JP6468372B2 JP2017562479A JP2017562479A JP6468372B2 JP 6468372 B2 JP6468372 B2 JP 6468372B2 JP 2017562479 A JP2017562479 A JP 2017562479A JP 2017562479 A JP2017562479 A JP 2017562479A JP 6468372 B2 JP6468372 B2 JP 6468372B2
Authority
JP
Japan
Prior art keywords
current
current value
theft
contract
predicted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017562479A
Other languages
Japanese (ja)
Other versions
JPWO2017126273A1 (en
Inventor
常世 佐野
常世 佐野
光 瀧ケ崎
光 瀧ケ崎
広和 伊藤
広和 伊藤
Original Assignee
東京電力ホールディングス株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to JP2016007172 priority Critical
Priority to JP2016007172 priority
Application filed by 東京電力ホールディングス株式会社 filed Critical 東京電力ホールディングス株式会社
Priority to PCT/JP2016/087741 priority patent/WO2017126273A1/en
Publication of JPWO2017126273A1 publication Critical patent/JPWO2017126273A1/en
Application granted granted Critical
Publication of JP6468372B2 publication Critical patent/JP6468372B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Description

本発明は、盗電検出装置及びプログラムに関する。   The present invention relates to a theft detection device and a program.
従来、配電線の現場画像と戸別電力契約情報とに基づいて、盗電を検出する装置が提案されている(例えば、特許文献1)。   2. Description of the Related Art Conventionally, a device that detects a theft of electric power based on a field image of a distribution line and door-to-door power contract information has been proposed (for example, Patent Document 1).
特開2014−93931号公報JP 2014-93931 A
しかしながら、特許文献1に記載されるような従来の技術においては、盗電が疑われる配電線の現場画像を、盗電検出に先立って取得しなければならず、盗電検出のための手間が低減できないという問題があった。
本発明は上記の点に鑑みてなされたものであり、盗電検出のための手間を低減することができる盗電検出装置及びプログラムを提供する。
However, in the conventional technology as described in Patent Document 1, it is necessary to acquire an on-site image of a distribution line suspected of stealing prior to the detection of the theft, and the effort for the theft detection cannot be reduced. There was a problem.
The present invention has been made in view of the above points, and provides a theft detection device and a program that can reduce the effort for detection of theft.
本発明の一態様は、電力供給契約が示す契約容量に基づいて、配電線ごとの需要特性に基づいた負荷パターンの分類によって負荷電流の予測値である予測電流値を算出する予測電流算出部と、電線を流れる負荷電流が検出された値である検出電流値を取得する検出電流取得部と、前記予測電流算出部が算出する前記予測電流値と、前記検出電流取得部が取得する前記検出電流値とに基づいて、前記電線を流れる前記負荷電流のうち未契約の電流である盗電電流値を算出する盗電電流算出部とを備える盗電検出装置である。
また、本発明の一態様の盗電検出装置は、前記予測電流算出部が、電力供給契約が示す契約容量に基づいて、配電線ごとの需要特性に基づいたクラスタ分析によって負荷電流の予測値である予測電流値を算出する。
According to one aspect of the present invention, a predicted current calculation unit that calculates a predicted current value that is a predicted value of a load current by classifying a load pattern based on a demand characteristic for each distribution line based on a contract capacity indicated by a power supply contract; A detection current acquisition unit that acquires a detection current value that is a value in which a load current flowing through the electric wire is detected; the prediction current value calculated by the prediction current calculation unit; and the detection current acquired by the detection current acquisition unit And a stealing current calculating unit that calculates a stealing current value that is a non-contracted current out of the load current flowing through the electric wire based on the value.
Further, in the power theft detection device of one aspect of the present invention, the predicted current calculation unit is a predicted value of load current by cluster analysis based on demand characteristics for each distribution line based on a contract capacity indicated by a power supply contract. A predicted current value is calculated.
また、本発明の一態様の盗電検出装置は、前記電力供給契約の契約種類と、前記盗電電流算出部が算出する前記盗電電流値との相関に基づいて、前記契約種類毎の前記盗電電流値の構成比を算出する盗電構成比算出部を備える。   Further, the theft detection device according to one aspect of the present invention is based on a correlation between the contract type of the power supply contract and the stealing current value calculated by the theft power calculation unit. A power theft composition ratio calculation unit is provided.
また、本発明の一態様の盗電検出装置は、前記電力供給契約の契約種類と、前記盗電電流算出部が算出する前記盗電電流値との相関に基づいて、前記契約種類毎の契約高を算出する契約高算出部を備える。   The theft detection device according to one aspect of the present invention calculates a contract height for each contract type based on a correlation between the contract type of the power supply contract and the stealing current value calculated by the theft power calculation unit. A contract height calculation unit.
また、本発明の一態様は、電力供給契約が示す契約容量に基づいて、負荷電流の予測値である予測電流値を算出する予測電流算出部と、電線を流れる負荷電流が検出された値である検出電流値を取得する検出電流取得部と、前記予測電流算出部が算出する前記予測電流値と、前記検出電流取得部が取得する前記検出電流値とに基づいて、前記電線を流れる前記負荷電流のうち未契約の電流である盗電電流値を算出する盗電電流算出部と、前記電力供給契約の契約種類と、前記盗電電流算出部が算出する前記盗電電流値との相関に基づいて、前記契約種類毎の前記盗電電流値の構成比を算出する盗電構成比算出部とを備える盗電検出装置である。
また、本発明の一態様は、電力供給契約が示す契約容量に基づいて、負荷電流の予測値である予測電流値を算出する予測電流算出部と、電線を流れる負荷電流が検出された値である検出電流値を取得する検出電流取得部と、前記予測電流算出部が算出する前記予測電流値と、前記検出電流取得部が取得する前記検出電流値とに基づいて、前記電線を流れる前記負荷電流のうち未契約の電流である盗電電流値を算出する盗電電流算出部と、前記電力供給契約の契約種類と、前記盗電電流算出部が算出する前記盗電電流値との相関に基づいて、前記契約種類毎の契約高を算出する契約高算出部とを備える盗電検出装置である。
また、本発明の一態様は、コンピュータに、電力供給契約が示す契約容量に基づいて、配電線ごとの需要特性に基づいた負荷パターンの分類によって負荷電流の予測値である予測電流値を算出する予測電流算出ステップと、電線を流れる負荷電流が検出された値である検出電流値を取得する検出電流値取得ステップと、前記予測電流算出ステップにおいて算出される前記予測電流値と、前記検出電流取得ステップにおいて取得される前記検出電流値とに基づいて、前記電線を流れる前記負荷電流のうち未契約の電流である盗電電流値を算出する盗電電流算出ステップとを実行させるためのプログラムである。
Further, according to one aspect of the present invention, a predicted current calculation unit that calculates a predicted current value that is a predicted value of the load current based on the contracted capacity indicated by the power supply contract, and a value in which the load current flowing through the electric wire is detected. a detection photoelectric Nagareto obtained unit that acquires a certain detected current value, and the predicted current value the predicted current calculating unit calculates, on the basis of said detected current value, wherein the detected current acquisition unit acquires, through the electric wire Based on a correlation between a stealing current calculation unit that calculates a stealing current value that is an unsigned current among the load currents, a contract type of the power supply contract, and the stealing current value calculated by the stealing current calculation unit , A theft detection device comprising a theft power ratio calculation unit for calculating the ratio of the theft current value for each contract type.
Further, according to one aspect of the present invention, a predicted current calculation unit that calculates a predicted current value that is a predicted value of the load current based on the contracted capacity indicated by the power supply contract, and a value in which the load current flowing through the electric wire is detected. a detection photoelectric Nagareto obtained unit that acquires a certain detected current value, and the predicted current value the predicted current calculating unit calculates, on the basis of said detected current value, wherein the detected current acquisition unit acquires, through the electric wire Based on a correlation between a stealing current calculation unit that calculates a stealing current value that is an unsigned current among the load currents, a contract type of the power supply contract, and the stealing current value calculated by the stealing current calculation unit And a contract amount calculation unit that calculates a contract amount for each contract type.
Further, according to one embodiment of the present invention, a predicted current value that is a predicted value of a load current is calculated by a load pattern classification based on a demand characteristic for each distribution line based on a contract capacity indicated by a power supply contract. a predicted current calculating step, the detected current value acquiring step of load current flowing through the electric wire to obtain a detected current value is detected values, and the predicted current value that will be calculated in the predicted current calculating step, the detected current value A program for executing a stealing current calculation step of calculating a stealing current value that is an uncontracted current among the load currents flowing through the electric wire based on the detected current value acquired in the acquiring step.
本発明によれば、盗電検出のための手間を低減することができる。   According to the present invention, it is possible to reduce the effort for detecting theft.
本発明の実施形態に係る盗電検出装置の検出対象の設備の一例を示す図である。It is a figure which shows an example of the installation of the detection target of the theft detection apparatus which concerns on embodiment of this invention. 本実施形態の盗電検出装置の構成の一例を示す図である。It is a figure which shows an example of a structure of the theft detection apparatus of this embodiment. 本実施形態の電力供給契約の契約種別の一例を示す図である。It is a figure which shows an example of the contract classification of the electric power supply contract of this embodiment. 本実施形態の配電線の各系統におけるロードカーブの一例を示す図である。It is a figure which shows an example of the load curve in each system | strain of the distribution line of this embodiment. 本実施形態の配電線のロードカーブについての契約種別ごとの契約高の構成比の一例を示す図である。It is a figure which shows an example of the composition ratio of the contract height for every contract classification about the load curve of the distribution line of this embodiment. 本実施形態の予測電流算出部によるクラスタ分析結果の一例を示す図である。It is a figure which shows an example of the cluster analysis result by the prediction electric current calculation part of this embodiment. 本実施形態の盗電検出装置の動作の一例を示す図である。It is a figure which shows an example of operation | movement of the theft detection apparatus of this embodiment. 本実施形態の盗電電流算出部による盗電電流の算出結果の一例を示す図である。It is a figure which shows an example of the calculation result of the theft electric current by the theft electric current calculation part of this embodiment. 本実施形態の正規化された盗電電流値の一例を示す図である。It is a figure which shows an example of the normalized theft electric current value of this embodiment. 本実施形態の各クラスタの正規化された平均電流値の一例を示す図である。It is a figure which shows an example of the normalized average electric current value of each cluster of this embodiment. 本実施形態の盗電契約高算出部による契約高の算出結果の一例を示す図である。It is a figure which shows an example of the calculation result of the contract amount by the theft electric power contract amount calculation part of this embodiment.
[実施形態]
以下、図面を参照して、本発明に係る盗電検出装置10の一実施形態について説明する。まず、図1を参照して、盗電検出装置10の検出対象の設備の概要について説明する。
[Embodiment]
Hereinafter, an embodiment of a theft detection apparatus 10 according to the present invention will be described with reference to the drawings. First, with reference to FIG. 1, the outline | summary of the detection target equipment of the theft detection apparatus 10 is demonstrated.
[盗電検出装置10の概要]
図1は、本発明の実施形態に係る盗電検出装置10の検出対象の設備の一例を示す図である。この一例において、検出対象の設備とは、電力供給のための配電システム1である。配電システム1は、変電所SBと、配電線DSTと、電柱EPとを備える。変電所SBは、不図示の発電所から供給される電力を変換し、変換した電力を配電線DSTに供給する。配電線DSTは、変電所SBから供給される電力を需要家に配電する。この一例では、配電線DSTには、A系統(配電線DST−A)とB系統(配電線DST−B)との2種類の系統がある。電柱EPは、配電線DSTを懸架する。電柱EPには不図示の柱上トランスが設置されている。柱上トランスは、配電線DSTから供給される電力の電圧を供給に適した電圧に変換する。柱上トランスから需要家に対して、引込線SLが設置される。需要家とは、住宅や商業施設、工場などである。以下、住宅によって消費される電力、又はこの住宅を、住宅負荷Hとも記載する。また、商業施設や工場によって消費される電力、又はこの商業施設や工場を、商工業負荷Fとも記載する。
ここで、配電線DSTには、高圧配電線と低圧配電線とがある。高圧配電線とは、変電所SBから柱上トランスまでの配電線である。低圧配電線とは、柱上トランスから引込線SLまでの配電線である。この場合、変電所SBから供給される電力は、高圧配電線、柱上変圧器、低圧配電線、引込線SLを順に介して需要家に配電される。なお、以下の説明においては、変電所SBから供給される電力は、配電線DST、柱上変圧器、引込線SLを順に介して需要家に配電されるものとして記載する。すなわち、配電線DSTにおいて、高圧配電線と低圧配電線との区別を省略して記載する。
[Outline of theft detection device 10]
FIG. 1 is a diagram illustrating an example of a facility to be detected by a theft detection device 10 according to an embodiment of the present invention. In this example, the facility to be detected is a power distribution system 1 for supplying power. The power distribution system 1 includes a substation SB, a distribution line DST, and a utility pole EP. The substation SB converts power supplied from a power station (not shown), and supplies the converted power to the distribution line DST. The distribution line DST distributes the electric power supplied from the substation SB to consumers. In this example, the distribution line DST includes two types of systems, an A system (distribution line DST-A) and a B system (distribution line DST-B). The utility pole EP suspends the distribution line DST. A pole transformer (not shown) is installed on the utility pole EP. The pole transformer converts the voltage of power supplied from the distribution line DST into a voltage suitable for supply. A service line SL is installed from the pole transformer to the customer. A consumer is a house, a commercial facility, a factory, or the like. Hereinafter, the power consumed by the house or this house is also referred to as a house load H. Moreover, the electric power consumed by a commercial facility or factory, or this commercial facility or factory is also referred to as a commercial and industrial load F.
Here, the distribution line DST includes a high-voltage distribution line and a low-voltage distribution line. The high voltage distribution line is a distribution line from the substation SB to the pole transformer. The low voltage distribution line is a distribution line from the pole transformer to the service line SL. In this case, the electric power supplied from the substation SB is distributed to consumers through the high-voltage distribution line, the pole transformer, the low-voltage distribution line, and the service line SL in this order. In the following description, the power supplied from the substation SB is described as being distributed to consumers through the distribution line DST, the pole transformer, and the service line SL in this order. That is, in the distribution line DST, the distinction between the high-voltage distribution line and the low-voltage distribution line is omitted.
なお、配電線DSTは、複数の区間に分割されることがある。具体的には、A系統の配電線DST−Aは、区間SEC−A1、区間SEC−A2及び区間SEC−A3の3区間に分割される。B系統の配電線DST―Bは、区間SEC−B1、及び区間SEC−B2の2区間に分割される。   The distribution line DST may be divided into a plurality of sections. Specifically, the distribution line DST-A of the A system is divided into three sections, a section SEC-A1, a section SEC-A2, and a section SEC-A3. The distribution line DST-B of the B system is divided into two sections, a section SEC-B1 and a section SEC-B2.
各需要家は、電柱EPに設置される柱上トランスから、引込線SLを介して電力の供給を受ける。具体的には、住宅負荷HA1は、電柱EPA1に設置される柱上トランスから、引込線SLA1を介して電力の供給を受ける。商工業負荷FA1は、電柱EPA3に設置される柱上トランスから、引込線SLA3を介して電力の供給を受ける。同様に、住宅負荷HB1は、電柱EPB1に設置される柱上トランスから、引込線SLB1を介して電力の供給を受ける。   Each consumer receives supply of electric power from the pole transformer installed in the utility pole EP via the service line SL. Specifically, the residential load HA1 is supplied with electric power from the pole transformer installed on the utility pole EPA1 via the service line SLA1. The commercial and industrial load FA1 is supplied with electric power from the pole transformer installed on the utility pole EPA3 via the service line SLA3. Similarly, the house load HB1 is supplied with electric power from the pole transformer installed on the utility pole EPB1 via the service line SLB1.
ここで、需要家には、電力供給者との間に締結される電力供給契約に基づいて電力の供給を受ける正規の需要家と、この電力供給契約に基づかずに電力の供給を受ける非正規の需要家とがある。この非正規の需要家を、未契約需要家又は未契約負荷NCとも記載する。また、未契約需要家による、配電システム1によって供給される電力の使用を、盗電とも記載する。つまり、盗電とは、未契約需要家による電力の使用である。   Here, a regular consumer who receives power supply based on a power supply contract concluded with a power supplier, and a non-regular customer who receives power supply not based on this power supply contract There is a consumer. This non-regular customer is also described as an uncontracted customer or an uncontracted load NC. Moreover, use of the electric power supplied by the power distribution system 1 by an unsigned consumer is also referred to as theft. That is, power theft is the use of electric power by non-contracted consumers.
図1に示す一例においては、未契約負荷NCA1は、配電線DST−Aの電柱EPA0に設置される柱上トランスに、未契約の引込線NCLを接続することにより、配電線DST−Aから電力の供給を受ける。   In the example shown in FIG. 1, the uncontracted load NCA1 is connected to a pole transformer installed in the utility pole EPA0 of the distribution line DST-A by connecting the uncontracted service line NCL to the power supply from the distribution line DST-A. Receive supply.
ここで、未契約負荷NCによる電力の使用に対しては、電力供給契約に基づく電力料金の請求ができない。つまり、未契約負荷NCが存在すると、電力を搾取される。このため、盗電は、電力供給者にとって問題である。したがって、電力供給者は、未契約負荷NCによる電力の使用、つまり盗電を検出できることが望ましい。以下、盗電検出装置10が盗電を検出する仕組みについて説明する。   Here, for the use of power by the non-contracted load NC, it is not possible to charge a power charge based on the power supply contract. That is, if there is an unsigned load NC, power is exploited. For this reason, power theft is a problem for power suppliers. Therefore, it is desirable that the power supplier can detect the use of power by the uncontracted load NC, that is, theft. Hereinafter, a mechanism in which the theft detection device 10 detects theft will be described.
図2は、本実施形態の盗電検出装置10の構成の一例を示す図である。盗電検出装置10は、予測電流算出部101と、検出電流取得部102と、盗電電流算出部103と、盗電構成比算出部104と、盗電契約高算出部105とを備える。   FIG. 2 is a diagram illustrating an example of the configuration of the theft detection device 10 of the present embodiment. The theft detection device 10 includes a predicted current calculation unit 101, a detection current acquisition unit 102, a theft power calculation unit 103, a theft power configuration ratio calculation unit 104, and a theft power contract amount calculation unit 105.
予測電流算出部101は、電力供給契約が示す契約容量に基づいて、負荷電流の予測値である予測電流値を算出する。この予測電流算出部101は、設備情報記憶部20と、契約情報記憶部30とに接続される。   The predicted current calculation unit 101 calculates a predicted current value that is a predicted value of the load current based on the contract capacity indicated by the power supply contract. The predicted current calculation unit 101 is connected to the facility information storage unit 20 and the contract information storage unit 30.
設備情報記憶部20には、電力供給設備の情報が記憶されている。具体的には、設備情報記憶部20には、配電線DSTの系統数、各系統の配電線DSTの区間数などの情報が記憶されている。
契約情報記憶部30には、電力供給契約の情報が記憶されている。具体的には、契約情報記憶部30には、各需要家の契約種別や契約高、当該需要家に接続されている配電線DSTの区間SECなどが、需要家ごとに記憶されている。ここで、図3を参照して契約種別の一例について説明する。
The facility information storage unit 20 stores information on power supply facilities. Specifically, the facility information storage unit 20 stores information such as the number of distribution lines DST and the number of sections of distribution lines DST of each system.
The contract information storage unit 30 stores power supply contract information. Specifically, the contract information storage unit 30 stores the contract type and contract amount of each customer, the section SEC of the distribution line DST connected to the customer, and the like for each customer. Here, an example of the contract type will be described with reference to FIG.
図3は、本実施形態の電力供給契約の契約種別の一例を示す図である。契約種別には、低圧契約と、高圧契約とがある。また、低圧契約には、電灯契約と、動力契約とがある。
高圧契約には、業務用電力契約と、高圧電力契約とがある。
FIG. 3 is a diagram illustrating an example of a contract type of the power supply contract according to the present embodiment. There are two types of contracts: low pressure contracts and high pressure contracts. The low-pressure contract includes a light contract and a power contract.
High-voltage contracts include commercial power contracts and high-voltage power contracts.
図2に戻り、予測電流算出部101は、クラスタ分析によって、各系統の配電線DSTについて、契約種別ごとの契約高の構成比を算出する。   Returning to FIG. 2, the predicted current calculation unit 101 calculates the contract ratio of each contract type for the distribution lines DST of each system by cluster analysis.
図4は、本実施形態の配電線DSTの各系統におけるロードカーブの一例を示す図である。この一例では、A系統の配電線DST−A及びB系統の配電線DST−Bの1日あたりのロードカーブを示す。ここで、配電線DST−Aのロードカーブは、電流波形WAによって示される。また、配電線DST−Bのロードカーブは、電流波形WBによって示される。なお以下の説明において、ロードカーブを需要特性とも記載する。   FIG. 4 is a diagram illustrating an example of a load curve in each system of the distribution line DST of the present embodiment. In this example, the load curve per day of the distribution line DST-A of A system and the distribution line DST-B of B system is shown. Here, the load curve of the distribution line DST-A is indicated by the current waveform WA. Further, the load curve of the distribution line DST-B is indicated by a current waveform WB. In the following description, the load curve is also referred to as demand characteristics.
