JP6454897B1 - Piping suspension support structure comprising a plurality of piping suspension supports - Google Patents

Piping suspension support structure comprising a plurality of piping suspension supports Download PDF

Info

Publication number
JP6454897B1
JP6454897B1 JP2017200873A JP2017200873A JP6454897B1 JP 6454897 B1 JP6454897 B1 JP 6454897B1 JP 2017200873 A JP2017200873 A JP 2017200873A JP 2017200873 A JP2017200873 A JP 2017200873A JP 6454897 B1 JP6454897 B1 JP 6454897B1
Authority
JP
Japan
Prior art keywords
pipe
suspension
support
suspension support
band
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2017200873A
Other languages
Japanese (ja)
Other versions
JP2019074147A (en
Inventor
隆次郎 渋谷
隆次郎 渋谷
Original Assignee
株式会社アカギ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社アカギ filed Critical 株式会社アカギ
Priority to JP2017200873A priority Critical patent/JP6454897B1/en
Application granted granted Critical
Publication of JP6454897B1 publication Critical patent/JP6454897B1/en
Publication of JP2019074147A publication Critical patent/JP2019074147A/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

【目的】トンネル天井への長尺スパンにおける配管吊下支持であっても地震時の防震性及び耐震性の高い配管吊下支持具を提供する。【構成】配管軸方向の左前方位置・右後方位置から斜めに吊下げられる左前方吊下支持杆・右後方吊下支持杆による2点斜め吊下支持と吊りボルトによる1点吊下支持との合計3点吊下支持構成と成る第一サポート支持構成と、配管軸方向の左後方位置・右前方位置から斜めに吊下げられる左後方吊下支持杆・右前方吊下支持杆による2点斜め吊下支持と吊りボルトによる1点吊下支持との合計3点吊下支持構成と成る第二サポート支持構成と、の2種類のサポート支持構成を有する配管吊下支持具を、配管軸方向において交互に吊下配設した構成によって、隣接する配管吊下支持具同士が平面視した際に配管軸方向において対称のサポート支持構成を有する構成。【選択図】 図1[Purpose] To provide a pipe suspension support that is highly earthquake-proof and earthquake-resistant even when it is pipe suspension support in a long span to the tunnel ceiling. [Configuration] A left front suspension support rod that is slanted from the left front position and right rear position in the pipe axis direction, a two-point slant suspension support by a right rear suspension support rod, and a one-point suspension support by a suspension bolt 1 point support structure which is a total of 3 points suspension support structure, and 2 points by left rear suspension support rod and right front suspension support rod which is slanted from left rear position / right front position in the pipe axis direction A pipe suspension support tool having two types of support support structures, that is, a second support support structure having a total three-point suspension support structure including a slant suspension support and a one-point suspension support using suspension bolts, is provided in a pipe axial direction. The structure which has the support support structure symmetrical in a pipe-axis direction when adjacent pipe suspension support tools planarly view by the structure arrange | positioned alternately. [Selection] Figure 1

Description

本発明は複数の配管吊下支持具を具備する配管の吊下支持構造に関し、詳しくは天井スラブやトンネル天井等の取付面に、各種配管類を数mから数十m以上に及ぶ長尺スパンで吊下支持する複数の配管吊下支持具を具備する配管の吊下支持構造に関する。
The present invention relates to a pipe suspension support structure including a plurality of pipe suspension supports, and in particular, a long span extending from several meters to several tens of meters on various mounting surfaces such as ceiling slabs and tunnel ceilings. It is related with the suspension support structure of piping which comprises a plurality of piping suspension supports which are suspended and supported by.

天井スラブやトンネル天井等の取付面に各種配管類を吊下支持するには、例えば、特許文献1〜3等に示すような、吊りボルトと配管バンドとから成る支持構成を一組とする同構成の吊下支持具、或いは、斜めに垂設した1本又は2本の吊下支持杆を更に付加した支持構成を一組とする同構成の吊下支持具を、数mないし数十m間隔で複数個配設することにより行われている。   In order to suspend and support various pipes on a mounting surface such as a ceiling slab or a tunnel ceiling, for example, as shown in Patent Documents 1 to 3 and the like, a support structure including a suspension bolt and a piping band is used as a set. A suspension support having the same configuration, or a suspension support having the same configuration in which one or two suspension support rods provided obliquely are further added, is a few meters to a few tens of meters. This is done by arranging a plurality at intervals.

上記の吊下支持構成は、たとえ数百mないし数百m以上に及ぶトンネル内配管等のように超長尺スパンにおける吊下支持であっても、前記したような同構成の配管支持具を多数個用いることにより行われている。   Even if the above suspension support structure is a suspension support in a very long span such as a pipe in a tunnel extending over several hundreds of meters to several hundreds of meters or more, the pipe support having the same structure as described above is used. This is done by using a large number.

特開2004−150452号JP2004150452 実用新案登録第2524340号Utility Model Registration No. 2524340 登録実用新案第3148361号Registered Utility Model No. 3148361

同構成の配管支持具を長尺スパンにおいて複数個ないし多数個用いて吊下支持した場合、地震等の揺れが発生すると、配管軸方向の振動負荷と配管軸直交方向の振動負荷とが同時に生じることに加えて、捻れを含む軸線回り方向に傾動・揺動する負荷・モーメント・応力・歪等をも生じることになり、揺れを収束させることができないことが多いだけでなく、複数個ないし多数個の配管支持具に掛かる負荷・モーメント・応力・歪等が同調して増幅されてしまうこともあり、配管支持具に歪みや破損が生じ易く、耐震強度の点で問題が起き易いことが判った。   When multiple or many pipe supports with the same configuration are suspended and supported in a long span, vibrations in the direction of the pipe axis and vibrations in the direction perpendicular to the pipe axis are generated simultaneously when vibration such as an earthquake occurs. In addition, it may cause loads, moments, stresses, strains, etc. that tilt and oscillate in the direction around the axis including torsion. It can be seen that loads, moments, stresses, strains, etc. applied to individual pipe supports may be amplified in synchronism, and the pipe supports are likely to be distorted and damaged, and problems are likely to occur in terms of seismic strength. It was.

そこで本発明の課題は、トンネル天井への長尺スパンにおける配管吊下支持であっても地震時の防震性及び耐震性の高い複数の配管吊下支持具を具備する配管の吊下支持構造を提供することにある。
Accordingly, an object of the present invention is to provide a pipe suspension support structure including a plurality of pipe suspension supports having high earthquake resistance and earthquake resistance even in the case of pipe suspension support in a long span to a tunnel ceiling. It is to provide.

上記課題を解決する本発明は下記構成を有する。   The present invention for solving the above problems has the following configuration.

1.配管類を抱持するバンド抱持部と、該バンド抱持部の開放両端部に連設されたバンド端部とを有し、
天井スラブやトンネル天井等の取付面から吊り下げられる吊りボルトに、吊下接続部材を介して前記バンド端部を接続して、前記バンド抱持部に抱持した配管を前記取付面に吊下支持する複数の配管吊下支持具を具備する配管の吊下支持構造であって、
配管すべき略全域に亘って前記取付面から複数本の吊りボルトが所定間隔毎に吊り下げられ、この複数本の吊りボルトの各々に、前記配管吊下支持具が個々に接続されることにより、配管の長尺スパンにおける配管の吊下支持が可能な複数の配管吊下支持具を具備する配管の吊下支持構造において、
前記配管吊下支持具は、下記「配管の吊下支持構造における方向の定義」に基づいており、
該配管吊下支持具のバンド抱持部には、配管軸に直交するバンド抱持部の左右の側方部から横方向外側に各々延伸する左係止部・右係止部が設けられ、且つ、これらの左係止部・右係止部には透孔が各々形成された構成であり、
更に、前記配管吊下支持具は、下記構成の(1)第一サポート支持構成を有するものと、(2)第二サポート支持構成を有するものと、の2種類のサポート支持構成を有する配管吊下支持具を、配管軸方向において交互に吊下配設した構成とすることによって、この隣接する配管吊下支持具同士が平面視した際に配管軸方向において対称のサポート支持構成を有する構成であること、を特徴とする複数の配管吊下支持具を具備する配管の吊下支持構造
[2種類のサポート支持構成]
(1)第一サポート支持構成
バンド抱持部の左係止部の透孔には、前記取付面であって前記吊りボルトの吊下位置に対して配管軸方向の左前方位置に一端が固定されて斜めに吊下げられる左前方吊下支持杆の他端が接続取付された状態で係合される構成であり、
バンド抱持部の右係止部の透孔には、前記取付面であって前記吊りボルトの吊下位置に対して配管軸方向の右後方位置に一端が固定されて斜めに吊下げられる右後方吊下支持杆の他端が接続取付された状態で係合される構成であり、
この左前方吊下支持杆・右後方吊下支持杆による2点斜め吊下支持と、前記吊りボルトによる1点吊下支持と、によって合計3点吊下支持構成と成る第一サポート支持構成。
(2)第二サポート支持構成
バンド抱持部の左係止部の透孔には、前記取付面であって前記吊りボルトの吊下位置に対して配管軸方向の左後方位置に一端が固定されて斜めに吊下げられる左後方吊下支持杆の他端が接続取付された状態で係合される構成であり、
バンド抱持部の右係止部の透孔には、前記取付面であって前記吊りボルトの吊下位置に対して配管軸方向の右前方位置に一端が固定されて斜めに吊下げられる右前方吊下支持杆の他端が接続取付された状態で係合される構成であり、
この左後方吊下支持杆・右前方吊下支持杆による2点斜め吊下支持と、前記吊りボルトによる1点吊下支持と、によって合計3点吊下支持構成と成る第二サポート支持構成。
[「配管の吊下支持構造における方向」の定義]
配管の吊下支持構造において複数の配管支持具に抱持支持される配管の一端側を正対視した際の該配管の一端を正面として、該配管の正面の左方向側を左とし、該配管の正面の右方向側を右とし、配管軸方向における手前側を前方とし、配管軸方向における奥側である配管の他端方向を後方とする。
1. A band holding portion for holding the piping, and a band end portion connected to both open ends of the band holding portion,
Hanging bolt hung from a mounting surface such as a ceiling slab and tunnel ceilings, connecting the band end through the hanging down connecting member, suspended the pipe that holding the band holding unit to the mounting surface A pipe suspension support structure comprising a plurality of pipe suspension supports to be supported ,
A plurality of suspension bolts are suspended from the mounting surface over a substantially entire area to be piped at predetermined intervals, and the pipe suspension support is individually connected to each of the plurality of suspension bolts. In the pipe suspension support structure comprising a plurality of pipe suspension supports capable of supporting the suspension of the pipe in the long span of the pipe,
The pipe suspension support is based on the following "definition of direction in the pipe suspension support structure",
The band holding portion of the pipe suspension support tool is provided with a left locking portion and a right locking portion respectively extending laterally outward from the left and right side portions of the band holding portion orthogonal to the piping axis, And these left latching parts and right latching parts are each formed with through holes,
Further, the pipe suspension support tool has two types of support support structures: (1) having a first support support structure and (2) having a second support support structure. By adopting a configuration in which the lower support is alternately suspended in the pipe axis direction, the adjacent pipe suspension supports have a support support configuration that is symmetrical in the pipe axis direction when viewed in plan. A pipe suspension support structure comprising a plurality of pipe suspension supports .
[Two types of support structure]
(1) First Support Support Configuration One end of the through hole of the left retaining portion of the band holding portion is fixed to the attachment surface at the left front position in the pipe axis direction with respect to the suspension position of the suspension bolt. a has been configured to the other end of the left front suspension support rod that is suspended obliquely are engaged in a state of being connected attachment,
The hole of the right engaging portion of the band holding portion, that hung obliquely one end fixed to the right rear position of the pipe axis direction with respect to suspended position of the said a mounting surface hanger rod a configuration in which the other end of the right rear suspension supporting rod is engaged in a state of being connected attachment,
A first support support structure comprising a total of three-point suspension support structure, including a two-point oblique suspension support by the left front suspension support rod and right rear suspension support rod and a one-point suspension support by the suspension bolt.
(2) Second support support structure One end of the through hole of the left holding portion of the band holding portion is fixed at the left rear position in the pipe axis direction with respect to the suspension position of the suspension bolt. a has been configured to the other end of the left rear suspension support rod that is suspended obliquely are engaged in a state of being connected attachment,
The hole of the right engaging portion of the band holding portion, that hung obliquely one end fixed to the right front position of the pipe axis direction with respect to suspended position of the said a mounting surface hanger rod a configuration in which the other end of the right front suspension support rod is engaged in a state of being connected attachment,
A second support support structure comprising a total of three-point suspension support structures by the two-point slant suspension support by the left rear suspension support rod and the right front suspension support rod and the one-point suspension support by the suspension bolt.
[Definition of “Direction in Suspension Support Structure for Piping”]
In the suspended support structure for piping, one end of the pipe when facing one end side of the pipe held and supported by a plurality of pipe supports is the front, the left side of the front of the pipe is the left, The right side of the front of the pipe is the right, the front side in the pipe axis direction is the front, and the other end direction of the pipe, which is the back side in the pipe axis direction, is the rear.

2.前記バンド抱持部が、相対向する半円形状の2つのバンド抱持部が円形に組合うことによって配管を抱持可能であり、該2つのバンド抱持部の下端部分は組式又は蝶番式の如き接続部により拡開可能に接続された構成であることを特徴とする上記1に記載の複数の配管吊下支持具を具備する配管の吊下支持構造
2. The band holding portion can hold a pipe by combining two semicircular band holding portions facing each other in a circular shape, and the lower end portion of the two band holding portions is a combination type or a hinge. 2. A pipe suspension support structure comprising the plurality of pipe suspension supports according to 1 above , wherein the pipe suspension supports are connected to each other in such a manner that they can be expanded.

3.前記バンド抱持具が一本の帯状バンド体を環状に彎曲することによって配管を抱持可能であり、この帯状バンド体の開放両端部に前記バンド端部が各々連設された構成であることを特徴とする上記1に記載の複数の配管吊下支持具を具備する配管の吊下支持構造
3. The band-holding device can be configured to hold a pipe by bending a single band-shaped band in an annular shape, and the band ends are connected to both open ends of the band-shaped band, respectively. 2. A pipe suspension support structure comprising the plurality of pipe suspension supports according to 1 above.

請求項1に示す発明によれば、トンネル天井への長尺スパンにおける配管吊下支持であっても地震時の防震性及び耐震性の高い複数の配管吊下支持具を具備する配管の吊下支持構造を提供することができる。
According to the first aspect of the present invention, a pipe suspension comprising a plurality of pipe suspension supports having high earthquake resistance and earthquake resistance even in the case of pipe suspension support in a long span to a tunnel ceiling. A support structure can be provided.

2種類のサポート支持構成を有する配管吊下支持具を配管軸方向において交互に用いて配管を吊下支持することによって、この2種類の配管吊下支持具が、隣接するもの同士で平面視した際に配管軸方向において対称のサポート支持構成となるので、配管軸方向の振動負荷と配管軸直交方向の振動負荷とが同時に生じることに加えて、捻れを含む軸線回り方向に傾動・揺動する負荷・モーメント・応力・歪等をも生じた場合であっても、様々な方向における揺れを対称構成の2種類のサポート構成が互いに打ち消す作用効果を発揮し、揺れを収束させることができる。従って、長尺スパンにおける配管吊下支持であっても、複数個ないし多数個の配管支持具に掛かる負荷・モーメント・応力・歪等が同調して増幅されてしまうことを抑制することができ、配管支持具に歪みや破損が生じ難いという効果を有している。また、地震時に震源地の違いによって地震波の入射方向が変わっても、様々な振動方向にも対処することができるという、2種類のサポート支持構成による相乗効果を有している。   By suspending and supporting the pipes by alternately using the pipe suspension supports having two types of support support configurations in the pipe axis direction, the two types of pipe suspension supports are viewed in plan with each other adjacent to each other. Since the support support structure is symmetrical in the pipe axis direction, the vibration load in the pipe axis direction and the vibration load in the direction perpendicular to the pipe axis are generated at the same time, and tilt and swing in the direction around the axis including torsion. Even when a load, moment, stress, strain, or the like occurs, the two types of support configurations having symmetrical configurations can exhibit the effect of canceling each other in various directions, and the swing can be converged. Therefore, even if it is a pipe suspension support in a long span, it can be suppressed that the load, moment, stress, strain, etc. applied to a plurality or a plurality of pipe supports are synchronized and amplified. It has the effect that distortion and breakage hardly occur in the pipe support. Moreover, even if the incident direction of the seismic wave changes due to the difference in the epicenter during an earthquake, it has a synergistic effect by the two types of support support configurations that can cope with various vibration directions.

特に、各々合計3点吊下支持構成である第一サポート支持構成・第二サポート支持構成との2種類のサポート支持構成によって様々な振動方向にも対処できる、というコスト面及び配管取付面の事情(背面取付面は、必ずしも支持杆を自由に取付け可能であるとは限らない。)を配慮した有意な効果を発揮する。   In particular, the cost and pipe installation situation that various vibration directions can be dealt with by the two types of support support configurations, the first support support configuration and the second support support configuration, which are each a three-point suspension support configuration. (The back mounting surface does not always allow the support rod to be freely mounted).

更に、左前方吊下支持杆6と左後方吊下支持杆7、及び右前方吊下支持杆8と右後方吊下支持杆9の取付面が比較的接近する位置にあるので、配管支持工事の能率性の点で有意な効果を発揮する。   Further, since the mounting surfaces of the left front suspension support rod 6 and the left rear suspension support rod 7 and the right front suspension support rod 8 and the right rear suspension support rod 9 are located relatively close to each other, the pipe support work It shows a significant effect in terms of efficiency.

以上の効果によって、配管支持具や吊りボルト等の配管支持構成のみならず、配管そのもの、配管の接続部分・継手部分の歪み・損傷・破損等を著しく抑制することができるので、一箇所の被災が全システムに影響を及ぼす水道管等に代表されるライフラインに特に有用である。   As a result of the above effects, not only the pipe support structure such as the pipe support and suspension bolts, but also the piping itself, pipe connections and joints, distortion, damage, breakage, etc. can be remarkably suppressed. Is particularly useful for lifelines such as water pipes that affect the entire system.

請求項2に示す発明によれば、一般的な組式の配管支持バンドを用いて製造することができるので容易に且つ低コストで提供することが可能である。   According to the invention shown in claim 2, since it can be manufactured using a general assembly type pipe support band, it can be provided easily and at low cost.

請求項3に示す発明によれば、一般的な提灯式の配管支持バンドを用いて製造することができるので容易に且つ低コストで提供することが可能である。   According to the invention shown in claim 3, since it can be manufactured using a general lantern type pipe support band, it can be provided easily and at low cost.

本発明に係る配管吊下支持具の使用状態の実施例を示す概略側面図(配管軸直交方向の側面から見た図)The schematic side view which shows the Example of the use condition of the piping suspension support tool which concerns on this invention (The figure seen from the side surface of a piping axis orthogonal direction) 図1の概略平面図(配管軸直交方向である上方から見た図(II−II線方向平面図))Schematic plan view of FIG. 1 (view from above which is the direction orthogonal to the pipe axis (plan view in the direction of the II-II line)) 図1の第一サポート支持構成の配管吊下支持具のみの概略正面図(配管軸方向から見た図)Schematic front view of only the pipe suspension support of the first support support configuration of FIG. 1 (viewed from the pipe axis direction) 図1の第二サポート支持構成の配管吊下支持具のみの概略正面図(配管軸方向から見た図)Schematic front view of only the pipe suspension support of the second support support configuration of FIG. 1 (viewed from the pipe axis direction)

次に、添付の図面に従って本発明を詳細に説明する。   Next, the present invention will be described in detail with reference to the accompanying drawings.

