JP5968581B1 - Power generation system, load test method - Google Patents

Power generation system, load test method Download PDF

Info

Publication number
JP5968581B1
JP5968581B1 JP2016520702A JP2016520702A JP5968581B1 JP 5968581 B1 JP5968581 B1 JP 5968581B1 JP 2016520702 A JP2016520702 A JP 2016520702A JP 2016520702 A JP2016520702 A JP 2016520702A JP 5968581 B1 JP5968581 B1 JP 5968581B1
Authority
JP
Japan
Prior art keywords
switch
power
generator
battery
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016520702A
Other languages
Japanese (ja)
Other versions
JPWO2017017975A1 (en
Inventor
豊嗣 近藤
豊嗣 近藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tatsumi Corp
Original Assignee
Tatsumi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tatsumi Corp filed Critical Tatsumi Corp
Priority claimed from PCT/JP2016/055158 external-priority patent/WO2017017975A1/en
Application granted granted Critical
Publication of JP5968581B1 publication Critical patent/JP5968581B1/en
Publication of JPWO2017017975A1 publication Critical patent/JPWO2017017975A1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Stand-By Power Supply Arrangements (AREA)

Abstract

バッテリーの放電試験や発電機の負荷試験が可能な発電システム抵抗ユニットのそれぞれは、バッテリーと、充電回路を有するものであり、第1スイッチ部は、抵抗ユニットのバッテリー若しくは特定電気機器への電力の供給元を、商用電源と発電機とで切り替え制御するために使用され、第2スイッチ部は、特定電気機器への電力の供給元を、発電機とインバーターを介した抵抗ユニットのバッテリーとで切り替え制御するために使用され、試験モードに設定された場合には、発電機が発電を行う状態で、バッテリーの放電試験のために、インバーターと第2スイッチ部を介してバッテリーからの電力が特定電気機器へ供給され、発電機の負荷試験のために、バッテリーから特定電気機器への電力供給が停止され、第1スイッチ部を介して発電機からの電力がバッテリーへ供給される。Each of the power generation system resistance units that can perform a battery discharge test and a generator load test has a battery and a charging circuit, and the first switch unit controls the power to the battery of the resistance unit or a specific electrical device. Used to switch the supply source between the commercial power supply and the generator, and the second switch unit switches the supply source of power to the specific electrical equipment between the generator and the battery of the resistance unit via the inverter. It is used to control and when it is set to test mode, the power from the battery is supplied through the inverter and the second switch unit for the specified electrical The power supply from the battery to the specific electric device is stopped for the load test of the generator, and is supplied to the device via the first switch unit. Power from electrical machine is supplied to the battery.

Description

本発明は、停電時に電力供給を行う発電システムに関する。   The present invention relates to a power generation system that supplies power during a power failure.

従来、特許文献1のように、停電時に電力供給を行う発電システム(電源装置)が提案されている。   Conventionally, as in Patent Document 1, a power generation system (power supply device) that supplies power during a power failure has been proposed.

特開2013−230063号公報JP 2013-230063 A

しかし、発電機やバッテリーが正しく動作するかについての試験が考慮されていない。   However, tests for proper operation of the generator and battery are not considered.

したがって本発明の目的は、バッテリーの放電試験や発電機の負荷試験が可能な発電システムを提供することである。   Accordingly, an object of the present invention is to provide a power generation system capable of performing a battery discharge test and a generator load test.

本発明に係る発電システムは、エンジンと、エンジンの出力に基づいて発電を行い、外部の特定電気機器と接続される発電機と、複数の抵抗ユニットを有する抵抗部と、インバーターと、通常モードと試験モードとを切り替えるために使用される操作部と、第1スイッチ部と、第2スイッチ部とを備えた発電システムであって、複数の抵抗ユニットは、発電機に対して並列に接続され、複数の抵抗ユニットのそれぞれは、バッテリーと、バッテリーと発電機の間に設けられた充電回路を有するものであり、第1スイッチ部は、抵抗ユニットのバッテリー若しくは特定電気機器への電力の供給元を、商用電源と発電機とで切り替え制御するために使用され、第2スイッチ部は、特定電気機器への電力の供給元を、発電機とインバーターを介した抵抗ユニットのバッテリーとで切り替え制御するために使用され、操作部を介して通常モードに設定された状態で、商用電源から特定電気機器への電力供給が不能となった場合には、エンジンを始動してから第1時間が経過するまで若しくは発電機が定常運転状態になるまでは、インバーターと第2スイッチ部を介してバッテリーからの電力が特定電気機器へ供給されるものであり、操作部を介して試験モードに設定された場合には、発電機が発電を行う状態で、バッテリーの放電試験のために、インバーターと第2スイッチ部を介してバッテリーからの電力が特定電気機器へ供給され、その後、発電機の負荷試験のために、バッテリーから特定電気機器への電力供給が停止され、第1スイッチ部を介して発電機からの電力が複数のバッテリーのうち少なくとも1つへ供給される。   A power generation system according to the present invention generates an engine, generates power based on the output of the engine, is connected to an external specific electrical device, a resistance unit having a plurality of resistance units, an inverter, and a normal mode. A power generation system including an operation unit used for switching between test modes, a first switch unit, and a second switch unit, wherein the plurality of resistance units are connected in parallel to the generator, Each of the plurality of resistance units has a battery and a charging circuit provided between the battery and the generator, and the first switch unit supplies a power supply source to the battery of the resistance unit or the specific electric device. , Used for switching control between commercial power supply and generator, the second switch part is the power supply source to the specific electrical equipment via the generator and inverter Used to control switching with the battery of the anti-unit, and when the power supply from the commercial power supply to the specified electrical equipment becomes impossible while the normal mode is set via the operation unit, the engine is started. Until the first time elapses or until the generator is in a steady operation state, the power from the battery is supplied to the specific electric device via the inverter and the second switch unit, and the operation unit is When the test mode is set, the power from the battery is supplied to the specific electrical device via the inverter and the second switch unit for the battery discharge test in a state where the generator generates power. Thereafter, for the load test of the generator, the power supply from the battery to the specific electric device is stopped, and the power from the generator is supplied to the plurality of batteries via the first switch unit. It is supplied to at least one of the.

特定電気機器への電力供給を行う発電機とバッテリーを含む抵抗ユニットとを備えた発電システムにより、商用電源からの電力供給が不能となった場合でも、スムーズに、バッテリーや発電機から供給された電力で、特定電気機器を駆動することが出来る。   Even when the power supply from the commercial power supply is disabled by the power generation system that includes the generator that supplies power to the specified electrical equipment and the resistor unit that includes the battery, the power is supplied smoothly from the battery or generator. A specific electric device can be driven by electric power.

バッテリーを含む抵抗ユニットが並列に複数設けられ、これら複数の抵抗ユニットと発電機との接続状態を切り替えることにより、発電機の負荷試験を行うことが出来る。
また、その前にバッテリー群から特定電気機器への電力供給を行うので、停電時にエンジンを始動してから発電機が定常運転になるまでの間、バッテリー群が特定電気機器への電力供給を維持出来るかどうかの試験(放電試験)を行うことが出来る。
放電試験の際に、セルモーターを使ってエンジンを始動し、発電機による発電を行っておくので、放電試験中や負荷試験中に停電が起きても、瞬時に発電機から特定電気機器への電力供給に切り替えることが出来る。
A plurality of resistance units including a battery are provided in parallel, and a load test of the generator can be performed by switching the connection state between the plurality of resistance units and the generator.
In addition, since power is supplied from the battery group to the specific electrical device before that, the battery group maintains power supply to the specific electrical device after the engine is started during a power failure until the generator enters steady operation. A test (discharge test) can be performed.
During the discharge test, the engine is started using the cell motor and power is generated by the generator, so even if a power outage occurs during the discharge test or load test, the generator instantly switches to the specified electrical device. Switch to power supply.

好ましくは、発電システムに接続される特定電気機器よりも消費電力が大きい負荷を有する放電回路と、第3スイッチ部とを更に備え、第3スイッチ部は、インバーターを介したバッテリーからの電力の供給先を、特定電気機器と放電回路とで切り替え制御するために使用され、操作部を介して試験モードに設定された場合には、発電機が発電を行う状態で、バッテリーの放電試験のために、インバーターと第3スイッチ部と第2スイッチ部を介してバッテリーからの電力が特定電気機器へ供給され、第1時間経過後であって、発電機の負荷試験の前に、インバーターと第3スイッチ部を介してバッテリーからの電力が放電回路へ供給され、負荷試験の際は、バッテリーから放電回路への電力供給が停止され、第1スイッチ部を介して発電機からの電力が複数のバッテリーのうち少なくとも1つへ供給される。   Preferably, the power supply system further includes a discharge circuit having a load that consumes more power than a specific electric device connected to the power generation system, and a third switch unit, and the third switch unit supplies power from the battery via the inverter. Used for switching control between the specific electrical device and the discharge circuit, and when the test mode is set via the operation unit, the generator is generating power and is used for battery discharge testing. The electric power from the battery is supplied to the specific electrical device through the inverter, the third switch unit, and the second switch unit, and after the first time has elapsed and before the generator load test, the inverter and the third switch The power from the battery is supplied to the discharge circuit via the unit, and during the load test, the power supply from the battery to the discharge circuit is stopped, and the generator is connected via the first switch unit. Et power is supplied to at least one of the plurality of batteries.

放電試験完了後は、バッテリー群から特定電気機器への電力供給を、バッテリー群から放電回路への電力供給に切り替える。
消費電力が大きい放電回路への電力供給に切り替えることにより、バッテリーの放電時間を早めることが出来、また、特定電気機器の使用を最小限に抑えることが出来る。
After the discharge test is completed, the power supply from the battery group to the specific electric device is switched to the power supply from the battery group to the discharge circuit.
By switching to power supply to a discharge circuit with high power consumption, the battery discharge time can be shortened, and the use of specific electrical equipment can be minimized.

さらに好ましくは、インバーターと第3スイッチ部の間に、継電器が設けられ、継電器で検出される電圧若しくは電流が閾値以下になると、インバーターと第3スイッチ部を介してバッテリーから放電回路への電力供給が、第1スイッチ部を介して発電機からバッテリーの少なくとも一つへの電力供給に切り替えられる。   More preferably, a relay is provided between the inverter and the third switch unit, and when the voltage or current detected by the relay falls below a threshold value, power is supplied from the battery to the discharge circuit via the inverter and the third switch unit. However, the power supply is switched from the generator to at least one of the batteries via the first switch unit.

また、好ましくは、第1スイッチ部のリレーコイルに電流が流れていないオフ状態の時に第1スイッチ部の可動接点と接続する第1スイッチ部の常時閉路接点は、発電機からの電力線と接続され、第2スイッチ部のリレーコイルに電流が流れていないオフ状態の時に第2スイッチ部の可動接点と接続する第2スイッチ部の常時閉路接点は、第1スイッチ部を介した発電機若しくは商用電源からの電力線と接続される。   Preferably, the normally closed contact of the first switch unit that is connected to the movable contact of the first switch unit when the current is not flowing through the relay coil of the first switch unit is connected to the power line from the generator. The normally closed contact of the second switch part connected to the movable contact of the second switch part when the current is not flowing through the relay coil of the second switch part is a generator or commercial power source via the first switch part. Connected to the power line from

各スイッチの駆動用の電源からの電力供給が途絶えても、発電機から特定電気機器への電力供給を行うスイッチ状態が維持されるので、エンジンや発電機が動作している限り、特定電気機器への電力供給を維持することが出来る。   Even if the power supply from the power supply for driving each switch is interrupted, the switch state for supplying power from the generator to the specified electrical device is maintained, so as long as the engine or generator is operating, the specified electrical device The power supply to can be maintained.

本発明に係る発電システムにおける発電機の負荷試験方法は、エンジンと、エンジンの出力に基づいて発電を行い、外部の特定電気機器と接続される発電機と、複数の抵抗ユニットを有する抵抗部と、インバーターと、通常モードと試験モードとを切り替えるために使用される操作部と、第1スイッチ部と、第2スイッチ部とを備え、複数の抵抗ユニットは、発電機に対して並列に接続され、複数の抵抗ユニットのそれぞれは、バッテリーと、バッテリーと発電機の間に設けられた充電回路を有するものであり、第1スイッチ部は、抵抗ユニットのバッテリー若しくは特定電気機器への電力の供給元を、商用電源と発電機とで切り替え制御するために使用され、第2スイッチ部は、特定電気機器への電力の供給元を、発電機とインバーターを介した抵抗ユニットのバッテリーとで切り替え制御するために使用され、操作部を介して通常モードに設定された状態で、商用電源から特定電気機器への電力供給が不能となった場合には、エンジンを始動してから第1時間が経過するまで若しくは発電機が定常運転状態になるまでは、インバーターと第2スイッチ部を介してバッテリーからの電力が特定電気機器へ供給されるものであり、操作部を介して試験モードに設定され、発電機が発電を行う状態で、インバーターと第2スイッチ部を介してバッテリーからの電力が特定電気機器へ供給されるバッテリー放電試験ステップと、バッテリー放電試験ステップの後、バッテリーから特定電気機器への電力供給が停止され、第1スイッチ部を介して発電機からの電力が複数のバッテリーのうち少なくとも1つへ供給される負荷試験ステップとを備える。   A generator load test method in a power generation system according to the present invention includes an engine, a generator that generates power based on the output of the engine, and that is connected to an external specific electrical device, and a resistance unit having a plurality of resistance units. An inverter, an operation unit used for switching between the normal mode and the test mode, a first switch unit, and a second switch unit, and the plurality of resistance units are connected in parallel to the generator. Each of the plurality of resistance units has a battery and a charging circuit provided between the battery and the generator, and the first switch unit is a power supply source to the battery of the resistance unit or the specific electric device. Is used for switching control between a commercial power source and a generator, and the second switch unit controls the power supply source to the specific electric device, the generator and the inverter. If the power supply from the commercial power supply to the specified electrical equipment becomes impossible when the normal mode is set via the operation unit, the engine is switched off. The power from the battery is supplied to the specific electric device via the inverter and the second switch unit until the first time has elapsed from the start or until the generator is in a steady operation state. A battery discharge test step in which the electric power from the battery is supplied to the specific electric device through the inverter and the second switch unit in a state where the test mode is set through the generator and the generator is generating power, and the battery discharge test step. Thereafter, the power supply from the battery to the specific electrical device is stopped, and the power from the generator is sent to the plurality of batteries via the first switch unit. And a load test steps to be supplied to at least one.

以上のように本発明によれば、バッテリーの放電試験や発電機の負荷試験が可能な発電システムを提供することができる。   As described above, according to the present invention, it is possible to provide a power generation system capable of performing a battery discharge test and a generator load test.

本実施形態における発電システムの構成を示す模式図で、「通常モード」で且つ停電していない状態を示す図である。It is a schematic diagram which shows the structure of the electric power generation system in this embodiment, and is a figure which shows the state which is "normal mode" and does not have a power failure. 操作部の構成を示す図である。It is a figure which shows the structure of an operation part. 発電システムの模式図で、「通常モード」で停電直後の状態を示す図である。It is a schematic diagram of a power generation system, and shows a state immediately after a power failure in “normal mode”. 発電システムの模式図で、「通常モード」で停電し、発電機が定常運転状態になるまでの状態を示す図である。It is a schematic diagram of a power generation system, and is a figure which shows the state until a power failure is carried out in "normal mode" and a generator will be in a steady operation state. 発電システムの模式図で、「通常モード」で停電し、発電機が定常運転状態になった後の状態を示す図である。It is a schematic diagram of a power generation system, and is a diagram showing a state after a power failure occurs in “normal mode” and the generator is in a steady operation state. 発電システムの模式図で、「試験モード」で、エンジンを始動する時の状態を示す図である。It is a schematic diagram of a power generation system and is a diagram showing a state when an engine is started in a “test mode”. 発電システムの模式図で、「試験モード」で、バッテリー群から特定電気機器への電力供給が行われる状態を示す図である。It is a schematic diagram of a power generation system, and is a diagram showing a state where power is supplied from a battery group to a specific electrical device in a “test mode”. 発電システムの模式図で、「試験モード」で、バッテリー群から放電回路への電力供給が行われる状態を示す図である。It is a schematic diagram of a power generation system and is a diagram showing a state where power is supplied from a battery group to a discharge circuit in a “test mode”. 発電システムの模式図で、「試験モード」で、発電機の負荷試験が行われる状態を示す図である。It is a schematic diagram of a power generation system, and is a diagram showing a state in which a load test of a generator is performed in “test mode”. 単相交流発電機を用いた場合の発電システムの模式図で、「通常モード」で停電し、発電機が定常運転状態になった後の状態を示す図である。It is a schematic diagram of a power generation system in the case of using a single-phase AC generator, and is a diagram showing a state after a power failure occurs in a “normal mode” and the generator is in a steady operation state. セルモーターが第1バッテリー群〜第3バッテリー群と接続される場合の発電システムの模式図で、「通常モード」で停電し、発電機が定常運転状態になった後の状態を示す図である。It is a schematic diagram of a power generation system when the cell motor is connected to the first battery group to the third battery group, and shows a state after a power failure occurs in the “normal mode” and the generator is in a steady operation state. .

以下、本実施形態について、図を用いて説明する(図1参照)。   Hereinafter, the present embodiment will be described with reference to the drawings (see FIG. 1).

本実施形態における発電システム1は、商用電源と特定電気機器の間に設けられ、商用電源からの電力供給が不能になった場合に特定電気機器へ電力供給を行うために使用される。
発電システム1は、エンジン3、発電機4、セルモーター5、操作部7、制御部8、第1継電器9a、第2継電器9b、抵抗部10(第1抵抗ユニット10a、第2抵抗ユニット10b、第3抵抗ユニット10c)、スイッチング部(第1スイッチ群SW1、第2スイッチ群SW2、第3スイッチ群SW3、第1スイッチ部SWC1、第2スイッチ部SWC2、第3スイッチ部SWC3)、インバーター51、第3継電器53、放電回路55、U相線Lu、V相線Lv、W相線Lwを有する。
The power generation system 1 in the present embodiment is provided between a commercial power source and a specific electrical device, and is used to supply power to the specific electrical device when power supply from the commercial power source becomes impossible.
The power generation system 1 includes an engine 3, a generator 4, a cell motor 5, an operation unit 7, a control unit 8, a first relay 9a, a second relay 9b, a resistance unit 10 (first resistance unit 10a, second resistance unit 10b, Third resistor unit 10c), switching unit (first switch group SW1, second switch group SW2, third switch group SW3, first switch unit SWC1, second switch unit SWC2, third switch unit SWC3), inverter 51, It has the 3rd relay 53, the discharge circuit 55, the U-phase line Lu, the V-phase line Lv, and the W-phase line Lw.

なお、本実施形態における特定電気機器は、非常用照明器具や排煙機など、商用電源からの電力供給が不能となった状態でも、動作させる必要がある電気機器を有し、通常は商用電源から供給された電力で駆動し、商用電源からの電力供給が不能な場合には、バッテリー群(第1バッテリー群BG1〜第3バッテリー群BG3)若しくは発電機4から供給された電力で駆動する。   In addition, the specific electric device in the present embodiment includes an electric device that needs to be operated even in a state where power supply from a commercial power source is disabled, such as an emergency lighting apparatus or a smoke exhauster, and is usually a commercial power source. When the power supply from the commercial power supply is impossible, the battery is driven with the power supplied from the battery group (first battery group BG1 to third battery group BG3) or the generator 4.

エンジン3は、ガスの爆発力などに基づいて回転力を発生させ、発電機4に当該回転力を与える装置で、セルモーター5は、エンジン3の始動に用いられる。   The engine 3 is a device that generates a rotational force based on the explosive force of gas and the like and applies the rotational force to the generator 4. The cell motor 5 is used to start the engine 3.

U相線Lu、V相線Lv、W相線Lwは、一方が第1スイッチ部SWC1と接続され、他方が第2スイッチ部SWC2と接続される。
U相線Luは、第1スイッチ部SWC1を介して、発電機4のU相端子UTや商用電源からの電力線のR相線Lrと接続される。
V相線Lvは、第1スイッチ部SWC1を介して、発電機4のV相端子VTや商用電源からの電力線のS相線Lsと接続される。
W相線Lwは、第1スイッチ部SWC1を介して、発電機4のW相端子WTや商用電源からの電力線のT相線Ltと接続される。
One of the U-phase line Lu, the V-phase line Lv, and the W-phase line Lw is connected to the first switch unit SWC1, and the other is connected to the second switch unit SWC2.
The U-phase line Lu is connected to the U-phase terminal UT of the generator 4 and the R-phase line Lr of the power line from the commercial power supply via the first switch unit SWC1.
The V-phase line Lv is connected to the V-phase terminal VT of the generator 4 and the S-phase line Ls of the power line from the commercial power supply via the first switch unit SWC1.
The W-phase line Lw is connected to the W-phase terminal WT of the generator 4 and the T-phase line Lt of the power line from the commercial power supply via the first switch unit SWC1.

操作部7は、「通常モード」と、発電機4の負荷試験や抵抗部10のバッテリーの放電試験を行う「試験モード」の切替を行うために使用されるモードスイッチ7a、発電機4の負荷試験を行う際の負荷量を調整する、すなわち発電機4と接続する抵抗ユニットを選択する負荷量調整スイッチ7b(第1スイッチ7b1、第2スイッチ7b2、第3スイッチ7b3)、発電システム1の動作状態を表示する表示部7cを有する(図2参照)。   The operation unit 7 is a mode switch 7a used for switching between the “normal mode” and the “test mode” for performing the load test of the generator 4 and the battery discharge test of the resistor unit 10, and the load of the generator 4. Load amount adjustment switch 7b (first switch 7b1, second switch 7b2, third switch 7b3) for adjusting a load amount at the time of performing a test, that is, selecting a resistance unit connected to the generator 4, operation of the power generation system 1 It has the display part 7c which displays a state (refer FIG. 2).

制御部8は、操作部7の操作状態、及び第1継電器9aや第2継電器9bや第3継電器53からの信号に基づいて、スイッチング部(第1スイッチ群SW1、第2スイッチ群SW2、第3スイッチ群SW3、第1スイッチ部SWC1、第2スイッチ部SWC2、第3スイッチ部SWC3)の各スイッチを制御する。   Based on the operation state of the operation unit 7 and the signals from the first relay 9a, the second relay 9b, and the third relay 53, the control unit 8 switches the switching unit (the first switch group SW1, the second switch group SW2, the first switch group SW2). 3 switches SW3, first switch unit SWC1, second switch unit SWC2, and third switch unit SWC3).

発電機4や抵抗部10の試験を行う時以外は、モードスイッチ7aは、「通常モード」に設定され、発電機4や抵抗部10の試験を行う時は、モードスイッチ7aは、「試験モード」に設定される。   Except when testing the generator 4 and the resistance unit 10, the mode switch 7a is set to “normal mode”. When testing the generator 4 and the resistance unit 10, the mode switch 7a is set to “test mode”. "Is set.

モードスイッチ7aが、「通常モード」に設定された場合であって、商用電源からの電力供給が可能な状態の時は、商用電源からの電力が、抵抗部10のバッテリー(第1バッテリー群BG1、第2バッテリー群BG2、第3バッテリー群BG3)や特定電気機器に供給されるように、制御部8は、スイッチング部の各スイッチを制御する(図1参照)。   When the mode switch 7a is set to the “normal mode” and power can be supplied from the commercial power source, the power from the commercial power source is supplied to the battery of the resistor unit 10 (first battery group BG1). , The second battery group BG2, the third battery group BG3) and the control unit 8 controls each switch of the switching unit so as to be supplied to the specific electrical device (see FIG. 1).

モードスイッチ7aが、「通常モード」に設定された場合であって、停電など、商用電源からの電力供給が不能な状態の時は、エンジン3の始動のために、一部のバッテリー群(第1バッテリー群BG1)からの電力が、セルモーター5に供給され、残りのバッテリー群(第2バッテリー群BG2、第3バッテリー群BG3)からの電力が、特定電気機器に供給されるように、制御部8は、スイッチング部の各スイッチを制御する(図3参照)。   When the mode switch 7a is set to the “normal mode” and the power supply from the commercial power source is not possible due to a power failure or the like, some battery groups (first Control is performed so that power from one battery group BG1) is supplied to the cell motor 5 and power from the remaining battery groups (second battery group BG2, third battery group BG3) is supplied to the specific electrical device. The unit 8 controls each switch of the switching unit (see FIG. 3).

エンジン3が始動した後、発電機4が定常運転状態になるまでは、総てのバッテリー群(第1バッテリー群BG1〜第3バッテリー群BG3)をからの電力が、特定電気機器に供給されるように、制御部8は、スイッチング部の各スイッチを制御する(図4参照)。
発電機4が定常運転状態になったかどうかの判断は、第2継電器9bから出力される信号に基づいて行う形態であってもよいし、後述する第1時間t1を用い、エンジン3の始動から第1時間t1を経過したか否かで判断する形態であってもよい。
After the engine 3 is started, power from all the battery groups (the first battery group BG1 to the third battery group BG3) is supplied to the specific electric device until the generator 4 is in a steady operation state. Thus, the control part 8 controls each switch of a switching part (refer FIG. 4).
The determination as to whether or not the generator 4 is in a steady operation state may be performed based on a signal output from the second relay 9b, or from the start of the engine 3 using a first time t1 described later. It may be determined based on whether or not the first time t1 has elapsed.