図5は、本実施形態の配電線DSTのロードカーブについての契約種別ごとの契約高の構成比の一例を示す図である。この一例においては、A系統の配電線DST−Aは、電灯、動力、業務用電力の構成比が比較的小さく、高圧電力の構成比が比較的大きい。また、B系統の配電線DST−Bは、電灯の構成比が比較的大きく、業務用電力の構成比が電灯の構成比に次いで大きく、動力と、高圧電力との構成比が比較的小さい。予測電流算出部101は、クラスタ分析によって算出した構成比が示すロードカーブの特徴に基づいて、配電線DSTごとのロードカーブを分類することができる。 FIG. 5 is a diagram illustrating an example of the composition ratio of the contract height for each contract type regarding the load curve of the distribution line DST of the present embodiment. In this example, the A system distribution line DST-A has a relatively small component ratio of electric light, power, and commercial power, and a relatively large component ratio of high-voltage power. Further , the distribution line DST-B of the B system has a relatively large component ratio of electric light, a component ratio of commercial power is next to that of the lamp, and a component ratio of power and high-voltage power is relatively small. The predicted current calculation unit 101 can classify the load curve for each distribution line DST based on the characteristics of the load curve indicated by the composition ratio calculated by the cluster analysis.
また、予測電流算出部101は、クラスタ分析において、月ごと、平日及び休日ごと、1時間単位の時間ごとに、ロードカーブの特徴を算出してもよい。この場合、予測電流算出部101は、月ごと、平日及び休日ごと、1時間単位の時間ごとのロードカーブの特徴を算出する。予測電流算出部101がロードカーブの特徴を算出した結果の一例について、図6に示す。   In addition, the predicted current calculation unit 101 may calculate the characteristics of the road curve for each hour in the cluster analysis, every month, every weekday, every holiday, and every hour. In this case, the predicted current calculation unit 101 calculates the characteristics of the load curve for each month, weekday, holiday, and hour. An example of the result of calculating the characteristics of the load curve by the predicted current calculation unit 101 is shown in FIG.
図6は、本実施形態の予測電流算出部101によるクラスタ分析結果の一例を示す図である。予測電流算出部101は、上述したロードカーブの特徴を、月ごと、平日及び休日ごとに、数種類の負荷パターンにクラスタ化する。図6には、任意の月の平日のロードカーブを、4種類の負荷パターンにクラスタ化した一例を示す。負荷パターン1は、電灯の構成比が比較的大きく、動力と、業務用電力と、高圧電力との構成比が比較的小さい。また、負荷パターン2は、電灯と、高圧電力と、動力と、業務用電力との構成比が同程度である。負荷パターン3は、業務量電力の構成比が比較的大きく、電灯と、動力と、高圧電力との構成比が比較的小さい。負荷パターン4は、高圧電力の構成比が比較的大きく、電灯と、動力と、業務量電力の構成比が比較的小さい。   FIG. 6 is a diagram illustrating an example of a cluster analysis result by the predicted current calculation unit 101 of the present embodiment. The predicted current calculation unit 101 clusters the characteristics of the above-described load curve into several types of load patterns for each month, weekday, and holiday. FIG. 6 shows an example in which weekday load curves of an arbitrary month are clustered into four types of load patterns. The load pattern 1 has a relatively large component ratio of the lamp and a relatively small component ratio of power, business power, and high voltage power. Moreover, the load pattern 2 has the same component ratio of electric light, high-voltage power, power, and business power. The load pattern 3 has a relatively large composition ratio of work amount power, and a relatively small composition ratio of electric light, power, and high-voltage power. The load pattern 4 has a relatively high composition ratio of high-voltage power and a relatively small composition ratio of electric light, power, and workload.
図2に戻り、予測電流算出部101は、クラスタ分析の結果に基づいて予測電流を算出する。この一例では、予測電流算出部101は、重回帰分析によって予測電流を算出する。なお、予測電流算出部101は、重回帰分析に代えて、ニューラルネットワーク分析や時系列分析によって予測電流を算出してもよい。   Returning to FIG. 2, the predicted current calculation unit 101 calculates a predicted current based on the result of the cluster analysis. In this example, the predicted current calculation unit 101 calculates a predicted current by multiple regression analysis. Note that the predicted current calculation unit 101 may calculate the predicted current by neural network analysis or time series analysis instead of the multiple regression analysis.
検出電流取得部102は、配電線DSTを流れる電流の実測値を取得する。ここで、配電線DSTを流れる電流の実測値を、検出電流値とも記載する。つまり、検出電流取得部102は、電線を流れる負荷電流が検出された値である検出電流値を取得する。
検出電流取得部102は、電流検出部40に接続されている。この電流検出部40は、電流センサを備えており、配電線DSTを流れる電流の電流値を検出する。電流検出部40は、配電システム1の様々な配電設備に設置可能である。例えば、電流検出部40は、配電線DSTの変電所SB側の端、すなわち給電ポイントに設置される。この場合、電流検出部40は、ある系統の配電線DSTに流れる電流の総電流値、すなわち変電所SBの送出電流値を検出する。また、電流検出部40は、各電柱EPに設置されてもよい。また、電流検出部40は、配電線DSTの区間SECごとに設置されてもよい。
The detected current acquisition unit 102 acquires an actual measurement value of the current flowing through the distribution line DST. Here, the actual measurement value of the current flowing through the distribution line DST is also referred to as a detected current value. That is, the detected current acquisition unit 102 acquires a detected current value that is a value in which a load current flowing through the electric wire is detected.
The detected current acquisition unit 102 is connected to the current detection unit 40. The current detection unit 40 includes a current sensor and detects a current value of a current flowing through the distribution line DST. The current detection unit 40 can be installed in various power distribution facilities of the power distribution system 1. For example, the electric current detection part 40 is installed in the end by the side of the substation SB of the distribution line DST, ie, a feeding point. In this case, the current detection unit 40 detects the total current value of the current flowing through the distribution line DST of a certain system, that is, the transmission current value of the substation SB. Moreover, the electric current detection part 40 may be installed in each utility pole EP. Moreover, the electric current detection part 40 may be installed for every area SEC of the distribution line DST.
盗電電流算出部103は、予測電流算出部101が算出する予測電流値と、検出電流取得部102が取得する検出電流値とに基づいて、電線を流れる負荷電流のうち未契約の電流である盗電電流値を算出する。   The stealing current calculation unit 103 is based on the predicted current value calculated by the predicted current calculation unit 101 and the detected current value acquired by the detected current acquisition unit 102. Calculate the current value.
盗電構成比算出部104は、電力供給契約の契約種類と、盗電電流算出部103が算出する盗電電流値との相関に基づいて、契約種類毎の盗電電流値の構成比を算出する。
盗電契約高算出部105は、電力供給契約の契約種類と、盗電電流算出部103が算出する盗電電流値との相関に基づいて、契約種類毎の契約高を算出する。
次に、これら盗電検出装置10の各部の動作の具体例について、図7を参照して説明する。
The theft power ratio calculation unit 104 calculates the ratio of the theft current value for each contract type based on the correlation between the contract type of the power supply contract and the theft current value calculated by the theft current calculation unit 103.
The theft contract amount calculation unit 105 calculates the contract amount for each contract type based on the correlation between the contract type of the power supply contract and the theft current value calculated by the theft power calculation unit 103.
Next, a specific example of the operation of each part of the theft detection device 10 will be described with reference to FIG.
[盗電検出装置10の動作の具体例]
図7は、本実施形態の盗電検出装置10の動作の一例を示す図である。
(ステップS10)予測電流算出部101は、式(1)に基づいて予測電流を算出する。
[Specific example of operation of theft detection device 10]
FIG. 7 is a diagram illustrating an example of the operation of the theft detection device 10 of the present embodiment.
(Step S10) The predicted current calculation unit 101 calculates a predicted current based on the formula (1).


