JPH03247820A - Waterproof panel and construction method of underground external wall - Google Patents

Waterproof panel and construction method of underground external wall

Info

Publication number
JPH03247820A
JPH03247820A JP2043977A JP4397790A JPH03247820A JP H03247820 A JPH03247820 A JP H03247820A JP 2043977 A JP2043977 A JP 2043977A JP 4397790 A JP4397790 A JP 4397790A JP H03247820 A JPH03247820 A JP H03247820A
Authority
JP
Japan
Prior art keywords
waterproof
panel
slab
concrete
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2043977A
Other languages
Japanese (ja)
Inventor
Kyoji Matsuo
Hiroshi Nakamura
Yasue Obata
Kyoichi Yoneda
Original Assignee
Toyo Bussan Kk
Toyo Tire & Rubber Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyo Bussan Kk, Toyo Tire & Rubber Co Ltd filed Critical Toyo Bussan Kk
Priority to JP2043977A priority Critical patent/JPH03247820A/en
Publication of JPH03247820A publication Critical patent/JPH03247820A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE: To facilitate handling by placing the surface of a waterproof unit panel sticking a waterproof film on the surface and sticking any of a solid wire gauze, grating body with legs and solid truss panel on the rear toward the outside, and constructing the rear together with a reinforced concrete wall as a unit.
CONSTITUTION: In a waterproof unit panel 1, a waterproof layer is stuck on over the whole surface and, at the same time, any of a solid wire gauze, grating body with legs and solid truss panel is mounted to the rear thereof. A concrete sub-slab 90, bottom waterproof sheet 80 and reinforced concrete bottom slab 70 are piled up on an excavated ground bottom 100. After that, the waterproof unit panel 1 is matched to the end 71 of the reinforced concrete bottom slab 70 to erect. Then, wall bar arrangement 50 and form 40 are assembled, and after an extra length 81 of the bottom waterproof sheet is completely stuck, wall concrete is placed. The form 40 is removed to comple an underground external wall.
COPYRIGHT: (C)1991,JPO&Japio
JP2043977A 1990-02-23 1990-02-23 Waterproof panel and construction method of underground external wall Pending JPH03247820A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2043977A JPH03247820A (en) 1990-02-23 1990-02-23 Waterproof panel and construction method of underground external wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2043977A JPH03247820A (en) 1990-02-23 1990-02-23 Waterproof panel and construction method of underground external wall

Publications (1)

Publication Number Publication Date
JPH03247820A true JPH03247820A (en) 1991-11-06

Family

ID=12678779

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2043977A Pending JPH03247820A (en) 1990-02-23 1990-02-23 Waterproof panel and construction method of underground external wall

Country Status (1)

Country Link
JP (1) JPH03247820A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104762999A (en) * 2015-04-16 2015-07-08 中天建设集团有限公司天津分公司 Self-adhesion coiled material underground waterproof construction method
CN105887923A (en) * 2016-04-13 2016-08-24 中国十七冶集团有限公司 Construction method for pre-paving and invertedly adhering waterproof coiled material in large underground waterproof project
CN106284430A (en) * 2016-08-26 2017-01-04 中国十七冶集团有限公司 A kind of structural concrete for large deep foundation pit with waterproofing protection
CN106759528A (en) * 2016-12-14 2017-05-31 上海建工二建集团有限公司 Basement bottom board bed course in emergency work
KR20190096557A (en) * 2018-02-09 2019-08-20 강성숙 finishing frame structure of waterproof corners of concrite structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104762999A (en) * 2015-04-16 2015-07-08 中天建设集团有限公司天津分公司 Self-adhesion coiled material underground waterproof construction method
CN105887923A (en) * 2016-04-13 2016-08-24 中国十七冶集团有限公司 Construction method for pre-paving and invertedly adhering waterproof coiled material in large underground waterproof project
CN106284430A (en) * 2016-08-26 2017-01-04 中国十七冶集团有限公司 A kind of structural concrete for large deep foundation pit with waterproofing protection
CN106759528A (en) * 2016-12-14 2017-05-31 上海建工二建集团有限公司 Basement bottom board bed course in emergency work
KR20190096557A (en) * 2018-02-09 2019-08-20 강성숙 finishing frame structure of waterproof corners of concrite structure

Similar Documents

Publication Publication Date Title
GR3025421T3 (en) Hydraulic embedment of waste in subterranean formations
DE69108948D1 (en) Means and methods for the permanent erection of a building structure.
DE3465617D1 (en) Concrete foundation pile and device for driving the same into the ground
AU514560B2 (en) Setting concrete in offshore structures
ES515849A0 (en) Method of erecting a wall or structure of panels, reinforcements and particular materials in a wet environment, especially in pier, dock and similar.
AU526267B2 (en) Reinforced earth structures
AT1004T (en) Additives for concrete or cement mortar and the use thereof as a pump aid.
DK554186A (en) Air and step soil dumping plastics for swimming cement floors or swimming wooden floors
BR9304341A (en) Flexible membrane to be permanently buried in the soil at a construction site as a barrier against termites and other underground pests
JPS58225070A (en) Delta2-1,2,4-triazolin-5-one derivative and preparation and use thereof
RU97100299A (en) Method for making a concrete wall using stressed formwork, and also devices for implementing the method
HK44882A (en) Method and apparatus for building vertical walled structures in the ground
DE3168407D1 (en) Method of and apparatus for use in reinforcing a piling structure, and a precast concrete pile for use in the method
FR2694315B1 (en) Method and device for driving a tube into the ground, by beating, in particular for making a foundation pile
FR2647828B1 (en) Method and device for taking off concrete to which it adhesds, an end joint of a wall panel molded in the ground
GB2030976B (en) Pumpable thixotropic cement slurries for use in a well or in a subterranean formation
AU512007B2 (en) Precast reinforced concrete wall element
PH14360A (en) Improvement to the method of compacting mixtures of gypsum and plaster with a view to obtaining new water repellant materials
FR2670542B1 (en) Method and device for attaching an object to a wall in a lightweight construction material.
JPS57224A (en) Protection work of slope and modified ruler used therefor
DE2937469A1 (en) Pump and syringe unit for unhardened concrete and the like
DE59406448D1 (en) Method for erecting walls, in particular the outer walls of a building, using formwork elements
GB9014774D0 (en) Reinforced concrete piles
EP0339261A3 (en) Device for uncovering the reinforcement rods in concrete piles
DE69200158T2 (en) Method and device for increasing the pressure absorption of concrete and concrete structures reinforced in this way.