JP5036065B2 - Pile head joint structure - Google Patents

Pile head joint structure Download PDF

Info

Publication number
JP5036065B2
JP5036065B2 JP2008258978A JP2008258978A JP5036065B2 JP 5036065 B2 JP5036065 B2 JP 5036065B2 JP 2008258978 A JP2008258978 A JP 2008258978A JP 2008258978 A JP2008258978 A JP 2008258978A JP 5036065 B2 JP5036065 B2 JP 5036065B2
Authority
JP
Japan
Prior art keywords
pile head
pile
steel
concrete
end plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2008258978A
Other languages
Japanese (ja)
Other versions
JP2010090547A (en
Inventor
治克 角屋
信博 荒木
喜照 丸山
秀和 重松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Asahi Kasei Construction Materials Corp
Original Assignee
Asahi Kasei Construction Materials Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Asahi Kasei Construction Materials Corp filed Critical Asahi Kasei Construction Materials Corp
Priority to JP2008258978A priority Critical patent/JP5036065B2/en
Publication of JP2010090547A publication Critical patent/JP2010090547A/en
Application granted granted Critical
Publication of JP5036065B2 publication Critical patent/JP5036065B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、フーチングや最下段のスラブ等の建造物の基礎コンクリート構造部と既製コンクリート杭の杭頭部との接合構造に関する。特に、杭頭端面に端板を備える中空状の既製コンクリート杭との接合構造に関する。   The present invention relates to a joint structure between a foundation concrete structure portion of a building such as a footing or a lowermost slab and a pile head portion of a ready-made concrete pile. In particular, it is related with the joining structure with the hollow ready-made concrete pile which equips an end plate with a pile head end surface.

中空状の既製コンクリート杭としては、遠心力高強度プレストレストコンクリート杭(PHC杭)や、プレストレスト鉄筋コンクリート杭(PRC杭)、外殻鋼管付きコンクリート杭(SC杭)などが知られている。この種の中空状の既製コンクリート杭に関する接合構造においては、その既製コンクリート杭の杭頭端面に設けられる杭頭端板に下部を固着した杭頭鉄筋を介して建造物の基礎コンクリート構造部と接合する接合構造が広く知られている。また、その場合に、杭頭鉄筋の一部に周囲のコンクリートと付着しない非定着部を形成した半剛接合のものも知られている(特許文献1)。そして、この半剛接合構造によれば、その非定着部における杭頭鉄筋の変形によって杭頭部の固定度が低減され、杭頭部に生じる曲げモーメントが低減されることから、杭頭部の損傷を抑制できるという効果も知られている。
特開2000−144763号公報
Known hollow concrete piles include centrifugal high-strength prestressed concrete piles (PHC piles), prestressed reinforced concrete piles (PRC piles), concrete piles with shell steel pipes (SC piles), and the like. In this type of hollow prefabricated concrete pile connection structure, it is connected to the foundation concrete structure part of the building via a pile head rebar with the lower part fixed to the pile head end plate provided on the pile head end face of the ready made concrete pile. The joining structure is widely known. In that case, a semi-rigid joint is also known in which a non-fixed portion that does not adhere to surrounding concrete is formed on a part of a pile head reinforcing bar (Patent Document 1). And, according to this semi-rigid joint structure, the degree of fixation of the pile head is reduced by the deformation of the pile head rebar in the non-fixed part, and the bending moment generated in the pile head is reduced. The effect that damage can be suppressed is also known.
JP 2000-144663 A

ところで、杭頭部の端板に対して基礎コンクリート構造部を構成するコンクリートが当接した状態にある一般的な接合形態の場合には、その杭頭部に作用する曲げモーメントに対し、引張力には杭頭鉄筋が抵抗し、圧縮力には杭頭鉄筋とコンクリートとが抵抗することになる。つまり、端板上部の基礎コンクリート構造部は、鉛直圧縮変形に対して大きな抵抗力を持っている。この圧縮変形に対する抵抗力は、杭頭接合部の挙動、とりわけ杭頭接合部の回転変形に対して大きな影響を与えることになる。一方、建造物は一般的に複数本の杭によって支持する支持構造が採用されており、地震時等にそれらの各杭に作用する軸力は、個々の杭の設置位置によって変動するという事情が存在する。このように、地震時等に作用する個々の杭に対する軸力が変動するとともに、コンクリートから圧縮方向に対する拘束作用の影響を受けるため、個々の杭頭部の固定度すなわち回転剛性が変動するという厄介な技術的問題があった。このため、当該建造物の強度設計がきわめて複雑であり、個々の杭頭の状況を考慮して個々に杭頭部の断面形状等を変えて対応しようとすると、膨大で繁雑な設計作業となり、また施工性も大きく低下するという問題があった。   By the way, in the case of a general joint form in which the concrete that constitutes the foundation concrete structure abuts against the end plate of the pile head, the tensile force against the bending moment acting on the pile head The pile head rebar resists, and the pile head rebar and concrete resist the compressive force. That is, the foundation concrete structure part above the end plate has a large resistance to vertical compression deformation. This resistance force against compressive deformation has a great influence on the behavior of the pile head joint, particularly the rotational deformation of the pile head joint. On the other hand, a structure is generally supported by multiple piles, and the axial force acting on each pile during an earthquake etc. varies depending on the installation position of each pile. Exists. In this way, the axial force on individual piles acting in the event of an earthquake, etc. fluctuates, and because of the influence of the restraining action on the compression direction from the concrete, the problem is that the fixing degree of each pile head, that is, the rotational rigidity, fluctuates. There was a serious technical problem. For this reason, the strength design of the building is extremely complex, and it becomes an enormous and complicated design work when trying to respond by changing the cross-sectional shape of the pile head individually considering the situation of each pile head, In addition, there is a problem that workability is greatly reduced.

本発明は、以上のような従来の技術的状況に鑑み、基礎コンクリート構造部を構成するコンクリートによる拘束作用を縮小し、軸力による杭頭部の回転剛性の変動を低減して、地震時等における軸力の変動による影響を抑制するとともに、個々の杭頭の状況を考慮して個別的に対応する場合の施工性の向上にも有効な杭頭接合構造を提供することを目的とするものである。   In view of the above-described conventional technical situation, the present invention reduces the restraining action by the concrete constituting the foundation concrete structure part, reduces the fluctuation of the rotational rigidity of the pile head due to the axial force, etc. The purpose is to provide a pile head joint structure that is effective in suppressing the effects of fluctuations in axial force and improving workability when dealing with individual pile head situations. It is.

前記課題を解決するため、請求項1の発明では、下端部が杭頭端板に固着される複数の杭頭鉄筋を用いて建造物の基礎コンクリート構造部と既製コンクリート杭の杭頭部とを接合する杭頭接合構造において、前記杭頭端板上に前記杭頭鉄筋に外嵌した状態に複数の鋼製スリーブを配設するとともに、それらの鋼製スリーブ上に前記杭頭端板の上方を覆うように鋼製プレートを載置し、前記鋼製スリーブにより前記杭頭端板と前記鋼製プレートとの間の間隔を保持するとともに、その鋼製スリーブにより杭頭部に作用する圧縮荷重を分担して前記杭頭鉄筋を補強するという技術手段を採用した。以上のように、請求項1の発明では、鋼製プレートによって下方に空隙部を形成することにより、杭頭部に対するコンクリートからの拘束作用を排除するとともに、前記鋼製スリーブによって杭頭部に作用する圧縮荷重を分担することにより杭頭鉄筋を補強するという技術手段を採用した点で特徴を有する。すなわち、前記空隙部の形成によりコンクリートからの拘束作用を排除して軸力による杭頭部の回転剛性の変動を低減し、地震時等における軸力の変動による影響を抑制するとともに、その空隙部の形成によって増加する杭頭鉄筋に対する圧縮荷重を前記鋼製スリーブによって分担して緩和することにより杭頭鉄筋を補強するようにした点で特徴を有する。なお、前記鋼製プレートの外径は、例えば前記既製コンクリート杭の外径とほぼ同径に設定される(請求項)。 In order to solve the above-mentioned problems, in the invention of claim 1, the foundation concrete structure part of the building and the pile head part of the ready-made concrete pile are formed using a plurality of pile head reinforcing bars whose lower end parts are fixed to the pile head end plate. In the pile head joining structure to be joined, a plurality of steel sleeves are disposed on the pile head end plates so as to be fitted on the pile head reinforcing bars, and above the pile head end plates on the steel sleeves. A steel plate is placed so as to cover the steel plate, and the steel sleeve holds a distance between the pile head end plate and the steel plate, and the steel sleeve compresses the pile head by acting on the pile head. The technical means of reinforcing the pile head rebar by sharing the above was adopted . As the following, the invention of claim 1, by forming the gap portion downwardly by a steel plate, while eliminating the restraint effect of the concrete for the pile head, depending on the steel sleeves pile It has the feature that the technical means of reinforcing the pile head rebar by sharing the compressive load acting on the part is adopted. That is, the formation of the void portion eliminates the restraining action from the concrete, reduces the fluctuation in the rotational rigidity of the pile head due to the axial force, suppresses the influence due to the fluctuation of the axial force during an earthquake, etc. having said compressive load on pile rebar be increased by forming at the points so as to reinforce the pile head rebar by relaxing and thus shared by the steel sleeves. The outer diameter of the steel plate is set to be substantially the same as the outer diameter of the ready-made concrete pile, for example (Claim 2 ).

また、請求項の発明では、前記杭頭端板上に前記杭頭鉄筋に外嵌した状態に複数の鋼製スリーブを配設するとともに、それらの鋼製スリーブの上部を閉塞して、それぞれの鋼製スリーブの内部にコンクリートの流入しない空隙部を形成するとともに、それらの鋼製スリーブの内部を非定着部とするという技術手段を採用した。さらに、請求項の発明では、前記杭頭端板上に前記杭頭鉄筋に外嵌した状態に発泡スチロール等からなる圧縮力に弱い複数のスペーサを配設して、それらのスペーサによって前記杭頭鉄筋の下部に非定着部を形成するとともに、それぞれの非定着部の周囲にコンクリートを排除した部分を形成するという技術手段を採用した。以上のように、請求項及び請求項の発明では、それぞれの杭頭鉄筋に外嵌した前記鋼製スリーブやスペーサの設置により、それらの鋼製スリーブやスペーサによって各杭頭鉄筋の下部に形成された非定着部の周囲にコンクリートを排除した部分を個別的に形成することにより、全体でコンクリートと杭頭端面との接触面積を縮小して軸力による杭頭部の回転剛性の変動を低減し、地震時等における軸力の変動による影響を抑制するという技術手段を採用した点で特徴を有する。すなわち、コンクリートに対する鉄筋及び鋼製スリーブのヤング係数比が大きいため、杭頭端板に対するコンクリートの接触面積を少し減らしただけでも、杭頭鉄筋及び鋼製スリーブに負荷される割合が大きくなり、コンクリートによる影響を小さくすることができる。 Moreover, in invention of Claim 3 , while arrange | positioning several steel sleeves in the state externally fitted to the said pile head reinforcement on the said pile head end plate, obstruct | occlude the upper part of those steel sleeves, A technical means was adopted in which a void portion into which concrete does not flow was formed inside the steel sleeve, and the inside of the steel sleeve was used as a non-fixing portion. Further, in the invention of claim 4, a plurality of spacers made of foamed polystyrene or the like are disposed on the pile head end plate so as to be externally fitted to the pile head reinforcing bars, and the pile heads are formed by these spacers. The technical means of forming the non-fixed part at the lower part of the reinforcing bar and forming the part excluding the concrete around each non-fixed part was adopted. As mentioned above, in invention of Claim 3 and Claim 4 , by installation of the steel sleeves and spacers externally fitted to the respective pile head rebars, the lower portions of the pile head rebars are formed by those steel sleeves and spacers. By individually forming the part where the concrete is excluded around the formed non-fixed part, the contact area between the concrete and the pile head end face is reduced as a whole, and the fluctuation of the rotational rigidity of the pile head due to the axial force is reduced. It is characterized in that it employs technical means to reduce and suppress the effects of fluctuations in axial force during earthquakes. In other words, because the Young's modulus ratio of the reinforcing steel and steel sleeve to the concrete is large, even if the contact area of the concrete to the pile head end plate is slightly reduced, the proportion of load on the pile head reinforcing steel and steel sleeve increases. The influence by can be reduced.

本発明によれば、次の効果を得ることができる。
(1)本発明によれば、杭頭部に対するコンクリートからの拘束作用を排除あるいは縮小できるので、軸力による杭頭部の回転剛性の変動を低減し、地震時等における軸力の変動による影響を抑制することができる。
(2)請求項1、2の発明によれば、鋼製プレートによって形成される下方の広い空隙部により、杭頭部に対するコンクリートの拘束作用を効果的に排除ないし低減することができる。
(3)しかも、前記鋼製スリーブによって杭頭部に作用する圧縮荷重を分担することにより杭頭鉄筋が補強され、空隙部の形成によって増加する杭頭鉄筋に対する圧縮荷重の影響を緩和できることから、バランスのよい杭頭接合構造が得られる。
(4)また、前記鋼製スリーブの板厚等を変更することにより、個々の杭頭の状況に応じた対応を簡便に実施し得ることから、施工性の向上にもきわめて有効である。
(5)さらに、杭頭部に対するコンクリートからの拘束作用を排除し、前記杭頭鉄筋と鋼製スリーブによって圧縮力を受けることから、その挙動の解析が容易になり、設計作業の簡素化にもきわめて有効である。
(6)請求項3、4の発明によれば、杭頭鉄筋の設置作業において、個々の杭頭鉄筋に対して前記鋼製スリーブやスペーサを外嵌するという簡便な作業によって、全体でコンクリートと杭頭端面との接触面積を縮小して軸力による杭頭部の回転剛性の変動を低減することが可能であり、地震時等における軸力の変動による影響を抑制できるので、施工性がきわめて良好である。
According to the present invention, the following effects can be obtained.
(1) According to the present invention, the restraining action from the concrete on the pile head can be eliminated or reduced, so the fluctuation of the rotational rigidity of the pile head due to the axial force can be reduced, and the influence of the fluctuation of the axial force during an earthquake, etc. Can be suppressed.
(2) According to the first and second aspects of the invention, the constraining action of the concrete against the pile head can be effectively eliminated or reduced by the lower wide gap formed by the steel plate.
(3) Moreover, the pile head reinforcement is reinforced by sharing the compression load acting on Therefore pile head on the steel sleeves, that can reduce the impact of compressive load against the pile rebar be increased by forming the air gap Therefore, a well-balanced pile head joint structure can be obtained.
(4) Further, by changing the thickness or the like of the steel sleeves, since that can be conveniently performed action appropriate to the situation of each pile head, it is also very effective in improving the workability.
(5) In addition, to eliminate the restraint effect of the concrete for the pile head, from undergoing Therefore compressive force to the pile head rebar and steel sleeves, it facilitates the analysis of the behavior, simplifies design work Is also very effective.
(6) According to the inventions of claims 3 and 4 , in the installation work of the pile head reinforcing bars, the concrete sleeves and the spacers are individually fitted to the individual pile head reinforcing bars, thereby making the concrete and the concrete as a whole. The contact area with the pile head end face can be reduced to reduce the fluctuation of the rotational rigidity of the pile head due to the axial force. It is good.

本発明は、下端部が杭頭端板に固着される複数の杭頭鉄筋を用いて建造物の基礎コンクリート構造部と既製コンクリート杭の杭頭部とを接合する杭頭接合構造であれば、広く適用することができる。上述のように、鋼製プレートを用いて杭頭端板の上方を覆うことにより、杭頭部に対するコンクリートからの拘束作用を排除ないし低減する形態のものでも、個々の杭頭鉄筋に外嵌した鋼製スリーブやスペーサによって杭頭鉄筋毎にコンクリートを排除することにより、杭頭部に対するコンクリートの拘束作用を低減する形態のものでも実施が可能である。また、前記杭頭鉄筋の基礎コンクリート構造部に対する定着形態に関しては、以下の実施例のように軸部の付着力によるものでもよいし、上部に付設した定着板により定着し、軸部にはアンボンド用のシース管等を外嵌する形態のものでも適用が可能である。前記鋼製プレートは、円板状のものでもよいし、杭頭端板の上方を覆うように杭頭端板に沿って設置されるリング状のものでもよい。また、鋼製プレートの外径は、杭頭部の外径とほぼ同径にして杭頭端板の上方の全体を覆うことにより、杭頭部に対するコンクリートの拘束作用を排除する形態が好ましいが、杭頭端板の上方を部分的に覆うことにより、コンクリートの拘束作用を低減する形態も可能である。因みに、この鋼製プレートに対しては、必要に応じて外周縁部に垂下状のリング部材を付設するなどの閉塞手段を講じて、鋼製プレートの下方へ打設コンクリートが流入しないように構成する。前記鋼製スリーブに関しては、前記杭頭鉄筋に対する補強の程度に応じ、杭頭部に作用する圧縮荷重の分担に適した板厚や素材強度などを具体的に選定することになる。さらに、上述のように、その鋼製スリーブの板厚や素材強度などを杭頭毎に選定することにより、個々の杭頭の状況に応じた対応をも簡便に実施することができる。 The present invention is a pile head joint structure that joins a foundation concrete structure part of a building and a pile head of a ready-made concrete pile using a plurality of pile head reinforcing bars whose lower end part is fixed to the pile head end plate. Can be widely applied. As described above, by covering the top of the pile head end plate using a steel plate, even those with a form that eliminates or reduces the restraining action from the concrete on the pile head is externally fitted to each pile head rebar. By excluding concrete for each pile head rebar with a steel sleeve or spacer, it is possible to implement a configuration that reduces the concrete restraining action on the pile head. Further, regarding the fixing form of the pile head reinforcement to the foundation concrete structure part, it may be based on the adhesive force of the shaft part as in the following examples, or it is fixed by the fixing plate attached to the upper part and unbonded to the shaft part. A configuration in which a sheath tube or the like is externally fitted is also applicable. The steel plate may be a disk-shaped one or a ring-shaped one installed along the pile head end plate so as to cover the top of the pile head end plate. Further, the outer diameter of the steel plate is preferably substantially the same as the outer diameter of the pile head and covers the entire top of the pile head end plate, thereby eliminating the concrete restraining action on the pile head. The form which reduces the restraining action of concrete is also possible by partially covering the upper part of the pile head end plate. By the way, for this steel plate, it is configured so that the cast concrete does not flow below the steel plate by providing blocking means such as attaching a hanging ring member to the outer peripheral edge if necessary. To do. Regarding the steel sleeves are depending on the degree of reinforcement for the pile head reinforcement, we will specifically selected such thickness and material strength suitable for sharing compressive load acting on the pile head. Further, as mentioned above, by selecting and thickness and material strength of the steel sleeves in each pile head, corresponding it can also be conveniently carried out according to the situation of each pile head.