ここで、負荷パターン及び契約種別は、上述したとおり、いずれも4種類である。したがって、式(1)の偏回帰係数は、16種類ある。予測電流算出部101は、式(2)に示すように、この16種類の電流値を予測電流値として算出する。   Here, as described above, there are four types of load patterns and contract types. Therefore, there are 16 types of partial regression coefficients in equation (1). The predicted current calculation unit 101 calculates these 16 types of current values as predicted current values as shown in Expression (2).


(ステップS20)検出電流取得部102は、配電線DSTを流れる電流の実測値を取得する。
(ステップS30)盗電電流算出部103は、式(3)に基づいて、盗電電流値を算出する。
(Step S20) The detected current acquisition unit 102 acquires an actual measurement value of the current flowing through the distribution line DST.
(Step S30) The stolen current calculation unit 103 calculates a stealing current value based on the equation (3).



この盗電電流算出部103による盗電電流の算出結果の一例を図8に示す。
図8は、本実施形態の盗電電流算出部103による盗電電流の算出結果の一例を示す図である。盗電電流算出部103は、検出電流取得部102が取得する検出電流値(電流波形W2)から、予測電流算出部101が算出する予測電流値(電流波形W1)を差し引くことにより、盗電電流値(電流波形W3)を算出する。
An example of the calculation result of the stealing current by the stealing current calculation unit 103 is shown in FIG.
FIG. 8 is a diagram illustrating an example of a calculation result of the stolen current by the stealing current calculation unit 103 according to the present embodiment. The stealing current calculating unit 103 subtracts the predicted current value (current waveform W1) calculated by the predicted current calculating unit 101 from the detected current value (current waveform W2) acquired by the detected current acquiring unit 102, thereby A current waveform W3) is calculated.
盗電電流算出部103は、算出した盗電電流値を、盗電検出装置10の外部の装置に出力してもよい。盗電検出装置10は、この盗電電流値を出力することにより、盗電の検出作業の担当者に対して盗電の状況を提示することができる。   The stealing current calculation unit 103 may output the calculated stealing current value to a device outside the theft detection device 10. The theft detection device 10 can present the status of the theft to the person in charge of the theft detection operation by outputting this theft current value.
(ステップS40)盗電構成比算出部104は、式(4)に基づいて、盗電電流値を正規化する。   (Step S40) The theft power configuration ratio calculation unit 104 normalizes the theft power value based on the equation (4).



盗電構成比算出部104が正規化した盗電電流値の一例を図9の電流波形W4に示す。
図9は、本実施形態の正規化された盗電電流値の一例を示す図である。
An example of the theft electric current value normalized by the theft power ratio calculation unit 104 is shown in a current waveform W4 in FIG.
FIG. 9 is a diagram illustrating an example of the normalized stealing current value according to the present embodiment.



また、盗電構成比算出部104は、式(5)に基づいて、正規化された盗電電流値と、各クラスタの正規化された平均電流値との相関係数を求める。図10に各クラスタの正規化された平均電流値の一例を示す。   Further, the theft power configuration ratio calculation unit 104 obtains a correlation coefficient between the normalized power theft current value and the normalized average current value of each cluster based on the equation (5). FIG. 10 shows an example of a normalized average current value of each cluster.
図10は、本実施形態の各クラスタの正規化された平均電流値の一例を示す図である。
盗電構成比算出部104は、正規化された盗電電流値と最も相関が高い、正規化された平均電流値のクラスタに、盗電電流値を分類する。図10に示す一例では、クラスタ1の正規化された平均電流値が、電流波形WC1によって示される。クラスタ2の正規化された平均電流値が、電流波形WC2によって示される。クラスタ3の正規化された平均電流値が、電流波形WC3によって示される。クラスタ4の正規化された平均電流値が、電流波形WC4によって示される。ここでは、正規化された盗電電流値と各クラスタの正規化された平均電流値との相関係数について、クラスタ1が0.21、クラスタ2が0.59、クラスタ2と3が0.59、クラスタ4が0.96である。この場合、盗電構成比算出部104は、正規化された盗電電流値と最も相関が高い、正規化された平均電流値のクラスタが、クラスタ4であると判定する。盗電構成比算出部104は、正規化された盗電電流値をクラスタ4に分類する。
FIG. 10 is a diagram illustrating an example of a normalized average current value of each cluster according to the present embodiment.
The theft power ratio calculation unit 104 classifies the stealed current values into clusters of normalized average current values that have the highest correlation with the normalized stealed current values. In the example shown in FIG. 10, the normalized average current value of cluster 1 is indicated by current waveform WC1. The normalized average current value of cluster 2 is indicated by current waveform WC2. The normalized average current value of cluster 3 is indicated by current waveform WC3. The normalized average current value of cluster 4 is indicated by current waveform WC4. Here, regarding the correlation coefficient between the normalized electric current value and the normalized average current value of each cluster, cluster 1 is 0.21, cluster 2 is 0.59, and clusters 2 and 3 are 0.59. , Cluster 4 is 0.96. In this case, the stealing power configuration ratio calculating unit 104 determines that the cluster of the normalized average current value having the highest correlation with the normalized stealing current value is the cluster 4. The theft power ratio calculation unit 104 classifies the normalized power theft current values into the cluster 4.
(ステップS50)盗電契約高算出部105は、式(6)に示すように、盗電電流値と、分類されたクラスタの偏回帰係数とに基づいて、電力供給契約の契約高を算出する。   (Step S50) The theft contract amount calculation unit 105 calculates the contract amount of the power supply contract based on the theft current value and the partial regression coefficient of the classified cluster, as shown in Expression (6).





