JP5928014B2 - Demand control system, supply and demand control method and demand control program - Google Patents

Demand control system, supply and demand control method and demand control program Download PDF

Info

Publication number
JP5928014B2
JP5928014B2 JP2012052801A JP2012052801A JP5928014B2 JP 5928014 B2 JP5928014 B2 JP 5928014B2 JP 2012052801 A JP2012052801 A JP 2012052801A JP 2012052801 A JP2012052801 A JP 2012052801A JP 5928014 B2 JP5928014 B2 JP 5928014B2
Authority
JP
Japan
Prior art keywords
power
frequency
demand control
generator
supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2012052801A
Other languages
Japanese (ja)
Other versions
JP2013188050A (en
Inventor
井上 敬
敬 井上
Original Assignee
日本電気株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本電気株式会社 filed Critical 日本電気株式会社
Priority to JP2012052801A priority Critical patent/JP5928014B2/en
Publication of JP2013188050A publication Critical patent/JP2013188050A/en
Application granted granted Critical
Publication of JP5928014B2 publication Critical patent/JP5928014B2/en
Application status is Active legal-status Critical
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers

Description

本発明は、送電線に接続された需要家への系統電力の制御を行う需給制御システム、需給制御方法及び需給制御用プログラムに関する。 The present invention, supply and demand control system for controlling system power to the connected customer in the transmission line, to a supply and demand control method and demand control program.

近年、エネルギーセキュリティに対する意識の高まりから、太陽光発電を初めとする自然エネルギーに対する期待が高まっている。 In recent years, from increasing awareness of energy security, there is a growing expectation for renewable energy, including the solar power. 電気事業者が運用する大規模な発電装置のほかに、エネルギー供給手段として自然エネルギーを利用した小規模な発電機の重要性が増している。 In addition to the large-scale power generation equipment electrical operators to operate, the importance of small-scale power generator using natural energy as energy supply means has increased. 電力需要家側においても、分散型電源として自然エネルギーの導入が進められている。 Also in the power demand side, are underway introduction of natural energy as a distributed power source. こうした需要家では、自然条件などにより自然エネルギーによる発電量が大きくなった場合に、電力系統に接続して余剰電力を供給する逆潮流が行われる。 In such consumers, if increased power generation amount by the natural energy such as by natural conditions, reverse power flow is performed to supply surplus power by connecting to the power system.

このような自然エネルギーの利用などによる分散型電源は、パワーコンディショナーを経由して需要家内の分電盤に接続されている。 Distributed power supply caused by the use of such natural energy is connected to the distribution board demand cottage via power conditioner. 発生された電力は、パワーコンディショナーによって、発電された電気を適正な電圧及び周波数に整定されて利用可能になる。 The generated power by a power conditioner, is settling the generated electric the proper voltage and frequency become available.

電力系統内においては、電力を発生して供給する電気事業者においては中央給電指令所、マイクログリッドにおいては需給制御装置などのような発電機の出力制御を行う機構(以下、発電機制御機構と称する)が必要である。 In power within the system, the central dispatching center in electric utilities and supplies the generated electric power, mechanism for controlling the output of a generator such as supply and demand control device in microgrid (hereinafter, the generator control mechanism referred to) is required.

自然エネルギーを利用した発電機は、供給する電力出力は比較的小規模であるが、天候変化などにより時間的な変動が大きく、供給する電力出力は長時間にわたって安定するものではない。 Generator using natural energy, although the power output for providing a relatively small, temporal variations due to weather changes greatly, and supplies power output is not intended to be stable over time.

このため、自然エネルギーを利用した発電機は大規模な発電装置と供給電力を補完しあって、需要家からの電力需要に安定して対応できるよう、電力需給システムを構築する必要がある。 Therefore, the generator using natural energy each other complement the supply power and large power generation device, to accommodate stably the power demand from the customer, it is necessary to construct the power supply system.

一方、需要家からの電力需要は利用者の生活様式や行動様態に従って時間的に変動する。 On the other hand, power demand from consumers is time varying in accordance with the lifestyle and behavioral aspects of the user.

すなわち、需要家側でも、供給される電力出力に電力要求値を変更して対応する必要性が増している。 That is, even in the customer side, need to address by changing the power required value to the power output to be supplied is increased.

発電機制御機構は系統内の電力の供給と需要のバランスをとる役割を果たす。 Generator control mechanism serves to balance the supply and demand of electric power in the system. もし、電力の需要と供給のバランスが崩れると交流電力の周波数の値が変動してしまう。 If the value of the frequency of the AC power balance between supply and demand of electric power is lost fluctuates. このような性質に対して、系統内の発電機制御機構は、標準となる周波数(以下、標準周波数と称する)から一定の範囲(以下、定格周波数と称する)を維持するために、発電機の出力を調整する。 For such properties, the generator control mechanism in the strains, the standard to become a constant frequency in the range (hereinafter, referred to as standard frequency) to maintain (hereinafter, referred to as the rated frequency) generator to adjust the output.

分散型電源を導入する需要家が増加する状況で、電力系統に接続された分散型電源が大量に導入されると、条件によっては電力供給量が過剰になるおそれがある。 In situations where consumers introducing a distributed power supply is increased, the dispersion type power source connected to the power grid are introduced in large quantities, depending on the conditions which may power supply amount is excessive. 例えば、春先の大型連休の期間中は電力需要が小さくなる一方で、自然エネルギーによる発電量が増大する状況が考えられる。 For example, during the early spring holiday season While the power demand decreases, it is conceivable situation where power generation by natural energy is increased. このような状況においては、電力の供給過多が発生するおそれがある。 In such a situation, there is a possibility that the excess supply of electric power is generated.

このため、分散型電源の出力抑制や電力需要の創出による電力の需給制御の必要性がますます高まってきている。 Therefore, the need for creation through electric power supply and demand control of distributed power sources output suppression and power demand is increasing more and more.

電力需要の創出として効果が期待されているものとして、蓄電池やヒートポンプ給湯器などの蓄エネルギー型の負荷機器がある。 As being effective expected as creation of power demand, there is a load device of the energy storing type, such as a storage battery and a heat pump water heater. これらの負荷機器は、供給された電力を、化学的エネルギーに変換して物質の状態の変化として、或いは、熱エネルギーに変換して水などの媒体の温度変化として蓄積する。 These load devices, the supplied power, as a change in state of the material was converted to chemical energy, or is converted into thermal energy accumulated as a temperature change of the medium such as water.

現状では、需要家ごとの需給予測に基づいて作成した運転スケジュールに従ってこれらの負荷機器が運転されている。 At present, these load equipment is being operated in accordance with the operation schedule that was created on the basis of supply and demand prediction of each customer. これらの負荷機器の運転時間を適宜シフトして利用することにより、電力系統内で必要とされる時間帯に需要を創出する効果が期待されている。 By utilizing appropriately shifting the operation times of these load devices, the effect of creating a demand time slot required in the power within the system is expected. 運転時間のシフトは、需要家の需要パターンと整合しない場合は、需要家に不利益を生ずるものとなるが、この不利益は著しく大きいものではない。 Shift operation time, if not consistent with customer demand patterns, becomes shall become disadvantageous to the consumer, this disadvantage is not significantly greater.