本発明に係る配管吊下支持具は、天井スラブやトンネル天井等の取付面に、給水管、排水管、送風管等の各種配管類を数mから数十mに及び長尺スパン、或いは数百m以上に及ぶ超長尺スパンで吊下支持するものであり、配管を抱持した配管バンドを取付面から垂設された釣りボルトと取付面から斜めに垂設した吊下支持杆とによって防振(防震)状態で多点吊下支持する支持構成を1組の吊下支持具とし、この吊下支持具を数mないし数十m間隔で複数個配設する構成である。  The piping suspension support according to the present invention has a long span or several spans of various pipes such as water supply pipes, drain pipes, blower pipes, etc. on the mounting surface such as a ceiling slab or tunnel ceiling. The suspension is supported by a very long span of more than a hundred meters, with a fishing band that hangs the pipe and a fishing bolt that is suspended from the mounting surface and a suspension support rod that is slanted from the mounting surface. A support structure for supporting multiple points in a vibration-proof (vibration-proof) state is a set of suspension supports, and a plurality of suspension supports are arranged at intervals of several meters to several tens of meters.

固定支持する種々の配管としては、一般的な鋼管の他、鋼管に代わって近年多く用いられるようになった合成樹脂管(ポリエチレン管、架橋ポリエチレン管、ポリブデン管、塩化ビニル管、プロピレン管、ABS管等)の固定支持にも有効である。   As various pipes to be fixed and supported, in addition to general steel pipes, synthetic resin pipes (polyethylene pipes, cross-linked polyethylene pipes, polybutene pipes, vinyl chloride pipes, propylene pipes, ABS, which have been widely used in recent years instead of steel pipes It is also effective for fixing and supporting pipes).

本発明の配管吊下支持具の具体的構成としては、図1〜図4に示すように、
配管類を抱持するバンド抱持部11と、該バンド抱持部11の開放両端部に連設されたバンド端部13・13とを有し、
天井スラブやトンネル天井等の取付面2から吊り下げられる吊りボルト3に、タンバックルの如き吊下接続部材31を介して前記バンド端部13・13を接続して、前記バンド抱持部11に抱持した配管Pを前記取付面2に吊下支持する配管吊下支持具1であって、 配管すべき略全域に亘って前記取付面2から複数本の吊りボルト3・3・3・・・が所定間隔毎に吊り下げられ、この複数本の吊りボルト3の各々に、前記配管吊下支持具1が個々に接続されることにより、配管Pの長尺スパンにおける吊下支持が可能なものであり、
前記配管吊下支持具1のバンド抱持部11には、配管軸に直交するバンド抱持部11の左右の側方部から横方向外側に各々延伸する左係止部14・右係止部15が設けられ、且つ、これらの左係止部14・右係止部15には透孔が各々形成された構成であり、
更に、前記配管吊下支持具1は、下記構成の(1)第一サポート支持構成Aを有するものと、(2)第二サポート支持構成Bを有するものと、の2種類のサポート支持構成A・Bを有する配管吊下支持具1を、配管軸方向において交互に吊下配設した構成とすることによって、この隣接する配管吊下支持具1・1同士が平面視した際に配管軸方向において対称のサポート支持構成を有する構成であることを主構成とするものである。
「配管の吊下支持構造における方向の定義」について付記すれば、図3及び図4に示すように、配管の吊下支持構造において複数の配管支持具に抱持支持される配管の一端側を正対視した際の該配管の一端を正面として、該配管の正面の左方向側を左とし、該配管の正面の右方向側を右とし、配管軸方向における手前側を前方とし、配管軸方向における奥側である配管の他端方向を後方とする。即ち、図1及び図2における右方向側が前方であり、左方向側が後方である。また、図2における上方側が左であり、下方側が右である。
As a specific configuration of the pipe suspension support of the present invention, as shown in FIGS.
A band holding portion 11 for holding piping, and band end portions 13 and 13 connected to both open ends of the band holding portion 11;
The band end portions 13 and 13 are connected to a suspension bolt 3 that is suspended from a mounting surface 2 such as a ceiling slab or a tunnel ceiling via a suspension connection member 31 such as a tumble buckle. A pipe suspension support 1 for suspending and supporting the pipe P held by the mounting surface 2, and a plurality of suspension bolts 3, 3, 3. Is suspended at predetermined intervals, and the pipe suspension support 1 is individually connected to each of the plurality of suspension bolts 3 to enable suspension support in the long span of the pipe P. Is,
The band holding portion 11 of the pipe suspension support 1 includes a left locking portion 14 and a right locking portion that extend laterally outward from the left and right side portions of the band holding portion 11 orthogonal to the piping axis. 15 and the left locking portion 14 and the right locking portion 15 are formed with through holes,
Further, the pipe suspension support tool 1 has two types of support support configurations A: (1) having a first support support configuration A and (2) having a second support support configuration B. The pipe suspension support 1 having B is configured to be alternately suspended in the pipe axis direction, so that when the adjacent pipe suspension supports 1. The main structure is a structure having a symmetric support support structure.
If it adds about "definition of the direction in the suspension support structure of piping", as shown in FIG.3 and FIG.4, in the suspension support structure of piping, the one end side of piping supported by the several piping support tool is shown. One end of the pipe when viewed from the front is the front, the left side of the front of the pipe is the left, the right side of the front of the pipe is the right, the front side in the pipe axis direction is the front, the pipe shaft The other end direction of the pipe that is the back side in the direction is the rear side. That is, the right side in FIGS. 1 and 2 is the front, and the left side is the rear. Moreover, the upper side in FIG. 2 is left, and the lower side is right.

2種類のサポート支持構成A・Bは下記構成を有する。   The two types of support support configurations A and B have the following configurations.

(1)第一サポート支持構成A
バンド抱持部11の左係止部14の透孔には、前記取付面2であって前記吊りボルト3の吊下位置に対して配管軸方向の左前方位置に一端が固定されて斜めに吊下げられる吊りボルトの如き左前方吊下支持杆6の他端が直接又は間接的に接続取付された状態で係合される構成であり、
バンド抱持部11の右係止部15の透孔には、前記取付面2であって前記吊りボルト3の吊下位置に対して配管軸方向の右後方位置に一端が固定されて斜めに吊下げられる吊りボルトの如き右後方吊下支持杆9の他端が直接又は間接的に接続取付された状態で係合される構成であり、
この左前方吊下支持杆6・右後方吊下支持杆9による2点斜め吊下支持と、前記吊りボルト3による1点吊下支持と、によって合計3点吊下支持構成と成る第一サポート支持構成。
(1) First support support structure A
One end of the through hole of the left holding portion 14 of the band holding portion 11 is fixed to the attachment surface 2 at a left front position in the pipe axis direction with respect to the suspension position of the suspension bolt 3. The other end of the left front suspension support rod 6 such as a suspension bolt to be suspended is configured to be engaged in a state of being connected or attached directly or indirectly,
One end of the through hole of the right holding portion 15 of the band holding portion 11 is fixed to the attachment surface 2 at the right rear position in the pipe axis direction with respect to the suspension position of the suspension bolt 3 so as to be inclined. The other end of the right rear suspension support rod 9 such as a hanging bolt to be suspended is configured to be engaged in a state of being connected or attached directly or indirectly,
The first support having a total three-point suspension support structure with the two-point oblique suspension support by the left front suspension support rod 6 and the right rear suspension support rod 9 and the one-point suspension support by the suspension bolt 3. Support configuration.

(2)第二サポート支持構成B
バンド抱持部11の左係止部14の透孔には、前記取付面2であって前記吊りボルト3の吊下位置に対して配管軸方向の左後方位置に一端が固定されて斜めに吊下げられる吊りボルトの如き左後方吊下支持杆7の他端が直接又は間接的に接続取付された状態で係合される構成であり、
バンド抱持部11の右係止部15の透孔には、前記取付面2であって前記吊りボルト3の吊下位置に対して配管軸方向の右前方位置に一端が固定されて斜めに吊下げられる吊りボルトの如き右前方吊下支持杆8の他端が直接又は間接的に接続取付された状態で係合される構成であり、
この左後方吊下支持杆7・右前方吊下支持杆8による2点斜め吊下支持と、前記吊りボルト3による1点吊下支持と、によって合計3点吊下支持構成と成る第二サポート支持構成。
(2) Second support support structure B
One end of the through hole of the left holding portion 14 of the band holding portion 11 is fixed to the left rear position in the pipe axis direction with respect to the attachment surface 2 and the suspension position of the suspension bolt 3. The other end of the left rear suspension support rod 7 such as a suspension bolt to be suspended is configured to be engaged in a state where it is connected or attached directly or indirectly,
One end of the through hole of the right holding portion 15 of the band holding portion 11 is fixed to the attachment surface 2 at a right front position in the pipe axis direction with respect to the suspension position of the suspension bolt 3 so as to be inclined. The other end of the right front suspension support rod 8 such as a suspension bolt to be suspended is engaged with the other end connected directly or indirectly.
A second support having a total of three-point suspension support structure by the two-point oblique suspension support by the left rear suspension support rod 7 and the right front suspension support rod 8 and the one-point suspension support by the suspension bolt 3. Support configuration.

尚、図1〜図4に示す本実施例において、左係止部14の透孔への左前方吊下支持杆6・左後方吊下支持杆7の各一端の接続取付はナット61・ナット71の螺合によって行われ、右係止部15の透孔への右前方吊下支持杆8・右後方吊下支持杆9の各一端の接続取付はナット81・ナット91の螺合によって行われる。   In addition, in the present embodiment shown in FIGS. 1 to 4, connection of each end of the left front suspension support rod 6 and the left rear suspension support rod 7 to the through hole of the left locking portion 14 is performed by a nut 61 and a nut. 71, and the connection attachment of each end of the right front suspension support rod 8 and the right rear suspension support rod 9 to the through hole of the right locking portion 15 is performed by the screw engagement of the nut 81 and the nut 91. Is called.

尚また、符号16は吊下接続部材31にバンド端部13・13を接続固定するためのボルト・ナットを示し、符号12は2つのバンド抱持部11・11の下端部分を接続する組式又は蝶番式(本実施例では蝶番式)の如き接続部を示す。   Reference numeral 16 denotes a bolt and nut for connecting and fixing the band end portions 13 and 13 to the suspended connection member 31, and reference numeral 12 denotes a combined type for connecting the lower end portions of the two band holding portions 11 and 11. Alternatively, a connection portion such as a hinge type (in this embodiment, a hinge type) is shown.

以下、本発明の構成について更に詳説する。   Hereinafter, the configuration of the present invention will be described in more detail.

本発明の配管吊下支持具1は、この種の配管吊下支持具に用いられる材料として公知公用のものを特別の制限なく用いることができ、好ましくはステンレスやその他の金属製である。   As the pipe suspension support 1 of the present invention, a publicly known material can be used as a material used for this type of pipe suspension support, without any particular limitation, and is preferably made of stainless steel or other metal.

第一サポート構成A・第二サポート構成Bの各々の配管吊下支持具1の左係止部14・右係止部15は、その形成に際しての基点位置が本実施例ではバンド抱持部11の左右の側方部の略中央位置であるが、略中央位置より上方位置或いは下方位置であってもよく、この基点の位置を含めて左係止部14・右係止部15の延伸角度については、左係止部14・右係止部15に螺合係止される左前方吊下支持杆6・左後方吊下支持杆7・右前方吊下支持杆8・右後方吊下支持杆9の吊下げ角度等の諸条件によって適宜設定される。   The left latching portion 14 and the right latching portion 15 of the pipe suspension support 1 of each of the first support configuration A and the second support configuration B have base points at the time of formation of the band holding portion 11 in this embodiment. The left and right side portions of the left locking portion 14 and the right locking portion 15 including the positions of the base points may be extended at a position substantially above or below the center position. The left front suspension support rod 6, the left rear suspension support rod 7, the right front suspension support rod 8, and the right rear suspension support that are screwed and locked to the left engagement portion 14 and the right engagement portion 15. It is set as appropriate according to various conditions such as the hanging angle of the flange 9.

左係止部14・右係止部15の形成構成としては、図1〜図4に示す本実施例では、バンド抱持部11と同素材であって別体構成である板材をバンド抱持部11の形成位置に溶接によって取り付けることによって、左係止部14・右係止部15が各々形成されている。   In the present embodiment shown in FIGS. 1 to 4, the left latching portion 14 and the right latching portion 15 are formed by holding the plate material that is the same material and separate from the band holding portion 11. By attaching to the formation position of the part 11 by welding, the left latching | locking part 14 and the right latching | locking part 15 are each formed.