盗電契約高算出部105による契約高の算出結果の一例を図11に示す。
図11は、本実施形態の盗電契約高算出部105による契約高の算出結果の一例を示す図である。この一例では、盗電契約高算出部105は、電灯契約を3000kW、動力契約を600kW、業務用電力契約を800kW、高圧電力を300kWとして算出する。
An example of the calculation result of the contract amount by the theft power contract amount calculation unit 105 is shown in FIG.
FIG. 11 is a diagram illustrating an example of a contract amount calculation result by the theft contract amount calculation unit 105 of the present embodiment. In this example, the power theft contract calculation unit 105 calculates the power contract as 3000 kW, the power contract as 600 kW, the business power contract as 800 kW, and the high-voltage power as 300 kW.
以上説明したように、本実施形態の盗電検出装置10は、予測電流算出部101が予測した予測電流値と、実際の電流値とを比較することにより、盗電を検出する。したがって、本実施形態の盗電検出装置10によれば、従来技術のように配電線の現場画像がなくても、盗電を検出することができる。このように構成することにより、盗電検出装置10は、盗電の検出に先立って、配電線の現場画像を取得する手間が無いため、従来技術に比べて、盗電の検出の手間を低減することができる。   As described above, the theft detection apparatus 10 of the present embodiment detects theft by comparing the predicted current value predicted by the predicted current calculation unit 101 with the actual current value. Therefore, according to the theft detection apparatus 10 of the present embodiment, it is possible to detect theft even if there is no field image of the distribution line as in the prior art. By configuring in this way, the theft detection device 10 does not have the trouble of acquiring the on-site image of the distribution line prior to the detection of the theft, and therefore can reduce the effort of the detection of theft compared to the prior art. it can.
また、本実施形態の盗電検出装置10は、予測電流算出部101がクラスタ分析によって予測電流値を算出する。このクラスタ分析は、電力供給契約の契約種類や契約高に基づいて、配電線毎に行われる。ここで、電力供給契約の契約種類や契約高は、需要特性を示している。つまり、盗電検出装置10は、配電線ごとの需要特性に基づいたクラスタ分析によって予測電流値を算出する。このように構成することにより、盗電検出装置10は、配電線の需要特性に基づいて盗電を検出することができる。例えば、電灯、動力、業務用、及び高圧電力の契約種類のうち、ある配電線は、電灯の契約高の割合が、他の契約種類の契約高の割合よりも小さい場合がある。つまりこの場合、この配電線は、正規の契約による「電灯」の使用量が比較的少ない。この場合には、盗電が「電灯」について行われているとすると、この配電線の「電灯」の使用量に対する盗電の使用量の割合が、他の配電線に比べて大きくなりやすい。したがって、この配電線については、少しでも「電灯」の検出電流値が増加した場合には、盗電が行われている可能性が高いと判定することができる。
すなわち、本実施形態の盗電検出装置10によれば、配電線ごとの需要特性に基づいたクラスタ分析によって予測電流値を算出することにより、配電線ごとの需要特性に応じた盗電の検出を行うことができる。
Further, in the theft detection apparatus 10 of the present embodiment, the predicted current calculation unit 101 calculates a predicted current value by cluster analysis. This cluster analysis is performed for each distribution line based on the contract type and contract height of the power supply contract. Here, the contract type and contract amount of the power supply contract indicate demand characteristics. That is, the theft detection device 10 calculates the predicted current value by cluster analysis based on the demand characteristics for each distribution line. By comprising in this way, the theft detection apparatus 10 can detect a theft based on the demand characteristic of a distribution line. For example, among the contract types of electric power, power, commercial use, and high-voltage power, a certain distribution line may have a contract amount ratio of the light smaller than a contract amount ratio of other contract types. In other words, in this case, the distribution line uses a relatively small amount of “light” under a regular contract. In this case, if power theft is performed for “light”, the ratio of the power usage of the power to the power usage of “light” of this distribution line tends to be larger than that of other power distribution lines. Therefore, for this distribution line, if the detected current value of the “light” increases even a little, it can be determined that there is a high possibility of theft being performed.
That is, according to the theft detection device 10 of the present embodiment, by detecting a predicted current value by cluster analysis based on the demand characteristics for each distribution line, it is possible to detect theft according to the demand characteristics for each distribution line. Can do.
また、盗電検出装置10は、配電線の区間ごとに、クラスタ分析を行うことによって予測電流値を算出してもよい。このように構成することにより、盗電検出装置10は、配線線ごとにクラスタ分析を行う場合に比べて、より細かく区分けされた需要特性に応じて、盗電の検出を行うことができる。つまり、このように構成することにより、盗電検出装置10は、盗電の検出の精度を向上させることができる。   The theft detection device 10 may calculate the predicted current value by performing cluster analysis for each section of the distribution line. With this configuration, the theft detection device 10 can detect theft in accordance with demand characteristics that are more finely divided than in the case of performing cluster analysis for each wiring line. In other words, with this configuration, the theft detection device 10 can improve the accuracy of detection of theft.
また、盗電検出装置10は、盗電構成比算出部104が、盗電電流値の需要特性と、配電線ごとの需要特性との相関に基づいて、盗電電流値の需要特性を分類する。このように構成することにより盗電検出装置10は、盗電電流値の契約種類の構成比を、盗電の検出作業の担当者に提示することができる。
また、盗電検出装置10は、盗電契約高算出部105が、盗電電流値と、配電線ごとの需要特性とに基づいて、盗電電流値の契約高を算出する。このように構成することにより盗電検出装置10は、盗電電流値の契約高を、盗電の検出作業の担当者に提示することができる。
このように、盗電検出装置10は、盗電電流値の契約種類の構成比や、盗電電流値の契約高を提示する。盗電検出装置10によれば、盗電がどのような状況で行なわれているのかを類推するための情報を提供することができる。
Further, in the theft detection device 10, the theft power configuration ratio calculation unit 104 classifies the demand characteristics of the theft current value based on the correlation between the demand characteristics of the theft current value and the demand characteristics for each distribution line. With this configuration, the theft detection device 10 can present the ratio of contract types of the theft current value to the person in charge of the detection of theft.
Also, in the theft detection device 10, the theft contract amount calculation unit 105 calculates the contract amount of the theft current value based on the theft current value and the demand characteristics for each distribution line. With this configuration, the theft detection device 10 can present the contract amount of the theft current value to the person in charge of the detection operation of the theft.
In this manner, the theft detection device 10 presents the contract ratio of the theft current value and the contract amount of the theft current value. The theft detection device 10 can provide information for inferring under what circumstances the theft is being performed.
以上、本発明の実施形態を、図面を参照して詳述してきたが、具体的な構成はこの実施形態に限られるものではなく、本発明の趣旨を逸脱しない範囲で適宜変更を加えることができる。   The embodiment of the present invention has been described in detail with reference to the drawings. However, the specific configuration is not limited to this embodiment, and appropriate modifications may be made without departing from the spirit of the present invention. it can.
なお、上述の各装置は内部にコンピュータを有している。そして、上述した各装置の各処理の過程は、プログラムの形式でコンピュータ読み取り可能な記録媒体に記憶されており、このプログラムをコンピュータが読み出して実行することによって、上記処理が行われる。ここでコンピュータ読み取り可能な記録媒体とは、磁気ディスク、光磁気ディスク、CD−ROM、DVD−ROM、半導体メモリ等をいう。また、このコンピュータプログラムを通信回線によってコンピュータに配信し、この配信を受けたコンピュータが当該プログラムを実行するようにしてもよい。   Each of the above devices has a computer inside. The process of each device described above is stored in a computer-readable recording medium in the form of a program, and the above-described processing is performed by the computer reading and executing the program. Here, the computer-readable recording medium means a magnetic disk, a magneto-optical disk, a CD-ROM, a DVD-ROM, a semiconductor memory, or the like. Alternatively, the computer program may be distributed to the computer via a communication line, and the computer that has received the distribution may execute the program.
また、上記プログラムは、前述した機能の一部を実現するためのものであってもよい。さらに、前述した機能をコンピュータシステムにすでに記録されているプログラムとの組み合わせで実現できるもの、いわゆる差分ファイル(差分プログラム)であってもよい。   The program may be for realizing a part of the functions described above. Furthermore, what can implement | achieve the function mentioned above in combination with the program already recorded on the computer system, what is called a difference file (difference program) may be sufficient.
1…配電システム、10…盗電検出装置、101…予測電流算出部、102…検出電流取得部、103…盗電電流算出部、104…盗電構成比算出部、105…盗電契約高算出部 DESCRIPTION OF SYMBOLS 1 ... Power distribution system, 10 ... Stealing power detection apparatus, 101 ... Predictive current calculation part, 102 ... Detection current acquisition part, 103 ... Stealing current calculation part, 104 ... Stealing power composition ratio calculation part, 105 ... Stealing contract height calculation part

