JP6573491B2 - Connecting structure of support column to support metal, installation structure of fence body and driftwood flow system - Google Patents

Connecting structure of support column to support metal, installation structure of fence body and driftwood flow system Download PDF

Info

Publication number
JP6573491B2
JP6573491B2 JP2015122691A JP2015122691A JP6573491B2 JP 6573491 B2 JP6573491 B2 JP 6573491B2 JP 2015122691 A JP2015122691 A JP 2015122691A JP 2015122691 A JP2015122691 A JP 2015122691A JP 6573491 B2 JP6573491 B2 JP 6573491B2
Authority
JP
Japan
Prior art keywords
support
ground
fence
fence body
ground surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015122691A
Other languages
Japanese (ja)
Other versions
JP2017008510A (en
Inventor
丈示 嶋
丈示 嶋
Original Assignee
丈示 嶋
丈示 嶋
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 丈示 嶋, 丈示 嶋 filed Critical 丈示 嶋
Priority to JP2015122691A priority Critical patent/JP6573491B2/en
Publication of JP2017008510A publication Critical patent/JP2017008510A/en
Application granted granted Critical
Publication of JP6573491B2 publication Critical patent/JP6573491B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、地表面に設置された支圧金物に対して柵体用の支柱を連結する支圧金物に対する支柱の連結構造その支柱の連結構造における2本以上の支柱間に設けられた柵体を備える柵体の設置構造及び流木導流システムに関するものである。 The present invention, fence provided coupling structure of the post for Bearing hardware for connecting the strut of fence body, between two or more struts in connecting structure of the struts with respect to bearing capacity hardware installed in the ground surface The present invention relates to an installation structure of a fence body including a body and a driftwood flow guiding system .

従来より、接地板を介して地表面に緊張力を付与することにより、これを安定化させる支圧金物が提案されている。この支圧金物は、例えば特許文献1に示すように、地中に貫入されてアンカー機能を果たす引張り部材と、引張り部材の地上突出部に装着されて当該引張り部材に与えられた緊張力を地表面に伝達する接地板とを備えている。特に、この特許文献1の開示技術では、複数の接地板間をワイヤにより緊張連結することにより、地表面の安定化区域全体として地盤強度の向上を図ることに主眼をおいたものである。具体的には接地板上に立設された補強用リブとしての脚板に切欠を設けた上でこれにワイヤを挿通させて緊張可能とされている。   Conventionally, a support metal has been proposed that stabilizes the ground surface by applying tension to the ground surface via a ground plate. For example, as shown in Patent Document 1, the bearing metal is provided with a tension member that penetrates into the ground and performs an anchor function, and a tension force that is attached to the ground protruding portion of the tension member and applied to the tension member. And a ground plate that transmits to the surface. In particular, the technique disclosed in Patent Document 1 focuses on improving the ground strength as a whole of the stabilization area of the ground surface by connecting the ground plates to each other by tension. Specifically, a leg plate as a reinforcing rib standing on the ground plate is provided with a notch, and a wire is inserted through the leg plate to allow tension.

上述の如き支圧金物を用いて地表面を安定化させる安定化工法では、地面の整形や樹木の伐採等の作業が殆ど必要とされない。このため、樹木の保全、景観維持等の点で、自然斜面からなる地表面を安定化させる工法として優れている。   In the stabilization method of stabilizing the ground surface using the support metal as described above, operations such as ground shaping and tree cutting are hardly required. For this reason, it is excellent as a construction method that stabilizes the ground surface composed of natural slopes in terms of maintaining trees and maintaining the landscape.

しかしながら、このような自然斜面においては一般に、不安定な土塊、浮石が混在しているため、安定化施工をしたその斜面から落石が生じる場合がある。このような落石に対して、特許文献1に示すような接地板間をワイヤにより緊張連結する技術では、落石防止を図ることができない。このため、地表面の安定化を図るとともに落石防止を図ることが可能な斜面安定化工法が提案されている(例えば、特許文献2参照。)。この特許文献2の開示技術によれば、接地板間を連結する親ロープにより大きな三角形網目を形成し、その中に子ロープによる網目の小さい落石防止用網を形成する。この落石防止用網の子ロープによる細かい網目が浮石・転石を押さえて、落石を防止することができる。   However, in general, unstable rocks and floats are mixed on such natural slopes, and rock fall may occur from the slopes that have been stabilized. With respect to such falling rocks, the technique of tension-connecting the ground plates as shown in Patent Document 1 with a wire cannot prevent falling rocks. For this reason, a slope stabilization method that can stabilize the ground surface and prevent falling rocks has been proposed (see, for example, Patent Document 2). According to the technique disclosed in Patent Document 2, a large triangular mesh is formed by a parent rope connecting between ground plates, and a small rock fall prevention net is formed therein by a child rope. The fine mesh by the rope for preventing falling rocks can prevent the falling rocks and rolling stones to prevent falling rocks.

特開平9−111761号公報Japanese Patent Laid-Open No. 9-111761 特開2004−124689号公報Japanese Patent Application Laid-Open No. 2004-124689

ところで、近年の多発する集中豪雨やこれに伴う斜面崩壊等により木が地表面から崩れ落ちる場合があり、また上述した斜面安定化工法が施されていない更なる斜面上方の木々が押し倒されて斜面を流下してくる場合がある。このような斜面上を落下又は流下してくる木については、斜面の麓にある道路や民家にそのまま落下するのを防止する観点からこれを捕捉し、ひいては沢すじや渓流等に導くことが望ましい。   By the way, there are cases where trees fall from the ground surface due to the recent heavy rains and the accompanying slope collapse, and the trees above the slope where the slope stabilization method described above has not been applied are pushed down and the slope is It may flow down. For trees that fall or flow down on such slopes, it is desirable to capture them from the viewpoint of preventing them from falling on the roads and private houses at the foot of the slope, and to lead to swaths, mountain streams, etc. .

これに対して、上述した構成からなる特許文献2の開示技術によれば、地表面の安定化と落石の防止を図ることができるものの、このような斜面上を落下又は流下してくる木については、これを捕捉し、ひいては沢すじや渓流等に導くことができない。このため、特許文献2の開示技術によれば、落下又は流下してくる木がそのまま斜面下方に向けて落ちていくだけであるため、斜面の麓にある道路や民家に甚大な被害を及ぼしてしまうのを防止することができないという問題点があった。   On the other hand, according to the technique disclosed in Patent Document 2 having the above-described configuration, although it is possible to stabilize the ground surface and prevent falling rocks, about trees that fall or flow down on such slopes Can't catch this and eventually lead to swamps and mountain streams. For this reason, according to the technology disclosed in Patent Document 2, a tree that falls or flows down is just dropped downward on the slope, which causes serious damage to roads and private houses at the foot of the slope. There was a problem that it could not be prevented.

そこで本発明は、上述した問題点に鑑みて案出されたものであり、その目的とするところは、地表面の安定化を図ると共に、地表面を流下してくる木を捕捉し、望ましくはこれを沢すじや渓流等に導くことにより、斜面の麓にある道路や民家に甚大な被害を及ぼしてしまうのを防止することが可能な、支圧金物に対する支柱の連結構造柵体の設置構造及び流木導流システムを提供することにある。 Therefore, the present invention has been devised in view of the above-described problems, and its object is to stabilize the ground surface and capture trees flowing down the ground surface. by directing it to swamp streaks and streams, etc., which can be prevented from being adversely extensive damage to roads and houses at the foot of the slope, the coupling structure of the struts with respect Bearing hardware, installation of the fence member It is to provide a structure and driftwood flow system .

本発明者らは上述した課題を解決するために、地中に貫入されてアンカー機能を果たす引張り部材と、上記引張り部材の地上突出部に装着されて当該引張り部材に与えられた緊張力を地表面に伝達する接地板と、接地板上面に略垂直に立設される補強用リブとを有する支圧金物により地表面の安定化を図ると共に、その支圧金物における補強用リブに設けられた貫通孔に挿通されたピン構造を介して回動自在に連結され、その上部にはワイヤロープが連結されている支柱に設けられた柵体により、地表面を流下してくる木を捕捉し、或いはこれを沢すじや渓流等に導くことが可能な支圧金物に対する支柱の連結構造柵体の設置構造及び流木導流システムを発明した。 In order to solve the above-mentioned problems, the present inventors apply a tension member that penetrates into the ground and performs an anchor function, and a tension force that is attached to the ground protruding portion of the tension member and applied to the tension member. The ground surface is stabilized by a bearing metal having a ground plate transmitting to the surface and a reinforcing rib standing substantially vertically on the upper surface of the ground plate, and provided on the reinforcing rib in the bearing metal. Through the pin structure inserted through the through hole, it is rotatably connected, and the upper part captures the tree flowing down the ground surface by the fence provided on the pillar to which the wire rope is connected, Alternatively, the invention has invented a structure for connecting a column to a bearing metal that can lead this to a swirl or a mountain stream , an installation structure of a fence body, and a driftwood diversion system .

請求項1記載の支圧金物に対する支柱の連結構造は、地表面の安定化工法に用いられる、地表面に設置された支圧金物に対して柵体用の支柱を連結する支圧金物に対する支柱の連結構造であって、上記支圧金物は、地中に貫入されてアンカー機能を果たす引張り部材と、上記引張り部材の地上突出部に装着されて当該引張り部材に与えられた緊張力を地表面に伝達する接地板と、上記接地板上面に略垂直に立設される補強用リブとを有し、上記支柱は、上記支圧金物における補強用リブに設けられた貫通孔に挿通されたピン構造を介して回動自在に連結され、その上部にはワイヤロープが連結され、前記支柱に連結された一の前記支圧金物における前記引張り部材の長さは、一の前記支圧金物に離間して設置されるとともに前記支柱とは独立した他の支圧金物における引張り部材の長さよりも長いことを特徴とする。 The strut connection structure for a support metal fitting according to claim 1 is used for a ground stabilization method . The support strut for a support metal fitting for connecting a support pillar for a fence to a support metal installed on the ground surface. In the connecting structure, the support metal is inserted into the ground to perform an anchoring function, and a tension member attached to the ground projecting portion of the tensioning member to apply the tension applied to the tensioning member to the ground surface. And a reinforcing rib standing substantially vertically on the upper surface of the grounding plate, and the support column is inserted into a through hole provided in the reinforcing rib of the bearing metal A wire rope is connected to the upper part of the support member, and the length of the tension member in the one support metal connected to the support is separated from the one support metal. And independent from the support And wherein longer than the length of the other tension in Bearing hardware member.

請求項2記載の支圧金物に対する支柱の連結構造は、請求項1記載の発明において、上記接地板は、斜面の地表面に当接され、上記補強用リブは、平面視で上記支圧金物における地上突出部を中心に互いに異なる方向へ伸びる2本以上で構成され、上記貫通孔は、上記斜面に対してより下方に伸びる補強用リブに設けられていることを特徴とする。   According to a second aspect of the present invention, in the invention, the grounding plate is brought into contact with the ground surface of the slope, and the reinforcing rib is arranged in a plan view. The above-mentioned through hole is provided in a reinforcing rib that extends further downward with respect to the inclined surface.

請求項3記載の支圧金物に対する支柱の連結構造は、請求項1又は2記載の発明において、上記支柱は、上記ピン構造による回動方向に対して更に他の方向に回動自在に設けられていることを特徴とする。   According to a third aspect of the present invention, in the invention, the support column is provided so as to be rotatable in another direction with respect to the rotation direction of the pin structure. It is characterized by.

請求項4記載の支圧金物に対する支柱の連結構造は、請求項1〜3のうち何れか1項記載の発明において、上記支柱は、その軸方向を中心として回転自在に設けられていることを特徴とする。   According to a fourth aspect of the present invention, there is provided a structure for connecting the support column to the bearing metal according to any one of the first to third aspects, wherein the support column is provided to be rotatable about its axial direction. Features.

請求項5記載の柵体の設置構造は、請求項1〜4のうち何れか1項に記載の支柱の連結構造における2本以上の上記支柱間に設けられた柵体を備えることを特徴とする。   The installation structure of the fence body of Claim 5 is provided with the fence body provided between the two or more said support | pillars in the connection structure of the support | pillar of any one of Claims 1-4, To do.

請求項6記載の柵体の設置構造は、請求項5記載の発明において、請求項1〜4のうち
何れか1項に記載の支柱の連結構造における上記接地板は、斜面の地表面に当接され、1組の上記柵体は、2本以上の上記支柱の間にフェンス用ロープと、フェンスパネルを設置して構成され、2組以上の上記柵体は、互いに離間されて設けられ、柵体が設けられる支柱間の方向は、上記組間において、斜面下方ほど水平方向に近づくように設定されていることを特徴とする。
The installation structure of the fence body according to claim 6 is the invention according to claim 5, wherein the grounding plate in the strut connection structure according to any one of claims 1 to 4 contacts the ground surface of the slope. is contact, a set of the Sakutai includes a fence rope between two or more of the above post, is constructed by installing a fence panel, two or more sets of the Sakutai is set vignetting are spaced from each other The direction between the support columns provided with the fence body is set so as to approach the horizontal direction toward the lower side of the slope between the groups.

請求項7記載の柵体の設置構造は、請求項6記載の発明において、上下に隣接する柵体
は、互いに離間されてなり、かつ上記水平方向に向けて重複する領域を有するように設け
られていることを特徴とする。
請求項8記載の流木導流システムは、地表面を流下してくる木を流下領域に導流するための地表面の安定化工法を兼ね備えた流木導流システムであって、請求項5〜7の何れか1項に記載の柵体の設置構造を備え、前記柵体は、流下領域に繋がるように設けられることを特徴とする。
The installation structure of the fence body according to claim 7 is the invention according to claim 6, wherein the vertically adjacent fence bodies are provided so as to be spaced apart from each other and have an area overlapping in the horizontal direction. It is characterized by.
The driftwood diversion system according to claim 8 is a driftwood diversion system having a ground surface stabilization method for introducing a tree flowing down the ground surface to the flow area. It is characterized by providing the installation structure of the fence body of any one of these, The said fence body is provided so that it may connect with a flow-down area | region.

上述の如き構成からなる本発明によれば、支圧金物による地盤支持力を向上させることによる地表面の安定化と落石の防止を実現することができ、更に、地表面を流下してくる木を柵体を介して捕捉することも可能となる。近年の多発する集中豪雨やこれに伴う斜面崩壊等により木が地表面から崩れ落ちる場合があり、また上述した斜面安定化工法が施されていない更なる斜面上方の木々が押し倒されて斜面を流下してくる場合がある。このような斜面上を落下又は流下してくる木は、柵体に到達した場合に、これにより捕捉されることになる。その結果、斜面の麓にある道路や民家に流下してくる木がそのまま落下するのを防止することが可能となり、道路や民家に甚大な被害が及ぶのを防止することができる。   According to the present invention having the above-described configuration, it is possible to realize stabilization of the ground surface and prevention of falling rocks by improving the ground supporting force by the bearing metal, and furthermore, the tree flowing down the ground surface Can be captured through the fence body. Trees may fall from the ground surface due to frequent heavy rains and slope failures accompanying this, and trees above the slope where the slope stabilization method described above has not been applied are pushed down and flow down the slope. May come. Trees falling or flowing down on such slopes are captured by this when they reach the fence. As a result, it is possible to prevent the trees flowing down the roads and private houses at the foot of the slope from falling as they are, and it is possible to prevent the roads and private houses from being seriously damaged.

これに加えて本発明は、柵体が渓流等の流下領域に繋がるように設けられていてもよい。これにより、流下してきた木は、この柵体により案内されて流下領域へと導かれることになる。流下領域に導かれた木は、そのまま渓流の流れに沿って下流側へと流れていくこととなる。これにより、流下してくる木が斜面の麓にある道路や民家にそのまま落下するのをより強固に防止することが可能となる。   In addition to this, the present invention may be provided such that the fence body is connected to a downstream area such as a mountain stream. As a result, the tree that has flowed down is guided by the fence and guided to the flow-down area. The trees led to the downflow area will flow downstream along the mountain stream. As a result, it is possible to more firmly prevent the flowing down tree from falling on the road or private house at the foot of the slope.

