JP7663432B2 - Anchor hanging jig and foundation construction method - Google Patents
Anchor hanging jig and foundation construction method Download PDFInfo
- Publication number
- JP7663432B2 JP7663432B2 JP2021109534A JP2021109534A JP7663432B2 JP 7663432 B2 JP7663432 B2 JP 7663432B2 JP 2021109534 A JP2021109534 A JP 2021109534A JP 2021109534 A JP2021109534 A JP 2021109534A JP 7663432 B2 JP7663432 B2 JP 7663432B2
- Authority
- JP
- Japan
- Prior art keywords
- anchor
- bolt
- anchor bolt
- foundation
- hanging jig
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims description 23
- 238000012790 confirmation Methods 0.000 claims description 73
- 238000009415 formwork Methods 0.000 claims description 32
- 238000000034 method Methods 0.000 claims description 16
- 239000004567 concrete Substances 0.000 claims description 13
- 238000007689 inspection Methods 0.000 claims description 4
- 238000011900 installation process Methods 0.000 claims description 4
- 239000000725 suspension Substances 0.000 claims description 2
- 230000000149 penetrating effect Effects 0.000 claims 1
- 230000003014 reinforcing effect Effects 0.000 description 11
- 238000013461 design Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000003780 insertion Methods 0.000 description 2
- 230000037431 insertion Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000009970 fire resistant effect Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Landscapes
- Foundations (AREA)
- Joining Of Building Structures In Genera (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
本発明は、アンカー吊り下げ治具及び基礎施工方法に係り、特に、基礎用型枠の上部に取り付けられ、基礎コンクリートにアンカーボルトを一部突出させた状態で埋設するために用いられるアンカー吊り下げ治具及び基礎施工方法に関する。 The present invention relates to an anchor hanging jig and a foundation construction method, and in particular to an anchor hanging jig that is attached to the top of a foundation formwork and is used to embed an anchor bolt in foundation concrete with a portion of the anchor bolt protruding, and a foundation construction method.
近年の建物は、耐震構造、耐火構造が要求されることから、鉄骨構造の建物が多くなり、建物の主要部には鉄骨構造が採用されている。
この鉄骨構造の建物の柱脚部は、基礎コンクリート内に埋設されるアンカーボルトにより固定されている。
In recent years, buildings are required to be earthquake-resistant and fire-resistant, so the number of buildings is increasing, and steel frame structures are being used for the main parts of the buildings.
The column bases of this steel-framed building are fixed in place by anchor bolts buried in the concrete foundation.
従来、上記アンカーボルトを設置するに際に、基礎用型枠の上部に架設され、基礎コンクリートに複数のアンカーボルトを一部突出させた状態で埋設するために用いられるアンカー吊り下げ治具が利用されている。
このアンカー吊り下げ治具は、基礎用型枠の上面に架設され、アンカーボルトの水平方向における位置決めを行うアンカー定規と、上下方向に長尺に延びておりアンカー定規とアンカーボルトを連結し、アンカー定規に対してアンカーボルトの高さ位置を変更可能な状態で取り付けられるアンカー高さ調整部材と、から主に構成されている(例えば、特許文献1、2参照)。
Conventionally, when installing the above-mentioned anchor bolts, an anchor hanging jig is used, which is erected on top of the foundation formwork and used to embed multiple anchor bolts in the foundation concrete with some of them protruding.
This anchor hanging jig is installed on the upper surface of the foundation formwork and is mainly composed of an anchor ruler that positions the anchor bolt in the horizontal direction, and an anchor height adjustment member that extends a long length in the vertical direction, connects the anchor ruler and the anchor bolt, and is attached in a state where the height position of the anchor bolt relative to the anchor ruler can be changed (see, for example, Patent Documents 1 and 2).
ところで、アンカーボルトの高さ位置が設計上の許容範囲を満たすか否かは、アンカーボルトの引き抜き強度等との関係で極めて重要である。
アンカー吊り下げ治具を用いてアンカーボルトを設置する際に、アンカーボルトの高さ位置の確認は、例えば、所定の基準面からアンカーボルト上端部までの距離を巻尺等のスケールを用いて計測して行われている。
しかし、巻尺等のスケールを用いてアンカーボルトの高さ位置を計測するときには、アンカーボルトの上端部の位置がアンカー吊り下げ治具によって隠れてしまい視認できない場合がある。そのため、計測誤差が大きくなり、アンカーボルトの高さ位置を精度よく確認することができない虞がある。
そこで、アンカーボルト(アンカーボルトの上端部)の高さ位置を精度よく確認することが可能な技術が求められていた。
また、アンカーボルトの高さ位置が設計上の許容範囲を満たさない場合に、アンカーボルトの上端部の高さ位置を確認しながら、アンカーボルトの高さ位置を簡易に調整することが可能な技術が求められていた。
Incidentally, whether or not the height position of the anchor bolt satisfies the design tolerance is extremely important in relation to the pull-out strength of the anchor bolt, etc.
When installing an anchor bolt using an anchor hanging jig, the height position of the anchor bolt is confirmed, for example, by measuring the distance from a predetermined reference plane to the upper end of the anchor bolt using a scale such as a tape measure.
However, when measuring the height position of the anchor bolt using a scale such as a tape measure, the position of the upper end of the anchor bolt may be hidden by the anchor hanging jig and may not be visible. This may result in a large measurement error, making it difficult to accurately check the height position of the anchor bolt.
Therefore, there has been a demand for a technique that can accurately check the height position of the anchor bolt (the upper end portion of the anchor bolt).
In addition, there has been a demand for technology that enables easy adjustment of the height position of an anchor bolt while checking the height position of the upper end portion of the anchor bolt when the height position of the anchor bolt does not satisfy the design tolerance range.
本発明は、上記課題に鑑みてなされたものであり、本発明の目的は、建物の基礎を施工するにあたって、アンカーボルトの高さ位置を精度よく確認することが可能なアンカー吊り下げ治具及び基礎施工方法を提供することにある。
また、本発明の他の目的は、アンカーボルトの高さ位置を確認しながら、アンカーボルトの高さ位置を簡易に調整することが可能なアンカー吊り下げ治具及び基礎施工方法を提供することにある。
The present invention has been made in consideration of the above-mentioned problems, and an object of the present invention is to provide an anchor hanging jig and a foundation construction method that make it possible to accurately check the height position of an anchor bolt when constructing the foundation of a building.
Another object of the present invention is to provide an anchor hanging jig and a foundation construction method that enable the height position of the anchor bolt to be easily adjusted while checking the height position of the anchor bolt.
前記課題は、本発明のアンカー吊り下げ治具によれば、基礎用型枠の上部に取り付けられ、基礎コンクリートにアンカーボルトを一部突出させた状態で埋設するために用いられるアンカー吊り下げ治具であって、前記基礎用型枠の上部に架設され、前記アンカーボルトの水平方向における位置決めを行うためのアンカー定規と、上下方向に長尺に延びており、前記アンカー定規を上下方向に貫通するように前記アンカー定規と連結され、前記アンカー定規に対して前記アンカーボルトの高さ位置を変更可能な状態で取り付けられるアンカー高さ調整部材と、を有し、前記アンカー高さ調整部材には、前記アンカーボルトが吊り下げられたときに前記アンカーボルトの高さ位置を確認するために、前記アンカー高さ調整部材の上端部から前記アンカーボルトの上端部に至るまで鉛直方向に貫通した位置確認穴が形成され、前記アンカー高さ調整部材は、前記アンカー定規に設けられた組み付け穴を通じて組み付けられ、上下方向に長尺なボルトと、前記ボルトの軸部分に対して螺合されるナットと、を有し、前記アンカー定規に対して前記ボルト又は前記ナットの組み付け位置を調整することで、前記アンカーボルトの高さ位置を変更可能となるように構成され、前記ボルトには、前記位置確認穴が形成され、前記位置確認穴は、前記ボルトの上端部から下端部に至るまで前記ボルトの軸方向に沿って貫通していること、により解決される。 The above problem is solved by the anchor hanging jig of the present invention, which is attached to an upper part of a foundation formwork and used for embedding an anchor bolt in a state in which a part of the anchor bolt protrudes into foundation concrete, and which includes an anchor ruler that is erected on the upper part of the foundation formwork and for positioning the anchor bolt in a horizontal direction, and an anchor height adjustment member that extends long in the vertical direction, is connected to the anchor ruler so as to penetrate the anchor ruler in the vertical direction, and is attached in a state in which a height position of the anchor bolt can be changed relative to the anchor ruler, and the anchor height adjustment member has a function of adjusting the height of the anchor bolt when the anchor bolt is hung. In order to confirm the position, a position confirmation hole is formed that penetrates vertically from the upper end of the anchor height adjustment member to the upper end of the anchor bolt , the anchor height adjustment member is assembled through an assembly hole provided in the anchor ruler and has a bolt that is long in the vertical direction and a nut that is screwed onto the shank portion of the bolt, and is configured so that the height position of the anchor bolt can be changed by adjusting the assembly position of the bolt or the nut relative to the anchor ruler, and the position confirmation hole is formed in the bolt, and the position confirmation hole penetrates along the axial direction of the bolt from the upper end to the lower end of the bolt .
上記構成により、建物の基礎を施工するにあたって、アンカーボルトの高さ位置を精度よく確認することが可能なアンカー吊り下げ治具を実現できる。
詳しく述べると、上記位置確認穴を利用して、例えば、高さ確認ゲージやレーザー光を用いることによって、アンカーボルト(アンカーボルトの上端部)の高さ位置を精度よく確認することができる。
また上記構成により、アンカー高さ調整部材を利用して、アンカーボルトの高さ位置を確認しながら、アンカーボルトの高さ位置を簡易に調整することができる。
また上記のように、アンカー高さ調整部材が有するボルト又はナットの組み付け位置を調整することで、アンカーボルトの高さ位置を確認しながら、アンカーボルトの高さ位置を一層簡易に調整できる。
With the above configuration, it is possible to realize an anchor hanging jig that can accurately check the height position of an anchor bolt when constructing the foundation of a building.
More specifically, by utilizing the position confirmation hole and using, for example, a height confirmation gauge or laser light, the height position of the anchor bolt (the upper end portion of the anchor bolt) can be confirmed with high accuracy.
Furthermore , with the above-described configuration, the height position of the anchor bolt can be easily adjusted while checking the height position of the anchor bolt by utilizing the anchor height adjustment member.
Furthermore, as described above, by adjusting the mounting position of the bolt or nut of the anchor height adjustment member, the height position of the anchor bolt can be adjusted even more easily while checking the height position of the anchor bolt.
このとき、前記位置確認穴は、前記アンカーボルトの高さ位置を確認するための確認棒を挿入可能な大きさに形成されていると良い。
上記構成により、確認棒をスムーズに位置確認穴に挿入できると共に、例えば、目盛りが刻まれた確認棒を位置確認穴に挿入することによって、アンカーボルトの高さ位置を一層精度よく確認することが可能となる。
In this case, it is preferable that the position confirmation hole is formed to a size that allows the insertion of a confirmation rod for confirming the height position of the anchor bolt.
With the above-described configuration, the confirmation rod can be smoothly inserted into the position confirmation hole, and by inserting, for example, an confirmation rod with a scale engraved thereon into the position confirmation hole, the height position of the anchor bolt can be confirmed with even greater accuracy.
また、前記課題は、上記アンカー吊り下げ治具を用いた基礎施工方法であって、前記基礎用型枠を組み立てる型枠組み立て工程と、前記基礎用型枠の上部に前記アンカー吊り下げ治具を架設する治具架設工程と、前記アンカー吊り下げ治具に前記アンカーボルトを吊り下げるように組み付けるアンカー組み付け工程と、組み付けた前記アンカーボルトの高さ位置を確認するアンカー確認工程と、を含み、前記アンカー確認工程では、前記アンカーボルトが吊り下げられたときに前記アンカーボルトの高さ位置を確認するために、前記アンカー吊り下げ治具の上端部から前記アンカーボルトの上端部に至るまで鉛直方向に貫通した前記位置確認穴によって前記アンカーボルトの上端部の高さ位置を確認することを特徴とする基礎施工方法によっても解決される。 The above problem is also solved by a foundation construction method using the above -mentioned anchor hanging jig, the foundation construction method including a formwork assembling step of assembling the foundation formwork, a jig erecting step of erecting the anchor hanging jig on the upper part of the foundation formwork, an anchor assembling step of assembling the anchor bolt to the anchor hanging jig so as to hang it, and an anchor confirmation step of confirming a height position of the assembled anchor bolt, characterized in that in the anchor confirmation step, in order to confirm the height position of the anchor bolt when it is suspended, the height position of the upper end of the anchor bolt is confirmed by the position confirmation hole that penetrates vertically from an upper end of the anchor hanging jig to an upper end of the anchor bolt.
このとき、前記アンカー確認工程では、前記アンカー吊り下げ治具の上方から、前記アンカーボルトの高さ位置を確認するための確認棒を前記位置確認穴に挿入し、挿入した前記確認棒を前記アンカーボルトの上端部に当接させると良い。
上記構成により、確認棒がアンカーボルトの上端部に当接したことを目安として、アンカーボルトの高さ位置を一層精度よく確認することができる。
At this time, in the anchor confirmation step, an confirmation rod for confirming the height position of the anchor bolt is inserted into the position confirmation hole from above the anchor hanging jig, and the inserted confirmation rod is brought into contact with the upper end of the anchor bolt.
With the above-described configuration, the height position of the anchor bolt can be confirmed with even greater accuracy, using the contact of the confirmation rod with the upper end of the anchor bolt as a guide.
本発明のアンカー吊り下げ治具及び基礎施工方法によれば、建物の基礎を施工するにあたって、アンカーボルトの高さ位置を精度よく確認することが可能となる。
また、アンカーボルトの高さ位置を確認しながら、アンカーボルトの高さ位置を簡易に調整することが可能となる。
According to the anchor hanging jig and foundation construction method of the present invention, it is possible to accurately check the height position of the anchor bolt when constructing the foundation of a building.
Also, it becomes possible to easily adjust the height position of the anchor bolt while checking the height position of the anchor bolt.
以下、本発明に係る実施形態について図1-図7を参照して説明する。
本実施形態は、基礎用型枠の上部に取り付けられ、基礎コンクリートにアンカーボルトを一部突出させた状態で埋設するために用いられる「アンカー吊り下げ治具」の発明に関するものである。
また、アンカー吊り下げ治具を用いた「基礎施工方法」の発明に関するものである。
Hereinafter, an embodiment of the present invention will be described with reference to FIGS.
This embodiment relates to an invention of an "anchor hanging jig" that is attached to the upper part of a foundation formwork and used to embed an anchor bolt in a state where a part of the anchor bolt protrudes into the foundation concrete.
It also relates to an invention for a "foundation construction method" using an anchor hanging jig.
<基礎施工治具>
本実施形態の基礎施工治具1は、図1、図2に示すように、鉄筋コンクリート製の建物の基礎Fを施工する際に用いられる治具であって、例えば、ハイベース工法(露出型固定柱脚工法)による基礎の施工の際に用いられる治具である。
具体的には、基礎施工治具1は、基礎コンクリートを打設する際に用いられ、基礎の形状に合わせて組まれた基礎用型枠10(10A、10B)と、基礎用型枠10の上部に架設され基礎コンクリートに複数のアンカーボルトF2を一部突出させた状態で埋設するためのアンカー吊り下げ治具20と、アンカーボルトF2の上端部の高さ位置を確認するための確認棒30と、アンカー吊り下げ治具20の上部に取り付けられ、柱(柱脚)の芯位置を確認するための位置確認治具40と、から主に構成されている。
<Foundation construction jig>
The foundation construction jig 1 of this embodiment, as shown in Figures 1 and 2, is a jig used when constructing the foundation F of a reinforced concrete building, for example, a jig used when constructing a foundation using the high base method (exposed fixed column base method).
Specifically, the foundation construction jig 1 is used when pouring foundation concrete and is mainly composed of a foundation formwork 10 (10A, 10B) assembled to match the shape of the foundation, an anchor hanging jig 20 that is erected on top of the foundation formwork 10 and used to embed multiple anchor bolts F2 in the foundation concrete with some of them protruding, an inspection rod 30 that is used to check the height position of the upper ends of the anchor bolts F2, and a position inspection jig 40 that is attached to the top of the anchor hanging jig 20 and used to check the center position of the column (base).
なお、基礎内部には、図1に示すように、基礎地盤F3(捨てコンクリート)上に設置されるプレート状のアンカーボルト支持具F1と、アンカーボルト支持具F1によって支持され、基礎と柱(柱脚)を連結するための複数のアンカーボルトF2と、アンカーボルト支持具F1によって支持され、複数のアンカーボルトF2を囲むように配置される不図示の鉄筋ユニット(柱型鉄筋ユニット)と、が埋設されることになる。 As shown in FIG. 1, embedded inside the foundation are a plate-shaped anchor bolt support F1 that is placed on the foundation ground F3 (basic concrete), multiple anchor bolts F2 that are supported by the anchor bolt support F1 and connect the foundation to the column (column base), and reinforcing bar units (column-type reinforcing bar units) (not shown) that are supported by the anchor bolt support F1 and are arranged to surround the multiple anchor bolts F2.
アンカーボルト支持具F1は、図1に示すように、基礎地盤F3上の所定位置に設置されるプレート状のベース部材F1aと、ベース部材F1a上に設けられ、アンカーボルトF2を下方から支持する複数のアンカー支持部材F1bと、ベース部材F1a上に設けられ、鉄筋ユニットを下方及び側方から支持する複数の鉄筋支持部材F1cと、を備えている。
なお、アンカー支持部材F1bの上端部には、アンカーボルトF2の下端部に設けられた被係合部に脱着可能に係合する係合部が形成されている。
アンカー支持部材F1b、鉄筋支持部材F1cは、それぞれベース部材F1aの外縁部分に所定の間隔を空けて設けられている。詳しく述べると、アンカー支持部材F1bと鉄筋支持部材F1cが交互に並ぶように配置されている。
As shown in FIG. 1, the anchor bolt support F1 comprises a plate-shaped base member F1a that is installed at a predetermined position on the foundation ground F3, a plurality of anchor support members F1b that are provided on the base member F1a and support the anchor bolts F2 from below, and a plurality of reinforcing bar support members F1c that are provided on the base member F1a and support the reinforcing bar units from below and laterally.
The upper end of the anchor support member F1b is formed with an engaging portion that detachably engages with an engaged portion provided at the lower end of the anchor bolt F2.
The anchor support members F1b and the reinforcing bar support members F1c are provided at predetermined intervals on the outer edge of the base member F1a. More specifically, the anchor support members F1b and the reinforcing bar support members F1c are arranged alternately.
アンカーボルトF2は、図1、図3に示すように、アンカーボルトF2の本体部となる上下方向に長尺なアンカー本体部F2aと、アンカー本体部F2aから連続して上方に延びているアンカーネジ部F2bと、アンカー本体部F2aの下端部に設けられた円板状のアンカー定着部F2cと、から主に構成されている。 As shown in Figures 1 and 3, the anchor bolt F2 is mainly composed of an anchor body F2a that is long in the vertical direction and forms the main body of the anchor bolt F2, an anchor thread portion F2b that extends upward from the anchor body F2a, and a disk-shaped anchor fixing portion F2c that is provided at the lower end of the anchor body F2a.
基礎用型枠10は、図1に示すように、基礎(基礎となる空間)の幅方向の両側部分に対向するようにそれぞれ設けられ、基礎の延出方向に沿って配置される型枠である。
組み立てられた基礎用型枠10の上面には、基礎の延出方向に沿ってアンカー吊り下げ治具20(アンカー定規21)が組み付けられる。
なお、図1において基礎用型枠10が一部省略されている。
As shown in FIG. 1, the foundation formwork 10 is provided so as to face both sides in the width direction of the foundation (space that will become the foundation) and is a formwork disposed along the extension direction of the foundation.
An anchor hanging jig 20 (anchor ruler 21) is attached to the upper surface of the assembled foundation formwork 10 along the extension direction of the foundation.
In addition, part of the foundation formwork 10 is omitted in FIG.
アンカー吊り下げ治具20は、図1-図5に示すように、基礎用型枠10(10A、10B)の上面に架設されアンカーボルトF2の水平方向における位置決めを行うためのアンカー定規21と、上下方向に長尺に延びており、アンカー定規21及びアンカーボルトF2を連結し、アンカー定規21に対してアンカーボルトF2の高さ位置を変更可能な状態で取付けられるアンカー高さ調整部材22と、から主に構成されている。 As shown in Figures 1 to 5, the anchor hanging jig 20 is mainly composed of an anchor ruler 21 that is installed on the top surface of the foundation formwork 10 (10A, 10B) and is used to position the anchor bolt F2 in the horizontal direction, and an anchor height adjustment member 22 that extends vertically and connects the anchor ruler 21 and the anchor bolt F2, and is attached in a state in which the height position of the anchor bolt F2 can be changed relative to the anchor ruler 21.
アンカー定規21は、図1、図2に示すように、所定の幅を有する平板を組み合わせた枠状体からなり、基礎用型枠10の上面に締結部材を用いて固定されている。
具体的には、アンカー定規21は、基礎用型枠10の上面に固定される枠状の型枠固定部21aと、型枠固定部21aよりも内側位置に配置され、複数のアンカー高さ調整部材22を支持する枠状のアンカー支持部21bと、型枠固定部21a及びアンカー支持部21bを連結する複数の連結部21cと、を有している。
アンカー支持部21bは、矩形枠状からなり、アンカー支持部21bの四隅には、アンカー高さ調整部材22を組み付けるための組み付け穴21dがそれぞれ形成されている。
As shown in Figs. 1 and 2, the anchor ruler 21 is made of a frame-like body made up of flat plates having a predetermined width, and is fixed to the upper surface of the foundation formwork 10 using fastening members.
Specifically, the anchor ruler 21 has a frame-shaped formwork fixing portion 21a that is fixed to the upper surface of the foundation formwork 10, a frame-shaped anchor support portion 21b that is positioned more inward than the formwork fixing portion 21a and supports a plurality of anchor height adjustment members 22, and a plurality of connecting portions 21c that connect the formwork fixing portion 21a and the anchor support portion 21b.
The anchor support portion 21b has a rectangular frame shape, and assembly holes 21d for assembling the anchor height adjustment members 22 are formed at each of the four corners of the anchor support portion 21b.
アンカー高さ調整部材22は、図2、図3に示すように、上下方向に延びてアンカー定規21(組み付け穴21d)を貫通しているボルト22a(長尺ボルト)と、ボルト22aに螺合されアンカー定規21を上下方向で挟み込む挟持ナット22b、22cと、ボルト22aの軸部分に対して上部から螺合され、上下方向に延びているナット22d(高さ調整ナット)と、から主に構成されている。
ボルト22aがナット22dの螺合穴に所定位置まで螺入された後、ナット22dの螺合穴上端部においてボルト22a及びナット22dは溶接22fによって固定され、ボルト22a及びナット22dが一体化されている。
また、ナット22dの下部には、アンカーボルトF2のアンカーネジ部F2b全体が螺合されており、アンカーネジ部F2bのネジ山全体が養生された状態となっている(図6参照)。そして、ナット22d及びアンカーボルトF2が連結されている。
As shown in Figures 2 and 3, the anchor height adjustment member 22 is mainly composed of a bolt 22a (long bolt) that extends in the vertical direction and passes through the anchor ruler 21 (assembly hole 21d), clamping nuts 22b, 22c that are screwed onto the bolt 22a and clamp the anchor ruler 21 in the vertical direction, and a nut 22d (height adjustment nut) that is screwed onto the shaft portion of the bolt 22a from above and extends in the vertical direction.
After the bolt 22a is screwed into the screw hole of the nut 22d to a predetermined position, the bolt 22a and the nut 22d are fixed at the upper end of the screw hole of the nut 22d by welding 22f, and the bolt 22a and the nut 22d are integrated together.
The entire threaded portion F2b of the anchor bolt F2 is screwed into the lower portion of the nut 22d, and the entire thread of the anchor threaded portion F2b is cured (see FIG. 6). The nut 22d and the anchor bolt F2 are then connected.
上記構成において、ボルト22a及びナット22dとアンカーボルトF2とが一体となって連結され、アンカー定規21に対してボルト22a又はナット22dの組み付け位置を調整することで、アンカーボルトF2の高さ位置を変更することが可能である。 In the above configuration, the bolt 22a and nut 22d are connected to the anchor bolt F2 as a single unit, and the height position of the anchor bolt F2 can be changed by adjusting the assembly position of the bolt 22a or nut 22d relative to the anchor ruler 21.
ところで、本実施形態では、アンカーボルトF2の位置精度を高めるために、アンカーボルトF2をアンカー支持部材F1bから同軸で立設させるとともに、アンカー定規21の組み付け穴21dとボルト22aとのクリアランスを極力小さく設定している。
そうすると、アンカーボルトF2の位置精度が高まるものの、例えば基礎コンクリートF4の打設時に、当該コンクリートの側圧によってアンカーボルトF2が流されてしまい、アンカーボルトF2が傾くことで、アンカー定規21からボルト22aが抜けなくなる。
そこで、アンカー支持部材F1bによってアンカーボルトF2を同軸で立設するように支持させて、アンカーボルトF2が傾かないように工夫している。
また、アンカーボルトF2及びナット22dの螺合によって若干の遊びを作ることで、アンカーボルトF2が幾分傾いた場合であっても、アンカー定規21からボルト22aが抜けやすくなるように工夫している。
In this embodiment, in order to increase the positional accuracy of the anchor bolt F2, the anchor bolt F2 is set upright coaxially from the anchor support member F1b, and the clearance between the assembly hole 21d of the anchor ruler 21 and the bolt 22a is set as small as possible.
This improves the positional accuracy of the anchor bolt F2. However, for example, when pouring the foundation concrete F4, the anchor bolt F2 may be swept away by the lateral pressure of the concrete, causing the anchor bolt F2 to tilt, making it impossible for the bolt 22a to be removed from the anchor ruler 21.
Therefore, the anchor bolt F2 is supported so as to be erected coaxially by the anchor support member F1b, so as to prevent the anchor bolt F2 from tilting.
In addition, by creating a small amount of play by screwing the anchor bolt F2 and the nut 22d together, the bolt 22a is designed to be easily removed from the anchor ruler 21 even if the anchor bolt F2 is slightly tilted.
また、ボルト22aの内部には、図4-図6に示すように、確認棒30を挿入するための位置確認穴22eが形成されている。
位置確認穴22eは、ボルト22aの上端部から下端部に至るまでボルト22aの軸方向に沿って鉛直にボルト22aを貫通している貫通穴である。厳密に言えば、位置確認穴22eは、図6に示すように、ボルト22aに形成された貫通穴と、ナット22dの螺合穴とが連通して形成される穴である。
また換言すれば、位置確認穴22eは、アンカー吊り下げ治具20のうち、アンカーボルトF2の真上位置に対応する位置に形成されている貫通穴である。
位置確認穴22eの大きさは、図5、図6に示すように、確認棒30が挿入可能な大きさに形成されている。例えば、位置確認穴22eの直径は、確認棒30の直径よりも若干大きな直径となるように形成されている。
As shown in FIGS. 4 to 6, a position confirmation hole 22e for inserting a confirmation rod 30 is formed inside the bolt 22a.
The position confirmation hole 22e is a through hole that passes vertically through the bolt 22a along the axial direction of the bolt 22a from the upper end to the lower end of the bolt 22a. Strictly speaking, the position confirmation hole 22e is a hole that is formed by communicating a through hole formed in the bolt 22a with a screw hole of the nut 22d, as shown in FIG.
In other words, the position confirmation hole 22e is a through hole formed in the anchor hanging jig 20 at a position corresponding to a position directly above the anchor bolt F2.
5 and 6, the size of the position confirmation hole 22e is formed to allow the confirmation rod 30 to be inserted therein. For example, the diameter of the position confirmation hole 22e is formed to be slightly larger than the diameter of the confirmation rod 30.
確認棒30は、図4-図6に示すように、アンカーボルトF2の上端部の高さ位置を確認するための部材であって、長尺な円柱状に形成された棒状体である。
確認棒30の外周面には、その上端部から下端部に至るまで軸方向の全体に亘って目盛り31が刻まれている。
確認棒30の太さは、位置確認穴22eに挿入可能な太さに形成されている。
また、確認棒30は、目盛り31が視認できるように、ボルト22aの長さとナット22dの長さを合算した長さよりも若干長く形成されている。
As shown in FIGS. 4 to 6, the checking rod 30 is a member for checking the height position of the upper end of the anchor bolt F2, and is a rod-like body formed in a long cylindrical shape.
A scale 31 is engraved on the outer circumferential surface of the check rod 30 over the entire axial direction from its upper end to its lower end.
The thickness of the confirmation rod 30 is formed to be large enough to be inserted into the position confirmation hole 22e.
The check bar 30 is formed to be slightly longer than the combined length of the bolt 22a and the nut 22d so that the scale 31 can be visually confirmed.
上記構成において、アンカー定規21に組み付けられたボルト22aの下部は、ナット22dの上部に螺合し、ナット22dの下部は、アンカーボルトF2の上部と螺合することで、アンカー定規21、ボルト22a、ナット22d及びアンカーボルトF2は、一体となって連結される。
そして、ボルト22aに形成された位置確認穴22eが、アンカーボルトF2の鉛直方向の上方に延びていることで、ボルト22aの上方から確認棒30を挿入し、確認棒30をアンカーボルトF2の上端部に当接させ、アンカーボルトF2の上端部の高さ位置を確認することが可能である。
In the above configuration, the lower part of the bolt 22a assembled to the anchor ruler 21 is screwed into the upper part of the nut 22d, and the lower part of the nut 22d is screwed into the upper part of the anchor bolt F2, so that the anchor ruler 21, the bolt 22a, the nut 22d and the anchor bolt F2 are connected together as a single unit.
Furthermore, since the position confirmation hole 22e formed in the bolt 22a extends vertically upward of the anchor bolt F2, it is possible to insert an confirmation rod 30 from above the bolt 22a and abut the confirmation rod 30 against the upper end of the anchor bolt F2, thereby confirming the height position of the upper end of the anchor bolt F2.
位置確認治具40は、図1に示すように、アンカー吊り下げ治具20のうち、複数のボルト22aの上端部に取り付けられ、柱の芯位置を確認するための治具であり、T字形状で構成されている。
具体的には、位置確認治具40は、平板上の位置確認プレートと、当該位置確認プレートのうち柱の芯位置となる部分から鉛直方向の下方に延びている下げ振りと、を備えている。
上記構成において、位置確認治具40は、アンカー吊り下げ治具20(ボルト22a)の上端よりも下方位置に配置されている。すなわち、位置確認治具40が位置確認穴22eを塞がないように配置されている。そのため、位置確認穴22eに上方から確認棒30を挿入したときに、確認棒30と位置確認治具40が干渉してしまうことを避けることができる。
As shown in FIG. 1, the position confirmation jig 40 is attached to the upper ends of the multiple bolts 22a of the anchor hanging jig 20 and is a jig for confirming the center position of the pillar, and is configured in a T-shape.
Specifically, the position confirmation jig 40 comprises a flat position confirmation plate and a plumb bob extending vertically downward from a portion of the position confirmation plate that is the core position of the pillar.
In the above configuration, the position confirmation jig 40 is disposed below the upper end of the anchor hanging jig 20 (bolt 22a). In other words, the position confirmation jig 40 is disposed so as not to block the position confirmation hole 22e. Therefore, when the confirmation rod 30 is inserted into the position confirmation hole 22e from above, interference between the confirmation rod 30 and the position confirmation jig 40 can be avoided.
<基礎施工方法>
次に、アンカー吊り下げ治具20を用いた基礎施工方法について、図7に基づいて説明する。
まずは、図1に示すように、基礎工の作業者が、基礎地盤F3上にアンカーボルト支持具F1を設置し、不図示の固定部材(例えば、コンクリート釘)を用いて固定する「アンカー支持具設置工程」(ステップS1)から始まる。
このとき、基礎地盤F3上に予め描かれた墨だし線を目印とすることで、アンカーボルト支持具F1を基礎地盤F3上の所定位置(柱の立設位置)に精度よく設置できる。
<Foundation construction method>
Next, a foundation construction method using the anchor hanging jig 20 will be described with reference to FIG.
First, as shown in FIG. 1, the process starts with an “anchor support installation process” (step S1) in which a foundation worker installs an anchor bolt support F1 on the foundation ground F3 and fixes it using a fixing member (e.g., a concrete nail) (not shown).
At this time, by using a marking line drawn in advance on the foundation ground F3 as a guide, the anchor bolt support F1 can be installed with high precision at a predetermined position (pillar erection position) on the foundation ground F3.
その後、作業者が、アンカーボルト支持具F1上にアンカーボルトF2を設置する「アンカー設置工程」を行い(ステップS2)、さらに不図示の鉄筋ユニットを組み立てる「鉄筋組み立て工程」を行う(ステップS3)。
このとき、設置された複数のアンカーボルトF2を側方から保持するように不図示の鉄筋ユニットを組み立てると良い。なお、上記ステップS2とステップS3の順番を入れ替えても良い。その場合には、鉄筋ユニットを設置し、当該鉄筋ユニットによって囲まれた領域に上方からアンカーボルトF2を設置すると良い。
Thereafter, a worker performs an "anchor installation process" in which the anchor bolt F2 is installed on the anchor bolt support F1 (step S2), and further performs a "reinforcing bar assembly process" in which a reinforcing bar unit (not shown) is assembled (step S3).