Claims (7)

  1. 電力供給契約が示す契約容量に基づいて、配電線ごとの需要特性に基づいた負荷パターンの分類によって負荷電流の予測値である予測電流値を算出する予測電流算出部と、
    電線を流れる負荷電流が検出された値である検出電流値を取得する検出電流取得部と、
    前記予測電流算出部が算出する前記予測電流値と、前記検出電流取得部が取得する前記検出電流値とに基づいて、前記電線を流れる前記負荷電流のうち未契約の電流である盗電電流値を算出する盗電電流算出部と
    を備える盗電検出装置。
    Based on the contract capacity indicated by the power supply contract, a predicted current calculation unit that calculates a predicted current value that is a predicted value of the load current by classifying the load pattern based on the demand characteristics for each distribution line;
    A detection photoelectric Nagareto obtained part load current flowing through the electric wire to obtain a detected current value is detected values,
    Based on the predicted current value calculated by the predicted current calculation unit and the detected current value acquired by the detected current acquisition unit, a stealing current value that is an unsigned current among the load currents flowing through the electric wire is calculated. A stealing detection device comprising: a stealing current calculation unit for calculating.
  2. 前記予測電流算出部は、電力供給契約が示す契約容量に基づいて、配電線ごとの需要特性に基づいたクラスタ分析によって負荷電流の予測値である予測電流値を算出す
    求項1に記載の盗電検出装置。
    The predicted current calculation unit based on the contracted capacity indicated by the power supply contract, it calculates the predicted current value is a prediction value of the load current by cluster analysis based on the demand characteristics of each distribution line
    Theft detection apparatus according to Motomeko 1.
  3. 前記電力供給契約の契約種類と、前記盗電電流算出部が算出する前記盗電電流値との相関に基づいて、前記契約種類毎の前記盗電電流値の構成比を算出する盗電構成比算出部
    を備える請求項1又は請求項2に記載の盗電検出装置。
    A power theft configuration ratio calculation unit that calculates a configuration ratio of the power theft current value for each contract type based on a correlation between the contract type of the power supply contract and the power theft current value calculated by the power theft current calculation unit The theft detection device according to claim 1 or 2.
  4. 前記電力供給契約の契約種類と、前記盗電電流算出部が算出する前記盗電電流値との相関に基づいて、前記契約種類毎の契約高を算出する契約高算出部
    を備える請求項1から請求項3のいずれか一項に記載の盗電検出装置。
    Billing and contract type of the power supply contract, based on the correlation between the theft current value the theft current calculator calculates, from claim 1, further comprising a policy amount calculation unit that calculates a contract high for each of the contract type Item 4. The theft detection device according to any one of items 3 to 4.
  5. 電力供給契約が示す契約容量に基づいて、負荷電流の予測値である予測電流値を算出する予測電流算出部と、
    電線を流れる負荷電流が検出された値である検出電流値を取得する検出電流取得部と、
    前記予測電流算出部が算出する前記予測電流値と、前記検出電流取得部が取得する前記検出電流値とに基づいて、前記電線を流れる前記負荷電流のうち未契約の電流である盗電電流値を算出する盗電電流算出部と、
    前記電力供給契約の契約種類と、前記盗電電流算出部が算出する前記盗電電流値との相関に基づいて、前記契約種類毎の前記盗電電流値の構成比を算出する盗電構成比算出部と
    を備える盗電検出装置。
    A predicted current calculation unit that calculates a predicted current value that is a predicted value of the load current based on the contracted capacity indicated by the power supply contract;
    A detection photoelectric Nagareto obtained part load current flowing through the electric wire to obtain a detected current value is detected values,
    Based on the predicted current value calculated by the predicted current calculation unit and the detected current value acquired by the detected current acquisition unit, a stealing current value that is an unsigned current among the load currents flowing through the electric wire is calculated. A stealing current calculation unit to calculate,
    A power theft configuration ratio calculation unit that calculates a configuration ratio of the power theft current value for each contract type based on the correlation between the contract type of the power supply contract and the power theft current value calculated by the power theft current calculation unit; Theft detection device provided.
  6. 電力供給契約が示す契約容量に基づいて、負荷電流の予測値である予測電流値を算出する予測電流算出部と、
    電線を流れる負荷電流が検出された値である検出電流値を取得する検出電流取得部と、
    前記予測電流算出部が算出する前記予測電流値と、前記検出電流取得部が取得する前記検出電流値とに基づいて、前記電線を流れる前記負荷電流のうち未契約の電流である盗電電流値を算出する盗電電流算出部と、
    前記電力供給契約の契約種類と、前記盗電電流算出部が算出する前記盗電電流値との相関に基づいて、前記契約種類毎の契約高を算出する契約高算出部と
    を備える盗電検出装置。
    A predicted current calculation unit that calculates a predicted current value that is a predicted value of the load current based on the contracted capacity indicated by the power supply contract;
    A detection photoelectric Nagareto obtained part load current flowing through the electric wire to obtain a detected current value is detected values,
    Based on the predicted current value calculated by the predicted current calculation unit and the detected current value acquired by the detected current acquisition unit, a stealing current value that is an unsigned current among the load currents flowing through the electric wire is calculated. A stealing current calculation unit to calculate,
    A theft detection apparatus comprising: a contract height calculation unit that calculates a contract amount for each contract type based on a correlation between a contract type of the power supply contract and the stealing current value calculated by the stealing current calculation unit.
  7. コンピュータに、
    電力供給契約が示す契約容量に基づいて、配電線ごとの需要特性に基づいた負荷パターンの分類によって負荷電流の予測値である予測電流値を算出する予測電流算出ステップと、
    電線を流れる負荷電流が検出された値である検出電流値を取得する検出電流値取得ステップと、
    前記予測電流算出ステップにおいて算出される前記予測電流値と、前記検出電流取得ステップにおいて取得される前記検出電流値とに基づいて、前記電線を流れる前記負荷電流のうち未契約の電流である盗電電流値を算出する盗電電流算出ステップと
    を実行させるためのプログラム。
    On the computer,
    Based on the contract capacity indicated by the power supply contract, a predicted current calculation step of calculating a predicted current value that is a predicted value of the load current by classifying the load pattern based on the demand characteristics for each distribution line;
    A detection current value acquisition step of acquiring a detection current value that is a value in which a load current flowing through the electric wire is detected;
    And the predicted current value that will be calculated in the predicted current calculating step, based on said detected current value acquired in the detected current value obtaining step, a non-contracted current of the load current flowing through the electric wire theft A program for executing a stealing current calculation step for calculating a current value.
JP2017562479A 2016-01-18 2016-12-19 Theft detection device and program Active JP6468372B2 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2016007172 2016-01-18
JP2016007172 2016-01-18
PCT/JP2016/087741 WO2017126273A1 (en) 2016-01-18 2016-12-19 Power-theft detection apparatus and program