本発明を適用した柵体の設置構造の全体構成について説明するための図である。It is a figure for demonstrating the whole structure of the installation structure of the fence which applied this invention. 本発明を適用した柵体の設置構造を地表上に接地した例を示す図である。It is a figure which shows the example which earth | grounded the installation structure of the fence body to which this invention was applied on the ground surface. 本発明を適用した柵体の設置構造を構成する支圧金物と支柱との連結構造の側面図である。It is a side view of the connection structure of the bearing metal which comprises the installation structure of the fence body to which this invention is applied, and a support | pillar. 本発明を適用した柵体の設置構造を構成する支圧金物の断面図である。It is sectional drawing of the bearing metal which comprises the installation structure of the fence which applied this invention. 本発明を適用した柵体の設置構造を構成する支圧金物の平面図である。It is a top view of the bearing metal which comprises the installation structure of the fence which applied this invention. 支圧金物と支柱との間に設けられるピン構造の構成について説明するための図である。It is a figure for demonstrating the structure of the pin structure provided between a bearing metal and a support | pillar. 支圧金物と支柱との間に設けられるピン構造の詳細な構成について説明するための図である。It is a figure for demonstrating the detailed structure of the pin structure provided between a bearing metal and a support | pillar. (a)は、支柱に対するワイヤロープの連結例について説明するための図であり、(b)は、他の支圧金物に対してワイヤロープを固定する例について説明するための図である。(A) is a figure for demonstrating the connection example of the wire rope with respect to a support | pillar, (b) is a figure for demonstrating the example which fixes a wire rope with respect to another bearing metal. 柵体の構成について説明するための図である。It is a figure for demonstrating the structure of a fence body. 支柱を支圧金物に対して2軸により回動自在に構成したピン構造の例を示す図である。It is a figure which shows the example of the pin structure which comprised the support | pillar so that rotation with respect to the bearing metal was possible by 2 axes | shafts. 支柱の軸を中心として回転自在に設けた例について説明するための図である。It is a figure for demonstrating the example provided rotatably about the axis | shaft of the support | pillar. 支柱の軸を中心として回転自在に設ける場合における他の実施形態について説明するための図である。It is a figure for demonstrating other embodiment in the case of providing rotatably about the axis | shaft of a support | pillar. ワイヤロープを支柱に取り付ける他の例について説明するための図である。It is a figure for demonstrating the other example which attaches a wire rope to a support | pillar.

以下、本発明を適用した柵体の設置構造の実施形態について、図面を参照しながら詳細に説明をする。   Hereinafter, embodiments of a fence installation structure to which the present invention is applied will be described in detail with reference to the drawings.

本発明を適用した柵体の設置構造1は、図1、2に示すように、斜面からなる地表面2に設置され、柵体5を介して斜面上を落下又は流下する木を捕捉し、或いは沢すじや渓流等を始めとした流下領域7へと導くものである。この設置構造1は、支圧金物3と、支圧金物3に対して連結された支柱4と、支柱4間に架設された柵体5とを備えている。   As shown in FIGS. 1 and 2, the installation structure 1 of the fence body to which the present invention is applied is installed on the ground surface 2 formed of a slope, and captures trees that fall or flow down on the slope via the fence body 5. Or it leads to the flow down area 7 including a swamp and a mountain stream. The installation structure 1 includes a support metal 3, a support column 4 connected to the support metal 3, and a fence body 5 installed between the support columns 4.

図3は、この支圧金物3と支柱4との連結構造の側面図である。図4は、支圧金物3の断面図であり、図5はその平面図である。   FIG. 3 is a side view of the connection structure between the bearing metal 3 and the column 4. 4 is a cross-sectional view of the bearing metal 3 and FIG. 5 is a plan view thereof.

支圧金物3は、地中に貫入されてアンカー機能を果たす引張部材34と、引張部材34の地上突出部32に装着される接地板31と、接地板31の略中央に設けられる断面円形の短管43と、接地板31上面及び短管43の外周面に当接された状態で接合される鋼製の補強用リブ33と、結合補強プレート49とを有している。   The support metal 3 has a tensile member 34 that penetrates into the ground and performs an anchor function, a ground plate 31 that is mounted on the ground protrusion 32 of the tensile member 34, and a circular cross-section that is provided at the approximate center of the ground plate 31. It has a short pipe 43, a steel reinforcing rib 33 that is joined in contact with the upper surface of the ground plate 31 and the outer peripheral surface of the short pipe 43, and a coupling reinforcing plate 49.

引張部材34は、ロックボルト42と、ロックボルト42の下端に設けられたビット37と、上下のロックボルト42を連結するためのカプラ38とを備えている。   The tension member 34 includes a lock bolt 42, a bit 37 provided at the lower end of the lock bolt 42, and a coupler 38 for connecting the upper and lower lock bolts 42.

また地上突出部32は、ロックボルト42の上端に設けられたねじ付き球面座金39と、このねじ付き球面座金39にあてがわれてロックボルト42に螺着される球面付きナット40と、この球面付きナット40並びにねじ付き球面座金39を被覆するカバー44と、カバー44内に充填された充填材45とを備えている。   The ground protrusion 32 includes a threaded spherical washer 39 provided at the upper end of the lock bolt 42, a spherical nut 40 which is applied to the threaded spherical washer 39 and is screwed to the lock bolt 42, and the spherical surface. The cover 44 covers the nut 40 and the threaded spherical washer 39, and the filler 45 filled in the cover 44.

ロックボルト42は、例えば中空で外周にネジ山を有する棒鋼等で構成され、地中の深さ方向に向けて延伸されている。このロックボルト42は、延伸深さに応じて必要な本数が決められ、カプラ38を介して連結されることとなる。カプラ38は、連結すべきロックボルト42を締め込んで固定するための図示しない締め込み部が設けられている。このようなカプラ38を介してロックボルト42を強固に固定することにより、当該ロックボルト42に緊張力が付与された場合においても、その抜け出しを防止することが可能となる。ビット37は、貫入孔46を削孔しロックボルト42を地中へ推進させる際に用いられ、計画深度まで到達した後はそのまま地中に埋設される。   The lock bolt 42 is made of, for example, a steel bar that is hollow and has a thread on the outer periphery, and extends in the depth direction in the ground. The required number of the lock bolts 42 is determined according to the extension depth, and is connected via the coupler 38. The coupler 38 is provided with a tightening portion (not shown) for tightening and fixing the lock bolt 42 to be connected. By firmly fixing the lock bolt 42 via such a coupler 38, even when a tension force is applied to the lock bolt 42, it is possible to prevent the lock bolt 42 from coming out. The bit 37 is used when the penetration hole 46 is drilled and the lock bolt 42 is propelled into the ground. After reaching the planned depth, the bit 37 is buried in the ground as it is.

ねじ付き球面座金39は、ロックボルト42の上端に挿通されており、その外周面にはネジが形成され、このネジにカバー44の下端内周に設けられたネジが螺合されることにより当該カバー44が取り付けられている。このねじ付き球面座金39は、短管43の上に取り付けられた座金プレートの上に配置されてロックボルト42が挿通され、上述した球面付きナット40がロックボルト42に螺着されることにより固定される。カバー44内に充填される充填材45は、例えば防錆油などで構成されている。   The threaded spherical washer 39 is inserted into the upper end of the lock bolt 42, a screw is formed on the outer peripheral surface thereof, and the screw provided on the inner periphery of the lower end of the cover 44 is screwed into the screw. A cover 44 is attached. The threaded spherical washer 39 is disposed on a washer plate mounted on a short tube 43 and a lock bolt 42 is inserted, and the above-described spherical nut 40 is screwed onto the lock bolt 42 to be fixed. Is done. The filler 45 filled in the cover 44 is made of, for example, rust preventive oil.

接地板31は、鋼板から構成されており、その略中央付近には、ロックボルト42を挿通させるための開口が形成されており、さらにその開口の直上には、地上突出部32を構成する短管43が溶接により固着されている。接地板31の平面視の形状は、図5に示すように、三角形の角部を面取りした形状とされていてもよいが、これに限定されるものではない。   The ground plate 31 is made of a steel plate. An opening for inserting the lock bolt 42 is formed in the vicinity of the approximate center of the ground plate 31, and a short portion constituting the ground protrusion 32 is formed immediately above the opening. The tube 43 is fixed by welding. As shown in FIG. 5, the shape of the ground plate 31 in plan view may be a shape in which a corner portion of a triangle is chamfered, but is not limited thereto.

補強用リブ33は、接地板31に対して略垂直方向に向けて立設されている。補強用リブ33は、接地板31に対して例えば溶接等により固着されている。この補強用リブ33は、平面視で図5に示すように地上突出部32を中心に互いに異なる方向へ伸びる2本以上で構成されていてもよいが、これに限定されるものではなく、1本以上であれば何本で構成されていてもよいし、またいかなる方向に伸びるものであってもよい。但し、以下の例では、補強用リブ33につき、互いに異なる3方向に伸び、平面視でほぼ120°間隔で形成されている場合を例にとり説明をする。なお、この補強用リブ33において短管43との当接部分においては、切欠33aを設けるようにしてもよい。また補強用リブ33には、貫通孔36が形成されている。   The reinforcing rib 33 is erected in a substantially vertical direction with respect to the ground plate 31. The reinforcing rib 33 is fixed to the ground plate 31 by, for example, welding. As shown in FIG. 5, the reinforcing ribs 33 may be composed of two or more extending in different directions around the ground protrusion 32 as shown in FIG. 5, but are not limited to this. As long as it is more than this number, it may be composed of any number and may extend in any direction. However, in the following example, the case where the reinforcing ribs 33 extend in three different directions and are formed at intervals of approximately 120 ° in plan view will be described as an example. It should be noted that a notch 33 a may be provided in a portion of the reinforcing rib 33 that contacts the short pipe 43. A through hole 36 is formed in the reinforcing rib 33.

結合補強プレート49は、少なくとも一の補強用リブ33における貫通孔36の近傍に立設されている。この結合補強プレート49は、その面内方向が、補強用リブ33の伸びる方向と平行となるように配設されている。なお、結合補強プレート49の構成は省略するようにしてもよい。また結合補強プレート49は、2枚立設させるようにしてもよい。かかる場合には、補強用リブ33の両脇に結合補強プレート49を並列させるようにしてもよい。   The joint reinforcing plate 49 is erected in the vicinity of the through hole 36 in at least one reinforcing rib 33. The coupling reinforcing plate 49 is disposed so that the in-plane direction thereof is parallel to the direction in which the reinforcing rib 33 extends. Note that the configuration of the coupling reinforcing plate 49 may be omitted. Two coupling reinforcing plates 49 may be erected. In such a case, the joint reinforcing plates 49 may be juxtaposed on both sides of the reinforcing rib 33.

上述した支圧金物3を介して地表面2を安定化させる場合、まずロックボルト42の下端部のビット37により、図4に示すように地中に貫入させる。ロックボルト42を貫入するための貫入孔46は、作業者がドリルを手で操作して行うようにして予め開削しておくようにしてもよい。   When the ground surface 2 is stabilized via the above-mentioned support metal 3, first, the bit 37 at the lower end of the lock bolt 42 is inserted into the ground as shown in FIG. 4. The penetration hole 46 for penetrating the lock bolt 42 may be opened beforehand by an operator operating the drill manually.

そして、このロックボルト42と貫入孔46との間の空間に、グラウト等の充填材を充填する。   A space between the lock bolt 42 and the through hole 46 is filled with a filler such as grout.

支圧金物3の短管43にロックボルト42の地上部分を挿通させることにより、支圧金物3を地表面2に接地する。この短管43の上端にねじ付き球面座金39を配置し、球面付きナット40をロックボルト42に螺合させる。   By inserting the ground portion of the lock bolt 42 through the short pipe 43 of the support metal 3, the support metal 3 is grounded to the ground surface 2. A threaded spherical washer 39 is disposed at the upper end of the short pipe 43 and a nut 40 with a spherical surface is screwed onto the lock bolt 42.

次に球面付きナット40を締め付けてねじ付き球面座金39を押し下げる。その結果、地表面2を反力としてロックボルト42に緊張力が生じる同時にこの緊張力を短管43を介して接地板31が受けることになり、この接地板31から地表面2に対して押圧力が負荷されることとなる。最後にねじ付き球面座金39及び球面付きナット40を覆うようにカバー44を取り付けて図示しない充填材注入孔より充填材45を充填する。   Next, the spherical nut 40 is tightened to push down the threaded spherical washer 39. As a result, the ground surface 2 acts as a reaction force, and a tension force is generated in the lock bolt 42. At the same time, this ground force is received by the ground plate 31 through the short tube 43, and the ground plate 31 pushes against the ground surface 2. Pressure will be applied. Finally, a cover 44 is attached so as to cover the threaded spherical washer 39 and the spherical nut 40, and the filler 45 is filled from a filler injection hole (not shown).

支圧金物3によれば、上述のようにして接地板31から押圧力が負荷されることにより、地表面2に対する地盤支持力(支圧力)が得られる。   According to the support metal 3, the ground support force (support pressure) with respect to the ground surface 2 is obtained by applying a pressing force from the ground plate 31 as described above.

また、かかる接地板31には、地表面2から上述した地盤支持力に対する反作用の力が作用するため、上方に向けて跳ね上がろうとする力が作用する。しかしながら、接地板31の上面には補強用リブ33が設けられていることにより、このような反作用の力を上から押さえ込むことが可能となる。   Moreover, since the reaction force with respect to the ground supporting force mentioned above acts from the ground surface 2 on this ground plate 31, the force which tries to jump up acts on it. However, since the reinforcing rib 33 is provided on the upper surface of the ground plate 31, it is possible to suppress such reaction force from above.

なお地盤支持力を増大させるために、地表面2上において所定間隔をもって配置された複数の支圧金物3のうちの隣接する2つ以上の支圧金物3相互間を、補強用リブ33に形成した切欠33aに通した鋼線のワイヤ20で緊張連結するようにしてもよい。   In order to increase the ground supporting force, the reinforcing ribs 33 are formed between two or more adjacent support metal fittings 3 among a plurality of support metal fittings 3 arranged at a predetermined interval on the ground surface 2. The steel wire 20 passed through the cutout 33a may be connected in tension.

次に支柱4並びに柵体5の構成について説明をする。   Next, the structure of the support | pillar 4 and the fence 5 is demonstrated.

支柱4は、例えば断面四角形状又は断面円形の鋼管柱により構成されている。この支柱4は、その下端から突出された固定片52と、高さ方向に向けて複数段に亘り設けられた貫通孔51とを有している。   The support | pillar 4 is comprised, for example by the steel pipe pillar of cross-sectional square shape or cross-sectional circle. This support | pillar 4 has the fixed piece 52 protruded from the lower end, and the through-hole 51 provided in multiple steps toward the height direction.

固定片52は、挿通孔91が設けられている。この固定片52と、補強用リブ33とが互いに回動自在に構成されるようにピン構造9が設けられる。図6、7はピン構造9の詳細な構成を示している。このうち、図6、図7(a)は、結合補強プレート49を省略する構成であるが、かかる場合には2枚の固定片52の間に補強用リブ33を介装させ、固定片52における挿通孔91と、補強用リブ33における貫通孔36とに対しボルト80を挿通させ、ボルト80の先端をナット81により螺合させることによりこれを固定する。図7(b)は、一枚の結合補強プレート49を設ける構成であるが、かかる場合には固定片52を一枚で構成し、結合補強プレート49と補強用リブ33との間に固定片52を介装させる。そして、固定片52における挿通孔91と、補強用リブ33における貫通孔36とに対しボルト80を挿通させ、ボルト80の先端をナット81により螺合させることによりこれを固定する。   The fixed piece 52 is provided with an insertion hole 91. The pin structure 9 is provided so that the fixing piece 52 and the reinforcing rib 33 are configured to be rotatable with respect to each other. 6 and 7 show the detailed structure of the pin structure 9. Among these, FIGS. 6 and 7A show a configuration in which the coupling reinforcing plate 49 is omitted. In such a case, the reinforcing ribs 33 are interposed between the two fixing pieces 52 to fix the fixing pieces 52. The bolt 80 is inserted into the insertion hole 91 in the through hole and the through hole 36 in the reinforcing rib 33, and the tip of the bolt 80 is screwed with the nut 81 to fix it. FIG. 7B shows a configuration in which a single coupling reinforcing plate 49 is provided. In such a case, the fixed piece 52 is configured as a single piece, and the fixed piece is provided between the coupling reinforcing plate 49 and the reinforcing rib 33. 52 is interposed. Then, the bolt 80 is inserted into the insertion hole 91 in the fixing piece 52 and the through hole 36 in the reinforcing rib 33, and the tip of the bolt 80 is screwed with the nut 81 to fix it.

上述の如き構成からなるピン構造9を介して、支圧金物3における補強用リブ33に対して回動自在に連結されることとなる。支柱4の回動方向は、支柱4が取り付けられる補強用リブ33の伸びる方向となるため、いかなる方向に支柱4を回動させるかに伴い、この補強用リブ33の固定方向を調整することとなる。   Through the pin structure 9 having the above-described configuration, it is rotatably connected to the reinforcing rib 33 in the bearing member 3. Since the rotation direction of the column 4 is the direction in which the reinforcing rib 33 to which the column 4 is attached extends, the fixing direction of the reinforcing rib 33 is adjusted according to the direction in which the column 4 is rotated. Become.

なお、上述したボルト80及びナット81は、互いに強固に締め付けるのではなく、ピン構造9を介して、固定片52が補強用リブ33に対して回動自在となる程度に緩めた状態で螺合されていることが望ましい。このとき、ボルト80及びナット81は、支柱4の角度及び柵体5の方向を決定した後に、互いに締め付ける。   The bolt 80 and the nut 81 described above are not firmly tightened to each other, but are screwed in a state where the fixing piece 52 is loosened so as to be rotatable with respect to the reinforcing rib 33 via the pin structure 9. It is desirable that At this time, the bolt 80 and the nut 81 are tightened together after determining the angle of the support column 4 and the direction of the fence body 5.

貫通孔51には、ワイヤロープ41が挿通される。図8(a)は、支柱4の断面図を示しているが、貫通孔51に挿通されたワイヤロープ41の一端41aを、当該ワイヤロープ41の途中に合わせてこれらを束ねた上で止め金具54を介して締め付け固定する。ちなみに、この止め金具54の代替として、かしめによる固定を行うようにしてもよい。またワイヤロープ41の他端は、必要に応じてターンバックル53を介して中継された上で、図8(b)に示すように、他の支圧金物3における補強用リブ33の貫通孔36に挿通され、当該ワイヤロープ41の途中に合わせてこれらを束ねた上で止め金具54を介して締め付け固定される。ちなみに、この止め金具54の代替として、かしめによる固定を行うようにしてもよい。これらの方法に基づいてワイヤロープ41は、他の支圧金物3における補強用リブ33に対して取り付けられることとなる。即ち、この支柱4は、図3に示すように、その下端において取り付けられている支圧金物3とは異なる他の支圧金物3に連結されるワイヤロープ41に、その上端が連結されることとなる。支柱4は、このワイヤロープ41を介して引っ張られることによりピン構造9を介して回動方向に向けて自由に回動してしまうのを防止することができる。   The wire rope 41 is inserted into the through hole 51. FIG. 8A shows a cross-sectional view of the support column 4. One end 41 a of the wire rope 41 inserted into the through hole 51 is aligned with the middle of the wire rope 41, and these are bundled. Tighten and fix through 54. Incidentally, as an alternative to the stopper 54, fixing by caulking may be performed. Further, the other end of the wire rope 41 is relayed via a turnbuckle 53 as necessary, and then, as shown in FIG. 8B, the through hole 36 of the reinforcing rib 33 in the other support metal 3. The wire rope 41 is bundled in the middle of the wire rope 41 and then fastened and fixed via the stopper 54. Incidentally, as an alternative to the stopper 54, fixing by caulking may be performed. Based on these methods, the wire rope 41 is attached to the reinforcing rib 33 in the other support metal 3. That is, as shown in FIG. 3, the support 4 is connected at its upper end to a wire rope 41 connected to another support metal 3 different from the support metal 3 attached at the lower end. It becomes. The column 4 can be prevented from freely rotating in the rotation direction via the pin structure 9 by being pulled through the wire rope 41.

柵体5は、図9に示すように、フェンス用ロープ71と、フェンスパネル72とを有している。   As shown in FIG. 9, the fence body 5 includes a fence rope 71 and a fence panel 72.

フェンス用ロープ71は、その両端が支柱4に接続される。具体的には、フェンス用ロープ71の端部を支柱4における貫通孔51に挿通させる。そして、支柱4における貫通孔51から突出されたフェンス用ロープ71の端部は座金が形成され、ナット75により螺着されることにより固定される。このようなフェンス用ロープ71が1段又は複数段に亘り形成されている。   Both ends of the fence rope 71 are connected to the column 4. Specifically, the end of the fence rope 71 is inserted into the through hole 51 in the support column 4. And the end part of the rope 71 for fences protruded from the through-hole 51 in the support | pillar 4 forms a washer, and is fixed by screwing with the nut 75. FIG. Such a fence rope 71 is formed over one or more stages.

フェンスパネル72は、支柱4間において架設される金属製の板状体で構成される。このフェンスパネル72は、その両端が支柱4に対してボルト接合等により取り付けられる。   The fence panel 72 is formed of a metal plate that is installed between the columns 4. Both ends of the fence panel 72 are attached to the support column 4 by bolting or the like.

なお柵体5は、このようなフェンス用ロープ71並びにフェンスパネル72により構成される場合に限定されるものではなく、例えば金網、網体、メッシュフェンス、金属性の棒体等、柵を構成し得るものであればいかなるものに代替されてもよい。   The fence body 5 is not limited to the case of being configured by such a fence rope 71 and the fence panel 72. For example, the fence body 5 constitutes a fence such as a wire mesh, a net body, a mesh fence, or a metal rod. As long as it is obtained, it may be replaced with anything.

上述した支柱4及び柵体5を設置する際には、先ず支柱4の下端を支圧金物3に対して取り付ける。このとき、支柱4の下端にある固定片52における図示しない挿通孔と、補強用リブ33における貫通孔36とに対しボルト80を挿通させ、ボルト80の先端をナット81により螺合させる。これにより支柱4は支圧金物3に対して回動自在となるため、作業者は、この支柱4の立設方向を支圧金物3に対して任意の方向まで回動させる。次に回動させた後の支柱4を把持しつつ、貫通孔51にワイヤロープ41を挿通させて止め金具54により固定する。この支柱4へのワイヤロープ41の固定は、支柱4を取り付ける前において事前に行うようにしてもよい。次に、ワイヤロープ41の他端を補強用リブ33における貫通孔36に挿通させてこれを固定する。これにより、回動させた後の支柱4の立設方向を保持した状態で、これを安定させることが可能となる。   When installing the column 4 and the fence body 5 described above, first, the lower end of the column 4 is attached to the support metal 3. At this time, the bolt 80 is inserted into the insertion hole (not shown) in the fixing piece 52 at the lower end of the support column 4 and the through hole 36 in the reinforcing rib 33, and the tip of the bolt 80 is screwed by the nut 81. As a result, the support column 4 is rotatable with respect to the support metal 3, and the operator rotates the support column 4 up to an arbitrary direction with respect to the support metal 3. Next, the wire rope 41 is inserted into the through hole 51 and fixed by the stopper 54 while gripping the post 4 after being rotated. The wire rope 41 may be fixed to the support column 4 in advance before the support column 4 is attached. Next, the other end of the wire rope 41 is inserted into the through hole 36 in the reinforcing rib 33 and fixed. As a result, it is possible to stabilize the column 4 while maintaining the standing direction of the support column 4 after the rotation.

このようにして支柱4の取り付けを終了させた後、柵体5の配設を行う。柵体5をフェンス用ロープ71で構成する場合には、上述したように、支柱4における貫通孔51にこれを挿通させて固定する。   After the attachment of the column 4 is finished in this way, the fence body 5 is disposed. When the fence body 5 is constituted by the fence rope 71, as described above, the fence body 5 is inserted into and fixed to the through hole 51 in the support column 4.

上述の如き構成からなる本発明によれば、支圧金物3による地盤支持力を向上させることによる地表面2の安定化と落石の防止を実現することができ、更に、地表面を流下してくる木を柵体5を介して捕捉することも可能となる。近年の多発する集中豪雨やこれに伴う斜面崩壊等により木が地表面から崩れ落ちる場合があり、また上述した斜面安定化工法が施されていない更なる斜面上方の木々が押し倒されて斜面を流下してくる場合がある。このような斜面上を落下又は流下してくる木は、柵体5に到達した場合に、これにより捕捉されることになる。その結果、流下してくる木が斜面の麓にある道路や民家にそのまま落下するのを防止することが可能となり、道路や民家に甚大な被害が及ぶのを防止することができる。   According to the present invention having the above-described configuration, it is possible to realize stabilization of the ground surface 2 and prevention of falling rocks by improving the ground supporting force by the support metal 3, and further flow down the ground surface. It is also possible to capture the coming tree through the fence body 5. Trees may fall from the ground surface due to frequent heavy rains and slope failures accompanying this, and trees above the slope where the slope stabilization method described above has not been applied are pushed down and flow down the slope. May come. Trees falling or flowing down on such slopes are captured by this when they reach the fence body 5. As a result, it is possible to prevent the flowing trees from falling on the roads and private houses at the foot of the slope as they are, and to prevent the roads and private houses from being seriously damaged.

これに加えて本発明は、図1に示すように柵体5が流下領域7に繋がるように設けられていてもよい。これにより、流下してきた木は、この柵体5により案内されて流下領域7へと導かれることになる。流下領域7に導かれた木は、そのまま渓流の流れに沿って下流側へと流れていくこととなる。これにより、流下してくる木が斜面の麓にある道路や民家にそのまま落下するのをより強固に防止することが可能となる。   In addition to this, the present invention may be provided such that the fence 5 is connected to the flow-down region 7 as shown in FIG. Thereby, the tree that has flowed down is guided by the fence body 5 and guided to the flow-down area 7. The tree led to the downflow area 7 will flow to the downstream side as it is along the mountain stream. As a result, it is possible to more firmly prevent the flowing down tree from falling on the road or private house at the foot of the slope.

このとき、互いに離間された2組以上に亘り柵体5が設けられる場合において、柵体5が設けられる支柱4の方向が斜面下方ほど水平方向に近づくように設定されているのが望ましい。これにより、流下してくる木は、この柵体5により図中矢印方向に向けて案内されてくることとなる。特に柵体5の方向が斜面下方ほど水平方向に近づくように設定されていることで、流下してくる木の落下スピードを徐々に緩衝させながら流下領域7に導くことができ、斜面下方の柵体5に落下の加速度を伴った大きな衝撃が加わるのを防止することが可能となる。   At this time, when the fence bodies 5 are provided over two or more sets separated from each other, it is desirable that the direction of the support column 4 on which the fence bodies 5 are provided is set so as to approach the horizontal direction as it goes down the slope. Thereby, the tree which flows down will be guided by this fence 5 toward the arrow direction in the figure. In particular, the direction of the fence body 5 is set so as to approach the horizontal direction toward the lower side of the slope, so that the falling speed of the falling tree can be gradually buffered and guided to the downstream area 7. It is possible to prevent the body 5 from being subjected to a large impact accompanied by the fall acceleration.

このとき、更に上下に隣接する柵体5は、互いに離間されてなり、かつ水平方向に向けて重複する領域Sを有するように設けられていることが望ましい。これにより、斜面を流下してくる木が、上下に隣接する柵体5間の間をすり抜けてそのまま落下し、道路や民家に甚大な被害が及ぶのを防止することができる。   At this time, it is desirable that the fence bodies 5 adjacent to each other in the vertical direction are provided so as to have regions S that are separated from each other and overlap in the horizontal direction. As a result, it is possible to prevent the trees flowing down the slope from passing between the fence bodies 5 adjacent to each other vertically and falling as they are, and causing serious damage to roads and private houses.

ちなみに、このピン構造9が設けられる補強用リブ33は、図4、5に示すように、斜面に対してより下方に伸びるものとされていることが望ましい。落下してきた木が柵体5に衝突したときにより下方に向けて大きな衝突荷重が支柱4に負荷されることとなるが、斜面に対してより下方に伸びる補強用リブ33にピン構造9が形成されていることにより、当該衝突荷重に対して十分に耐えられる力学的な配置となる。   Incidentally, as shown in FIGS. 4 and 5, it is desirable that the reinforcing rib 33 provided with the pin structure 9 extend downward with respect to the slope. When the falling tree collides with the fence 5, a larger collision load is applied to the support column 4 downward, but the pin structure 9 is formed on the reinforcing rib 33 extending further downward with respect to the slope. As a result, the mechanical arrangement can sufficiently withstand the collision load.

なお、本発明は、上述した形態に限定されるものではなく、以下に説明する形態を適用するものであってもよい。   In addition, this invention is not limited to the form mentioned above, The form demonstrated below may be applied.

図10は、支柱4を支圧金物3に対して2軸により回動自在に構成したピン構造98の例を示している。この例では中間連結部材95を新たに設ける。この中間連結部材95は、固定片152及び挿通孔191と、固定片152に対して略垂直に設けられた固定プレート92と、固定プレート92上に立設された中間連結片93とを有している。そして、固定片152における挿通孔191と、補強用リブ33における貫通孔36とに対し図示しないボルトを挿通させ、この図示しないボルトの先端をナット81により螺合させることによりこれを固定する。   FIG. 10 shows an example of a pin structure 98 in which the support column 4 is configured to be rotatable with respect to the bearing metal 3 by two axes. In this example, an intermediate connecting member 95 is newly provided. The intermediate connecting member 95 includes a fixing piece 152 and an insertion hole 191, a fixing plate 92 provided substantially perpendicular to the fixing piece 152, and an intermediate connecting piece 93 erected on the fixing plate 92. ing. Then, a bolt (not shown) is inserted through the insertion hole 191 in the fixing piece 152 and the through hole 36 in the reinforcing rib 33, and the tip of the bolt (not shown) is screwed with a nut 81 to fix it.

中間連結片93には図示しない挿通孔が開口されており、これと支柱4の下端から突出された固定片52の挿通孔91とにボルト96を挿通させ、ボルト96の先端をナット97により螺合させることによりこれを固定する。   An insertion hole (not shown) is opened in the intermediate connection piece 93, and a bolt 96 is inserted into this through-hole 91 of the fixing piece 52 protruding from the lower end of the column 4, and the tip of the bolt 96 is screwed by a nut 97. This is fixed by combining.

このような図10に示すピン構造9aでは、支柱4を互いに直交する2軸に亘り回動させることが可能となる。このため、支柱4の回動方向の自由度を高くすることが可能となり、柵体5の方向を任意の方向へコントロールすることが可能となる。ちなみに、この図10の例では、結合補強プレート49を省略した構成であるが、結合補強プレート49を配設する場合においても図7(b)と同様の固定方法を適用するようにしてもよいことは勿論である。   In such a pin structure 9a shown in FIG. 10, it is possible to rotate the support column 4 along two axes orthogonal to each other. For this reason, it becomes possible to raise the freedom degree of the rotation direction of the support | pillar 4, and it becomes possible to control the direction of the fence body 5 to arbitrary directions. Incidentally, in the example of FIG. 10, the coupling reinforcing plate 49 is omitted. However, even when the coupling reinforcing plate 49 is provided, the same fixing method as in FIG. 7B may be applied. Of course.

更に図11(a)、(b)は、支柱4について、その軸を中心として回転自在に設けたピン構造9bの例を示している。この例では、中間連結部材95と支柱4との間に、更に中間連結部材121を設けている。この中間連結部材121は、固定片52と、この固定片52に対して略垂直に取り付けられた平板111とを備えている。この平板111は、支柱4の底面112と当接可能とされている。そして、この平板111には図11(c)に示すように図示しない貫通孔が形成されており、同様に底面112にも図示しないネジ孔が形成されている。この図示しない貫通孔並びに図示しないネジ孔に対してボルト115を図11(b)に示すように下側から螺入させることにより、中間連結部材121と支柱4とが連結可能とされている。このとき、支柱4を中間連結部材121に対して任意の方向に回転させ、その上でボルト115による接合を行うようにしてもよい。これにより、支柱4に対する平面視での柵体5の配設角度を自在に調整することができる。なお、中間連結部材121における固定片52は、上述と同様に中間連結部材95の中間連結片93に対して回動自在に取り付けられる。   Further, FIGS. 11A and 11B show an example of a pin structure 9b in which the support column 4 is provided to be rotatable around its axis. In this example, an intermediate connecting member 121 is further provided between the intermediate connecting member 95 and the support column 4. The intermediate connecting member 121 includes a fixed piece 52 and a flat plate 111 attached substantially perpendicular to the fixed piece 52. The flat plate 111 can be brought into contact with the bottom surface 112 of the support column 4. Further, as shown in FIG. 11C, a through hole (not shown) is formed in the flat plate 111, and a screw hole (not shown) is also formed in the bottom surface 112. The intermediate coupling member 121 and the column 4 can be connected by screwing a bolt 115 into the through hole (not shown) and the screw hole (not shown) from below as shown in FIG. At this time, the support column 4 may be rotated in an arbitrary direction with respect to the intermediate connecting member 121, and then joined by the bolt 115. Thereby, the arrangement | positioning angle of the fence 5 in planar view with respect to the support | pillar 4 can be adjusted freely. The fixing piece 52 in the intermediate connecting member 121 is rotatably attached to the intermediate connecting piece 93 of the intermediate connecting member 95 in the same manner as described above.

なお、この支柱4をその軸を中心として回転自在に構成する例において、中間連結部材95を省略するようにしてもよい。かかる場合において、中間連結部材121における固定片52と、補強用リブ33における貫通孔36とに対しボルト80を挿通させ、ボルト80の先端をナット81により螺合させることによりこれを固定することとなる。   In the example in which the support column 4 is configured to be rotatable around its axis, the intermediate connecting member 95 may be omitted. In such a case, the bolt 80 is inserted into the fixing piece 52 in the intermediate connecting member 121 and the through hole 36 in the reinforcing rib 33, and the tip of the bolt 80 is screwed with the nut 81 to fix it. Become.

支柱4を回転自在に構成する場合には、上述した図11の例に限定されるものではなく、例えば図12(a)に示すように、平板111上に嵌合凸部135を設けておき、これに対して底面を開放した支柱4を上から嵌合させるようにしてもよい。この嵌合凸部135は断面円形で構成され、支柱4も断面円形の鋼管で構成されていることにより、嵌合凸部135に被せた支柱4を任意の方向へ回転させることが可能となる。また、嵌合凸部135の外周には、ネジ孔131が設けられ、支柱4の下端部近傍の外周には、貫通孔132が設けられている。このネジ孔131と貫通孔132は互いに対応する位置において設けられている。支柱4の配設方向を決定した後、図12(b)に示すように、貫通孔132にボルト136を挿通させ、さらにネジ孔131に螺着させることにより固定する。これにより、支柱4と中間連結部材121は互いに強固に取り付けられることとなる。   When the support column 4 is configured to be rotatable, the support column 4 is not limited to the example of FIG. 11 described above. For example, as shown in FIG. Alternatively, the support column 4 with the bottom open may be fitted from above. This fitting convex part 135 is comprised by circular cross section, and the support | pillar 4 is also comprised by the steel pipe of circular cross section, Therefore It becomes possible to rotate the support | pillar 4 which covered the fitting convex part 135 to arbitrary directions. . Further, a screw hole 131 is provided on the outer periphery of the fitting convex portion 135, and a through hole 132 is provided on the outer periphery in the vicinity of the lower end portion of the support column 4. The screw hole 131 and the through hole 132 are provided at positions corresponding to each other. After determining the arrangement direction of the support columns 4, as shown in FIG. 12B, the bolts 136 are inserted into the through holes 132 and further fixed by being screwed into the screw holes 131. Thereby, the support | pillar 4 and the intermediate connection member 121 will be firmly attached to each other.

図13は、ワイヤロープ41を支柱4に取り付ける他の例を示している。支柱4に鞘管161を例えば隅肉溶接等により固着させ、この鞘管161にワイヤロープ41を挿通させる。このワイヤロープ41は、同様に止め金具54により締め付け固定されることとなる。これ以外にも、例えばワイヤロープ41の先端に設けられた図示しないフックを、支柱4に固着された鞘管161に係合させることにより固定するようにしてもよい。   FIG. 13 shows another example in which the wire rope 41 is attached to the column 4. The sheath tube 161 is fixed to the support column 4 by fillet welding or the like, and the wire rope 41 is inserted into the sheath tube 161. The wire rope 41 is similarly fastened and fixed by a stopper 54. In addition to this, for example, a hook (not shown) provided at the tip of the wire rope 41 may be fixed by engaging with a sheath tube 161 fixed to the support column 4.

1 設置構造
2 地表面
3 支圧金物
4 支柱
5 柵体
7 流下領域
9 ピン構造
20 ワイヤ
31 接地板
32 地上突出部
33 補強用リブ
34 引張部材
36 貫通孔
37 ビット
38 カプラ
39 球面座金
40 球面付きナット
41 ワイヤロープ
42 ロックボルト
43 短管
44 カバー
45 充填材
46 貫入孔
49 結合補強プレート
51 貫通孔
52 固定片
53 ターンバックル
54 金具
71 フェンス用ロープ
72 フェンスパネル
75、81、97 ナット
80 ボルト
91 挿通孔
92 固定プレート
93 中間連結片
95、121 中間連結部材
96、115、136 ボルト
111 平板
112 底面
131 ネジ孔
132 貫通孔
135 嵌合凸部
152 固定片
161 鞘管
191 挿通孔
DESCRIPTION OF SYMBOLS 1 Installation structure 2 Ground surface 3 Support metal 4 Support column 5 Fence body 7 Flow area 9 Pin structure 20 Wire 31 Ground plate 32 Ground protrusion 33 Reinforcement rib 34 Tension member 36 Through-hole 37 Bit 38 Coupler 39 Spherical washer 40 With sphere Nut 41 Wire rope 42 Lock bolt 43 Short pipe 44 Cover 45 Filler 46 Penetration hole 49 Bonding reinforcing plate 51 Through hole 52 Fixing piece 53 Turnbuckle 54 Metal fitting 71 Fence rope 72 Fence panels 75, 81, 97 Nut 80 Bolt 91 Insertion Hole 92 Fixing plate 93 Intermediate connecting piece 95, 121 Intermediate connecting member 96, 115, 136 Bolt 111 Flat plate 112 Bottom face 131 Screw hole 132 Through hole 135 Fitting convex part 152 Fixed piece 161 Sheath pipe 191 Insertion hole

Claims (8)

地表面の安定化工法に用いられる、地表面に設置された支圧金物に対して柵体用の支柱を連結する支圧金物に対する支柱の連結構造であって、
上記支圧金物は、地中に貫入されてアンカー機能を果たす引張り部材と、上記引張り部材の地上突出部に装着されて当該引張り部材に与えられた緊張力を地表面に伝達する接地板と、上記接地板上面に略垂直に立設される補強用リブとを有し、
上記支柱は、上記支圧金物における補強用リブに設けられた貫通孔に挿通されたピン構造を介して回動自在に連結され、その上部にはワイヤロープが連結され
前記支柱に連結された一の前記支圧金物における前記引張り部材の長さは、一の前記支圧金物に離間して設置されるとともに前記支柱とは独立した他の支圧金物における引張り部材の長さよりも長いこと
を特徴とする支圧金物に対する支柱の連結構造。
A strut connection structure for a support metal that connects a support for a fence body to a support metal installed on the ground surface, which is used in the stabilization method of the ground surface,
The bearing metal is a tension member that penetrates into the ground and performs an anchor function, a ground plate that is attached to the ground protrusion of the tension member and transmits the tension applied to the tension member to the ground surface, A reinforcing rib standing substantially vertically on the upper surface of the ground plate,
The strut is rotatably connected via a pin structure inserted in a through hole provided in a reinforcing rib in the bearing metal, and a wire rope is connected to the upper part thereof .
The length of the tension member in one of the bearing members connected to the column is set apart from the one bearing member, and the length of the tension member in another bearing member independent of the column. A strut connection structure for a bearing metal characterized by being longer than the length .
上記接地板は、斜面の地表面に当接され、
上記補強用リブは、平面視で上記支圧金物における地上突出部を中心に互いに異なる方向へ伸びる2本以上で構成され、
上記貫通孔は、上記斜面に対してより下方に伸びる補強用リブに設けられていること
を特徴とする請求項1記載の支圧金物に対する支柱の連結構造。
The grounding plate is in contact with the ground surface of the slope,
The reinforcing rib is composed of two or more extending in different directions around the ground protrusion in the bearing metal in plan view,
The strut connection structure to a bearing metal according to claim 1, wherein the through hole is provided in a reinforcing rib extending downward with respect to the slope.
上記支柱は、上記ピン構造による回動方向に対して更に他の方向に回動自在に設けられていること
を特徴とする請求項1又は2記載の支圧金物に対する支柱の連結構造。
The strut connection structure for a bearing metal according to claim 1 or 2, wherein the strut is provided so as to be rotatable in another direction with respect to the rotation direction of the pin structure.
上記支柱は、その軸方向を中心として回転自在に設けられていること
を特徴とする請求項1〜3のうち何れか1項記載の支圧金物に対する支柱の連結構造。
The said support | pillar is rotatably provided centering on the axial direction, The connection structure of the support | pillar with respect to the bearing metal in any one of Claims 1-3 characterized by the above-mentioned.
請求項1〜4のうち何れか1項に記載の支柱の連結構造における2本以上の上記支柱間に設けられた柵体を備えること
を特徴とする柵体の設置構造。
The installation structure of the fence body provided with the fence body provided between the said 2 or more said support | pillars in the connection structure of the support | pillar of any one of Claims 1-4.
請求項1〜4のうち何れか1項に記載の支柱の連結構造における上記接地板は、斜面の地表面に当接され、
1組の上記柵体は、2本以上の上記支柱の間にフェンス用ロープと、フェンスパネルを設置して構成され、
2組以上の上記柵体は、互いに離間されて設けられ、
柵体が設けられる支柱間の方向は、上記組間において、斜面下方ほど水平方向に近づくように設定されていること
を特徴とする請求項5記載の柵体の設置構造。
The grounding plate in the strut connection structure according to any one of claims 1 to 4, is in contact with a ground surface of a slope,
One set of the fences is configured by installing a fence rope and a fence panel between two or more of the columns.
Two or more sets of the Sakutai is set vignetting are spaced apart from each other,
The installation structure of the fence body according to claim 5, wherein the direction between the support columns on which the fence body is provided is set so as to approach the horizontal direction as the slope is lower between the groups.
上下に隣接する柵体は、互いに離間されてなり、かつ上記水平方向に向けて重複する領域を有するように設けられていること
を特徴とする請求項6記載の柵体の設置構造。
The fence body installation structure according to claim 6, wherein the vertically adjacent fence bodies are provided so as to be spaced apart from each other and have an area overlapping in the horizontal direction.
地表面を流下してくる木を流下領域に導流するための地表面の安定化工法を兼ね備えた流木導流システムであって、A driftwood diversion system that also has a ground surface stabilization method for diverting trees flowing down the ground surface to the flow area,
請求項5〜7の何れか1項に記載の柵体の設置構造を備え、The installation structure of the fence body according to any one of claims 5 to 7,
前記柵体は、流下領域に繋がるように設けられることThe fence body is provided so as to be connected to the flow area.
を特徴とする流木導流システム。Driftwood flow system characterized by.
JP2015122691A 2015-06-18 2015-06-18 Connecting structure of support column to support metal, installation structure of fence body and driftwood flow system Active JP6573491B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015122691A JP6573491B2 (en) 2015-06-18 2015-06-18 Connecting structure of support column to support metal, installation structure of fence body and driftwood flow system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015122691A JP6573491B2 (en) 2015-06-18 2015-06-18 Connecting structure of support column to support metal, installation structure of fence body and driftwood flow system

Publications (2)

Publication Number Publication Date
JP2017008510A JP2017008510A (en) 2017-01-12
JP6573491B2 true JP6573491B2 (en) 2019-09-11

Family

ID=57762911

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015122691A Active JP6573491B2 (en) 2015-06-18 2015-06-18 Connecting structure of support column to support metal, installation structure of fence body and driftwood flow system

Country Status (1)

Country Link
JP (1) JP6573491B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102382043B1 (en) * 2021-12-02 2022-04-01 주식회사 대흥미래기술 Prefabricated Lightweight Transport Blocking Device

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS537038Y2 (en) * 1973-04-19 1978-02-22
JP2931830B2 (en) * 1994-02-08 1999-08-09 東京製綱株式会社 Rockfall guide fence
JP3033678B2 (en) * 1995-10-17 2000-04-17 日鐵建材工業株式会社 Bearing metal for slope stabilization and slope stabilization
JP3258994B2 (en) * 2000-04-06 2002-02-18 東京製綱株式会社 Large span rock fall protection method and support device
JP4175617B2 (en) * 2002-07-29 2008-11-05 日鐵住金建材株式会社 Slope stabilization method and structure for rockfall prevention and connecting metal fittings used therefor
JP5032255B2 (en) * 2007-09-28 2012-09-26 東京製綱株式会社 Rockfall protection and avalanche prevention facility
JP4999773B2 (en) * 2008-05-02 2012-08-15 日鐵住金建材株式会社 Slope stabilization method and bearing member used therefor
JP5164791B2 (en) * 2008-10-29 2013-03-21 前田工繊株式会社 Shock absorbing fence
DE202010003434U1 (en) * 2010-03-10 2011-08-02 Resint N.V. Mobile device
JP3174304U (en) * 2011-11-15 2012-03-15 静和建設株式会社 Steel retaining fence
JP6062724B2 (en) * 2012-11-27 2017-01-18 神鋼建材工業株式会社 Avalanche reduction

Also Published As

Publication number Publication date
JP2017008510A (en) 2017-01-12

Similar Documents

Publication Publication Date Title
JP4936232B2 (en) Protective bodies such as avalanches and rockfalls
JP4686794B2 (en) Collapsed sediment protection fence
JP6644975B2 (en) Protective fence
JP4690781B2 (en) Rock fall prevention fence
JP6573491B2 (en) Connecting structure of support column to support metal, installation structure of fence body and driftwood flow system
JP5818213B2 (en) Guard fence and its construction method
KR101506953B1 (en) Base hardware for binding pillar of deckroad
JP4338713B2 (en) Avalanche, rockfall and other protective body support
JP2007023566A (en) Impact absorbing structural body
KR100808939B1 (en) wire-reinforced structure for underground pre-scaffolding system
JP2009002023A (en) Prop for protective structure against avalanche and falling rock
JP3960559B1 (en) Reinforcement pipe with pressure plate, ground fall prevention method, and slope reinforcement method
JP4580862B2 (en) Rope direction change device for civil engineering facilities
JP3856731B2 (en) Protective fence
JP2000273833A (en) Column to be constructed in ground
JP4656606B2 (en) Auxiliary tools for the production of support pillars such as avalanches and rockfalls
JP6114537B2 (en) Rockfall protection device and rockfall protection method
JP5161823B2 (en) Falling rock and avalanche fence
JP6681766B2 (en) Above-ground partial protection structure of slope stabilization method
JP2018017052A (en) Tsunami barrier
JP4061346B1 (en) Assembly foundation and earth anchor
JP4879331B2 (en) Rockfall prevention fence, structure equipped with rockfall prevention fence, and construction method of rockfall prevention fence
JP2015140575A (en) Reinforcement method for rockfall prevention fence and rockfall prevention fence
JP5161822B2 (en) Support structure
JP7001507B2 (en) Permeation type dam and its construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180607

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190129

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190205

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190405

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190806

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190813

R150 Certificate of patent or registration of utility model

Ref document number: 6573491

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250