以上の構成を有する本発明の配管吊下支持具1は、その使用に際して図1及び図2に示すように、
図3に示す第一サポート支持構成Aを有する配管吊下支持具1を、取付面2に一端が固定される吊りボルト3にタンバックルの如き吊下接続部材31を介してバンド端部13をボルト・ナット16により固定することで前記取付面2に吊下支持し(第1点目の吊下支持)、前記取付面2に一端が固定され、斜め吊下げする公知公用の吊りボルトの如き左前方吊下支持杆6の他端を左係止部14の透孔に挿通してナット61によって螺合緊締することによって斜め吊下支持する(第2点目の斜め吊下支持)と共に、前記取付面2に一端が固定され、斜め吊下げする公知公用の吊りボルトの如き右後方吊下支持杆9の他端を右係止部15の透孔に挿通してナット91によって螺合緊締することによって斜め吊下支持する(第3点目の斜め吊下支持)ことにより、第一サポート支持構成Aにおける合計3点吊下支持構成と成ると共に、
次に、図4に示す第二サポート支持構成Bの配管支持具1を、上記の第一サポート構成Aを吊下支持する吊りボルト3の配管軸方向において隣接する吊りボルト3にタンバックルの如き吊下接続部材31を介してバンド端部13をボルト・ナット16により固定することで前記取付面2に吊下支持し(第1点目の吊下支持)、前記取付面2に一端が固定され、斜め吊下げする公知公用の吊りボルトの如き左後方吊下支持杆7の他端を左係止部14の透孔に挿通してナット71によって螺合緊締することによって斜め吊下支持する(第2点目の斜め吊下支持)と共に、前記取付面2に一端が固定され、斜め吊下げする公知公用の吊りボルトの如き右前方吊下支持杆8の他端を右係止部15の透孔に挿通してナット81によって螺合緊締することによって斜め吊下支持する(第3点目の斜め吊下支持)ことにより、第二サポート支持構成Bにおける合計3点吊下支持構成と成り、
上記の第一サポート支持構成Aと第二サポート支持構成Bとを、配管軸方向において繰り返して吊下配設した構成とする。かかる構成によって、この隣接する配管吊下支持具1・1同士が図2に示すように平面視した際に配管軸方向において対称のサポート支持構成を有する構成となる。
As shown in FIGS. 1 and 2, the pipe suspension support 1 of the present invention having the above-described configuration is as shown in FIGS.
The pipe suspension support 1 having the first support support configuration A shown in FIG. 3 is attached to the suspension bolt 3 whose one end is fixed to the mounting surface 2 via the suspension connection member 31 such as a tangle. It is supported by the bolts and nuts 16 so as to be suspended and supported on the mounting surface 2 (first point of suspension support). The other end of the left front suspension support rod 6 is inserted into the through hole of the left locking portion 14 and screwed and tightened with the nut 61 to support the slant suspension (second oblique slant support), One end is fixed to the mounting surface 2 and the other end of the right rear suspension support rod 9 such as a publicly known suspension bolt that hangs obliquely is inserted into the through hole of the right locking portion 15 and screwed and tightened by a nut 91. To support the slanting suspension (the third point of slanting support) It result, the composed total of three-point hanging lower support structure and the first support supporting structure A,
Next, the pipe support 1 of the second support support structure B shown in FIG. 4 is attached to the suspension bolt 3 adjacent to the suspension bolt 3 in the direction of the pipe axis of the suspension support 3 for supporting the first support structure A as shown by a tumble. The band end portion 13 is fixed by bolts and nuts 16 via the suspension connection member 31 so as to be suspended from the attachment surface 2 (first point suspension support), and one end is fixed to the attachment surface 2. The other end of the left rear suspension support rod 7 such as a publicly known suspension bolt that is obliquely suspended is inserted into the through hole of the left locking portion 14 and screwed and tightened with a nut 71 to support the oblique suspension. Along with (second slanting suspension support), one end is fixed to the mounting surface 2 and the other end of the right front suspension support rod 8 such as a publicly known hanging bolt that slantly hangs is connected to the right locking portion 15. Screwing and tightening with a nut 81 Thus by oblique suspension support (diagonal suspension support of the third point), for a total of three points hanging lower support structure of the second support supporting structure B,
The first support support configuration A and the second support support configuration B are repeatedly suspended in the pipe axis direction. With this configuration, the adjacent pipe suspension supports 1 and 1 have a support support structure that is symmetrical in the pipe axis direction when viewed in plan as shown in FIG.

以上の構成、即ち、2種類のサポート支持構成A・Bを有する配管吊下支持具1を配管軸方向において交互に用いて配管Pを吊下支持することによって、この2種類(A・B)の配管吊下支持具1が、隣接するもの同士で平面視した際に配管軸方向において対称のサポート支持構成となるので、配管軸方向の振動負荷と配管軸直交方向の振動負荷とが同時に生じることに加えて、捻れを含む軸線回り方向に傾動・揺動する振動負荷をも生じた場合であっても、様々な方向における揺れを対称構成の2種類のサポート構成A・Bが互いに打ち消す作用効果を発揮し、揺れを収束させることができる。従って、長尺スパンや超長尺スパンにおける配管吊下支持であっても、複数個ないし多数個の配管支持具1・1・1・・・に掛かる負荷が同調して増幅されてしまうことを抑制することができ、配管支持具1に歪みや破損が生じ難いという、本発明に係る特定の2種類のサポート支持構成による相乗効果を有している。   By suspending and supporting the pipe P by alternately using the pipe suspension support 1 having the above configuration, that is, the two types of support support structures A and B in the pipe axis direction, these two types (A and B) are provided. Since the pipe suspension support tool 1 has a support support structure that is symmetrical in the pipe axis direction when viewed in plan from each other, the vibration load in the pipe axis direction and the vibration load in the direction perpendicular to the pipe axis are generated simultaneously. In addition, even when a vibration load that tilts and swings in the direction around the axis including torsion is generated, the two support configurations A and B having symmetrical configurations cancel out each other in various directions. The effect is demonstrated and the shaking can be converged. Therefore, even in the case of pipe suspension support in a long span or an ultra-long span, the load applied to a plurality or a large number of pipe supports 1. It has a synergistic effect by two specific types of support support configurations according to the present invention that can be suppressed and that the pipe support 1 is less likely to be distorted or damaged.

また、図1〜図4に示す上記実施例では、左係止部14・右係止部15はバンド抱持部11の側方部に溶接により接続された構成であるが、本発明はかかる構成に限定されず、融着・接着・ネジ留めの如き固着手段により止着した構成とすることもできるし、或いはバンド抱持部の一部を切起すことにより形成した構成とすることもできる。   Moreover, in the said Example shown in FIGS. 1-4, although the left latching | locking part 14 and the right latching | locking part 15 are the structures connected to the side part of the band holding part 11 by welding, this invention starts. It is not limited to the configuration, but may be a configuration that is fixed by a fixing means such as fusion, adhesion, or screwing, or may be a configuration that is formed by raising a part of the band holding portion. .

更に、図1〜図4に示す上記実施例では、配管吊下支持具1の本体が半円状の2本のバンド抱持部11を下方の蝶番式の接続部12で接続した構成であるが、この種の配管バンドとして公知公用の構成及び素材を有する種々仕様のものを特別の制限なく用いることができ。例えば、組式構成の接続部を有する配管バンドであってもよいし、1本の環状の帯状板材から形成された提灯式の配管バンドであってもよい。   Furthermore, in the said Example shown in FIGS. 1-4, the main body of the piping suspension support 1 is the structure which connected the two semicircle-shaped band holding parts 11 with the lower hinge-type connection part 12. FIG. However, it is possible to use various types of piping bands having various publicly known configurations and materials without any particular limitation. For example, it may be a piping band having a connection portion of a combined configuration, or may be a lantern type piping band formed from one annular strip-shaped plate material.

1 配管吊下支持具
11 バンド抱持部
12 接続部
13 バンド端部
14 左係止部
15 右係止部
16 ボルト・ナット
2 取付面
3 吊りボルト
31 吊下接続部材
6 左前方吊下支持杆
61 ナット
7 左後方吊下支持杆
71 ナット
8 右前方吊下支持杆
81 ナット
9 右後方吊下支持杆
91 ナット
P 配管
A 第一サポート支持構成
B 第二サポート支持構成
DESCRIPTION OF SYMBOLS 1 Pipe suspension support 11 Band holding part 12 Connection part 13 Band edge part 14 Left latching part 15 Right latching part 16 Bolt and nut 2 Mounting surface 3 Suspension bolt 31 Suspension connection member 6 Left front suspension support rod 61 Nut 7 Left rear suspension support rod 71 Nut 8 Right front suspension support rod 81 Nut 9 Right rear suspension support rod 91 Nut P Piping A First support support configuration B Second support support configuration

Claims (3)

配管類を抱持するバンド抱持部と、該バンド抱持部の開放両端部に連設されたバンド端部とを有し、
天井スラブやトンネル天井等の取付面から吊り下げられる吊りボルトに、吊下接続部材を介して前記バンド端部を接続して、前記バンド抱持部に抱持した配管を前記取付面に吊下支持する複数の配管吊下支持具を具備する配管の吊下支持構造であって、
配管すべき略全域に亘って前記取付面から複数本の吊りボルトが所定間隔毎に吊り下げられ、この複数本の吊りボルトの各々に、前記配管吊下支持具が個々に接続されることにより、配管の長尺スパンにおける配管の吊下支持が可能な複数の配管吊下支持具を具備する配管の吊下支持構造において、
前記配管吊下支持具は、下記「配管の吊下支持構造における方向の定義」に基づいており、
該配管吊下支持具のバンド抱持部には、配管軸に直交するバンド抱持部の左右の側方部から横方向外側に各々延伸する左係止部・右係止部が設けられ、且つ、これらの左係止部・右係止部には透孔が各々形成された構成であり、
更に、前記配管吊下支持具は、下記構成の(1)第一サポート支持構成を有するものと、(2)第二サポート支持構成を有するものと、の2種類のサポート支持構成を有する配管吊下支持具を、配管軸方向において交互に吊下配設した構成とすることによって、この隣接する配管吊下支持具同士が平面視した際に配管軸方向において対称のサポート支持構成を有する構成であること、を特徴とする複数の配管吊下支持具を具備する配管の吊下支持構造
[2種類のサポート支持構成]
(1)第一サポート支持構成
バンド抱持部の左係止部の透孔には、前記取付面であって前記吊りボルトの吊下位置に対して配管軸方向の左前方位置に一端が固定されて斜めに吊下げられる左前方吊下支持杆の他端が接続取付された状態で係合される構成であり、
バンド抱持部の右係止部の透孔には、前記取付面であって前記吊りボルトの吊下位置に対して配管軸方向の右後方位置に一端が固定されて斜めに吊下げられる右後方吊下支持杆の他端が接続取付された状態で係合される構成であり、
この左前方吊下支持杆・右後方吊下支持杆による2点斜め吊下支持と、前記吊りボルトによる1点吊下支持と、によって合計3点吊下支持構成と成る第一サポート支持構成。
(2)第二サポート支持構成
バンド抱持部の左係止部の透孔には、前記取付面であって前記吊りボルトの吊下位置に対して配管軸方向の左後方位置に一端が固定されて斜めに吊下げられる左後方吊下支持杆の他端が接続取付された状態で係合される構成であり、
バンド抱持部の右係止部の透孔には、前記取付面であって前記吊りボルトの吊下位置に対して配管軸方向の右前方位置に一端が固定されて斜めに吊下げられる右前方吊下支持杆の他端が接続取付された状態で係合される構成であり、
この左後方吊下支持杆・右前方吊下支持杆による2点斜め吊下支持と、前記吊りボルトによる1点吊下支持と、によって合計3点吊下支持構成と成る第二サポート支持構成。
[「配管の吊下支持構造における方向」の定義]
配管の吊下支持構造において複数の配管支持具に抱持支持される配管の一端側を正対視した際の該配管の一端を正面として、該配管の正面の左方向側を左とし、該配管の正面の右方向側を右とし、配管軸方向における手前側を前方とし、配管軸方向における奥側である配管の他端方向を後方とする。
A band holding portion for holding the piping, and a band end portion connected to both open ends of the band holding portion,
Hanging bolt hung from a mounting surface such as a ceiling slab and tunnel ceilings, connecting the band end through the hanging down connecting member, suspended the pipe that holding the band holding unit to the mounting surface A pipe suspension support structure comprising a plurality of pipe suspension supports to be supported ,
A plurality of suspension bolts are suspended from the mounting surface over a substantially entire area to be piped at predetermined intervals, and the pipe suspension support is individually connected to each of the plurality of suspension bolts. In the pipe suspension support structure comprising a plurality of pipe suspension supports capable of supporting the suspension of the pipe in the long span of the pipe,
The pipe suspension support is based on the following "definition of direction in the pipe suspension support structure",
The band holding portion of the pipe suspension support tool is provided with a left locking portion and a right locking portion respectively extending laterally outward from the left and right side portions of the band holding portion orthogonal to the piping axis, And these left latching parts and right latching parts are each formed with through holes,
Further, the pipe suspension support tool has two types of support support structures: (1) having a first support support structure and (2) having a second support support structure. By adopting a configuration in which the lower support is alternately suspended in the pipe axis direction, the adjacent pipe suspension supports have a support support configuration that is symmetrical in the pipe axis direction when viewed in plan. A pipe suspension support structure comprising a plurality of pipe suspension supports .
[Two types of support structure]
(1) First Support Support Configuration One end of the through hole of the left retaining portion of the band holding portion is fixed to the attachment surface at the left front position in the pipe axis direction with respect to the suspension position of the suspension bolt. a has been configured to the other end of the left front suspension support rod that is suspended obliquely are engaged in a state of being connected attachment,
The hole of the right engaging portion of the band holding portion, that hung obliquely one end fixed to the right rear position of the pipe axis direction with respect to suspended position of the said a mounting surface hanger rod a configuration in which the other end of the right rear suspension supporting rod is engaged in a state of being connected attachment,
A first support support structure comprising a total of three-point suspension support structure, including a two-point oblique suspension support by the left front suspension support rod and right rear suspension support rod and a one-point suspension support by the suspension bolt.
(2) Second support support structure One end of the through hole of the left holding portion of the band holding portion is fixed at the left rear position in the pipe axis direction with respect to the suspension position of the suspension bolt. a has been configured to the other end of the left rear suspension support rod that is suspended obliquely are engaged in a state of being connected attachment,
The hole of the right engaging portion of the band holding portion, that hung obliquely one end fixed to the right front position of the pipe axis direction with respect to suspended position of the said a mounting surface hanger rod a configuration in which the other end of the right front suspension support rod is engaged in a state of being connected attachment,
A second support support structure comprising a total of three-point suspension support structures by the two-point slant suspension support by the left rear suspension support rod and the right front suspension support rod and the one-point suspension support by the suspension bolt.
[Definition of “Direction in Suspension Support Structure for Piping”]
In the suspended support structure for piping, one end of the pipe when facing one end side of the pipe held and supported by a plurality of pipe supports is the front, the left side of the front of the pipe is the left, The right side of the front of the pipe is the right, the front side in the pipe axis direction is the front, and the other end direction of the pipe, which is the back side in the pipe axis direction, is the rear.
前記バンド抱持部が、相対向する半円形状の2つのバンド抱持部が円形に組合うことによって配管を抱持可能であり、該2つのバンド抱持部の下端部分は組式又は蝶番式の如き接続部により拡開可能に接続された構成であることを特徴とする請求項1に記載の複数の配管吊下支持具を具備する配管の吊下支持構造The band holding portion can hold a pipe by combining two semicircular band holding portions facing each other in a circular shape, and the lower end portion of the two band holding portions is a combination type or a hinge. 2. A pipe suspension support structure comprising a plurality of pipe suspension supports according to claim 1, wherein the pipe suspension supports are connected to each other in such a manner that they can be expanded. 前記バンド抱持具が一本の帯状バンド体を環状に彎曲することによって配管を抱持可能であり、この帯状バンド体の開放両端部に前記バンド端部が各々連設された構成であることを特徴とする請求項1に記載の複数の配管吊下支持具を具備する配管の吊下支持構造The band-holding device can be configured to hold a pipe by bending a single band-shaped band in an annular shape, and the band ends are connected to both open ends of the band-shaped band, respectively. A pipe suspension support structure comprising a plurality of pipe suspension supports according to claim 1.
JP2017200873A 2017-10-17 2017-10-17 Piping suspension support structure comprising a plurality of piping suspension supports Expired - Fee Related JP6454897B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017200873A JP6454897B1 (en) 2017-10-17 2017-10-17 Piping suspension support structure comprising a plurality of piping suspension supports

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017200873A JP6454897B1 (en) 2017-10-17 2017-10-17 Piping suspension support structure comprising a plurality of piping suspension supports

Publications (2)

Publication Number Publication Date
JP6454897B1 true JP6454897B1 (en) 2019-01-23
JP2019074147A JP2019074147A (en) 2019-05-16

Family

ID=65037079

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017200873A Expired - Fee Related JP6454897B1 (en) 2017-10-17 2017-10-17 Piping suspension support structure comprising a plurality of piping suspension supports

Country Status (1)

Country Link
JP (1) JP6454897B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63121883U (en) * 1987-01-30 1988-08-08
US20140008500A1 (en) * 2010-12-09 2014-01-09 Martin Cousineau Para-seismic support for pipes
JP2014222074A (en) * 2013-05-13 2014-11-27 日栄インテック株式会社 Suspension support structure, and suspension support device
JP2017015155A (en) * 2015-06-30 2017-01-19 有限会社アールストーン Pipe hanging supporter

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63121883U (en) * 1987-01-30 1988-08-08
US20140008500A1 (en) * 2010-12-09 2014-01-09 Martin Cousineau Para-seismic support for pipes
JP2014222074A (en) * 2013-05-13 2014-11-27 日栄インテック株式会社 Suspension support structure, and suspension support device
JP2017015155A (en) * 2015-06-30 2017-01-19 有限会社アールストーン Pipe hanging supporter

Also Published As

Publication number Publication date
JP2019074147A (en) 2019-05-16

Similar Documents

Publication Publication Date Title
US9046197B2 (en) Para-seismic support for pipes
KR101712803B1 (en) Hanger Apparatus For Ceiling Which is Designed For Earthquake-resistant
US7367363B2 (en) Sanitary conduit support systems
JP5421789B2 (en) Ceiling brace mounting bracket
JP3152068U (en) Suspension for pipe support
JP6454896B1 (en) Piping suspension support structure comprising a plurality of piping suspension supports
JP6454898B1 (en) Piping suspension support structure comprising a plurality of piping suspension supports
JP6561418B2 (en) Piping suspension support structure comprising a plurality of piping suspension supports
JP6454897B1 (en) Piping suspension support structure comprising a plurality of piping suspension supports
JP6454895B1 (en) Piping suspension support structure comprising a plurality of piping suspension supports
US20100264278A1 (en) Conduit hanger
JP6454899B1 (en) Piping suspension support structure comprising a plurality of piping suspension supports
JP6454900B1 (en) Piping suspension support structure comprising a plurality of piping suspension supports
JP6550616B2 (en) Suspension support structure for piping provided with a plurality of piping suspension supports
JP3152657U (en) Pipe suspension support
JP6550615B2 (en) Suspension support structure for piping provided with a plurality of piping suspension supports
JP6561420B2 (en) Piping suspension support structure comprising a plurality of piping suspension supports
JP6561419B2 (en) Piping suspension support structure comprising a plurality of piping suspension supports
JP6481869B2 (en) Piping suspension support structure comprising a plurality of piping suspension supports
JP6534006B2 (en) Suspension support structure for piping provided with a plurality of piping suspension supports
JP6481870B2 (en) Piping suspension support structure comprising a plurality of piping suspension supports
JP2019027581A (en) Suspension supporting structure of pipe including plural pipe suspension supporting tools
JP6534007B2 (en) Suspension support structure for piping provided with a plurality of piping suspension supports
JP2005127364A (en) Wire anti-sway device of suspension bolt
JP3152067U (en) Suspension for pipe support

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20171017

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180821

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180928

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20181023

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20181122

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20181122

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20181126

R150 Certificate of patent or registration of utility model

Ref document number: 6454897

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees