JP5559102B2 - Shaft assembly joining equipment - Google Patents

Shaft assembly joining equipment Download PDF

Info

Publication number
JP5559102B2
JP5559102B2 JP2011148935A JP2011148935A JP5559102B2 JP 5559102 B2 JP5559102 B2 JP 5559102B2 JP 2011148935 A JP2011148935 A JP 2011148935A JP 2011148935 A JP2011148935 A JP 2011148935A JP 5559102 B2 JP5559102 B2 JP 5559102B2
Authority
JP
Japan
Prior art keywords
piece
assembly
joint fitting
shaft assembly
fitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2011148935A
Other languages
Japanese (ja)
Other versions
JP2013014955A (en
Inventor
進 川嶋
Original Assignee
株式会社カネシン
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社カネシン filed Critical 株式会社カネシン
Priority to JP2011148935A priority Critical patent/JP5559102B2/en
Publication of JP2013014955A publication Critical patent/JP2013014955A/en
Application granted granted Critical
Publication of JP5559102B2 publication Critical patent/JP5559102B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、軸組材、例えば、柱と梁を接合する際に用いる、木造建物の軸組材の接合装置に関するものである。   The present invention relates to a joining device for a shaft assembly material of a wooden building, for example, used when joining a shaft assembly material, for example, a column and a beam.

梁や桁などの軸組材(横架材)を柱や胴差などの軸組材(構造材)に接合するものとして、所謂ほぞ接合に代えて金具接合方式のものが一般に用いられるようになっている。   As a method of joining a shaft assembly material (horizontal material) such as a beam or girder to a shaft assembly material (structural material) such as a column or trunk difference, a so-called mortise joint type is generally used. It has become.

該金具接合方式のものとして、取付け片の縦方向に沿う両側に接続片を相対設して接合金具を構成し、該接合金具を、一方の軸組材(柱)の側面に前記取付け片において止着して突設し、該接合金具を係合した縦溝を他方の軸組材(梁)の、前記側面に当接する端面に設け、該縦溝に前記接合金具を介して相対する一対の補強板を収設し、該補強板を通じて前記他方の軸組材に嵌挿した掛止杆を接合金具の前記接続片に掛止するようにした構造のもの(例えば、特許文献1)や、この構造のもの中の接合金具を、前記一方の軸組材を貫通させたボルト杆の先端に螺合したナット材に代えた構造のものがある(例えば、特許文献2)。   As for the metal fitting joining method, connecting pieces are relatively provided on both sides along the longitudinal direction of the attachment piece to form the attachment fitting, and the attachment fitting is attached to the side of one shaft assembly (column) on the attachment piece. A pair of vertical grooves fixed and projecting and engaged with the joint fittings are provided on the end surface of the other shaft assembly (beam) that abuts against the side surface, and are opposed to the vertical grooves via the joint fittings. A reinforcing plate, and a hook that is inserted into the other shaft assembly through the reinforcing plate is hooked to the connecting piece of the joint fitting (for example, Patent Document 1) There is a structure in which the joining metal fitting in this structure is replaced with a nut material screwed into the tip of a bolt rod that penetrates the one shaft assembly (for example, Patent Document 2).

特開2003−227175号公報JP 2003-227175 A 特開2004−324323号公報JP 2004-324323 A

前記従来例を他方の軸組材に嵌挿した掛止杆を接合金具又はナット材に掛止する構成を採るので、他方の軸組材に掛止杆嵌挿用の嵌挿孔を設けることと、該嵌挿孔に嵌挿して、掛止杆を他方の軸組材に組付ける施工工程を必要とし、この嵌挿孔の孔開けと嵌挿孔に対する掛止杆の取付け作業が煩雑で、必要以上に経費が嵩む原因となっている。   Since the above-described conventional example adopts a configuration in which the latch rod fitted to the other shaft assembly material is latched to the joint fitting or the nut material, the other shaft assembly material is provided with an insertion hole for inserting the latch rod. And a process for assembling the latching rod to the other shaft assembly member by inserting into the fitting insertion hole, and making the fitting rod into the fitting insertion hole is complicated. This is the cause of higher costs than necessary.

本発明は、このような従来例の欠点に着目し、従来例の掛止杆を利用したものに代わる斬新な構造の、軸組材の接合装置を提供することを目的として創案したものである。   The present invention has been created with the object of providing a joining device for a shaft assembly having a novel structure in place of the conventional method using the latching rod, paying attention to the drawbacks of the conventional example. .

取付け片と、該取付け片の縦方向に沿う両端に設けて相対させたスペーサ片と、各スペーサ片の自由端に前記取付け片と並行する方向にして設けた受止片および各受止片の自由端に設けて相対させた組付け片とで平面視略溝形の第一接合金具を構成し、該第一接合金具を、前記取付け片において止着して一方の軸組材の側面に突設する一方、該第一接合金具を係合する縦溝を前記側面に当接する第二軸組材の端面に設け、該縦溝に第一接合金具の前記組付け片間に係合する第二接合金具を収設し、該第二接合金具の、前記組付け片に重ね合わせて前記第二軸組材を通じてドリフトピンを嵌挿する挿通孔を設けた組付け片の自由端側の上端に、鉤状の掛止片を設け、該掛止片が係合して掛止する切込みを、前記側面との間で前記掛止片先端の係合間隙を存して相対する前記受止片に設けた構成とする。   An attachment piece, spacer pieces provided at opposite ends along the longitudinal direction of the attachment piece, a receiving piece provided in a direction parallel to the attachment piece at a free end of each spacer piece, and each receiving piece A first joint fitting having a substantially groove shape in a plan view is constituted by an assembly piece provided at a free end and opposed thereto, and the first joint fitting is fastened to the mounting piece and attached to a side surface of one shaft assembly member. While projecting, a vertical groove for engaging the first joint fitting is provided on the end surface of the second shaft assembly that contacts the side surface, and the vertical groove engages between the assembly pieces of the first joint fitting. The second joining bracket is accommodated, and the second joining bracket is provided on the free end side of the assembly piece provided with an insertion hole for inserting the drift pin through the second shaft assembly material so as to overlap the assembly piece. A hook-shaped latching piece is provided at the upper end, and a notch that engages and latches with the latching piece is connected to the side of the latching piece at the tip. A structure provided on opposite said receiving plate and exist gaps.

本発明によれば、一方の軸組材に取付けた第一接合金具側の切り込みに、他方の軸組材に取付けた第二接合金具の掛止片を係合掛止することにより両軸組材を組付けることができ、掛止杆を用いる構造のものと比較し、施工工程を簡略した、斬新な構造の、軸組材の接合装置を提供できる。   According to the present invention, both the shaft assemblies are obtained by engaging and latching the latching pieces of the second joint fitting attached to the other shaft assembly material in the notch on the first joint fitting side attached to one shaft assembly material. It is possible to provide a shaft assembly material joining apparatus having a novel structure in which a material can be assembled and a construction process is simplified as compared with a structure using a latch.

第一実施形態の断面図。Sectional drawing of 1st embodiment. 図1の平面図。The top view of FIG. 図2の、柱の一部を欠截して示した側面図。FIG. 3 is a side view of FIG. 2 with a part of a pillar omitted. 図1の分解図。The exploded view of FIG. 接合金具の斜視図。The perspective view of a joining metal fitting. 第二実施形態の一部欠截正面図。The partially missing front view of the second embodiment. 図6の平面図。The top view of FIG. 第二実施形態の接合金具の斜視図。The perspective view of the joining metal fitting of a second embodiment.

図示の実施形態は、一方の軸組材である柱Pに他方の軸組材である梁Bを第一、第二の接合金具を用いて接合する例を示すが、柱Pに代えて胴差に梁Bや梁Bに代わる桁に本発明を適用しても不都合はない。   The illustrated embodiment shows an example in which a beam P, which is the other shaft assembly material, is joined to the column P, which is one shaft assembly material, using the first and second joint fittings. Even if the present invention is applied to the beam B or the beam replacing the beam B, there is no inconvenience.

また、実施形態は、第一、第二実施形態の第一接合金具Aa又はAbと第一、第二実施形態の第二接合金具Ba又はBbの組合わせによって柱Pに梁Bを接合するようにしたものであるが、その組合わせは自由に選択して適用できる。   Further, in the embodiment, the beam B is joined to the column P by a combination of the first joining metal fitting Aa or Ab of the first and second embodiments and the second joining fitting Ba or Bb of the first or second embodiment. The combination can be freely selected and applied.

第一実施形態
第一実施形態は、第一接合金具Aaを柱Pに止着し、第二接合金具Baを梁Bに止着しておき、これらを互いに組付けて柱Pに梁Bを接合するようにしたものである。
1st embodiment 1st embodiment fixes 1st joining metal fitting Aa to pillar P, 2nd joining metal fitting Ba is secured to beam B, these are mutually assembled | attached, and beam B is attached to pillar P. It is made to join.

第一接合金具Aaは、中央の縦長の取付け片1と、該取付け片1の縦方向に沿う両端に、該両端を屈曲して取付け片1よりわずかに突出させたスペーサ片2、該スペーサ片2の、前記縦方向に沿う自由端に該自由端を前記取付け片1と平行する方向に屈曲して設けた受止片3および該受止片3の自由端を前記スペーサ片2と平行する方向に屈曲して設けた組付け片4を備えた平面視略溝形の枠体で構成したものである。   The first joining metal fitting Aa includes a vertically long mounting piece 1, a spacer piece 2 that is bent at both ends along the longitudinal direction of the mounting piece 1 and slightly protrudes from the mounting piece 1, the spacer piece 2, a receiving piece 3 provided by bending the free end in a direction parallel to the mounting piece 1 at a free end along the longitudinal direction, and a free end of the receiving piece 3 parallel to the spacer piece 2 It is constituted by a frame having a substantially groove shape in a plan view provided with an assembly piece 4 which is bent in the direction.

この第一実施形態の第一接合金具Aaの前記取付け片1には、該取付け片1を柱Pに止着するためのスクリューボルト11を挿通するためのボルト孔13,…を縦方向に並べて設け、前記組付け片4,4には、該組付け片4,4間において互いに一致するドリフトピン12挿通用の挿通孔14を縦方向に並設すると共に、前記スペーサ片2に連続する、受止片3の上下両端には、所要長さの切込み6,6を設けて第二接合金具Ba側の掛止片7の頸部が係合して掛止するようにしてある。   In the mounting piece 1 of the first joining metal fitting Aa of the first embodiment, bolt holes 13 for inserting a screw bolt 11 for fixing the mounting piece 1 to the pillar P are arranged in the vertical direction. Provided, the assembly pieces 4 and 4 are provided with insertion holes 14 for inserting the drift pins 12 that are aligned with each other between the assembly pieces 4 and 4 in the vertical direction, and are continuous with the spacer piece 2. The upper and lower ends of the receiving piece 3 are provided with cuts 6 and 6 having a required length so that the neck portion of the holding piece 7 on the second joining bracket Ba side is engaged and hooked.

なお、第一接合金具Aaは、左右方向並びに上下方向に線対称形を成し、左右勝手並びに上下勝手自在に軸組材(例えば、柱P)に取付けても支障がないようにしてある。   In addition, the 1st joining metal fitting Aa comprises a line symmetrical form in the left-right direction and the up-down direction, and it is set up so that even if it attaches to a shaft assembly material (for example, column P) freely in the left-right direction and the up-down direction, there will be no trouble.

第一実施形態の第二接合金具Baは、中央の縦長の取付け片21と、該取付け片21の縦方向に沿う両端に、該両端を屈曲して相対設した組付け片24とで成る平面視溝形枠体で成り、取付け片21には、該取付け片21を梁Bに止着するためのスクリューボルト111を挿通するためのボルト孔113,…を縦方向に並べて設け、組付け片24,24には該組付け片24,24間において互いに一致するドリフトピン12挿通用の挿通孔114,…を縦方向に並べて設けると共に、前記組付け片24の、自由端側の上下方向の一端(図5に於いては上端)には鉤状の前記掛止片7を設けたものである。   The second joint fitting Ba of the first embodiment is a plane composed of a vertically long attachment piece 21 and an assembly piece 24 that is bent at both ends along the longitudinal direction of the attachment piece 21 and provided oppositely. The mounting piece 21 is provided with a bolt hole 113 for inserting a screw bolt 111 for fixing the mounting piece 21 to the beam B, arranged in the vertical direction. 24, 24 are provided with insertion holes 114,... For inserting the drift pins 12 that are aligned with each other between the assembly pieces 24, 24 in the vertical direction, and the vertical direction of the assembly piece 24 on the free end side. One end (the upper end in FIG. 5) is provided with the hook-shaped hooking piece 7.

なお、組付け片24,24間の外径は、第一接合金具Aaの前記組付け片4,4間の内径よりわずかに狭くして第一接合金具Aaの組付け片4,4間に係合できるようにしてある。   In addition, the outer diameter between the assembly pieces 24 and 24 is slightly narrower than the inner diameter between the assembly pieces 4 and 4 of the first joint fitting Aa, so that it is between the assembly pieces 4 and 4 of the first joint fitting Aa. It can be engaged.

そして、予め案内穴30を形成した柱Pの側面に、前記案内穴30と適宜のボルト孔13を一致させるようにして取付け片1を重ね合わせ、ボルト孔13を通じてスクリューボルト11を前記案内穴30にねじ込むと、第一接合金具Aaは柱Pの側面に止着され、突設される。   Then, the mounting piece 1 is overlaid on the side surface of the pillar P in which the guide hole 30 is formed in advance so that the guide hole 30 and the appropriate bolt hole 13 coincide with each other, and the screw bolt 11 is inserted into the guide hole 30 through the bolt hole 13. When screwed into the first joint fitting Aa, the first joint fitting Aa is fixed to the side surface of the column P and protruded.

取付け片1にボルト孔13を複数個を設けてあるのは、前記スクリューボルト11に対して直交する方向にして柱P内に配される、例えば、柱Pに対して第一接合金具Aaを用いて一対の梁B,Bを直行方向に配するときの他のスクリューボルトとの干渉を避け、複数個中の適宜の2個のボルト孔13,13を選択して利用するためである。   A plurality of bolt holes 13 are provided in the mounting piece 1 because they are arranged in the pillar P in a direction perpendicular to the screw bolt 11. For example, the first joining metal Aa is attached to the pillar P. This is for avoiding interference with other screw bolts when arranging the pair of beams B, B in the orthogonal direction, and selecting and using appropriate two bolt holes 13, 13 in a plurality.

また、第一接合金具Aaの取付け片1を柱Pの側面に重ね合わせる際、該取付け片1の外(背)面に互いに同一斜線上に配して突設した一対の突子31,31を柱Pに圧(嵌)入させて前記取付け片1を柱Pにスクリューボルト11で締付けるようにしてあるが、この突子31はスクリューボルト11と取付け片1に設けたボルト孔13との間の、わずかな隙間(クリアランス)による取付け片1すなわち第一接合金具Aaの回転を防いで、該第一接合金具Aaに対する梁B側に設けた(取付けた)第二接合金具Baの組付け操作を円滑に行うためである(第二接合金具Baを第一接合金具Aaに組付ける際、第一接合金具Aaが動くと、つまり回転すると、その作業性に支障を来たす)。   Further, when the mounting piece 1 of the first joining metal fitting Aa is overlapped with the side surface of the column P, a pair of protrusions 31, 31 are provided on the outer (back) surface of the mounting piece 1 so as to project on the same diagonal line. Is inserted into the column P and the mounting piece 1 is fastened to the column P with the screw bolt 11. The protrusion 31 is formed by the screw bolt 11 and the bolt hole 13 provided in the mounting piece 1. Assembly of the second joint fitting Ba provided (attached) on the beam B side with respect to the first joint fitting Aa while preventing the attachment piece 1, ie, the first joint fitting Aa, from rotating due to a slight gap (clearance) between them This is because the operation is performed smoothly (when the second joining bracket Ba is assembled to the first joining bracket Aa, if the first joining bracket Aa moves, that is, rotates, the workability is hindered).

前記梁Bは、柱Pの側面に接合する端面中央に、柱Pの側面より突出する前記第一接合金具Aaの部分全部が嵌め込まれるに充分な縦溝32が設けられ、該縦溝32の奥壁32aの中央に、第二接合金具Baに設けた、上下一対の前記ボルト孔113,113に対応させて前記スクリューボルト111の案内穴130を形成してある。そして、第二接合金具Baの取付け片21を、この梁Bの縦溝32に係合させ、かつ、ボルト孔113と案内孔130を互いに一致させるようにして、縦溝32の奥壁32aに重ね合わせ、ボルト孔113を通じて前記スクリューボルト111を前記案内穴130を螺入させると、第二接合金具Baは縦溝32内に係合された状態で梁Bに組付け、固定される。   The beam B is provided with a longitudinal groove 32 at the center of the end face joined to the side surface of the column P, which is sufficient to fit the entire portion of the first joint fitting Aa protruding from the side surface of the column P. A guide hole 130 for the screw bolt 111 is formed in the center of the back wall 32a so as to correspond to the pair of upper and lower bolt holes 113, 113 provided in the second joint fitting Ba. Then, the attachment piece 21 of the second joint fitting Ba is engaged with the vertical groove 32 of the beam B, and the bolt hole 113 and the guide hole 130 are made to coincide with each other, so that the rear wall 32a of the vertical groove 32 is formed. When the screw bolt 111 is screwed into the guide hole 130 through the bolt hole 113, the second joint fitting Ba is assembled and fixed to the beam B while being engaged in the vertical groove 32.

そして、第二接合金具Baを、組付けた梁Bを柱P側面に組付け、第一接合金具Aaの上方から、第一接合金具Aaの内側に係合させるようにして降下させると、第一接合金具Aaを梁Bの縦溝32の内側に係合させつつ(第一接合金具Aaの組付け片4,4間に第二接合金具Baの組付け片24すなわち第二接合金具Baが係合されつつ)梁Bは降下し、ついには、鉤状の掛止片7の頸部が切込み6に係合し、先端がスペーサ2の存在によって受止片3と柱Bとの間に形成される隙間aに係合して梁B側の第二接合金具Baと柱P側の第一接合金具Aaは互いに組合わされる。この組合わせた状態で互いに一致させる位置に配するようにした挿通孔14,114に、柱B側に横設した貫通孔33に前記ドリフトピン12を嵌挿することにより梁Bを柱Pに接合することができる。   Then, when the assembled beam B is assembled to the side surface of the column P and the second joint fitting Ba is lowered from above the first joint fitting Aa so as to be engaged with the inside of the first joint fitting Aa, While the one joining metal Aa is engaged with the inside of the longitudinal groove 32 of the beam B (the assembly piece 24 of the second joining metal Ba, that is, the second joining metal Ba is between the assembly pieces 4 and 4 of the first joining metal Aa. While being engaged, the beam B descends, and finally, the neck portion of the hook-shaped hooking piece 7 is engaged with the notch 6, and the tip is between the receiving piece 3 and the column B due to the presence of the spacer 2. The second joint fitting Ba on the beam B side and the first joint fitting Aa on the column P side are combined with each other by engaging with the gap a to be formed. By inserting the drift pin 12 into the through-hole 33 provided laterally on the column B side into the insertion holes 14 and 114 arranged to coincide with each other in this combined state, the beam B is made to the column P. Can be joined.

第二実施形態
第二実施形態は、図6乃至図8で示すが、これらの図で明らかな通り、第二実施形態の第一接合金具Abは、第一実施形態の第一接合金具Aaと構造的に殆ど同じで、スペーサ片2の取付け片1からの突出量を変えただけで、残余の点は符号を同じにして示す通り、第一実施形態と略同様なので説明を省略する。
Second Embodiment The second embodiment is shown in FIG. 6 to FIG. 8, and as is apparent from these drawings, the first joint metal fitting Ab of the second embodiment is the same as the first joint metal fitting Aa of the first embodiment. Since the structure is almost the same and only the amount of protrusion of the spacer piece 2 from the mounting piece 1 is changed, the remaining points are substantially the same as in the first embodiment as shown by the same reference numerals, and the description thereof is omitted.

なお、スペーサ片2の、取付け片1からの突出幅を第一実施形態より幅広くしたのは、柱Pの側面に凹入部(穴)39を設け(図6、図7)、該凹入部39に取付け片1を嵌め込んで、スクリューボルト11によって柱Pに締付け、柱Pに対して第一接合金具Abを尚一層安定させて取付けられるようにしたものである。   The reason why the width of the spacer piece 2 protruding from the mounting piece 1 is wider than that of the first embodiment is that a concave portion (hole) 39 is provided on the side surface of the column P (FIGS. 6 and 7). The mounting piece 1 is fitted to the column P, and is fastened to the column P by the screw bolt 11 so that the first joint fitting Ab can be mounted on the column P in a more stable manner.

従って、第一実施形態の前記第一接合金具Aaに代えてこの第二実施形態の第一接合金具Abを適用しても構造的な不都合はない(柱Pに凹入部39を設けることはともかくとして)。   Therefore, there is no structural inconvenience even if the first joint fitting Ab of the second embodiment is applied instead of the first joint fitting Aa of the first embodiment (although the recessed portion 39 is provided in the column P anyway). As).

第二実施形態の第二接合金具Bb(第一実施形態の第二接合金具Baと同じ部分は同符号で示す)は、中央の縦長の基片34と、該取付け片34の縦方向に沿う両端に、該両端を屈曲して相対設した組付け片24とで成る平面視溝形枠体の前記基片34の外面中央に取付け片221を突設し、取付け片221には、該取付け片221を梁Bに止着するためのドリフトピン112を挿通するための透孔113Aを縦方向に並べて設け、組付け片24,24は該組付け片24,24間において互いに一致するドリフトピン12挿通用の挿通孔114,…を縦方向に並べて設けると共に、前記組付け片24の、自由端側の上下方向の一端には鉤状の掛止片7を設けたものである。すなわち、第二実施形態の第二接合金具Bbは、第一実施形態の物の梁Bに対する取付け手段が組付け片24と取付け片21で成る溝形体の取付け片21に形成したボルト孔113を利用してスクリューボルト111で梁Bに組付けるに対し、前記第二接合金具Bbの取付け片21に対応する基片34の外面に取付け片221を設け、該取付け片221を透孔113Aを利用してドリフトピン112で梁Bに固定するようにした点が相違するだけで、残余の点は第一実施形態の第二接合金具Baと相異ることはない。   The second joint fitting Bb of the second embodiment (the same parts as those of the second joint fitting Ba of the first embodiment are denoted by the same reference numerals) are arranged along the longitudinal direction of the center longitudinal base piece 34 and the attachment piece 34. A mounting piece 221 is projected at the center of the outer surface of the base piece 34 of the groove-like frame body in plan view, which is composed of an assembly piece 24 which is bent at both ends and is opposed to each other. The through holes 113A for inserting the drift pins 112 for fixing the pieces 221 to the beams B are provided in the vertical direction, and the assembled pieces 24, 24 are the drift pins that coincide with each other between the assembled pieces 24, 24. .. Are provided side by side in the vertical direction, and a hook-like hooking piece 7 is provided at one end of the assembly piece 24 in the vertical direction on the free end side. That is, the second joint fitting Bb of the second embodiment has the bolt hole 113 formed in the groove-shaped attachment piece 21 in which the attachment means to the beam B of the object of the first embodiment is composed of the assembly piece 24 and the attachment piece 21. The mounting piece 221 is provided on the outer surface of the base piece 34 corresponding to the mounting piece 21 of the second joint fitting Bb, and the mounting piece 221 is utilized through the through-hole 113A. The only difference is that the drift pin 112 is fixed to the beam B, and the remaining points are not different from those of the second joint fitting Ba of the first embodiment.

従って、第一実施形態の第二接合金具Baに代えて第二実施形態の第二接合金具Bbを適用しても何等支障はないし、なおいえば、第二実施形態の第一接合金具Abに代えて第一実施形態の第一接合金具Aaを、第二実施形態の第二接合金具Bbに代えて第一実施形態の第二接合金具Abをそれぞれ用いても支障はない。   Therefore, there is no problem even if the second joint fitting Bb of the second embodiment is applied in place of the second joint fitting Ba of the first embodiment. Instead, there is no problem even if the first joining metal fitting Aa of the first embodiment is used and the second joining metal fitting Ab of the first embodiment is used instead of the second joining metal fitting Bb of the second embodiment.

そして、柱Pの側面に形成した凹入部39に第一接合金具Abの取付け片1を係合し、第一実施形態と同様にボルト孔13を通じて案内孔30にスクリューボルト11を螺入して締付けると、柱Pに第一接合金具Abは組付け、固定される。   Then, the mounting piece 1 of the first joint fitting Ab is engaged with the recessed portion 39 formed on the side surface of the column P, and the screw bolt 11 is screwed into the guide hole 30 through the bolt hole 13 as in the first embodiment. When tightened, the first joining bracket Ab is assembled and fixed to the column P.

そして、梁Bの端面に、柱Pに突設した前記第一接合金具Abが係合するに充分に形成した縦溝32と該縦溝32の奥壁32a中央に設けたスリット溝32bに、縦溝32に組付け片24側が、スリット溝32bに取付け片221がそれぞれ係合するようにして第二接合金具Bbを梁B内に収設して、取付け片221に設けた透孔113Aに一致するようにして梁Bに予め設けた貫通孔333を通じて透孔113Aにドリフトピン112を嵌挿することにより梁Bに第二接合金具Bbは組付けられる。そして、柱Pに突設した第一接合金具Abの上方から梁Bに取付けた第二接合金具Bbを梁Bの降下に伴って降下させると、第二接合金具Bbの掛止片7が第一接合金具Abの切込み6に係合し、その先端がスペーサ2の存在によって受止片3と柱Dとの間に形成される隙間aに係合され、梁B側の第二接合金具Bbと柱P側の第一接合金具Abは互いに組合わされる。この組合わせた状態で、第一実施形態と同様に、互いに一致させる位置に配するようにした挿通孔14,114に梁B側が横設した貫通孔33に前記ドリフトピン12を嵌挿することにより梁Bを柱Pに接合することができる。   And, on the end face of the beam B, the longitudinal groove 32 sufficiently formed to engage the first joining metal fitting Ab protruding from the column P and the slit groove 32b provided in the center of the rear wall 32a of the longitudinal groove 32, The second joint fitting Bb is accommodated in the beam B so that the assembly piece 24 side engages with the longitudinal groove 32 and the attachment piece 221 engages with the slit groove 32b. The second joint fitting Bb is assembled to the beam B by fitting the drift pin 112 into the through hole 113A through the through-hole 333 previously provided in the beam B so as to match. Then, when the second joint fitting Bb attached to the beam B is lowered from the upper side of the first joint fitting Ab projecting on the column P as the beam B is lowered, the latch piece 7 of the second joint fitting Bb becomes the first. The joint 6 is engaged with the notch 6 of the metal fitting Ab, and the tip thereof is engaged with the gap a formed between the receiving piece 3 and the column D due to the presence of the spacer 2, and the second joint metal Bb on the beam B side. And the first joining metal fitting Ab on the column P side are combined with each other. In this combined state, as in the first embodiment, the drift pin 12 is inserted into the through-hole 33 in which the beam B side is horizontally provided in the insertion holes 14 and 114 that are arranged to coincide with each other. Thus, the beam B can be joined to the column P.

第一接合金具Aa,Abを柱Pに固着するには、実施形態では、スクリューボルト11を用いるようにしてあるが、案内穴(スクリューボルトより径を小さくしてスクリューボルトを螺合するようにしてある)に代えて通し孔を柱Pに設け、該通し孔に第一接合金具Aa,Abを通じて締付けボルトを貫通させ、通し孔より突出する締付けボルトの先端に締付けナットを螺合して締付けるようにしても良い。   In order to fix the first joining brackets Aa and Ab to the pillar P, the screw bolt 11 is used in the embodiment, but the guide hole (the diameter of the screw bolt is smaller than that of the screw bolt and the screw bolt is screwed together). Instead of this, a through hole is provided in the column P, and a tightening bolt is passed through the through hole through the first joint fittings Aa and Ab, and a tightening nut is screwed onto the tip of the tightening bolt protruding from the through hole. You may do it.

なお、各実施形態では、第一接合金具Aa,Abに対して梁Bを降下させて、該第一接合金具Aa,Abに第二接合金具Ba,Bbを組付けるようにしているが、各実施形態の掛止片7の向きを逆さにするようにして第二接合金具Ba,Bbを梁Bに取付け、柱Pに既設の第一接合金具Aa,Abに向けて上昇させて掛止片7を切込み6に係合させ(掛止片7が切込み6に係止することにより上昇を規制するから位置決めの機能をなす)、該係合状態をクレーン等保持させつつ、ドリフトピン12を打込むことによって梁Bを柱Pに接合するようにする用い方もある。この場合は、既設の梁(旧)と無関係に該梁の下側で新しい梁を柱Pに組付けることができるから、梁の取替え(建物のリフォーム)に適用するに有効である。   In each embodiment, the beam B is lowered with respect to the first joint fittings Aa and Ab, and the second joint fittings Ba and Bb are assembled to the first joint fittings Aa and Ab. The second joining brackets Ba and Bb are attached to the beam B so that the direction of the latching piece 7 of the embodiment is reversed, and is raised toward the first joining fittings Aa and Ab existing on the column P, and the latching piece 7 is engaged with the notch 6 (the latching piece 7 is locked to the notch 6 so as to restrict the rise, so that the positioning function is performed). There is also a usage in which the beam B is joined to the column P by inserting. In this case, since a new beam can be assembled to the column P below the existing beam (old), it is effective for application to beam replacement (building reform).

第二接合金具Ba,Bbの組付け片24,24の下部24aを下端に至るに従って次第に近接させたテーパー状にしてあるのは第一接合金具Aa,Abに対しその内側に係合し易くするためである。   The taper shape in which the lower portions 24a of the assembly pieces 24, 24 of the second joint fittings Ba, Bb are gradually brought closer to the lower end makes it easier to engage the first joint fittings Aa, Ab with the inside thereof. Because.

Aa 第一接合金具
Ba 第二接合金具
P 柱
B 梁
1 取付け片
2 スペーサ片
3 受止片
4 組付け片
6 切込み
7 掛止片
12 ドリフトピン
24 組付け片
32 縦溝
114 挿通孔
Aa 1st joining bracket Ba 2nd joining bracket P Column B Beam 1 Mounting piece 2 Spacer piece 3 Receiving piece 4 Assembly piece 6 Cutting 7 Latching piece 12 Drift pin 24 Assembly piece 32 Vertical groove 114 Insertion hole

Claims (1)

取付け片と、該取付け片の縦方向に沿う両端に設けて相対させたスペーサ片と、各スペーサ片の自由端に前記取付け片と並行する方向にして設けた受止片および各受止片の自由端に設けて相対させた組付け片とで平面視略溝形の第一接合金具を構成し、該第一接合金具を、前記取付け片において止着して一方の軸組材の側面に突設する一方、該第一接合金具を係合する縦溝を前記側面に当接する第二軸組材の端面に設け、該縦溝に第一接合金具の前記組付け片間に係合する第二接合金具を収設し、該第二接合金具の、前記組付け片に重ね合わせて前記第二軸組材を通じてドリフトピンを嵌挿する挿通孔を設けた組付け片の自由端側の上端に、鉤状の掛止片を設け、該掛止片が係合して掛止する切込みを、前記側面との間で前記掛止片先端の係合間隙を存して相対する前記受止片に設けた、軸組材の接合装置。   An attachment piece, spacer pieces provided at opposite ends along the longitudinal direction of the attachment piece, a receiving piece provided in a direction parallel to the attachment piece at a free end of each spacer piece, and each receiving piece A first joint fitting having a substantially groove shape in a plan view is constituted by an assembly piece provided at a free end and opposed thereto, and the first joint fitting is fastened to the mounting piece and attached to a side surface of one shaft assembly member. While projecting, a vertical groove for engaging the first joint fitting is provided on the end surface of the second shaft assembly that contacts the side surface, and the vertical groove engages between the assembly pieces of the first joint fitting. The second joining bracket is accommodated, and the second joining bracket is provided on the free end side of the assembly piece provided with an insertion hole for inserting the drift pin through the second shaft assembly material so as to overlap the assembly piece. A hook-shaped latching piece is provided at the upper end, and a notch that engages and latches with the latching piece is connected to the side of the latching piece at the tip. Provided on opposite said receiving plate and exist a gap, joining device framework member.
JP2011148935A 2011-07-05 2011-07-05 Shaft assembly joining equipment Active JP5559102B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011148935A JP5559102B2 (en) 2011-07-05 2011-07-05 Shaft assembly joining equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011148935A JP5559102B2 (en) 2011-07-05 2011-07-05 Shaft assembly joining equipment

Publications (2)

Publication Number Publication Date
JP2013014955A JP2013014955A (en) 2013-01-24
JP5559102B2 true JP5559102B2 (en) 2014-07-23

Family

ID=47687863

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011148935A Active JP5559102B2 (en) 2011-07-05 2011-07-05 Shaft assembly joining equipment

Country Status (1)

Country Link
JP (1) JP5559102B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6341897B2 (en) * 2015-10-07 2018-06-13 学校法人 関西大学 Steel floor slab repair method
JP6668729B2 (en) * 2015-12-15 2020-03-18 日本製鉄株式会社 Joint structure of floor joists

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005155196A (en) * 2003-11-26 2005-06-16 Kuretetsuku Kk Bracket, metal joint for construction and joint method for wooden member for construction

Also Published As

Publication number Publication date
JP2013014955A (en) 2013-01-24

Similar Documents

Publication Publication Date Title
KR100827716B1 (en) Bracket for window and door frames
JP5559102B2 (en) Shaft assembly joining equipment
KR20150026738A (en) Falling object protective apparatus
KR101583352B1 (en) Bracket for fixing a window frame which having improved structure
JP2010019055A (en) Clamping mechanism
KR200424942Y1 (en) A mounting structure for frame of bed
KR101479062B1 (en) Structure for installing a curtain wall for steel framed reinforced concrete structure
KR102397240B1 (en) Formwork fastening clamp
JP2010180612A (en) Mounting member for external facing material, external facing structure, and method for constructing the external facing structure
JP2010189872A (en) Door frame and construction method
JP3201716U (en) Temporary scaffolding materials
KR20100132103A (en) Fastening structure of curtain wall system
KR100658037B1 (en) A pillar cover plate and method for installing the plate
JP2016148182A (en) Reinforcement material for temporary scaffold
KR102433968B1 (en) push-button assembly and channel structures using the same
KR20200022123A (en) Side tie for use of interval maintenance device of mold
JP2015007326A (en) Ceiling structure and brace lower fixture
JP2010090636A (en) Flat panel mounting tool and flat panel mounting structure
KR200420674Y1 (en) Assembly reinforcement structure for preventing shake of angle bar
KR101413269B1 (en) Light shape steel and assembly system using the same
KR100825961B1 (en) Bracket for bracing connection
JP6951031B2 (en) Elevator three-way frame fixture and three-way frame installation structure
KR200408544Y1 (en) Combination a mold
JP3753679B2 (en) Ceiling mounting equipment support
JP6445071B2 (en) Fixing tool and fixing method thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130306

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20131225

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140513

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140605

R150 Certificate of patent or registration of utility model

Ref document number: 5559102

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250