Publications (2)

Publication Number Publication Date
JPWO2017126273A1 JPWO2017126273A1 (en) 2018-04-26
JP6468372B2 true JP6468372B2 (en) 2019-02-13

Family

ID=59362278

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017562479A Active JP6468372B2 (en) 2016-01-18 2016-12-19 Theft detection device and program

Country Status (2)

Country Link
JP (1) JP6468372B2 (en)
WO (1) WO2017126273A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108256559B (en) * 2017-12-27 2021-05-14 国网河南省电力公司电力科学研究院 Low-voltage electricity stealing user positioning method based on local outlier factor

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005185028A (en) * 2003-12-22 2005-07-07 Tm T & D Kk Monitoring system of low-voltage power distribution system
JP5560828B2 (en) * 2010-03-26 2014-07-30 東京電力株式会社 Transformer load estimation method
JP5842120B2 (en) * 2011-02-16 2016-01-13 パナソニックIpマネジメント株式会社 Power usage monitoring device, power usage monitoring system
JP5538288B2 (en) * 2011-03-31 2014-07-02 三菱電機株式会社 Distribution system voltage controller
JP2013090344A (en) * 2011-10-13 2013-05-13 Hitachi Ltd Power interchange method and power interchange device

Also Published As

Publication number Publication date
JPWO2017126273A1 (en) 2018-04-26
WO2017126273A1 (en) 2017-07-27

Similar Documents

Publication Publication Date Title
Hernández et al. Artificial neural networks for short-term load forecasting in microgrids environment
Günter et al. Energy storage for grid services and applications: Classification, market review, metrics, and methodology for evaluation of deployment cases
JP6147802B2 (en) Distribution system analysis using meter data
Jalali et al. A multi-stage MINLP-based model for sub-transmission system expansion planning considering the placement of DG units
WO2015004893A1 (en) Power management device, power management system, server, power management method, and program
WO2014080515A1 (en) Data analyzing device and program
US10197613B2 (en) Transformer connection phase determination device, method, and program
JP6468372B2 (en) Theft detection device and program
US20200220743A1 (en) Activity management device, activity management system, and activity management method
Esmaeeli et al. Risk-based planning of distribution substation considering technical and economic uncertainties
Hreinsson et al. Stochastic security constrained unit commitment and non-spinning reserve allocation with performance guarantees
JP4531638B2 (en) Transformer load assumption method, transformer load assumption device
Sun et al. An efficient approach for short-term substation load forecasting
Lotfi et al. An efficient preprocessing approach for uncertainty consideration in microgrids
Haq et al. Clear—a circuit level electric appliance radar for the electric cabinet
JP2019054715A (en) Power theft monitoring system, power theft monitoring device, power theft monitoring method and program
US10908198B2 (en) Determining meter phase using interval voltage measurements
JPWO2018168053A1 (en) Power management device, power management method, and program
WO2018225455A1 (en) Power management system, power storage system, transmission method, and program
CN109345013A (en) A kind of distribution user power utilization behavior prediction method
Alam et al. Power Flow Management With Demand Response Profiles Based on User-Defined Area, Load, and Phase Classification
Liu Combining sister load forecasts
Grigoras et al. Smart Metering Based Strategies for Improving Energy Efficiency in Microgrids
Bukhsh et al. Adequacy assessment of future electricity networks
JP2020004164A (en) Photovoltaic power generation output estimation device and output estimation method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20171128

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180724

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180919

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20181030

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20181207

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20181218

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20181231

R150 Certificate of patent or registration of utility model

Ref document number: 6468372

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150