JP7102063B2 - Building joint structure - Google Patents

Building joint structure Download PDF

Info

Publication number
JP7102063B2
JP7102063B2 JP2018083087A JP2018083087A JP7102063B2 JP 7102063 B2 JP7102063 B2 JP 7102063B2 JP 2018083087 A JP2018083087 A JP 2018083087A JP 2018083087 A JP2018083087 A JP 2018083087A JP 7102063 B2 JP7102063 B2 JP 7102063B2
Authority
JP
Japan
Prior art keywords
pile
joint structure
plate member
outer peripheral
cap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018083087A
Other languages
Japanese (ja)
Other versions
JP2019190103A (en
Inventor
康浩 郡司
寿昭 新井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nishimatsu Construction Co Ltd
Original Assignee
Nishimatsu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nishimatsu Construction Co Ltd filed Critical Nishimatsu Construction Co Ltd
Priority to JP2018083087A priority Critical patent/JP7102063B2/en
Publication of JP2019190103A publication Critical patent/JP2019190103A/en
Application granted granted Critical
Publication of JP7102063B2 publication Critical patent/JP7102063B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Description

本発明は、建築物の上部構造と杭とを接合する接合構造に関する。 The present invention relates to a joint structure for joining a superstructure of a building and a pile.

建築物の上部構造と杭との接合では、図1に示すように、杭10の頂部である杭頭10aが、パイルキャップ11と呼ばれる領域を介し、上部構造としての基礎梁12や柱13に一体化される。 In the joint between the superstructure of a building and a pile, as shown in FIG. 1, the pile head 10a, which is the top of the pile 10, is attached to the foundation beam 12 and the column 13 as the superstructure via a region called a pile cap 11. Be integrated.

杭頭10aには、杭頭10aに発生する曲げモーメントを伝達するため、定着筋14が溶接され、定着筋14を含む鉄筋の被り厚確保の観点から、パイルキャップ11に埋め込まれる。鉄筋の被り厚は、鉄筋を覆うコンクリートの厚さのことである。このため、パイルキャップ11は、縁空き部15と呼ばれる、杭10の側方から水平方向に突出し、縁空き部15の下面が、捨てコンおよび砕石と接し、地震時の水平力で発生する曲げモーメントやせん断力を負担する構造とされている。 In order to transmit the bending moment generated in the pile head 10a to the pile head 10a, the fixing bar 14 is welded and embedded in the pile cap 11 from the viewpoint of securing the covering thickness of the reinforcing bar including the fixing bar 14. The covering thickness of the reinforcing bar is the thickness of the concrete covering the reinforcing bar. For this reason, the pile cap 11 projects in the horizontal direction from the side of the pile 10, which is called the edge vacant portion 15, and the lower surface of the rim vacant portion 15 comes into contact with the waste container and the crushed stone, and the bending generated by the horizontal force at the time of an earthquake occurs. It has a structure that bears moments and shearing forces.

縁空き部15は、上記の曲げやせん断力に対して所定の強度を確保すべく、杭10の杭径をDとした場合、慣例として0.75Dより厚くなるように設計される。しかしながら、これではパイルキャップ11の寸法が大きくなり、施工が非効率になるという問題があった。 The rim open portion 15 is customarily designed to be thicker than 0.75D when the pile diameter of the pile 10 is D in order to secure a predetermined strength against the above-mentioned bending and shearing force. However, this causes a problem that the size of the pile cap 11 becomes large and the construction becomes inefficient.

そこで、縁空き部15を薄くし、小型化するべく、縁空き部15にプレストレスを導入し、縁空き部15を薄くすることの強度低下を補う技術が提案されている(例えば、特許文献1参照)。 Therefore, in order to make the marginal space 15 thinner and smaller, a technique has been proposed in which prestress is introduced into the marginal space 15 to compensate for the decrease in strength due to the thinning of the marginal space 15 (for example, Patent Documents). 1).

特開2017-82548号公報JP-A-2017-82548

しかしながら、上記の技術では、パイルキャップ11を工場生産によるプレキャストとしているため、事前に寸法が厳密に決定され、現場での杭施工の誤差による杭芯や杭頭レベルのばらつきに対して許容度が小さくなるという問題があった。 However, in the above technique, since the pile cap 11 is precast by factory production, the dimensions are strictly determined in advance, and the tolerance for variations in the pile core and pile head level due to errors in pile construction at the site is sufficient. There was a problem that it became smaller.

そこで、現場打ちで製造することができ、また、小型化でき、施工の合理化を図ることができる接合構造を提供することを目的とする。 Therefore, it is an object of the present invention to provide a joint structure that can be manufactured on-site, can be miniaturized, and can be rationalized in construction.

本発明は、上記課題に鑑みてなされたものであり、建築物の上部構造と杭とを接合する接合構造であって、
杭の杭頭を埋め込むように設けられ、上部構造と接合するキャップ部材と、
杭の外周面から水平方向に延びるキャップ部材の縁空き部の下面を覆うように設けられ、杭が挿通可能な穴を有する板部材と、
縁空き部の下面に隣接する板部材の上面から上部構造に向けてキャップ部材に埋め込むように設けられる1以上の棒状部材とを含む、接合構造が提供される。
The present invention has been made in view of the above problems, and is a joint structure for joining a superstructure of a building and a pile.
A cap member that is provided to embed the pile head of the pile and joins with the superstructure,
A plate member provided so as to cover the lower surface of the rim open portion of the cap member extending horizontally from the outer peripheral surface of the pile and having a hole through which the pile can be inserted.
A joint structure is provided that includes one or more rod-shaped members provided to be embedded in the cap member from the upper surface of the plate member adjacent to the lower surface of the rim open portion toward the upper structure.

本発明によれば、現場打ちで製造することができ、また、小型化でき、施工の合理化を図ることができる接合構造を提供することができる。 According to the present invention, it is possible to provide a joint structure that can be manufactured on-site, can be miniaturized, and can be rationalized in construction.

従来の上部構造と基礎杭とを接合するパイルキャップを例示した図。The figure which illustrated the pile cap which joins a conventional superstructure and a foundation pile. 従来の接合構造の一例を示した図。The figure which showed an example of the conventional joining structure. パイルキャップの縁空き部の挙動をシミュレーションした図。The figure which simulated the behavior of the rim of the pile cap. 本実施形態の接合構造の一例を示した図。The figure which showed an example of the joining structure of this embodiment. 図4の切断線A-Aで切断した断面図。The cross-sectional view cut along the cutting line AA of FIG.

本実施形態の建築物の上部構造と杭とを接合する接合構造について説明する前に、従来の接合構造について説明しておく。図2は、従来の接合構造の一例を示した図である。杭10は、建築物を支持するために地盤に打ち込まれて構築される基礎である。杭10は、例えば円筒形の既製コンクリート杭とされ、機械によって掘削された孔に埋め込まれることで設置される。既製コンクリート杭とは、工場で製作されて現場に持ち込まれ設置される杭である。杭10は、既製コンクリート杭に限定されるものではなく、鋼製の杭であってもよい。 Before explaining the joint structure for joining the superstructure of the building and the pile of the present embodiment, the conventional joint structure will be described. FIG. 2 is a diagram showing an example of a conventional joint structure. The pile 10 is a foundation constructed by being driven into the ground to support a building. The pile 10 is, for example, a cylindrical ready-made concrete pile, and is installed by being embedded in a hole excavated by a machine. Ready-made concrete piles are piles that are manufactured at the factory and brought to the site for installation. The pile 10 is not limited to the ready-made concrete pile, and may be a steel pile.

上部構造の一部である基礎梁12は、柱と柱の根元を水平に結ぶ梁で、地面の中に施工される。地面を掘り下げて所定の空間を作る根切りという作業を行った後、砕石16を敷き詰め、プレート等で転圧を掛ける。そして、捨てコンクリート17と呼ばれる、基礎の底面を平らにし、建築物の位置を決めるためのコンクリートを打設する。基礎梁12は、捨てコンクリート17の平らな面上にコンクリートを打設する等して構築される。基礎梁12は、工場で製作され現場に持ち込まれる、あるいは、現場で製作される鉄筋コンクリート製の梁に限定されるものではなく、I型鋼等の鋼製の梁であってもよい。 The foundation beam 12, which is a part of the superstructure, is a beam that horizontally connects the columns and the bases of the columns, and is constructed in the ground. After performing the work of digging the ground to create a predetermined space, the crushed stone 16 is spread and compacted with a plate or the like. Then, a concrete called abandoned concrete 17 for flattening the bottom surface of the foundation and deciding the position of the building is placed. The foundation beam 12 is constructed by placing concrete on a flat surface of the discarded concrete 17. The foundation beam 12 is not limited to the reinforced concrete beam manufactured at the factory and brought to the site, or may be a steel beam such as I-shaped steel.

杭頭10aには、杭10からその上部の上部構造に向けて延びるように、定着部材としての定着筋14が1以上設けられる。定着筋14は、キャップ部材としてのパイルキャップ11に杭10を固定するために用いられるアンカーである。ちなみに、上部構造と杭10との接合強度は、定着筋14によるのが基本とされている。定着筋14は、所定の長さの鉄筋で、杭頭10aの外周面に溶接する等して取り付けられる。 The pile head 10a is provided with one or more fixing bars 14 as fixing members so as to extend from the pile 10 toward the superstructure above the pile 10. The anchoring bar 14 is an anchor used to fix the pile 10 to the pile cap 11 as a cap member. Incidentally, the joint strength between the superstructure and the pile 10 is basically based on the fixing bar 14. The fixing bar 14 is a reinforcing bar having a predetermined length and is attached to the outer peripheral surface of the pile head 10a by welding or the like.

定着筋14は、杭10の杭径が小さいと、外周面に取り付けることができる本数が限られ、接合強度から見て、必要数設けることができない場合がある。その対策として、杭頭10aの所定の長さを、定着部として採用し、定着筋14とともに杭頭10aを埋め込むようにパイルキャップ11を構築することができる。 If the pile diameter of the pile 10 is small, the number of the fixing bars 14 that can be attached to the outer peripheral surface is limited, and the required number may not be provided in view of the joint strength. As a countermeasure, a predetermined length of the pile head 10a can be adopted as the fixing portion, and the pile cap 11 can be constructed so as to embed the pile head 10a together with the fixing bar 14.

杭頭10aを埋め込むようにパイルキャップ11を構築するため、杭頭10aの周囲の地盤を、基礎梁12の地盤より1段深く掘り下げ、その部分に砕石18を敷き詰め、捨てコンクリート19を打設する。この作業は、基礎梁12の砕石16を敷き詰め、捨てコンクリート17を打設する作業と同時に行うことができる。パイルキャップ11は、捨てコンクリート19の平らな面上に型枠を設けてコンクリートを打設し、杭10と基礎梁12とを接合するように構築される。 In order to construct the pile cap 11 so as to embed the pile head 10a, the ground around the pile head 10a is dug one step deeper than the ground of the foundation beam 12, crushed stone 18 is laid in that portion, and the discarded concrete 19 is placed. .. This work can be performed at the same time as the work of laying the crushed stone 16 of the foundation beam 12 and placing the discarded concrete 17. The pile cap 11 is constructed so that a formwork is provided on a flat surface of the waste concrete 19 and concrete is cast, and the pile 10 and the foundation beam 12 are joined.

すると、杭10の外周面から、捨てコンクリート19の平らな面に平行な水平方向に延びるパイルキャップ11の縁空き部15が形成され、地震時の水平力で発生する曲げモーメントやせん断力を縁空き部15が負担しなければならなくなる。 Then, an edge gap 15 of the pile cap 11 extending in the horizontal direction parallel to the flat surface of the waste concrete 19 is formed from the outer peripheral surface of the pile 10, and the bending moment and the shearing force generated by the horizontal force at the time of an earthquake are applied to the edge. The vacant portion 15 will have to bear the burden.

その強度を確保するため、基準等で特に定められたものではないが、慣例として、縁空き部15の厚さWは、杭10の杭径をDとした場合、0.75Dより厚くなるようにしている。 In order to secure the strength, the thickness W of the edge vacant portion 15 is set to be thicker than 0.75D when the pile diameter of the pile 10 is D, although it is not specified in particular by the standard or the like. ing.

ここで、パイルキャップ11の縁空き部15の厚さを変えて、杭10に水平力が加わった場合にパイルキャップ11の挙動がどのように変化するかについて説明する。 Here, how the behavior of the pile cap 11 changes when a horizontal force is applied to the pile 10 by changing the thickness of the edge gap 15 of the pile cap 11 will be described.

図3(a)は、慣例としての0.75Dとした場合の三次元有限要素法解析によるシミュレーション結果を示し、図3(b)は、0.75Dより薄くし、0.5Dとした場合のシミュレーション結果を示した図である。有限要素法は、上部構造およびパイルキャップを複数の要素に分割し、分割された要素毎に変位を表す近似式を導き出し、導き出した近似式から構造全体の近似解を求める手法である。水平力は、矢線に示すように、向かって左側から右側へ向けて加えられている。シミュレーション結果は、x軸方向、z軸方向への変位(mm)を示しているが、等高線(コンター)のように示される色の違いは、z軸方向の変位のみを表している。 FIG. 3A shows the simulation result by the three-dimensional finite element method analysis when 0.75D is used as a convention, and FIG. 3B shows the simulation result when the value is 0.5D, which is thinner than 0.75D. It is a figure shown. The finite element method is a method in which the superstructure and pile cap are divided into a plurality of elements, an approximate expression representing the displacement is derived for each divided element, and an approximate solution for the entire structure is obtained from the derived approximate expression. The horizontal force is applied from the left side to the right side as shown by the arrow. The simulation results show the displacement (mm) in the x-axis direction and the z-axis direction, but the color difference shown as the contour line shows only the displacement in the z-axis direction.

杭10は、矢線で示す加力方向に水平力が加えられると、水平力が加えられた部分が大きく撓もうとするが、杭頭10aにはそれに抵抗する力が作用し、杭頭10aが加力方向とは反対方向へパイルキャップ11を押す。 When a horizontal force is applied to the pile 10 in the direction of the applied force indicated by the arrow line, the portion to which the horizontal force is applied tends to bend significantly, but a force resisting the force acts on the pile head 10a, and the pile head 10a Pushes the pile cap 11 in the direction opposite to the applying direction.

縁空き部15の厚さが、0.75Dである場合、図3(a)に示すように、杭頭10aがパイルキャップ11を押すが、その厚さが充分に厚いので、大きく変位する部分はなく、シミュレーション結果からは、パイルキャップ11の形状が保持されると予測される。 When the thickness of the rim opening portion 15 is 0.75D, as shown in FIG. 3A, the pile head 10a pushes the pile cap 11, but since the thickness is sufficiently thick, the portion that is largely displaced is not included. However, from the simulation results, it is predicted that the shape of the pile cap 11 will be retained.

一方、縁空き部15の厚さが、0.5Dである場合、図3(b)に示すように、その厚さが充分ではないので、杭頭10aに隣接する部分の変位が大きく、特に縁空き部15の下面が大きく変位し、シミュレーション結果では、縁空き部15の下面がせり上がると予測される。これは、パイルキャップ11の縁空き部15の下面が、捨てコンクリート19と接しているに過ぎず、変位しやすいためであると推定される。 On the other hand, when the thickness of the edge vacant portion 15 is 0.5D, as shown in FIG. 3B, the thickness is not sufficient, so that the displacement of the portion adjacent to the pile head 10a is large, and the edge is particularly large. The lower surface of the vacant portion 15 is greatly displaced, and the simulation result predicts that the lower surface of the vacant portion 15 will rise. It is presumed that this is because the lower surface of the rim opening portion 15 of the pile cap 11 is merely in contact with the waste concrete 19 and is easily displaced.

このように地震の揺れで、水平力が加わると、縁空き部15の下面がせり上がると予測されるため、この部分がせり上がらないように補強できれば、縁空き部15の厚さを、従来の0.75Dより薄くすることができる。 When a horizontal force is applied due to the shaking of an earthquake in this way, it is predicted that the lower surface of the marginal space 15 will rise. Can be thinner than 0.75D.

そこで、接合構造を、図4に示すような構造とすることができる。図4は、本実施形態の接合構造の一例を示した図である。この接合構造は、図2に示した従来の接合構造と同様、砕石16を敷き詰め、捨てコンクリート17を打設した後に基礎梁12が構築される。また、杭頭10aに定着筋14を取り付け、砕石18を敷き詰め、捨てコンクリート19を打設した後にパイルキャップ11が構築される。なお、定着筋14は、必要に応じて設けることができる。 Therefore, the joining structure can be a structure as shown in FIG. FIG. 4 is a diagram showing an example of the joining structure of the present embodiment. In this joint structure, similarly to the conventional joint structure shown in FIG. 2, the foundation beam 12 is constructed after the crushed stone 16 is spread and the discarded concrete 17 is placed. Further, the pile cap 11 is constructed after the fixing bar 14 is attached to the pile head 10a, the crushed stone 18 is spread, and the discarded concrete 19 is placed. The fixing bar 14 can be provided as needed.

図4に示す接合構造では、縁空き部15の厚さWが、0.75Dより薄くなるように地盤を掘り下げ、砕石18を敷き詰め、捨てコンクリート19を打設した後、捨てコンクリート19の平らな面上に板部材としての補強鋼板20を配置する。板部材は、縁空き部15の下面を補強するために設けられるため、縁空き部15を構成するコンクリートより強度が高い材料により作製される。補強鋼板20には、例えば1以上のねじ溝が設けられ、各ねじ溝に、ねじ山を有する1以上の棒状部材としてのアンカー筋21が螺合される。なお、アンカー筋21は、補強鋼板20に溶接する等して固定されていてもよい。 In the joint structure shown in FIG. 4, the ground is dug down so that the thickness W of the rim opening portion 15 is thinner than 0.75D, crushed stone 18 is spread, and the waste concrete 19 is placed, and then the flat surface of the waste concrete 19 is placed. A reinforcing steel plate 20 as a plate member is arranged on the plate member. Since the plate member is provided to reinforce the lower surface of the rim open portion 15, it is made of a material having higher strength than the concrete constituting the rim open portion 15. The reinforcing steel plate 20 is provided with, for example, one or more thread grooves, and an anchor bar 21 as one or more rod-shaped members having threads is screwed into each thread groove. The anchor bar 21 may be fixed to the reinforcing steel plate 20 by welding or the like.

捨てコンクリート19上に、アンカー筋21が取り付けられた補強鋼板20を配置した後、コンクリートを打設して、杭頭10a、定着筋14、アンカー筋21を埋め込み、基礎梁12と接合するようにパイルキャップ11を構築する。 After arranging the reinforcing steel plate 20 to which the anchor bar 21 is attached on the waste concrete 19, concrete is cast so that the pile head 10a, the fixing bar 14, and the anchor bar 21 are embedded and joined to the foundation beam 12. Build the pile cap 11.

縁空き部15の厚さWは、アンカー筋21の被り厚さを確保することができる厚み以上であって、0.75Dより薄いものであれば、いかなる厚さであってもよい。被り厚さは、鉄筋を覆うコンクリートの厚さで、水、空気、酸、塩基による鉄筋の腐食を防止し、鉄筋とコンクリートとを有効に付着させ、所定の耐久性および強度を有するように、建築物の部位により規定されている。 The thickness W of the rim opening portion 15 may be any thickness as long as it is at least a thickness that can secure the covering thickness of the anchor bar 21 and is thinner than 0.75D. The cover thickness is the thickness of the concrete that covers the reinforcing bar, preventing corrosion of the reinforcing bar by water, air, acid, and base, effectively adhering the reinforcing bar and concrete, and having a predetermined durability and strength. It is regulated by the part of the building.

ところで、アンカー筋21の上部および周部は、パイルキャップ11に埋め込まれるため、被り厚さを確保することができるが、アンカー筋21の下部は、補強鋼板20に取り付けられているため、被り厚さを確保することはできない。 By the way, since the upper part and the peripheral portion of the anchor bar 21 are embedded in the pile cap 11, the covering thickness can be secured, but since the lower part of the anchor bar 21 is attached to the reinforcing steel plate 20, the covering thickness can be secured. It cannot be secured.

そこで、補強鋼板20の下面に隣接する捨てコンクリート19を、パイルキャップ11と同等のコンクリートを用い、所定の厚さに打設することで、捨てコンクリート19をアンカー筋21に対する被り厚に算入することができる。 Therefore, the waste concrete 19 adjacent to the lower surface of the reinforcing steel plate 20 is cast to a predetermined thickness using the same concrete as the pile cap 11, so that the waste concrete 19 is included in the covering thickness with respect to the anchor bar 21. Can be done.

図5は、図4に示す切断線A-Aで切断した断面図である。杭10は、中空の円管とされ、内部にコンクリートが打設されたもので、その外周面に1以上の定着筋14が溶接する等して取り付けられる。図5に示す例では、杭10の外周面に沿って45°毎に8つの定着筋14が取り付けられている。所定の接合強度を確保することができれば、定着筋14の数は何本であってもよく、その長さや径も、いかなる長さや径であってもよい。 FIG. 5 is a cross-sectional view taken along the cutting line AA shown in FIG. The pile 10 is a hollow circular pipe in which concrete is cast, and one or more fixing bars 14 are welded to the outer peripheral surface of the pile 10 to be attached. In the example shown in FIG. 5, eight anchoring bars 14 are attached at every 45 ° along the outer peripheral surface of the pile 10. As long as a predetermined joint strength can be secured, the number of fixing bars 14 may be any number, and the length and diameter thereof may be any length and diameter.

補強鋼板20は、その中央に杭10が挿通可能な穴を有し、パイルキャップ11の縁空き部15を覆うものとされる。補強鋼板20は、縁空き部15を覆うことができれば、形状は矩形に限定されるものではない。 The reinforcing steel plate 20 has a hole in the center through which the pile 10 can be inserted, and covers the rim open portion 15 of the pile cap 11. The shape of the reinforcing steel plate 20 is not limited to a rectangle as long as it can cover the open edge portion 15.

アンカー筋21は、補強鋼板20に取り付けられ、図5に示す例では、定着筋14の外周側に45°毎に8つ取り付けられている。せり上がり変形により補強鋼板20が下向きに移動しようとする力に抵抗する上向きの力を付与し、その変形を抑止することができれば、アンカー筋21の数は何本であってもよく、その長さや径も、いかなる長さや径であってもよい。 The anchor bars 21 are attached to the reinforcing steel plate 20, and in the example shown in FIG. 5, eight anchor bars 21 are attached to the outer peripheral side of the fixing bar 14 at intervals of 45 °. The number of anchor streaks 21 may be any number as long as an upward force that resists the force that the reinforcing steel plate 20 tries to move downward due to the rising deformation can be applied and the deformation can be suppressed. The sheath diameter may be any length or diameter.

また、アンカー筋21は、補強鋼板20と接続する下部のみならず、上部にもねじ山を設け、ナット等を螺合した状態でパイルキャップ11内に埋め込んでもよい。これにより、より少ない本数で、せり上がり変形に対抗することができ、また、縁空き部15の厚さWをより薄くすることができる。 Further, the anchor bar 21 may be embedded in the pile cap 11 in a state where a screw thread is provided not only at the lower portion connected to the reinforcing steel plate 20 but also at the upper portion and a nut or the like is screwed. As a result, it is possible to counter the rising deformation with a smaller number of lines, and it is possible to make the thickness W of the marginal space 15 thinner.

補強鋼板20の矩形の外周の寸法は、パイルキャップ11の断面の外周の寸法、すなわち縁空き部15の外周の寸法と同じ寸法とし、縁空き部15の下面全体を覆うことができるが、図5に示すように、縁空き部15の外周の寸法より小さくするほうが望ましい。これは、杭10の杭芯位置に施工誤差が多少発生しても、縁空き部15からはみ出すことなく、同一の部材に使用することができるからである。 The rectangular outer peripheral dimension of the reinforcing steel plate 20 is the same as the outer peripheral dimension of the cross section of the pile cap 11, that is, the outer peripheral dimension of the marginal space 15, and the entire lower surface of the marginal space 15 can be covered. As shown in 5, it is desirable that the size is smaller than the outer peripheral dimension of the marginal space 15. This is because even if a construction error occurs to some extent at the pile core position of the pile 10, it can be used for the same member without protruding from the marginal space 15.

以上のように、パイルキャップ11に埋め込んだ杭頭10aとこれを覆う縁空き部15の厚みで水平力を負担する基礎構造において、縁空き部15の下面を覆う補強鋼板20を配置することで、パイルキャップ11の縁空き部15の厚さを従来よりも薄くすることができる。これにより、パイルキャップ11の平面寸法を縮小した構造が設計可能となる。また、パイルキャップ11の平面寸法の縮小により構造や施工の合理化を図ることができる。 As described above, in the foundation structure in which the horizontal force is borne by the thickness of the pile head 10a embedded in the pile cap 11 and the edge space 15 covering the pile head 10a, the reinforcing steel plate 20 covering the lower surface of the edge space 15 is arranged. , The thickness of the rim open portion 15 of the pile cap 11 can be made thinner than before. This makes it possible to design a structure in which the plane dimension of the pile cap 11 is reduced. Further, the structure and construction can be rationalized by reducing the plane dimension of the pile cap 11.

これまで本発明の接合構造について図面に示した実施形態を参照しながら詳細に説明してきたが、本発明は、上述した実施形態に限定されるものではなく、他の実施形態や、追加、変更、削除など、当業者が想到することができる範囲内で変更することができ、いずれの態様においても本発明の作用・効果を奏する限り、本発明の範囲に含まれるものである。 Although the joining structure of the present invention has been described in detail with reference to the embodiments shown in the drawings, the present invention is not limited to the above-described embodiments, and other embodiments, additions, and modifications are made. , Deletion, etc. can be changed within the range that can be conceived by those skilled in the art, and any aspect is included in the scope of the present invention as long as the action / effect of the present invention is exhibited.

10…杭
10a…杭頭
11…パイルキャップ
12…基礎梁
13…柱
14…定着筋
15…縁空き部
16…砕石
17…捨てコンクリート
18…砕石
19…捨てコンクリート
20…補強鋼板
21…アンカー筋
10 ... Pile 10a ... Pile head 11 ... Pile cap 12 ... Foundation beam 13 ... Pillar 14 ... Fixing bar 15 ... Edge vacant part 16 ... Crushed stone 17 ... Waste concrete 18 ... Crushed stone 19 ... Waste concrete 20 ... Reinforcing steel plate 21 ... Anchor bar

Claims (5)

建築物の上部構造と杭とを接合する接合構造であって、
前記杭の杭頭を埋め込むように設けられ、前記上部構造と接合するキャップ部材と、
前記キャップ部材の 前記杭の外周面から水平方向に延びる該外周面より外側の部分である縁空き部の下面を覆うように設けられ、前記杭が挿通可能な穴を有する板部材と、
前記縁空き部の下面に隣接する前記板部材の上面から前記上部構造に向けて前記キャップ部材に埋め込むように設けられる1以上の棒状部材とを含む、接合構造。
It is a joint structure that joins the superstructure of a building and piles.
A cap member provided so as to embed the pile head of the pile and joined to the superstructure,
Of the cap member Extends horizontally from the outer peripheral surface of the pileIt is a part outside the outer peripheral surface.A plate member provided so as to cover the lower surface of the rim open portion and having a hole through which the pile can be inserted, and a plate member.
A joint structure including one or more rod-shaped members provided so as to be embedded in the cap member from the upper surface of the plate member adjacent to the lower surface of the rim open portion toward the upper structure.
前記板部材の上面の外周の寸法が、前記縁空き部の下面の外周の寸法より小さい、請求項1に記載の接合構造。 The joining structure according to claim 1, wherein the outer peripheral dimension of the upper surface of the plate member is smaller than the outer peripheral dimension of the lower surface of the open edge portion. 前記縁空き部の厚さが、前記杭の杭径に0.75を乗算して得られる厚さより薄い、請求項1または2に記載の接合構造。 The joint structure according to claim 1 or 2, wherein the thickness of the vacant portion is thinner than the thickness obtained by multiplying the pile diameter of the pile by 0.75. 前記板部材の下面は、該板部材の下面に打設された捨てコンクリートにより覆われる、請求項1~3のいずれか1項に記載の接合構造。 The joint structure according to any one of claims 1 to 3, wherein the lower surface of the plate member is covered with waste concrete cast on the lower surface of the plate member. 前記杭から前記上部構造に向けて延びるように該杭の杭頭に設けられる1以上の定着部材を含み、
前記キャップ部材は、前記1以上の定着部材を埋め込むように設けられる、請求項1~4のいずれか1項に記載の接合構造。
Includes one or more anchoring members provided at the pile head of the pile so as to extend from the pile towards the superstructure.
The joining structure according to any one of claims 1 to 4, wherein the cap member is provided so as to embed the one or more fixing members.
JP2018083087A 2018-04-24 2018-04-24 Building joint structure Active JP7102063B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018083087A JP7102063B2 (en) 2018-04-24 2018-04-24 Building joint structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018083087A JP7102063B2 (en) 2018-04-24 2018-04-24 Building joint structure

Publications (2)

Publication Number Publication Date
JP2019190103A JP2019190103A (en) 2019-10-31
JP7102063B2 true JP7102063B2 (en) 2022-07-19

Family

ID=68389438

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018083087A Active JP7102063B2 (en) 2018-04-24 2018-04-24 Building joint structure

Country Status (1)

Country Link
JP (1) JP7102063B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008144471A (en) 2006-12-11 2008-06-26 Shimizu Corp Pile head connection structure and method of constructing the same
JP2016223094A (en) 2015-05-28 2016-12-28 ジャパンパイル株式会社 Pile head connection device, pile head connection structure, and pile head connection method
JP2017082548A (en) 2015-10-30 2017-05-18 高周波熱錬株式会社 Concrete foundation joint member and pile structure
JP2018031206A (en) 2016-08-25 2018-03-01 ジャパンパイル株式会社 Pile head joint part

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008144471A (en) 2006-12-11 2008-06-26 Shimizu Corp Pile head connection structure and method of constructing the same
JP2016223094A (en) 2015-05-28 2016-12-28 ジャパンパイル株式会社 Pile head connection device, pile head connection structure, and pile head connection method
JP2017082548A (en) 2015-10-30 2017-05-18 高周波熱錬株式会社 Concrete foundation joint member and pile structure
JP2018031206A (en) 2016-08-25 2018-03-01 ジャパンパイル株式会社 Pile head joint part

Also Published As

Publication number Publication date
JP2019190103A (en) 2019-10-31

Similar Documents

Publication Publication Date Title
KR101556545B1 (en) Method for constructing using a double wall Precast Concrete
KR101708760B1 (en) Construction method for precast concrete wall
KR100862005B1 (en) Manufacturing method of segmental internally confined hollow concrete filled tube
JP2008231799A (en) Base isolation structure
KR20130026311A (en) Precast bridge post
JP2008266910A (en) Projection structure of anchorage or deviator of tendon, and construction method therefor
JP6393588B2 (en) Existing building reinforcement method
JP6849871B2 (en) Culvert wall structure and culvert wall construction method
JP2016205051A (en) Construction method for structure
JP7102063B2 (en) Building joint structure
JP5457276B2 (en) Underground pillar construction
JP4420697B2 (en) Standing structure of steel pipe columns
WO2015146907A1 (en) Beam member and framework employing same
JP5270255B2 (en) Foundation reinforcement method for existing wooden houses
JP2017082548A (en) Concrete foundation joint member and pile structure
JP2007162237A (en) Skeleton reinforcing structure
JP2011021379A (en) Reinforcing method for existing building and reinforcing structure
JP4449595B2 (en) Column-beam joint structure, method for constructing column-beam joint structure, method for constructing underground structure, and building
JP6684088B2 (en) Seismic retrofitting structure and method for existing buildings
JP5024696B2 (en) Seismic reinforcement structure for existing buildings
JP6611303B2 (en) Foundation structure
JP6083001B1 (en) Reinforcement structure of building
JP6220315B2 (en) Joining structure and joining method
JP6232190B2 (en) Joint components, concrete placement methods, concrete structures
JP6934356B2 (en) Concrete foundation reinforcement structure for columns

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210208

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20211222

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220104

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220302

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220705

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220705

R150 Certificate of patent or registration of utility model

Ref document number: 7102063

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150