JP6393100B2 - トンネル切羽前方探査方法 - Google Patents
トンネル切羽前方探査方法 Download PDFInfo
- Publication number
- JP6393100B2 JP6393100B2 JP2014142040A JP2014142040A JP6393100B2 JP 6393100 B2 JP6393100 B2 JP 6393100B2 JP 2014142040 A JP2014142040 A JP 2014142040A JP 2014142040 A JP2014142040 A JP 2014142040A JP 6393100 B2 JP6393100 B2 JP 6393100B2
- Authority
- JP
- Japan
- Prior art keywords
- vibration
- geophone
- drill bit
- tunnel
- drilling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims description 27
- 238000005553 drilling Methods 0.000 claims description 37
- 230000010355 oscillation Effects 0.000 claims description 11
- 238000004458 analytical method Methods 0.000 claims description 6
- 239000002245 particle Substances 0.000 claims description 6
- 230000001133 acceleration Effects 0.000 description 7
- 238000004364 calculation method Methods 0.000 description 4
- 238000009412 basement excavation Methods 0.000 description 2
- 239000002131 composite material Substances 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000002360 preparation method Methods 0.000 description 2
- 230000000644 propagated effect Effects 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000000470 constituent Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000011002 quantification Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 230000002194 synthesizing effect Effects 0.000 description 1
Images
Landscapes
- Geophysics And Detection Of Objects (AREA)
Description
ところが、地表面からの事前調査により、線状構造物であるトンネルの地山の状態を完全に把握することは困難であった。
このようなトンネル切羽前方探査として、例えば、特許文献1には、切羽の前方に向けて先進ボーリングを行い、この先進ボーリング掘削時にドリルビットから発生する削孔振動の弾性波を利用する方法が開示されている。
この場合には、波動のXY成分、YZ成分、XZ成分を直交軸にプロットし、より大きな波の入射方向を、削孔振動による弾性波の入射方向と推定する、いわゆるパーティクルオービットに基づく解析方法を使用することで、入射方向を特定している。
そのため、トンネル内またはトンネルの近傍に設けられた受振器は、ドリルビットから発振された削孔振動とともに、トンネル坑内のボーリングマシン等から発振された振動も受振してしまうおそれがある。
そのため、切羽前方の断層破砕帯の位置を高精度に確定することができる。
前記ドリルビットの削孔振動が前記受振器に到達するまでの到達時間を算出することを特徴としている。
wR(t)=eB・w(t)=(eBx×wx(t)+eBy×wy(t)+eBz×wz(t))=|w(t)|cosφ(t) ・・・式1
ここで、wR:合成波形ベクトル
eB:削孔ビット方向の単位ベクトル (eBx,eBy,eBz)
w(t):時間tにおける3成分波形ベクトル(wx(t),wy(t),wz(t))
φ(t):ベクトルと波形ベクトルがなす角
本実施形態では、トンネル1の側壁から横方向(トンネルの軸方向と交差する方向)に受振孔6を形成し、この受振孔6に受振器7を設置する(図1の(a)参照)。
本実施形態では、受振器7として3成分加速度計を使用する。
パイロットセンサー9は、ロッド5を伝搬した振動(加速度または速度)を受振する装置であって、ボーリングマシン8のスイベル8aに取り付ける。なお、パイロットセンサー9を構成する機械は、振動を測定することが可能であれば限定されない。
ボーリング孔3の削孔は、先端にドリルビット4が取り付けられたロッド5により行う。
本実施形態では、受振器7による削孔振動の受振を削孔期間中に連続的に行う。
パイロットセンサー9は、地山切削時にロッド5を伝搬した振動(加速度または速度)を受振する。
本実施形態では、パイロットセンサー9による振動(加速度または速度)の受振を、削孔期間中に連続的に行う。
弾性波速度は、削孔振動が受振器7に到達する到達時間と、ドリルビット4から受振器7までの距離Lとに基づいて算出する。すなわち、ドリルビット4からの波形が受振器7に到達する到達時間Tと、ドリルビット4から受振器7までの距離Lとを座標にプロットした傾きにより速度Vを求める(図1の(b)および(c)参照)。