このように、需要家による需給制御は回避されることが望ましい。 Thus, it is desirable that the supply and demand control by the consumer are avoided. そのため、このような需給制御は時間帯を限定して実施するなどの配慮が必要である。 Therefore, such supply and demand control is necessary to consider, such as carried out by limiting the time zone. また、上述の電力の需給制御を電力系統内で実施するためには、発電機制御機構から各需要家に需給制御通知を伝送する通信網の整備が必要である。 Further, in order to implement the demand control of the above power the power within the system, it is necessary to establish a communication network for transmitting supply and demand control notification from the generator control mechanism to the customers.

このような通信網は、発電機制御機構と各需要家を接続する大規模な伝送網であり、新たに構築して敷設するには莫大な費用と期間が必要となる。 Such communication networks are large transmission network for connecting the generator control mechanism and the customers requires huge cost and time to lay in newly constructed. このため、既存の電力送電線を需給制御通知の伝送に利用することが好ましい。 Therefore, it is preferable to use the existing power transmission lines for transmission of supply and demand control notification.

特許文献1は、電力供給と電力需要が不均衡になった場合に生じる周波数変動を、需要家に通信し、需要家内の負荷機器を調整し、それにより系統電力の周波数を定格周波数内に収まるように制御する周波数制御装置及び系統周波数制御方法を開示する。 Patent Document 1, the frequency variation occurring when power supply and power demand has become unbalanced, and communicated to the customer, to adjust the load equipment demand cottage, thereby fits the frequency of the system power in the rated frequency frequency control apparatus and system frequency control method for controlling so as to disclose.

特許文献1に開示された周波数制御技術では、電力系統において、電力を供給する側の発電機制御機器は電力需要の時間的変化に対応するため、各発電機に対して出力制御をおこなっている。 In Patent Document 1 disclosed frequency control technology in power systems, the generator control device side for supplying power to correspond to the temporal change in power demand, and performing output control for each generator .

一方、需要家側で小規模な発電機による電力供給の逆潮流が生じた場合など、電力を供給する側での発電機調整機構では調整可能な範囲を超えて、需要に対して供給が過剰になることがある。 On the other hand, such as when you encounter reverse flow of power supply by small-scale generators at customer side, the generator control mechanism in side for supplying power to exceed an adjustable range, excess supplied to demand it may become. このとき、系統電力の周波数が定格周波数よりも高くなる。 At this time, the frequency of the system power is higher than the rated frequency. 一方、供給の方が少なくなれば、周波数は低くなる。 On the other hand, if less is more supply, the frequency becomes lower. このように、周波数変動は需給状況を示す情報として活用できる。 Thus, the frequency variation can be used as information indicating the supply and demand situation.

特許文献1の開示する周波数制御方法は、周波数変動により電力の供給過剰を検出したときに、余剰になった供給電力を需要家側で消費するよう、需要家に通知して需要家側の負荷機器を稼動させる。 Frequency control method disclosed in Patent Document 1, when detecting the power supply excess by frequency variation, so as to consume the supplied power becomes excessive at the customer side, the load of the customer side to inform the consumer operating the instrument. 或いは、需要家側で小規模発電機により電力を発生している場合、需要家側で電力の供給過剰を検知したときには、負荷機器を稼動して余剰電力を消費する。 Alternatively, if the generated power by a small generator in customer side, when detecting a power supply excess in customer side consumes the surplus power by operating the load device.

特許文献2は、移動体の非接触給電装置において、供給される交流電流の周波数を変位させることにより情報を伝達する情報伝達装置を開示する。 Patent Document 2, in the non-contact power feeding device of the mobile, which discloses a communication device for transmitting information by displacing the frequency of the alternating current supplied.

特開2006−042458号公報 JP 2006-042458 JP 特開平7−61350号公報 JP 7-61350 discloses

しかしながら、電力需給状況に由来する周波数の変動を、そのまま需要家への需給制御通知情報に置き換えては制御に不都合が生じる場合がある。 However, the variation of the frequency derived from the power supply and demand situation, as it is replaced by a supply and demand control notification information to the customer which may inconvenience the control occurs. 例えば、一部の需要家が需給状況の変化に対応して負荷機器の運転を行って、需要量と供給量が釣り合った場合を考える。 For example, by performing a part of the customer is the operation of the load device in response to changes in the supply and demand situation, consider the case where the amount of supply and demand are balanced. このとき、系統電力の周波数は望ましい範囲内で推移している。 At this time, has remained within the frequency of system power is desirable. このため、他の需要家は、需給バランスの安定が、需要家需給制御によってもたらされたのかどうかが判断できない。 For this reason, other customers are, stability of supply and demand balance is, can not determine whether it was caused by the consumer supply and demand control.

このように、需要家側で周波数の変動を検出する場合は、需要家間で周波数変動に対する応答に差が生じ、各需要家側負荷機器を効率的に利用できない。 Thus, when detecting a variation in frequency is customer side, a difference in the response to frequency variation between customer occurs, can not use the customers side load equipment efficiently.

また、特許文献1が開示する通信手段は、電力供給網とは別個の通信経路と各需要家側で通信手段を設ける必要があり、需給システム全体のコストを引き上げる。 The communication means Patent Document 1 is disclosed, the power grid must be provided communication means in a separate communication path and the customer side, raise the cost of the entire supply system.

特許文献2の開示する情報伝達装置は、移動体の非接触給電装置で供給される交流電流の周波数を変位させる。 Information transmission device disclosed in Patent Document 2, to displace the frequency of the alternating current supplied by the non-contact power feeding device of the mobile. 特許文献2の開示する移動体は、供給された交流電力を整流して直流変換して利用するため、周波数の変動に対して制限されない。 Mobile disclosed in Patent Document 2, in order to utilize to DC conversion by rectifying the AC power supplied not limited to variations in frequency. 一方、特許文献1の開示する周波数制御方法では、供給電力の周波数を定格周波数になるよう制御するので、電力供給網とは別個に通信網で情報を伝達する。 On the other hand, in the frequency control method disclosed in Patent Document 1, since the control so as to be rated frequency the frequency of the supply power, to transmit information in separate communication network to the power supply network. このため、特許文献2の情報伝達方法を特許文献1の周波数制御方法に組み合わせることはできない。 Therefore, it is impossible to combine the method of information transmission Patent Document 2 to the frequency control method of the Patent Document 1.

本発明は、上述した点に鑑みてなされたもので、既存の電力送電線を利用した通信経路により、上位系統が意図的に系統電力の周波数を変化させて下位系統に通知し、需要家電力制御が必要か否かを示す需給制御システム及び需給制御方法を提供することを目的とする。 The present invention has been made in view of the above, the communication path utilizing the existing power transmission lines, and notifies the subordinate system higher strains intentionally changing the frequency of the system power demand consumer electronics power and to provide a demand control system and demand control method indicates whether the control needs.

上記の目的を達成するため、本発明の電力の需給制御システムは、発電機と発電機を制御する発電機制御部を有する上位系統と、負荷機器を有する下位系統とを含み、発電機制御部は発電機が発生する電力の周波数を変更することにより電力の需給を制御することを特徴とする。 To achieve the above object, the power demand control system of the present invention includes an upper line having a generator control unit for controlling the generator and the generator, and a lower line having a load device, the generator control unit It is characterized by controlling the supply and demand of electric power by changing the frequency of the power generator is generated.

また、本発明の需給制御方法は、電力を発生する発電機を有する上位系統と負荷機器を有する下位系統とを含む電力系統の需給制御方法であって、電力の周波数を変更するステップと、周波数の変更を検知して電力の需給を制御するステップとを含むことを特徴とする。 Moreover, supply and demand control method of the present invention is a lower line and demand control method for electric power system with having a higher line load device having a generator for generating electric power, and changing the frequency of the power, frequency detects the change, characterized in that it comprises a step of controlling the supply and demand of electric power.

さらに、本発明の需給制御用プログラムは、電力を発生する発電機を有する上位系統と負荷機器を有する下位系統とを含む電力系統の需給制御用プログラムであって、電力の周波数を変更する処理と、周波数の変更を検知して電力の需給を制御する処理とをコンピュータに行わせることを特徴とする。 Moreover, supply and demand control program of the present invention is a program for supply and demand control of the electric power system with the lower lines with higher line load device having a generator for generating electric power, a process of changing the frequency of the power , characterized in that to perform a process of controlling the supply power by detecting a change in frequency in the computer.

本発明によれば、上位系統の発電機制御部の指示により、下位系統の需要家全体による、電力系統の需給制御が可能になる。 According to the present invention, an instruction generator control unit of the upper grid, according to the entire customer lower lines, it is possible to supply and demand control of the electric power system. また、既存の電力送電線を利用して需給制御指示を伝送するので、新たに情報伝送経路を設ける必要がなく、需給制御システムの構築のコストを抑制できる。 Further, since the transmitting demand control instruction by utilizing the existing power transmission lines, it is not necessary to newly provide the information transmission path, suppressing the costs of construction of supply and demand control system.

本発明の第1及び第2の実施形態に係る電力系統の構成の一例を示す。 It shows an example of the configuration of a power system according to the first and second embodiments of the present invention. 本発明の第1の実施形態に係る需要家の構成の一例を示す。 It shows an example of a customer configuration according to the first embodiment of the present invention. 本発明の第2の実施形態に係る需要家の構成の一例を示す。 It shows an example of a customer configuration according to the second embodiment of the present invention. 本発明の第1及び第2の実施形態に係る需給制御方法において、系統電力周波数が高い値に変位する場合の周波数値の時間変化の一例を示す。 In supply and demand control method according to the first and second embodiments of the present invention, showing an example of temporal changes in the frequency value when the displaced high value grid power frequency. 本発明の第1及び第2の実施形態に係る需給制御方法において、系統電力周波数が低い値に変位する場合の周波数値の時間変化の一例を示す。 In supply and demand control method according to the first and second embodiments of the present invention, showing an example of temporal changes in the frequency value when the grid power frequency is displaced to a lower value. 本発明の第1及び第2の実施形態に係る需給制御方法において、上位系統の動作の流れの一例を示すフローチャートである。 In supply and demand control method according to the first and second embodiments of the present invention, it is a flowchart illustrating an example of the flow of the operation of the upper line. 本発明の第1及び第2の実施形態に係る需給制御方法において、下位系統の動作の流れの一例を示すフローチャートである。 In supply and demand control method according to the first and second embodiments of the present invention, it is a flowchart illustrating an example of a flow of operation of the lower line.

次に、発明を実施するための最良の形態について図面を参照して詳細に説明する。 It will now be described in detail with reference to the drawings best mode for carrying out the invention. ただし、本発明は以下に示す実施形態に限定されない。 However, the present invention is not limited to the following embodiments.
[第1の実施形態] First Embodiment
[構成] [Constitution]
図1は本発明の第1の実施形態に係る需給制御システムの構成の一例を示す。 Figure 1 shows an example of a configuration of the supply and demand control system according to a first embodiment of the present invention.

図1において、電力系統100は、上位系統200、送電網300、下位系統400を含む。 In Figure 1, power system 100 includes a upper grid 200, the power grid 300, the lower lines 400.

上位系統200は、発電機制御部210と、発電機220を含む。 Top system 200 includes a generator control unit 210, a generator 220. 図1において、上位系統200は、2つの発電機220を含むが、これに限定されず、発電機220は1つでもよいし、3つ以上でもよい。 In Figure 1, the upper line 200 includes two generators 220, not limited thereto, the generator 220 may be one or may be three or more. 発電機制御部210は、上位系通信網230を介して、発電機220の出力を制御する。 Generator control unit 210 via the host communication network 230, and controls the output of the generator 220.

送電網300は、発電機220から出力された電力を下位系統400に供給する。 Power grid 300 supplies power output from the generator 220 to the lower lines 400.

下位系統400は、需要家410を含み、送電網300から供給された電力を消費する。 Lower system 400 includes a customer 410 consumes power supplied from the power grid 300. 需要家410は、供給された電力を例えば家庭内で稼働する電気機器などで消費する。 Customer 410 consumes such electrical equipment running the supplied power for example at home.

図1において、下位系統は2つの需要家410を含むが、これに限定されず、需要家410は1つでもよいし、3つ以上でもよい。 In Figure 1, the lower line comprises two consumer 410 is not limited to this, and the customer 410 may be one, or three or more. また、需要家410の数は上位系統200の発電機220の数と異なってもよい。 The number of customer 410 may be different from the number of the generator 220 of the upper grid 200.

本発明の第1の実施形態に係る需給制御システムでは、発電機制御部210が上位系通信網230を介して発電機220を制御し、周波数の変化を指示、すなわち系統電力の周波数を通常の運転状態とは異なる値に設定する。 In demand control system according to the first embodiment of the present invention, the generator control unit 210 controls the generator 220 via the host communication network 230, instructing the change in frequency, i.e. the frequency of the system power normal set to a value different from the operating conditions. 発電機220が供給する電力の周波数の変化は送電網300に伝達され、下位系統400の全体に通知される。 Change in frequency of the generator 220 supplies electrical power is transmitted to the power grid 300, is notified to the entire lower line 400.

図2は、本発明の第1の実施形態に係る需要家410の構成の一例を示す。 Figure 2 shows an example of the configuration of the customer 410 according to the first embodiment of the present invention.

需要家410は、周波数検知器420、パワーコンディショナー440、分散型電源450、調整可能負荷機器460、及び、その他負荷機器470を含む。 Customer 410 includes a frequency detector 420, a power conditioner 440, distributed power 450, adjustable load device 460, and other load device 470.

周波数検知器420は系統電力の周波数を検知し、需要家410に対して需給制御が必要かどうかを判定する。 Frequency detector 420 detects the frequency of the system power, determines whether it is necessary to supply and demand control for customer 410. 需給制御が必要であると判断すると、周波数検知器420は、パワーコンディショナー440と調整可能負荷機器460に、需要家内通信線430を介して、需要家需給制御通知を送信する。 If it is determined that it is necessary to supply and demand control, the frequency detector 420, the adjustable load device 460 and power conditioner 440, through the demand cottage communication line 430, and transmits the consumer demand control notification.

分散型電源450は、電力を発電する。 Distributed Power 450 generates power. 発電した電力はパワーコンディショナー440を経由して、家庭内に供給される。 Generated power is via the power conditioner 440, is supplied to the home. 或いは、発電した電力は、パワーコンディショナー440を介して、送電網300に逆潮流される。 Alternatively, the generated electric power through the power conditioner 440, head tide flows to the grid 300.

このとき、パワーコンディショナー440は、発電された電力の電圧や周波数などを適正な値に調整し、或いは、発電出力を抑制する(電力変換部)。 At this time, the power conditioner 440, generated electric power of the voltage, frequency and adjusted to an appropriate value, or inhibit generation output (power conversion unit).

また、家庭内で電力を消費する負荷機器は、調整可能負荷460と、その他負荷機器470に分類される。 The load device consumes power in the home, the adjustable load 460, are classified as other load device 470.

調整可能負荷機器460は蓄エネルギーが可能である。 Adjustable load device 460 is capable of energy storage. すなわち、蓄電池或いはヒートポンプ給湯器などを利用して需要家需給制御用としての運転が可能である。 That is, it can be operated as a consumer demand control by using such battery or a heat pump water heater. 需給制御が必要でない場合は、調整可能負荷機器460は、その他負荷機器470と同様に動作する。 If supply and demand control not necessary, adjustable load device 460 operates in the same manner as the other load device 470. 周波数検知機420から需要家需給制御通知を受信すると、調整可能負荷機器460は、需要を創出する運転を開始して、需給安定化に寄与する動作を行う。 Upon receiving the customer demand control notification from the frequency detectors 420, adjustable load device 460 starts the operation to create the demand, perform contributes operation demand stabilization.

本実施形態においては、説明のため、需要家410には分散型電源450を接続しているが、これに限定されない。 In the present embodiment, for explanation, but it connects the distributed power supply 450 to the customer 410, but is not limited thereto. 例えば、本需給システム内では、全ての需要家410が分散型電源450を具備する必要はない。 For example, in this supply system, it is not necessary that all consumers 410 comprises a distributed power supply 450.
[動作] [Operation]
次に、本実施形態の動作について、図1、2、4乃至7を参照して説明する。 Next, the operation of this embodiment will be described with reference to FIGS. 1, 2, 4 to 7.

図4及び5は、需給制御時の系統電力の周波数変化を示す。 4 and 5 show a frequency change of the system power when supply and demand control.

図6は、上位系統200の動作の一例を示すフローチャートである。 Figure 6 is a flow chart showing an example of the operation of the upper line 200.

図1において、発電機制御部210は、送電網300に供給されている電力の周波数を検知して、需要家需給制御が必要か否かを判断する(ステップS610)。 In Figure 1, the generator control unit 210 detects the frequency of the power supplied to the power grid 300, it is determined whether the customer demand control is necessary (step S610).

需給制御が必要なければ(S610NO)、通常運転を行うように発電機220が制御される(ステップS630)。 If necessary supply and demand control (S610NO), the generator 220 is controlled so as to perform normal operation (step S630). このとき、系統電力の周波数は定格の範囲内で変動する。 At this time, the frequency of the system power varies within the range of ratings.

需要家需給制御が必要であると判断された場合(S610YES)、発電機制御部210は、周波数を図4に示されるように変化させる。 If it is determined that it is necessary to consumer demand control (S610YES), the generator control unit 210 alters as indicated frequencies in FIG. すなわち、系統内の系統電力の周波数fが、標準周波数f stdよりも有意に高い値をとるように、例えば所定の閾値f th よりも高くなるように、各発電機220を制御する。 In other words, the system power at a frequency f in the strains, to take a significantly higher value than the standard frequency f std, for example to be higher than a predetermined threshold value f th H, controls each generator 220. その結果、系統電力の周波数が通常の状態よりも高い値で推移する。 As a result, the frequency of the system power has remained at a higher value than a normal state. この周波数が高い状態は、需要家需給制御が必要でないと発電機制御部210が判断するまで維持される。 This frequency is high, the generator control unit 210 is maintained until it is determined that not required consumer demand control.

また、図5に示されるような、系統電力の周波数fが標準周波数f stdよりも有意に低い値をとるように、例えば所定の閾値f th よりも低くなるような、各発電機220の制御も考えられる。 Further, as shown in FIG. 5, as the frequency f of the system power take significantly lower than the normal frequency f std, for example, such as lower than a predetermined threshold value f th L, of each generator 220 control is also conceivable. 図4の周波数変化と図5の周波数変化を併用すれば、3段階の系統電力の周波数fについての状態の生成が可能である。 When combined the frequency change of the frequency change and 5 in FIG. 4, it is possible to produce a state of the three-stage system power of frequency f.

次に、図7を参照して、下位系統400の動作を説明する。 Next, with reference to FIG. 7, the operation of the lower line 400.

図7は、需要家410内の各機器の動作の一例を示すフローチャートである。 Figure 7 is a flow chart showing an example of the operation of each device in the customer 410.

図2において、周波数検知機420は系統電力の周波数fを測定しており、予め定めた閾値f th より高いか否かを判定している。 2, the frequency detectors 420 are measured a frequency f of the system power, it is determined whether higher than the threshold value f th H a predetermined. すなわち、周波数検知機420は、系統電力の周波数fが一定時間以上閾値f th を上回る状態が持続するか否かを測定する(ステップS710)。 That is, the frequency detectors 420, state above the frequency f is a predetermined time or greater than the threshold f th H of the system power is determining whether the duration (step S710).

周波数fが一定時間以上閾値f th を上回る状態が持続すると判定された場合(S710YES)、ステップS720に進み、そうでない場合(S710NO)はステップS710に戻る。 If the frequency f is determined condition persists over a certain period of time the threshold f th H (S710YES), the process proceeds to step S720, otherwise (S710NO) returns to step S710.

この条件判定は、電力系統100の不安定さに由来する周波数変動を、需要家需給制御指示と誤って検知することを防止する。 The condition determination, a frequency variation resulting from instability of the power system 100, to prevent erroneous detection of a customer supply and demand control instruction. これにより、発電機制御部210の意図的な周波数変動を検知することが可能になる。 Thus, it is possible to detect an intentional frequency variation of the generator control unit 210.

需要家需給制御指示を受けた場合(S710YES)、周波数検知器420は、調整可能負荷機器460とパワーコンディショナー440に対して、需要家需給制御指示を送信する。 When receiving a customer supply and demand control instruction (S710YES), the frequency detector 420, to the adjustable load device 460 and a power conditioner 440, and transmits the consumer supply and demand control instruction. パワーコンディショナーは、該通知を受けて、分散型電源450の出力を抑制する(ステップS720)。 Power conditioner receives the notification, to suppress the output of the distributed power supply 450 (step S720).

図4は、系統電力周波数が高い値に変移する場合の周波数値の時間変化を示す。 Figure 4 shows the time change of the frequency value in the case of transition to a high value grid power frequency.

系統内の系統電力周波数fについて、標準周波数は例えば、50ヘルツまたは60ヘルツである。 For grid power frequency f in the system, a standard frequency, for example, 50 Hz or 60 Hz. また、f th は、周波数検知器に設定された閾値である。 Further, f th H is a threshold value set to a frequency detector.

周波数fが増加して標準周波数f stdから閾値f th を越える値まで変化した時刻をT とする。 The time that has changed from the standard frequency f std to a value exceeding the threshold value f th H frequency f is increased to T 1. また、周波数fが閾値f th を越える値から、標準周波数f std付近まで変化した時刻をT とする。 Further, from the value frequency f exceeds the threshold value f th H, the time that has changed to near the normal frequency f std and T 2.

から経過した時間を計測し、T までにこの時間が所定の値t thよりも長いと判別されると、需要家需給制御指示を受けたと判定し、需要家410に分散型電源450が具備されている場合は、分散型電源450の出力を抑制し、需要家410から送電網300への余剰電力の逆潮流を抑制する。 Measures the time elapsed from T 1, this time to T 2 is determined to be longer than the predetermined value t th, it determines that receiving the consumer supply and demand control instruction, distributed power sources to the customer 410 450 If is being provided suppresses the output of the distributed power supply 450, inhibits the backward flow of the excess power from the customer 410 to power grid 300.

需要家410はさらに、調整可能負荷機器460を稼動して、需要家410内で余剰電力を消費し、電力系統内での電力の需給の均衡をはかる。 Customer 410 further running an adjustable load device 460, consume excess power in the consumer 410, to balance the supply and demand of electric power in the power within the system. この需給抑制指示は、需給抑制解除の指示があるまで持続する。 The demand suppression instruction lasts until instructed to supply derepression. この処理を以下に説明する。 This process will be described below.

運転中の調整可能負荷機器460の蓄エネルギー状態について判別する(ステップS730)。 Determine the energy storing state of the adjustable load device 460 in operation (step S730). 調整可能負荷機器460が満蓄状態であれば(S730YES)、ステップS760に進み、そうでなければ(S730NO)、ステップS740に進む。 If adjustable load device 460 is in Man蓄 state (S730YES), the process proceeds to step S760, otherwise (S730NO), the process proceeds to step S740.

調整可能負荷機器460が満蓄状態である場合(S730YES)は、調整可能負荷機器460を停止する(ステップS760)。 If the adjustable load device 460 is in Man蓄 state (S730YES) stops the adjustable load device 460 (step S760).

需要家410の調整可能負荷機器460が満蓄状態であると、この需要家410では、電力系統100内の余剰電力をこれ以上消費することができない。 When the adjustable load device 460 of the customer 410 is in Man蓄 state, in the customer 410, it is impossible to consume the excess power of the power system 100 further. 送電網300に接続された他の需要家410の調整可能負荷機器460が余剰電力を消費し、或いは、上位系統で発電機制御部210が上位系統の発電機220の出力を抑制するまで待機する。 Adjustable load device 460 other customer 410 connected to the power grid 300 consumes the surplus power, or the generator control unit 210 in the upper line waits inhibits the output of the generator 220 of the upper grid .

なお、調整可能負荷機器460が停止するとは、余剰電力を消費する動作を停止する処理であり、その他負荷機器470と同様の動作で運転することを意味する。 Incidentally, the adjustable load device 460 to stop is a process of stopping the operation of consuming the surplus power means to operate in the same operation with other load device 470. 例えば、蓄電池であれば充電動作を停止して必要に応じて放電する、ヒートポンプ給湯器であれば湯沸し動作を停止して必要に応じて給湯するなどの、動作状態の変更を行う。 For example, to stop the charging operation if the storage battery is discharged as needed, such as hot water as needed to stop the kettle operation if the heat pump water heater, to change the operating state.

発電機制御部210からの需給制御の解除は、系統電力の周波数fが標準周波数f stdから変化してあらかじめ定めた閾値f th よりも低い状態を所定時間以上持続することにより、各需要家410に指示される。 The release of the supply and demand control from the generator control unit 210, by sustained lower than the threshold value f th L a predetermined frequency f of the system power is changed from the normal frequency f std predetermined time or more, each customer 410 is instructed to.

需要家410において、周波数検知器420が系統電力の周波数を検知する。 In consumer 410, frequency detector 420 detects the frequency of the system power. 周波数fが所定の閾値f th を下回る状態が一定時間以上持続するか否かを測定する(ステップS770)。 Frequency f a state below a predetermined threshold value f th L is determining whether the duration predetermined time or more (step S770).

周波数fが一定時間以上閾値f th を下回る状態が持続すると判定された場合(S770YES)、需給制御が解除されたと判定して、需給制御処理を終了し(ステップS780)、そうでない場合(S770NO)は、需給制御が持続すると判定して、ステップS770に戻る。 If the state where the frequency f is below the threshold value f th L over a certain time is determined to persist (S770YES), it is determined that demand control is canceled, it terminates the supply and demand control process (step S780), otherwise (S770NO ), it is determined that the supply and demand control continues, the flow returns to step S770.

ステップS780では、周波数検知器420がパワーコンディショナー440に需要家需給制御を解除する指示を送信する。 In step S780, it transmits an instruction to the frequency detector 420 releases the customer supply and demand control the power conditioner 440. 需要家需給制御が解除された後、パワーコンディショナー440は、分散型電源450の出力抑制を解除して、ステップS710に戻る。 After the consumer demand control is canceled, the power conditioner 440 releases the output suppression of the distributed power supply 450, the flow returns to step S710.

図5は、系統電力周波数が低い値に変移する場合の周波数値の時間変化を示す。 Figure 5 shows the time variation of the frequency value when the system power frequency is shifted to a low value.

系統内の系統電力周波数fについて、f th Lは、周波数検知器に設定された閾値である。 For grid power frequency f in the system, f th L is a threshold value set to a frequency detector.

周波数fが減少して標準周波数f stdから閾値f th Lを下回る値まで変化した時刻をT とする。 The time when the variation frequency f is reduced from the standard frequency f std to a value below the threshold f th L and T 3. また、周波数fが閾値f th Lを下回る値から、標準周波数f std付近まで変化した時刻をT とする。 Further, from the value frequency f is below the threshold value f th L, the time that has changed to near the normal frequency f std and T 4.

から経過した時間を計測し、T までにこの時間が所定の値t thよりも長いと判別されると、需要家需給制御指示が解除されたと判定する。 Measures the time elapsed from T 3 determines, this time to T 4 is determined to longer than the predetermined value t th, the consumer demand control instruction is canceled. このとき、需要家410に分散型電源450が具備されている場合は、分散型電源450の出力の抑制を解除し、需要家410から送電網300への余剰電力の逆潮流の抑制を解除する。 At this time, when the dispersed power source 450 to the customer 410 is provided to release the suppression of the output of the distributed power supply 450, to release the suppression of the backward flow of the excess power from the customer 410 to power grid 300 .

調整可能負荷機器460が満蓄状態でない場合(S730NO)、発電機制御部210が需給制御を解除するよう指示するまで、調整可能負荷機器460は余剰電力の消費を持続する。 If the adjustable load device 460 is not in Man蓄 state (S730NO), the generator control unit 210 until an instruction to release the supply and demand control, adjustable load device 460 to sustain the consumption of excess power.

需要家410において、周波数検知器420が系統電力の周波数を検知する。 In consumer 410, frequency detector 420 detects the frequency of the system power. 周波数fが所定の閾値f th を下回る状態が一定時間以上持続するか否かを測定する(ステップS740)。 Frequency f a state below a predetermined threshold value f th L is determining whether the duration predetermined time or more (step S740).

周波数fが一定時間以上閾値f th を下回る状態が持続すると判定された場合(S740YES)、需給制御が解除されたと判定して、ステップS750に進み、そうでない場合(S740NO)は、需給制御が持続すると判定して、ステップS740に戻る。 If the frequency f is determined condition persists below the threshold f th L over a certain time (S740YES), it is determined that demand control is canceled, the process proceeds to step S750, otherwise (S740NO) is supply and demand control it is determined that persists, the flow returns to step S740. 以降、需給制御が解除されるまでステップS730とステップS740が繰り返されるが、調整可能負荷機器460が満蓄状態に到達した場合は、ステップS760に進む。 Since, although step S730 and step S740 until the supply and demand control is canceled is repeated, if the adjustable load device 460 has reached the Man蓄 state, the process proceeds to step S760. すなわち、この需要家410の調整可能負荷機器460では、これ以上余剰電力を消費できないので、他の需要家410の調整可能負荷機器460に電力を消費させながら、需給制御が解除されるまで待機する。 That is, in the adjustable load device 460 of the customer 410, you can not consume more surplus power, while consuming the electric power to the adjustable load device 460 of another consumer 410 waits until supply and demand control is canceled .

ステップS750では、周波数検知器420が調整可能負荷機器460とパワーコンディショナー440に、需要家需給制御を解除する指示を送信する。 In step S750, the frequency detector 420 to the adjustable load device 460 and a power conditioner 440, transmits an instruction to release the consumer supply and demand control. 需要家需給制御が解除された後、調整可能負荷機器460は通常の運転を行う。 After the consumer demand control is canceled, the adjustable load device 460 performs a normal operation. また、パワーコンディショナー440は、分散型電源450の出力抑制を解除し、ステップS710に戻る。 The power conditioner 440 releases the output suppression of the distributed power supply 450, the flow returns to step S710.

本発明の第1の実施形態に係る需給制御システム100においては、上位系統200における発電機制御部210が発電機220を、周波数が所定時間だけ標準周波数と一定の変位を有するように制御する。 In supply and demand control system 100 according to the first embodiment of the present invention, the generator control unit 210 in the upper line 200 is a generator 220 is controlled to have a constant displacement frequency is the normal frequency for a predetermined time. この周波数の変化は、送電網300を介して伝送され、送電網300に接続された下位系統400の全て需要家410に、需給制御が指示される。 This change in frequency is transmitted through a transmission network 300 to all consumers 410 in the lower line 400 connected to the power grid 300, supply and demand control is instructed. 仮に他の需要家が指令に応じていたとしても、あらゆる需要家に、指令を伝えることが可能になる。 Even if other customers were in response to a command, to all customers, it is possible to convey the directive. これにより、全ての需要家410により下位系統の全体の需給制御を実施することが可能になり、迅速に需給安定化をはかることができる。 Thus, by all consumers 410 makes it possible to implement the entire supply and demand control of the lower system quickly can be achieved supply stabilization. すなわち、余剰の電力供給を各需要家側負荷機器で分散して消費すれば、電力需給の不均衡に迅速に対応できる。 That is, if consumption is distributed in each consumer-side load device power supply excess, can quickly respond to an imbalance in the electric power supply and demand.

また、需要家410が単独で需給制御指示に対応する場合に比べて、それぞれの需要家410が具備する調整可能負荷機器460にかかる負荷も相対的に軽微になり、需給制御時のそれぞれの需要家410への影響も軽減される。 Further, as compared with the case where the customer 410 corresponds to the supply and demand control instruction by itself, the load on the adjustable load device 460, each of the customer 410 is provided also becomes relatively insignificant, each demand time supply and demand control the influence of the house 410 is also reduced.

さらに、上位系統における発電機は大型であるため、可動部分の時定数が長く、上位系統のみでの需給制御は、需給状況の変化に対する遅延が避けられない。 Further, since the generator in the upper line is large, the time constant is long moving parts, demand control of only the upper line does not delay to changes in supply and demand can be avoided. 本願発明のように、基準周波数に対して所定の値で周波数を変更する動作であれば、周波数変化による発電機にかかる負担は軽微であり、また需給状況の変化に追従可能である。 As in the present invention, if the operation of changing the frequency by a predetermined value with respect to the reference frequency, the burden on the generator according to the frequency change is slight, also it is follow the change in supply and demand.

また、発電機制御部210から各需要家410への需給制御指示は、電力送電網を利用して伝送される。 Also, demand control instruction from the generator control unit 210 to each consumer 410 is transmitted by using the power transmission network. したがって、新たに情報伝送の経路を設ける必要はなく、需給システム構築のコストを抑えることが可能である。 Therefore, it is not necessary to provide a path for new information transmission, it is possible to suppress the cost of the supply and demand system construction.
[第2の実施形態] Second Embodiment
次に、本発明の第2の実施形態について、図1及び3を参照して説明する。 Next, a second embodiment of the present invention will be described with reference to FIGS. 1 and 3.

図1は、本発明の第2の実施形態に係る需給制御システムの構成の一例を示し、下位系統400に含まれる需要家411の構成の一例を図3に示す。 Figure 1 shows an example of the configuration of the supply and demand control system according to a second embodiment of the present invention, showing an example of the configuration of the customer 411 contained in the lower line 400 in FIG. 3.

図3において、周波数検知器内蔵パワーコンディショナー480及び周波数検知器内蔵調整可能負荷機器490のそれぞれは周波数検知器(図示せず)を内蔵する。 3, each of the frequency detector chip power conditioner 480 and the frequency detector built adjustable load device 490 incorporating a frequency detector (not shown). すなわち、本実施形態の周波数検知器内蔵パワーコンディショナー480及び周波数検知器内蔵調整可能負荷機器490は、それぞれ第1の実施形態に係る需要家410に含まれるパワーコンディショナー440及び調整可能負荷機器460が周波数検知器420の機能を具備したものである。 That is, the frequency detector chip power conditioner 480 and the frequency detector built adjustable load device 490 of this embodiment, the power conditioner 440 and the adjustable load device 460 included in the customer 410 according to the first embodiment, each frequency it is obtained by a function of the detector 420.

図3におけるこの他の構成要素は、第1の実施形態と同一であり、発電機制御部210からの指示に対する動作も同一であるので説明を省略する。 Other components of FIG. 3 is identical to the first embodiment, the description thereof is omitted since the operation for the instruction from the generator controller 210 also is the same.

また、図1において、下位系統400は、第2の実施形態に係る需要家411と第1の実施形態にかかる需要家410が混在してもよい。 Further, in FIG. 1, the lower line 400, customer 410 and customer 411 according to the second embodiment according to the first embodiment may be mixed.

本発明の第2の実施形態に係る需給制御システム100においては、第1の実施形態に係る需要家410における通信線430が不要になり、需要家411の構成が単純になる。 In supply and demand control system 100 according to the second embodiment of the present invention will become unnecessary communication line 430 in customer 410 according to the first embodiment, configuration of the customer 411 is simplified. これにより、需給システム構築のコストを抑えることができる。 As a result, it is possible to reduce the cost of supply and demand system construction.

以上、実施形態を参照して本発明を説明したが、本発明は上記各実施形態及び実施例に限定されない。 Although the invention has been described with reference to the embodiments, the present invention is not limited to the above embodiments and examples. 本発明の構成や詳細については当業者が理解しうる様々な変更を加えることができる。 The structures and details of the present invention can make various modifications that those skilled in the art can understand. また、本発明には上記各実施形態の構成の一部又は全部を相互に適宜組み合わせたものも含まれる。 Further, the present invention also include those appropriate combination of a part of or the whole part of the structure of the above embodiments.

なお、上述の処理動作を実行させるためのプログラムを、フレキシブルディスク、CD−ROM(Compact Disk Read−Only Memory)、MO(Magneto−Optical disk)などのコンピュータ読取可能な記録媒体に格納して配布し、当該プログラムをコンピュータにインストールすることにより、上述の処理動作を実行する装置を構成しても良い。 Incidentally, the program for executing the above processing operation, a flexible disk, CD-ROM (Compact Disk Read-Only Memory), and distributed and stored in a computer-readable recording medium such as MO (Magneto-Optical disk) by installing the program in the computer may be configured a device for performing the above processing operations.

本発明は上記の実施形態に限定されるものではなく、送電網を介して接続された上位系統及び下位系統から構成される電力系統における電力の需給制御システムに好適に適用可能である。 The present invention is not limited to the above-described embodiment, and can suitably applied to a power supply and demand control system of the composed electric power system from the host system are connected via a transmission network and a lower line.

本発明は、小規模地域でエネルギー需給調整を行うマイクログリッドや、電力会社管内といった大規模電力系統など、規模の大きさにかかわらず電力需給調整の必要な電力系統に好適に適用可能である。 The invention, and microgrid performs energy supply and demand adjustment in small areas, such as large-scale power systems such as electric power company pipe is suitably applicable to the required electric power system of electric power supply and demand adjusted regardless of the size of scale.

100 電力系統 200 上位系統 210 発電機制御部 220 発電機 230 上位系通信網 300 送電網 400 下位系統 410 需要家 411 需要家 420 周波数検知器 430 通信線 440 パワーコンディショナー 450 分散型電源 460 調整可能負荷機器 470 その他負荷機器 480 周波数検知器内蔵パワーコンディショナー 490 周波数検知器内蔵調整可能負荷機器 100 power system 200 upper grid 210 generator control unit 220 generator 230 upper communication network 300 transmission network 400 the lower line 410 customer 411 customer 420 frequency detector 430 communication line 440 power conditioner 450 distributed power supply 460 adjustable load device 470 other load device 480 frequency detector chip power conditioner 490 frequency detector built adjustable load device

Claims (10)

  1. 上位系統と、下位系統と、を備える電力の需給制御システムであって、 The upper line, a power supply and demand control system comprising a lower line, and
    前記上位系統は、 The upper lines,
    発電機と、 A generator,
    前記発電機を制御する発電機制御部と、を備え、 And a generator control unit for controlling the generator,
    前記下位系統は、 The lower lines,
    周波数検知部と、 And the frequency detecting unit,
    パワーコンディショナーと、を備え、 Includes a power conditioner, the,
    前記発電機制御部は、送電網に供給される電力に周波数に基づいて、需要家需給制御の要否を判定し、前記需要家需給制御が必要である場合に、前記発電機が発生する電力の周波数を変更することにより電力の需給を制御し、 The generator control unit, based on the frequency power supplied to the grid, and determines the necessity of the customer supply and demand control, when the customer demand control is required, the generator generates electric power controlling supply and demand of electric power by changing the frequency of,
    前記周波数検知部は、前記発電機により発生する電力の周波数を検知し、検知した前記周波数に基づいて、前記上位系統からの需要家需給制御指示を判定し、 Wherein the frequency detecting unit detects the frequency of the power generated by the generator, based on the frequency detected, determines consumer demand control instruction from the host system,
    前記パワーコンディショナーは、需要家需給制御指示がある場合に、出力する電力量を抑制することを特徴とする需給制御システム。 The power conditioner, supply and demand control system, characterized in that when there is a consumer demand control instruction, to suppress the amount of power output.
  2. 上位系統と、下位系統と、を備える電力の需給制御システムであって、 The upper line, a power supply and demand control system comprising a lower line, and
    前記上位系統は、 The upper lines,
    発電機と、 A generator,
    前記発電機を制御する発電機制御部と、を備え、 And a generator control unit for controlling the generator,
    前記下位系統は、 The lower lines,
    周波数検知部と、 And the frequency detecting unit,
    パワーコンディショナーと、を備え、 Includes a power conditioner, the,
    前記発電機制御部は、需要家需給制御が必要であると判定した場合に、前記発電機が発生する電力の周波数を変更することにより電力の需給を制御し、 The generator control unit, when it is determined that it is necessary to demand Yoie supply and demand control, to control the supply and demand of electric power by changing the frequency of power the generator occurs,
    前記周波数検知部は、前記発電機により発生する電力の周波数を検知し、検知した前記周波数に基づいて、前記上位系統からの需要家需給制御指示の有無を判定し、 Wherein the frequency detecting unit detects the frequency of the power generated by the generator, based on the frequency detected, it determines customer whether supply and demand control instruction from the host system,
    前記パワーコンディショナーは、需要家需給制御指示がある場合に、出力する電力量を抑制することを特徴とする需給制御システム。 The power conditioner, supply and demand control system, characterized in that when there is a consumer demand control instruction, to suppress the amount of power output.
  3. 前記周波数検知部は、前記発電機により発生する電力の周波数を検知し、検知した前記周波数が所定時間以上、閾値を上回る場合に、前記需要家需給制御指示を受けたと判定することを特徴とする請求項2に記載の需給制御システム。 Wherein the frequency detecting unit detects the frequency of the power generated by the generator, the frequency has been detected more than a predetermined time, when above a threshold, and judging that receives the customer supply and demand control instruction demand control system according to claim 2.
  4. 前記下位系統は、電力を消費可能な負荷機器を備え、 The lower line is provided with a load device capable of consuming electric power,
    前記負荷機器は、前記需要家需給制御指示がある場合に、電力消費を増加することを特徴とする請求項2または3に記載の需給制御システム。 The load device may demand control system according to claim 2 or 3 wherein when there is consumer demand control instruction, characterized in that it increases the power consumption.
  5. 前記周波数検知部は、前記発電機により発生する電力の周波数を検知し、検知した前記周波数が所定時間以上、閾値を下回る場合に、前記需要家需給制御指示が解除されたと判定することを特徴とする請求項4に記載の需給制御システム。 Wherein the frequency detecting unit, the detecting the frequency of the power generated by the generator, the detected the frequency is more than a predetermined time, if below a threshold, the determining means determines that the customer demand control instruction is canceled demand control system according to claim 4.
  6. 前記パワーコンディショナーは、前記需要家需給制御指示が解除された場合に、出力する電力量の抑制を解除することを特徴とする請求項5に記載の需給制御システム。 The power conditioner, demand control system according to claim 5, wherein the customer demand control instruction when it is released, characterized in that to release the amount of power suppression is output.
  7. 周波数検知部と、 And the frequency detecting unit,
    パワーコンディショナーと、を備え、 Includes a power conditioner, the,
    前記周波数検知部は、上位系統が備える発電機により発生する電力の周波数を検知し、検知した前記周波数に基づいて、前記上位系統からの需要家需給制御指示の有無を判定し、 Wherein the frequency detecting unit detects the power frequency generated by the generator provided in the upper line, on the basis of the frequency detected, it determines customer whether supply and demand control instruction from the host system,
    前記パワーコンディショナーは、前記需要家需給制御指示がある場合に、出力する電力量を抑制する下位系統装置。 The power conditioner, wherein when there is a consumer demand control instruction to suppress the lower grid device the amount of power output.
  8. 発電機と、 A generator,
    前記発電機を制御する発電機制御部と、を備え、 And a generator control unit for controlling the generator,
    前記発電機制御部は、送電網に供給される電力に周波数に基づいて、需要家需給制御の要否を判定し、前記需要家需給制御が必要である場合に、前記発電機が発生する電力の周波数を変更することにより電力の需給を制御することを特徴とする上位系統装置。 The generator control unit, based on the frequency power supplied to the grid, and determines the necessity of the customer supply and demand control, when the customer demand control is required, the generator generates electric power Top system apparatus characterized by controlling the supply and demand of electric power by changing the frequency of the.
  9. 電力を発生する発電機を有する上位系統と負荷機器を有する下位系統とを含む電力系統の需給制御方法であって A demand control method of a power system and a lower line having a higher line load device having a generator for generating electric power,
    要家需給制御が必要であると判定した場合に、前記上位系統が備える前記発電機が発生する電力の周波数を変更することにより電力の需給を制御するステップと、 And controlling the supply and demand of electric power by when demand Yoie supply and demand control is determined to be necessary, to change the frequency of the power the generator in which the upper grid comprises occurs,
    前記発電機により発生する電力の周波数を検知し、検知した前記周波数に基づいて、前記上位系統からの需要家需給制御指示の有無を判定するステップと、 Detecting the frequency of the power generated by the generator, based on the frequency of detecting and determining the presence or absence of customer demand control instruction from the host system,
    前記需要家需給制御指示がある場合に、前記下位系統に備えるパワーコンディショナーで出力する電力量を抑制するステップを含むことを特徴とする需給制御方法。 Supply and demand control method comprising when there is a consumer demand control instruction, to include step of suppressing the amount of power output by the power conditioner provided in the lower line.
  10. 電力を発生する発電機を有する上位系統と負荷機器を有する下位系統とを含む電力系統の需給制御用プログラムであって、 A program for supply and demand control of the electric power system with the lower lines with higher line load device having a generator for generating electric power,
    需要家需給制御が必要であると判定した場合に、前記上位系統が備える前記発電機が発生する電力の周波数を変更することにより電力の需給を制御する処理と、 A process of controlling the supply and demand of electric power by when it is determined that it is necessary to consumer demand control to change the power frequency of the generator is generated the higher system comprises,
    前記発電機により発生する電力の周波数を検知し、検知した前記周波数に基づいて、前記上位系統からの需要家需給制御指示の有無を判定する処理と、 Detecting the frequency of the power generated by the generator, based on the frequency detected, the process of determining whether the customer demand control instruction from the host system,
    前記需要家需給制御指示がある場合に、前記下位系統に備えるパワーコンディショナーで出力する電力量を抑制する処理と、 If there is the consumer demand control instruction, and the process of suppressing the amount of power output by the power conditioner provided in the lower line,
    をコンピュータに行わせることを特徴とする需給制御用プログラム。 Program supply and demand control, characterized in that to perform the computer.
JP2012052801A 2012-03-09 2012-03-09 Demand control system, supply and demand control method and demand control program Active JP5928014B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012052801A JP5928014B2 (en) 2012-03-09 2012-03-09 Demand control system, supply and demand control method and demand control program

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012052801A JP5928014B2 (en) 2012-03-09 2012-03-09 Demand control system, supply and demand control method and demand control program
PCT/JP2013/001292 WO2013132814A1 (en) 2012-03-09 2013-03-04 Supply-demand control system, supply-demand control method, and supply-demand control program

Publications (2)

Publication Number Publication Date
JP2013188050A JP2013188050A (en) 2013-09-19
JP5928014B2 true JP5928014B2 (en) 2016-06-01

Family

ID=49116310

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012052801A Active JP5928014B2 (en) 2012-03-09 2012-03-09 Demand control system, supply and demand control method and demand control program

Country Status (2)

Country Link
JP (1) JP5928014B2 (en)
WO (1) WO2013132814A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103683325B (en) * 2013-12-04 2015-09-16 广东电网公司电力调度控制中心 Based on island unit control method fcb
JP6422682B2 (en) * 2014-06-24 2018-11-14 株式会社東芝 Power control apparatus and power control method
JP6440974B2 (en) * 2014-06-24 2018-12-19 株式会社東芝 Power control apparatus and power control method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0761350A (en) * 1993-08-26 1995-03-07 Sumitomo Electric Ind Ltd Information transmitting device for non-contact feeding device for moving body
JP4228380B2 (en) * 2000-06-30 2009-02-25 株式会社ジーエス・ユアサコーポレーション The control method in the power supply system and power supply system
JP3647746B2 (en) * 2000-12-25 2005-05-18 株式会社東芝 Parallel operation control device for a single-phase power converter
US7149605B2 (en) * 2003-06-13 2006-12-12 Battelle Memorial Institute Electrical power distribution control methods, electrical energy demand monitoring methods, and power management devices
JP4616579B2 (en) * 2004-05-13 2011-01-19 株式会社四国総合研究所 Power supply system
JP5583507B2 (en) * 2010-07-29 2014-09-03 株式会社日立製作所 Smart Grid supervisory control method and device

Also Published As

Publication number Publication date
JP2013188050A (en) 2013-09-19
WO2013132814A1 (en) 2013-09-12

Similar Documents

Publication Publication Date Title
US7269751B2 (en) Supplying power to at least one electrical device based on an efficient operating point of a power supply
CN102170249B (en) solar power system and operational approach thereof
CN103748757B (en) Hybrid power plant occurs in real time using devices combined with the energy storage system
JP5311153B2 (en) Power control apparatus and power control method
US20120283888A1 (en) Seamless Transition Method and Apparatus for Micro-grid Connect/Disconnect from Grid
JP4694614B2 (en) Power system stabilization system
JP5546832B2 (en) Power distribution system
US9735619B2 (en) Power conversion device
JP6048546B2 (en) Power system control system and method
JP5893544B2 (en) Voltage control unit, the voltage control method, the power adjustment device, and a voltage control program
CN102598454A (en) Control apparatus and control method
EP2715904A1 (en) System and method for integrating and managing demand/response between alternative energy sources, grid power, and loads
JP3726265B2 (en) Household distributed power system and a control method thereof according to the DC interconnection
JP5011230B2 (en) Control device and a control method for a secondary battery
CN102667144A (en) Output control method and output control device for wind-powered electricity generating facility
JP2013183577A (en) Power control system, power control, and power control method
JP2001258176A (en) Power consumption control system
JP5799254B2 (en) Power distribution system
JP2007129845A (en) Power quality maintaining controller
JPH11289668A (en) Apparatus and method for controlling reactive power
JP2002199592A (en) Distributed power supply system
US20140062086A1 (en) Reactive Power Regulation
US8341442B2 (en) Energy load management method and system
US9590422B2 (en) Power supply system, power conversion apparatus, and measurement point switching apparatus
JP5309077B2 (en) Power system control system, and, the power system control method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20150216

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150818

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20151008

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20151104

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20151224

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20160119

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20160309

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20160329

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20160411

R150 Certificate of patent (=grant) or registration of utility model

Ref document number: 5928014

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150