図1及び図2は本発明の第1実施例を示したもので、図1は設置状態を示した縦断面図、図2はその杭頭部のA−A断面図である。図中1は中空状の既製コンクリート杭であり、2はその杭1の上端面に設置された杭頭端板である。図示のように、杭頭端板2には、複数の杭頭鉄筋3が下端部をネジ結合や溶接などで固着した状態で立設されている。また、各杭頭鉄筋3には、鋼製スリーブ4が外嵌されており、それらの鋼製スリーブ4上に円板状の鋼製プレート5を載置し、前記鋼製スリーブ4によって杭頭端板2と鋼製プレート5との間の間隔を保持することにより、空隙部6が形成されるように構成している。各杭頭鉄筋3の下部には雄ネジ部が形成されており、それらの雄ネジ部に螺合した円形ナット7によって鋼製プレート5と鋼製スリーブ4を杭頭端板2に対して締付固定するように構成している。図中8は、後から打設されるフーチングや最下段のスラブ等の基礎コンクリート構造部を示したもので、本実施例においては、この基礎コンクリート構造部8と各杭頭鉄筋3との間の付着力に基づく定着力によって、基礎コンクリート構造部8と既製コンクリート杭1の杭頭部とを接合することになる。なお、図2中の9は、杭頭端板2を杭1の上端面に固着するため、各杭頭鉄筋3の設置位置に隣接して設置されたPC鋼より線等からなる固定部材を示したものである。   1 and 2 show a first embodiment of the present invention. FIG. 1 is a longitudinal sectional view showing an installed state, and FIG. 2 is an AA sectional view of the pile head. In the figure, 1 is a hollow ready-made concrete pile, and 2 is a pile head end plate installed on the upper end surface of the pile 1. As shown in the drawing, a plurality of pile head rebars 3 are erected on the pile head end plate 2 in a state where the lower end portions are fixed by screw connection or welding. Further, a steel sleeve 4 is fitted on each pile head reinforcing bar 3, and a disk-shaped steel plate 5 is placed on the steel sleeve 4, and the pile head is placed by the steel sleeve 4. By maintaining a gap between the end plate 2 and the steel plate 5, the gap 6 is formed. Male thread portions are formed at the bottom of each pile head rebar 3, and the steel plate 5 and the steel sleeve 4 are fastened to the pile head end plate 2 by a circular nut 7 screwed into these male thread portions. It is configured to be fixed. In the figure, reference numeral 8 shows a foundation concrete structure such as a footing or a bottom slab to be placed later, and in this embodiment, between the foundation concrete structure 8 and each pile head rebar 3. The foundation concrete structure portion 8 and the pile head portion of the ready-made concrete pile 1 are joined by the fixing force based on the adhesion force. Note that 9 in FIG. 2 is a fixing member made of a PC steel strand or the like installed adjacent to the installation position of each pile head rebar 3 in order to fix the pile head end plate 2 to the upper end surface of the pile 1. It is shown.

しかして、地震等により外力が作用した場合には、杭頭端板2の上方に空隙部6が形成されることから、杭頭部に対する基礎コンクリート構造部8を構成するコンクリートからの拘束作用は解消される。したがって、本実施例における圧縮荷重は、各杭頭鉄筋3とそれらに外嵌された鋼製スリーブ4とによって分担することになる。なお、引張荷重に関しては、鋼製スリーブ4と杭頭鉄筋3とを一体的に結合した場合には、引張荷重についても両部材で分担することになるが、鋼製スリーブ4を単に杭頭鉄筋3に対して外嵌しただけの場合には、鋼製スリーブ4は引張荷重に対抗しないことから、杭頭鉄筋3によって全引張荷重に対抗することになる。因みに、上述したように、鋼製スリーブ4の素材や板厚を選定することにより、それぞれの杭頭部に作用する個々の荷重状況に応じた個別的な対応を簡便に実施することができる。ところで、本実施例の場合、前記基礎コンクリート構造部8を打設する際に、鋼製プレート5の下方の杭頭鉄筋3との間へのコンクリートの流入を阻止して前記空隙部6を形成することが重要である。このため、上述のように、必要に応じて鋼製プレート5の外周縁に垂下状のリング部材を付設するなどの適宜の閉塞手段を講じて、鋼製プレートの下方へ打設コンクリートが流入しないように構成することになる。   Thus, when an external force is applied due to an earthquake or the like, the gap 6 is formed above the pile head end plate 2, so that the restraining action from the concrete constituting the foundation concrete structure portion 8 with respect to the pile head is It will be resolved. Therefore, the compression load in a present Example is shared by each pile head reinforcement 3 and the steel sleeve 4 externally fitted by them. Regarding the tensile load, when the steel sleeve 4 and the pile head rebar 3 are integrally coupled, the tensile load is shared by both members, but the steel sleeve 4 is simply connected to the pile head rebar. When the steel sleeve 4 is merely fitted externally to the steel plate 3, the steel sleeve 4 does not resist the tensile load. Incidentally, as described above, by selecting the material and the plate thickness of the steel sleeve 4, it is possible to easily carry out individual measures corresponding to individual load situations acting on the respective pile heads. By the way, in the case of a present Example, when the said foundation concrete structure part 8 is laid, the inflow of the concrete between the pile head reinforcing bars 3 below the steel plate 5 is prevented, and the said space | gap part 6 is formed. It is important to. For this reason, as described above, appropriate blocking means such as attaching a hanging ring member to the outer peripheral edge of the steel plate 5 as necessary is provided, and the cast concrete does not flow below the steel plate. It will be configured as follows.

及び図は本発明の第実施例を示したもので、図は設置状態を示した縦断面図、図はその杭頭部のB−B断面図である。図示のように、本実施例の場合においても、中空状の既製コンクリート杭1の上端面に設置された杭頭端板2に対し、下端部をネジ結合や溶接などで固着して複数の杭頭鉄筋3が立設される点で、前記第1実施例の場合と変るところはない。本実施例の場合には、前記杭頭鉄筋3に外嵌した状態に複数の鋼製スリーブ10を配設するとともに、前記鋼製プレート5は使用することなく、それらの鋼製スリーブ10の上部開口部を円形ナット11により閉塞した状態で締付固定することにより、各鋼製スリーブ10の内部に空隙部12を個別的に形成した点で特徴を有する。そして、本実施例の場合には、図に示したように、個々の鋼製スリーブ10の内部に形成した空隙部12の分だけ杭頭端板2に対するコンクリートの接触面積を縮小することができ、これによりコンクリートによる拘束作用を低減して、軸力による杭頭部の回転剛性の変動を低減できることから、個々の杭頭鉄筋3に対して前記鋼製スリーブ10を外嵌設置するという簡便な作業によって、地震時等における軸力の変動による影響を抑制することが可能である。因みに、本実施例に係る前記鋼製スリーブ10に関しては、その鋼製スリーブ10の強度を大きく設定して圧縮荷重を分担することにより杭頭鉄筋3を補強するように構成してもよいし、逆に弱い強度に設定して圧縮荷重は分担せず、単に内部に空隙部12を形成するための手段として用いることも可能である。なお、図示はしないが、後述の第実施例も含め、既製コンクリート杭1の中空部は、打設後に杭頭部付近まで土砂等が充填されるため、基礎コンクリート構造物8を構築する際のコンクリートの流下防止手段(型枠等)は特に設ける必要はない。 3 and 4 show a second embodiment of the present invention. FIG. 3 is a longitudinal sectional view showing an installation state, and FIG. 4 is a sectional view taken along the line BB of the pile head. As shown in the figure, even in the case of the present embodiment, the pile head end plate 2 installed on the upper end surface of the hollow ready-made concrete pile 1 is fixed to the pile head end plate 2 by screw coupling, welding, or the like. There is no difference from the case of the first embodiment in that the head rebar 3 is erected. In the case of the present embodiment, a plurality of steel sleeves 10 are disposed in a state of being externally fitted to the pile head rebar 3, and the steel plates 5 are not used, and upper portions of the steel sleeves 10 are not used. It is characterized in that the gaps 12 are individually formed inside each steel sleeve 10 by tightening and fixing the opening in a state of being closed by the circular nut 11 . And in the case of a present Example, as shown in FIG. 4 , the contact area of the concrete with respect to the pile head end plate 2 can be reduced by the part of the space | gap part 12 formed in the inside of each steel sleeve 10. FIG. This can reduce the restraining action by the concrete and reduce the fluctuation of the rotational rigidity of the pile head due to the axial force, so that the steel sleeve 10 can be easily fitted to each pile head rebar 3. It is possible to suppress the influence due to the fluctuation of the axial force during an earthquake or the like by simple work. Incidentally, regarding the steel sleeve 10 according to the present embodiment, it may be configured to reinforce the pile head rebar 3 by setting the strength of the steel sleeve 10 large and sharing the compression load, On the contrary, it is possible to set the strength to be weak and not share the compressive load, but simply use it as a means for forming the gap 12 inside. Although not shown, since the hollow portion of the ready-made concrete pile 1 including the third embodiment to be described later is filled with earth and sand to the vicinity of the pile head after placing, when constructing the foundation concrete structure 8 There is no need to provide concrete flow-down prevention means (such as formwork).

及び図は本発明の第実施例を示したもので、図は設置状態を示した縦断面図、図はその杭頭部のC−C断面図である。図示のように、本実施例の場合においても、中空状の既製コンクリート杭1の上端面に設置された杭頭端板2に対し、下端部をネジ結合や溶接などで固着して複数の杭頭鉄筋3が立設される点で、前記第実施例の場合と変るところはない。本実施例の場合には、前記鋼製スリーブ10に替えて、発泡スチロール等からなる圧縮力に弱い複数のスペーサ13を各杭頭鉄筋3に外嵌することにより、それらの杭頭鉄筋3の下部に非定着部を形成するとともに、それぞれの非定着部の周囲にコンクリートを排除した部分を個別的に形成した点で特徴を有する。そして、本実施例の場合には、図に示したように、スペーサ13の設置部分だけ杭頭端板2に対するコンクリートの接触面積を縮小することができ、これによりコンクリートによる拘束作用を低減して、軸力による杭頭部の回転剛性の変動を低減できることから、個々の杭頭鉄筋3に対して前記スペーサ13を外嵌設置するという簡便な作業によって、地震時等における軸力の変動による影響を抑制することが可能である。 5 and 6 show a third embodiment of the present invention. FIG. 5 is a longitudinal sectional view showing an installation state, and FIG. 6 is a CC sectional view of the pile head. As shown in the figure, even in the case of the present embodiment, the pile head end plate 2 installed on the upper end surface of the hollow ready-made concrete pile 1 is fixed to the pile head end plate 2 by screw coupling, welding, or the like. There is no difference from the case of the second embodiment in that the head rebar 3 is erected. In the case of the present embodiment, instead of the steel sleeve 10 , a plurality of spacers 13 made of foamed polystyrene or the like that are weak against compressive force are externally fitted to each pile head rebar 3, so In addition to forming non-fixed portions, each of the non-fixed portions is characterized in that a portion from which concrete is excluded is individually formed. And in the case of a present Example, as shown in FIG. 6 , the contact area of the concrete with respect to the pile head end plate 2 can be reduced only by the installation part of the spacer 13 , thereby reducing the restraining action by concrete. Since the fluctuation of the rotational rigidity of the pile head due to the axial force can be reduced, the simple operation of externally installing the spacer 13 on each pile head rebar 3 enables the fluctuation of the axial force during an earthquake or the like. It is possible to suppress the influence.

本発明の第1実施例の設置状態を示した縦断面図である。It is the longitudinal cross-sectional view which showed the installation state of 1st Example of this invention. 同実施例の杭頭部のA−A断面図である。It is AA sectional drawing of the pile head of the Example. 本発明の第2実施例の設置状態を示した縦断面図である。It is the longitudinal cross-sectional view which showed the installation state of 2nd Example of this invention. 同実施例の杭頭部のB−B断面図である。It is BB sectional drawing of the pile head of the Example. 本発明の第3実施例の設置状態を示した縦断面図である。It is the longitudinal cross-sectional view which showed the installation state of 3rd Example of this invention. 同実施例の杭頭部のC−C断面図である。It is CC sectional drawing of the pile head of the Example.

1:既製コンクリート杭、2:杭頭端板、3:杭頭鉄筋、4:鋼製スリーブ、5:鋼製プレート、6:空隙部、7:円形ナット、8:基礎コンクリート構造部、9:固定部材、10:鋼製スリーブ、11:円形ナット、12:空隙部、13:スペーサ 1: ready-made concrete pile, 2: pile head end plate, 3: pile head rebar, 4: steel sleeve, 5: steel plate, 6: gap, 7: circular nut, 8: foundation concrete structure, 9: Fixing member, 10 : steel sleeve, 11 : circular nut, 12 : gap portion, 13 : spacer

Claims (4)

下端部が杭頭端板に固着される複数の杭頭鉄筋を用いて建造物の基礎コンクリート構造部と既製コンクリート杭の杭頭部とを接合する杭頭接合構造において、前記杭頭端板上に前記杭頭鉄筋に外嵌した状態に複数の鋼製スリーブを配設するとともに、それらの鋼製スリーブ上に前記杭頭端板の上方を覆うように鋼製プレートを載置し、前記鋼製スリーブにより前記杭頭端板と前記鋼製プレートとの間の間隔を保持するとともに、その鋼製スリーブにより杭頭部に作用する圧縮荷重を分担して前記杭頭鉄筋を補強するように構成したことを特徴とする杭頭接合構造。   In a pile head joint structure in which a foundation concrete structure part of a building and a pile head part of a ready-made concrete pile are joined using a plurality of pile head rebars whose lower ends are fixed to the pile head end plate, the pile head end plate A plurality of steel sleeves are disposed in a state of being externally fitted to the pile head reinforcing bars, and a steel plate is placed on the steel sleeves so as to cover the top of the pile head end plates, and the steel The spacing between the pile head end plate and the steel plate is maintained by the sleeve, and the pile head reinforcement is reinforced by sharing the compressive load acting on the pile head by the steel sleeve. Pile head joint structure characterized by 前記鋼製プレートの外径を前記既製コンクリート杭の外径とほぼ同径にしたことを特徴とする請求項1に記載の杭頭接合構造。 The pile head joint structure according to claim 1, wherein an outer diameter of the steel plate is substantially the same as an outer diameter of the ready-made concrete pile. 下端部が杭頭端板に固着される複数の杭頭鉄筋を用いて建造物の基礎コンクリート構造部と既製コンクリート杭の杭頭部とを接合する杭頭接合構造において、前記杭頭端板上に前記杭頭鉄筋に外嵌した状態に複数の鋼製スリーブを配設するとともに、それらの鋼製スリーブの上部を閉塞して、それぞれの鋼製スリーブの内部にコンクリートの流入しない空隙部を形成するとともに、それらの鋼製スリーブの内部を非定着部としたことを特徴とする杭頭接合構造。   In a pile head joint structure in which a foundation concrete structure part of a building and a pile head part of a ready-made concrete pile are joined using a plurality of pile head rebars whose lower ends are fixed to the pile head end plate, the pile head end plate A plurality of steel sleeves are arranged in a state of being externally fitted to the pile head reinforcing bars, and the upper portions of the steel sleeves are closed to form a void portion in which no concrete flows into each steel sleeve. And a pile head joint structure characterized in that the inside of the steel sleeve is a non-fixed portion. 下端部が杭頭端板に固着される複数の杭頭鉄筋を用いて建造物の基礎コンクリート構造部と既製コンクリート杭の杭頭部とを接合する杭頭接合構造において、前記杭頭端板上に前記杭頭鉄筋に外嵌した状態に発泡スチロール等からなる圧縮力に弱い複数のスペーサを配設して、それらのスペーサによって前記杭頭鉄筋の下部に非定着部を形成するとともに、それぞれの非定着部の周囲にコンクリートを排除した部分を形成するように構成したことを特徴とする杭頭接合構造。   In a pile head joint structure in which a foundation concrete structure part of a building and a pile head part of a ready-made concrete pile are joined using a plurality of pile head rebars whose lower ends are fixed to the pile head end plate, the pile head end plate A plurality of spacers that are weak to compressive force made of foamed polystyrene or the like are disposed in a state of being externally fitted to the pile head reinforcement, and non-fixed portions are formed at the lower portion of the pile head reinforcement by the spacers. Pile head joint structure characterized in that it is configured to form a part that excludes concrete around the fixing part.
JP2008258978A 2008-10-03 2008-10-03 Pile head joint structure Active JP5036065B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008258978A JP5036065B2 (en) 2008-10-03 2008-10-03 Pile head joint structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008258978A JP5036065B2 (en) 2008-10-03 2008-10-03 Pile head joint structure

Publications (2)

Publication Number Publication Date
JP2010090547A JP2010090547A (en) 2010-04-22
JP5036065B2 true JP5036065B2 (en) 2012-09-26

Family

ID=42253524

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008258978A Active JP5036065B2 (en) 2008-10-03 2008-10-03 Pile head joint structure

Country Status (1)

Country Link
JP (1) JP5036065B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104695459A (en) * 2013-12-10 2015-06-10 江苏建华管桩有限公司 Connection method of concrete precast pile and pile foundation cap
JP6468888B2 (en) * 2015-03-09 2019-02-13 前田建設工業株式会社 Pile head seismic isolation structure
CN110258608A (en) * 2019-06-12 2019-09-20 南通大学 A kind of new device that prestressed pile is connect with cushion cap or bottom plate

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004300754A (en) * 2003-03-31 2004-10-28 Geotop Corp Pile head joint structure

Also Published As

Publication number Publication date
JP2010090547A (en) 2010-04-22

Similar Documents

Publication Publication Date Title
KR101415253B1 (en) Hollow Core PC Composite Column for SRC Columns and SRC Structures Using the Same
JP4284056B2 (en) Non-embedded column base construction method and non-embedded column base structure
JP5036065B2 (en) Pile head joint structure
WO2016181669A1 (en) Rigid connection structure for bottom end of pillar and concrete pile
JP6422795B2 (en) Composite beam, PCa composite beam member constituting the same, and composite ramen structure
JP6815183B2 (en) Complex building
JP2005155058A (en) Beam member of rc structure
JP2011231574A (en) Attachment structure of seismic isolator
JP5574840B2 (en) PC joint structure between pile and foundation in structure
JP2009097257A (en) Designing method for bridge pier joint structure
JP5424761B2 (en) Seismic reinforcement method for existing buildings
JP4790865B2 (en) Underground wall structure
JP6240425B2 (en) Seismic reinforcement structure
KR101458435B1 (en) Half precast concrete column manufacturing method using saddle-type ties and dual hoops and constructing method using the same
JP6814610B2 (en) Concrete pile
JP6719293B2 (en) Seismic reinforcement structure of pile foundation
JP2004250984A (en) Cast-in-place steel pipe reinforced concrete pile
JP6873302B2 (en) Complex building
JP2008144452A (en) Existing building aseismic reinforcing structure
JP6884259B2 (en) Concrete pile
JP2011089290A (en) Concrete member
JP6733905B2 (en) Double pipe structure of pile head and its designing method
JP2001254532A (en) Mounting structure and mounting method of seismic isolator
JP7127244B2 (en) Seismic reinforcement structure
JP2007040049A (en) Antiseismic reinforcing structure for existing building

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20110207

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120423

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120427

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120611

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120629

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120702

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150713

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 5036065

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150