JP5458679B2 - Furnace top installation method for coke oven construction - Google Patents

Furnace top installation method for coke oven construction Download PDF

Info

Publication number
JP5458679B2
JP5458679B2 JP2009135081A JP2009135081A JP5458679B2 JP 5458679 B2 JP5458679 B2 JP 5458679B2 JP 2009135081 A JP2009135081 A JP 2009135081A JP 2009135081 A JP2009135081 A JP 2009135081A JP 5458679 B2 JP5458679 B2 JP 5458679B2
Authority
JP
Japan
Prior art keywords
coke oven
furnace
roof
construction
furnace top
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2009135081A
Other languages
Japanese (ja)
Other versions
JP2010280809A (en
Inventor
保章 小柳
浩 多久和
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Original Assignee
JFE Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Steel Corp filed Critical JFE Steel Corp
Priority to JP2009135081A priority Critical patent/JP5458679B2/en
Publication of JP2010280809A publication Critical patent/JP2010280809A/en
Application granted granted Critical
Publication of JP5458679B2 publication Critical patent/JP5458679B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Description

本発明は、コークス炉を新設したり補修したりして建設する場合に、そのコークス炉の炉頂設備を据付けるコークス炉建設における炉頂設備据付工法に関するものである。   The present invention relates to a furnace top equipment installation method in the construction of a coke oven in which the furnace top equipment of the coke oven is installed when the coke furnace is newly constructed or repaired.

コークス炉の炭化室や燃焼室の壁部は耐火レンガを積み重ねて構築される。コークス炉の新設或いは補修に伴って、耐火レンガを積み重ねるとき、及び積み重ねた耐火レンガを昇温するときには、それら積み重ねた耐火レンガを風雨にさらされないようにする必要があり、新設或いは補修するコークス炉は、仮設上屋と呼ばれる仮設建家で覆われる。この仮設上屋によって炉体を構成する耐火レンガは風雨から守られる。下記特許文献1、2に記載されるコークス炉では、このように仮設上屋を構築した後、例えばコークス炉の炉頂に設けられた装炭車用のレールに門型クレーンを搭載し、この門型クレーンを用いてコークス炉の炉頂設備を吊り上げ、それを搬送して据付けるようにしている。   The walls of the coking oven carbonization chamber and combustion chamber are constructed by stacking refractory bricks. When stacking refractory bricks and raising the temperature of the stacked refractory bricks due to the installation or repair of a coke oven, it is necessary to prevent the stacked refractory bricks from being exposed to the wind and rain. Is covered with a temporary building called a temporary roof. The refractory bricks constituting the furnace body are protected from wind and rain by this temporary roof. In the coke ovens described in Patent Documents 1 and 2 below, after constructing the temporary roof in this way, for example, a portal crane is mounted on a rail for a coal-mounted vehicle provided at the top of the coke oven, Using a portal crane, the coke oven top equipment is lifted and transported for installation.

特開2008−75018号公報JP 2008-75018 A 特開2008−266533号公報JP 2008-266533 A

しかしながら、前記特許文献1、2に記載されるコークス炉建設用仮上屋を使用した建設における炉頂設備据付工法では、コークス炉の炉頂に設けられた装炭車用のレールに門型クレーンを搭載し、この門型クレーンを用いてコークス炉の炉頂設備を吊り上げ、それを搬送して据付けるようにしているため、炉頂部から炭化室及び燃焼室の炉壁を構成する耐火レンガに荷重が作用する。この荷重は、積み重ねられた耐火レンガや昇温中の耐火レンガに作用するため、積み重ねられた耐火レンガに歪みが生じたり、レンガ間のモルタルに亀裂が生じたりする。このような耐火レンガの歪みやモルタルの亀裂は、操業後のガス漏れやそれに伴う黒煙発生の原因となるため、積み重ねられた耐火レンガに可及的に荷重が作用しない炉頂設備据付工法が望まれている。
本発明は、上記のような問題点に着目してなされたものであり、積み重ねられた耐火レンガに可及的に荷重が作用しないコークス炉建設における炉頂設備据付工法を提供することを目的とするものである。
However, in the furnace top equipment installation method in the construction using the coke oven construction temporary roof described in Patent Documents 1 and 2, a portal crane is installed on the rail for the coal-coating vehicle provided at the top of the coke furnace. The coke oven furnace top equipment is lifted using this portal crane and transported and installed, so the refractory bricks that make up the furnace wall of the carbonization chamber and combustion chamber from the top of the furnace are installed. A load acts. Since this load acts on the stacked refractory bricks or the refractory bricks being heated, the stacked refractory bricks are distorted or the mortar between the bricks is cracked. Such distortion of refractory bricks and cracks in mortar cause gas leakage after operation and the generation of black smoke associated therewith.Therefore, it is necessary to install a furnace top facility that does not apply as much load as possible to stacked refractory bricks. It is desired.
The present invention has been made paying attention to the above-mentioned problems, and an object thereof is to provide a furnace top equipment installation method in the construction of a coke oven in which a load does not act as much as possible on the stacked refractory bricks. To do.

上記課題を解決するために、本発明のコークス炉建設における炉頂設備据付工法は、コークス炉の新設や補修といったコークス炉建設における炉頂設備据付工法であって、建設されるコークス炉の上方に設けられた仮設上屋の上屋根に、当該コークス炉の炉団方向に走行し移動可能な天井クレーンを設置し、前記仮設上屋の上屋根の妻面を全面開口し、その全面開口された妻面から前記天井クレーンに吊り下げた炉頂設備を建設されるコークス炉の炉頂部に搬送することを特徴とするものである。
また、前記天井クレーンを、建設されるコークス炉の幅方向に二基以上併設することを特徴とするものである。
また、前記天井クレーンを、前記仮設上屋の上屋根の妻面から当該仮設上屋の炉団方向外側に所定の長さだけ突設したことを特徴とするものである。
In order to solve the above problems, the furnace top equipment installation method in the construction of a coke oven of the present invention is a furnace top equipment installation method in the construction of a coke oven such as new installation or repair of a coke oven, which is located above the coke oven to be constructed. An overhead crane was installed on the roof of the temporary roof that was installed and moved in the direction of the furnace group of the coke oven. The furnace top equipment suspended from the wife surface on the overhead crane is transported to the top of the coke oven to be constructed.
Further, two or more overhead cranes are provided in the width direction of the coke oven to be constructed.
Further, the overhead crane protrudes from the end surface of the upper roof of the temporary roof by a predetermined length to the outside of the temporary roof in the furnace group direction.

而して、本発明のコークス炉建設における炉頂設備据付工法によれば、建設されるコークス炉の上方に設けられた仮設上屋の上屋根に、当該コークス炉の炉団方向に移動可能な天井クレーンを設置すると共に、仮設上屋の上屋根の妻面を全面開口し、その全面開口された妻面から天井クレーンに吊り下げた炉頂設備を建設されるコークス炉の炉頂部に搬送することとしたため、建設されるコークス炉の積み重ねられた耐火レンガに荷重が作用するのを可及的に抑制防止することができる。   Thus, according to the furnace top equipment installation method in the construction of the coke oven of the present invention, it can be moved to the upper roof of the temporary roof provided above the coke oven to be constructed in the direction of the coke oven of the coke oven. In addition to installing an overhead crane, the entire surface of the top roof of the temporary roof is opened, and the furnace top equipment suspended from the overhead crane is transferred to the top of the coke oven. Therefore, it is possible to suppress and prevent the load from acting on the fire bricks stacked in the coke oven to be constructed as much as possible.

また、天井クレーンを、建設されるコークス炉の幅方向に二基以上併設することとしたため、炉頂設備据付の施工能率が向上する。
また、天井クレーンを、仮設上屋の上屋根の妻面から当該仮設上屋の炉団方向外側に所定の長さだけ突設したことにより、コークス炉炉外の据付用デッキから炉頂設備を直接炉頂部に搬送することが可能となり、炉頂設備据付の施工能率が向上する。
In addition, since two or more overhead cranes are provided side by side in the width direction of the coke oven to be constructed, the construction efficiency for installing the furnace top facility is improved.
In addition, the overhead crane is installed from the installation deck outside the coke oven furnace by projecting the overhead crane by a predetermined length from the face of the roof of the temporary roof to the outside of the temporary roof. It becomes possible to convey directly to the top of the furnace, improving the efficiency of installing the furnace top equipment.

本発明のコークス炉建設における炉頂設備据付工法の一実施形態を示す全体正面図である。It is a whole front view which shows one Embodiment of the furnace top equipment installation construction method in the coke oven construction of this invention. 図1のコークス炉炉頂設備据付工法の側面図である。It is a side view of the coke oven top equipment installation construction method of FIG. 従来のコークス炉建設における炉頂設備据付工法の一例を示す全体正面図である。It is a whole front view which shows an example of the furnace top equipment installation construction method in the conventional coke oven construction. 図3のコークス炉炉頂設備据付工法の側面図である。It is a side view of the coke oven top equipment installation method of FIG.

次に、本発明のコークス炉建設における炉頂設備据付工法の一実施形態について図面を参照しながら説明する。
図1、図2は、既設のコークス炉に隣接して新設コークス炉を建設した本実施形態の炉頂設備据付状態を示している。これらの図中の符号1は新設コークス炉、符号2は既設コークス炉である。新設コークス炉1の炭化室3には、紙面垂直方向に、図示しない燃焼室が隣接しており、この燃焼室内で燃料ガスを燃焼させることにより、炭化室1内の石炭を乾留してコークスとする。図2では、炭化室3に対して、図の左側に押出機用の押出機軌条4が配設されている。一方、炭化室3の図示右方にはガイド車軌条5が敷設され、ガイド車軌条5の右下方には消火車6が配設されている。これらガイド車及び消火車6は、軌条に沿って、図の紙面垂直方向に移動可能としてある。
Next, an embodiment of a furnace top equipment installation method in the construction of a coke oven according to the present invention will be described with reference to the drawings.
FIG. 1 and FIG. 2 show a furnace top equipment installation state of this embodiment in which a new coke oven is constructed adjacent to an existing coke oven. In these drawings, reference numeral 1 is a newly installed coke oven, and reference numeral 2 is an existing coke oven. A combustion chamber (not shown) is adjacent to the carbonization chamber 3 of the new coke oven 1 in the direction perpendicular to the paper surface. By burning fuel gas in the combustion chamber, the coal in the carbonization chamber 1 is dry-distilled to produce coke. To do. In FIG. 2, an extruder rail 4 for the extruder is disposed on the left side of the drawing with respect to the carbonization chamber 3. On the other hand, a guide vehicle rail 5 is laid on the right side of the carbonization chamber 3 in the drawing, and a fire extinguisher 6 is disposed on the lower right side of the guide vehicle rail 5. These guide wheels and fire extinguishing vehicles 6 are movable along the rails in the direction perpendicular to the drawing sheet.

炭化室3や燃焼室の壁、所謂炉壁は、モルタルを介在して、耐火レンガを積み重ねて構築する。耐火レンガの積み重ね作業は勿論、コークス炉完成後の耐火レンガの昇温工程も重要である。特に、耐火レンガの昇温工程は、温度管理の重要性から長期間に及ぶ。耐火レンガを昇温して硝子化するプロセスが特に重要である。
前記炭化室3や燃焼室の下方には、炉底7が形成されている。本実施形態では、炉底7の両側に煙道8が形成されており、炉底7の内部には、コークス炉の燃料ガスとしてのコークス炉ガス配管9や、高炉から供給される高炉ガス配管10が設置されている。コークス炉ガスは、燃焼室内の燃料ガスとして用いられるが、発熱量が大きすぎるため、高炉ガスを混合して発熱量を制御するのである。
The walls of the carbonization chamber 3 and the combustion chamber, so-called furnace walls, are constructed by stacking refractory bricks with mortar interposed therebetween. In addition to the stacking work of refractory bricks, the temperature raising process of the refractory bricks after completion of the coke oven is also important. In particular, the temperature raising process of refractory bricks extends over a long period of time because of the importance of temperature management. The process of raising the temperature of the refractory brick to vitrification is particularly important.
A furnace bottom 7 is formed below the carbonization chamber 3 and the combustion chamber. In the present embodiment, the flue 8 is formed on both sides of the furnace bottom 7, and the coke oven gas pipe 9 as a fuel gas for the coke oven and the blast furnace gas pipe supplied from the blast furnace are formed inside the furnace bottom 7. 10 is installed. Coke oven gas is used as fuel gas in the combustion chamber. However, since the calorific value is too large, the blast furnace gas is mixed to control the calorific value.

前述したように、図2の新設コークス炉1の左右に押出機及びガイド車が配設されているので、図2の左右方向がコークスの押出方向となる(図1では紙面垂直方向)。このコークスの押出方向を幅方向、コークスの押出方向と垂直な方向を炉団方向とすると、図1の左右方向が炉団方向に相当する(図2では紙面垂直方向)。新設コークス炉1は、炉団方向に所定間隔で立設された擁壁11の間に構築される。また、新設コークス炉1の幅方向両端部にはバックステイ12が立設され、このバックステイ12の外側にプラットホーム13が構築される。なお、新設コークス炉1と既設コークス炉2の間の部分は中間デッキ15と呼ばれ、例えばガイド車のメンテナンス領域として使用される。また、新設コークス炉1を挟んだ中間デッキ15と反対側には、新設コークス炉1を建設するための物資を置くメンテナンスデッキ16が設けられている。   As described above, since the extruder and the guide wheel are disposed on the left and right sides of the new coke oven 1 shown in FIG. 2, the left-right direction in FIG. 2 is the coke extrusion direction (the vertical direction in FIG. 1). If the coke extrusion direction is the width direction and the direction perpendicular to the coke extrusion direction is the furnace group direction, the left-right direction in FIG. The new coke oven 1 is constructed between retaining walls 11 erected at a predetermined interval in the furnace group direction. Further, a backstay 12 is erected on both ends in the width direction of the new coke oven 1, and a platform 13 is constructed outside the backstay 12. A portion between the newly installed coke oven 1 and the existing coke oven 2 is called an intermediate deck 15 and is used, for example, as a maintenance area for a guide car. In addition, a maintenance deck 16 for placing materials for constructing the new coke oven 1 is provided on the opposite side of the intermediate deck 15 with the new coke oven 1 interposed therebetween.

新設コークス炉1は、図1の2つの擁壁11の間に建設されるので、上屋根(この上屋根のことを上屋ともいう)14も、2つの擁壁11の間に仮設されている。本実施形態のコークス炉用仮設上屋は、前述したプラットホーム上に柱を立設し、その柱の上に上屋根14を設けているため、新設コークス炉1をすっぽり覆う広さとすることができる。また、押出機軌条4の上方には、低い下屋根(下屋とも言う)17が仮設されている。   Since the new coke oven 1 is constructed between the two retaining walls 11 in FIG. 1, an upper roof (this upper roof is also referred to as a roof) 14 is also temporarily installed between the two retaining walls 11. Yes. The temporary coke oven for coke oven according to the present embodiment has a pillar standing on the platform described above and an upper roof 14 provided on the pillar, so that the newly installed coke oven 1 can be covered enough. . In addition, a lower lower roof (also referred to as a lower store) 17 is temporarily provided above the extruder rail 4.

本実施形態では、新設コークス炉1の炉頂設備を搬送・据付するために、仮設上屋の上屋根14に天井クレーン18を設置した。この天井クレーン18は、吊り荷重が10tのものであり、新設コークス炉1の炉団方向に長手なクレーン用レール19を、当該新設コークス炉1の幅方向に、計4本、即ち2セット分、上屋根14に取付け、夫々に計2基の天井クレーン18を取付けた(図1の天井クレーン18は移動の様子を示しており、実際には2基しか取付けられていない)。また、仮設上屋のメンテナンスデッキ16側の妻面部23を全面開口し、クレーン用レール19をメンテナンスデッキ16側に3m張り出してある。   In the present embodiment, an overhead crane 18 is installed on the roof 14 of the temporary roof in order to transport and install the furnace top equipment of the newly installed coke oven 1. This overhead crane 18 has a suspension load of 10 t, and has four crane rails 19 that are long in the direction of the furnace group of the newly installed coke oven 1 in the width direction of the newly installed coke oven 1, that is, 2 sets. A total of two overhead cranes 18 were attached to the upper roof 14, respectively (the overhead crane 18 in FIG. 1 shows a state of movement, and only two overhead cranes are actually attached). Further, the end face 23 on the maintenance deck 16 side of the temporary shed is fully opened, and the crane rail 19 is projected 3 m toward the maintenance deck 16 side.

この天井クレーン18で搬送・据付する炉頂設備としては、例えば図2に示す装炭車軌条20、上昇管21、ドライメーン22、図示しない集塵ダクト、炉蓋、炉枠、タイロッドなどが挙げられる。これらの炉頂設備をメンテナンスデッキ16に置き、メンテナンスデッキ16の上方に移動させた天井クレーン18で吊り上げ、炉頂設備を吊った状態で天井クレーン18を新設コークス炉1の炉上に移動して、それらを搬送し、必要箇所に炉頂設備を下ろして据付ける。この間、新設コークス炉1の炉頂には、少なくとも炉頂設備の荷重は作用しないから、積み重ねた耐火レンガにも荷重が作用することがなく、耐火レンガに歪みが生じたり、モルタルに亀裂が生じたりするのを回避することができる。   Examples of the furnace top equipment that is transported and installed by the overhead crane 18 include a coal-car carriage rail 20, a rising pipe 21, a dry main 22, a dust collection duct (not shown), a furnace lid, a furnace frame, and a tie rod shown in FIG. . These furnace top facilities are placed on the maintenance deck 16, lifted by the overhead crane 18 moved above the maintenance deck 16, and the overhead crane 18 is moved onto the furnace of the newly installed coke oven 1 with the furnace top equipment suspended. Then, transport them and set down the furnace top equipment at the required location. During this time, at least the load at the top of the furnace does not act on the top of the new coke oven 1, so no load is applied to the stacked refractory bricks, and the refractory bricks are distorted or cracked in the mortar. Can be avoided.

図3、図4は、従来のコークス炉建設における炉頂設備据付工法を説明するためのものである。なお、本実施形態と共通する構成には、同等の符号を付した。従来の炉頂設備据付工法では、例えば装炭車軌条20に門型クレーン101を搭載し、この門型クレーン101を移動してメンテナンスデッキ16上の炉頂設備102を搬送・据付していた。しかしながら、このようにしたのでは新設コークス炉1の炉頂に炉頂設備102及び門型クレーン101の荷重が作用し、それによって積み重ねられた炉壁の耐火レンガにも荷重が作用し、耐火レンガに歪みが生じたり、モルタルに亀裂が生じたりする。そして、このように積み重ねられた耐火レンガに歪みが生じたり、隙間を覆うモルタルに亀裂が生じたりすると、そこからガス漏れや黒煙が生じるという問題になる。   FIG. 3 and FIG. 4 are for explaining a furnace top equipment installation method in conventional coke oven construction. In addition, the same code | symbol was attached | subjected to the structure which is common in this embodiment. In the conventional furnace top equipment installation method, for example, the portal crane 101 is mounted on the coal-cooked rail 20, and the furnace crane 102 on the maintenance deck 16 is transported and installed by moving the portal crane 101. However, if it did in this way, the load of the furnace top equipment 102 and the portal crane 101 will act on the furnace top of the newly installed coke oven 1, and the load will also act on the fire bricks of the stacked furnace wall, and fire bricks will be applied. Distortion or cracks in the mortar. When the fire bricks stacked in this way are distorted or cracks occur in the mortar covering the gaps, there is a problem that gas leaks and black smoke are generated therefrom.

このように本実施形態のコークス炉建設における炉頂設備据付工法では、建設される新設コークス炉1の上方に設けられた仮設上屋の上屋根14に、当該コークス炉1の炉団方向に移動可能な天井クレーン18を設置すると共に、仮設上屋の上屋根14の妻面部23を全面開口し、その全面開口された妻面部23から天井クレーン18に吊り下げた炉頂設備を建設される新設コークス炉1の炉頂部に搬送することにより、建設される新設コークス炉1の積み重ねられた耐火レンガに荷重が作用するのを可及的に抑制防止することができる。   As described above, in the furnace top facility installation method in the construction of the coke oven according to the present embodiment, the coke oven 1 moves to the upper roof 14 of the temporary roof provided above the new coke oven 1 to be constructed. A new overhead building 18 is constructed in which a ceiling crane 18 that can be installed is opened, and the end face 23 of the roof 14 of the temporary roof is fully opened, and the top face crane 23 is hung on the overhead crane 18 from the end face 23 that is fully open. By conveying to the furnace top part of the coke oven 1, it can suppress as much as possible that a load acts on the refractory bricks piled up of the new coke oven 1 constructed.

また、天井クレーンを18、建設される新設コークス炉1の幅方向に二基以上併設することにより、炉頂設備据付の施工能率が向上する。
また、天井クレーン18を、仮設上屋の上屋根14の妻面部23からメンテナンスデッキ16側、即ち当該仮設上屋の炉団方向外側に所定の長さだけ突設したことにより、コークス炉炉外のメンテナンスデッキ16から炉頂設備を直接炉頂部に搬送することが可能となり、炉頂設備据付の施工能率が向上する。
Moreover, by installing two or more overhead cranes in the width direction of the newly installed coke oven 1 to be constructed, the construction efficiency of the furnace top facility installation is improved.
Further, by projecting the overhead crane 18 by a predetermined length from the end face 23 of the upper roof 14 of the temporary roof to the maintenance deck 16 side, that is, to the outside of the temporary roof in the furnace group direction, the outside of the coke oven furnace is provided. It becomes possible to convey the furnace top equipment directly from the maintenance deck 16 to the top of the furnace, thereby improving the installation efficiency of the furnace top equipment installation.

1は新設コークス炉、2は既設コークス炉、3は炭化室、4は押出機軌条、5はガイド車軌条、6は消火車、7は炉底、8は煙道、9はコークス炉ガス配管、10は高炉ガス配管、11は擁壁、12はバックステイ、13はプラットホーム、14は上屋根、15は中間デッキ、16はメンテナンスデッキ、17は下屋根、18は天井クレーン、19はクレーン用レール、20は装炭車軌条、21は上昇管、22はドライメーン、23は妻面部   1 is a new coke oven, 2 is an existing coke oven, 3 is a carbonization chamber, 4 is an extruder rail, 5 is a guide rail, 6 is a fire extinguisher, 7 is a bottom, 8 is a flue, 9 is a coke oven gas pipe 10 is a blast furnace gas pipe, 11 is a retaining wall, 12 is a backstay, 13 is a platform, 14 is an upper roof, 15 is an intermediate deck, 16 is a maintenance deck, 17 is a lower roof, 18 is an overhead crane, 19 is for a crane Rail, 20 is a coal rail, 21 is a riser, 22 is a dry main, 23 is a wife

Claims (2)

コークス炉の新設や補修といったコークス炉建設における炉頂設備据付工法であって、建設されるコークス炉の上方に設けられた仮設上屋の上屋根に、当該コークス炉の炉団方向に移動可能な天井クレーンを設置し、前記天井クレーンを、前記仮設上屋の上屋根の妻面から当該仮設上屋の炉団方向外側且つメンテナンスデッキの上方に所定の長さだけ突設し、前記仮設上屋の上屋根の妻面を全面開口し、メンテナンスデッキに置かれた炉頂設備を天井クレーンで吊り上げ、前記全面開口された妻面から前記天井クレーンに吊り下げた炉頂設備を建設されるコークス炉の炉頂部に搬送することを特徴とするコークス炉建設における炉頂設備据付工法。 This is a method for installing the top equipment in the construction of a coke oven, such as the construction or repair of a coke oven, which can be moved in the direction of the coke oven of the coke oven on the roof of a temporary roof provided above the coke oven to be constructed. An overhead crane is installed, and the overhead crane is projected by a predetermined length from the end face of the roof of the temporary roof to the outside of the temporary roof of the temporary roof and above the maintenance deck. A coke oven in which the top surface of the top roof is fully opened, the furnace top equipment placed on the maintenance deck is lifted by an overhead crane, and the top equipment is suspended from the full surface opening on the ceiling crane. A furnace top equipment installation method in the construction of a coke oven characterized by being conveyed to the top of the furnace. 前記天井クレーンを、建設されるコークス炉の幅方向に二基以上併設することを特徴とする請求項1に記載のコークス炉建設における炉頂設備据付工法。   2. The method of installing a top equipment in a coke oven construction according to claim 1, wherein two or more overhead cranes are provided side by side in the width direction of the coke oven to be constructed.
JP2009135081A 2009-06-04 2009-06-04 Furnace top installation method for coke oven construction Active JP5458679B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009135081A JP5458679B2 (en) 2009-06-04 2009-06-04 Furnace top installation method for coke oven construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009135081A JP5458679B2 (en) 2009-06-04 2009-06-04 Furnace top installation method for coke oven construction

Publications (2)

Publication Number Publication Date
JP2010280809A JP2010280809A (en) 2010-12-16
JP5458679B2 true JP5458679B2 (en) 2014-04-02

Family

ID=43537840

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009135081A Active JP5458679B2 (en) 2009-06-04 2009-06-04 Furnace top installation method for coke oven construction

Country Status (1)

Country Link
JP (1) JP5458679B2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103374357B (en) * 2012-04-25 2014-08-27 五冶集团上海有限公司 Method for building cellular regenerative chamber of coke oven
CN103509565B (en) * 2012-06-20 2015-06-24 五冶集团上海有限公司 Cleaning and protection method of chute above parts of large-scale coke oven in construction process
JP5839001B2 (en) * 2013-06-27 2016-01-06 Jfeスチール株式会社 Coke oven construction temporary house and coke oven construction method
JP6375686B2 (en) * 2014-05-08 2018-08-22 新日鐵住金株式会社 Coke oven temporary roof and coke oven construction method
GB201503127D0 (en) * 2015-02-03 2015-04-08 Fosbel Inc Methods and apparatus for constructing glass furnace structures
CN110319695A (en) * 2019-07-15 2019-10-11 五冶集团上海有限公司 Refractory brick long range horizontal transporter and transportation resources in a kind of horizontal kiln
CN115521796A (en) * 2022-10-13 2022-12-27 中国五冶集团有限公司 BIM technology-based large coke oven integral flat layer building method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6049675B2 (en) * 1982-10-26 1985-11-02 品川フア−ネス株式会社 Relocation scaffolding for coke oven construction work
JP2942879B2 (en) * 1991-12-24 1999-08-30 株式会社竹中工務店 Temporary house for all-weather construction
JP2006036934A (en) * 2004-07-27 2006-02-09 Jfe Steel Kk Method for construction of temporary shed for coke oven and coke oven

Also Published As

Publication number Publication date
JP2010280809A (en) 2010-12-16

Similar Documents

Publication Publication Date Title
JP5458679B2 (en) Furnace top installation method for coke oven construction
US10851306B2 (en) System and method for repairing a coke oven
TW421705B (en) Method of repairing coke oven and apparatus for taking-in bricks for repair
JP5050694B2 (en) Heat insulation box for repairing coke oven carbonization chamber and method for repairing coke oven
CN201512560U (en) Car-type high-temperature gas thermal treatment stove
JP6008071B1 (en) Coke oven construction method
CN102692131B (en) Method for overhauling fire-resistant material for annular air duct and chute in coke dry quenching furnace
CN103059883A (en) Arch stuffing supporting technology by bricking arch apex for division of flue in coke oven
CN106766929B (en) Independent hot-blast stove on-bne repair Nai Cai transportation system and repair method
JP2019167503A (en) Method for construction of coke oven and temporary shed for construction of coke oven
CN107163956A (en) A kind of quick overhaul construction method of coke dry quenching furnace liner
JP5407558B2 (en) Temporary roof for coke oven
CN103788966A (en) High-temperature resistant expansion joint for dry quenching
CN204787780U (en) Car -type heating furnace
KR20120112791A (en) Method for repairing coke oven
JP6693776B2 (en) Brick module uptake device in coke oven
CN205002590U (en) Tunnel cave with automatic temperature control system
CN108676566B (en) Chute protection method for coke oven hot repair combustion chamber
CN104073269A (en) Deep maintenance method on coke-oven charcoal bottom bricks
JP2006036934A (en) Method for construction of temporary shed for coke oven and coke oven
CN204355993U (en) A kind of New-type hot-air furnace vault manhole repairs hanging apparatus online
CN203975750U (en) Circulating steel ball mechanical transport device
CN203866243U (en) High-temperature-resistant expansion joint for dry quenching
CN204824577U (en) Glass melting furnace seals flue
CN114958397B (en) Heat recovery coke oven masonry construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120423

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130927

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20131008

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20131128

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20131217

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20131230

R150 Certificate of patent or registration of utility model

Ref document number: 5458679

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250