発電機4が定常運転になった後は、発電機4からの電力が、特定電気機器に供給されるように、制御部8は、スイッチング部の各スイッチを制御する(図5参照)。   After the generator 4 is in a steady operation, the control unit 8 controls each switch of the switching unit so that the electric power from the generator 4 is supplied to the specific electrical device (see FIG. 5).

停電状態が解消するなど、商用電源からの電力供給が可能な状態になった後は、エンジン3や発電機4が停止され、図1の状態に戻される。   After the power failure state is resolved and the power supply from the commercial power source is enabled, the engine 3 and the generator 4 are stopped and returned to the state shown in FIG.

操作部7や制御部8や各スイッチの駆動用の電源は、バッテリー群(第1バッテリー群BG1、第2バッテリー群BG2、第3バッテリー群BG3)の少なくとも1つが使用される。ただし、図示しない別のバッテリーを設け、当該別のバッテリーを各スイッチの駆動用に使用する形態であってもよい。
また、第1スイッチ部SWC1は、商用電源で駆動され、オン状態の時は、商用電源が可動接点と接続され、オフ状態(停電)の時は、発電機4が可動接点と接続される形態であってもよい。
At least one of the battery groups (first battery group BG1, second battery group BG2, and third battery group BG3) is used as a power source for driving the operation unit 7, the control unit 8, and each switch. However, another battery (not shown) may be provided, and the other battery may be used for driving each switch.
Further, the first switch unit SWC1 is driven by a commercial power source, and when the power switch is in an on state, the commercial power source is connected to the movable contact, and when it is in an off state (power failure), the generator 4 is connected to the movable contact. It may be.

本実施形態では、各スイッチのリレーコイルに電流が流れていないオフ状態の時、各スイッチは、図5の状態にされる。
このため、操作部7や制御部8や各スイッチの駆動用の電源(ここでは、バッテリー群のいずれか)からの電力供給が途絶えても、発電機から特定電気機器への電力供給を行うスイッチ状態(図5のスイッチ状態)が維持されるので、エンジン3や発電機4が動作している限り、特定電気機器への電力供給を維持することが出来る。
In the present embodiment, each switch is brought into the state shown in FIG. 5 when the current is not flowing through the relay coil of each switch.
For this reason, even if the power supply from the power source (in this case, one of the battery group) for driving the operation unit 7, the control unit 8, or each switch is interrupted, the switch that supplies power from the generator to the specific electrical device Since the state (switch state in FIG. 5) is maintained, as long as the engine 3 and the generator 4 are operating, it is possible to maintain power supply to the specific electrical device.

モードスイッチ7aが、「試験モード」に設定された場合は、エンジン3の始動とバッテリー群の放電試験のために、一部のバッテリー群(第1バッテリー群BG1)からの電力が、セルモーター5に供給され、残りのバッテリー群(第2バッテリー群BG2、第3バッテリー群BG3)からの電力が、特定電気機器に供給されるように、制御部8は、スイッチング部の各スイッチを制御する(バッテリー放電試験ステップ、図6参照)。   When the mode switch 7a is set to the “test mode”, the electric power from a part of the battery group (first battery group BG1) is supplied to the cell motor 5 for starting the engine 3 and discharging the battery group. The control unit 8 controls each switch of the switching unit so that power from the remaining battery groups (second battery group BG2 and third battery group BG3) is supplied to the specific electrical device ( Battery discharge test step, see FIG. 6).

エンジン3が始動した後、第1時間t1の間、総てのバッテリー群からの電力が、特定電気機器に供給されるように、制御部8は、スイッチング部の各スイッチを制御する(バッテリー放電試験ステップ、図7参照)。   After the engine 3 is started, the control unit 8 controls each switch of the switching unit (battery discharge) so that the power from all the battery groups is supplied to the specific electric device during the first time t1. Test step, see FIG. 7).

これは、停電時にエンジン3を始動してから発電機4が定常運転状態になるまでの間、バッテリー群が特定電気機器への電力供給を維持出来るかどうかを試験する目的で行われる。   This is performed for the purpose of testing whether or not the battery group can maintain the power supply to the specific electric device after the engine 3 is started at the time of a power failure until the generator 4 is in a steady operation state.

第1時間t1は、エンジン3の始動から発電機4が定常運転状態になるまでに必要な時間(たとえば、40秒)に設定される。   The first time t1 is set to a time (for example, 40 seconds) required from the start of the engine 3 until the generator 4 enters a steady operation state.

エンジン3の始動から、第1時間t1が経過した後は、総てのバッテリー群からの電力が、放電回路55に供給されるように、制御部8は、スイッチング部の各スイッチを制御する(図8参照)。   After the first time t1 has elapsed from the start of the engine 3, the control unit 8 controls each switch of the switching unit so that power from all the battery groups is supplied to the discharge circuit 55 ( (See FIG. 8).

放電完了後、発電機4の負荷試験を行うために、バッテリー群から放電回路55への電力供給が停止され、発電機4からの電力が、総てのバッテリー群へ供給されるように、制御部8は、スイッチング部の各スイッチを制御する(負荷試験ステップ、図9参照)。
ただし、負荷量の調整のため、発電機4から電力供給するバッテリー群を使用者が選択出来るように、第1スイッチ群SWの第1スイッチS11〜第13スイッチS13については、負荷量調整スイッチ7b(第1スイッチ7b1、第2スイッチ7b2、第3スイッチ7b3)の操作状態に応じてオンオフ制御される。
ここでいう放電完了は、総てのバッテリー群が完全に放電しきった状態ではなく、制御部8やスイッチング部の各スイッチなどを駆動出来る電力を残した状態を言うものとする。
In order to perform a load test of the generator 4 after the discharge is completed, the power supply from the battery group to the discharge circuit 55 is stopped, and the power from the generator 4 is controlled to be supplied to all the battery groups. The unit 8 controls each switch of the switching unit (load test step, see FIG. 9).
However, the load amount adjustment switch 7b is used for the first switch S11 to the thirteenth switch S13 of the first switch group SW so that the user can select the battery group to be supplied with power from the generator 4 for adjusting the load amount. On / off control is performed in accordance with the operation state of the first switch 7b1, the second switch 7b2, and the third switch 7b3.
The completion of discharge here means not a state where all the battery groups are completely discharged, but a state where power that can drive the control unit 8 and each switch of the switching unit is left.

第1継電器9aは、商用電源の電力線(R相線Lr、S相線Ls、T相線Lt)と接続され、商用電源の電力線に流れる電流若しくは、当該電力線を介して電気機器へ印加される電圧を検知する。   The first relay 9a is connected to a power line (R-phase line Lr, S-phase line Ls, T-phase line Lt) of a commercial power source, and is applied to an electric device through a current flowing through the power line of the commercial power source or the power line. Sense voltage.

第1継電器91aで検知された電流値や電圧値が所定の範囲外である(たとえば、電圧値が所定値よりも低い)場合には、第1継電器9aは、停電など商用電源からの電力供給が不能であるとして、所定の信号を制御部8に送信し、制御部8は、スイッチング部の各スイッチを制御する。
また、第1継電器9aに代えて、電圧若しくは電流を検知する計測器を設け、制御部8に当該電圧若しくは当該電流に関する情報を送信し、表示部7cに表示させる形態であってもよい。
When the current value or voltage value detected by the first relay 91a is outside a predetermined range (for example, the voltage value is lower than the predetermined value), the first relay 9a supplies power from a commercial power source such as a power failure. Therefore, a predetermined signal is transmitted to the control unit 8, and the control unit 8 controls each switch of the switching unit.
Moreover, it may replace with the 1st relay 9a, the measuring device which detects a voltage or an electric current, the form which transmits the information regarding the said voltage or the said electric current to the control part 8, and makes it display on the display part 7c may be sufficient.

第2継電器9bは、発電機4の電力線と接続され、発電機4の電力線に流れる電流若しくは、当該電力線を介して特定電気機器などへ印加される電圧を検知する。   The second relay 9b is connected to the power line of the generator 4 and detects a current flowing through the power line of the generator 4 or a voltage applied to a specific electric device or the like via the power line.

第2継電器9bで検知された電流値や電圧値が所定の範囲外である(たとえば、電圧値が所定値よりも高い)場合には、第2継電器9bは、発電機4からの電力供給が可能である(定常運転状態である)として、所定の信号を制御部8に送信し、制御部8は、スイッチング部の各スイッチを制御する。
また、第2継電器9bに代えて、電圧若しくは電流を検知する計測器を設け、制御部8に当該電圧若しくは当該電流に関する情報を送信し、発電機4の負荷試験の際などに、表示部7cに表示させる形態であってもよい。
When the current value or voltage value detected by the second relay 9b is outside a predetermined range (for example, the voltage value is higher than the predetermined value), the second relay 9b is supplied with power from the generator 4. A predetermined signal is transmitted to the control unit 8 as being possible (in a steady operation state), and the control unit 8 controls each switch of the switching unit.
Further, instead of the second relay 9b, a measuring instrument for detecting voltage or current is provided, information on the voltage or current is transmitted to the control unit 8, and the display unit 7c is used during a load test of the generator 4 or the like. It may be a form to be displayed.

具体的には、図1、図6の状態で、商用電源からの電力供給が不能となった場合は、未だ発電機4が動作しておらず、発電機4から特定電気機器への電力供給が十分に出来ない。
このため、エンジン3の始動のために、一部のバッテリー群(第1バッテリー群BG1)からの電力が、セルモーター5に供給され、残りのバッテリー群(第2バッテリー群BG2、第3バッテリー群BG3)からの電力が、特定電気機器に供給されるように、制御部8は、スイッチング部の各スイッチを制御する(図3参照)。
Specifically, in the state shown in FIGS. 1 and 6, when power supply from the commercial power supply is disabled, the generator 4 is not operating yet, and power is supplied from the generator 4 to the specific electrical device. Is not enough.
Therefore, in order to start the engine 3, electric power from a part of the battery group (first battery group BG1) is supplied to the cell motor 5, and the remaining battery groups (second battery group BG2, third battery group). The control unit 8 controls each switch of the switching unit so that the electric power from BG3) is supplied to the specific electrical device (see FIG. 3).

また、図7〜図9の状態で、商用電源からの電力供給が不能となった場合は、発電機4が定常運転状態になっており、発電機4から特定電気機器への電力供給が十分に出来る。
このため、発電機4からの電力が、特定電気機器に供給されるように、制御部8は、スイッチング部の各スイッチを制御する(図5参照)。
7 to 9, when power supply from the commercial power supply is disabled, the generator 4 is in a steady operation state, and the power supply from the generator 4 to the specific electrical device is sufficient. I can do it.
For this reason, the control part 8 controls each switch of a switching part so that the electric power from the generator 4 may be supplied to a specific electric equipment (refer FIG. 5).

抵抗部10の第1抵抗ユニット10a〜第3抵抗ユニット10cは、第1スイッチ部SWC1や第1スイッチ群SW1(単極単投式の第11スイッチS11と第12スイッチS12と第13スイッチS13)を介して、並列に、商用電源や発電機4と接続される。   The first resistor unit 10a to the third resistor unit 10c of the resistor unit 10 include a first switch unit SWC1 and a first switch group SW1 (single pole single throw type eleventh switch S11, twelfth switch S12, and thirteenth switch S13). Are connected in parallel with the commercial power source and the generator 4.

第1スイッチ群SW1は、第1抵抗ユニット10a〜第3抵抗ユニット10cのうちで、商用電源若しくは発電機4と接続されるものを切り替えるために使用される。   The first switch group SW1 is used for switching one of the first resistance unit 10a to the third resistance unit 10c that is connected to the commercial power source or the generator 4.

また、第1抵抗ユニット10a〜第3抵抗ユニット10cは、第2スイッチ群SW2(単極双投式の第21スイッチS21、単極単投式の第22スイッチS22と第23スイッチS23)、第3スイッチ群SW3(単極双投式の第31スイッチS31と第32スイッチS32と第33スイッチS33)、インバーター51を介して、直列又は単独で特定電気機器若しくは放電回路55と接続される。   The first resistor unit 10a to the third resistor unit 10c include a second switch group SW2 (single pole double throw type 21st switch S21, single pole single throw type 22nd switch S22 and 23rd switch S23), Three switches SW3 (single pole double throw type 31st switch S31, 32nd switch S32 and 33rd switch S33) are connected to a specific electric device or discharge circuit 55 in series or alone via an inverter 51.

第2スイッチ群SW2と第3スイッチ群SW3は、第1抵抗ユニット10a〜第3抵抗ユニット10cのそれぞれに設けられた第1バッテリー群BG1〜第3バッテリー群BG3のうちで、セルモーター5に接続されるものや、特定電気機器若しくは放電回路55に接続されるものを切り替えるために使用される。   The second switch group SW2 and the third switch group SW3 are connected to the cell motor 5 among the first battery group BG1 to the third battery group BG3 provided in each of the first resistance unit 10a to the third resistance unit 10c. Used to switch between those connected to the specific electrical equipment or the discharge circuit 55.

第1抵抗ユニット10aは、第1AC/DCコンバーター11a、第1充電回路13a、第1バッテリー群BG1を有する。
第1AC/DCコンバーター11aは、第11スイッチS11を介して、U相線Luと接続され、V相線Lvと接続され、商用電源若しくは発電機4からU相線LuやV相線Lvを介して供給される電力について、電気の種類を交流から直流に変換する。
第1バッテリー群BG1は、1以上の二次電池を有し、第1AC/DCコンバーター11aや第1充電回路13aを介して、商用電源若しくは発電機4から供給される電力を蓄積する。蓄積する際における、第1AC/DCコンバーター11aや第1充電回路13aや第1バッテリー群BG1の抵抗が、発電機4の負荷試験の負荷として利用される。
第1抵抗ユニット10aには、第1バッテリー群BG1の充電状態を検知するため、第1バッテリー群BG1の充電電圧若しくは充電電流を計測する装置が設けられ、第1バッテリー群BG1が満充電の時には、第1充電回路13aを介した第1抵抗ユニット10aへの電力供給を遮断させる制御が行われるのが望ましい。
The first resistance unit 10a includes a first AC / DC converter 11a, a first charging circuit 13a, and a first battery group BG1.
The first AC / DC converter 11a is connected to the U-phase line Lu through the eleventh switch S11, and is connected to the V-phase line Lv, and from the commercial power supply or the generator 4 via the U-phase line Lu and the V-phase line Lv. The type of electricity is converted from alternating current to direct current.
The first battery group BG1 includes one or more secondary batteries, and accumulates electric power supplied from a commercial power source or the generator 4 via the first AC / DC converter 11a and the first charging circuit 13a. When accumulating, the resistance of the first AC / DC converter 11a, the first charging circuit 13a, and the first battery group BG1 is utilized as a load test load of the generator 4.
The first resistance unit 10a is provided with a device for measuring the charging voltage or the charging current of the first battery group BG1 in order to detect the charging state of the first battery group BG1, and when the first battery group BG1 is fully charged. It is desirable to perform control to cut off the power supply to the first resistance unit 10a via the first charging circuit 13a.

第2抵抗ユニット10bは、第2AC/DCコンバーター11b、第2充電回路13b、第2バッテリー群BG2を有する。
第2AC/DCコンバーター11bは、第12スイッチS12を介して、W相線Lwと接続され、U相線Luと接続され、商用電源若しくは発電機4からW相線LwやU相線Luを介して供給される電力について、電気の種類を交流から直流に変換する。
第2バッテリー群BG2は、1以上の二次電池を有し、第2AC/DCコンバーター11bや第2充電回路13bを介して、商用電源若しくは発電機4から供給される電力を蓄積する。蓄積する際における、第2AC/DCコンバーター11bや第2充電回路13bや第2バッテリー群BG2の抵抗が、発電機4の負荷試験の負荷として利用される。
第2抵抗ユニット10bには、第2バッテリー群BG2の充電状態を検知するため、第2バッテリー群BG2の充電電圧若しくは充電電流を計測する装置が設けられ、第2バッテリー群BG2が満充電の時には、第2充電回路13bを介した第2抵抗ユニット10bへの電力供給を遮断させる制御が行われるのが望ましい。
The second resistance unit 10b includes a second AC / DC converter 11b, a second charging circuit 13b, and a second battery group BG2.
The second AC / DC converter 11b is connected to the W-phase line Lw via the twelfth switch S12, and is connected to the U-phase line Lu. From the commercial power supply or the generator 4, the W-phase line Lw and the U-phase line Lu are connected. The type of electricity is converted from alternating current to direct current.
The second battery group BG2 includes one or more secondary batteries, and accumulates power supplied from the commercial power source or the generator 4 via the second AC / DC converter 11b and the second charging circuit 13b. The resistance of the second AC / DC converter 11b, the second charging circuit 13b, and the second battery group BG2 during storage is used as a load test load of the generator 4.
The second resistance unit 10b is provided with a device for measuring the charging voltage or charging current of the second battery group BG2 in order to detect the charging state of the second battery group BG2, and when the second battery group BG2 is fully charged. It is desirable to perform control to cut off the power supply to the second resistance unit 10b via the second charging circuit 13b.

第3抵抗ユニット10cは、第3AC/DCコンバーター11c、第3充電回路13c、第3バッテリー群BG3を有する。
第3AC/DCコンバーター11cは、第13スイッチS13を介して、V相線Lvと接続され、W相線Lwと接続され、商用電源若しくは発電機4からV相線LvやW相線Lwを介して供給される電力について、電気の種類を交流から直流に変換する。
第3バッテリー群BG3は、1以上の二次電池を有し、第3AC/DCコンバーター11cや第3充電回路13cを介して、商用電源若しくは発電機4から供給される電力を蓄積する。蓄積する際における、第3AC/DCコンバーター11cや第3充電回路13cや第3バッテリー群BG3の抵抗が、発電機4の負荷試験の負荷として利用される。
第3抵抗ユニット10cには、第3バッテリー群BG3の充電状態を検知するため、第3バッテリー群BG3の充電電圧若しくは充電電流を計測する装置が設けられ、第3バッテリー群BG3が満充電の時には、第3充電回路13cを介した第3抵抗ユニット10cへの電力供給を遮断させる制御が行われるのが望ましい。
The third resistance unit 10c includes a third AC / DC converter 11c, a third charging circuit 13c, and a third battery group BG3.
The third AC / DC converter 11c is connected to the V-phase line Lv through the thirteenth switch S13, and is connected to the W-phase line Lw, and from the commercial power supply or the generator 4 via the V-phase line Lv and the W-phase line Lw. The type of electricity is converted from alternating current to direct current.
The third battery group BG3 includes one or more secondary batteries, and accumulates electric power supplied from the commercial power supply or the generator 4 via the third AC / DC converter 11c and the third charging circuit 13c. When accumulating, the resistance of the third AC / DC converter 11c, the third charging circuit 13c, and the third battery group BG3 is utilized as a load test load of the generator 4.
The third resistance unit 10c is provided with a device for measuring the charging voltage or charging current of the third battery group BG3 in order to detect the charging state of the third battery group BG3. When the third battery group BG3 is fully charged, It is desirable to perform control to cut off the power supply to the third resistance unit 10c via the third charging circuit 13c.

また、第1抵抗ユニット10a〜第3抵抗ユニット10cそれぞれのAC/DCコンバーターや充電回路やバッテリー群を冷却するために、これらの近傍に冷却ファンが設けられるのが望ましい。   Further, in order to cool the AC / DC converter, the charging circuit, and the battery group of each of the first resistance unit 10a to the third resistance unit 10c, it is desirable to provide a cooling fan in the vicinity thereof.

負荷試験の時間内に、二次電池への充電が完了出来るように、第1抵抗ユニット10a〜第3抵抗ユニット10cのそれぞれの充電回路は、急速充電タイプのものであることが望ましい。   It is desirable that each charging circuit of the first resistance unit 10a to the third resistance unit 10c is of a quick charging type so that charging of the secondary battery can be completed within the time of the load test.

本実施形態では、第1バッテリー群BG1〜第3バッテリー群BG3のそれぞれは、12Vの二次電池を2つ有し且つ直列に接続され、第1抵抗ユニット10a〜第3抵抗ユニット10cのそれぞれが、バッテリー群とAC/DCコンバーターと充電回路とで、定格容量2kWの抵抗器群を構成する例を示す。ただし、二次電池の数や、定格容量の値は、これに限るものではない。   In the present embodiment, each of the first battery group BG1 to the third battery group BG3 has two 12V secondary batteries and is connected in series, and each of the first resistance unit 10a to the third resistance unit 10c An example in which a battery group, an AC / DC converter, and a charging circuit constitute a resistor group having a rated capacity of 2 kW is shown. However, the number of secondary batteries and the value of the rated capacity are not limited to this.

また、抵抗部10が3つの抵抗ユニット(第1抵抗ユニット10a〜第3抵抗ユニット10c)で構成される形態を示すが、負荷試験のため、少なくとも2つの抵抗ユニットがあればよく、また4以上の抵抗ユニットが設けられる形態であってもよい。   Moreover, although the resistance part 10 shows the form comprised by three resistance units (the 1st resistance unit 10a-the 3rd resistance unit 10c), at least 2 resistance units should just be provided for a load test, and four or more It may be a form in which the resistance unit is provided.

また、抵抗ユニットのそれぞれについて、充電回路とバッテリー群の間には、バッテリー群から充電回路への放電(逆流)を防ぐために、ダイオードなどの逆流防止装置(不図示)が設けられるのが望ましい。   Further, for each of the resistance units, it is desirable to provide a backflow prevention device (not shown) such as a diode between the charging circuit and the battery group in order to prevent discharge (backflow) from the battery group to the charging circuit.

また、第1スイッチ群SW1(第11スイッチS11〜第13スイッチS13)が、U相線LuやV相線LvやW相線Lwと抵抗ユニットのAC/DCコンバーターの間に設けられる形態を説明したが、抵抗ユニットの充電回路とバッテリー群の間に設けられる形態であってもよい。この場合には、第1スイッチ群SW1が逆流防止装置の役割も果たす。   Further, a description will be given of a mode in which the first switch group SW1 (the eleventh switch S11 to the thirteenth switch S13) is provided between the U-phase line Lu, the V-phase line Lv, the W-phase line Lw, and the AC / DC converter of the resistance unit. However, a form provided between the charging circuit of the resistance unit and the battery group may be employed. In this case, the first switch group SW1 also serves as a backflow prevention device.

次に、バッテリー群や各スイッチの接続形態について説明する。
第1バッテリー群BG1の一方の端子(+端子)は、第1充電回路13aの一方の端子や第21スイッチS21の共通端子(可動接点)と接続される。
第2バッテリー群BG2の一方の端子(+端子)は、第2充電回路13bの一方の端子や第22スイッチS22の端子の一方(たとえば、固定接点)と接続される。
第3バッテリー群BG3の一方の端子(+端子)は、第3充電回路13cの一方の端子や第23スイッチS23の端子の一方(たとえば、固定接点)と接続される。
Next, the connection form of the battery group and each switch will be described.
One terminal (+ terminal) of the first battery group BG1 is connected to one terminal of the first charging circuit 13a and a common terminal (movable contact) of the 21st switch S21.
One terminal (+ terminal) of the second battery group BG2 is connected to one terminal of the second charging circuit 13b and one terminal (for example, a fixed contact) of the 22nd switch S22.
One terminal (+ terminal) of the third battery group BG3 is connected to one terminal of the third charging circuit 13c and one terminal (for example, a fixed contact) of the 23rd switch S23.

第1バッテリー群BG1の他方の端子(−端子)は、セルモーター5の一方の端子や第1充電回路13aの他方の端子や第31スイッチS31の端子の一方(常時閉路接点)と接続される。
第2バッテリー群BG2の他方の端子(−端子)は、第2充電回路13bの他方の端子や第32スイッチS32の端子の一方(常時閉路接点)と接続される。
第3バッテリー群BG3の他方の端子(−端子)は、第3充電回路13cの他方の端子や第33スイッチS33の端子の一方(常時閉路接点)と接続される。
The other terminal (-terminal) of the first battery group BG1 is connected to one terminal of the cell motor 5, the other terminal of the first charging circuit 13a, and one of the terminals of the 31st switch S31 (normally closed contact). .
The other terminal (− terminal) of the second battery group BG2 is connected to the other terminal of the second charging circuit 13b and one of the terminals of the 32nd switch S32 (normally closed contact).
The other terminal (-terminal) of the third battery group BG3 is connected to the other terminal of the third charging circuit 13c and one of the terminals of the 33rd switch S33 (normally closed contact).

第31スイッチ31の端子の一方(常時閉路接点)は、第1バッテリー群BG1の他方の端子(−端子)と接続され、第31スイッチS31の端子の他方(常時開路接点)は、第21スイッチS21の端子の一方(常時閉路接点)やインバーター51と接続され、第31スイッチS31の共通端子(可動接点)は、第22スイッチS22の端子の他方(たとえば、可動接点)や第32スイッチS32の端子の他方(常時開路接点)と接続される。   One terminal (normally closed contact) of the 31st switch 31 is connected to the other terminal (−terminal) of the first battery group BG1, and the other terminal (always open contact) of the 31st switch S31 is connected to the 21st switch. One of the terminals of S21 (normally closed contact) and the inverter 51 are connected, and the common terminal (movable contact) of the 31st switch S31 is the other of the terminals of the 22nd switch S22 (for example, the movable contact) and of the 32nd switch S32. Connected to the other terminal (normally open contact).

第32スイッチS32の端子の一方(常時閉路接点)は、第2バッテリー群BG2の他方の端子(−端子)と接続され、第32スイッチS32の端子の他方(常時開路接点)は、第22スイッチS22の端子の他方(たとえば、可動接点)や第31スイッチS31の共通端子と接続され、第32スイッチS32の共通端子(可動接点)は、第23スイッチS23の端子の他方(たとえば、可動接点)や第33スイッチS33の端子の他方(常時開路接点)と接続される。   One terminal (normally closed contact) of the 32nd switch S32 is connected to the other terminal (-terminal) of the second battery group BG2, and the other terminal (normally open contact) of the 32nd switch S32 is connected to the 22nd switch. The other terminal (for example, movable contact) of S22 is connected to the common terminal of the 31st switch S31 and the common terminal (movable contact) of the 32nd switch S32 is the other terminal (for example, movable contact) of the 23rd switch S23. And the other terminal (normally open contact) of the 33rd switch S33.

第33スイッチS33の端子の一方(常時閉路接点)は、第3バッテリー群BG3の他方の端子(−端子)と接続され、第33スイッチS33の端子の他方(常時開路接点)は、第23スイッチS23の端子の他方(たとえば、可動接点)や第32スイッチS32の共通端子と接続され、第33スイッチS33の共通端子(可動接点)は、インバーター51と接続される。   One terminal (normally closed contact) of the 33rd switch S33 is connected to the other terminal (−terminal) of the third battery group BG3, and the other terminal (always open contact) of the 33rd switch S33 is connected to the 23rd switch. The other terminal of S23 (for example, a movable contact) is connected to the common terminal of the thirty-second switch S32, and the common terminal (movable contact) of the thirty-third switch S33 is connected to the inverter 51.

第21スイッチS21の端子の他方(常時開路接点)は、セルモーター5の他方の端子と接続される。   The other terminal (normally open contact) of the 21st switch S <b> 21 is connected to the other terminal of the cell motor 5.

第1スイッチ部SWC1は、連動して動作する3つの単極双投式スイッチを有し、バッテリー群若しくは特定電気機器への電力の供給元を、商用電源と発電機4とで切り替え制御するために使用される。   The first switch unit SWC1 has three single-pole double-throw switches that operate in conjunction with each other, and controls the supply of power to the battery group or the specific electric device between the commercial power source and the generator 4. Used for.

第1スイッチ部SWC1を構成する3つのスイッチのうち、共通端子(可動接点)がU相線Luと接続されたものは、端子の一方(たとえば、常時開路接点)が、商用電源からの電力線のR相線Lrと接続され、端子の他方(たとえば、常時閉路接点)が、発電機4のU相端子UTからの電力線と接続される。
第1スイッチ部SWC1を構成する3つのスイッチのうち、共通端子(可動接点)がV相線Lvと接続されたものは、端子の一方(たとえば、常時開路接点)が、商用電源からの電力線のS相線Lsと接続され、端子の他方(たとえば、常時閉路接点)が、発電機4のV相端子VTからの電力線と接続される。
第1スイッチ部SWC1を構成する3つのスイッチのうち、共通端子(可動接点)がW相線Lwと接続されたものは、端子の一方(たとえば常時開路接点)が、商用電源からの電力線のT相線Ltと接続され、端子の他方(たとえば、常時閉路接点)が、発電機4のW相端子WTからの電力線と接続される。
Of the three switches constituting the first switch unit SWC1, one in which the common terminal (movable contact) is connected to the U-phase line Lu is one of the terminals (for example, the normally open contact) is connected to the power line from the commercial power source. Connected to R-phase line Lr, the other terminal (for example, normally closed contact) is connected to a power line from U-phase terminal UT of generator 4.
Of the three switches constituting the first switch unit SWC1, one in which the common terminal (movable contact) is connected to the V-phase line Lv has one of the terminals (for example, a normally open contact) connected to the power line from the commercial power supply. It is connected to S phase line Ls, and the other terminal (for example, normally closed contact) is connected to a power line from V phase terminal VT of generator 4.
Of the three switches constituting the first switch unit SWC1, one in which the common terminal (movable contact) is connected to the W-phase line Lw is such that one of the terminals (for example, the normally open contact) is the T of the power line from the commercial power source. It is connected to phase line Lt, and the other terminal (for example, normally closed contact) is connected to a power line from W phase terminal WT of generator 4.

第2スイッチ部SWC2は、連動して動作する3つの単極双投式スイッチを有し、特定電気機器への電力の供給元を、発電機4とバッテリー群とで切り替え制御するために使用される。
第2スイッチ部SWC2を構成する3つのスイッチは、それぞれ、端子の一方(たとえば、常時閉路接点)が発電機4からの電力線(U相線Lu、V相線Lv、W相線w)と接続され、端子の他方(たとえば、常時開路接点)が第3スイッチ部SWC3を構成する3つのスイッチそれぞれの端子の一方(たとえば、常時閉路接点)からの電力線と接続され、共通端子(可動接点)が特定電気機器と接続される。
The second switch unit SWC2 has three single-pole double-throw switches that operate in conjunction with each other, and is used to switch and control the power supply source to the specific electric device between the generator 4 and the battery group. The
In each of the three switches constituting the second switch unit SWC2, one of the terminals (for example, a normally closed contact) is connected to a power line (U-phase line Lu, V-phase line Lv, W-phase line w) from the generator 4. The other terminal (for example, normally open contact) is connected to the power line from one of the terminals of each of the three switches (for example, normally closed contact) constituting the third switch unit SWC3, and the common terminal (movable contact) is Connected with specific electrical equipment.

第3スイッチ部SWC3は、連動して動作する3つの単極双投式スイッチを有し、バッテリー群からの電力の供給先を、特定電気機器と放電回路55とで切り替え制御するために使用される。
第3スイッチ部SWC3を構成する3つのスイッチは、それぞれ、端子の一方(たとえば、常時閉路接点)が、第2スイッチ部SWC2を構成する3つのスイッチそれぞれの端子の他方(たとえば、常時開路接点)からの電力線と接続され、端子の他方(たとえば、常時開路接点)が放電回路55からの電力線と接続され、共通端子(可動接点)がインバーター51からの電力線と接続される。
The third switch unit SWC3 has three single-pole double-throw switches that operate in conjunction with each other, and is used to switch and control the supply destination of power from the battery group between the specific electrical device and the discharge circuit 55. The
The three switches constituting the third switch unit SWC3 have one terminal (for example, a normally closed contact), and the other one of the terminals of each of the three switches that constitute the second switch unit SWC2 (for example, a normally open contact). The other terminal (for example, normally open contact) is connected to the power line from the discharge circuit 55, and the common terminal (movable contact) is connected to the power line from the inverter 51.

インバーター51は、第1バッテリー群BG1〜第3バッテリー群BG3から供給される電力について、電気の種類を直流から交流に変換し、交流の電力を後段の特定電気機器若しくは放電回路55に供給する。   The inverter 51 converts the type of electricity from direct current to alternating current with respect to the electric power supplied from the first battery group BG1 to the third battery group BG3, and supplies the alternating current power to the specific electrical device or the discharge circuit 55 in the subsequent stage.

第3継電器53は、インバーター51と第3スイッチ部SWC3の間に設けられ、インバーター51から特定電気機器や放電回路55への電力線と接続され、当該電力線に流れる電流若しくは、当該電力線を介して特定電気機器若しくは放電回路55へ印加される電圧を検知する。
第3継電器53で検知された電流値や電圧値が所定の範囲外である(たとえば、電圧値が所定値よりも低い)場合には、第3継電器53は、第1バッテリー群BG1〜第3バッテリー群BG3の放電が完了したとして、所定の信号を制御部8に送信し、発電機4の負荷試験を行うため、発電機4からの電力が、バッテリー群へ供給されるように、制御部8は、スイッチング15の各スイッチを制御する(図9参照)。
また、第3継電器53に代えて、電圧若しくは電流を検知する計測器を設け、制御部8に当該電圧若しくは当該電流に関する情報を送信し、バッテリー群の放電試験の際などに、表示部7cに表示させる形態であってもよい。
The third relay 53 is provided between the inverter 51 and the third switch unit SWC3 and is connected to a power line from the inverter 51 to the specific electrical device or the discharge circuit 55, and is specified via the current flowing through the power line or the power line. A voltage applied to the electric device or the discharge circuit 55 is detected.
When the current value or the voltage value detected by the third relay 53 is outside a predetermined range (for example, the voltage value is lower than the predetermined value), the third relay 53 is connected to the first battery group BG1 to the third battery group BG1 to the third battery group BG1. When the discharge of the battery group BG3 is completed, the control unit transmits a predetermined signal to the control unit 8 and performs a load test on the generator 4 so that the power from the generator 4 is supplied to the battery group. 8 controls each switch of the switching 15 (see FIG. 9).
Further, instead of the third relay 53, a measuring instrument for detecting a voltage or current is provided, information on the voltage or current is transmitted to the control unit 8, and the display unit 7c is displayed during a discharge test of the battery group. The form to display may be sufficient.

放電回路55は、抵抗器など、バッテリー群から供給された電力を消費する負荷(電気部材)を有し、バッテリー群の放電のために使用される。
バッテリー群を特定電気機器に接続した場合に比べて、バッテリー群の放電を早くするため、放電回路55は、発電システム1に接続される特定電気機器の消費電力よりも大きい負荷を有する。
The discharge circuit 55 has a load (electrical member) that consumes power supplied from the battery group, such as a resistor, and is used for discharging the battery group.
Compared to the case where the battery group is connected to the specific electrical device, the discharge circuit 55 has a load larger than the power consumption of the specific electrical device connected to the power generation system 1 in order to expedite the discharge of the battery group.

特定電気機器への電力供給を行う発電機4とバッテリー群とを一体にした発電システム1により、商用電源からの電力供給が不能となった場合でも、スムーズに、バッテリーや発電機4から供給された電力で、特定電気機器を駆動することが出来る。   Even when the power supply from the commercial power source becomes impossible by the power generation system 1 in which the power generator 4 for supplying power to the specific electric device and the battery group are integrated, the power is smoothly supplied from the battery or the power generator 4. It is possible to drive specific electrical equipment with high power.

本実施形態では、バッテリー群を含む抵抗ユニットが並列に複数設けられ、これら複数の抵抗ユニットと発電機4との接続状態を切り替えることにより、発電機4の負荷試験を行うことが出来る。
また、その前にバッテリー群から特定電気機器への電力供給を行うので、停電時にエンジン3を始動してから発電機4が定常運転になるまでの間、バッテリー群が特定電気機器への電力供給を維持出来るかどうかの試験(放電試験)を行うことが出来る。
放電試験の際に、セルモーター5を使ってエンジン3を始動し、発電機4による発電を行っておく(発電機4が発電を行う状態で放電試験などが行われる)ので、放電試験中や負荷試験中に停電が起きても、瞬時に発電機4から特定電気機器への電力供給に切り替えることが出来る。
In the present embodiment, a plurality of resistance units including a battery group are provided in parallel, and the load test of the generator 4 can be performed by switching the connection state between the plurality of resistance units and the generator 4.
In addition, since power is supplied from the battery group to the specific electrical device before that, the battery group supplies power to the specific electrical device after the engine 3 is started in the event of a power failure until the generator 4 is in steady operation. Can be maintained (discharge test).
At the time of the discharge test, the engine 3 is started using the cell motor 5 and power is generated by the generator 4 (a discharge test or the like is performed while the generator 4 is generating power). Even if a power failure occurs during the load test, it is possible to instantaneously switch to power supply from the generator 4 to the specific electrical device.

放電試験完了後は、バッテリー群から特定電気機器への電力供給を、バッテリー群から放電回路55への電力供給に切り替える。
消費電力が大きい放電回路55への電力供給に切り替えることにより、バッテリー群の放電時間を早めることが出来、また、特定電気機器の使用を最小限に抑えることが出来る。
After the discharge test is completed, the power supply from the battery group to the specific electrical device is switched to the power supply from the battery group to the discharge circuit 55.
By switching to the power supply to the discharge circuit 55 that consumes a large amount of power, the discharge time of the battery group can be shortened, and the use of specific electrical equipment can be minimized.

なお、本実施形態では、商用電源などから電力供給される電気の種類が三相交流である形態を説明したが、単相交流である形態でも良い(図10参照)。   In the present embodiment, the form in which the type of electricity supplied from a commercial power source or the like is a three-phase alternating current has been described. However, a form that is a single-phase alternating current may be used (see FIG. 10).

また、セルモーター5への電力供給は第1バッテリー群BG1単独で行う形態であってもよいが、第1バッテリー群BG1〜第3バッテリー群BG3の総てで行う形態であってもよい(図11参照)。
この場合、セルモーター5とインバーター51は、第1バッテリー群BG1〜第3バッテリー群BG3に対して並列に接続されることになり、セルモーター5への電力供給のオンオフ制御のために、単極単投式の第41スイッチS41が設けられる。また、第21スイッチS21は、単極双投式のものから単極単投式のものに置き換えられる。
The power supply to the cell motor 5 may be performed by the first battery group BG1 alone, but may be performed by all of the first battery group BG1 to the third battery group BG3 (FIG. 11).
In this case, the cell motor 5 and the inverter 51 are connected in parallel to the first battery group BG1 to the third battery group BG3, and a single pole is used for on / off control of power supply to the cell motor 5. A single throw type 41st switch S41 is provided. The twenty-first switch S21 is replaced from a single pole double throw type to a single pole single throw type.

また、スイッチング15の各スイッチの制御は、制御部8によるものだけに限らない。
たとえば、第1継電器9a、第2継電器9b、第3継電器53からの出力信号や、操作部7の操作状態に基づいて、制御部8を介さずに、各スイッチが制御される形態が考えられる。
Further, the control of each switch of the switching 15 is not limited to that by the control unit 8.
For example, a mode in which each switch is controlled without using the control unit 8 based on the output signals from the first relay 9a, the second relay 9b, and the third relay 53 and the operation state of the operation unit 7 can be considered. .

具体的に各スイッチの動作状態を説明する。   Specifically, the operating state of each switch will be described.

第1スイッチ部SWC1は、第1継電器9aからの出力信号やモードスイッチ7aの操作状態に基づいて動作する。
「通常モード」に設定され、商用電源からの電力供給がある場合は、第1スイッチ部SWC1の可動接点は、オン状態で商用電源と接続される(図1参照)。
「通常モード」に設定され、商用電源からの電力供給が無い場合は、第1スイッチ部SWC1の可動接点は、オフ状態で発電機4と接続される(図3〜図5参照)。
「試験モード」に設定された場合は、第1スイッチ部SWC1の可動接点は、オフ状態で発電機4と接続される(図6〜図9参照)。
The first switch unit SWC1 operates based on the output signal from the first relay 9a and the operation state of the mode switch 7a.
When the “normal mode” is set and power is supplied from the commercial power source, the movable contact of the first switch unit SWC1 is connected to the commercial power source in the ON state (see FIG. 1).
When the “normal mode” is set and no power is supplied from the commercial power supply, the movable contact of the first switch unit SWC1 is connected to the generator 4 in the off state (see FIGS. 3 to 5).
When the “test mode” is set, the movable contact of the first switch unit SWC1 is connected to the generator 4 in the off state (see FIGS. 6 to 9).

第2スイッチ部SWC2は、第1継電器9aと第2継電器9bからの出力信号やモードスイッチ7aの操作状態に基づいて動作する。
「通常モード」に設定され、商用電源からの電力供給がある場合は、第2スイッチ部SWC2の可動接点は、オフ状態で第1スイッチ部SWC1(発電機4側)と接続される(図1参照)。
「通常モード」に設定され、商用電源からの電力供給が無い場合は、発電機4が定常運転状態になるまでは、第2スイッチ部SWC2の可動接点は、オン状態で第3スイッチ部SWC3(インバーター51側)と接続され(図3、図4参照)、発電機4が定常運転状態になった後は、第2スイッチ部SWC2の可動接点は、オフ状態で第1スイッチ部SWC1(発電機4側)と接続される(図5参照)。
「試験モード」に設定された場合は、第2スイッチ部SWC2の可動接点は、オン状態で第3スイッチ部SWC3(インバーター51側)と接続される(図6〜図9参照)。
The second switch unit SWC2 operates based on the output signals from the first relay 9a and the second relay 9b and the operation state of the mode switch 7a.
When “normal mode” is set and power is supplied from a commercial power supply, the movable contact of the second switch unit SWC2 is connected to the first switch unit SWC1 (generator 4 side) in the off state (FIG. 1). reference).
When the “normal mode” is set and no power is supplied from the commercial power supply, the movable contact of the second switch unit SWC2 is in the ON state until the generator 4 enters the steady operation state, and the third switch unit SWC3 ( After the generator 4 is in a steady operation state, the movable contact of the second switch unit SWC2 is in the off state and the first switch unit SWC1 (generator) is connected to the inverter 51 side (see FIGS. 3 and 4). 4 side) (see FIG. 5).
When the “test mode” is set, the movable contact of the second switch unit SWC2 is connected to the third switch unit SWC3 (inverter 51 side) in the ON state (see FIGS. 6 to 9).

ただし、第2スイッチ部SWC2は、第1時間t1を計測するタイマーを内蔵し、第1継電器9aからの出力信号やモードスイッチ7aの操作状態に基づいて動作する形態であってもよい。
「通常モード」に設定され、商用電源からの電力供給がある場合は、第2スイッチ部SWC2の可動接点は、オフ状態で第1スイッチ部SWC1(発電機4側)と接続される(図1参照)。
「通常モード」に設定され、商用電源からの電力供給が無い場合は、エンジン3の始動から第1時間t1が経過するまでは、第2スイッチ部SWC2の可動接点は、オン状態で第3スイッチ部SWC3(インバーター51側)と接続され(図3、図4参照)、第1時間t1が経過した後は、第2スイッチ部SWC2の可動接点は、オフ状態で第1スイッチ部SWC1(発電機4側)と接続される(図5参照)。
「試験モード」に設定された場合は、第2スイッチ部SWC2の可動接点は、オン状態で第3スイッチ部SWC3(インバーター51側)と接続される(図6〜図9参照)。
However, the second switch unit SWC2 may have a built-in timer that measures the first time t1, and may operate based on the output signal from the first relay 9a and the operation state of the mode switch 7a.
When “normal mode” is set and power is supplied from a commercial power supply, the movable contact of the second switch unit SWC2 is connected to the first switch unit SWC1 (generator 4 side) in the off state (FIG. 1). reference).
When “normal mode” is set and no power is supplied from the commercial power supply, the movable contact of the second switch unit SWC2 remains in the ON state until the first time t1 has elapsed since the start of the engine 3. After the first time t1 has elapsed after being connected to the part SWC3 (inverter 51 side) and the first time t1 has elapsed, the movable contact of the second switch part SWC2 is in the off state and the first switch part SWC1 (generator 4 side) (see FIG. 5).
When the “test mode” is set, the movable contact of the second switch unit SWC2 is connected to the third switch unit SWC3 (inverter 51 side) in the ON state (see FIGS. 6 to 9).

第3スイッチ部SWC3は、第1時間t1を計測するタイマーを内蔵し、第3継電器53からの出力信号やモードスイッチ7aの操作状態に基づいて動作する。
「通常モード」に設定された場合は、第3スイッチ部SWC3の可動接点は、オフ状態で第2スイッチ部SWC2(特定電気機器側)と接続される(図1、図3〜図5参照)。
「試験モード」に設定された場合は、エンジン3の始動から第1時間t1が経過するまでは、第3スイッチ部SWC3の可動接点は、オフ状態で第2スイッチ部SWC2(特定電気機器側)と接続され(図6、図7参照)、第1時間t1が経過した後であって、バッテリー群の放電が完了するまでは、第3スイッチ部SWC3の可動接点は、オン状態で放電回路55と接続され(図8参照)、バッテリー群の放電が完了した後は、第3スイッチ部SWC3の可動接点は、オフ状態で第2スイッチ部SWC2(特定電気機器側)と接続される(図9参照)。
The third switch unit SWC3 includes a timer for measuring the first time t1, and operates based on an output signal from the third relay 53 and an operation state of the mode switch 7a.
When the “normal mode” is set, the movable contact of the third switch unit SWC3 is connected to the second switch unit SWC2 (specific electric device side) in the off state (see FIGS. 1 and 3 to 5). .
When the “test mode” is set, the movable contact of the third switch unit SWC3 is in the OFF state until the first time t1 has elapsed from the start of the engine 3, and the second switch unit SWC2 (specific electric device side). (See FIGS. 6 and 7), and after the first time t1 has elapsed and until the discharge of the battery group is completed, the movable contact of the third switch unit SWC3 is in the ON state and the discharge circuit 55 (See FIG. 8), after the discharge of the battery group is completed, the movable contact of the third switch unit SWC3 is connected to the second switch unit SWC2 (specific electrical device side) in the off state (FIG. 9). reference).

第1スイッチ群SW1(第11スイッチS11〜第13スイッチS13)は、第3継電器53からの出力信号やモードスイッチ7aや負荷量調整スイッチ7bの操作状態に基づいて動作する。
「通常モード」に設定され、商用電源からの電力供給がある場合は、第1スイッチ群SW1のそれぞれはオン状態(閉路状態)にされる(図1参照)。
「通常モード」に設定され、商用電源からの電力供給が無い場合は、第1スイッチ群SW1のそれぞれはオフ状態(開路状態)にされる(図3〜図5参照)。
「試験モード」に設定され、バッテリー群の放電が完了するまでは、第1スイッチ群SW1のそれぞれはオフ状態(開路状態)にされ(図6〜図8参照)、バッテリー群の放電が完了した後は、第11スイッチS11は、第1スイッチ7b1の操作状態に応じてオンオフ制御され、第12スイッチS12は、第2スイッチ7b2の操作状態に応じてオンオフ制御され、第13スイッチS13は、第3スイッチ7bcの操作状態に応じてオンオフ制御される(図9参照)。
The first switch group SW1 (the eleventh switch S11 to the thirteenth switch S13) operates based on the output signal from the third relay 53 and the operation state of the mode switch 7a and the load amount adjustment switch 7b.
When the “normal mode” is set and power is supplied from a commercial power source, each of the first switch groups SW1 is turned on (closed state) (see FIG. 1).
When the “normal mode” is set and no power is supplied from the commercial power supply, each of the first switch groups SW1 is turned off (opened state) (see FIGS. 3 to 5).
The first switch group SW1 is turned off (opened state) until the battery group is completely discharged after being set to the “test mode” (see FIGS. 6 to 8), and the battery group is completely discharged. Thereafter, the eleventh switch S11 is on / off controlled in accordance with the operating state of the first switch 7b1, the twelfth switch S12 is on / off controlled in accordance with the operating state of the second switch 7b2, and the thirteenth switch S13 is The on / off control is performed according to the operation state of the 3 switch 7bc (see FIG. 9).

第2スイッチ群SW2の第21スイッチS21は、第2時間t2を計測するタイマーを内蔵し、第1継電器9aからの出力信号やモードスイッチ7aの操作状態に基づいて動作する。
第2時間t2は、セルモーター5を動作させてエンジン3が始動するまでに必要な時間(たとえば、2秒)に設定される。
「通常モード」に設定され、商用電源からの電力供給がある場合は、第21スイッチS21の可動接点は、オフ状態でインバーター51と接続される(図1参照)。
「通常モード」に設定され、商標電源からの電力供給が無い場合は、セルモーター5を動作させてから第2時間t2が経過するまでは、第21スイッチS21の可動接点は、オン状態でセルモーター5と接続され(図3参照)、第2時間t2が経過した後は、第21スイッチS21の可動接点は、オフ状態でインバーター51と接続される(図4、図5参照)。
「試験モード」に設定され、セルモーター5を動作させてから第2時間t2が経過するまでは、第21スイッチS21の可動接点は、オン状態でセルモーター5と接続され(図6参照)、第2時間t2が経過した後は、第21スイッチS21の可動接点は、オフ状態でインバーター51と接続される(図7〜図9参照)。
The 21st switch S21 of the second switch group SW2 has a built-in timer for measuring the second time t2, and operates based on the output signal from the first relay 9a and the operation state of the mode switch 7a.
The second time t2 is set to a time (for example, 2 seconds) required until the engine 3 is started by operating the cell motor 5.
When the “normal mode” is set and power is supplied from a commercial power source, the movable contact of the twenty-first switch S21 is connected to the inverter 51 in the off state (see FIG. 1).
When “normal mode” is set and no power is supplied from the trademark power source, the movable contact of the 21st switch S21 remains in the ON state until the second time t2 elapses after the cell motor 5 is operated. After the second time t2 has elapsed after being connected to the motor 5 (see FIG. 3), the movable contact of the twenty-first switch S21 is connected to the inverter 51 in the off state (see FIGS. 4 and 5).
The movable contact of the 21st switch S21 is connected to the cell motor 5 in the ON state until the second time t2 has elapsed after the cell motor 5 is operated after being set to the “test mode” (see FIG. 6). After the second time t2 has elapsed, the movable contact of the twenty-first switch S21 is connected to the inverter 51 in the off state (see FIGS. 7 to 9).

第2スイッチ群SW2の第22スイッチS22と第23スイッチS23は、第1継電器9aと第2継電器9bと第3継電器53からの出力信号やモードスイッチ7aの操作状態に基づいて動作する。
「通常モード」に設定され、商用電源からの電力供給がある場合は、第22スイッチS22や第23スイッチS23は、オフ状態(開路状態)にされる(図1参照)。
「通常モード」に設定され、商用電源からの電力供給が無い場合は、発電機4が定常運転状態になるまでは、第22スイッチS22や第23スイッチS23は、オン状態(閉路状態)にされ(図3、図4参照)、発電機4が定常運転状態になった後は、第22スイッチS22や第23スイッチS23は、オフ状態(開路状態)にされる(図5参照)。
「試験モード」に設定された場合は、バッテリー群の放電が完了するまでは、第22スイッチS22や第23スイッチS23は、オン状態(閉路状態)にされ(図6〜図8参照)、バッテリー群の放電が完了した後は、第22スイッチS22や第23スイッチS23は、オフ状態(開路状態)にされる(図9参照)。
The 22nd switch S22 and the 23rd switch S23 of the second switch group SW2 operate based on the output signals from the first relay 9a, the second relay 9b, and the third relay 53 and the operation state of the mode switch 7a.
When the “normal mode” is set and power is supplied from the commercial power supply, the 22nd switch S22 and the 23rd switch S23 are turned off (opened state) (see FIG. 1).
When the “normal mode” is set and no power is supplied from the commercial power supply, the 22nd switch S22 and the 23rd switch S23 are kept in the on state (closed state) until the generator 4 enters the steady operation state. After the generator 4 is in a steady operation state (see FIGS. 3 and 4), the 22nd switch S22 and the 23rd switch S23 are turned off (open circuit state) (see FIG. 5).
When the “test mode” is set, the 22nd switch S22 and the 23rd switch S23 are turned on (closed state) until the discharge of the battery group is completed (see FIGS. 6 to 8), and the battery After the discharge of the group is completed, the 22nd switch S22 and the 23rd switch S23 are turned off (open circuit state) (see FIG. 9).

ただし、第2スイッチ群SW2の第22スイッチS22と第23スイッチS23は、第1時間t1を計測するタイマーを内蔵し、第1継電器9aと第3継電器53からの出力信号やモードスイッチ7aの操作状態に基づいて動作する形態であってもよい。
「通常モード」に設定され、商用電源からの電力供給がある場合は、第22スイッチS22や第23スイッチS23は、オフ状態(開路状態)にされる(図1参照)。
「通常モード」に設定され、商用電源からの電力供給が無い場合は、エンジン3の始動から第1時間t1が経過するまでは、第22スイッチS22や第23スイッチS23は、オン状態(閉路状態)にされ(図3、図4参照)、第1時間t1が経過した後は、第22スイッチS22や第23スイッチS23は、オフ状態(開路状態)にされる(図5参照)。
「試験モード」に設定された場合は、バッテリー群の放電が完了するまでは、第22スイッチS22や第23スイッチS23は、オン状態(閉路状態)にされ(図6〜図8参照)、バッテリー群の放電が完了した後は、第22スイッチS22や第23スイッチS23は、オフ状態(開路状態)にされる(図9参照)。
However, the 22nd switch S22 and the 23rd switch S23 of the second switch group SW2 incorporate a timer for measuring the first time t1, and output signals from the first relay 9a and the third relay 53 and the operation of the mode switch 7a. It may be configured to operate based on the state.
When the “normal mode” is set and power is supplied from the commercial power supply, the 22nd switch S22 and the 23rd switch S23 are turned off (opened state) (see FIG. 1).
When the “normal mode” is set and no power is supplied from the commercial power source, the 22nd switch S22 and the 23rd switch S23 are in the on state (closed state) until the first time t1 has elapsed from the start of the engine 3. After the first time t1 has elapsed, the twenty-second switch S22 and the twenty-third switch S23 are turned off (opened state) (see FIG. 5).
When the “test mode” is set, the 22nd switch S22 and the 23rd switch S23 are turned on (closed state) until the discharge of the battery group is completed (see FIGS. 6 to 8), and the battery After the discharge of the group is completed, the 22nd switch S22 and the 23rd switch S23 are turned off (open circuit state) (see FIG. 9).

第3スイッチ群SW3の第31スイッチS31は、第2時間t2を計測するタイマーを内蔵し、第1継電器9aからの出力信号やモードスイッチ7aの操作状態に基づいて動作する。
「通常モード」に設定され、商用電源からの電力供給がある場合は、第31スイッチS31の可動接点は、オフ状態で第1バッテリー群BG1の他方の端子(−端子)と接続される(図1参照)。
「通常モード」に設定され、商用電源からの電力供給が無い場合は、セルモーター5を動作させてから第2時間t2が経過するまでは、第31スイッチS31の可動接点は、インバーター51と接続され(図3参照)、第2時間t2が経過した後は、第31スイッチS31の可動接点は、第1バッテリー群BG1の他方の端子(−端子)と接続される(図4、図5参照)。
「試験モード」に設定された場合は、セルモーター5を動作させてから第2時間t2が経過するまでは、第31スイッチS31の可動接点は、インバーター51と接続され(図6参照)、第2時間t2が経過した後は、第31スイッチS31の可動接点は、第1バッテリー群BG1の他方の端子(−端子)と接続される(図7〜図9参照)。
The 31st switch S31 of the third switch group SW3 incorporates a timer for measuring the second time t2, and operates based on the output signal from the first relay 9a and the operation state of the mode switch 7a.
When the “normal mode” is set and power is supplied from a commercial power supply, the movable contact of the 31st switch S31 is connected to the other terminal (−terminal) of the first battery group BG1 in the off state (see FIG. 1).
When “normal mode” is set and no power is supplied from the commercial power supply, the movable contact of the 31st switch S31 is connected to the inverter 51 until the second time t2 has elapsed after the cell motor 5 is operated. After the second time t2 has elapsed (see FIG. 3), the movable contact of the 31st switch S31 is connected to the other terminal (− terminal) of the first battery group BG1 (see FIGS. 4 and 5). ).
When the “test mode” is set, the movable contact of the 31st switch S31 is connected to the inverter 51 (see FIG. 6) until the second time t2 elapses after the cell motor 5 is operated. After the elapse of 2 hours t2, the movable contact of the 31st switch S31 is connected to the other terminal (−terminal) of the first battery group BG1 (see FIGS. 7 to 9).

第3スイッチ群SW3の第32スイッチS32の可動接点は、「通常モード」でも「試験モード」でも、第2バッテリーBG2の他方の端子(−端子)と接続され(図1、図3〜図9参照)、点検などでバッテリー群の接続条件を変える(たとえば、複数バッテリー群の直列接続から、第3バッテリー群BG3の単独使用に変える)際に、第32スイッチS32の可動接点は、第31スイッチ31(インバーター51側)と接続される。   The movable contact of the thirty-second switch S32 of the third switch group SW3 is connected to the other terminal (− terminal) of the second battery BG2 in either “normal mode” or “test mode” (FIGS. 1, 3 to 9). The movable contact of the 32nd switch S32 is changed to the 31st switch when changing the connection condition of the battery group in the inspection or the like (for example, changing from the series connection of a plurality of battery groups to the single use of the third battery group BG3). 31 (inverter 51 side).

第3スイッチ群SW3の第33スイッチS33の可動接点は、「通常モード」でも「試験モード」でお、第3バッテリーBG3の他方の端子(−端子)と接続され(図1、図3〜図9参照)、点検などでバッテリー群の接続条件を変える(たとえば、複数バッテリー群の直列接続から、第2バッテリー群BG2の単独使用に変える)際に、第33スイッチS33の可動接点は、第32スイッチS32(インバーター51側)と接続される。   The movable contact of the 33rd switch S33 of the third switch group SW3 is connected to the other terminal (−terminal) of the third battery BG3 in the “normal mode” or the “test mode” (FIGS. 1, 3 to 3). 9), when the connection condition of the battery group is changed by inspection or the like (for example, changing from the series connection of a plurality of battery groups to the single use of the second battery group BG2), the movable contact of the 33rd switch S33 is the 32nd switch. Connected to the switch S32 (inverter 51 side).

1 発電システム
3 エンジン
4 発電機
5 セルモーター
7 操作部
7a モードスイッチ
7b 負荷量調整スイッチ
7b1〜7b3 第1スイッチ〜第3スイッチ
7c 表示部
8 制御部
9a、9b 第1継電器、第2継電器
10 抵抗部
10a〜10c 第1抵抗ユニット〜第3抵抗ユニット
11a〜11c 第1AC/DCコンバーター〜第3AC/DCコンバーター
13a〜13c 第1充電回路〜第3充電回路
51 インバーター
53 第3継電器
55 放電回路
BG1〜BG3 第1バッテリー群〜第3バッテリー群
Lr 商用電源からの電力線のR相線
Ls 商用電源からの電力線のS相線
Lt 商用電源からの電力線のT相線
Lu U相線
Lv V相線
Lw W相線
S11〜S13 第11スイッチ〜第13スイッチ
S21〜S23 第21スイッチ〜第23スイッチ
S31〜S33 第31スイッチ〜第33スイッチ
S41 第41スイッチ
SW1〜SW3 第1スイッチ群〜第3スイッチ群
SWC1〜SWC3 第1スイッチ部〜第3スイッチ部
UT 発電機のU相端子
VT 発電機のV相端子
WT 発電機のW相端子
DESCRIPTION OF SYMBOLS 1 Power generation system 3 Engine 4 Generator 5 Cell motor 7 Operation part 7a Mode switch 7b Load amount adjustment switch 7b1-7b3 First switch-3rd switch 7c Display part 8 Control part 9a, 9b 1st relay, 2nd relay 10 Resistance Part 10a-10c 1st resistance unit-3rd resistance unit 11a-11c 1st AC / DC converter-3rd AC / DC converter 13a-13c 1st charging circuit-3rd charging circuit 51 Inverter 53 3rd relay 55 Discharge circuit BG1- BG3 1st battery group to 3rd battery group Lr R phase line of power line from commercial power supply Ls S phase line of power line from commercial power supply Lt T phase line of power line from commercial power supply Lu U phase line Lv V phase line Lw W Phase wire S11-S13 11th switch-13th switch S21-S23 21st Switch to 23rd switch S31 to S33 31st switch to 33rd switch S41 41st switch SW1 to SW3 1st switch group to 3rd switch group SWC1 to SWC3 1st switch part to 3rd switch part UT U phase terminal of generator VT generator V-phase terminal WT generator W-phase terminal

Claims (5)

エンジンと、
前記エンジンの出力に基づいて発電を行い、外部の特定電気機器と接続される発電機と、
複数の抵抗ユニットを有する抵抗部と、
インバーターと、
通常モードと試験モードとを切り替えるために使用される操作部と、
第1スイッチ部と、
第2スイッチ部とを備えた発電システムであって、
前記複数の抵抗ユニットは、前記発電機に対して並列に接続され、
前記複数の抵抗ユニットのそれぞれは、バッテリーと、前記バッテリーと前記発電機の間に設けられた充電回路を有するものであり、
前記第1スイッチ部は、前記抵抗ユニットのバッテリー若しくは前記特定電気機器への電力の供給元を、商用電源と前記発電機とで切り替え制御するために使用され、
前記第2スイッチ部は、前記特定電気機器への電力の供給元を、前記発電機と前記インバーターを介した前記抵抗ユニットのバッテリーとで切り替え制御するために使用され、
前記操作部を介して前記通常モードに設定された状態で、商用電源から前記特定電気機器への電力供給が不能となった場合には、前記エンジンを始動してから第1時間が経過するまで若しくは前記発電機が定常運転状態になるまでは、前記インバーターと前記第2スイッチ部を介して前記バッテリーからの電力が前記特定電気機器へ供給されるものであり、
前記操作部を介して前記試験モードに設定された場合には、前記発電機が発電を行う状態で、前記バッテリーの放電試験のために、前記インバーターと前記第2スイッチ部を介して前記バッテリーからの電力が前記特定電気機器へ供給され、その後、前記発電機の負荷試験のために、前記バッテリーから前記特定電気機器への電力供給が停止され、前記第1スイッチ部を介して前記発電機からの電力が前記複数のバッテリーのうち少なくとも1つへ供給されることを特徴とする発電システム。
Engine,
A generator that generates power based on the output of the engine and is connected to an external specific electrical device;
A resistance portion having a plurality of resistance units;
An inverter,
An operation unit used to switch between the normal mode and the test mode;
A first switch part;
A power generation system including a second switch unit,
The plurality of resistance units are connected in parallel to the generator,
Each of the plurality of resistance units has a battery and a charging circuit provided between the battery and the generator,
The first switch unit is used to switch and control a power supply source to the battery of the resistance unit or the specific electrical device between a commercial power source and the generator,
The second switch unit is used to switch and control a power supply source to the specific electrical device between the generator and a battery of the resistance unit via the inverter.
When power supply from the commercial power source to the specific electrical device is disabled in the state set to the normal mode via the operation unit, until the first time elapses after starting the engine Or until the generator is in a steady operation state, the power from the battery is supplied to the specific electrical device via the inverter and the second switch unit,
When the test mode is set via the operation unit, the battery is discharged from the battery via the inverter and the second switch unit for a discharge test of the battery while the generator is generating power. Power is supplied to the specific electrical device, and then the power supply from the battery to the specific electrical device is stopped for the load test of the generator, and from the generator via the first switch unit Power is supplied to at least one of the plurality of batteries.
前記発電システムに接続される前記特定電気機器よりも消費電力が大きい負荷を有する放電回路と、
第3スイッチ部とを更に備え、
前記第3スイッチ部は、前記インバーターを介した前記バッテリーからの電力の供給先を、前記特定電気機器と前記放電回路とで切り替え制御するために使用され、
前記操作部を介して前記試験モードに設定された場合には、前記発電機が発電を行う状態で、前記バッテリーの放電試験のために、前記インバーターと前記第3スイッチ部と前記第2スイッチ部を介して前記バッテリーからの電力が前記特定電気機器へ供給され、
前記第1時間経過後であって、前記発電機の負荷試験の前に、前記インバーターと前記第3スイッチ部を介して前記バッテリーからの電力が前記放電回路へ供給され、
前記負荷試験の際は、前記バッテリーから前記放電回路への電力供給が停止され、前記第1スイッチ部を介して前記発電機からの電力が前記複数のバッテリーのうち少なくとも1つへ供給されることを特徴とする請求項1に記載の発電システム。
A discharge circuit having a load that consumes more power than the specific electrical equipment connected to the power generation system;
A third switch part,
The third switch unit is used to switch and control a supply destination of power from the battery via the inverter between the specific electrical device and the discharge circuit,
When the test mode is set through the operation unit, the inverter, the third switch unit, and the second switch unit are used for a discharge test of the battery while the generator is generating power. Power from the battery is supplied to the specific electrical device via
After the first time has elapsed and before the load test of the generator, power from the battery is supplied to the discharge circuit via the inverter and the third switch unit,
During the load test, power supply from the battery to the discharge circuit is stopped, and power from the generator is supplied to at least one of the plurality of batteries via the first switch unit. The power generation system according to claim 1.
前記インバーターと前記第3スイッチ部の間に、継電器が設けられ、
前記継電器で検出される電圧若しくは電流が閾値以下になると、前記インバーターと前記第3スイッチ部を介して前記バッテリーから前記放電回路への電力供給が、前記第1スイッチ部を介して前記発電機から前記バッテリーの少なくとも一つへの電力供給に切り替えられることを特徴とする請求項2の発電システム。
A relay is provided between the inverter and the third switch unit,
When the voltage or current detected by the relay falls below a threshold value, the power supply from the battery to the discharge circuit via the inverter and the third switch unit is supplied from the generator via the first switch unit. The power generation system according to claim 2, wherein the power generation system is switched to power supply to at least one of the batteries.
前記第1スイッチ部のリレーコイルに電流が流れていないオフ状態の時に前記第1スイッチ部の可動接点と接続する前記第1スイッチ部の常時閉路接点は、前記発電機からの電力線と接続され、
前記第2スイッチ部のリレーコイルに電流が流れていないオフ状態の時に前記第2スイッチ部の可動接点と接続する前記第2スイッチ部の常時閉路接点は、前記第1スイッチ部を介した前記発電機若しくは前記商用電源からの電力線と接続されることを特徴とする請求項1に記載の発電システム。
The normally closed contact of the first switch part connected to the movable contact of the first switch part when the current is not flowing through the relay coil of the first switch part is connected to the power line from the generator,
The normally closed contact of the second switch part connected to the movable contact of the second switch part when the current is not flowing through the relay coil of the second switch part is the power generation via the first switch part. The power generation system according to claim 1, wherein the power generation system is connected to a power line from a machine or the commercial power source.
エンジンと、前記エンジンの出力に基づいて発電を行い、外部の特定電気機器と接続される発電機と、複数の抵抗ユニットを有する抵抗部と、インバーターと、通常モードと試験モードとを切り替えるために使用される操作部と、第1スイッチ部と、第2スイッチ部とを備えた発電システムにおける前記発電機の負荷試験方法であって、
前記複数の抵抗ユニットは、前記発電機に対して並列に接続され、
前記複数の抵抗ユニットのそれぞれは、バッテリーと、前記バッテリーと前記発電機の間に設けられた充電回路を有するものであり、
前記第1スイッチ部は、前記抵抗ユニットのバッテリー若しくは前記特定電気機器への電力の供給元を、商用電源と前記発電機とで切り替え制御するために使用され、
前記第2スイッチ部は、前記特定電気機器への電力の供給元を、前記発電機と前記インバーターを介した抵抗ユニットのバッテリーとで切り替え制御するために使用され、
前記操作部を介して前記通常モードに設定された状態で、商用電源から前記特定電気機器への電力供給が不能となった場合には、前記エンジンを始動してから第1時間が経過するまで若しくは前記発電機が定常運転状態になるまでは、前記インバーターと前記第2スイッチ部を介して前記バッテリーからの電力が前記特定電気機器へ供給されるものであり、
前記操作部を介して前記試験モードに設定され、前記発電機が発電を行う状態で、前記インバーターと前記第2スイッチ部を介して前記バッテリーからの電力が前記特定電気機器へ供給されるバッテリー放電試験ステップと、
前記バッテリー放電試験ステップの後、前記バッテリーから前記特定電気機器への電力供給が停止され、前記第1スイッチ部を介して前記発電機からの電力が前記複数のバッテリーのうち少なくとも1つへ供給される負荷試験ステップとを備えることを特徴とする負荷試験方法。
In order to switch between an engine, a power generator based on the output of the engine, a generator connected to an external specific electrical device, a resistance unit having a plurality of resistance units, an inverter, and a normal mode and a test mode A generator load test method in a power generation system including an operation unit, a first switch unit, and a second switch unit to be used,
The plurality of resistance units are connected in parallel to the generator,
Each of the plurality of resistance units has a battery and a charging circuit provided between the battery and the generator,
The first switch unit is used to switch and control a power supply source to the battery of the resistance unit or the specific electrical device between a commercial power source and the generator,
The second switch unit is used to switch and control a power supply source to the specific electrical device between the generator and a battery of a resistance unit via the inverter,
When power supply from the commercial power source to the specific electrical device is disabled in the state set to the normal mode via the operation unit, until the first time elapses after starting the engine Or until the generator is in a steady operation state, the power from the battery is supplied to the specific electrical device via the inverter and the second switch unit,
Battery discharge in which electric power from the battery is supplied to the specific electrical device through the inverter and the second switch unit in a state where the test mode is set through the operation unit and the generator is generating power. Testing steps;
After the battery discharge test step, power supply from the battery to the specific electrical device is stopped, and power from the generator is supplied to at least one of the plurality of batteries via the first switch unit. And a load test method.
JP2016520702A 2015-07-24 2016-02-23 Power generation system, load test method Active JP5968581B1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2015146323 2015-07-24
JP2015146323 2015-07-24
PCT/JP2016/055158 WO2017017975A1 (en) 2015-07-24 2016-02-23 Power generation system and load testing method

Publications (2)

Publication Number Publication Date
JP5968581B1 true JP5968581B1 (en) 2016-08-10
JPWO2017017975A1 JPWO2017017975A1 (en) 2017-07-27

Family

ID=56689558

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016520702A Active JP5968581B1 (en) 2015-07-24 2016-02-23 Power generation system, load test method

Country Status (1)

Country Link
JP (1) JP5968581B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018100761A1 (en) * 2016-11-30 2018-06-07 株式会社辰巳菱機 Load test system
CN113394870A (en) * 2021-07-13 2021-09-14 中船邮轮科技发展有限公司 AC/DC general distribution board and lighting system control method
CN113767292A (en) * 2019-05-07 2021-12-07 株式会社辰巳菱机 Load test device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54153213A (en) * 1978-05-24 1979-12-03 Nippon Soken Performance test instrument for generator
JPH04334935A (en) * 1991-05-10 1992-11-24 Nippon Hoso Kyokai <Nhk> Emergency power source
JP2005245190A (en) * 2004-01-28 2005-09-08 Densei Lambda Kk Power supply system equipped with thunder detecting means
JP2009050073A (en) * 2007-08-17 2009-03-05 Honda Motor Co Ltd Cogeneration apparatus
JP2014050147A (en) * 2012-08-29 2014-03-17 Suzuki Motor Corp Fault diagnosis apparatus for vehicular generator
JP2014171375A (en) * 2013-03-05 2014-09-18 Tokyo Gas Co Ltd Power supply system, power supply program and power supply method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54153213A (en) * 1978-05-24 1979-12-03 Nippon Soken Performance test instrument for generator
JPH04334935A (en) * 1991-05-10 1992-11-24 Nippon Hoso Kyokai <Nhk> Emergency power source
JP2005245190A (en) * 2004-01-28 2005-09-08 Densei Lambda Kk Power supply system equipped with thunder detecting means
JP2009050073A (en) * 2007-08-17 2009-03-05 Honda Motor Co Ltd Cogeneration apparatus
JP2014050147A (en) * 2012-08-29 2014-03-17 Suzuki Motor Corp Fault diagnosis apparatus for vehicular generator
JP2014171375A (en) * 2013-03-05 2014-09-18 Tokyo Gas Co Ltd Power supply system, power supply program and power supply method

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021152551A (en) * 2016-11-30 2021-09-30 株式会社辰巳菱機 Load test system
US10976369B2 (en) 2016-11-30 2021-04-13 Tatsumi Ryoki Co., Ltd Load test system
KR20190085089A (en) * 2016-11-30 2019-07-17 가부시키가이샤다쓰미료키 Load test system
CN110235009A (en) * 2016-11-30 2019-09-13 株式会社辰巳菱机 Load test system
WO2018100761A1 (en) * 2016-11-30 2018-06-07 株式会社辰巳菱機 Load test system
KR102178667B1 (en) * 2016-11-30 2020-11-13 가부시키가이샤다쓰미료키 Load test system
JP2018091650A (en) * 2016-11-30 2018-06-14 株式会社辰巳菱機 Load test system
JP7432292B2 (en) 2016-11-30 2024-02-16 株式会社辰巳菱機 load test system
EP3550315A4 (en) * 2016-11-30 2020-07-15 Tatsumi Ryoki Co., Ltd Load test system
JP7224741B2 (en) 2016-11-30 2023-02-20 株式会社辰巳菱機 Load test system
JP2022186828A (en) * 2016-11-30 2022-12-15 株式会社辰巳菱機 Load test system
CN110235009B (en) * 2016-11-30 2022-11-04 株式会社辰巳菱机 Load test system
CN113767292B (en) * 2019-05-07 2023-01-24 株式会社辰巳菱机 Load test device
CN113767292A (en) * 2019-05-07 2021-12-07 株式会社辰巳菱机 Load test device
CN113394870B (en) * 2021-07-13 2022-07-12 中船邮轮科技发展有限公司 AC/DC general distribution board and lighting system control method
CN113394870A (en) * 2021-07-13 2021-09-14 中船邮轮科技发展有限公司 AC/DC general distribution board and lighting system control method

Also Published As

Publication number Publication date
JPWO2017017975A1 (en) 2017-07-27

Similar Documents

Publication Publication Date Title
US8307223B2 (en) Battery management system and driving method thereof
JP2848554B2 (en) System for supplying power to a device and method for evaluating the life and capacity of a power storage device
CN106451623B (en) Hot plug method, hot plug control device, voltage balance method and voltage balance device
JP5968581B1 (en) Power generation system, load test method
EP2626971A1 (en) Power supply system and method for controlling same
WO2017017975A1 (en) Power generation system and load testing method
CN103580261A (en) Control system, power supply system and method for avoiding battery float charge
WO2013057821A1 (en) Electricity storage device control system
JPWO2017043238A1 (en) Battery monitoring device
US20010022472A1 (en) Method and apparatus for providing uninterrupted power during transitions between a power source and a standby generator using capacitor supplied voltage
WO2014083788A1 (en) Bidirectional converter
EP2001096B1 (en) Controller
JP2013042598A (en) Charge/discharge controller
WO2015125183A1 (en) Load-testing apparatus and electrical-power storage apparatus
KR20140087930A (en) Battery energy storage system and controlling method using the same
JP4276193B2 (en) Charging method for instantaneous voltage drop compensator
JP6397673B2 (en) Control method of power supply control device
GB2507955A (en) Parallel charging &amp; discharging of multiple lead acid batteries
JP2014133650A (en) Elevator control device
CN116418080A (en) Power supply control method, power conversion device, energy storage device and storage medium
JP2006238514A (en) Uninterruptible power supply device
US10983169B2 (en) Cycle test method
JP6441189B2 (en) Uninterruptible power system
KR20180096090A (en) Uninterruptible power supply system
JP2013252012A (en) Power storage system

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20160630

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20160704

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20160705

R150 Certificate of patent or registration of utility model

Ref document number: 5968581

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250