At this time, it is preferable to assemble a reinforcing bar unit (not shown) so as to hold the installed anchor bolts F2 from the side. The order of steps S2 and S3 may be reversed. In that case, it is preferable to install the reinforcing bar unit and then install the anchor bolts F2 from above in the area surrounded by the reinforcing bar unit.
その後、図1に示すように、作業者が、基礎となる空間の幅方向の両側部分に基礎用型枠10A、基礎用型枠10Bを対向するように組み立てる「型枠組み立て工程」を行い(ステップS4)、さらに、基礎用型枠10の上部にアンカー吊り下げ治具20を架設する「治具架設工程」を行う(ステップS5)。 After that, as shown in FIG. 1, workers perform a "form assembly process" in which they assemble foundation formwork 10A and foundation formwork 10B facing each other on both sides of the width of the space that will become the foundation (step S4), and then perform a "jig installation process" in which they install an anchor hanging jig 20 on top of foundation formwork 10 (step S5).
その後、図1、図3、図4に示すように、作業者が、アンカー吊り下げ治具20にアンカーボルトF2を吊り下げるように組み付ける「アンカー組み付け工程」を行う(ステップS6)。
このとき、ボルト22a及びナット22dとアンカーボルトF2とは一体となって連結され、アンカー定規21に対してボルト22a又はナット22dの組み付け位置を調整することで、アンカーボルトF2の高さ位置を変更することが可能である。
Thereafter, as shown in Figs. 1, 3 and 4, an operator performs an "anchor assembling process" in which the anchor bolt F2 is assembled so as to be suspended from the anchor suspension jig 20 (step S6).
At this time, the bolt 22a and the nut 22d are connected as a single unit to the anchor bolt F2, and by adjusting the assembly position of the bolt 22a or the nut 22d relative to the anchor ruler 21, the height position of the anchor bolt F2 can be changed.
その後、図4-図6に示すように、組み付けたアンカーボルトF2の高さ位置を確認する「アンカー確認工程」を行う(ステップS7)。
具体的には、アンカー吊り下げ治具20に形成された位置確認穴22eに、アンカーボルトF2の高さ位置を確認するための確認棒30を挿入し、アンカーボルトF2の上端部に当接させる。そうすることで、アンカーボルトF2の高さ位置を精度よく確認することが可能である。
なお、アンカーボルトF2の高さ位置が設計上の許容範囲を満たさない場合には、ステップS6に戻り、アンカーボルトF2の高さ位置を調整することになる。
Thereafter, as shown in FIGS. 4 to 6, an "anchor checking step" is performed to check the height position of the assembled anchor bolt F2 (step S7).
Specifically, an inspection rod 30 for checking the height position of the anchor bolt F2 is inserted into a position checking hole 22e formed in the anchor hanging jig 20 and brought into contact with the upper end of the anchor bolt F2. In this way, it is possible to check the height position of the anchor bolt F2 with high accuracy.
If the height position of the anchor bolt F2 does not satisfy the design tolerance, the process returns to step S6, and the height position of the anchor bolt F2 is adjusted.
上記ステップS7の工程を終えて、一連の作業工程を終了する。上記作業工程の終了後には、基礎施工治具1を取り外す。
上記ステップS1~S7の工程を行うことで、アンカーボルトF2が精度良く位置決めされる。
具体的には、アンカーボルト支持具F1及びアンカー定規21によってアンカーボルトF2の水平方向における位置決めを行うことができる。また、アンカー高さ調整部材22によってアンカーボルトF2の高さ方向における位置決めを行うことができる。
なお、アンカーボルト支持具F1のアンカー支持部材F1bを、例えば、ボルトナット機構を用いて高さ調整可能となるように構成しても良い。そうすれば、アンカー支持部材F1bに係合するアンカーボルトF2自体を回転させることで、アンカーボルトF2の高さ位置を変更することができる。
After the above step S7 is completed, the series of work steps is completed. After the above work steps are completed, the foundation construction jig 1 is removed.
By carrying out the above steps S1 to S7, the anchor bolt F2 is positioned with high precision.
Specifically, the anchor bolt F2 can be positioned in the horizontal direction by the anchor bolt support F1 and the anchor ruler 21. In addition, the anchor bolt F2 can be positioned in the height direction by the anchor height adjustment member 22.
The anchor support member F1b of the anchor bolt support F1 may be configured to be height adjustable, for example, using a bolt and nut mechanism. In this way, the height position of the anchor bolt F2 can be changed by rotating the anchor bolt F2 itself that engages with the anchor support member F1b.
なお、上記基礎施工方法において、各作業工程の順番を適宜入れ替えても良い。
例えば、S1の「アンカー支持具設置工程」、S2の「アンカー設置工程」、S3の「鉄筋組み立て工程」の前に、S4の「型枠組み立て工程」、S5の「治具架設工程」を先に行っても良い。
そのとき、S2の「アンカー設置工程」及びS6の「アンカー組み付け工程」を同時に行うこととしても良い。
また、例えば、アンカーボルト支持具F1を不要としても良い。その場合には、S1の「アンカー支持具設置工程」を省くことができる。
In the above foundation construction method, the order of each work step may be changed as appropriate.
For example, the "formwork assembling process" in S4 and the "jig erecting process" in S5 may be performed before the "anchor support installing process" in S1, the "anchor installing process" in S2, and the "rebar assembling process" in S3.
At that time, the "anchor installation step" of S2 and the "anchor assembly step" of S6 may be performed simultaneously.
Also, for example, the anchor bolt support F1 may be unnecessary. In that case, the "anchor support installation step" of S1 can be omitted.
<その他の実施形態>
上記実施形態では、アンカー吊り下げ治具20のうち、アンカー高さ調整部材22(ボルト22a)に位置確認穴22eが形成されているが、特に限定されることなく変更可能である。
具体的には、アンカー吊り下げ治具20のうち、アンカーボルトF2の真上位置に対応する部分に位置確認穴22eが形成されていれば良い。例えば、アンカーボルトF2の真上位置にアンカー定規21が配置されている場合には、アンカー定規21に位置確認穴22eが形成されていると良い。
また例えば、アンカーボルトF2の真上位置にアンカー定規21及びアンカー高さ調整部材22が配置されている場合には、アンカー定規21及びアンカー高さ調整部材22の両方に位置確認穴22eが形成されていると良い。
<Other embodiments>
In the above embodiment, the position confirmation hole 22e is formed in the anchor height adjustment member 22 (bolt 22a) of the anchor hanging jig 20, but this is not particularly limited and can be modified.
Specifically, it is sufficient that the position confirmation hole 22e is formed in a portion of the anchor hanging jig 20 that corresponds to a position directly above the anchor bolt F2. For example, when the anchor ruler 21 is disposed in a position directly above the anchor bolt F2, it is sufficient that the position confirmation hole 22e is formed in the anchor ruler 21.
Furthermore, for example, when the anchor ruler 21 and the anchor height adjustment member 22 are arranged directly above the anchor bolt F2, it is preferable that the position confirmation hole 22e is formed in both the anchor ruler 21 and the anchor height adjustment member 22.
上記実施態様では、位置確認穴22eは、アンカーボルトF2の上端部の高さ位置を確認するための確認棒30を挿入可能な大きさに形成されているが、特に限定されることなく変更可能である。
具体的には、位置確認穴22eは、所定形状に形成された部材を挿入可能な大きさに形成しても良い。
例えば、L字形状に形成された棒状体や板状体などを位置確認穴22eの上端部から挿入し、アンカーボルトF2の上端部に当接させてアンカーボルトの高さ位置を確認しても良い。
また、位置確認穴22eは、レーザー距離計などレーザー測定器のレーザー光が通過可能な大きさに形成しても良い。
例えば、位置確認穴22eの上端部にレーザー距離計を配置し、レーザー光を使用して位置確認穴22eの上端部からアンカーボルトの上端部までの距離を確認しても良い。
In the above embodiment, the position confirmation hole 22e is formed to a size that allows the insertion of an confirmation rod 30 for confirming the height position of the upper end of the anchor bolt F2, but this can be changed without being particularly limited.
Specifically, the position confirmation hole 22e may be formed to a size that allows a member formed in a predetermined shape to be inserted therein.
For example, an L-shaped rod or plate may be inserted from the upper end of the position confirmation hole 22e and brought into contact with the upper end of the anchor bolt F2 to confirm the height position of the anchor bolt.
Furthermore, the position confirmation hole 22e may be formed to a size that allows the passage of laser light from a laser measuring device such as a laser rangefinder.
For example, a laser distance meter may be disposed at the upper end of the position confirmation hole 22e, and a laser beam may be used to confirm the distance from the upper end of the position confirmation hole 22e to the upper end of the anchor bolt.
上記実施態様では、図3、図4に示すように、アンカー高さ調整部材22が、ボルト22a及びナット22dから構成される「高さ調整手段」を備えているが、高さ調整手段について特に限定されることなく変更可能である。
具体的には、機械的構造による公知な高さ調整手段を採用しても良い。
例えば、アンカーボルトの下端部にジャッキなどを用いた「高さ調整手段」を採用しても良い。
In the above embodiment, as shown in Figures 3 and 4, the anchor height adjustment member 22 is provided with a "height adjustment means" composed of the bolt 22a and the nut 22d, but the height adjustment means is not particularly limited and can be changed.
Specifically, a known height adjustment means using a mechanical structure may be used.
For example, a "height adjustment means" using a jack or the like may be used at the lower end of the anchor bolt.
上記実施形態では、主として、本発明に係るアンカー吊り下げ治具20及び基礎施工方法に関して説明した。
ただし、上記実施形態は、本発明の理解を容易にするための一例に過ぎず、本発明を限定するものではない。本発明は、その趣旨を逸脱することなく、変更、改良され得ると共に、本発明にはその等価物が含まれることは勿論である。
In the above embodiment, the anchor hanging jig 20 and the foundation construction method according to the present invention have been mainly described.
However, the above embodiment is merely an example for facilitating understanding of the present invention, and does not limit the present invention. The present invention can be modified and improved without departing from the spirit of the present invention, and the present invention naturally includes equivalents thereof.
F 基礎
F1 アンカーボルト支持具
F1a ベース部材
F1b アンカー支持部材
F1c 鉄筋支持部材
F2 アンカーボルト
F2a アンカー本体部
F2b アンカーネジ部
F2c アンカー定着部
F3 基礎地盤(捨てコンクリート)
1 基礎施工治具
10(10A、10B) 基礎用型枠
20 アンカー吊り下げ治具
21 アンカー定規
21a 型枠固定部
21b アンカー支持部
21c 連結部
21d 組み付け穴
22 アンカー高さ調整部材
22a ボルト(長尺ボルト)
22b、22c 挟持ナット
22d ナット(高さ調整ナット)
22e 位置確認穴
22f 溶接
30 確認棒
31 目盛り
40 位置確認治具
F Foundation F1 Anchor bolt support F1a Base member F1b Anchor support member F1c Reinforced bar support member F2 Anchor bolt F2a Anchor body F2b Anchor screw portion F2c Anchor fixing portion F3 Foundation ground (spare concrete)
1 Foundation construction jig 10 (10A, 10B) Foundation formwork 20 Anchor hanging jig 21 Anchor ruler 21a Formwork fixing part 21b Anchor support part 21c Connection part 21d Assembly hole 22 Anchor height adjustment member 22a Bolt (long bolt)
22b, 22c Clamping nut 22d Nut (height adjustment nut)
22e Position confirmation hole 22f Welding 30 Confirmation rod 31 Scale 40 Position confirmation jig
Claims (4)
前記基礎用型枠の上部に架設され、前記アンカーボルトの水平方向における位置決めを行うためのアンカー定規と、
上下方向に長尺に延びており、前記アンカー定規を上下方向に貫通するように前記アンカー定規と連結され、前記アンカー定規に対して前記アンカーボルトの高さ位置を変更可能な状態で取り付けられるアンカー高さ調整部材と、を有し、
前記アンカー高さ調整部材には、前記アンカーボルトが吊り下げられたときに前記アンカーボルトの高さ位置を確認するために、前記アンカー高さ調整部材の上端部から前記アンカーボルトの上端部に至るまで鉛直方向に貫通した位置確認穴が形成され、
前記アンカー高さ調整部材は、
前記アンカー定規に設けられた組み付け穴を通じて組み付けられ、上下方向に長尺なボルトと、前記ボルトの軸部分に対して螺合されるナットと、を有し、
前記アンカー定規に対して前記ボルト又は前記ナットの組み付け位置を調整することで、前記アンカーボルトの高さ位置を変更可能となるように構成され、
前記ボルトには、前記位置確認穴が形成され、
前記位置確認穴は、前記ボルトの上端部から下端部に至るまで前記ボルトの軸方向に沿って貫通していることを特徴とするアンカー吊り下げ治具。 An anchor hanging jig that is attached to the top of a foundation formwork and used to embed an anchor bolt in foundation concrete with a part of the anchor bolt protruding,
An anchor ruler that is installed on an upper portion of the foundation formwork and that is used to position the anchor bolt in a horizontal direction;
an anchor height adjustment member that extends long in the vertical direction, is connected to the anchor ruler so as to penetrate the anchor ruler in the vertical direction, and is attached in a state in which a height position of the anchor bolt can be changed relative to the anchor ruler;
a position confirmation hole is formed in the anchor height adjustment member , the position confirmation hole penetrating vertically from an upper end of the anchor height adjustment member to an upper end of the anchor bolt, in order to confirm a height position of the anchor bolt when the anchor bolt is suspended ;
The anchor height adjustment member is
The anchor includes a bolt that is long in the vertical direction and is assembled through an assembly hole provided in the anchor ruler, and a nut that is screwed onto a shaft portion of the bolt,
The height position of the anchor bolt can be changed by adjusting the assembly position of the bolt or the nut with respect to the anchor ruler,
The bolt is provided with the position confirmation hole,
An anchor hanging jig characterized in that the position confirmation hole penetrates the bolt along the axial direction from the upper end to the lower end of the bolt .
前記基礎用型枠を組み立てる型枠組み立て工程と、
前記基礎用型枠の上部に前記アンカー吊り下げ治具を架設する治具架設工程と、
前記アンカー吊り下げ治具に前記アンカーボルトを吊り下げるように組み付けるアンカー組み付け工程と、
組み付けた前記アンカーボルトの高さ位置を確認するアンカー確認工程と、を含み、
前記アンカー確認工程では、前記アンカーボルトが吊り下げられたときに前記アンカーボルトの高さ位置を確認するために、前記アンカー吊り下げ治具の上端部から前記アンカーボルトの上端部に至るまで鉛直方向に貫通した前記位置確認穴によって前記アンカーボルトの上端部の高さ位置を確認することを特徴とする基礎施工方法。 A foundation construction method using the anchor hanging jig according to claim 1 ,
a formwork assembling process for assembling the foundation formwork;
a jig installation process for installing the anchor hanging jig on the upper part of the foundation formwork;
an anchor assembling process of assembling the anchor bolt to the anchor hanging jig so as to hang it thereon;
and an anchor confirmation step of confirming a height position of the assembled anchor bolt,
The anchor confirmation step is a foundation construction method characterized in that, in order to confirm the height position of the anchor bolt when it is suspended, the height position of the upper end of the anchor bolt is confirmed by the position confirmation hole that penetrates vertically from the upper end of the anchor suspension jig to the upper end of the anchor bolt.
前記アンカー吊り下げ治具の上方から、前記アンカーボルトの高さ位置を確認するための確認棒を前記位置確認穴に挿入し、
挿入した前記確認棒を前記アンカーボルトの上端部に当接させることを特徴とする請求項3に記載の基礎施工方法。 In the anchor confirmation step,
A confirmation rod for confirming the height position of the anchor bolt is inserted into the position confirmation hole from above the anchor hanging jig;
4. The foundation construction method according to claim 3 , wherein the inserted confirmation rod is brought into contact with an upper end of the anchor bolt.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021109534A JP7663432B2 (en) | 2021-06-30 | 2021-06-30 | Anchor hanging jig and foundation construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021109534A JP7663432B2 (en) | 2021-06-30 | 2021-06-30 | Anchor hanging jig and foundation construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2023006768A JP2023006768A (en) | 2023-01-18 |
| JP7663432B2 true JP7663432B2 (en) | 2025-04-16 |
Family
ID=85106919
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2021109534A Active JP7663432B2 (en) | 2021-06-30 | 2021-06-30 | Anchor hanging jig and foundation construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7663432B2 (en) |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2001255103A (en) | 2000-03-08 | 2001-09-21 | Sekisui House Ltd | Anchor bolt length measuring tool |
| JP2020002657A (en) | 2018-06-28 | 2020-01-09 | 大和ハウス工業株式会社 | Construction method of building foundation |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3072016B2 (en) * | 1995-03-10 | 2000-07-31 | クボタハウス株式会社 | Anchor bolt mounting bracket |
| JPH116160A (en) * | 1997-06-19 | 1999-01-12 | Sekisui House Ltd | Positioning device for anchor bolts for partition foundation |
-
2021
- 2021-06-30 JP JP2021109534A patent/JP7663432B2/en active Active
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2001255103A (en) | 2000-03-08 | 2001-09-21 | Sekisui House Ltd | Anchor bolt length measuring tool |
| JP2020002657A (en) | 2018-06-28 | 2020-01-09 | 大和ハウス工業株式会社 | Construction method of building foundation |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2023006768A (en) | 2023-01-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7823348B1 (en) | Device and method for the support of both steel and precast concrete wall posts for installation | |
| JP4732915B2 (en) | Foundation construction method and device, and anchor bolt support device for construction | |
| CA3049851A1 (en) | Pillar fixing metal fitting | |
| CN113187228A (en) | Portable concrete structure sleeve pre-embedding tool and method | |
| US9909329B2 (en) | Anchor device positioning and plumbing tool and methods related thereto | |
| JP7341420B2 (en) | Anchor bolt construction jig and foundation formwork structure | |
| JP7663432B2 (en) | Anchor hanging jig and foundation construction method | |
| EP2414604B1 (en) | Building construction method | |
| JP7663431B2 (en) | Anchor bolt support, foundation construction method, and anchor bolt used in the foundation construction method | |
| JP2024159940A (en) | Anchor Support and Method of Using the Anchor Support | |
| JP4838281B2 (en) | Sheath tube holding jig | |
| JP7663433B2 (en) | Foundation construction jig and foundation construction method | |
| JP7704224B2 (en) | Anchor bolt installation tool and anchor bolt installation method | |
| KR100954209B1 (en) | Beam structure | |
| CN206346116U (en) | A kind of skewback embedded anchor bar alignment system | |
| JP2015055079A (en) | Anchor frame, and method for constructing anchor structure using the anchor frame | |
| JP6031149B2 (en) | Building unit positioning member, building unit positioning structure, and building unit installation method | |
| JP7682758B2 (en) | Positioning jig, foundation construction jig, and foundation construction method | |
| JP2546972B2 (en) | Insertion method and equipment for stress core material of column-type underground continuous wall | |
| CN217356170U (en) | Direct-buried foundation bolt mounting part | |
| WO2022254533A1 (en) | Anchor support tool and form set for foundation | |
| JP2021195834A (en) | Column base anchor structure, trestle, and design method for column base anchor structure | |
| JP2002180474A (en) | Sheath pipe holding jig | |
| JP5483059B2 (en) | Steel pipe erection stand and steel pipe erection structure using the same | |
| JP7018869B2 (en) | Fixture |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| RD01 | Notification of change of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7426 Effective date: 20210709 |
|
| RD01 | Notification of change of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7426 Effective date: 20210813 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20210712 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20210816 |
|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20240610 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20241126 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20241127 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20250127 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20250311 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20250404 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7663432 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |