JPH01257549A JP63082292A JP8229288A JPH01257549A JP H01257549 A JPH01257549 A JP H01257549A JP 63082292 A JP63082292 A JP 63082292A JP 8229288 A JP8229288 A JP 8229288A JP H01257549 A JPH01257549 A JP H01257549A
Authority
JP
Japan
Prior art keywords
product
work
data
production line
file
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP63082292A
Other languages
Japanese (ja)
Other versions
JPH0657384B2 (en
Inventor
Akira Tada
多田 公
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Seiki Co Ltd
Original Assignee
Hitachi Seiki Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Seiki Co Ltd filed Critical Hitachi Seiki Co Ltd
Priority to JP63082292A priority Critical patent/JPH0657384B2/en
Publication of JPH01257549A publication Critical patent/JPH01257549A/en
Publication of JPH0657384B2 publication Critical patent/JPH0657384B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • General Factory Administration (AREA)
  • Multi-Process Working Machines And Systems (AREA)

Abstract

PURPOSE:To improve the efficiency of managing work by forming a product work item file for every product based on a standard work item file indicating machining/assembling content of every product, a work item file for every specification and an additional specification file. CONSTITUTION:At first, IC cards 3 fixed to products A-N moved to processes are set in a card reader/writer 5, then any one of product specification display, work item display or specification item display is selected through a keyboard and the CRT of a terminal 6. If there is an additional specification, additional confirmation data are inputted to produce a product work item file through a host computer 1. Upon finish of work of indicated items, inspection item data are inputted and the IC card 3 is set in the reader/writer 5 thus writing in specification confirmation data, work achievement data, inspection data and the like. By such arrangement, management efficiency is improved and delay of work in process is minimized.

Description

【発明の詳細な説明】 [産業上の利用分野] この発明は、加工・組立を行う生産ラインのための生産
ライン情報管理方法に関する。更に詳しくは、加工・組
立情報をICカードなどの移動できる情報記録媒体に記
憶させて、この記憶情報にしたがって作業を行うもので
ある。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a production line information management method for a production line that performs processing and assembly. More specifically, processing/assembly information is stored in a movable information recording medium such as an IC card, and work is performed according to this stored information.

[従来技術] 加工・組立作業のなめに、被加工の対象であるワークに
ICなどのワーク情報を記憶するカードを取り付けて移
動させるものがある。例えば、特開昭62−11486
0号公報には、ワークとともに移動するワーク情報保持
装置に検査情報を書き込み、各工程でこの情報を読み取
って検査を行い、検査結果をワーク情報保持装置に書き
込むものが記載されている。特開昭62−94252号
公報、特開昭62−24950号公報には、同様にL 
S、 Iカードに製造仕様を書き込み、工程管理を行う
ものが記載されている。
[Prior Art] For processing and assembly work, there is a method in which a card such as an IC that stores work information is attached to a work to be processed and moved. For example, JP-A-62-11486
Publication No. 0 describes a method in which inspection information is written in a workpiece information holding device that moves with the workpiece, this information is read and inspected in each process, and the inspection results are written in the workpiece information holding device. Similarly, in JP-A-62-94252 and JP-A-62-24950, L
Manufacturing specifications are written on the S and I cards, and those for process control are written there.

[発明が解決しようとする問題点] 前記したものは、いずれも移動する製品に生産情報を書
き込んだ記録媒体(ICカード)を取り付けて生産ライ
ンに流している。したがって、ホストコンピュータがダ
ウンしても情報が独立しているので、生産が継続できる
などの優れた生産管理装置である。しかし、仕様が異な
る製品毎に作業項目、検査項目などの作業項目ファイル
を作成する点が記載されていない。この作業項目ファイ
ルを作成するには工数がかかる問題がある。
[Problems to be Solved by the Invention] In all of the above-mentioned products, a recording medium (IC card) on which production information is written is attached to a moving product and the product is sent to a production line. Therefore, even if the host computer goes down, the information is independent, making it an excellent production control device that allows production to continue. However, there is no mention of creating work item files such as work items and inspection items for each product with different specifications. There is a problem in that it takes a lot of man-hours to create this work item file.

この発明の目的は、製品毎の作業項目ファイルを迅速に
作成できる生産ライン情報管理方法を提供することにあ
る。
An object of the present invention is to provide a production line information management method that can quickly create a work item file for each product.

この発明の他の目的は、各工程の生産遅延を監視するた
めの生産ライン情報管理方法を提供することにある。
Another object of the present invention is to provide a production line information management method for monitoring production delays in each process.

[前記課題を解決するための手段] この発明は前記課題を解決するため次の手段を採る。[Means for solving the above problems] The present invention takes the following measures to solve the above problems.

複数の工程間を移動して製品を加工・組立する生産ライ
ンと、前記製品に付属して移動し生産情報を記録し書き
換え可能な記録媒体と、前記各工程に設けられ前記記録
媒体に記録された情報を読み取り/書き込みできるリー
ダ/ライタと、該リーダ/ライタおよび後記ホストコン
ピュータからの情報の表示と検査・作業結果とを入出力
できる端末と、これらの端末を管理し前記記録媒体を発
行回収するホストコンピュータとを有する生産ライン情
報管理装置において、前記ホストコンピュータには前記
製品の標準的な加工・組立内容を示す製品別標準作業項
目ファイルと、仕様毎の作業項目を示す仕様別作業項目
ファイル、と、製品毎の付加、仕様を示す付加仕様ファ
イルとから前記製品の製品作業項目ファ・イルを作成す
る生産ライン情報管理方法である。
A production line that processes and assembles products by moving between a plurality of processes, a recording medium that moves attached to the product and records production information and is rewritable, and a recording medium that is provided in each of the processes and records information on the recording medium. A reader/writer that can read/write information, a terminal that can display information and input/output inspection/work results from the reader/writer and the host computer described later, and manage these terminals and issue and collect the recording medium. In a production line information management device having a host computer, the host computer has a product-specific standard work item file indicating standard processing/assembly contents of the product, and a specification-specific work item file indicating work items for each specification. , and an additional specification file indicating additions and specifications for each product, to create a product work item file for the product.

ポストコンピュータは、各工程の実際の作業に要した時
間と作成した製品作業項目ファイルとを比較して生産が
遅延したとき端末を通して作業者に警告メツセージを発
したほうが良い。
The post computer should compare the time required for the actual work of each process with the created product work item file and issue a warning message to the worker through the terminal when production is delayed.

[作 用] ホストコンピュータは、標準的な加工・組立内容を示す
製品別標準作業項目ファイルと、仕様毎の作業項目を示
す仕様別作業項目ファイルと製品毎の付加仕様を示す付
加仕様ファイルとから加工しようとする製品毎の製品作
業項目ファイルを作成する。
[Function] The host computer stores a standard work item file for each product that shows standard processing/assembly contents, a work item file for each specification that shows work items for each specification, and an optional specification file that shows additional specifications for each product. Create a product work item file for each product to be processed.

[実施例] 以下、この発明の実施例を図面とともに説明する。第1
図は、この発明の生産ライン情報管理方法を工作機械の
組立・検査作業に適用した場合の機能ブロック図である
。ホストコンピュータ1は、このシステム全体を総括す
る中央処理装置である。ホストコンピュータ1には、カ
ードリーダ/ライタ2が直結して設けである。カードリ
ーダ/ライタ2は、ICカード3に書き込まれた情報を
読み込んだり、書き込むためのものである。
[Example] Hereinafter, an example of the present invention will be described with reference to the drawings. 1st
The figure is a functional block diagram when the production line information management method of the present invention is applied to assembly and inspection work of machine tools. The host computer 1 is a central processing unit that controls the entire system. A card reader/writer 2 is directly connected to the host computer 1. The card reader/writer 2 is for reading and writing information written on the IC card 3.

カードリーダ/ライタ2は、ICカード3を発行、回収
するものである。ICカード3は、製品1個に対応して
1枚発行される。生産ライン4に入る前に発行されるI
Cカード3は、製品の基盤となる材料または半製品の加
工・組立に支障がない位置に取り付けられる。ICカー
ド3が取り付けられた材料または半製品は、コンベヤな
どで結ばれた生産ライン4に投入される。生産ライン4
は、工程1〜工程Nまでの複数の工程があり、各工程1
〜工程Nで作業者が加工・組立作業を行う。
The card reader/writer 2 issues and collects IC cards 3. One IC card 3 is issued corresponding to one product. I issued before entering production line 4
The C card 3 is attached at a position that does not interfere with the processing and assembly of the material serving as the base of the product or the semi-finished product. The materials or semi-finished products to which the IC card 3 is attached are put into a production line 4 connected by a conveyor or the like. Production line 4
has multiple steps from step 1 to step N, and each step 1
~ In process N, workers perform processing and assembly work.

各工程1〜工程Nで加工・組立されたものは、製品A、
製品B・・・・・・製品Nとなり完成されて行く。各工
程1〜工程Nには、カードリーダ/ライタ5が設置しで
ある。カードリーダ/ライダ5は、端末器6と連結され
ている。端末器6は、CRT画面、入出力用のキーボー
ドなどを備えたものである。CRT画面には、作業者へ
の作業内容の指示を行う作業項目などが表示される。キ
ーボードは、作置の終了のときなどに終了を知らせるも
のである。各工程1〜T程Nにも同様にカードリーダ・
′ライタ5と、端末器6とが設置されている1、 作業−動−作− 第2図に示すフロー図は、作業者の動作、端末6および
カードリーグ、/ライタ5の動作を示ずt。
Products processed and assembled in each process 1 to process N are product A,
Product B becomes product N and is completed. A card reader/writer 5 is installed in each process 1 to process N. The card reader/rider 5 is connected to a terminal device 6. The terminal device 6 is equipped with a CRT screen, a keyboard for input/output, and the like. On the CRT screen, work items and the like for instructing the worker on the work contents are displayed. The keyboard is used to notify the end of the process, such as when the process is complete. For each process 1 to T and N, there is also a card reader
1, where the writer 5 and the terminal device 6 are installed. Work - Operation - The flow diagram shown in Figure 2 does not show the operation of the worker, the terminal 6 and the card league, /writer 5. t.

のである。まず最初に、作業者は、各工程1〜工程Nに
移動してきた製品A〜製品Nに取り付けられた1 (”
カード3をカードリーグ・′ライタ5にセ・ソ1〜する
(ステップP+)。作業者は、端末6の(、”、、 R
Tを画面を県ながら次の三つの表示を選択する。製品の
仕様情報表示、作業指示項目表示、検n項[1表示のい
ずれか一つをキーボードで選択する。仕様情報表示は、
製品の仕様の内容を表示するものである。
It is. First of all, the worker attaches the 1 ("
Card 3 is sent to Card League Writer 5 (Step P+). The worker uses terminal 6's (,",, R
Select the following three displays while pressing T on the screen. Select one of the product specification information display, work instruction item display, and inspection item [1] display using the keyboard. Specification information display is
It displays the contents of the product specifications.

仕様が付加されていれば、すなわち標準仕様以外の付加
仕様があれば、当該作業後キーボードから付加確認のデ
ータを入力する。作業指示項目表示は、作業者がその工
程で行うべき作業内容を表示するものである。表示され
た作業指示項目の作業が終了すると、端末うのキーボー
ドから入力され作業が終了したことを入力する(ステッ
プP。
If specifications have been added, that is, if there are additional specifications other than the standard specifications, input confirmation data from the keyboard after the work. The work instruction item display displays the work details that the worker should perform in the process. When the work for the displayed work instruction item is completed, input is made from the keyboard of the terminal to indicate that the work has been completed (step P).

、 P4 、 P5 )。検査項目表示は、製品A、製
品B、・・・製品Nごとの検査項目を表示し、その検査
項目のデータをキーボードから入力する(P3゜P4)
, P4, P5). The inspection item display displays the inspection items for each product A, product B, ... product N, and inputs the data of the inspection item from the keyboard (P3゜P4)
.

次に、ICカード3をカードリーダ/ライタ5にセット
して、仕様付加確認データ、作業実績データ、検査デー
タなどのデータを書き込み、作業を終了する(ステップ
P6 、 P7 )。作業者は、カードリーダ/ライタ
5からICカード3を取り出し、製品A、・・・製品N
へ戻す。各製品A、・・・Nを次工程へ移動させる。全
工程が完了すると、ICカード3を回収し、ホストコン
ピュータ1でデータを収集し完成品をラインアラ)−す
る(ステップP、。〜P1□)。
Next, the IC card 3 is set in the card reader/writer 5, and data such as specification addition confirmation data, work performance data, and inspection data are written, and the work is completed (steps P6 and P7). The worker takes out the IC card 3 from the card reader/writer 5 and reads product A, ... product N.
Return to. Each product A,...N is moved to the next process. When all steps are completed, the IC card 3 is collected, data is collected by the host computer 1, and the finished product is line-arrayed (steps P, . . . -P1□).

ICカード用データ作成手II町 第3図に示すフロー図は、ホストコンピュータ1が、I
Cカード3を発行する動作を示すものである4ステツプ
P1は、製品別にいつからどこのラインでいつまでに生
産するかなどの生産計画に関するデータを入力する。ホ
ストコンピュータ1にはあらかじめ工場全体の生産計画
、製品別の生産計画が入力されている。この入力データ
にしたがってICカード3に製品別の生産指示データが
記入される。
The flowchart shown in FIG. 3 shows that the host computer 1
In step P1, which shows the operation of issuing the C card 3, data regarding the production plan, such as when to produce each product and on which line and by when, is input. A production plan for the entire factory and a production plan for each product are input into the host computer 1 in advance. Production instruction data for each product is written in the IC card 3 according to this input data.

ステップP2でデータをチエツクしてステップP4に進
む。問題があればステップP3に進みエラー%埋を行う
。ステップP4では、製品の仕様情報をICカード3に
書き込みデータチエツクをする(ステップP4 、P、
)。問題がなければ、ステ・ツブP6でその製品に対応
した作業指示データを作成する。すなわち、加工・組立
作業の内容を作成するのである0作成された作業指示デ
ータは、あらかじめ入力された標準の作業である。この
標準作業に加えて付加的な仕様がある場合、追加される
作業が製品によっては生じてくる。この追加作業は、ス
テップP7で追加される。
The data is checked in step P2 and the process proceeds to step P4. If there is a problem, proceed to step P3 and fill in the error percentage. In step P4, the product specification information is written to the IC card 3 and the data is checked (steps P4, P,
). If there is no problem, step P6 creates work instruction data corresponding to the product. That is, the created work instruction data that creates the contents of the processing/assembly work is a standard work input in advance. If there are additional specifications in addition to this standard work, additional work may occur depending on the product. This additional work is added in step P7.

ステップP8の製品別検査項目データP8は、製品ごと
に精度、締付トルクなど検査項目があらかじめ決まって
いるので、この検査項目データを作業者が入力する。あ
るいは、作業者が手動で入力する必要のない自動検査機
械であればその検査機械から直接自動的にデータを入力
する。ステップP9では、標準作業日程データを作成す
る。すなわち、作業ごとに標準作業時間が決まっている
ので、時間がわかり日程または時間を決定できる。
In the product-specific inspection item data P8 in step P8, inspection items such as accuracy and tightening torque are predetermined for each product, so the operator inputs this inspection item data. Alternatively, if there is an automatic inspection machine that does not require manual input by the operator, the data is automatically input directly from the inspection machine. In step P9, standard work schedule data is created. That is, since the standard working time is determined for each task, the schedule and time can be determined by knowing the time.

ステップPIOでは、ステップP7で付加した付加仕様
によって作業時間が変更されるので、その作業時間を変
更して日程データを修正する。以上の手順でデータが完
成すると、ステップpHでICカード3にこれらのデー
タを書き込む。ステップP1□では、他にデータを書き
込むものがあるか否か判断し、あれば■に戻り同様の動
作を繰り出す。なければ、ステップPI3でカード3の
書き込みが終了し、作業者は生産ラインへカード3を供
給する。
In step PIO, since the working time is changed according to the additional specifications added in step P7, the working time is changed and the schedule data is corrected. When the data is completed through the above procedure, these data are written to the IC card 3 at step pH. In step P1□, it is determined whether there is any other data to be written, and if so, the process returns to ■ and the same operation is carried out. If not, writing to the card 3 is completed in step PI3, and the operator supplies the card 3 to the production line.

第4図は、ホストコンピュータ1が生産ライン4の流れ
を監視するための動作フロー図である。
FIG. 4 is an operational flow diagram for the host computer 1 to monitor the flow of the production line 4.

ステップP1では、各端末6から実績データを収集する
。すなわち、作業者が端末6のキーボードを操作して各
工程A、〜工程Nから指示された組立・加工作業が完了
した旨のデータを送る。または、作業ができない、必要
な部品がないなどの異常を作業者はホストコンピュータ
1に通知する。
In step P1, performance data is collected from each terminal 6. That is, the operator operates the keyboard of the terminal 6 to send data indicating that the assembly/processing work instructed from each process A to process N has been completed. Alternatively, the operator notifies the host computer 1 of abnormalities such as being unable to perform work or missing necessary parts.

ステップP2でそのデータが正確に送られてきたか否か
チエツクする。N、Oであれば、エラー処理をする(ス
テップP3)。YESであれば、ステップP4で通常の
作業完了データか、異常通知かの判断する。YESであ
れば、製品別の現在の加工・組立状況を示す工程デー、
夕のテーブル用のデータを更新する。
In step P2, it is checked whether the data has been sent correctly. If N or O, error processing is performed (step P3). If YES, it is determined in step P4 whether the data is normal work completion data or an abnormality notification. If YES, the process date showing the current processing/assembly status of each product,
Update the data for the evening table.

Noであれば、ステップP6で実績データを解読する。If No, the performance data is decoded in step P6.

この実績データ時間と標準の作業時間とを比較して、両
者を対比計算する(ステップP7、P8)。生産が予定
より遅延していれば、警告メツセージを発生させて端末
6のCRT画面に表示して作業者に知らせる(ステップ
P9、Pl。
This performance data time and standard working time are compared to calculate the comparison between the two (steps P7 and P8). If production is behind schedule, a warning message is generated and displayed on the CRT screen of the terminal 6 to notify the operator (steps P9 and Pl).

)。ステップP1□では、遅れ済製品か否か判断する。). In step P1□, it is determined whether the product is a delayed product or not.

すなわち、この工程で初めて遅れたか、その前の工程で
すでに遅れていたのか判断する。その遅れを回復したの
であればステップP12で警告を解除する。
In other words, it is determined whether the process is delayed for the first time in this process or whether it has already been delayed in the previous process. If the delay has been recovered, the warning is canceled in step P12.

ステップP13では、製品別に現在の加工・組立状況を
示すテーブルがあるので、そのデータを更新する。ステ
ップP14では、全工程が作業を終了したか否か判断し
、終了していなければステップP1に戻り前記同様の動
作を行う。
In step P13, since there is a table showing the current processing/assembly status for each product, the data is updated. In step P14, it is determined whether all processes have been completed, and if not, the process returns to step P1 and the same operations as described above are performed.

作業。六  の編集 第5図は、ホストコンピュータ1内で作業指示項目を編
集するときの編集方法を示す概念図である。製品別標準
作業データファイル10と、付加仕様30によって発生
する作業項目ファイル20を組み合わせて、製品1個毎
の正確な作業指示情報ファイル40を得るためのファイ
ルの編集するときの方法を示す。製品の種類、機種など
が決定すると、あらかじめこれに対応した標準作業項目
が決められているので、製品別標準作業項目ファイル1
0を記憶されているファイルから取り出し、作業領域の
RAMに移す。
work. 6. Editing FIG. 5 is a conceptual diagram showing an editing method when editing work instruction items within the host computer 1. A method for editing a file to obtain an accurate work instruction information file 40 for each product by combining a product-specific standard work data file 10 and a work item file 20 generated by an additional specification 30 will be described. Once the product type, model, etc. are determined, standard work items corresponding to these have been determined in advance, so the product-specific standard work item file 1 is created.
0 from the stored file and move it to the RAM in the work area.

通常、各製品は、客先の仕様などで標準製品を一部変更
して設計される。この付加される仕様は、あらかじめ仕
様別作業項目ファイル20としてファイルされている。
Typically, each product is designed by partially modifying a standard product to meet customer specifications. The specifications to be added are previously filed as a specification-specific work item file 20.

一方、今回製造される製品の付加仕様30が設計および
生産計画により決定される。この付加仕様30の情報に
よりその具体的な作業項目を仕様別作業項目ファイル2
0から抽出する。この抽出したデータとを合成して、最
終的な製品の作業項目ファイル40が完成する。このデ
ータの合成は、作業コードの番号順に並べるだけで達成
できる。仕様別作業項目ファイル20は、あらかじめ製
品別標準作業項目ファイル10に挿入されるように作業
コードが付されている。
On the other hand, additional specifications 30 of the product to be manufactured this time are determined based on the design and production plan. Based on the information of this additional specification 30, the specific work item is stored in the specification-specific work item file 2.
Extract from 0. This extracted data is combined to complete the final product work item file 40. This data synthesis can be accomplished simply by arranging the work codes in numerical order. A work code is attached to the specification-specific work item file 20 so that it can be inserted into the product-specific standard work item file 10 in advance.

[他の実施例] 前記実施例のICカード3は、各工程1〜Nで作業者が
ICカードを各製品A〜Nから取り外して、カードリー
ダ/ライタ5に取り付けている。
[Other Examples] In the IC card 3 of the above example, in each process 1 to N, an operator removes the IC card from each product A to N and attaches it to the card reader/writer 5.

しかし、各製品A〜Nが各工程1〜Nに移動してきたと
き、カードリーダ/ライタ5のアームに設けたコネクタ
が自動的にICカード3に近づき、接触また非接触で連
結しても良い。また、前記端末6、カードリーダ/ライ
タ5は、定置式であるが、製品A〜Nと共にコンベヤな
どで移動するものでも良い。
However, when each product A to N moves to each process 1 to N, the connector provided on the arm of the card reader/writer 5 automatically approaches the IC card 3 and may be connected with or without contact. . Furthermore, although the terminal 6 and the card reader/writer 5 are of a stationary type, they may be of a type that moves along with the products A to N on a conveyor or the like.

[発明の効果] 以上、詳記したようにこの発明は、異なる仕様の製品で
もその製品の加工・組立作業に応じた作業項目、検査項
目などが作成できる。また、工程の作業の遅れも最少限
にできる。
[Effects of the Invention] As described in detail above, according to the present invention, work items, inspection items, etc. can be created according to the processing/assembly work of the product even for products with different specifications. Also, delays in process work can be minimized.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は工作機械の組立作業に適用した実施例の機能ブ
ロック図、第2図は生産ラインでの作業者の動作のフロ
ーを示す図、第3図はホストコンピュータのカード発行
動作フロー図、第4図はホストコンピュータが生産ライ
ンを監視するフロー図、第5図は製品毎の作業項目を編
集する方法を示す図である。 1・・・ポスI・コンピュータ、2,5・・・カードリ
ーダ7・″ライタ、3・・・ICカード、6・・・端末
器、10・・・製品別標準作業項目ファ、イル、20・
・・仕様別作業項目ファイル、30・・付加仕様ファイ
ル、・10・・・製品作業項目ファイル
Fig. 1 is a functional block diagram of an embodiment applied to machine tool assembly work, Fig. 2 is a diagram showing the flow of operations of workers on the production line, Fig. 3 is a flow diagram of the card issuing operation of the host computer, FIG. 4 is a flowchart for the host computer to monitor the production line, and FIG. 5 is a diagram showing a method for editing work items for each product. 1...Pos I/Computer, 2,5...Card reader 7/''writer, 3...IC card, 6...Terminal device, 10...Standard work item file by product, file, 20・
...Specification work item file, 30...Additional specification file, 10...Product work item file

Claims (1)

【特許請求の範囲】 1、複数の工程間を移動して製品を加工・組立する生産
ラインと、前記製品に付属して移動し生産情報を記録し
書き換え可能な記録媒体と、前記各工程に設けられ前記
記録媒体に記録された情報を読み取り/書き込みできる
リーダ/ライタと、該リーダ/ライタおよび後記ホスト
コンピュータからの情報の表示と検査・作業結果とを入
出力できる端末と、これらの端末を管理し前記記録媒体
を発行回収するホストコンピュータとを有する生産ライ
ン情報管理装置において、前記ホストコンピュータには
前記製品の標準的な加工・組立内容を示す製品別標準作
業項目ファイルと、仕様毎の作業項目を示す仕様別作業
項目ファイルと、製品毎の付加仕様を示す付加仕様ファ
イルとから前記製品の製品作業項目ファイルを作成する
生産ライン情報管理方法。 2、前記ホストコンピュータは、前記各工程の実際の作
業完了時間と前記製品作業項目ファイルを比較し生産が
遅延したとき前記端末を通して警告メッセージを発する
ことを特徴とする第1項記載の生産ライン情報管理方法
[Claims] 1. A production line that processes and assembles products by moving between a plurality of processes, a recording medium that moves attached to the product and is capable of recording and rewriting production information, and a reader/writer that is installed and can read/write information recorded on the recording medium; a terminal that can display information and input/output inspection/work results from the reader/writer and the host computer described later; In a production line information management device having a host computer that manages the recording medium and issues and collects the recording medium, the host computer has a standard work item file for each product indicating standard processing and assembly contents of the product, and work for each specification. A production line information management method for creating a product work item file for the product from a specification-based work item file indicating items and an additional specification file indicating additional specifications for each product. 2. The production line information according to item 1, wherein the host computer compares the actual work completion time of each process with the product work item file and issues a warning message through the terminal when production is delayed. Management method
JP63082292A 1988-04-05 1988-04-05 Production line information management method Expired - Lifetime JPH0657384B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63082292A JPH0657384B2 (en) 1988-04-05 1988-04-05 Production line information management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63082292A JPH0657384B2 (en) 1988-04-05 1988-04-05 Production line information management method

Publications (2)

Publication Number Publication Date
JPH01257549A true JPH01257549A (en) 1989-10-13
JPH0657384B2 JPH0657384B2 (en) 1994-08-03

Family

ID=13770466

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63082292A Expired - Lifetime JPH0657384B2 (en) 1988-04-05 1988-04-05 Production line information management method

Country Status (1)

Country Link
JP (1) JPH0657384B2 (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH042448A (en) * 1990-04-17 1992-01-07 Mitsubishi Electric Corp Production process control method and equipment
JP2005305753A (en) * 2004-04-20 2005-11-04 Bridgestone Corp Tire molding drum and its production method
JP2006113901A (en) * 2004-10-15 2006-04-27 Nec Corp Rfid batch reading device, and article manufacturing system
US7177716B2 (en) 2004-02-28 2007-02-13 Applied Materials, Inc. Methods and apparatus for material control system interface
US7218983B2 (en) 2003-11-06 2007-05-15 Applied Materials, Inc. Method and apparatus for integrating large and small lot electronic device fabrication facilities
US7221993B2 (en) 2003-01-27 2007-05-22 Applied Materials, Inc. Systems and methods for transferring small lot size substrate carriers between processing tools
US7274971B2 (en) 2004-02-28 2007-09-25 Applied Materials, Inc. Methods and apparatus for electronic device manufacturing system monitoring and control
JP2008181557A (en) * 2008-03-24 2008-08-07 Nec Corp Rfid batch reading device and article manufacturing system
US7413069B2 (en) 2004-02-28 2008-08-19 Applied Materials, Inc. Methods and apparatus for transferring a substrate carrier within an electronic device manufacturing facility
JP2010274303A (en) * 2009-05-28 2010-12-09 Sumitomo Metal Ind Ltd Method for producing steel tube
JP2014081813A (en) * 2012-10-17 2014-05-08 Kobe Steel Ltd Operator support system, operator support method, and computer program

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH042448A (en) * 1990-04-17 1992-01-07 Mitsubishi Electric Corp Production process control method and equipment
US7221993B2 (en) 2003-01-27 2007-05-22 Applied Materials, Inc. Systems and methods for transferring small lot size substrate carriers between processing tools
US7218983B2 (en) 2003-11-06 2007-05-15 Applied Materials, Inc. Method and apparatus for integrating large and small lot electronic device fabrication facilities
US7274971B2 (en) 2004-02-28 2007-09-25 Applied Materials, Inc. Methods and apparatus for electronic device manufacturing system monitoring and control
US7177716B2 (en) 2004-02-28 2007-02-13 Applied Materials, Inc. Methods and apparatus for material control system interface
US7413069B2 (en) 2004-02-28 2008-08-19 Applied Materials, Inc. Methods and apparatus for transferring a substrate carrier within an electronic device manufacturing facility
JP2005305753A (en) * 2004-04-20 2005-11-04 Bridgestone Corp Tire molding drum and its production method
JP4492937B2 (en) * 2004-04-20 2010-06-30 株式会社ブリヂストン Tire molding drum manufacturing method
JP2006113901A (en) * 2004-10-15 2006-04-27 Nec Corp Rfid batch reading device, and article manufacturing system
JP2008181557A (en) * 2008-03-24 2008-08-07 Nec Corp Rfid batch reading device and article manufacturing system
JP4709244B2 (en) * 2008-03-24 2011-06-22 日本電気株式会社 RFID batch reader, article manufacturing system
JP2010274303A (en) * 2009-05-28 2010-12-09 Sumitomo Metal Ind Ltd Method for producing steel tube
JP2014081813A (en) * 2012-10-17 2014-05-08 Kobe Steel Ltd Operator support system, operator support method, and computer program

Also Published As

Publication number Publication date
JPH0657384B2 (en) 1994-08-03

Similar Documents

Publication Publication Date Title
US7567853B2 (en) Method and system for the electronic provision of services for machines via a data communication link
JPH01257549A (en) Production line information managing method
JP2011242831A (en) Information processor and information processing program
US20200033836A1 (en) Tool management system, tool management device, and tool management method
EP4130905A1 (en) Visualization system
JP4707946B2 (en) Process simulation system
CN114888543A (en) Cutter testing system and testing method
JPH10161718A (en) Machine tool working information outputting method and its device
JP3491558B2 (en) Alternative lot determination system
JP3390663B2 (en) Production control method
JPWO2006106729A1 (en) Processing management system
JP2021086219A (en) Cooperative work system, analysis and collection device, and analysis program
JP2005352934A (en) Production process management system and its device
Haijun et al. An application technology research about FO/AO based on MES system
JP7288654B2 (en) Manufacturing and assembly work management system for machine tools
WO2021240974A1 (en) Production process improvement assistance device and production process improvement assistance method
Melzer Three Manufacturing Trends that Meet the Need for Speed
JP2816022B2 (en) Switching management method in scheduling
JPH04135147A (en) Production control system
CN118331192A (en) Fully configurable MES system for flow industry
JP2002292710A (en) Cost control system and program in injection molding
Mesquita et al. Computer integrated and optimised turning
JP2598920B2 (en) Magnetic card type process control method
JP2658060B2 (en) Planning support system
Haseldine Implementing FMS: Flexible manufacturing project