wR(t)=eB・w(t)=(eBx×wx(t)+eBy×wy(t)+eBz×wz(t))=|w(t)|cosφ(t) ・・・式1
ここで、wR:合成波形ベクトル
eB:削孔ビット方向の単位ベクトル (eBx,eBy,eBz)
w(t):時間tにおける3成分波形ベクトル(wx(t),wy(t),wz(t))
φ(t):ベクトルと波形ベクトルがなす角
図3に示すように、パイロットセンサー9により類似する波形が確認される時間の周期がロッド伝搬時間T1の2倍となる。
相互相関処理を行うことで、トンネル内の掘削機等から発振されるノイズを除去した状態で、ドリルビット4の削孔振動が受振器7に達する到達時間T2を高精度に算出することができる。到達時間T2が分かれば、距離Lを到達時間T2で除することで、弾性波速度を算出することができ、ひいては、地山状況を把握することができる。
また、ボーリング孔および受振孔の孔径は限定されない。
また、到達時間は、必ずしもドリルビットの発振波に関して相互相関処理を行うことで算出する必要はない。
2 切羽
3 ボーリング孔
4 ドリルビット
5 ロッド
6 受振孔
7 受振器
8 ボーリングマシン
9 パイロットセンサー
Claims (3)
- トンネルの側壁から横方向に受振孔を形成するとともに当該受振孔に受振器を設置するステップと、
前記トンネルの切羽から前方に向けてドリルビットにより削孔するステップと、
前記ドリルビットの削孔振動を前記トンネルの側方に配置された前記受振器により受振するステップと、
前記削孔振動が前記受振器に到達する到達時間と、前記ドリルビットから前記受振器までの距離とに基づいて弾性波速度を算出するステップと、を備えるトンネル切羽前方探査方法であって、
前記受振器により受振した振動のパーティクルオービット解析に基づく波形入射ベクトルから、前記ドリルビットの位置から前記受振器の位置へ向う方向の振動成分を算出し、当該振動成分を利用して前記到達時間を算出することを特徴とする、トンネル切羽前方探査方法。 - トンネルの切羽から前方に向けてドリルビットにより削孔するステップと、
前記ドリルビットの削孔振動を前記トンネルの側方に配置された受振器により受振するステップと、
前記ドリルビットから生じる削孔振動をボーリングマシンに取り付けたパイロットセンサーにより受振するステップと、
前記削孔振動が前記受振器に到達する到達時間と、前記ドリルビットから前記受振器までの距離とに基づいて弾性波速度を算出するステップと、を備えるトンネル切羽前方探査方法であって、
前記受振器により受振した振動のパーティクルオービット解析に基づく波形入射ベクトルから、前記ドリルビットの位置から前記受振器の位置へ向う方向の振動成分を算出し、
前記パイロットセンサーで受振した波形と前記受振器で受振した波形との間で相互相関処理を行って算出した時間に、前記ドリルビットの削孔振動が前記パイロットセンサーに到達するまでの時間を加えることで、前記ドリルビットの削孔振動が前記受振器に到達するまでの到達時間を算出することを特徴とする、トンネル切羽前方探査方法。 - 前記振動成分と前記ドリルビットの発振波に関して相互相関処理を行うことで前記到達時間を算出することを特徴とする、請求項1または請求項2に記載のトンネル切羽前方探査方法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2014142040A JP6393100B2 (ja) | 2014-07-10 | 2014-07-10 | トンネル切羽前方探査方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2014142040A JP6393100B2 (ja) | 2014-07-10 | 2014-07-10 | トンネル切羽前方探査方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2016017900A JP2016017900A (ja) | 2016-02-01 |
JP6393100B2 true JP6393100B2 (ja) | 2018-09-19 |
Family
ID=55233204
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2014142040A Active JP6393100B2 (ja) | 2014-07-10 | 2014-07-10 | トンネル切羽前方探査方法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6393100B2 (ja) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6945917B2 (ja) * | 2017-12-22 | 2021-10-06 | 株式会社奥村組 | トンネル切羽前方探査方法 |
CN108957521B (zh) * | 2018-05-22 | 2020-06-02 | 石家庄铁道大学 | 一种用于隧道长距离三维超前地质预报方法 |
JP7200013B2 (ja) * | 2019-03-08 | 2023-01-06 | 株式会社大林組 | トンネル切羽前方探査システムおよびトンネル切羽前方地山の探査方法 |
CN110988978B (zh) * | 2019-11-26 | 2021-10-08 | 山东大学 | 适用于隧道内部的组装式车载地震映像探测系统及方法 |
CN111485890B (zh) * | 2020-04-08 | 2022-03-15 | 内蒙古金陶股份有限公司 | 巷道的掘进方法 |
JP7404147B2 (ja) * | 2020-04-28 | 2023-12-25 | 株式会社大林組 | スイベルジョイントおよびトンネル切羽前方探査システム |
CN111505733A (zh) * | 2020-04-30 | 2020-08-07 | 山东科技大学 | 一种地下工程裂隙岩体赋存特殊地质体多源异构信息融合分析与动态预测方法 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
IT1263156B (it) * | 1993-02-05 | 1996-08-01 | Agip Spa | Procedimento e dispositivo di rilevamento di segnali sismici per ottenere profili sismici verticali durante le operazioni di perforazione |
JP2710740B2 (ja) * | 1993-03-19 | 1998-02-10 | 戸田建設株式会社 | 切羽前方探査方式 |
US5774418A (en) * | 1994-04-28 | 1998-06-30 | Elf Aquitaine Production | Method for on-line acoustic logging in a borehole |
FR2719385B1 (fr) * | 1994-04-28 | 1996-06-07 | Elf Aquitaine | Procédé de diagraphie acoustique instantanée dans un puits de forage. |
JP4157635B2 (ja) * | 1998-12-07 | 2008-10-01 | 大成建設株式会社 | トンネル切羽前方探査方法 |
JP5985371B2 (ja) * | 2012-11-27 | 2016-09-06 | 株式会社フジタ | トンネル掘削中の地質探査方法 |
JP6131027B2 (ja) * | 2012-11-28 | 2017-05-17 | 株式会社安藤・間 | 地山弾性波速度測定方法 |
-
2014
- 2014-07-10 JP JP2014142040A patent/JP6393100B2/ja active Active
Also Published As
Publication number | Publication date |
---|---|
JP2016017900A (ja) | 2016-02-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6393100B2 (ja) | トンネル切羽前方探査方法 | |
KR101547508B1 (ko) | 전방 지질 예측 시스템 및 그 방법 | |
JP6584010B2 (ja) | トンネル切羽前方探査方法 | |
JP5985371B2 (ja) | トンネル掘削中の地質探査方法 | |
JP6131027B2 (ja) | 地山弾性波速度測定方法 | |
JP5839271B2 (ja) | トンネル切羽前方探査方法 | |
JP7005272B2 (ja) | 切羽前方探査方法 | |
JP6522918B2 (ja) | 弾性波速度測定方法 | |
JP6420054B2 (ja) | 弾性波速度測定方法 | |
JP5940303B2 (ja) | トンネル切羽前方探査方法 | |
AU2015222645B2 (en) | Method for locating seismic diffractors in subsurface formations from a wellbore | |
CA2866152A1 (en) | Correction of shear log for elastic anisotropy | |
JP6258010B2 (ja) | 弾性波速度測定方法および弾性波速度測定システム | |
JP4187042B2 (ja) | 地中挿入管を用いた地震波深部伝達方法 | |
US20120287757A1 (en) | Forward Looking Seismics From Drill-Bit | |
JP2011102706A (ja) | トンネル切羽前方探査方法及び探査システム | |
JP2005105651A (ja) | 地盤掘削部前方の地山評価方法 | |
CA2924463C (en) | Downhole acoustic ranging utilizing gradiometric data | |
JP2005291903A (ja) | 水中受振器用ハイドロホン及び多点観測水中受振器 | |
US9175558B2 (en) | Seismic navigation | |
JP6111107B2 (ja) | 弾性波探査方法 | |
JP6379261B2 (ja) | 弾性波速度測定方法および弾性波速度測定システム | |
CN112946753B (zh) | 近地表地层结构的分析系统及方法 | |
JP6748918B2 (ja) | トンネル切羽前方探査方法 | |
JP2020008368A (ja) | 地山弾性波測定方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20170418 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20180215 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20180220 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20180314 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20180814 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20180824 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6393100 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |