Jr.; Floyd E. Two story building collapsed for shipping

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61293410A (en) * 1985-06-22 1986-12-24 シルバ−工業株式会社 Bathroom unit

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61293410A (en) * 1985-06-22 1986-12-24 シルバ−工業株式会社 Bathroom unit

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5491934A (en) * 1992-07-24 1996-02-20 Bigelow, Jr.; Floyd E. Two story building collapsed for shipping

Also Published As

Publication number Publication date
JP2530040B2 (en) 1996-09-04

Similar Documents

Publication Publication Date Title
JPH03267478A (en) Manufacturing of bath room unit
JP6587428B2 (en) Bathing equipment and assembly bath body used therefor
JP4879045B2 (en) Bathroom unit installation structure and construction method
JPH0428946Y2 (en)
JP4203477B2 (en) Drain pipe fixing member
TWI783442B (en) Hygiene unit structure and method for implementing same
JPH0941684A (en) Bathroom unit
JP2777591B2 (en) Bus system and unit bus for assembling it
JP2501137Y2 (en) Faucet mounting structure
JPH08441Y2 (en) Bathroom assembly structure
JPS6326462Y2 (en)
JP2772708B2 (en) Floor panel pipe fixing structure, pipe fixing method, wash unit, kitchen unit, bath unit with floor panel fixing pipe
JP2001123681A (en) Unit type kitchen and sanitary space facility
JP2002013171A (en) Piping structure for building unit
JPH0756382Y2 (en) Split-type waterproof pan
JPH0682201U (en) Room unit
JPS636279Y2 (en)
JP4160744B2 (en) Equipment and building unit with the equipment installed
JPH0626203A (en) Construction method for sanitary equipment room
JPH06169854A (en) Bath unit
JPH07229181A (en) Underfloor piping structure
JP2001258780A (en) Bathroom unit
JPH02311667A (en) Unit bath room
JPH0559783A (en) Floor panel
JPH01169038A (en) Wall panel with piping

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees